Delft University of Technology Efficient driving of CBTC ...
Alstom Signalling Railway-Industry-Technologies ... · Signalling presentation CBTC, the right...
Transcript of Alstom Signalling Railway-Industry-Technologies ... · Signalling presentation CBTC, the right...
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 2
1
2
3
4
5
6
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 3
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
2
3
4
5
6
7
1
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 4
What is CBTC?Communication-Based Train Control System
CBTC means Communication Based Train Control
CBTC is the modern version of ATCand ATC means Automatic Train Control
As defined in the IEEE 1474 standard, a CBTC system is a continuous, automatic train control system using :• high-resolution train position reports, independent of track circuits the trains
send their position to wayside computers,• continuous, high-capacity, bidirectional train-to-wayside data
communications,• trainborne and wayside processors capable of implementing Automatic Train
Protection (ATP) functions, as well as optional Automatic Train Operation (ATO) and Automatic Train Supervision (ATS) functions.
CBTC is the standard Signalling solution for Metro Operation
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 5
What is ATC?Automatic Train Control system
ATC or Automatic Train Control is an electronic system that protects trains against over speeding, collisions and derailment when trains pass crossovers (or curved lines)
ATC includes two (2) main functions: ATP and ATO…
ATP or Automatic Train Protection is the fail-safe part that stops a train when any dangerous situation arrives;
ATO or Automatic Train Operation is the “robot” that drives the train under the close supervision of the ATP.
ATC = ATP (Safety) + ATO (Performance)
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 6
How does CBTC work?
Train Location computed on-board each train Train location sent by radio from each train to wayside Zone Controller Wayside Zone Controller computes “End of Authority” of each train and
sends it by radio to each train ATP safe braking speed curve computed on-board each train
Automatic protection envelope
Train Y…Train BTrain A…Train X
Train borne ATC sends Train Location
Wayside computes End of Movement
Authority
Train B calculates safe braking speed curve
End of Movement Authority
Train borne ATC computesTrain Location
Wayside Zone Controller
ATC beacon
…thanks to Moving Block, CBTC increases line capacity (more trains)
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 7
Why the need for CBTC?
Based on fixed blocks for protection
Provides rough position of trains
protecting long space to ensure
protection
more distance needed between
trains
Conventional signaling
Continuous communication
link between trains and wayside
Much more precise position of
the train at all times
Less space needed to ensure protection
Distance between trains
is reduced
CBTC solution with moving block
…with less wayside equipment, CBTC increases line capacity (more trains)
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 8
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 9
CBTC PerformancesCapacity increase: up to 60 trains per hour
High performance moving block shortens train interval
Short headways achieved without compromising commercial speed
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 10
Automatic Train Operation strategyEnergy saving & Optimized driving
Maximised energy savings and optimised maintenancethrough accurate train simulation
ATO Combines different strategies to enhance energy savings • Coasting optimization• Power limitation• Limited acceleration• Speed limitation• Optimization of Electrical brake
Decreases number of activationsof braking and traction relaysto reduce maintenance & energy consumption
up to 30% Energy Savings (with intelligent ATO and ATR)
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 11
-0.4 -0.3 -0.2 -0.1 0 0.1 0.2 0.30
10
20
30
40
50
60
70
80
90
Stopping accuracy (m)
Per
cent
age
of s
tops
Stopping accuracy
-0.2 -0.15 -0.1 -0.05 0 0.05 0.1 0.15 0.20
10
20
30
40
50
60
70
80
Stopping accuracy (m)
Per
cent
age
of s
tops
Stopping accuracy
Automatic Train Operation strategyTrain Stopping accuracy
Measured stopping accuracy
95% : +/- 9.5cm99% : +/- 11.5cm99.5% : +/- 13cm100% : +/- 15cm
Shenzhen L5 Shanghai L10
Robust stopping accuracywhilst preserving commercial speed and passenger comfort
Passengerscomfort
Stoppingaccuracy
Commerciaspeed
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 12
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 13
URBALIS™ Grades of AutomationIEC Standard 62290-1
Grade of Automation
(GoAn)
GoA1
GoA2
GoA3
GoA4
Train Operation
ATP with Driver
ATP and ATO with Driver
Driverless (DTO)
Unattended (UTO)
Setting Train in Motion
Driver
DriverAutomatic
Automatic
Automatic
Driving and Stopping
Train
Driver
Automatic
Automatic
Automatic
Door Closure
Driver
Driver
AttendantAutomatic
Automatic
Operation in the event
of Disruption
Driver
Driver
Attendant
Automatic
Designed for driverless – Can operate at any Grade of Automation
• ATP: Automatic Train Protection• ATO: Automatic Train Operation• DTO: Driverless Train Operation • UTO: Unattended Train Operation
UR
BA
LIS
™
Grade of Automation: from GoA1 to GoA4, from Manual Operation (driver) to Full Automated Operation (FAO) through an overall System Approach
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 14
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 15
CBTC typical architecture with its sub-systems
SMART I/OStation
Maintenance
URBALIS ATCOnboard
Controller
Zone ControllerURBALIS ATC
Zone ControllerSMARTLOCK
400
DCS – GIGABIT NETWORKS
RADIOS
ICONISATS & SCADAPIS & Security
PIS & Security
PIS & Security
A modular and scalable architecture, either distributed or centralised
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 16
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 17
Highest Level of Safety… and Availability!
IXL and ATC sub-systems at the highest Safety Level (SIL4) by international & official authorities
Service proven: circa 40 lines in revenue service and as many on-going projects… and more to come
Highly Available architecture (with redundancy principles and stand-by mechanisms)
Track records: 99.998% of signaling system availability
Safe Design
Available Architecture
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 18
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 19
Automatic Train Supervision:through a modular software architecture
Functional layering and modules
Layer 1: Basic functions, supervision & control
• IXL monitoring and manual control• Train control• Train tracking and identification• Route setting
Layer 2: Planning and automation
• Online timetable management• Traffic regulation (from timetables to headway)• Terminal management• Junction management
Layer 3: Operation Decision Support
• Management of operations and Incidents• Regulation modes management• Automatic garage management
• Alarms & Events• Login & Territory
assignment• Quality of Service• Archiving• Playback
Support Functions
• Signaling layout• Train graphs• Timetables• Forms
HMI
A scalable application with different layers, to better support Metro Operation
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 20Efficient Operation for new lines, extensions or revamping
ICC: Solution for Integrated Control Centres
Energy, Ventilation, AncillariesPassenger information
Train interface
Mass transit Suburban
SignallingSecurity (CCTV,…)
Integrated Control Centres:the eyes of the operator
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 21
Urban Signalling solutions
CBTC: the right solution for high performances
CBTC: the right solution for easy operation
CBTC: the right solution with light maintenance
CBTC: the right solution with high level of safety
CBTC: the right solution with friendly support to traffic controller
URBALIS™ CBTC U400: the right solution with platform approach
1
2
3
4
5
6
7
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 22
Platform strategy – … to system and deployment
URBALIS™ Solution is a Generic Platform used for previous projects This generic platform is already integrated and validated with generic
data, in factory, with a typical configuration Then, it is instantiated (or configured) for deployment on each project
by parameters that describe the line*
Benefits• No need to redevelop a new solution for each project• Solution builds on experience : it benefits from feed-back of previous
projects• Shorter projects• Important and dedicated R&D means• High quality level of the engineering process
Generic Platform Project A Project B Project C…
DataOIOIIOOIOIOIIO
DataOIOIIOOIOIOIIO
DataOIOIIOOIOIOIIO
DataOIOIIOOIOIOIIO
DataOIOIIOOIOIOIIO
DataOIOIIOOIOIOIIO
* The principle is similar to the data preparation used for Computer Based Interlocking (CBI)
URBALIS™ Platform deployment is based on data preparation
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 23
URBALIS™: a robust engineering process
Formal specification of vital software
Formal proof (B method) for vital software
Factory Integration and Validation Platform (FIVP)
Duplicate of the delivered system in a factory environment
75% of I&V process is performed with the FIVP: trouble shooting is done before delivery to the field
Stable and mature software & data/parameters delivered to site.Shortens and masters the site test period for:• a full and integrated Testing Strategy covering all the needs of
the Project / Customer: functional, operational and safety;• a fully Safety compliant process with Customer / ISA
attendance.
Supports Customer training (O&M staff)and maintenance activities
© ALSTOM SA, 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authorisation, is strictly prohibited
ALSTOM - 09/09/2016 – P 24
Production units
Factory Integration & Validation Platform
Project engineering centres
Rochester Madrid
Paris
Bologne
Budapest
Hong Kong
Beijing
Shanghai
Charleroi
Istanbul
Buenos AiresSantiago
Sao Paulo
Bangalore
Villeurbanne
A platform deployed from various sites around the worldwith a given tooling suit to be as close as possible to end users
Various Engineering Centres to better serve Customers and transfer know-how