Transcript of AMR & EMS- Automated Meter Reading and Energy Management System
National Power Training Institute(NR)
AT & C loss reduction by IT AT & C loss reduction by IT interfaceinterface
National Power Training Institute(NR)
ContentsContents
Smart Metering and IT: An opportunity to Leapfrog
AMR (Automated Meter Reading)EMS (Energy Management System)Prepaid Meters
National Power Training Institute(NR)
Smart Metering and IT
PASTELECTRO-MECHANICAL• Low Accuracy• Control – NIL• Communications - Expensive• Theft Detection – Poor
National Power Training Institute(NR)
Continued…
DIGITAL SOLID STATE High Accuracy Control – LIMITED Communications – External through Retrofit Theft Detection – Node only
PRESENT
National Power Training Institute(NR)
Continued…
LEAPFROGNEXT GEN SMART METER & IT SYSTEM• Very High Accuracy• Control – FULL• Communications – Built in (on chip / PCB)• Theft Detection – High (Network level)
National Power Training Institute(NR)
AUTOMATIC METER READING SYSTEM
National Power Training Institute(NR)
WHAT is WHAT is AMRAMR????
Automatic Meter Reading– Automating the process of
measurement and control through digital communication techniques.
– Bring “intelligence” into the revenue cycle and manage it.
Metering Billing Operations Customer Service
National Power Training Institute(NR)
WHY AMR NEEDED in place of current Stand-alone meter reading??
Present System Problems:- Highly Person dependant. Human errors cannot be avoided. Accessibility of meters in rural/ Agricultural zones. Energy Audits performed based on bill collection which is
highly inaccurate. Billing done mainly on estimated/ monthly average basis Inability to monitor and control discrete loads Billing cycle requires excessive time. Meter data used only for billing, cannot help in analysis like
demand analysis, energy audit, pinpointing losses, etc.
National Power Training Institute(NR)
Benefits of AMRBenefits of AMR
Ability to detect tamper events and outage occurrences. Remotely Connect/ Disconnect power supply through
meter. Calculate Transformer loading and Sizing from interval
data. 15 minute interval data gives accurate load information for
supply scheduling, switching operations, planning etc. Monitor voltage at each premise to know conditions when
to operate capacitor switches or regulators. Consistent and Granular data for improved accuracy.
National Power Training Institute(NR)
Automatic MeteringAutomatic Metering
Automatic
Meter
Reading
Automatic
Meter
Reading
Outage
Manage
ment
Pre-
payment
Sub-
MeteringRevenue Protectio
n
Automatic Metering Active
Load
Control
National Power Training Institute(NR)
AMR ARCHITECTURE RF/ PSTN / Modem RF/PSTN / Modem Meter 1 Meter 1 Meter 1
Meter 2 Meter 2 Meter 2 Meter 3 Meter 3 Meter 3
Meter 4 Meter 4 Meter 4 Meter 5 Meter 5 Meter 5 Meter n Meter n Meter n
Central Office Host Computer
Station.
Distribution Transformer 2.
Distribution Transformer 3.
Distribution Transformer 1.
Data Cocentrator Unit DCU 2
Data Cocentrator Unit DCU 3
Data Cocentrator Unit DCU 1
PL
CC
PL
CC
PL
CC
National Power Training Institute(NR)
AMR architecture for consumers
National Power Training Institute(NR)
COMPONENTSCOMPONENTS
Meter Interface ModuleCommunication SystemCentral Office Equipment
National Power Training Institute(NR)
Meter interface moduleMeter interface module
– The AMR system starts at the meter. Some means of translating readings from rotating meter dials, or cyclometer style meter dials, into digital form is necessary in order to send digital metering data from the customer site to a central point.
– Electro - optical interface– Signal Processing Electronics– RAM & Program Memory
National Power Training Institute(NR)
GSM / CDMA Based CommunicationGSM / CDMA Based Communication
MODEM
Dual Band or Triband modem or CDMA modems Designed for GPRS, data, fax, SMS and voice applications Interfaces RS-232 through D-TYPE 9 pin connector Power supply SMA antenna connector Toggle spring SIM holder Red LED Power on Green LED status of GSM / CDMA module
Antenna
National Power Training Institute(NR)
Central office systemsCentral office systems
Central office systems equipment includes– Modems– Central server – Client Software for data acquisition and
data analysis
National Power Training Institute(NR)
ELECTRIC COMPANY BENEFITSELECTRIC COMPANY BENEFITS
Smart automated processes instead of manual work Accurate information from the network load to optimise
maintenance and investments Customized rates and billing dates. Streamlined high bill investigations. Detection of tampering of Meters. Accurate measurement of transmission losses. Better network performance and cost efficiency. Demand and distribution management. More intelligence to business planning. Better company credibility.
National Power Training Institute(NR)
CUSTOMER BENEFITS
Precise consumption informationClear and accurate billing
– Automatic outage information – Better and faster customer service
National Power Training Institute(NR)
ENERGY MANAGEMENT SYSTEMENERGY MANAGEMENT SYSTEM(EMS)(EMS)
National Power Training Institute(NR)
Energy Management System (EMS) Energy Management System (EMS) ExperienceExperience
Why EMS…EMS provides real time solution in the area of power and energy management
Energy Management System (EMS) provides access to real time energy data for energy auditing and monitoring.
AT&C Loss Reduction
Quality of Supply
Customer Satisfaction
EMS helps DESCOM to achieve the objectives
National Power Training Institute(NR)
System OverviewSystem Overview
EMS with end-to-end infrastructure comprising of intelligent metering systems network equipments, communication backbone data handling software.
The system provides meter data on real time basis
Its systematic acquisition, storage and retrieval of data ensures MIS for business purposes Faster decision making Quality of Supply
National Power Training Institute(NR)
Features of EMSFeatures of EMS
Parameters Captured– Instantaneous voltage, Current– Frequency– KW, KVA, KVAr per phase & Total– KWH, KVAh, KVArh– PF
All feeder locations at 118 grids
Communicates with 2500 no feeder meters
At every 15 minute interval
2 lac data every single day
System Generates application reports
6000 Users in BSES can access these reports online
Data Historian of 4 years
EMS also converts Data into Useful Information
National Power Training Institute(NR)
EMS is based on data collection and analysis. EMS is based on data collection and analysis. Entire activity has following stagesEntire activity has following stages
Data Collection
Data Processing
Data Converted into useful information- For online availability
Analysis and Conclusion
Data Generation
National Power Training Institute(NR)
Application Reports on EMSApplication Reports on EMS
Bill Verification – EHV Loss Audit Grid Loss Audit Division /Company Manager Feeder wise energy on daily basis- interactive
software Energy forecasting Grid Alarm ABT Report and UI
National Power Training Institute(NR)
PREPAID METERSPREPAID METERS
National Power Training Institute(NR)
PREPAID METERS-AdvantagesPREPAID METERS-Advantages
For meter owner Assured revenue and reduced working capital costs Lower overheads Better load management and higher capacity utilization Improved fraud detection Quicker connections and better customer-service
For end-consumer Better budgeting Promotes energy savings and energy conservation Avoid long queues – choose when to pay No billing errors Convenient mode of payment
National Power Training Institute(NR)
National Power Training Institute(NR)
National Power Training Institute(NR)
System at workSystem at work
The consumer inserts the pre-paid card in the energy meter
The value (Credit + Any information) in the card is transferred to the meter
The meter keeps track of the number of units consumed as per the slab rate
When the value in the meter comes to 10-20% a signal is given -either beep or red light
When the value in the meter becomes nil the electricity supply is cut off
National Power Training Institute(NR)
ApplicationsApplications
Large-scale deployment by utilities for residential andcommercial connections
Sub-metering in apartments, shopping malls andbuilding complexes.
Convenient mode of payment in housing colonies As a second meter between utility meter and
distribution board for housing tenants Selective deployment by utilities in regions with poor
credit history Electricity supply for vendors, contractors and temporary
connections
National Power Training Institute(NR)
Summing up…Summing up…
Prepaid Smart Card Solution is idealReduces manpower cost to the EBImproves liquidity of the EBOverall efficiency in operations of
the EB will improveHassle free for the consumerPrepaid cards easily available
National Power Training Institute(NR)
Cost analysis and effectiveness of Cost analysis and effectiveness of AMRAMRBilling structure infoCost of AMR based on GSM/ CDMASavings on Operating cost inclusive
of administrative costAT & C loss reduction report for an
utility of NCR by the usage of IT system
National Power Training Institute(NR)
COST OF EQUIPMENTS USED IN COST OF EQUIPMENTS USED IN AMRAMR
•GSM modem ------------ Rs. 5000-6000•CDMA modem ------------ Rs. 4200-5000•Electronic Meter ------------ Rs. 1500-1800 (for 1Φ)with RS-232 port•Electronic Meter ------------ Rs. 4300-5000 (for 3Φ)with RS-232 port•GSM modem ------------ Rs. 5000-8000(With optical port adapter)
•Prepaid meters ------------Rs 6000(1Φ), 11000 (3Φ)
(All the data is provided by various vendors)
National Power Training Institute(NR)
Present billing structurePresent billing structure
• Data collection time - 7 days Data processing time - 2 days Bill dispatch +Due date time - 18 days Cost of (PDS) per device cost - 10,000 Expenditure per head on work force
employed for collecting meter reading-Rs.10000
Time interval for data collection – 1 Month
(Based on data provided by an utility in NCR and vendors)
National Power Training Institute(NR)
Cost involvementCost involvement for new system for new system (AMR)(AMR)
Total consumers-1127875 Total cost (GSM modem + electronic
meter with RS 232 port + software + operational cost per year)-Rs. 7.9 Billion (approx)
Total cost (CDMA modem + rest all above)-Rs. 6.44 Billion (approx)
(consumers are 1-Φ,based on data provided by an utility in NCR and vendors)
National Power Training Institute(NR)
Cost involvementCost involvement for upgrading for upgrading existing system(AMR)existing system(AMR)
Total consumers-1127875Total cost (GSM modem with optical
port adapter + software + operational cost per year)- Rs. 6.20 Billion (approx)
(consumers are 1-Φ,based on data provided by an utility in NCR and vendors)
National Power Training Institute(NR)
AMR reduces theft, improves AMR reduces theft, improves efficienciesefficiencies
Meter readings for close to 15,000 high-end customers done remotely from a central location.
Collection efficiency has improved by 5-10 percent, theft has reduced by 4 percent
The firm has recovered the initial project cost, pegged at around Rs 22 crore
(Data for an utility in NCR)
National Power Training Institute(NR)
Cost involvementCost involvement for new system for new system (Pre-Paid metering system)(Pre-Paid metering system)
Total consumers-1127875Total cost of involved in installing
prepaid meters + software-Rs. 6.20 Billion (approx)
(consumers are 1-Φ,based on data provided by an utility in NCR and vendors)
National Power Training Institute(NR)
WAYS OF COLLECTING WAYS OF COLLECTING REVENUEREVENUE
By imposing cost on consumer onper month basis for 5 years recoveryplan for new systemFor GSM modem with Electronic
meter having RS 232 port-Rs 116.74 For CDMA modem with Electronic
meter having RS 232 port-Rs. 95.16For Pre-Paid meters- Rs. 91.62
National Power Training Institute(NR)
Continued…Continued…
By imposing cost on consumer on
per month basis for 5 years recovery
plan for upgrading existing systemGSM with optical port adapter-Rs.
91.62
National Power Training Institute(NR)
Continued…Continued…
If SERC allows to increase per unit
charges for 5 years recovery plan For new GSM Based system-18paisa(approx) For new CDMA Based system-15 paisa(approx) For upgrading existing system-14 paisa(approx)
For new Prepaid meters-14 paisa(approx)
National Power Training Institute(NR)
Savings…Savings…
Saving with respect to existing
system with meter readers= Rs 7.8 crores + saving in cost of the
administration for meter readers
National Power Training Institute(NR)
THANK YOU FOR HAVING THANK YOU FOR HAVING PATIENCEPATIENCE