Alsina Today 1
-
Upload
hadj-taher-marwen -
Category
Documents
-
view
39 -
download
5
Transcript of Alsina Today 1
ALSINA TODAYALSINA GROUP NOWADAYS
October, 2005
06Inconveniences of
the re-propping
systems
04Alsipercha: the
professionals’
opinion
14Alsina works:
Washers
construction
02Advantages
of concrete
structures
02 ALSINA TODAY
EDITORIALHELP US TO IMPROVE
Greetings to everyone,
After a long experience of more than 55 years in the formworking business wecuriously continue to be “hooked on”, hopeful and really motivated. We wish togo on assuming more and more important challenges, demanding ourselvesmore promptness, improving our processes, sharing our difficulties, summing up,to continue working for and to you, “clients”, but above all: WORKING FORPEOPLE.One of the biggest satisfactions the whole Alsina team has is to be able to enjoy,vibrate and share your successes, which in a way we feel also as ours. The tech-nical solutions, the “on site” meetings in search of alternatives, trying sometimesto get the “impossible”, recommending cycles, changes in the planning, unders-tanding necessities… the Commercial Technician assisting the client, the OfficeStaff, Logistics Team, and Technicians constant dedication, work after work, orderafter order, that is what we really love!!!Let us ask you to continue demanding us, putting us to the test. We enjoy cha-llenges… and positively think that only in that way we will be able to be moreand more useful every time!!! We would also like to thank you for the complaints,ideas, opinions and suggestions you send to our e-mail address: [email protected], which we dealwith the maximum interest and consideration.We would like to approach you a little more with thisissue titled “Alsina TODAY”, so you can know us bet-ter and continue trusting in Alsina.
Best regards,
Alsina Team promises not to disappoint you!
AAllssiinnaa BBrrootthheerrss
summary
Alsina Oliva Brothers: Mr Joan,
Josep and Jaume Alsina Oliva
(from left to right), Encofrados
J. Alsina S.A managing directors.
Photograph of some member of the wide Alsina Team
· Editorial p.02
· Advantages of concrete structures p.03
· Concrete: a grandiose material p.03
· Alsipercha: prevention is better than… p.04
· Inconveniences of the Re-propping systems p.06
· Interview: Jaume Alsina Oliva p.08
· Alumecano and Alucubetas DIT Certificate p.10
· Alsina under the Quality Certification ISO 9001:2000 p.10
· Alsina works: international p.11
· Alsina works: Alsina’s new contribution to slabs p.12
· Alsina works: the construction of Sewage Treatment Plants p.14
ALSINA HOYALSINA GROUP NOWADAYS
Issue: October 2005
© Encofrados J. Alsina, S.A.Pol. Ind. Pla d'en Coll
Camí de la Font Freda, 1
08110 - Montcada i Reixac
(Barcelona) SPAIN
Tel. +34 935 753 000
Fax. +34 935 647 059
E-mail: [email protected]
www.alsina.com
*
* Download the Catalan and English versions of “Alsina Hoy” from our web.
OCTOBER’05 03
WINDSOR SKYSCRAPER FIRE
Concrete is made up of
cement, sand, gravel and
water and it has been used
in Spain since 1940s. This
material has increased its
resistance 8 to 10 times
during the last 50 years due
to the use of additives like
plasticizers or retarders that
are applied “à la carte” and
multiply its resistance. If we
add a steel heart its resis-
tance and durability increa-
se, as was clearly checked
during the Windsor fire on
12th February in Madrid.
The Windsor tower was built
between 1974 and 1979.
It consisted of a concrete and
iron mixed structure 106 m
THE ADVANTAGES OF CONCRETE STRUCTURES.
“The structure fulfilled a basic function: to resist the fire and stay up time enough to allow
a possible evacuation”La Vanguardia, 15th de February, 2005
high. The building was a
solid construction with a
resistant reinforced concrete
nucleus and 3,40 m high gir-
ders supporting the weight
of façades and floors made
of lighter sections.
It is outstanding that
although temperatures
during the fire exceeded
100º C, the structure did not
collapse.
As per the experts’ opinion,
the key point avoiding the
Windsor skyscraper to
collapse was that the whole
internal area was built with
reinforced concrete and the
internal nucleus was a box
“binding the whole building”.
BUILDING AT HEIGHT
There is a veiled competition
in the world to get the highest
skyscraper. Misfortunes like
11-S in the Twin Towers in
New York or the Windsor buil-
ding in Madrid have brought
up the subject of the neces-
sity of this kind of buildings;
nevertheless, there is a gene-
ral accord in the increasing
tendency to build the mentio-
ned buildings with structures
mainly made of concrete,
more resistant to fire and the-
refore, safer.
CONCRETE: A GRANDIOSE MATERIAL
Up to a few years ago it was thought that to make
the skyscrapers structures stable they should be
made of steel. But technology goes forward and
the resistance of concrete has greatly increased
along these years. As a result, concrete is more
and more frequently present at the skeleton of
high buildings.
The structure of a building is
the system/material in charge
of transferring all the dead
loads, service loads and acci-
dental loads actions from the
different areas of the building
to the foundations, guarante-
eing appropriately its three
basic aspects: Resistance,
Rigidity and Stability.
Although the skeletons of old
buildings like the Empire
State Building (448,7 m) were
already made of reinforced
concrete, the use of this
material is going further. As
an example we can mention
the Freedom Tower (541
metres) to be built in the
ground zero in New York
and the Spanish Santiago
Calatrava’s Fordham Spire
(610 metres) that is going to
be built in Chicago and will
become the highest building
in the world.
In Spain the height ranking is
led by the Bali Hotel in
Benidorm. With 52 storeys
and 210 m height is also the
highest hotel in Europe. Its
proportion of concrete is very
high. The building was inau-
gurated short after the Twin
Towers outrage and its struc-
ture allowed the architect to
say that in a similar case the
Bali would have not collapse.
Other examples: Agbar Tower in
Barcelona, l’Eix Macià Milleniu
Tower in Sabadell (PHOTO-
GRAPH), Hesperia Hotel, etc.
“What is clear is
that a concrete buil-
ding like this one
supports much
more than what
legislation requires.
We have checked it
now and in other
cases”*
* Cited by Manuel García Cabrera(Indus Cálculo company Industrial Engineer).La Vanguardia, 15th February 2005.
04 ALSINA TODAY
ALSIPERCHA, prevention is better than…
A FALL ARREST SYSTEM FOR THE FORMWORK
DECKING PHASE
There are people who say, “winning awards will not
feed you”...and it is true. But obtaining rewards
from technical collectives of the maximum prestige,
when an arduous task of investigation and develop-
ment lies beneath, is an important shot in the arm:
Mention of Honour to the best fall arrest
system. Competition summoned by the Official
Chamber of Contractors of Catalonia (CCOC),
November 2002.
1st Award to the International Creativity.
Competition summoned by the College of
Industrial Engineers of Catalonia. Variety: adop-
tion of innovating solutions and models in cons-
truction. May 2003.
1st Award Construmat 2003. Variety: Product
for construction, May 2003.
Award to Security in the Construction.
Granted by the Official Chamber of Contractors of
Catalonia, October 2003.
Caupolican Award. European Award to
Security in Construction. Competition summoned
by the General Board of Technical Architecture of
Spain, February 2004.
ALSIPERCHA ALREADY WORKS
IN OTHER MARKETS:
The alliance with the company
Combisafe for the United Kingdom is
the first step in the Alsipercha system
expansion. The safety system has
gone through the British market and
interest has also arisen in other coun-
tries. Agreements for its commerciali-
sation are being drafted in Germany,
Sweden, France, Netherlands and
Denmark.
And in the Alsina branches abroad like
the ones in the United States, Chile
and Portugal.
CCOOMMBBIISSAAFFEESAFETY BY SYSTEMS
WHY ALSIPERCHA?
· Because it is PREVENTIVE, that is to
say, that the accident does not
happen...there is no fall, the retractable
belt works within milliseconds.
· Because it is the ONLY SYSTEM THAT
PROTECTS during the perimetric opera-
tions on site – the most risky ones: can-
tilever decking placing, handrails installa-
tion, movement of the gallow type pro-
tections or placing of the side shutters.
· Because it is an EASY AND QUICK
SYSTEM TO USE.
· Because it is certified by the company
BVQI and Applus compliying with the
regulation UNE EN-795.
and if all above was not
enough....
· BECAUSE IT IS THE MOST ECONO-
MICAL SYSTEM IN THE MARKET: the
repercussion by m2 of structure is
less than half the ones born by other
solutions.
AlsitecAlsina Technical Department
AWARDS
Manuel José Gundín Garrote,
Partner of the company Encofrados Lena S.L.
“The operator slipped... fortunately he wasanchored to theAlsipercha”
“The operator slipped... fortunately
he was anchored to the Alsipercha”
Manolo Gundín’s opinion, partner of
the company Encofrados Lena S.L.,
located in Mieres, Asturias, is spe-
cially relevant as he has used the
Alsipercha in different works since
the beginning of the project. Besides
his wide experience in the construc-
tion business, particularly in the
formwork field, his critical and cons-
tructive spirit confers even more
value on the interview he granted us.
We include a brief extract of it.
Mr Gundín states:
(...) “it is the only system truly
effective and reliable for
domes and waffle slabs or all
decking, and very useful for
girders”
(...) “the truth is that right now
the system has avoided us two
accidents.”
(...) “compared with other
security systems it is much
quicker and economical and
its productivity is higher.”
OCTOBER’05 05
What do you think about
Alsipercha? Do you think
that with this Alsina’s con-
tribution the construction
field casualtiness will dimi-
nish?
(...) as per the Alsipercha
system, analysed from a
technical point of view, I
understand that it is more
complete than the nets
under the slab system due
to two main causes: first,
because it is a preventive
system and second, because
it covers all the risky situa-
tions during the decking
assembly, while the nets
under the slab do not cover
the risk in the perimetric
decks. Besides, in ICS
Ingeniería y Seguridad we
have checked its efficiency
for different work phases, like
for example the one-way slab
assembly and roof works. To
all this we should add a basic
factor: its economy. The
use of Alsipercha reduces
in an important way the
security labour costs.
From your point of view,
what should be done to
encourage formwork ope-
rators to use Alsipercha?
The use of Alsipercha is not
different from the use of the
security harness or the hel-
met in, for example, hanging
scaffoldings. Therefore the
correspondent information
and training to formwork ope-
rators, on the one hand, and
the vigilance of the site res-
ponsible on the other should
be enough.
Since the Gaudí Prevention
Service knew about the
Alsina Fall Arrest System
they have incorporated it as a
reliable prevention device for
daily work in some of the
more dangerous tasks in
construction works: falls from
height during the formwork
decking works phase.
If there is no a decided crite-
rion, during the drafting of
Health and Safety Studies
and Schemes our Technical
Office informs the contractors
and subcontractors about the
advantages this system pro-
vides opposite to other
systems, as it avoids the
inconveniences and limita-
tions of horizontal nets, nets
under the slab and lifelines
between columns. In the
implementation of works our
Health and Safety
Coordinators value:
· The guarantee offered by
the system due to its assem-
bling and use simplicity, mea-
ning that no external fitters
are needed.
· The wide accessible area
(100 m2) with no interferences
from an only anchoring point
making its use more comfor-
table to formwork operators.
· The possibility of being used
for the placing of collective
protections near the openings
or perimeters of the formwork
(security handrails, gallow
type nets), eluding in this way
the installation of lifelines, the
urgency of placing and the
temporality of application, all
of them factors against their
reliability.
Xavier Barberà
Gaudí P.S. Technical Office
Responsible
Servei de Prevenció Gaudí,
Technical Office Dep.
Coordination Dep.
The Gaudí Prevention Service hasincorporated Alsipercha as reliableprevention device.
ICS Ingeniería y Seguridad valuesthe importance of the Alsiperchasecurity system.
Do you think that
Alsipercha is a good solu-
tion for the works to be
made in the perimeter of
works?
The Alsipercha system is the
substitutive solution for the
nets under the slab in the
waffle slabs and is comple-
mentary to the rest of the
collective protections during
the structure phase. The hig-
her the security is in a work,
the lower the probability of an
accident happening will be
and the consequences of the
same in case it happened.
Do you think that the
assembly of Alsipercha is
compatible with the form-
work assembly tempo?
If a work is well planned and
organised, no problems of
any kind should appear bet-
ween the different trades. If
we decide to use Alsipercha
we have to calculate the
structure performance and
design the system in relation
to it. In this way the work
tempo will not be held up by
the Alsipercha system.
Germán del Valle Pérez
Technical Director
ICS Ingeniería y Seguridad
ALSIPERCHA: Fall Arrest System
THE EXPERTS’ OPINION
The Gaudí Prevention Service, company founded in
Barcelona in 1997, is specialized in the prevention of
occupational risks, with presence in the construction
sector. Its aims are to satisfy requirements and to give
adequate answers to the clients’ necessities in the occu-
pational health and security areas of their companies or
works. Nowadays its prestige is rising, so as its presen-
ce in the market, and little by little this company has
become a national reference.
The company ICS Ingeniería y Seguridad is dedicated to
the integral security in the construction field. This com-
pany, leader in reliance generation among the biggest con-
tracting companies in the Spanish east, offers security
coordination services, so as supply, placing and mainte-
nance of the necessary security elements.
servei de prevenció gaudíconstrucció
06 ALSINA TODAY
INCONVENIENCES OF THE RE-PROPPINGThe successive shoring systems offer optimum results both in construction tem-
pos and in structural performances.
The Construction Engineering professors of the Polytechnic University of Valencia, carried out a study about the slabs
formwork systems more commonly used in construction, falling especially upon the periods and ways of down-striking.
The study, made together with Encofrados Alsina, compares the recoverable formwork systems with the re-propping
systems.
The main conclusions, from a tech-
nical point of view, highlight the
following re-propping systems
inconveniences:
PARTIAL DOWN-STRIKING AFTER 6
DAYS INSTEAD OF 3.
The floor form release has to be made
6 days after concreting instead of after
3 like in the recoverable system of par-
tial down-striking.
RECOVERABLE FORMWORK SYSTEM
(ALUMECANO TYPE)
With no need of re-propping
Housing block built with Alumecano (St. Quirze del V., Barcelona)
On formworking an upper floor the props
keep the same vertical centre lines, avoiding
the punching of the structure.
On releasing partially the forms, the structu-
re is propped at every moment. In normal
conditions it can be done the third day after
concreting.
OK!
On form releasing on the third day the main
girders, which are kept at every moment,
avoid an excessive deflection of the floor, as
specified by the regulations.
OCTOBER’05 07
The study also concludes that:
1st - In the RE-PROPPING systems,
the recovery is generally made after 6
days instead of 3. In order to recover
material after 3 days a double amount
of props has to be placed or else very
special down striking precautions have
to be taken. This process has to be
planned and supervised by efficient
technical personnel. See conditions
included in the technical report.
2nd - Incorrect transmission of loads:
The cross distribution of props on the
supports of the PROPPED floors sup-
ports the load in the opposite way
(long) of the props of the floor being
concreted, which highlights the
recommendations made in the pre-
vious paragraph.
(*) As per the Technical Report drawn up by Mr Juan José Moragues – Professor of Edification and
Prefabrication -and Mr Pedro Calderón – Titular Professor of Edification and Prefabrication –of the
Polytechnic University of Valencia; this technical report is at our clients’ disposal for any consultation.
PROP SYSTEMS WITH RE-PROPPING
SUPPORTS
1.- It requires MORE LABOUR as the
props have to be placed TWICE.
2.- This system requires MORE
REFERENCES, (END MAIN GIR-
DER, INTERMEDIATE MAIN GIR-
DER, SUPPORT AND SUPPORT
GIRDER) instead of 3 (MAIN GIR-
DER, DROPHEAD and SUPPORT
GIRDER).
There is no coincidence in the location of
the upper floor props and the lower floor
ones, which could produce punching on
the slab.
On releasing forms, the structure supports
important stresses, as it is unloaded
during the re-propping.
3.- SECURITY: There are more risks
as the PANEL HAS A SMALLER SUP-
PORT on the main girders wings and
even smaller when these are covered
with concrete.
4.- FINISHES: due to the accumula-
tion of concrete on the wings, the
panel does not always rest at the
same height; the panel –timber– and
the prop –metal– buckle in different
ways, producing BIGGER MARKS ON
THE CONCRETE.
Encofrados J. Alsina, S.A.
Alsitec – Technical Office
September 2003
THE ASSEMBLY OPERATIONS OF THE RE-PROPPING SYSTEMS OFFER
BESIDES INCONVENIENCES THAT MUST BE CONSIDERED:
NO!If the form release is made before the sixth
day, deflections higher than the ones in the
systems with no re-propping could be pro-
duced, not complying with the regulations.
08 ALSINA TODAY
used to it he feels comfortable, works
safely, knows positively that he will not
fall and therefore works quicker. Up to
now there are more than 200 works
built in Spain with the use of the
Alsipercha System and it seems to be
that people who get used to work in
this way, always held, cannot work in
any other way afterwards. We are
especially excited knowing that this
product has had a very good acceptan-
ce in markets as demanding in security
subjects as the British one.”
Is there any similar fall arrest
system in the market?
“There are not at this moment.
Alsipercha is a new product which
advantage is that it avoids the fall.
There are systems, like the nets, which
work after the fall. Ours is a preventive
system.”
Do you have an own investigation
team?
“Yes, we do have a very strong I+D
team, because constant investigation
and security are our major challenges.
Along our fifty years’ history and
around twenty with formworks we have
been the most revolutionary ones in
many aspects. Alsipercha is a world
novelty, but we also were, for example,
the first ones in manufacturing the two
usable sides formwork panel. We were
the first ones to make a recoverable
formwork system in the country, which
allows recovering up to an 80% of the
material after three days, in front of the
traditional twenty-eight days. We were
also the first ones in manufacturing a
possibility was to make a column
extension and to search a supporting
point in the sky, that is to say, up.
As the first element to be built is the
column we worked on the idea of
making it the supporting element; the
gallow idea arose when trying to take
in up to 125m2”
Does the Alsipercha need of any
prevision from the contractor or
designer?
“No, it does not require any calculation
and it can actually be fitted in any
work. Only a slight work plan has to be
made at the moment of building. But
we –that carry out the formwork calcu-
lations and design for the clients who
require it- can also attach the
Alsipercha placing proposal. These are
placed in a cast-in tube in one column
out of every two or three.”
Have you designed any other secu-
rity elements?
“We have security platforms and han-
drails for concreting walls, security
handrails, tripods... We provide secu-
rity as a complement to our formworks,
which we demand to have all the
correspondent security elements. We
want to avoid any accident when wor-
king with our products.”
What is the users’ answer?
“The Alsipercha is a system that, as
any other security system, requires a
user’s effort. It has a certain initial diffi-
culty as the user has to be hooked on
it, but the truth is that experience has
proved us that once the operator gets
INTERVIEW - Jaume Alsina Oliva
The company was founded as a timber
store at Garrotxa Street in Barcelona
and was even also a small sawmill.
Some twenty years ago the company
began to sell formwork panels and
nowadays it is one of the main Spanish
formwork companies, designing,
manufacturing, selling and hiring with
the ISO 9001:2000 certificate for all its
processes.
Innovation is one of Alsina’s philo-
sophy items, currently having more
than fifty own patents. The other impor-
tant item is people, both the ones wor-
king in the company and the ones wor-
king with their products. “We could talk
about an Alsina spirit of simplicity,
honesty, laboriousness, efficiency,
competitiveness...”, explains the
Managing Director, as he shows us
their own design and calculation form-
work programmes at their headquar-
ters in Montcada i Reixac. The
Alsipercha Fall Arrest System was cre-
ated from the combination of these two
elements, an apparently simple pro-
duct that contains forty-five compo-
nents. The system was designed to
prevent falls from height during the
risky formwork decking processes. Our
Professional College awarded us with
a special mention at the first Catalonia
Construction Awards, in the category
of Construction Process Innovation.
Which was the Alsipercha creation
process?
“We began investigating in 2001 but it
was not commercialised until 2003,
although we already had the precau-
tion that our systems were safe a long
time ago, as we are a technical com-
pany that likes to be very close to our
clients. When building a roof at height
the problem is the operator’s ancho-
ring point. The idea came from a wor-
king team that noticed that the only
“(...) CONSTANT INNOVATION AND SECURITY ARE
OUR MAJOR CHALLENGES (...)”
“We are especially excited knowing that the Alsipercha
has had a very good acceptance in markets as deman-
ding in security subjects as the British one”
Interview published by the magazine “L’Informatiu” (no. 248), of the
College of Aparejadores and Technical Architects of Barcelona.
(Industrial Engineer)
OCTOBER’05 09
wall system with a sliding staple and
the first ones to introduce aluminium in
horizontal and vertical formworks. We
were pioneers in the formworks for
curve walls, in which it is no necessary
to move the panel to produce different
radiuses. Therefore, we can say that
we have a tradition in innovation. We
have signed collaboration agreements
with the UPC, Valencia University,
ITEC, the Structures Consultants
Association and the Gaudí Institute
among others.”
Does the sector evolve as well?
“Yes, this is a sector that is evolving. I
have been working in it for forty years.
I began when I was studying Industrial
Engineering and, at the same time, my
father visited clients. The way of using
formwork has greatly changed since
then, when timber props, screws and
formwork deckings were still used and
sold to contractors.
“We are the ones to make the structu-
re construction process and I feel that
we have helped to mechanised the
whole system and made it very quick:
we save an hour of formworking labour
per m2 of structure. But there is still a
long way to run in the field of innova-
ting the structures construction,
making them with elements of the 21st
century, optimising the steel and con-
crete used in them, and making them
quick, cheap, safe and environment
friendly.”
What you are stating is taking us to
a paradox. Formwork is every time
easier and quicker, and so it requi-
res less training from operators.
Therefore, there are more security
risks.
“You are right. Old formworking ope-
rators were professionals, veterans,
but nowadays there is no workmans-
hip like that. Basically what we have is
scarcely trained personnel that comes
from abroad. Due to this situation
what we try is to elaborate easy
systems, mechanised, very automa-
ted and really safe at the same time.
We are very happy about all of our
formwork systems having the maxi-
mum security elements for operators,
who can be not as well trained as
before.”
Does the designer ask you for
solutions?
“Yes. There are many engineering
companies and architecture offices
that come to visit us and we work
together in the design in order to
dimension the modules and their
shape. Above all, they come to see us
when they have singular works and
together we prepare the whole
design. For example, we work with
architects like Moneo. We are right
now designing the L´Illa Hotel in the
Diagonal in Barcelona with him. Or
with Brullet and de Pineda preparing
their new Quirón Clinic project.”
Which is the position of the Spanish
formwork sector in relation to the
world?
“I would say that we- and the Spanish
companies in general- have a very
good level. The important rise of the
construction in these last years has
allowed us to invest part of the money
in investigation and, therefore, we
have nothing to envy from the foreign
companies. The German companies
are the bench mark in this field but we,
Alsina, have some products even bet-
ter than theirs.”
Your fall arrest system has already
been awarded by engineers and
contractors and has also received
the Caupolican and the Construmat
awards. What did the Cataluña
Construcció recognition mean?
“Yes, it has been awarded several
times which means that we have
brought forward something. It is a new
idea...But the Cataluña Construcció
Award was special for us because it is
Catalan. We have branches along
Spain, we work in the United States,
Chile and Portugal and now we are in
the middle of an internationalisation
project- we would like to be between
the first ten formwork companies of the
world in ten years’ time and to be at
least in ten countries-. But at the same
time we consider ourselves as a very
Catalan company and obviously we
appreciate the local professionals’
recognition.”
Alsina contributes with their Alsipercha system to the security in the forming works of the edification structures.
010 ALSINA TODAY
ALUMECANO DIT CERTIFICATE
Since May 2005 Encofrados
J. Alsina have a new certifi-
cation for two of their hori-
zontal formwork systems:
the Technical Suitability
Document (DIT), granted by
the prestigious Construction
Sciences Institute “Eduardo
Torroja” of the CSIC.
The document, dated on 30th
May, 2005 and titled “ALU-
MECANO - ALUCUBETAS
FORMWORKS SYSTEMS”,
was granted with conces-
sion number 466.
The Alsina Group, formed by
the companies Encofrados
J. Alsina, S.A. and Servicio
de Encofrados Alisan, S.A.,
has obtained the ISO
9001:2000 Certification for
all its branches. These are
located in Aragon and
Navarre, Alicante, Valencia,
Santa Cruz de Tenerife, Las
Palmas, Madrid, Malaga,
Asturias, Seville, Sentmenat
and Montcada, and are
dedicated to the sale and
hire of equipments to form-
work concrete.
Certificate granted by BVQI,
an entity of renowned presti-
ge and worldwide experien-
ce, under the UKAS accredi-
tation.
The reach of this certifica-
tion confirms the maturity
and efficiency of the Quality
Management System in the
design, manufacturing, com-
mercialisation (sale and
hire) and maintenance of the
equipments to formwork
concrete, and also ratifies its
compromise with a conti-
nuous improvement.
The ISO 9001:2000
Certification for the sale, hire
and maintenance of form-
work equipments, both in
the headquarters and the
national branches, recogni-
ses worldwide the effort and
dedication of the whole
Alsina team in offering effi-
cient answers to their
clients’ necessities and reaf-
firms their steady orientation
towards the managerial
excellency.
NEW CERTIFICATION FOR THE ALSINA SLABS SYSTEMS
Since May 2005 Encofrados J. Alsina S.A. have a new
certification for two of their horizontal formwork
systems.
ISO 9001:2000ALSINA GROUP CERTIFIES ITS QUALITY MANAGEMENT SYSTEM
Nowadays we are the only company in the sector that
has normalised the activities of: design, manufacturing,
commercialisation, and maintenance of products to
formwork concrete. This Certification applies to all of
our national branches.
This new certification corro-
borates the line followed by
Encofrados Alsina of having
a range of products of the
highest technical level.
These certificate and logo are the
representation of what distinguis-
hes us with the ISO 9001:2000 qua-
lity management standard.
Nº 466
Alumecano system assembly on site.
Alucubetas System, a lighten slab that allows a great concrete save.
OCTOBER’05 011
ALSINAWORKS INTERNATIONALA WORLD UNDER CONSTRUCTIONEncofrados Alsina, with more than fifty five years of expe-
rience in the national market, faces now the challenge of its
internationalisation under the “10-10-10 plan”: being pre-
sent at ten countries in ten years’ time and being one of the
ten first companies of the world in the formwork sector.
Alta Miramar Building
Viña del Mar, V Región, CHILE
Washer Plant
Burley, Idaho, USA
Falcon Wharf
London- UK
Placed at the feet of the Rocky Mountain, the Burley was-
her plant has a 3.000 m2 structure, implemented thanks to
the Alisply Circular curve wall formwork system patented by
Alsina.
Alisply Circular has amazed in its use due to its versatility
and time and labour saving compared with the heavy tradi-
tional American systems.
The innovating fall arrest
system Alsipercha, created
by Alsina in 2003, contribu-
ted to the security in the
construction of one of the
singular luxury apartment
buildings in Falcon Wharf, in
London’s heart.
Residential building with a high finishes quality demand.
The site supervisor was highly satisfied with the results
thanks to the complete Alsina products range, specially
designed for edification.
· Vistaform Slabs: for the implementation of slabs with the
local typical concrete finish.
· Steel-ply and Alisply Walls: for the implementation of res
pectively, the inner and perimetric walls.
· Alispilar: light and resistant system for columns.
STRUCTURE: 12.000 m2 slabs - 21.200 m2 walls
STRUCTURE: 3.000 m2 curve wall
012 ALSINA TODAY
ALSINAWORKSFORMWORK TABLESNEW ALSINA’S CONTRIBUTION FOR THE IMPLEMENTATION OF SLABS
Encofrados J. Alsina has been supplier for the construction of 25.000 m2 of slab in the res-
toration of the old Philips factory placed in the Zona Franca walk in Barcelona
With this new
product Alsina
has widened its
range of solu-
tions for slabs. It is especially
useful for great areas with a
perpendicular and very regu-
lar columns array.
The Alsina Tables are availa-
ble in 4 standard measures,
two length dimensions: 4 and
5 m, and two width dimen-
sions: 2 and 2,45 m. In all the
cases the drophead can be
placed along the whole pri-
mary beam, which enables
the implementation of cantile-
vers. Besides, the drophead
is folded down simplifying the
formwork and form release
operations and allowing its
movement by skipping the
security handrails.
“The Alsina form-
work Table allows
a great agility in
the manipulation
of the system on
site, thanks to its
Hydraulic Trolley
and vertical
Transportation
Hook.”
For the horizontal displace-
ments the Alsina I+D depart-
ment has created a device
easy to manipulate and store,
with an hydraulic system that
makes the rising of tables an
easy and comfortable opera-
tion at the same time, without
requiring heavy mechanisms.
The Hook for vertical displa-
cements self-regulates its
gravity centre even if it is
unloaded. Security is granted
with this device when working
with a crane.
Old Philips factory restoration in Zona Franca, Barcelona. The new structure of the building will hold
modern offices and a shopping centre.
Detail of the rise hydraulic
system of the horizontal trans-
portation Trolley. It allows rising
and lowering the tables for their
placement and transportation to
the floor to be formworked with a
minimum effort.
OCTOBER’05 013
swivel drophead
detail
detail of the
security handrail
hook in its long
direction
TTHHEE PPRROODDUUCCTT:: AALLSSIINNAATTAABBLLEESS
standard measures of the tables:
length - 4 and 5 m; width - 2 and 2,45 m.
The Hook has a gravity centre self-regulation system that moves as per
the weight of the load.Displacement Trolley (with rise and lower hydraulic system) that simpli-
fies the displacement of the tables on the floors.
014 ALSINA TODAY
ALSINAWORKSALSINA WORKS SEWAGE WASHERSALISPLY CIRCULAR AND CLIMBING CONSOLE: THE PERFECT
COMBINATION FOR THE IMPLEMENTATION OF S.W.S.
Encofrados Alsina has been the company awarded for the formwork of the S.W.S.
Benquerencia. Washer with 30.000 m2 of walls from which 2/3 are curve.
The curve walls were
built with Alisply
Circular, with a
900 m2 equipment.
This system patented by
Alsina allows the connection
between panels in both, the
horizontal and vertical direc-
tion, by means of the manual
Staple, allowing at the same
time the quick and simple
connection with Alisply Walls
panels.
The 2,40 m Alsina climbing
console was used for higher
heights.
This new console designed
by the I+D Department sim-
plifies the climbing operation
as it allows the movement of
the formwork together with
the platform, with no need of
making it in two phases.
The displacement is easily
made by means of a zip
system that moves the form-
work in a biding way.
The suspension ring allows
to use one-face cast-in
anchorages or crossing
bars. In both cases the con-
sole has a security system
that secures the system
avoiding the console to get
out of the anchorage.
There is an optional auxiliary
platform for the recovery of
the suspension ring. Its fas-
tening system by pins allows
regulating the separation
between both platforms, and
allows at the same time
pivoting on the upper union
what simplifies the placing
and assembly.
All the walls have been built
with Alisply, combining
straight and curve panels.
Besides, the one face wall at
3 m height brackets have
been used. This system has
meant quickness, security
and quality in the finishes.
ON SITE TECHNICAL
SUPPORT
Encofrados Alsina through its
technical Department: Alsitec
produced a detailed study of
the equipments to be used in
order to get the best solution on
site.
“Besides, Alisply and its One Face
Wall accessory sorted out with quick-
ness, security and great finishes qua-
lity the straight walls of the work”
OCTOBER’05 015
This equipment is the per-
fect complement for the
entire construction of
Sewage Washer Stations.
Encofrados J. Alsina has
supplied the formwork
equipments for the Apraitz
S.W.S. at Elgoibar in
Guipúzcua.
The client valued highly the
entire solution brought for-
ward by Alsina. Besides the
Alisply Circular wall, the
climbing console and the
new Multidirectional, the
attention and dedication of
the Alsina Technical-
Commercial Department
contributed in a very
ALSINA MULTIDIRECTIONAL SYSTEMEncofrados J. Alsina has incorporated to their form-
work products, the new Multidirectional; matching so
their range of formwork products for slabs at heights
higher than 6 m.
Detail of the assembly of the Multidirectional shoring system for the
slab support of the deposits roof in the Apraitz S.W.S. in Elgoibar,
(Bilbao).
The Alsina 240 Climbing System
allows making the release and
climbing operations more easily
and safely.
Combined displacement of
Climbing Platform and Panel.
Detail of the security hook: it pre-
vents the movements of the climb.
Detail of the displacement device
of the panel in the 240 Climbing
Platform.
special way. The entire
work was re-planned in
consent with the works
manager and attention was
given on site.
The assembly of the whole
slab was made with a total
amount of 4.400 m3 of
Alsina light shoring system
in two weeks’ time. This
solution did not only mean
quickness but also security
and simplicity in the
assembly.
Its anchorage system and
measures optimisation
grants versatility in the
assembly with a high load
capacity (4.000 kg/support).
Logistical Centre*
Crta. de Caldes (C-1413) Km. 34
08181 Sentmenat (Barcelona)
Tel. 937 153 409 - Fax. 937 150 132
Andalucía Occidental*Polígono Industrial PolivisoHerreros, 61 Parcela 1741520 El Viso del Alcor (Sevilla)Tel. 955 749 870 - Fax. 955 945 087
Andalucía Oriental*Estrabón, 50 (Ctra. de Cádiz a Málaga)29004 MálagaTel. 952 238 281- Fax. 952 242 881
Aragón y Navarra*Ctra. de Zaragoza a Huesca Km. 1250830 Villanueva de Gállego (Zaragoza)Tel. 976 186 400 - Fax. 976 186 989
Islas Canarias (Tenerife)*Barranco de Jagua - Dársena Pesquera38180 Sta. Cruz de TenerifeTel. 922 591 224 - Fax. 922 591 214
Islas Canarias (Las Palmas)*Pol. Ind. El Cascajo - José Tejera Santana, 1Jinámar - Telde, 35220 Las PalmasTel. 928 717 464 - Fax. 928 717 594
Centro* Paseo del Prado, 5428340 Valdemoro (Madrid)Tel. 918 953 262 - Fax. 918 951 090
Levante (North)*Polígono 6, Parcela 17Camino de la Garrofera s/n Montortal - Guadassuar (Valencia)Tel. 962 440 663 - Fax. 962 441 809Dirección de correo:Apartado de correos 159 46250 L’ Alcudia
Levante (South)*Polígono Industrial Bajo SombraCalle "C", Nave 4603688 Hondón de las Nieves (Alicante)Tel. 965 480 651 - Fax. 965 480 669
Norte y Castilla*Polígono Industrial de Olloniego Parcela B-1533660 Olloniego (Asturias)Tel. 985 463 816 - Fax. 985 453 271
Castilla y León (Occ.) - Tel. 610 760 053Castilla y León (Or.) - Tel. 677 976 209
Galicia Norte - Tel. 677 976 213Galicia Sur - Tel. 610 760 051
Ibiza y Menorca - Tel. 610 760 065
Arlan Enkofratuak, S.L.(País Vasco)Gazanda Bidea, 4 (Barrio Atela)48100 Mungia (Bilbao)Tel. 946 155 080 - Fax. 946 156 309
Balear de Azulejos, S.L.(Palma de Mallorca)Polígono Son Noguera, Camí de Son Fosquet, 25. 07620 Llucmajor (Mallorca)Tel. 971 662 326 - Fax. 971 661 839
PORTUGALSoluções de Cofragem Alisply, Lda. Pct. António Gedeão, 17 Loja 2Paiões -2635-002- Rio de MouroTel. (+351) 219 172 535 - Fax. (+351) 219175 164
Portugal North - Tel. (+351) 914 857 236 Portugal South - Tel. (+351) 914 857 174
U.S.AAlsina Forms Co.200 East Touhy Ave. Des Plaines, IL 60018 - USATel. +1 847-299-7009-Fax. +1 847-299-7027
CHILEMoldajes Alsina Ltda.Nueva Taqueral 369, Panamericana Norte Km. 22, Lampa Santiago - ChileTel: (+56) 2 745 2003-Fax. (+56) 2 745 3023
Encofrados J. Alsina, S.A.
HEADQUARTERS*
Pol. Ind. Pla d'en Coll
Camí de la Font Freda, 1
08110 Montcada i Reixac
(Barcelona) SPAIN
Tel. 935 753 000 - Fax. 935 647 059
E-mail: [email protected]
www.alsina.com
*(Local branches under certification ISO 9001:2000)