EGAT Document Rev.
Document Status
Other Document Code (If any)Scale
Title, Subtitle
Contractor
Project
Client
Revision Date
EGAT Document no.
Revision History
Checked : Approved :Created :
ApprovedCheckedCreated
Owner
Contractor
Responsible Dept.
Originator Document No.
Format
Rev.DateSheet
Originator
Space for Stamping
Bang Pakong Combined Cycle (Units 1-2 Replacement) Project
Electricity Generating Authority of Thailand
Rev. Description
A1
A1
R
R
R
PT
41CP001A
PT
41CP001B
TE
41CT003
TE
41CT002
TW
41CT800
PT
41CP002A
PT PT
41CP002C
TW
41CT801A
TW
41CT801B
D
E
B
C
PIPING AND INSTRUMENT DIAGRAM
HOT REHEAT STEAM
E
G192675-10LBB-M2590
-
XX
MA
B11
AA202
HR
100
PT
35CP001A
PT
35CP001B
25
BR308
XXLB
B41
25
BR300
XX
MA
N35
25
BR301
XX
MA
N35
50
BR009
XXLBB41
TEGE
BV
TM
051
0008
HR
801
BV
HR
803
GE
900
BR001
XXMAN35
CONDENSER
BR001
XXLBA40
900
BR001
XXMAN34
41CP002B
25
BR300
XXLB
B41
25
BR301
XXLB
B41
TE
41CT004
GE BVGE BV
TE TE
41CT001B41CT001A
TE
41CT001C
BVGE BVGE BVGE
HR
701
HR
702
HR
703
150
BR001
XXMAN31
15
BR300
XX
MA
N31
15
BR301
XX
MA
N31
25
XX
MA
N31
25
BR305
XX
MA
N31
FT
31CF002A
PDT
31CP001
100
BR002
XX
MA
N31
CONNECTION
CLEANING
CHEMICAL
50
BR003
XXMAN31
25
BR002
XX
MA
L41
SD
311
CONDENSATE
XX
MA
B12
AA202
650
BR004
XXLBB41
HRSG BLOWDOWN TANK
0002
TE TE
12CE1X
12CE1X
12RD22 11RC21
25
BR306
XXLB
B41
25
BR307
XXLB
B41
27/JUN/18
KSA
KSA
AT001
25
BR200
XX
MA
N31
DR
31CF001
25
BR201
XX
MA
N31
TT
50
NOTE 3
PRE-WARMING LINE
BYPASS VALVE
NO
TE 2
25
BR001
XX
MA
L41
NO
TE 2
BV
GE GE
BV
BR007
XXLB
B41
500
41CT802B
TW
41CT802A
TW
41CT803A
TW
41CT803B
TW
25
BR309
XXLBB41
25
BR310
XXLBB41
NOTE 6 NOTE 6
NOTE 6
NOTE 6
NOTE 6
NOTE 6
NOTE 5
BR304
15
BR302
XX
MA
N31
15
BR303
XX
MA
N31
31CF002B
FT
150
BR001
XX
MA
N33
150
BR001
XXMAN32
12CE1X
12
RA2
X
LO
NOTE 7
BV GE
25
BR311
XXMAB20
25
BR313
XXMAB20
25
BR315
XXMAB20
20CP001A
PT
20CP001B
PT
20CP001C
PT
HR
HR
HR
GE BV
HR
HR
RE
HE
AT S
TE
AM
HRS
G H
OT
700
BR001
XXLBB41
14
RD2S
14
RD2S
500
BR008
XXLB
B41
BV
VPI
T
503
10LCA-M2343B
10LCA-M2343A
10LCQ-M2582
VALVE STEM LEAKOFF
MAIN STEAM CONTROL
10MAW-M2639A
300
BR005
XXLB
B41
000310LFC-M2586A
NOTE 3
50
50
BR003
XXLBB41
14RD2S
14
RD2S
E/H
E/H
E/H
E/H
IP STEAM
TURBINE
NOTE 9
NOTE 6
YKG TN
WUN JSN
NOTE 8
300
BR002
XXLB
B41
VT
25
BR200
XXLB
B41
35CT001A 35CT001B
25
BR200
XX
MA
N34
VT
E/H
GE BV
GE BV
831
832
833
834
NOTE 10
NOTE 5
AA001
AA704 AA705
AA700 AA701
AA001
AA501AA500
AA700 AA701
AA713 AA710
AA715
AA711
AA709 AA710
AA500
AA500 AA706 AA707 AA708
AA003
AA002
AA702 AA703
AA200
AA201
AA001
AA200
AA700 AA701
803
50
BR006
XXLBB41
14
RD2S
AA002AA202 14RD2S
LO
25
BR201
XXLBB41
25
BR310
XXMAB20
SD
GE
BV
411
25
BR202
XXLBB41
AA501 AA502
VT VT
14RD2S
HR
BV
GE
200
AA201XXMAB11
AA201XXMAB12
25
BR201
XXMAN33
DR
14RD2S
14RD2S
14RD2S
14RD2S
14RD2S
14RD2S
14
RD2S
14
RD2S
600
BR010
XXLBB41
14RD2S
BPRP1-D-BVTEM-10LBB-1002
AA200
450 450
12
CE1
X
D-S
BV
EM-1
0H
A-0
008
25
BR302
XXLB
B41 AA711
NOTE 5
40CT001
40
BR003
XXMAA45
14RD2S
D-BVTEM-10LCA-1011
D-BVTEM-10LCA-1010
D-BVTEM-10MAW-1056
D-BVTEM-10LCQ-1005
50
BR001
XXLFC13
14RD2SD-BVTEM-10LFC-1012
AA501
17/DEC/18 REVISED PER EGAT COMMENTSKSA WUN JSN
STRAIGHT PIPE DOWNSTREAM OF BYPASS VALVE NOT LESS THAN 9.0 M.
STRAIGHT PIPE UPSTREAM OF BYPASS VALVE NOT LESS THAN 2.5 M AND7.
TURBINE FIELD TESTING.
CAP (FNPT). REMOVE PIPE CAP AND INSTALL TEST TEMPERATURE ELEMENT FOR
TEST THERMOWELL WITH 15 MM (1/2 INCH) PIPE NIPPLE (MNPT) AND PIPE6.
PIPE PLUG FOR NITROGEN PURGING.
LINE AND PRESSURE TRANSMITTER FOR TURBINE FIELD TESTING. REMOVE
PLUG (MNPT). REMOVE PIPE PLUG AND INSTALL INSTRUMENT TUBE IMPULSE
ISOLATION VALVE WITH 15 MM (1/2 INCH) INSERT ADAPTER (FNPT) AND PIPE5.
NOTED.
TEMPERATURE INSTRUMENT CONNECTION SIZE IS 40 MM UNLESS OTHERWISE4.
AND REPLACE WITH SWLD CAPS AFTER STEAM BLOW.
CAPS ON DRAINS TO BE FABRICATED WITH THREADED CAPS. CUT OFF THREAD3.
SLOPE OF 21 MM PER METER (0.25 INCH PER FOOT).
PITCH BEFORE SEAT DRAIN DOWNWARD INTO HOT REHEAT LINE AT A MINIMUM2.
FOR COMPONENTS ASSOCIATED WITH UNIT 1 AND 2 RESPECTIVELY.
ALL SYSTEM COMPONENTS ARE SERIES XXLBBNNFFYYY WHERE XX IS 11 AND 121.
NOTES:
14RD2S
50
BR011
XXLBB41
00410LFC-M2586A
D-BVTEM-10LFC-1012
AA004
14RD2S14RD2S
14RD2S50
BR001
XXLFC14
AA003
50
BR012
XXLBB41
50
BR001
XXLFC15
14RD2S005 10LFC-M2586A
D-BVTEM-10LFC-1012
STEAM TURBINE FLASH TANK
STEAM TURBINE FLASH TANK
STEAM TURBINE FLASH TANK
BR004
XXLCA34
12CE1X
150
14RD2S
50
BR001
XXLCQ12
AA005 AA006
0001
XXMAB10HA001
NOTE 11
NOTE 12
41CF001
BR001
XX
MA
N37
150
12
RB2
X
LO
LO
NOTE 12
NOTE 12
0001
150 150
40
P&ID LEGENDD-BVTEM-01UUU-1015
P&ID LEGENDD-BVTEM-01UUU-1014
LEGEND REFERENCE DRAWING:14.
TRANSITION FOR DIFFERRENT MATERIAL.13.
INSERT SOCKET WELDED CAP AFTER HYDROTEST.12.
SCHEMATIC DIAGRAM STEAM SYSTEMD-SGEEM-10MAA-1009
GE REFERENCE DRAWING:11.
MANUFACTURER'S RECOMMENDATION.
STRAINER MESH OPENING SHALL BE AS PER SPRAY WATER CONTROL VALVE10.
THAN 17.9 METER.
DISTANCE OF FIRST TEMPERATURE ELEMENT AFTER BYPASS VALVE IS NOT LESS9.
THAN 5 TIMES OF THE PIPE OUTLET DIAMETER.
DISTANCE OF FIRST PRESSURE SENSOR AFTER BYPASS VALVE IS NOT LESS8.
NOTE 13
NOTE 12
NOTE 12
09/MAY/19 KSA YKG TN APPROVED FOR CONSTRUCTION
THE DISTRIBUTION AND USE OF THE NATIVE
FORMAT CAD FILE OF THIS DRAWING IS
UNCONTROLLED. THE USER SHALL VERIFY
TRACEABILITY OF THIS DRAWING TO THE LATEST
CONTROLLED VERSION.
CONSTRUCTIONAPPROVED FOR
AA204
AA203
29/OCT/19 REVISED PER ECN N-M-0020SKN YKG TN
MECHANICAL
25
BR203
XXLB
B41
VT
NOTE 12
AA503
ECN N-M-0020
ALL BACKCIRCLEDCHANGES PER
REVISED PER EGAT COMMENTS
kos80564
OpenPla
nt PID v
8.1
1.9.8
64
10/28/2019 3:2
2:5
2 P
M
Italian-Thai Development Public Co., Ltd.
Black & Veatch (Thailand) Ltd. and
The Consortium of Sumitomo Corporation,
1:1 F
ull Size
FINAL FOR
CONSTRUCTION09/MAY/19
FINAL FOR CONSTRUCTION