Alpha Borough Project
Presented by
Beta Solutions
Dave Woodruff
Crystalann Harbold
Todd Baldwin
Katie O’Connor
Adam Brown
![Page 2: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/2.jpg)
Beta Solutions
Presentation Overview
• Scope of Project• Concerns of Community• Ideas for new development• Present Preliminary Site
Design• Present Floor Plan• Funding Solutions• Question / Answer Session
![Page 3: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/3.jpg)
Beta Solutions
Vulcanite Avenue site
Vulcanite Ave.
Springtown R
d.
![Page 4: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/4.jpg)
Beta Solutions
Scope of Project
• Redesign Vulcanite Avenue recreational area so that it may provide services to a majority of the Alpha Borough community.
• Considerations:– economic, environmental, geotechnical, hydrology,
transportation, & structural
![Page 5: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/5.jpg)
Beta Solutions
Concerns/Needs of Community(Based on 2/07/02 town meeting)
• Renovate Pool
• Build Senior/Youth center
• Additional sports fields– Limited space restricts practices
• Continued Maintenance of building
• Funding for Site Development– Building must be cost-effective
![Page 6: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/6.jpg)
Beta Solutions
Ideas for New Development
• Renovate pool
• Build joint youth/senior center
• Refurbish park
• Provide sufficient parking
• Community Labor Assistance Program
• Be cost-effective in design– Exhaust all funding options
![Page 7: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/7.jpg)
Beta Solutions
Preliminary Design
![Page 8: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/8.jpg)
Beta Solutions
Preliminary Design(Youth/Senior Center)
9,660 Sq. Ft. Senior/Youth Center
![Page 9: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/9.jpg)
Beta Solutions
Preliminary Design (Outdoor facilities)
Relocation of small baseball feilds
Tennis Court and Basketball Court
Additional Picnic Tables
Roller Hockey Rink
Restriping of Football/Soccer Field
![Page 10: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/10.jpg)
Beta Solutions
Preliminary Design(Parking layout)
![Page 11: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/11.jpg)
Beta Solutions
Preliminary Design(Detention basin, community garden, walking path)
Community Garden Area
Walking Path
Proposed Detention Basin Area
![Page 12: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/12.jpg)
Beta Solutions
Preliminary Design(Generating revenue)
Lease Property to Generate $$:• Mini-Golf•Go-Carts•Arcade•Etc.
![Page 13: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/13.jpg)
Beta Solutions
Building Floor Plan
![Page 14: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/14.jpg)
Beta Solutions
Preliminary Cost Estimate
• Building
• Sports and recreation areas
• Detention basin
• Parking, lighting, Etc.
• Total estimated cost
$773,000
$230,000
$15,000
$642,400
$1,660,400
![Page 15: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/15.jpg)
Beta Solutions
Funding • Options:
– Green Acres Loan• Recreation areas, etc.
• Up to $500,000
– Small Cities Grant• Building
• Up to $400,000
– Other Foundations• Community participation
– Increase Pool Fees
– YMCA Branch Facility
$
![Page 16: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/16.jpg)
Beta Solutions
Conclusion• Layout fulfills requirement of Alpha
Borough
• Definite need of more outside funding sources (possible community support)
• Layout subject to change per community feedback
![Page 17: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.](https://reader035.fdocuments.us/reader035/viewer/2022081520/56649c815503460f9493989c/html5/thumbnails/17.jpg)
Beta Solutions
Question or Comments?• Thank you on behalf of Beta Solutions
• Any questions and comments will be greatly appreciated so we can better serve your community.
• Please send any comments
to Crystalann Harbold at [email protected]