AMIRCO Profile
description
Transcript of AMIRCO Profile
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
CONSTRICTION & CONTRACTING
CRANES & EQUIPMENTS
LOGISTICS
GENERAL TRADE
AMIRCO
AMIRCO
AMIRCO
AMIRCO
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Muhammad S. HafaraChair man
1
Amir Company was founded on 1st April 2005, Kurdistan - Erbil city . We are dealing with general trade, renting heavy equipments
(crane and construction ) and heavy load transportation. AMIRCO is one of the leading suppliers of equipment and services in Kurdistan - Iraq. For new industrial, Oilfield and construction projects in north of Iraq,
We supply a wide variety of equipment especially Cranes, provide the most reliable type of cranes, and other related support services.
The advantages to choose AMIRCO is Biggest renting company in Iraq and we can supply the customers with unlimited
equipments especially Cranes and forklift with periodical inspection.
AMIRCO has professional experience in the renting field, which its a mix of experience comes from the mother company in Holland
and a gained experience from local contracts with the largest companies in Iraq.
AMIRCO trusted by the largest companies because the result of the professional successful projects AMIRCO had done and that
support our well-known name.
WHY AMER COMPANY :
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Company Organization Chart
PresidentMuhammad S. Hafara
Authorized ManagerAmir M. Suliman
Logistic Specilist
Admin assistant
Equipment Engineer
2
Executive Manager
Accountant Maintenance Engineer
Operater and Driver Maintain Specilist
Office man
Legal
BUSINESS PLATFORM
3
Our goal is to offer the best possible service to our costumers
The company with substantial ability to provide the followings to its
costumers: -?Large fleet of trucks high bed and low bed
?Large fleet of mobile and crawler crane and tower cranes
?Large fleet construction equipments like excavators, wheel loaders, bulldozers ,
shovels and compactors
4
CRANES & EQUIPMENTS
The main duty of AMIRCO in renting heavy equipments especially crane and forkliftAnd we are inspecting periodically for all cranes, forklift and sling
We participated in drilling oil wells, cement plants and in the establishment of gas power stations, and many of the construction projects
5
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
Length Boom(m)
Kato NK 200 E 1998 20 31
Tadano Tg 250 E 1998 25 34
Tadano Tg 250 E 1997 25 34
Tadano Tg 250 E 1997 25 34
Libherr LTM 1030 1999 30 31
Libherr LTM 103 2001 30 31
Grove GMK 2035 2001 35 34
Kato KA 400 E 1992 40 41
Kato KA 400 E 1992 40 41
Tadano Tg 500 E 1999 50 45
Kato NK 500 E 1997 50 45
Grove GMK 3050 2001 50 45
Markettie MG 306 1997 60 46
Markettie MG 306 1997 60 46
Tadano Foun ATF 120 1997 70 49
Tadano Foun ATF 120 1997 70 49
Kato NK 800 E 1993 80 45
Demag AC 265 J 1991 100 63
Tadano Foun ATF 120 1997 120 71
Krupp KMK 6200 1992 200 96
- Cranes
LIFTING AND CONSTRUCTION EQUIPMENTS
6
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
Libherr LTM 1150 2002 150
Libherr LTM 1180 2001 180
Libherr LTM 1200 2001 1200
Libherr LTM 1250 2003 250
Libherr LTM 1300 2002 300
Libherr LTM 1350 2001 350
Libherr LTM 1400 2001 400
Libherr LTM 1500 2004 500
Libherr LTM 1800 2001 800
- Mobile Cranes
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
Libherr LR 1200 2001 200
Libherr LR 1250 2002 250
Libherr LR 1300 2003 300
Libherr LR 1350 2000 350
Libherr LR 1400 2002 400
Libherr LR 1400 2004 400
Libherr LR 1450 2001 450
Libherr LR 1500 2000 500
Libherr LR 1550 2001 500
Libherr LR 1750 2004 750
- Crawler Cranes
LIFTING AND CONSTRUCTION EQUIPMENTS
7
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
High (m)
Komatsu FD 50 1991 5 4.5
Haister H 700 XL 1997 7 5
Komatsu FD 100 2004 10 5.5
DAEWOO DWF 100 1998 10 6
Kalmur DCD 1000 / 6 XL 2000 10 6
CAT V 100 2005 10 6
Komatsu WA 380 2005 10 4
SVE SVE 12 1995 12 6
- Forklifts
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
Axle
MB 8 x 4 2002 150 8
MB 8 x 4 2004 150 8
MB 6 x 4 2005 120 6
Scania 6 x 4 1995 100 5
Volvo 6 x 2 2001 25 3
DAF 6 x 4 2004 80 5
DAF 6 x 4 2004 80 5
Other Trucks X 35 4 x 2 2001 - 2006 25 3
- Truck
LIFTING AND CONSTRUCTION EQUIPMENTS
8
BRAND TYPE MODEL Max. LiftingCapacity Radius (Ton)
Bulldozer (Komatsu) D 155 AX 1995 Bulldozer
Excavator (Liebherr) R 942 1995 Excavator
Shovel (Komatsu) WA 420 1999 Shovel
Shovel (Komatsu) WA 380 2005 Shovel
- Construction Equipment
LIFTING AND CONSTRUCTION EQUIPMENTS
9
LOGISTICS
AMERCO expert company in logistic in all Iraq. We have Highly Competitive Rates - Proven Operational Performance - Seasoned Transition Team- Seasoned Logisticians: Leaders/Managers/Operators
TransportationAMERCO have fleet trucks in Iraq can move to all Iraq governorates
Project transportationAMERCO having various projects in abroad with experienced and professional team. We have fast, economic and alternative solutions for hard and cruel transporting loads triumphantly.
AMERCO can transport until 400 ton by expendable low bed.
AMERCO have experience in rig moving and electrical power station
Warehousing2AMERCO have open yard 20,000 m for the storage with the security
Custom clearance AMERCO doing custom clearance in Ibrahim khalil , safwan and
GENERAL TRADE
10
Trading in heavy equipments, generators and sourced from Europe, Asia and Middle East, and we are selling over all Iraq.
Moreover, we are also supplying equipment and machinery for companies and government.
11
CONSTRUCTION AND CONTRACTING
Construction and civil work AMIRCO execute civil work for some operator oil company like hunt and reliance . building steel structure for Bazyan cement plant
And the following our duties:
1- Civil work2- Steel structure 3- Road constructions
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Executed Project
1- Orascom company - cement projects. 2005 - 2007 a. Building Bazian cement factory project. b. Rebuilding Tasluja cement factory.2- ITS company - Asia cell building air condition. 20063- Erbil gas electricity power station with Ray company. 2007 - 20084- Chemchamal gas electricity power station with Mass company. 2008 - 20095- Oil filed service: 2008 - 2009 a. Water pipe line for TTPOCO. b. Rig moving for TTOPCO, AOS and Weather ford. c. Leasing crane for installation the rig for AOS in KC. d. Leasing crane for installation the rig for Weather Ford in Ain Sefny. e. Leasing crane for installation the rig for Dana Gas in Kader Karam. f. Site preparation for HUNT OIL in Ain Sefny.
Summary of the major project and services implemented by us:
Summary
12
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Summary
1. Installation the Electrical transformer Project - Erbil - The Washington Group of Companies - through a Zozek Company.
2. Excretion Project - Erbil Cunay Turkish Company.
3. Project of establishing a network of fiber-optic communication - Arbil Siemens the German company .
4. Construction project the Erbil International Airport - Makyul Turkish company .
5. Dam Project Bekhme - Arbil -the Directorate works - Samyer Turkish company .
6. Sewage network construction project Arbil - through connector .
7. An oil exploration project - Zakho - Great Wall Chinese companies to drill oil wells .
8. Connector International Airport - Airports and rules - Gyara - minors - connector - NASA Turkish company - KBR .
9. Project to build apartments - Ways Koysanjaq - Arbil - Turkish company cevekler .
10. Construction project for the purposes of storage rooms and factories - Arbil - the company ICCB .
11. Connector International Airport - a Serka Turkish .
12. Contract unloading cargo planes and cargo from the Erbil International Airport to the city of Arbil and Sulaymaniyah - Chinese company Huawei .
13. Contract unloading cargo planes and cargo from the Erbil International Airport to the city of Arbil and Sulaymaniyah - Dejla Group of Companies for stores of the Asia cell
company for mobile .
14. Construction project apartments - by Enkawa - Arbil - Turkish company, whatever God .
15. Dream City project - the road to the airport - Arbil, the Lebanese Company ICC .
16. Transmission project, and installed a 10 megawatts - Arbil .
17. Project to dig a tunnel and construction of a bridge Sulaymaniyah Khazna Company .
As well as for transport, loading and unloading of tankers through the truck and transfer of materials and construction projects and roads and land settlement and processing of
client business and corporate materials, machinery and heavy equipment of all kinds of European, Japanese and American new and used brand.
Other Projects and Service impelemented by us:
Executed Project
13
1- Dana gas project.We were working on installation the rig in Qader karam (Kurmor) as third party by renting crane (3) ton for (4) months.
2- AOS (Atlantic oil field services).We were working with them in Kc1 “ Telyan village” as crane contractor by renting (60) tons, forklift and truck for (8) months.
3- Weather ford drilling project in Sh1 “Ain sefny”.We were working by renting (60 - 100) tons, forklift and truck for (8) months.
Oil field services section
14
Kar Erbil Refinery Project
15
The company perform several loading and unloading to Kar
oil project ltd, company’s, including large generator and various pipes and giant towers and installation. This Pipe is (140) ton in weight and (43) meter in length, loading by cranes (200 ton KMK, 120 ton NK1200, 120 ton AC395).
Power station project - Erbil 2007 - 2008
The company entered into a contract with the Ray company
which is the Iraqi contractors and renting cranes to complete its work in Erbil, a power station, as the Ray the contracting company had a contract with Mass Jordan company contractors, which is the completion of the draft contract for the power station Erbil, power station which is 400 megawatts, the company has the largest efforts in carrying the largest pieces of the project and put it in the highest point of the flue.
Additionally, the company has signed a contract to complete
work in chamchamal power station with bilal group, and then signed a contract with the Mass Jordanian directly to complete the work at the station, which was strongly 50 megawatt.
16
The company has entered into a contract with the Egyptian company Orascom cranes for the processing of various sizes for the project to build a cement
plant bazian at the end of 2005, and the ceiling of the period of the contract was until end of 2007.
Dealing with a large international company like Orascom to supply it by new cranes in different kinds & sizes for constructing cement factory In Bazian –
Sulaimania - Iraq by high producing power, was great challenge for Amir company because the hard conditions of the work in the position and the area. Therefore, we put our abilities & experiences together with our professional management and we used our experience from the mother company Adrighem. As a result, we made a great success in our mission in the project. And that was one of the levels of company development
Orascom -Bazian cement factory project 2005-2007.
BAZIAN
17
TASLUJA
18
Rebulding Tasluja cement factory
Amirco participate in this project as a crane contractor. 2006 - 2007
100 Ton crane working in tasluja cement factory- sulymania-iraq
In the beginning of 2006, the foreign companies started investment in petroleum fields in many areas in Kurdistan. One from the
important largest investment companies in this field is the Turkish Genel Enerji Company , Cooperated with ADAX Canadian Company. AMIRCO contributed with the both foreign companies in this field by rent Cranes flat beds, low beds, forklifts and all other required types of equipments.
Genel EnerjiTTOPCO
Genel Enerji -TaqTaq operating CO.-TaqTaq Oil field 2006-2007.
19
Aycet
The company provided Aycet construction company with number of cranes from 10 Ton up to 80 Ton and another various equipments
like trucks to operate the big contract with Orascam in steel and mechanical erection in the cement factory project in Bazian- sulymania.
Aycet construction Co. - steel and mechanical erection - bazian cement factory project 2006 - 2007.
20
Asiacell
21
(ITS) IRAQI TECHNICAL SUPPORT is registered and licensed in Iraq. ITS represents Abunayyan Trading Corporation which is Saudian Arabian Company committed to the global and Middle East infrastructure projects and enhancement. Abunayyan Trading Corporation is registered in Saudi Arabia, with their strong venture with A. Abunayyan Group of companies. We can assure that our relationship will benefit not only Iraqi business but also Middle East and Gulf Countries (GCC) as we joined hands in participating for the enhancement of the infrastructure in Iraq and Gulf region.
Iraq Tachnical Sppourt (ITS CO.)Asiacell Building-Aircondition Erection 2006.
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
1. Installation the Electrical transformer Project - Erbil - The Washington Group of Companies - through a Zozek Company.
2. Excretion Project - Erbil Cunay Turkish Company.
3. Project of establishing a network of fiber-optic communication - Arbil Siemens the German company .
4. Construction project the Erbil International Airport - Makyul Turkish company .
5. Dam Project Bekhme - Arbil -the Directorate works - Samyer Turkish company .
6. Sewage network construction project Arbil - through connector .
7. An oil exploration project - Zakho - Great Wall Chinese companies to drill oil wells .
8. Connector International Airport - Airports and rules - Gyara - minors - connector - NASA Turkish company - KBR .
9. Project to build apartments - Ways Koysanjaq - Arbil - Turkish company cevekler .
10. Construction project for the purposes of storage rooms and factories - Arbil - the company ICCB .
11. Connector International Airport - a Serka Turkish .
12. Contract unloading cargo planes and cargo from the Erbil International Airport to the city of Arbil and Sulaymaniyah - Chinese company Huawei .
13. Contract unloading cargo planes and cargo from the Erbil International Airport to the city of Arbil and Sulaymaniyah - Dejla Group of Companies for stores of the Asia cell company for mobile .
14. Construction project apartments - by Enkawa - Arbil - Turkish company, whatever God .
15. Dream City project - the road to the airport - Arbil, the Lebanese Company ICC .
16. Transmission project, and installed a 10 megawatts - Arbil .
17. Project to dig a tunnel and construction of a bridge Sulaymaniyah Khazna Company .
As well as for transport, loading and unloading of tankers through the truck and transfer of materials and construction projects and roads and land settlement and processing of client business and
corporate materials, machinery and heavy equipment of all kinds of European, Japanese and American new and used brand.
Other Projects and Service impelemented by us:
22
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Some of another projects
23
The company’s make several operations and the various transport with companies and government organization and non-
organizations, and the following some important Logistic project executed by AMIRCO:
1. Rig Moving: A. Rig moving for TTOPCO. B. Rig moving for AOS from TTOPCO to KC1. C. Rig moving for AOS from KC1 to jebil Semirtt inShekhan HUNT Oil site. D. Rig moving for Weather ford from Sh1 gulf key stone sit to Mol site in Akra.2. Logistic service for HUNT Oil including; Warehousing for casing pipe, chemical product and general transportation through kurdistan region .
Additional to several local transportation in Iraq.
24
LOGISTICS
25
QuantityPermissible Max. Weight with LoadWidth Make Type Model
: X 35: 25 ton: 2.55m: Mixed: 4 x 2: 2000 - 2005
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
QuantityPermissible Max. Weight with LoadWidth Make Type Model
: X 10: 35 ton: 2.55m: Mixed: 6 x 4: 2000 - 2005
26
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
9.5 M
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
11.5 M
Permissible Max. Weight with LoadWidth Make Type Power Model
: 35 ton: 2.55m: DAF: 6 x 4: 480 H.P: 2004
Permissible Max. Weight with LoadWidth Make Type Power Model
: 45 ton: 2.55m: DAF: 6 x 4: 480 H.P: 2004
27
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
13.5 M
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
14.5 M
Permissible Max. Weight with LoadWidth Make Type Power Model
: 65 ton: 2.75m: MB Actros: 6 x 4: 480 H.P: 2005
Permissible Max. Weight with LoadWidth Make Type Power Model
: 75 ton: 2.75m: Scania R 143: 6 x 4: 450 H.P: 1995
28
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
13.5 M
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
38 M
Permissible Max. Weight with LoadWidth Make Type Power Model
: 75 ton: 2.75m: MAN 41464: 8 x 4: 464 H.P: 2004
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
35 M
29
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
14.5 M
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
35 M
Permissible Max. Weight with LoadWidth Make Type Power Model
: 85 ton: 2.75m: MB Actros 4153: 8 x 4: 530 H.P: 2002
30
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
21.5 M
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
3.5 M8.5 M6.5 M6.5 M4.5 M
Permissible Max. Weight with LoadWidth Make Type Power Model Push
: 250 ton: 3.00m: MB Actros 4153: 8 x 4: 530 H.P: 2002: 250 ton
31
21.5 M AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Width Make Type Power Model Push
: 3.00m: MAN 41 464: 8 x 4: 530 H.P: 2004: 180 ton
Width Make Type Model Push
: 3.00m: MB Actros: 8 x 4: 2002: 250 ton
GoldhoferTHP / S250 ton
2002Multi
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Certification
32
Safety
33
The company takes safety point into consideration as a target of the company's objectives, which are needed, they are one of the priorities of work in the fields of projects supervised by the company or is a party of the project, safety of workers is a priority because they represent human life, so the company to provide workers the safety requirements of clothing and Shoes and helmets, gloves and glasses and all other requirements.
As for safety equipment and cranes are also to be them and of being certified to by the competent authorities and provided to each company or project if the need called for.
Summary
1- Steel structure of the Cement Bazian project.
2- Koye - Akhjalar Water project.
3- Site preparation for Hunt Oil in Ain Sefny.
34
AMIRCO AMIRCO
The company signed a contract with the Egyptians Orascom company for the completion of the steel structure of the cement Bazian project, duration of the termination of the project (8) months and the total amount for the installation of the metal on the building of is (1450) tonnes, at a daily rate of is (6971)killo gram has been installed at the building, as the company’s ability to connect the amount of 60 tons per day, and (4) cranes used by AMIRCO to complete the project, and the number of workers engaged in the project is (60) workers.
1- Steel structure of the Cement Bazian project.
35
Supervision of all administrative actions took place, where the administration of an active role in the entry into force of the work at the
site. Effort the administration had made gains in the company’s work.
Excellent project management.
36
37
The company signed a contract with Genel Enerji company to complete the work in the
project of supplying water through a length of (24) km by pipeline with pressure (32) bar from Gobtapa to Tilian area. Tilian region is an area close to the province of Sulaymaniyah high above sea level to 385 degrees, was to be a high - pressure pump with a (90) k and (360) meters high with diameter (4) inch.Number of pump is (6), station (3), generators (6), each and every one of (350) KV.A period to finish the project is (4) months, the establishment of basin Tilian in the capacity of (350) cubic meter.
2- Koye - Akhjalar Water project.
38
39
3- Site Preparation For HUNT Oil in Ain Sefny.
This contract with Hunt Oil for preparation drill site including access road, drill location, camp site
and water pit with lining.
40
AMIRCO
AMIRCODon’t risk it let AMIRCO lift it
Mob. : + 964 750 445 6617Tel. : + 964 66 25 19552 + 964 66 22 [email protected]
Raparin - 100m str. - infront of North industrial areaErbil - Kurdistan Region Iraq