AMS Cabling Meeting @ CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common cables (Mike & Alexei) -Subsystem / detector cables 2) Mock-up tour. (To understand what the starting point for Cad modeling is) 3) Discussion on how best to organize the activity: a) Central CAD designer? Who is willing to work @ CERN for the length of time required to do the job b) under what conditions? c) How best to organize the detector cabling with detector CAD designers remote from CERN.

Transcript of AMS Cabling Meeting @ CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show...

AMS Cabling Meeting @ CERN Prevessin 893-1D020

December 6, 2006

Agenda1) Brief overview

-Show Plumbing and VC ring-mounted-hardware-AMS overall-Common cables (Mike & Alexei)-Subsystem / detector cables

2) Mock-up tour.(To understand what the starting point for Cad modeling is)

3) Discussion on how best to organize the activity:a) Central CAD designer? Who is willing to work @ CERN for the length of time required to do the jobb) under what conditions?

c) How best to organize the detector cabling with detector CAD designers remote from CERN.

Electronics subsystem

Cabling

(integration team +M.Capell+A.Lebedev A.Roishkov)

Lower USS Cabling

(F.Cadoux,

C.Guandalini)

TRD / Upper-TOF cabling

(Isatec, C.Guandalini)Zenith Radiator Plumbing

(? CGS?)

Tracker Cooling Plumbing

(A.Alvino, E.Perrin, C.Gargiulo)

NASA / Shuttle / ISS Cabling

(Jacobs: J.Kastelic)

Tracker Cabling

(E.Perrin, A.Alvino, D.Rapin, CERN integration)

ACC (Isatec)

UGBS (R.Becker)

Starting points for cabling model:

Magnet and External Magnet hardware

ACC Cabling To S-Crate

Al-Cover on PMTs

(schematic)

ACC Cabling To S-Crate

Al-Cover on PMTs

Cable clasp

On the border of VC ring

TRD And ACC Cabling And Thermal Insulation

Al-Cover

Dallas sensors (DTS) on ECAL back panels

To be fixed on ECAL before EIB assembly (accessibility)To be fixed on ECAL before EIB assembly (accessibility)

Intermediatebracket

BP4R routing (… BP5R is about the same routing)

DTS routing

ECAL Bra

cket

ECAL Bra

cket

DTS board(glued on End caps)

Intermediatebracket

1

ECAL cabling to the Crates ECAL cabling to the Crates

ECrate(DAQ,EDR…)

HV cables to HVBrickLUSSII

ECAL

ECAL

ECAL Integration on LUSSII

DTS cables (from ECAL brackets to Crates)

DAQ Cables

Still to be assembled on ECAL

EIB Cabling + Radiator fixation (36 Boards / 20 Mechanical supports)EIB Cabling + Radiator fixation (36 Boards / 20 Mechanical supports)

EIB frame

“heaters” cabling + Terminal Bock

DAQ cables

HV cables

Trigger cable support

DAQ cable support

EIB frames

As you can see, except for F. Cadoux’s lower USS model Most of the cabling models are under developed or missing!..

Mock-up Tour!

How do we resolve Cabling?

Tasks:

Cable routing Mockup

Cable routing CAD

Bracket design, calculation, manufacture

3) Discussion on how best to organize the activity:

a) Central CAD designer? Who is willing to work @ CERN for the length of time required to do the job

b) Under what conditions? (only work share etc, not contractual)

c) How best to organize the detector cabling with detector CAD designers remote from CERN.

Tasks:

Critical Cables: Installation Priority??!

1) CAN Bus

2) AMS Wire 1

3) PDS 2

4) XPD cabling

5) Sub-detectors (need to prioritize)

n) GTSN (Dallas)

Critical Brackets:

1) vertical tubes on VC

2) Front panels

3) Balconies (info from Mockup?)

Possible Solutions (pending agreement internal to each person’s institute / Co.)

a) Franck 4 months @ CERN from February, need full funding for this time

-need to guarantee maintenance time -% work time designated to AMS cabling for follow-up. To what %age (min 1-2 days a week supported by LAPP)

a) Antonella: Contract with CGS 4 months, from Feb

-need to guarantee maintenance time -% work time designated to AMS cabling for follow-up. To what %age

Uses UG compatible with NASA model. Will need training period for new NX4 version and harnessing module.

c) Serena Starting Now! Supported by INFN Perugia (?!) –learning CAD and harness program, Follow-up possible? To what %age? (will have to attend TVT-test starting end February-July but can support to a degree)

d) Combined: Serena starts immediately with Franck joining February. Follow up? Who? (Franck can support 1-2days/week) What %age. (Serena? )

Need Big! Computer + CAD licenses

Office in 892 RBxx double office for 4 engineers. Available!

Input Needed:

List of cables (Xcel table)

Front panel drawings – labeled. Or clarification!.. Ask Mike.. Or CGS web-site

Updated detector models (and simplifying when necessary)

Cables routed on mockup & photos (when needed)

Fixation points (USS, crates, links, detectors, etc.)

Cable properties Cross section (sleeves, MLI?), weight, bending radius

Sticky tab properties (load rating)

Plumbing routing (magnet, TTCS, UGBS, Zenith radiator,)

(MLI)

CAD Licenses

Electronics Boxes installed in this step: ERPD0, ERPD1

All Electronics and structural links have now been installed forming a self supporting “Gemini” structureThe Crate Jigs are now ready to be replaced with the flight radiator

S0 U0U1S1 UG

SH

V1

SH

V0

UG

B

UG

PD

UP

D0

UP

D1

SH

V2

S2

T T

T T T

TT

T

TS

PD

3

TM

PD

2

TS

PD

1

TS

PD

0

TP

D7

TS

PD

6

TP

D5

TS

PD

4

GP

S

PDS

JT

CCEB

JPD J

CAB

UPS

CD

DCDD

TTCSTTCS

M

TT

TTPD

S3

SH

V3

CVB

ER

PD

1

ER

PD

0

Ram Crates Wake Crates

Radiator Electronics Installation(step 5)

Crate Jigs

Wake

Ram

Ram Crates & Jig