ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing alignment has been followed and existing Right of Way (RoW) has been utilized to the maximum extent possible to minimize acquisition of additional land. Major acquisition of land has been proposed for bypasses. Alternative analysis of site for Bypass Locations has been conducted and details furnished in the following sections. 1 ALTERNATIVE ANALYSIS OF BYPASSES Bypasses have been proposed for built-up areas at 8 locations (Pithwas, Luni, Satlana, Bacharna, Dhundhara, Bhanawas, Samadadi, Parloo) where geometric improvements are not possible as per design standards along the existing highway. Alternatives alignments for the bypasses have been analyzed using google maps and topo maps to best suitable alignment. The alternative analyses of proposed 8 bypasses are given in the following sections. Pithwas Bypass Analysis of alternative for Pithwas Bypass is presented in the below table and figure. Table1: Analysis of Alternatives for Pithwas Bypass Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing Alignment) 1 Take off Chainage 5.800 - 5.803 2 End Chainage 7.400 - 7.476 3 Route Alignment LHS of existing road RHS of existing road Existing road 4 Design Length (km) 1.6 2.784 1.673 km 5 Length of existing alignment Bypassed (km) 1.673 1.673 - 6 Terrain Plain /Rolling Plain/Rolling Plain /Rolling 7 Speed 80 Km/hr 80 Km/H 10-20 Km/hr 8 Smooth Geometrics Possible Possible Not Possible 9 Land use pattern agricultural agricultural Builtup 10 No of Proposed Structures 1-culvert - - 11 Service Road - - Service Road Required 12 Obligatory Points - - - 13 Junctions 1 1 1 14 Land Acquisition 45m width land required 45m width land required Required to widen existing road and accommodate Service Road 15 Area Required, Hectares 7.204 12.531 - 16 Resettlement & Rehabilitation No impact No impact Heavy Impact 17 Approx Cost 3 Cr/Km 3 Cr/Km 2 Cr./Km 18 Merits Length is less - Less LA 20 Demerits - Comparatively high LA High R&R issues 21 Recommendation Recommended Not recommended Not recommended

Transcript of ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF...

Page 1: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

ANALYSIS OF ALTERNATIVES

The proposed project is widening of existing State Highway. The existing alignment has been followed and existing

Right of Way (RoW) has been utilized to the maximum extent possible to minimize acquisition of additional land. Major

acquisition of land has been proposed for bypasses. Alternative analysis of site for Bypass Locations has been conducted

and details furnished in the following sections.

1 ALTERNATIVE ANALYSIS OF BYPASSES

Bypasses have been proposed for built-up areas at 8 locations (Pithwas, Luni, Satlana, Bacharna, Dhundhara, Bhanawas, Samadadi, Parloo) where geometric improvements are not possible as per design standards along the existing highway. Alternatives alignments for the bypasses have been analyzed using google maps and topo maps to best suitable alignment. The alternative analyses of proposed 8 bypasses are given in the following sections.

Pithwas Bypass

Analysis of alternative for Pithwas Bypass is presented in the below table and figure.

Table1: Analysis of Alternatives for Pithwas Bypass

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

1 Take off Chainage 5.800 - 5.803

2 End Chainage 7.400 - 7.476

3 Route Alignment LHS of existing road RHS of existing road Existing road

4 Design Length (km) 1.6 2.784 1.673 km

5 Length of existing alignment Bypassed (km)

1.673 1.673 -

6 Terrain Plain /Rolling Plain/Rolling Plain /Rolling

7 Speed 80 Km/hr 80 Km/H 10-20 Km/hr

8 Smooth Geometrics Possible Possible Not Possible

9 Land use pattern agricultural agricultural Builtup

10 No of Proposed Structures

1-culvert - -

11 Service Road - - Service Road Required

12 Obligatory Points - - -

13 Junctions 1 1 1

14 Land Acquisition 45m width land

required 45m width land

required

Required to widen existing road and accommodate Service

Road

15 Area Required, Hectares 7.204 12.531 -

16 Resettlement & Rehabilitation

No impact No impact Heavy Impact

17 Approx Cost 3 Cr/Km 3 Cr/Km 2 Cr./Km

18 Merits Length is less - Less LA

20 Demerits - Comparatively high LA High R&R issues

21 Recommendation Recommended Not recommended Not recommended

Page 2: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Figure1: Proposed Pithwas Bypass - Alternatives

Luni Bypass

Analysis of alternative for Luni Bypass is presented in the below table and figure.

Table 2: Analysis of Alternatives for Luni Bypass

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

1 Take off Chainage 43.000 - 47.716

2 End Chainage 46.700 - 50.566

3 Route Alignment LHS of existing road RHS of existing road Existing road

4 Design Length (km) 2.2 4.687 2.850 km

5 Length of existing

alignment Bypassed 2.850 km 2.850 km -

6 Terrain Plain /Rolling Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/hr - 10 Km/hr

8 Smooth Geometrics Possible Possible Not Possible

9 Land use pattern agricultural Barren/agricultural Builtup/barren

10 No of Proposed

Structures 1 culvert 1 culvert 2 MNB

11 Service Road - - Service Road Required

12 Obligatory Points - - -

13 Junctions - - -

14 Railway crossing Yes Yes Yes

15 Land Acquisition 45m width land

required 45m width land required

Area required for road widening

16 Area Required,

Hectares 9.906 21.092 -

17 Resettlement & Rehabilitation

No Impact No Impact Heavy Impact due to built up

area

18 Approx Cost 3.42 Cr./Km 4.85 Cr./Km 2 Cr./Km

Page 3: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

19 Merits Length is less Less LA

20 Demerits - Length is High, Two

Railway Crossings High R&R issues

21 Recommendation Recommended Not recommended Not recommended

Figure 2: Proposed Luni Bypass – Alternatives

Satlana Bypass

Analysis of alternative for Satlana Bypass is presented in the below table and figure.

Table 3: Analysis of Alternatives for Satlana Bypass

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

1 Take off Chainage 49.600 - 50.569

2 End Chainage 51.800 - 52.325

3 Route Alignment LHS of existing

road RHS of existing road Existing road

4 Design Length (Km) 2.200 2.268 1.756 km

5 Length of existing

alignment Bypassed (km) 1.756 1.756 km -

6 Terrain Plain /Rolling Plain /Rolling Plain /Rolling

7 Speed 80-100Km/hr - 10-20 Km/hr

8 Smooth Geometrics Possible Possible Not Possible

9 Land use pattern Barren/agricultural agricultural Builtup/agricultural

10 No of Proposed

Structures 1 Box culvert - 2 MNB

11 Service Road - - Service Road Required

12 Obligatory Points - - -

Page 4: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

13 Junctions 1 1 1

14 Land Acquisition 45m width land

required 45m width land required Required for road widening

15 Area Required, Hectares 6.750 8.618 1

16 Resettlement & Rehabilitation

No Impact No Impact Heavy Impact

17 Approx Cost 3 Cr./ Km 3 Cr./ Km 2 Cr./Km

18 Merits Length is less Less LA

20 Demerits - Length is High High R&R issues

21 Recommendation Recommended Not recommended Not recommended

Figure3: Proposed Satlana Bypass – Alternatives

Bhacharana Bypass

Analysis of alternative for Bhacharana Bypass is presented in the below table and figure.

Table4: Analysis of Alternatives for Bhacharana Bypass

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

1 Take off Chainage 62.100 - 62.640

2 End Chainage 63.500 - 63.911

3 Route Alignment LHS of existing road RHS of existing road Existing road

4 Design Length 1.490 km 1.934 1.271 km

5 Length of existing

alignment Bypassed 1.271 km 1.271 km -

6 Terrain Plain /Rolling Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/hr 80-100 Km/hr 10-20 Km/hr

8 Smooth Geometrics Possible Possible Not Possible

9 Land use pattern Barren/agricultural agricultural Builtup/agricultural

10 No of Proposed

Structures 1 Box culvert - 2 MNB

11 Service Road - - Service Road Required

Page 5: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

12 Obligatory Points - - -

13 Junctions 1 1 1

14 Land Acquisition 45m width land

required 45m width land required

Required to widen existing road

15 Area Required,

Hectares 6.75 8.618 -

16 Resettlement & Rehabilitation

No Impact No Impact Heavy Impact

17 Approx. Cost 3 Cr. / Km 3 Cr./ Km 2 Cr. /Km

18 Merits Length is less - Less LA

20 Demerits - Length is high High R&R issues

21 Recommendation Recommended Not recommended Not recommended

Figure4: Proposed Bacharana Bypass – Alternatives

Dhundhara Bypass

Analysis of alternative for Dhundhara Bypass is presented in the below table and figure.

Table5: Analysis of Alternatives for Dhundhara Bypass

Sl. No. Description Alternate 1 Alternate 2 (Existing Alignment)

1 Take off Chainage 69.200 69.639

2 End Chainage 72.400 72.156

3 Route Alignment LHS of existing road Existing road

4 Design Length 3.2 km 2.517 km

5 Length of existing alignment Bypassed 2.517 km -

6 Terrain Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/hr 10-20 Km/hr

8 Smooth Geometrics Possible Not Possible

9 Land use pattern Barren/agricultural Builtup/agricultural

10 No of Proposed Structures 1 culvert 2 MNB

Page 6: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 (Existing Alignment)

11 Service Road - Service Road Required

12 Obligatory Points - -

13 Junctions 1 4

14 Land Acquisition 45m width land required NA

15 Area Required, Hectares 14.859 -

16 Resettlement & Rehabilitation No impact Heavy Impact

17 Approx Cost 3 Cr./Km 2 Cr./Km

18 Merits Length is less Less LA

20 Demerits - High R&R issues

21 Recommendation Recommended Not recommended

Figure5: Proposed Dhundhara Bypass – Alternatives

Bhanawas Bypass

Analysis of alternative for Bhanawas Bypass is presented in the below table and figure.

Table 6: Analysis of Alternatives for Bhanawas Bypass

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

1 Take off Chainage 88.100 - 87.783

2 End Chainage 89.638 - 89.268

3 Route Alignment LHS of existing road RHS of existing road Existing road

4 Design Length 1.538 km 1.860 1.485km

5 Length of existing alignment

Bypassed 1.485 km 1.485 km -

6 Terrain Plain /Rolling Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/Hr 80-100 Km/Hr 10-20 Km/Hr

8 Smooth Geometrics Possible Possible Not Possible

9 Land use pattern agricultural agricultural Builtup

Page 7: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 Alternate 3 (Existing

Alignment)

10 No of Proposed Structures 1 Box Culvert 1 Box Culvert -

11 Service Road - - Service Road Required

12 Obligatory Points - - -

13 Junctions 1 nil 1

14 Land Acquisition 45m width land

required 45m width land

required NA

15 Area Required, Hectares 6.916 8.370 -

16 Resettlement & Rehabilitation

No impact No impact Heavy impact

17 Approx Cost 3 Cr / Km - 2 Cr./Km

18 Merits Length is less - Less LA

20 Demerits - Length is high. High R&R issues

21 Recommendation Recommended Not recommended Not recommended

Figure6: Proposed Bhanawas Bypass – Alternatives

Samdari Bypass

Analysis of alternative for Samdari Bypass is presented in the below table and figure.

Table 7: Analysis of Alternatives for Samdari Bypass

Sl. No. Description Alternate 1 Alternate 2 (Existing Alignment)

1 Take off Chainage 97.100 -

2 End Chainage 103.600 -

3 Route Alignment RHS of existing road Existing road

4 Design Length 6.5 km -

5 Length of existing alignment Bypassed - -

6 Terrain Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/hr 10-20 Km/hr

8 Smooth Geometrics Possible Not Possible

Page 8: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 (Existing Alignment)

9 Land use pattern agricultural Builtup

10 No of Proposed Structures 3-culverts,1-ROB 2 MNB

11 Service Road - Service Road Required

12 Obligatory Points - -

13 Junctions 2 2

14 Land Acquisition 45m width land required NA

15 Area Required, Hectares 28.8 1

16 Resettlement & Rehabilitation No Impact Heavy Impact

17 Approx Cost 3.68 Cr / Km 2 Cr /km

18 Merits Length is less Less LA

20 Demerits - High R&R issues

21 Recommendation Recommended Not recommended

Figure 7: Proposed Samadari Bypass – Alternatives

Parloo Bypass

Analysis of alternative for Parloo Bypass is presented in the below table and figure.

Table 8: Analysis of Alternatives for Parloo Bypass

Sl. No. Description Alternate 1 Alternate 2 (Existing

Alignment)

1 Take off Chainage 114.000 -

2 End Chainage 115.400. -

3 Route Alignment LHS of existing road Existing road

4 Design Length 1.4 km -

5 Length of existing alignment Bypassed - -

Page 9: ALTERNATIVE ANALYSIS OF BYPASSESenvironmentclearance.nic.in/writereaddata/Online/... · ANALYSIS OF ALTERNATIVES The proposed project is widening of existing State Highway. The existing

Sl. No. Description Alternate 1 Alternate 2 (Existing

Alignment)

6 Terrain Plain /Rolling Plain /Rolling

7 Speed 80-100 Km/Hr 10-20 Km/Hr

8 Smooth Geometrics Possible Not Possible

9 Land use pattern agricultural barren/builtup/agricultural

10 No of Proposed Structures 1-MNB,1-Culvert 2 MNB

11 Service Road - Service Road Required

12 Obligatory Points - -

13 Junctions Nil Nil

14 Land Acquisition 45m width land

required NA

15 Area Required, Hectares 6.3 1

16 Resettlement & Rehabilitation No impact Heavy Impact

17 Approx Cost 3 crores / Km 2 crores /km

18 Merits Length is less Less LA

20 Demerits - High R&R issues

21 Recommendation Recommended Not recommended

Figure 8: Proposed Parloo Bypass – Alternatives