Training Within Industry
The most underrated achievement of American 20th century industry
3
Created With a Purpose during WWII
“To help industry to help itself to get out more materials than had ever been thought possible, and at constantly accelerating speed.” - The Training Within Industry Final Report - 1945
4
5
6
“Without American production, the [allies]could never have won
the war.”
Joseph Stalin during a dinner at the Tehran Conference, 1943
7
TWI’s Impact on War ProductionOf the more than 600 companies monitored during WWII, they reported improvements of at least 25% due to TWI:
• 100% reduced training time
• 88% reduced labor hours
• 86% increased production
• 55% reduced scrap
• 100% reduced grievances
8
• 60% reduction in total hours per airplane
• Fly-a way’s increased from 75/mo in 1941 to 364/mo in 1944
• Cost $242,000 per plane in 1940 to cost of $139,254 in 1944
TWI’s Impact on the B-17 “Flying Fortress”
9
TWI’s Impact on Ship BuildingIn the Battle of Midway, both the US and the Japanese lost all but 2 aircraft carriers. In the 3 following years, until the end of WWII:
Japanese shipbuilders built 4 additional fleet carriers
During the same period, US shipbuilders added
• 24 Essex class “fleet” carriers• 9 Independence class “light” carriers• 122 “escort” carriers
10
11
12
TWI After WW II
• The TWI Service was terminated on September 19, 1945, 17 days after the formal surrender of Japan
• By the 1950’s, the United States had no rival for industrial output
• TWI was virtually abandoned in the United States but would be taught throughout Europe and Asia,
• Toyota Production System
13
Toyota and TWI“I have observed quite a few companies struggle with implementing standardized work, kaizen, and other items.
Often the short terms gains companies obtain fall away over time.
One direct reason why is that no proper plan was ever put in place to train people to the new method, and the JI technique provides the exact skill set required to do this work.
I can’t see how standardized work can function without JI in place underneath to support it in the long run.
Source: http://artoflean.com/documents/pdfs/Mr_Kato_Interview_on_TWI_and_TPS.pdf
For this reason I believe that Mr. Ohno would agree that TWI-JI had by far the biggest impact on TPS formulation.”
14
Freemont California - GM’s “worst” plant • Quality
• Productivity
• Safety
• Employee relations
• Turned over to Toyota in 1984 to run
15
In one year• Quality = best in GM history
• Equal to Toyota Takaoka
• Productivity = best in GM
• Close to Toyota Takaoka
• Same plant
• Same workforce
• Same union
• Different attitude
16
Why Now?
• Lack of skilled workers
• Rapidly changing technology
• Aging workforce
17
The Silver Tsunami
“As an aging workforce approaches retirement, employers must find ways to pass along older workers’ knowledge to younger or less experienced workers.”
- Dominic Cottone, The Leadership Conservatory, HR BLR.com, 04/01/10
18
Source: People & Profitability – NAM/Deloitte
19
Skills Gap
• Everyone agrees – there is a skills gap
• Exists now and will only get worse
• What are we doing about it?
20
The Original TWI “J” Programs
• Job Instruction
• Job Relations
• Job Methods
21
TWI Job Instruction Training
Job Instruction training is the way to teach aperson to quickly remember how to do a job:
• Correctly
• Safely
• Conscientiously
22
Job Instruction Training
Many other training methods exist
• Telling
• Showing
• Question & answer
• Documentation & testing
• Any combination of the above
None are as effective as TWI Job Instruction
23
The Fireman Underwriter’s Knot
24
Job Instruction 4-step Process
Prepare
Present
Continuous Improvement
Plan
DoCheck
ActFollow Up
Try Out
25
Job Breakdown Sheet
25
IMPORTANT STEPS KEY POINTS REASONS
A logical segment of the operation when something happens to
advance the work.
Anything in a step that might -1. Injure the worker2. Make or break the job3. Make the work easier to do,
i.e. “knack”, “trick”, bit of special information
Reasons for each key point
Untwist and straighten 6 inchesTo leave enough length for the next operation
Make a right loop In front of main strand The knot will not tie correctly
Make a left loop1. Pulling end toward you2. Under the stub3. Behind the main strand
1. It’s easier to do the next motion2. So the knot will tie correctly3. So the knot will tie correctly
Pass loose end through right loop
Pull taut1. Ends even2. Sliding loop down3. Firmly
1. So the knot will tie evenly2. To tie knot in correct position3. So it doesn’t come apart
26
27
The Job Instruction Motto
“If the person hasn’t learned,
the instructor hasn’t taught”
27
28
The Job Instruction Motto
“If the person hasn’t learned,
the instructor hasn’t taught”