Alpine Technical Delegates Update 2011
-
Upload
joseph-brewer -
Category
Documents
-
view
26 -
download
1
description
Transcript of Alpine Technical Delegates Update 2011
•Videos Competition and Training- “A” Fences- “B” Fences- Dying the slope- Workers, Coaches, Service People on the slope- Homologations- Jumps
Alpine Technical Delegates Update 2011
VIDEO 1 DH CRASH
Alpine Technical Delegates Update 2011
DYING PROCEDURE
•Lines should cover both sides
•Crossed lines with 5 to 10 mt distance in critical parts
Alpine Technical Delegates Update 2011
INTERMEDIATE TIMING
•People must stay in safe positions
•Outside the fences
•Timing devices always protected
•Holes into the fences ?
Alpine Technical Delegates Update 2011
COACHES POSITIONMEDICAL RESCUE
•Near to where possible accident can occurr
•Not to close to the race line
•Beside the fences, never in front
Alpine Technical Delegates Update 2011
•IMPACT ZONE
•Correct tension „A“ Fence
•Possible situation for a double „A“
•„B“ Fence in front?
•How many incident do you have in the same place?
Alpine Technical Delegates Update 2011
VIDEO 2 DH CRASH 2
Alpine Technical Delegates Update 2011
•GATE JUDGE POSITION
•Near the race line
•Flat sections are some times also dangerous
•Jury can also work as Gate Judges
• „C“ fences must be placed as far as possible form the race line
Alpine Technical Delegates Update 2011
•MARKING THE JUMP
•Cross lines before the Jump and also by landing zones
•Check also standing positions
Alpine Technical Delegates Update 2011
•MISTAKE BEFORE THE CRASH
•Even in „easy“ section mistakes are possible.
Alpine Technical Delegates Update 2011
„A“ FENCE IMPACT
•„A“ fence should also avoid impacts from the side.
•Slipp skirt in this cases are very important.
•Slipping the outside zone of the turn can also avoid the crash.
Alpine Technical Delegates Update 2011
VIDEO 3 SUPER G CRASH
Alpine Technical Delegates Update 2011
•COACHES POSITION
•Before stating the race check where coaches are standing alonge the course
Alpine Technical Delegates Update 2011
•HOMOLOGATION
•Ask for additional homologation and safety reports
•Check safety installations
•Special requirements
•Additional nets or protections are needed?
Alpine Technical Delegates Update 2011
BEFORE THE CRASH
•Is this an unusual situation?
•What can we do to avoid this mistake?
•Again a flat section is causing problems.
Alpine Technical Delegates Update 2011
BEFORE THE IMPACT
•Small bump in the „falling“ line makes the racer take some „air“ before the impact
•Distance between the „ideal“ race line and the „B“ fences.
Alpine Technical Delegates Update 2011
•INTO THE NETS
Two rows of „B“ fences
Alpine Technical Delegates Update 2011
•BIG CRASH
•Two rows of „B“ fences are not enough ?
•Threes must be also protected ?
• No consequences
Alpine Technical Delegates Update 2011
VIDEO DH FINISH CRASH
Alpine Technical Delegates Update 2011
DH FINISH AREA
• One gate before the finish line helps racer to find the correct line
• Red Line must be marked
Alpine Technical Delegates Update 2011
DH FINISH AREA
• Colouring the finish area
• Poor visibility before the finish and after the finish line
• Small bump in the shadow
Alpine Technical Delegates Update 2011
POSITION ON THE SLOPE
Alpine Technical Delegates Update 2011
POSITION ON THE SLOPE
• Outside race line
• No chance to see where the competitor will go
Alpine Technical Delegates Update 2011
POSITION ON THE SLOPE
• Too many people standing in the same position
Alpine Technical Delegates Update 2011
POSITION ON THE SLOPE
• He was not so „fast“
Alpine Technical Delegates Update 2011
SUPER G SLOPE
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• Check carefully the homologation
• Right side „C“ fences ?
• Are you sure we are using the homologated slope?
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• Tourist skiing beside the race slope
• Distance between the outisde pole and the fences
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• Mix of people inside the fences
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• Snow gun above the jump
• Enough protection?
• Check the homologation file
• Can we set another line and avoid the jump?
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• After the crash
• Distance between the outside pole and the fences
Alpine Technical Delegates Update 2011
8 m
??
SUPER G SLOPE
Alpine Technical Delegates Update 2011
SUPER G SLOPE
• People near the fences but outside the slope
• Plastic band in front of the fences
• Poles beside the course, drills?, keys? bags?
• Racer DNF
Alpine Technical Delegates Update 2011
VIDEO 7 DH JUMP
Alpine Technical Delegates Update 2011
•DH JUMP
•Preparation of the jump.
•Smooth and „clean“ table.
•Colour marked at the edge.
Alpine Technical Delegates Update 2011
DH JUMP
•High jump
Alpine Technical Delegates Update 2011
DH JUMP
•Another view
Alpine Technical Delegates Update 2011
DH JUMP
•Landing zone must be well prepared
Alpine Technical Delegates Update 2011
AAAAiiiiiiiiiiiiiiiiii...
DH JUMP
•Very long jump
•Unsual jump in comparation with all other competitors
•Consider different level of competitors
Alpine Technical Delegates Update 2011
DH JUMP
•Try to analyse with the Jury before the race where can this competitor end his/her jump
• Is this happening so often?
Alpine Technical Delegates Update 2011
•DH JUMP
•You can have different situations at the same jump.
Alpine Technical Delegates Update 2011
DH JUMP
•Would you say already start stop on the Jury radio?
Alpine Technical Delegates Update 2011
•DH JUMP
•Still no breathing.....
Alpine Technical Delegates Update 2011
•DH JUMP
•At the end nothing happens...
Alpine Technical Delegates Update 2011
GS TRAINING
Alpine Technical Delegates Update 2011
GS TRAINING
• Fences betweeen the slope and T-Bar
• 4 sec sliding before the crash
Alpine Technical Delegates Update 2011
Fences
GS TRAINING
• Remember this could be also the warm up for your competition.
•Many times is better to organise free skiing on the slope instead of warm up with gates.
Alpine Technical Delegates Update 2011
Alpine Technical Delegates Update 2011
Alpine Technical Delegates Update 2011