An Empirical Study on Factors Impacting Bug Fixing Time
-
Upload
feng-zhang -
Category
Technology
-
view
310 -
download
4
description
Transcript of An Empirical Study on Factors Impacting Bug Fixing Time
![Page 1: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/1.jpg)
An Empirical Study on Factors
Impacting Bug Fixing Time
Feng Zhang, Foutse Khomh, Ying Zou
and Ahmed E. Hassan
![Page 2: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/2.jpg)
2
New Assign Bug Fixing Verified Resolved
A Typical Process of Bug Fixing
![Page 3: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/3.jpg)
3
Bug Fixing Time
New Resolved Introduced
![Page 4: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/4.jpg)
4
Example: delay before change
Reported & Assigned
Oct-2006
Fixing started & Resolved:
Mar-2011
almost
5 years
![Page 5: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/5.jpg)
5
Example: delay after change
Reported & Assigned
Fixing started & ended:
September-2008
Resolved:
February-2011
over
2 years
![Page 6: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/6.jpg)
6
DBC DBF DAC
Intervals during Bug Fixing
DBR
New Resolved First
Response Bug Fixing
Start
Bug Fixing
End
Assign
DBA
Delay Before Response DBR
Delay Before Assigned DBA
Delay Before Change DBC
Duration of Bug Fixing DBF
Delay After Change DAC
![Page 7: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/7.jpg)
7
Benefits of Studying Delays
Locate time-consuming
steps
Understand factors affecting
the delays
Improve the process of bug fixing
![Page 8: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/8.jpg)
8
Subject Systems
3,883 logs
2,722 bugs
606 bugs
524 bugs
793 logs
638 logs
Mylyn
Eclipse Platform
PDE
![Page 9: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/9.jpg)
9
Data Sources
Properties of bug
Change history of bug
Properties of file edits
Static metrics
History metrics
Fine grained change types
Bug ID
![Page 10: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/10.jpg)
10
Properties of Source
Code
Properties of Code Change
Properties of Bug Report
Title
Summary
Severity of Bug
Operating System
Comments
Size (LOC, NOM)
Complexity (WMC)
Code Churn
Number of Changed Files
Fine Grained Change Types
Metrics from three Dimensions
![Page 11: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/11.jpg)
11
RQ1: Do delays by developers exist during
bug fixing process?
RQ2: Can we characterize delays incurred by
developers before and after fixing bugs?
RQ3: What factors contribute to the delays
most?
Research Questions
![Page 12: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/12.jpg)
12
RQ1: Bug fixing time extracted from two data sources
![Page 13: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/13.jpg)
13
RQ1: Intervals during bug fixing process
Delay
Before
Response
Delay
Before
Assign
Delay
Before
Change
Delay
After
Change
Duration
Of
Bug Fixing
![Page 14: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/14.jpg)
14
Enhancement v.s. Defect
364
Delay
Before
Change
56
186
4
Low Severity v.s. High Severity
198
n.s
110
n.s
RQ2: Properties of Bug Report
Delay
After
Change
Delay
Before
Change
Delay
After
Change
Delay
Before
Change
Delay
After
Change
Delay
Before
Change
Delay
After
Change
![Page 15: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/15.jpg)
15
RQ2: Properties of Bug Report (cont’)
Length of comment
delay before change
delay after change
![Page 16: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/16.jpg)
16
RQ2: Properties of Source Code
Size of Source Code
delay before change (sum)
delay after change (avg/sum/max)
Complexity of Source Code
delay before change (sum)
delay after change (sum/max)
![Page 17: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/17.jpg)
17
Code Churn
delay before change (avg/sum/max)
delay after change (avg/sum/max)
Fine Grained Change Types
delay before change
delay after change
RQ2: Properties of Code Change
![Page 18: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/18.jpg)
18
RQ3: What factors contribute to the delays most?
Events:
Long DBC : greater than median
Long DAC : greater than median
Analysis Method: (Logistic Regression Model)
Predict the probability of an event’s occurrence.
Combines different factors.
Interpretation by Coefficient:
magnitude describes importance
sign describes direction
![Page 19: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/19.jpg)
19
RQ3: Factors Impacting Delays Before Change
-0.5
0.4
0.3
0.2
is bug with high severity
max length of comment
sum NOM
sum Code Churn
-0.5 0.5 Coefficient
![Page 20: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/20.jpg)
20
-0.7
0.5
-0.5
max length of comment
is bug
sum WMC
max WMC
is OS Linux
length of description
avg Code Churn
-0.5
-0.3
0.3
0.7
RQ3: Factors Impacting Delays After Change
-1.0 1.0 Coefficient
![Page 21: An Empirical Study on Factors Impacting Bug Fixing Time](https://reader033.fdocuments.us/reader033/viewer/2022060200/55990df01a28ab0b2c8b458f/html5/thumbnails/21.jpg)
21
Top Two Intervals in Bug Fixing Process
delay before and after change
Delay Before Change
level of severity, code churn (most influential factors)
Delay After Change
comments, complexity (most influential factors)