All WP Meeting Athens - Workpackage 1 Update - Doron Goldfarb
-
Upload
digitised-manuscripts-to-europeana -
Category
Education
-
view
728 -
download
0
description
Transcript of All WP Meeting Athens - Workpackage 1 Update - Doron Goldfarb
co-funded by the European Union
WP1 - Content
DM2E All WP MeetingAthens, 28 November 2013
Doron Goldfarb, Austrian National Library (ONB)
Outline
DM2E All WP Meeting: Work Package 111.06.2013 2
1. WP1 last six months
2. New associated partners
3. Current status of content providers
WP1 Last six months
DM2E All WP Meeting: Work Package 111.06.2013
• MS1 Final Integration Report Draft
• EAD Meeting with NLI/SBB/UBER in Berlin
• Specification for uncertainties in metadata
• Task 1.3 Evaluation MINT, OmNom & SILK
• Task 1.4 Pundit test scenario setup / evaluation
3
MS1 Final Integration Report Draft
DM2E All WP Meeting: Work Package 111.06.2013
• MS1 Final Integration Report Draft
• July 2013
• Detailed descriptions ofContent Provider workflows
• Results of MINT Questionnaire
4
EAD Meeting with NLI/SBB/UBER in Berlin
DM2E All WP Meeting: Work Package 111.06.2013
• Meeting with NLI/SBB/UBER in Berlin
• Preliminary EAD mapping considerations for SBB/JDC/BRANDEIS
• Questions regarding the representation of the various hierarchical levels– Mandatory Web-Resources– Person/Subject references on different levels
5
Specification for uncertainties in metadata
DM2E All WP Meeting: Work Package 111.06.2013 6
• Provider input collected at London meeting
• Metadata elements with sometimes uncertain information:– Person roles (“presumed author”)– Time(spans) (19XX, 168?, 1500-1533)
• Collaborated with WP2 for specification (-> WP2)
Task 1.3 OmNom evaluation
DM2E All WP Meeting: Work Package 111.06.2013 7
• Will be done by ONB in cooperation with UMA• Evaluation questionnaire created
DM2E All WP Meeting: Work Package 111.06.2013 8
• Will be done by MPIWG together with UMA
• Triplestore with contextualization data set up
• Needs data ingested in order to be done!!!
• Evaluation questionnaire created
Task 1.3 SILK evaluation
DM2E All WP Meeting: Work Package 111.06.2013 9
• ONB in cooperation with UIB, NET7, UBER
• Surveys created for different audiences
• Will be presented tomorrow
T1.4 Pundit test scenario setup / evaluation
DM2E All WP Meeting: Work Package 111.06.2013 10
• For each legacy data format one Wiki page on dm2e.eu
• Short description/history of the format & its uses
• “Showcase” mapping from format to DM2E model
• Provide sample data & XSLT transformation online
• In cooperation with WP4 / Documentation deliverable
TBD: WIKI about DM2E mapping
Outline
1. WP1 Last six months
2. New associated partners
3. Current status of content providers
DM2E All WP Meeting: Work Package 111.06.2013 11
New associated partners
DM2E All WP Meeting: Work Package 111.06.2013
• EUROCORR – Burckhardtsource
– EUROCORR Advanced Grant project, funded by ERC
– Burckhardtsource platform on Muruca DL (Net7)
– http://burckhardtsource.org
12
New associated partners - Negotiating
DM2E All WP Meeting: Work Package 111.06.2013
• MarineLives - http://marinelives.org/
„MarineLives is an innovative academic project for the collaborative transcription, linkage and enrichment of primary manuscripts, which were originated in the High Court of Admiralty, London, 1650-1669. The end product will be a publicly and freely available online academic edition”
13
New associated partners - Negotiating
DM2E All WP Meeting: Work Package 111.06.2013
• Mannheim University Library -http://www.ub.uni-mannheim.de
– Collection of old prints, some of them already digitised, others currently digitised throughout ongoing project
14
Outline
1. WP1 Last six months
2. New associated partners
3. Current status of content providers
DM2E All WP Meeting: Work Package 111.06.2013 15
Status of Content Providers
DM2E All WP Meeting: Work Package 111.06.2013
• Focus on Final Content Integration due January 2014
– BBAW Ready ~430,000– CJH No data available yet ~400,000– NLI Workflow ready ~2,900,000– MPIWG Ready >535,000– ONB Codices Ready ~45,000
ABO Parts ready ~15,000,000– SBB Workflow ready, Delivery 2014 ~106,000– UIB Ready ~5,000– DFGA Workflow ready ~20,000– HUB Ready ~205,000– UBFFM Ready ~267,000
16
Status of Content Providers
DM2E All WP Meeting: Work Package 111.06.2013 17
Ready: ~ 1,487,000
Partly ready: ~ 15,000,000
Workflow ready: ~ 3,426,000
GOAL January 2014: 15,000,000
Status of Content Providers
DM2E All WP Meeting: Work Package 111.06.2013 18
Partly ready: ~ 15,000,000
ONB ABO Data
Status of Content Providers
DM2E All WP Meeting: Work Package 111.06.2013 19
co-funded by the European Union
Thank You !