AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R....
-
Upload
leona-gregory -
Category
Documents
-
view
216 -
download
0
Transcript of AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R....
![Page 1: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/1.jpg)
AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING
GNSS PPP WORKSHOP
D. CalleA. MozoP. NavarroR. PírizD. RodríguezG. Tobías
JUNE 13TH , 2013 - GNSS PPP WORKSHOP, OTTAWA, CANADA
SESSION 4: USER SOLUTIONS
![Page 2: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/2.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 2
OUTLINE PPP Infrastructure
– Server– Client
Testing on the field – highlights and lessons learned
Regional PPP
Galileo PPP
PPP protection levels
Conclusions
![Page 3: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/3.jpg)
June 12, 2008
PPP INFRASTRUCTURE
![Page 4: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/4.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 4
PPP DEMONSTRATOR SERVER
Multiple servers for redundancy
![Page 5: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/5.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
RT PPP DEMONSTRATOR CLIENT
Page 5
![Page 6: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/6.jpg)
June 12, 2008
PPP TESTING IN THE FIELD
![Page 7: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/7.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
KINEMATIC FIELD TESTS
Page 7
![Page 8: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/8.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
LEARNED EXPERIENCE
Page 8
correction outage correction outage Correction outages -> PPP products extrapolation.
Loss of lines of sights
Latency and Data rate performance impact
Quickstart for certain applications
![Page 9: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/9.jpg)
June 12, 2008
REGIONAL PPP
![Page 10: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/10.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013 Page 10
REGIONAL PPP Global network not always
affordable-> Demonstrator server allows to easily set up a regional network.
Real time PPP comparison– Global products– Regional products
Slight degradation performances
![Page 11: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/11.jpg)
June 12, 2008
GALILEO PPP
![Page 12: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/12.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
GALILEO PPP (1)
4 operational Galileo satellites (E11, E12, E19 and E20) since late 2012.
Large number of contributors to MGEX project (http://igs.org/mgex/) providing RINEX 3.0X and RTCM observations.
IOVs disposition provides up to 3 hours of common view over Europe -> feasibility for PPP solutions.
Page 12
![Page 13: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/13.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
GALILEO PPP (2)
TRIMBLE R10 receiver at GMVs premises.
May 31st. 150 minute window with 4 IOV satellites over Tres Cantos.
Postprocessing of the recorded RINEX data.– Static PPP based on IGS
products for precise coordinate determination.
– Galileo only static PPP based on GPS+Galileo products.
Position error below 5 cm.
Page 13
![Page 14: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/14.jpg)
June 12, 2008
PPP PROTECTION LEVELS
![Page 15: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/15.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
PPP PROTECTION LEVELS
Based on process indicators and experimentation we generate a PL.
Conservative approach for the definition of the PLs.
Computed PLs bound the position error in nominal condition and under challenging environments.
Intensive experimentation is foreseen.
Page 15
![Page 16: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/16.jpg)
June 12, 2008
CONCLUSIONS
![Page 17: AN INDUSTRY APPROACH TO PRECISE POINT POSITIONING GNSS PPP WORKSHOP D. Calle A. Mozo P. Navarro R. Píriz D. Rodríguez G. Tobías JUNE 13 TH, 2013 - GNSS.](https://reader035.fdocuments.us/reader035/viewer/2022062407/56649dc85503460f94abdd94/html5/thumbnails/17.jpg)
© GMV, 2013Precise Positioning Workshop 2013 June 2013
CONCLUSIONS
Full end user demonstration capability– Focused on robustness and operability– Enables to analyse different performance drivers– Extensive real-time field tests– Promising solutions for some of the main challenges
Regional PPP: Feasible, promising results in real-time
Galileo: Still proof of concept, but upcoming reality