ALJABER ENGINEERING | CORPORATE PROFILE 1

02

03

04

05

09

17

28

29

54

62

66

68

71

74

82

CHAIRMAN’S MESSAGE

VISION & MISSION

CEO’S MESSAGE

COMPANY PROFILE

CAPABILITIES

PROJECTS PORTFOLIO

SELECTED PROJECTS

HIGHWAYS, ROADS AND INFRASTRUCTURE

OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS

PIPELINE CONSTRUCTION

POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS

LANDMARK BUILDINGS

RESOURCES

AFFILIATES

CONTENTS

JEC_PRO_VER3_6_NOV_2015

In parallel with the vision and extraordinary growth of Qatar, AlJaber Engineering (JEC) continues to be at the forefront of the construction industry and a major player in the ongoing development of the nation.

JEC has fully diversified contracting capabilities through which we have successfully delivered numerous prestigious projects for local clients and we continue to participate in large scale projects either independently or in a joint venture with some of the largest multi-national companies in the world.

JEC’s future challenge in this dynamic market is to maximize its competitive edge and take full advantage of the strong pipeline of opportunities, which continue to emerge in Qatar. We are all working together to support JEC’s Mission to deliver projects for the benefit of our clients and partners.

I take this opportunity to offer my appreciation and gratitude to JEC’s partners and clients without which our continued success would not be possible. I look forward to a long and sustained partnerships with you all.

Mohamed Sultan Al JaberChairman

CHAIRMAN’S MESSAGE

ALJABER ENGINEERING | CORPORATE PROFILE 3

OUR VISION

JEC’s vision is to be Qatar’s premier general contractor always striving to deliver construction works to complex projects with excellence. Our track record has proven that regardless of all challenges, we deliver the work to the highest standards on time and on budget.

OUR MISSION

AlJaber Engineering endeavors to be the market leader and preferred general contractor, widely recognized for superior construction expertise. We achieve consistency in the delivery of high quality services and add value for clients through proactivity, transparency in communication, timely completion of projects, and high quality performance. We practice sustainability to safeguard our environment, and maintain the highest levels of professionalism, honesty, and trust in our relationships with clients, employees, and affiliates.

For over 15 years AlJaber Engineering (JEC) has been a cornerstone of development and infrastructure projects in the State of Qatar. As one of the largest general contractors in Qatar, we have been a consistent player in the nation’s extraordinary growth.

Qatar, under the wise leadership of His Highness The Emir, Sheikh Hamad Bin Khalifa Al Thani, is becoming increasingly international as an emerging diplomatic and travel hub. This is being delivered on the back of Qatar National Vision 2030, which supports strong public policy towards diversifying the national economy away from a dependence on oil and gas exports. This policy has already succeeded in dramatic fashion with Qatar’s successful bid for the FIFA World Cup 2022, supporting the nation’s upward trajectory.

AlJaber Engineering has been taking a leading role in providing general contracting services with uncompromised commitment to Quality, Health, Safety and Environment. We do this through the combination of an open relationship with our employees based on mutual trust, transparency, accountability and discipline.

To that end, we continue to invest in the most qualified, best-in-class talent to manage operations and project delivery. Our management team is backed by an international workforce of over 8,000, each trained to industry’s best practice and operating to fully accredited management systems, health, safety and environmental sustainability standards. This amounts to our ultimate goal of ensuring continued precision in everything we do. We use state-of-the-art equipment to help in participating in upcoming challenging large-scale projects.

We are proud of our achievements to date and we are committed to continually enhancing our capabilities to ensure we remain at the forefront of our industry both in terms of client and project needs.

Osama HadidChief Executive Officer

WELCOME MESSAGE

ALJABER ENGINEERING | CORPORATE PROFILE 5

AlJaber Engineering (JEC) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber Group - a major conglomerate with over 30 companies- JEC has successfully completed numerous large-scale turnkey projects for many prestigious clients in different sectors including:

• Highways, Roads and Infrastructure

• Engineering, Procurement, Installation & Commissioning (EPIC)

• Oil, Gas, Petrochemical and Industrial

• Pipeline Construction

• Power Generation, Substations & Desalination Plants

• Sewage Treatment Plants and Pumping Stations

• Maintenance of Oil & Gas and Petrochemical Installations

• Landmark Buildings

Our commitment to execute projects with the highest quality, on schedule and within budget while adhering to excellent standards of health, safety and environmental positioned JEC to be recognized as an icon in the construction community in Qatar. We have recently established an office in Iraq to undertake projects in contribution to the large ongoing developments.

In line with the growing demands to build Qatar’s infrastructure and new developments, JEC has invested in its resources to meet international standards and upgraded its fleet of equipment in preparation to participate in upcoming diverse projects.

COMPANY PROFILE

LEGAL & FINANCIAL STATEMENT

Certificate Document No. Expiry Date

Trade License 25964 03-06-2016

Commercial Registration 21753 10-08-2017

Contractor’s Classification Certificate 1602 14-12-2016

KAHRAMAA Grade “A” Contractors Certificate 1028 30-03-2017

Fire Alarm Certificate 1381 16-08-2017

Fire Protection (Defence) Certificate 1381 16-08-2017

ALJABER ENGINEERING | CORPORATE PROFILE 7

Key Personnel

SL. Name Position

01 Osama Hadid Chief Executive Officer

02 Hisham Hadid Executive Director

03 Amr Nadim Executive Manager - Engineering

04 Andrew Mulcuck Executive Manager - Commercial

05 Alex Calfat Executive Manager - Operations Civil

06 Baris Nazlim Executive Manager - Operations Civil

07 Nabil Nakhle Executive Manager - Operations Civil

08 Khaled Jarrar Executive Manager - Finance

09 Husam Orabi Corporate Business Development Manager

10 Thomas Anderson Corporate QHSE Manager

11 Sohile Ismail Operations Manager - M & E

12 Hisham Obeidat Corporate Assets Manager

13 Firas Abu Zaki Projects Controls Manager

14 Qais Al Dabbas Cost Control Manager

15 Matthew Wood Commercial Manager

16 Carlos Haddad Estimation Manager

17 Mohamed Al Smadi Engineering Manager

18 Ayman Amer Procurement Manager

19 Ahmed Effat Houda Planning Manager

20 Ahmed Hadid Corporate Finance Manager-Affiliates

21 Thaer Abu Shaikha Accounts Manager

22 Anas Al Ereksousi HR Operations Manager

23 Muttiya Khayyat IT Manager

AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:

Oil & Gas, Petrochemical & Industrial

CLIENTS

Large International EPC Contractors

Large Developers

Government Clients

ALJABER ENGINEERING | CORPORATE PROFILE 9

CAPABILITIES

ALJABER ENGINEERING | CORPORATE PROFILE 11

HIGHWAYS, ROADS AND INFRASTRUCTUREAlJaber Engineering is a leading general contractor executing Highways, Roads, Infrastructure and mega earth moving projects.

JEC FOCUS AREAS ARE:• Highways and roads.• Underpasses, bridges and interchanges.• Major earth and reclamation works.• Turnkey Infrastructure Projects.• Site development works for industrial and petrochemical plants.• Pipeline construction (water, sewage and drainage).• Treated sewage effluent system (TSE).• Drainage and sewage systems.• Electrical and telecommunication networks.• Street lighting.• Signalization and traffic light systems.• Tunneling including related electrical and mechanical works.

JEC STRENGTH INCLUDES;• JEC owns the largest fleet of construction and earthmoving equipment in the state of Qatar.

• Concrete supply through JEC affiliated company Al Wataniya, Total production capacity 100,000m3/ month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan).

• Asphalt works through JEC Affiliated company Al Jaber Makhlouf with own fleet of equipment for production and delivery of Asphalt, total capacity of 10,000 tons/day.

• JEC owns onsite crushing and screening plants utilized for production of fill, structural fill, sub base and other crushed products.

PETROCHEMICAL, INDUSTRIALAND OIL AND GAS

AlJaber Engineering has been a key contractor involved in design, procurement and construction of turnkey projects related to the following:

• EPIC projects • Waste management facilities

• Oil & Gas facilities • Water treatment plants

• Power and desalination plants • Water transmission systems

• Petrochemical plants • Tanks and reservoirs

• Industrial plants• Maintenance of petrochemical and industrial installations

• Sewage treatment plants • HV substations

JEC STRENGTH INCLUDES:

EngineeringJEC has a highly qualified technical team to manage the requirements and performance of design sub-contractors including any specialized services such as HAZOP.

ProcurementOur Procurement team has extensive experience in managing and performing procurement activities for large EPIC contracts.

ConstructionJEC construction team has worked on complex projects, with technical experience to meet international contracting standards and capable to perform high-profile projects.

ALJABER ENGINEERING | CORPORATE PROFILE 13

CIVIL WORKS• Underground and elevated concrete structures• Silos• Cooling towers• Precast concrete pipe racks• Culverts• Structural steel works• Industrial buildings• Underground utility networks• Road works• Fencing

MECHANICAL WORKS• Supply, fabrication and erection of major process static equipment• Process piping and Pipelines• Fire fighting systems• Pipe gantry’s and support systems• Cranes• Supply and erection of rotary equipment• HVAC systems• Insulation, Painting and scaffolding works

ELECTRICAL & INSTRUMENTS• Supply and erection of major electrical equipment.• Power distribution systems• Lighting and power• Fire detection and alarm systems• Programmable logic control systems (PLC)• Scada systems• Structural cabling• Security systems• Instrumentation and control works• Telecommunication systems

ALJABER ENGINEERING | CORPORATE PROFILE 15

LANDMARK BUILDINGSWe have successfully executed various industrial buildings on design and build basis. In addition, JEC currently executing construction of landmark buildings as part of a Joint Venture with international companies.

JEC is a Kirby Certified builder to supply and erect Kirby Buildings in Qatar.

JEC FOCUS AREAS ARE• Landmark buildings• Structural steel buildings• Control rooms• Blast proof buildings• Temporary facilities

JEC STRENGTH INCLUDESCIVIL WORKS:• Enabling works• Concrete works• Curtain wall systems• Stone cladding• Steel structure• Architectural finishes

MEP WORKS:• Drainage• Plumbing• HVAC systems• Chilled water systems• Waste water treatment systems• Electrical (MV/HV/ELV networks)• Instrumentation• Telecommunication• Lifts• Fire fighting and fire alarm systems• Building Management System (BMS)

ALJABER ENGINEERING | CORPORATE PROFILE 17

PROJECTSPORTFOLIO

Project Client Value (USD) Status of Completion

CP12-E Additional Dredging of Southern Marina ChannelLusail Real Estate Development Company W.L.L

25,656,219 Ongoing

Roads & Infrastructure in Wadi Aba Seleel – Package 1A, Advanced Grading & Temporary Roads (QS004-P01A)

Public Works Authority 43,830,488 Ongoing

Camp at Abu Nakhlah Aljaber Engineering LLC 35,616,438 Ongoing

Construction of CP08-A3: Enabling Works - Qetaifan Islands Lusail Real Estate Development Co. W.L.L. 50,645,068 Ongoing

Design & Build of Plants (STP, SWRO, TSE Polishing, RO) & Supply and Installation of Utility HUB and Pumping Stations-MEP Works including Process

Al-Ali Engineering Cont. Trading WLL 20,273,973 Ongoing

Doha Metro project - Gold Line (A Joint Venture with Aktor, Yapi Merkezi, STFA and Larsen & Toubro)

Qatar Rail 3,357,810,000 Ongoing

Design and Construct New Orbital Highway and Truck Route Mesaieed to Salwa Road (A Joint Venture with Leighton Contracting Qatar)

Public Works Authority 1,687,232,160 Ongoing

Site Preparation Works for GASAL Project GASAL Q.S.C 7,683,540 August, 2014

Construction of CP7A-1B waterfront wommercial / Seef Lusail Infrastructure works Lusail Real Estate Development Co. W.L.L. 38,540,200 Ongoing

Rasgas flow assurance project - Site preparation works RasGas Company Ltd. 1,800,350 May, 2014

Construction of CP7C-1C, enabling works for Commercial Boulevard Lusail Real Estate Development Co. W.L.L. 42,593,000 August, 2015

Upgrading of Mesaieed Town RPSQatar Electricity & Water Corporation-KAHRAMAA

27,900,000 Ongoing

Development of new camp for Internal Security Forces (ISF) at Al Duhail (A Joint venture with AKTOR).

Internal Security Force (ISF) 662,506,000 Ongoing

Coast Guard Base - Expansion of the main navigational channel & turning basin Urbacon General Contracting 10,405,500 May, 2014

The Base Project in North Lusail - The Island Bridge Works UrbaCon General Contracting 7,946,000 May, 2014

EPIC for wet utilities distribution network (Potable water supply, fire water and sewrage) for support services for an area of approximately 3000 Hectares complete with auxiliary facilities, sub-systems and mains network at West End extension, Ras Laffan Industrial City

Qatar Petroleum 147,370,000 May, 2014

HIGHWAYS, ROADS AND INFRASTRUCTURE

ALJABER ENGINEERING | CORPORATE PROFILE 19

Project Client Value (USD) Status of Completion

EPIC for southern perimeter industrial fence, security patrol access and other roads in Ras Laffan City

Qatar Petroleum 23,985,000 December, 2013

Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary irrigation, portable water networks and street lighting

Jawhara Greens Company SPC

20,274,000 November, 2013

The Base Secondary Chanel Excavation and Disposal Works in Semisima. UrbaCon General Contracting 7,209,600 April, 2013

Reconstruction of existing roads and construction of new roads with all associated services and infrastructure including upgrade of existing utilities and installation of new utilities at Mesaieed Community Area

Qatar Petroleum 190,000,000 February, 2012

Early site earth works for Barzan onshore project at Ras LaffanRasGas- Main Contractor: CCC /Teyseer JV

36,000,000 July, 2011

Construction of road paving at Pearl GTL plant area Strabag Qatar W.L.L. 1,272,000 January, 2011

West Bay project. Zone 66: Construction of roads and infrastructure services such as foul sewage, surface water, potable water, TSE lines, pump stations and storm water system in New Diplomatic area

Public Works Authority (ASHGHAL)

55,000,000 December, 2010

EPIC for new support services and site development of 3,000,000 m2 land at Ras Laffan Industrial City

Qatar Petroleum 82,000,000 November, 2010

Construction of underground piping systems consist of installation of GRP sea water pipelines, firewater, process, potable water lines and major infrastructure civil works at Aluminium Smelter in Mesaieed

SNC-Lavalin 96,000,000 August, 2010

Site development of service areas and potroom building area including earth works, construction of roads, surface drainages supply and installation of potable water lines for Qatar Aluminium Smelter in Mesaieed

Qatar Aluminium Co. (Qatalum)

18,071,000 October, 2009

Site preparation and earth works for Elsewedy Cables factory at Mesaieed. Elsewedy Cables 3,500,000 February, 2009

Salwa International Highway interchanges and installation of water pipelines and street lighting

Public Works Authority (ASHGHAL)

86,304,000 January, 2009

Site preparation and road works for QAFCO 5 project in MesaieedHyundai Engineering & Construction Co

8,410,000 December, 2008

Site preparation, ground improvement by dynamic compaction and installation of 8000 Im new security paliside fence for Qatar Aluminium Smelter and Power Plant in Mesaieed

Qatar Aluminium Co. (Qatalum)

34,446,000 December, 2008

Project Client Value (USD) Status of Completion

Gas pipeline crossings for service area and potroom building at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 1,730,000 April, 2008

Construction of land water drain outfall at Ras Laffan Port Jan De Nul / Boskalis JV 625,000 February, 2008

Soil Improvement for Boiler and Demin units in Qatar Vinyl Company Qatar Vinyl Company 500,000 May, 2007

Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water treatment area

Chiyoda /Technip JV 2,530,000 March, 2007

Ras Laffan port expansion project: Excavation and site preparation to construct a lake within Ras Laffan port expansion and construction of access road and street lighting

Jan De Nul / Boskalis JV 6,600,000 February, 2007

QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT) areas at Ras Laffan, in connection with Qatar Gas 3 project

Chiyoda / Technip JV 30,400,000 February, 2007

Hamad Medical City surface and ground water scheme: Construction of surface and groundwater pipelines by microtunneling and construction of reinforced concrete outfall structure

Public Works Authority (ASHGHAL)

12,500,000 September, 2006

Design and construction of central sewage collection system and construction of precast concrete boundary wall

Boom Construction Co. 4,000,000 October, 2006

Excavation and stockpiling of hard material at Ras Laffan Cracker II project site Qatar Petroleum 10,000,000 May, 2006

Ras Laffan Olefin project: Site preparation and installation offence Technip 8,000,000 April, 2006

Environmental clean-up for New Doha International Airport project site including excavation and removal of waste, transportation from NDIA site and placement at engineered landfill site in Mesaieed

New Doha International Airport (NDIA)

38,050,000 October, 2005

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical City

Public Works Authority (ASHGHAL)

18,600,000 October, 2005

Construction of paved walk ways, unpaved track road, landscaping and new boundary wall at Dukhan Township

Qatar Petroleum 3,300,000 March, 2004

ALJABER ENGINEERING | CORPORATE PROFILE 21

Project Client Value (USD) Status of Completion

Fabrication and installation of above ground metal piping, installation of water supply pumps, emergency cooling towers, compressed air piping system and closed cooling medium system at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 20,420,000 September, 2010

Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City Doha Cables 2,986,000 June, 2010

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Mesaieed

Qatar Aluminium Co. (Qatalum)

24,240,000 February, 2010

EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane facilities including all mechanical andelectrical works at Mesaieed Port

Qatar Petroleum 31,336,000 March, 2009

Installation of cathode roding equipment and induction furnace including supply and erection of all mechanical, electrical and instrumentation works at Qatar Aluminium Smelter in Mesaieed

SNC-Lavalin 7,850,000 January, 2009

Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical works for camps and other facilities including underground piping networks, road works, installation of treated effluent tanks, waste water treatment units and sludge treatment units

Chiyoda/Technip JV 33,455,000 November, 2007

OIL & GAS, PETROCHEMICAL ANDINDUSTRIAL PROJECTS

Project Client Value (USD) Status of Completion

Engineering, procurement, fabrication and installation of dust collection towers and sunshades

General Electric (GE) 1,600,000 August, 2007

EPIC of desalinated water network including installation, testing and commissioning of 14 km GRP pipelines at Ras Laffan

Qatar Petroleum 9,985,634 July, 2006

EPIC of potable water transmission system and landscaping mains to distribute water produced by RLPC to various facilities within Ras Laffan

Qatar Petroleum 13,600,000 October 2005

Construction of new access platforms and walkways in Dukhan oil fields Qatar Petroleum 580,000 June, 2004

Construction of dry storage sunshades at Camp As Sayliyah US Army 800,000 January, 2004

EPIC of waste management facility including construction of new landfill cells, HDPE membrane, access roads, weigh scale and concrete land treatment unit with a total capacity of 2800m3 of biodegradable waste at Ras Laffan Industrial City (RUC)

RasGas 4,600,000 December,2002

Extension of central control room building at QAFCO. Qatar FertilizerCo. (QAFCO) 1,800,000 March, 2002

ALJABER ENGINEERING | CORPORATE PROFILE 23

Project Client Value (USD) Status of Completion

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A

Qatar Electricity & Water Co. (KAHRAMAA)

436,649,087 Ongoing

Design and construction of 1200 mm of 30 Km transmission main from Doha West STW to Al Rakhiya farm

Public Works Authority (ASHGHAL)

44,370,000 December 2011

Upgrading of New and Old Salwa distillate and rising mains (22km of pipes)Qatar Electricity & Water Co. (KAHRAMAA)

32,000,000 September, 2007

EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with RasGas expansion project

CHIYODA - TECHNIP JV 21,200,000 February, 2007

Supply and lay the extension of water distribution mains (58 km) in north Duhail Phase C & D

Qatar Electricity & Water Co. (KAHRAMAA)

4,905,000 January, 2006

Supply and lay the extension of water distribution mains (57 km) in north Duhail Phase A & B.

Qatar Electricity & Water Co. (KAHRAMAA)

4,050,000 November,2005

Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor cycle race track

Qatar Electricity & Water Co. (KAHRAMAA)

13,100,000 July, 2004

PIPELINE CONSTRUCTION

Project Client Value (USD) Status of Completion

Umm Al Houl Power Project - Package A (Civil & Building Works) & Package B (HVAC Works)

Hitachi Zosen Corporation 95,800,000 Ongoing

Ras Abu Fontas A1 new water plant- Onshore civil works execution related to the construction of distillers and boilers areas, intake structure and potable water reservoirs for 45 MIGD water desalination plant at Ras Abu Fontas

Fisia Italimpianti 75,500,000 March, 2010

RAFB2-site-0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and large bore pipes (CS & SS)

General Electric (GE) 4,350,000 December, 2006

Qatar transmission system - Phase VI, Substations: Civil works associated with various substations

VATECH 4,900,000 March, 2006

Ras Laffan power and desalination project - Water plant island desalination unit and auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Laffan

Fisia Italimpianti / Enel Power 20,437,000 May, 2003

POWER GENERATION, SUBSTATIONSAND DESALINATION PLANTS

ALJABER ENGINEERING | CORPORATE PROFILE 25

Project Client Value (USD) Status of Completion

Engineering, Procurement, Construction, Testing & Commissioning of the District Cooling Plant-3 in West Bay

Qatar District Cooling (Q.C.S.C) 60,994,300 Ongoing

Refurbishment and upgrading works for various foul and stormwater pumping stations including civil, mechanical, electrical and HVAC works

Public Works Authority (Ashghal)

53,295,000 Ongoing

Construction of treated sewage effluent permanent disposal system including 21 km of HDPE pipeline at Ras Laffan

Chiyoda Technip JV -QGE (CTJV)

10,800,000 February, 2009

Civil works and upgrading of pumping stations Torishima Pump Mfg. Co. Ltd. 2,045,000 May, 2008

Design and construction of sewage treatment plant and labour compound infrastructure including boundary wall, roadworks and chainlink fence

New Doha International Airport (NDIA)

13,000,000 February, 2006

Upgrade of sewage network and refurbishment of pumping stations and relocation of TSE distribution mains

Qatar Petroleum 5,120,000 June, 2005

Construction of treated sewage effluent network (TSE) T5 to T7 including 14 km of TSE mains

Ministry of Municipal Affairs Agriculture (MMAA)

4,000,000 November, 2004

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of TSE mains

Ministry of Municipal Affairs Agriculture (MMAA)

13,000,000 April, 2004

Construction of additional sludge drying beds and other labour accomodation facilities including one storey building

Ministry of Municipal Affairs Agriculture (MMAA)

1,251,000 February, 2002

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS

Project Client Status of Completion

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed SNC - Lavalin Completed

Long term fabrication and maintenance support on call off basis Qatar Vinyl Company (QVC) Completed

Civil work for rolling mill major repair Qatar Steel Company (QASCO) Completed

Refurbishment of administration building ground floor corridor flooring tiles Qatar Fertilizer Co. (QAFCO) Completed

Revamp of closed cooling water cycle and civil works Qatar Fertilizer Co. (QAFCO) Completed

Surface protection of buried sealine O.S.B.L. at Ras Laffan QatarGas Completed

Repair of transformer DHTS 90000/140 ANSALDO Industrial Completed

MAINTENANCE OF OIL & GAS, PETROCHEMICALAND INDUSTRIAL INSTALLATIONS

ALJABER ENGINEERING | CORPORATE PROFILE 27

Project Client Value (USD) Status of Completion

Central warehouse at Mesaieed Qatar Steel Co. 2,500,000 July, 2005

EPIC of 2600 m² pre-engineered steel structure store building with all associated electrical and mechanical works at QAFCO 4 expansion project in Mesaieed

Qatar Fertilizer Co. (QAFCO) 1,615,000 November, 2003

EPIC of 3240m² new office building with all associated roads and external works including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan

RasGas 2,500,000 October, 2003

EPIC of steel frame structure bagging and storage warehouse at Q-CHEM petrochemical complex including complete civil and electro-mechanical works at Mesaieed

KBR / Technip 5,420,000 January, 2002

Design, supply, installation and commissioning of Q-Chem prefab temporary training facility, with all associated civil and MEP works

Q-CHEM 713,000 July,2001

EPIC of temporary facilities consist of prefabricated office with all associated power supply,mechanical and electrical works for Q-Chem project at Mesaieed

KBR / Technip 1,600,000 April, 2000

Project Client Value (USD) Status of Completion

Barwa Financial District. (A Joint venture with Bouygues and Midmac Contracting) Barwa Real Estate Company 1,301,370,000 Ongoing

Dubai Towers (A Joint venture with Al Habtoor) Sama Dubai 400,000,000 Ongoing

Alwaha Club RasGas 7,400,000 March, 2002

LANDMARK BUILDINGS

OTHER BUILDINGS

SELECTEDPROJECTS

ALJABER ENGINEERING | CORPORATE PROFILE 29

(0.1) HIGHWAYS, ROADS & INFRASTRUCTURE

Lusail Real Estate Development Company W.L.L

25,656,219

The Scope of Works consists of deepening the Southern Marina (By Dredging) from -3.00 ONHD to -4.50 QNHD as well as dredging additional isolated areas, including deepening of the Central Lagoon entrance.

The major work elements are:Dredging operation – average Dredging productivity 60,000 m3/Day. Transportation of dredged material to a multi-cell Spoil Pit. Pumping of sea water from the Spoil Pit to the existing sedimentation ponds 1 & 2 Removal of the wet silty material from the spoil pit to the “Drying multi-cell pit” for Drying process Finally, transportation of the dried material off site to approved municipality disposal site.

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

CP12-E ADDITIONAL DREDGING OF SOUTHERN MARINA CHANNEL

ALJABER ENGINEERING | CORPORATE PROFILE 31

Public Works Authority

43,830,488

The purpose of this project is to provide both single lane and dual two lane temporary roads in Wadi Aba Seleel within the project limits. This includes advance grading and levelling of specific sections of the roadways within the main project boundary, including the construction of temporary roads, over an area of aproximately 19.7km as follows;

Dual carriageway - 9.00km (approx.) Single Carriageway - 11.00km (approx.)

The Major quantities are: • Site Clearance - 147 Ha • Excavation - 533,200 m3 • Filling - 786,300 m3 • Roadworks (Sub-Base, Base Course & Wearing Course) - 323,500 m2 • 14m Street light Columns - 1,262 Nos. • Swales for Surface Water Drainage - 39,365 m • Gulleys & Soakaways • Road Marking & Road Signs • Kerb Stone & Precast Concrete Barricades

Ongoing

Client

Value (USD$)

Project Scope

The major scope of works

Completion Date

ROADS & INFRASTRUCTURE IN WADI ABA SELEEL – PACKAGE 1A, ADVANCED GRADING & TEMPORARY ROADS (QS004-P01A)

Aljaber Engineering LLC

35,616,438

Construction of new Worker’s Accommodation Facility as per the latest welfare standards. The facility estimated for a capacity of 4,500 workers with all the welfare & recreation facilities. The major elements consists of:

Labor Accommodation, Mess Hall & Kitchen, Camp Office & Training Room, Grocery & Retail Barber Shop, Clinic, Mosque, Guard Room, Delivery Area & Parking Money Exchange, Delivery Area & Parking, Car & Bus parking Lots, Garbage Collection Sewerage Treatment Plant, Generator Farm & Diesel Farm, Cricket Ground, Basket Ball Ground, Foot Ball GroundExternal Works & Utilities:• Road Works, Road Marking & Sign Boards • Hard Scaping works • Hoarding / Fencing, Gates & Barriers • Street Lighting • Drainage Network • Water Network • Fire Fighting Network • Electrical Works

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

CAMP AT ABU NAKHLAH

ALJABER ENGINEERING | CORPORATE PROFILE 33

Lusail Real Estate Development Company W.L.L

50,645,068

The Major Scope of the Project consists of:

• Design & Construction of the civil works and associated MEP works for two large diameter utility tunnels for the Bridge 9 and Bridge 8 • Construction of the Marafeq-designed 7 Nos. gasline crossings. • Removal of a section of the existing sea wall (198m) and construction of new realigned sea walls (152m).• Widening of the five (5) existing temporary earth bunds with pipe culverts • Raising the finished level of the existing sea wall on Qetaifan Islands from 2.0m to 2.5m QNHD by the installation of precast reinforced concrete capping blocks.• Construct concrete block staircases adjacent to the sea wall at five (5) locations providing restricted access from the promenade to the tidal lagoon basin.

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

CONSTRUCTION OF CP08-A3: ENABLING WORKS - QETAIFAN ISLANDS

Al-Ali Engineering Cont. Trading WLL

20,273,973

The Major Scope of the Project consists of: • Potable water pumping station TSE Pump Station• Fire Water Pumping Station Storm water Pump Stations - 3 Nos• Marine Restaurant Pump Station Sewag Pumping Stations - 6 Nos.• Design and build a sewage treatment facility with a design capacity of 2,600 cubic meter per day.• Design and build a seawater desalination facility with a design capacity of 4,500 cubic meter per day average daily demand• Design and build a treated sewage effluent polishing facility with a design capacity of 1,800 cubic meter per dayServices for Various Utility Buildings: • Storm Water and Waste water drainage system• Soil, waste and vent system• Supply and install sanitary fittings and fixtures.• Water supply works• Air conditioning and ventilation works• Fire Fighting works• Electrical works• Testing and commissioning Ongoing

Client

Value (USD$)

Project Scope

Completion Date

DESIGN & BUILD OF PLANTS (STP, SWRO, TSE POLISHING, RO) & SUPPLY AND INSTALLATION OF UTILITY HUB AND PUMPING STATIONS-MEP WORKS INCLUDING PROCESS

ALJABER ENGINEERING | CORPORATE PROFILE 35

Qatar Rail

3,357,810,000

The Doha Metro is part of the Qatar Integrated Railways Program (QIRP). The Gold Line Underground section of the network runs East/West through the heart of Doha City, starting to the East at Airport City and continuing through Al Sharq, Doha Souq, Msheireb and Al Adhawaa, before following both Al Sadd Street and Al Waab Street to the West of Doha and terminating at Sports City in the Aspire Zone.

The major elements consist of:

• 10 Nos. stations.• 11.7km of twin bored tunnels

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

DOHA METRO PROJECT - GOLD LINE(A JOINT VENTURE WITH AKTOR, YAPI MERKEZI, STFA AND LARSEN & TOUBRO)

Public Works Authority

1,687,232,160

The Project is located west and south of the Doha city and providing the New Orbital Highway connecting Mesaieed to Salwa Road.The major elements are:• 57 Km of road works with 5 Main Interchanges - 30 km of 14 lanes Orbital Highway - 27 km of 8-16 lane side roads• 4 no. grade separated clover leaf type Interchange and 1 no. grade separated Junction comprising 24 no. bridge structures• 18 no’s Braiding and Emergency exists• Pedestrian & Bicycle paths with appropriate underpass structures• New Utilities such as Surface Drainage Works, TSE Line, Electrical Works, Street lighting works, Q-Tel, QAF, ITS Ducts• Diversion and Protection of Existing Utilities (including QP gas pipelines)• Crossing Points of EHV Pylons• Landscaping (Within Interchange)

May 2017 (Ongoing)

Client

Value (USD$)

Project Scope

Completion Date

DESIGN AND CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE - MESAIEED TO SALWA ROAD - MRPSC/014/2012 2013/L (A JOINT VENTURE WITH LEIGHTON CONTRACTING QATAR).

ALJABER ENGINEERING | CORPORATE PROFILE 37

Lusail Real Estate Development Company W.L.L.

42,593,000

The scope includes early enabling works project consisting of dewatering works, bulk excavation and temporary support of excavation systems etc.

• Worksite Clearance• Temporary Fencing• Temporary Access Roads• Design, installation, operation and maintenance of temporary dewatering systems and handed over to the permanent works contractor• Excavation in the dry with mechanical means and the transport of excavated materials to an authorized off-site landfillThe Excavation consists of: - Car Park 2 141,587 m3 - Car Park 3 124,613 m3 - Car Park 4 105,576 m3 - Car Park 5 15,1622 m3 - Underpass Tunnel 996,973 m3• Monitoring ground movements around and within the excavations• Provision for the disposal of 3,000,000 m3 of excavated material from the stockpile generated by LREDC • Lowering of Western Marina 386,000 m3• Widening of Earth Bridge 2A 30,000 m3 (Filling with selected excavated material)

August,2015

Client

Value (USD$)

Project Scope

The major scope of works

Completion Date

CONSTRUCTION OF CP7C-1C, ENABLING WORKS FOR COMMERCIAL BOULEVARD

RasGas Company Ltd.

1,800,350

The project scope consists of site preparation and fencing works. The worksite consists of two (2) parts OSPL area and the Temporary Site Facilities (TSF) Area. The major works consists of:

For OSPL AreaSoil Cutting for Soil improvement 13,867 m3Excavation inside pile area 1,027m3Soil Fill (Type A material) 39,179 m3

For TSF AreaSoil Fill (Type B material) 9,387 m3Temporary Perimeter Fence 1,040 lmGates 4 setsTemporary pipe culverts 57 lmConcrete Pavement 670 m2

May, 2014

Client

Value (USD$)

Project Scope

Completion Date

RASGAS FLOW ASSURANCE PROJECT - SITE PREPARATION WORKS

ALJABER ENGINEERING | CORPORATE PROFILE 39

GASAL Q.S.C

7,683,540

The project site is located within Lot W8 of Ras Laffan Industrial City and the scope consists of earthworks encompassing excavation, dumping of unwanted soil to designated location within RLIC, backfill, grading, levelling, compaction to arrive at the finished ground level as per project requirements as set out in Specifications for Site Preparation Works, Concrete Works and Road Works.

The major quantities are:• Soil Grubbing and Scrubbing 75,000 m2• General Excavation 95,775 m3• Surface Levelling 75,000 m2• General fill and embankment (0 50mm) 189,420 m3• Surface Compaction 75,000 m2• Galvanized Fence 1,100 m• Vehicle Gates 2 Nos.• Protection of Existing Pipe 50 m

August,2014

Client

Value (USD$)

Project Scope

Completion Date

SITE PREPARATION WORKS FOR GASAL PROJECT

UrbaCon General Contracting

10,405,500

The scope of subcontract works shall be the excavation, bunds creation, bunds removal and disposal of all excavated materials:

• Complete excavation of estimated quantity 1,055,000 m3

• Creation and complete removal of the bounds to seabed level or original grade level• Supply, install and operate complete dewatering system ensuring working in dry ambient surface conditions• Pre and post survey works• Removal of excavated material from the excavated areas for drying purposes• Dispose all excavated materials off site to an approved local authorities disposal location

May, 2014

Client

Value (USD$)

Project Scope

The major scope of works

Completion Date

COAST GUARD BASE - EXPANSION OF THE MAIN NAVIGATIONAL CHANNEL & TURNING BASIN

ALJABER ENGINEERING | CORPORATE PROFILE 41

UrbaCon General Contracting

7,946,000

The project involves the construction of a bridge to provide access to the private island(Private residence palace) from mainland with an approximate length of 442 m with 20m span between two piers.

• Bridge construction including foundations, piers, superstructure, arch towers, lighting podiums and decorations.• Road pavement as well as all related drainage works for the road, sidewalks and utilities trenches.• Bridge lighting and decorative lighting.

May, 2014

Client

Value (USD$)

Project Scope

The major scope of works

Completion Date

THE BASE PROJECT IN NORTH LUSAIL - THE ISLAND BRIDGE WORKS

UrbaCon General Contracting

7,209,600

• Pre & Post excavation bathymetric surveys• Island channel excavation 537,000 m3

• Diposal of excavated material on land off-site 537,000 m3

April, 2013

Client

Value (USD$)

Project Scope

Completion Date

THE BASE SECONDARY CHANNEL EXCAVATION AND DISPOSAL WORKS.

ALJABER ENGINEERING | CORPORATE PROFILE 43

Qatar Petroleum

147,370,000

Engineering, procurement and construction of major Civil, Mechanical, Electrical, Instrumentation and SCADA control works detailed as follows:Various utility pipeline Networks 230 KmSewage pumping stations 29 Nos.Civil Works:• Excavation 873,300 m3

• Imported fill material 111,000 Ton• Precast concrete paving 28,000 m2

• Major RCC/Steel structure works & Road crossing(Microtunneling)Major Machanical Works: • Potable water/fire water pumping station• Potable water and fire water tanks 9 Tanks• Overhead cranes and manual hoist cranes 31 CranesMajor Electrical Installations:• Power network(Transformers with panels, ups, etc) 30 KmControl System and Instrumentation:• Telecommunication and SCADA control system• Fire alarm system/Fiber optic network (25 km)

February, 2013

Client

Value (USD$)

Project Scope

Completion Date

EPIC FOR WET UTILITIES DISTRIBUTION NETWORK (POTABLE WATER SUPPLY, FIRE WATER AND SEWRAGE) FOR SUPPORT SERVICES FOR AN AREA OF APPROXIMATELY 3000 HECTARES COMPLETE WITH AUXILIARY FACILITIES, SUB-SYSTEMS AND MAINS NETWORK AT RAS LAFFAN INDUSTRIAL CITY.

Qatar Petroleum

190,000,000

The project scope includes all associated Civil, Mechanical, Electrical, Instrumentation and telecommunication works.

Design Works:- Coordination of existing and future utility services- Traffic management strategy and traffic phasing- Reinforced concrete protection slab and culverts• Road Works and street lighting: 39 Km• Conversion of existing Mesaieed main and Police roundabout to traffic signal junction• Electricity and Power Network(LV/MV/HV/EHV) 187 Km• Potable Water Network 9 Km• Telecommunication Network 34 Km• Utility Duct Network 29 Km• Treated Sewer Effluent Network(TSE) 18 Km• Surface Water Drainage Network 70 Km• Foul Sewer Network 5 Km• Landscaping Network & Irrigation Network 250 Km

February, 2012

Client

Value (USD$)

Project Scope

Completion Date

RECONSTRUCTION OF EXISTING ROADS AND CONSTRUCTION OF NEW ROADS WITH ALL ASSOCIATED SERVICES AND INFRASTRUCTURE INCLUDING UPGRADE OF EXISTING UTILITIES AND INSTALLATION OF NEW UTILITIES AT MESAIEED COMMUNITY AREA.

ALJABER ENGINEERING | CORPORATE PROFILE 45

RasGas

CCC / Teyseer JV

36,000,000

Earth works for Barzan onshore early site project total area of 1,560,000 m2 detailed as follows:

• Grubbing, removal and transport vegetation 1,560,000 m2

• Remove, transport and depose marine deposit 1,512,000 m3

• Remove, transport and stockpile dune sand 400,000 m3

• Excavation (suitable soil, soft rock and hard rock) 940,000 m3

• Fill material 698,600 m3

• Imported fill 1,521,000 m3

July, 2011

Client

Main Contractor

Value (USD$)

Project Scope

Completion Date

EARLY SITE EARTH WORKS FOR BARZAN ONSHORE PROJECT AT RAS LAFFAN.

Public Works Authority (ASHGHAL)

55,000,000

• Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape works• Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other necessary security items.• Hard and soft landscaping and irrigation system.• Construction of roads (12.1 km)

December, 2010

Client

Value (USD$)

Project Scope

Completion Date

CONSTRUCTION OF ROADS AND INFRASTRUCTURE SERVICES SUCH AS FOUL SEWAGE, SURFACE WATER, POTABLE WATER, TSE LINES, PUMP STATIONS AND STORM WATER SYSTEM IN NEW DIPLOMATIC AREA.

ALJABER ENGINEERING | CORPORATE PROFILE 47

Qatar Petroleum

82,000,000

Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment and construction of internal and external roads detailed as follows:

• Excavation 435,000 m3

• Imported fill 2,060,000 m3

• Concrete 42,000 m3

• Concrete culverts (600 & 1000mm diameter) 13 Km• Construction of roads 145,000 m2

November, 2010

Client

Value (USD$)

Project Scope

Completion Date

EPIC FOR NEW SUPPORT SERVICES AND SITE DEVELOPMENT OF 3,000,000 M2 LAND AT RAS LAFFAN INDUSTRIAL CITY.

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

96,000,000

This project includes underground piping works and major Civil works for Qatar Aluminium plant detailed as follows:

• Total excavation 325,000 m3

• Dewatering 74,000 m3

• Sheet piling 38,500 m2

• Concrete works 15,500 m3

• Piping works 73 Km• Ducting works 58 Km

August, 2010

Client

EPC Contractor

Value (USD$)

Project Scope

Completion Date

CONSTRUCTION OF UNDERGROUND PIPING SYSTEMS CONSIST OF INSTALLATION OF GRP SEA WATER PIPELINES, FIREWATER, PROCESS, POTABLE WATER LINES AND MAJOR INFRASTRUCTURE CIVIL WORKS AT ALUMINIUM SMELTER IN MESAIEED.

ALJABER ENGINEERING | CORPORATE PROFILE 49

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

18,071,000Engineering and Technical Services:• Engineering and details design• Compaction test of the existing sub grade and newly constructed roads• Survey of existing utility servicesEarth Works:• Grading and leveling 3,000 m3

• Sub grade of road system and the drainage ditches 25,000 m3

• Site filling of utility corridor and underground pipelines 10,000 m3

Construction of Road System and Surface Drainage• Road base with well graded crushed stone (0-25mm)• Lining of the open ditches with well graded crushed stone 52,000 m3

• Surfacing of the road base with a layer of 70mm of compacted asphalt for roads 9,000 m3

• Curbstone, temporary road signs chain-link fence 87,000 m3

Supply & Installation of Potable Water Line• Permanent pipeline 300 Lm• Temporary pipeline including fire hydrants 4,000 Lm• Concrete works 1,100 m3

October, 2009

Client

EPC Contractor

Value (USD$)Project Scope

Completion Date

SITE DEVELOPMENT OF SERVICE AREAS AND POTROOM BUILDING AREA INCLUDING EARTH WORKS, CONSTRUCTION OF ROADS, SURFACE DRAINAGES SUPPLY AND INSTALLATION OF POTABLE WATER LINES FOR QATAR ALUMINIUM SMELTER IN MESAIEED.

Public Works Authority (ASHGHAL)

86,304,000

Water Pipes:

• Laying of D.I Pipes from 200mm to 400mm diameter 2300 LM• Removal of existing water D.I pipes 400mm & 500mm diameter 15,000 LM

Street lighting columns foundation: 1200 sets• Cable trenches 34,000 LM

Construction works for ten(10) interchanges:• Site clearance, demolition and earthworks• Sub-base and road base• Flexible surfacing• Road marking• Bridge structure works

January, 2009

Client

Value (USD$)

Project Scope

Completion Date

SALWA INTERNATIONAL HIGHWAY INTERCHANGES AND INSTALLATION OF WATER PIPELINES AND STREET LIGHTING.

ALJABER ENGINEERING | CORPORATE PROFILE 51

Qatar Aluminium Company (Qatalum)

34,446,000

• Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares).• Placing and compaction of fill materials for the platform construction of the aluminium and power plant

(4,540,000 m3).• Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing

and relocating to power plant area) of (750,000 m3).• Ground improvement for the carbon plant (12 Hectares), using dynamic compaction.• Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the

perimeter of the aluminium and power plant.

December, 2008

Client

Value (USD$)

Project Scope

Completion Date

SITE PREPARATION, GROUND IMPROVEMENT BY DYNAMIC COMPACTION AND INSTALLATION OF 8000 LM NEW SECURITY PALISIDE FENCE FOR QATAR ALUMINIUM SMELTER AND POWER PLANT IN MESAIEED.

Public Works Authority (ASHGHAL)

18,600,000

• Transformation of the existing Al Razi roundabout into a large elliptical roundabout with two underpasses including all associated road works, concrete works and diversion/replacement of existing underground utilities.

• upgrade of Ahamed Bin Ali Street (C Ring Road) between the existing Bin Omran roundabout and Rayyan street including all associated diversions and replacement of existing underground utilities.

• Excavation works for the overall car park, situated within the boundaries of the large elliptical roundabout.

October, 2005

Client

Value (USD$)

Project Scope

Completion Date

UNDERPASS AND ACCESS ROADS FOR DOHA 2006 ASIAN GAMES VILLAGE AND HAMAD MEDICAL CITY.

ALJABER ENGINEERING | CORPORATE PROFILE 53

ENVIRONMENTAL CLEAN-UP FOR NEW DOHA INTERNATIONAL AIRPORT PROJECT SITE INCLUDING EXCAVATION AND REMOVAL OF WASTE, TRANSPORTATION FROM NDIA SITE AND PLACEMENT AT ENGINEERED LANDFILL SITE AT MESAIEED.

New Doha International Airport (NDIA)

38,050,000

• Excavation and removal of 8,000,000 m3 waste from the NDIA site and placement at engineered landfill site at Mesaieed.• Demolition and removal of all direct structures.• Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated environmental aspects.• Stock piling of the waste removed to the new landfill site until the landfill is ready to receive waste materials.• Fencing for stock piling areas and wheel washing systems for transporting trucks.

October, 2005

Client

Value (USD$)

Project Scope

Completion Date

(0.2) OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS

ALJABER ENGINEERING | CORPORATE PROFILE 55

FABRICATION AND INSTALLATION OF ABOVE GROUND METAL PIPING, INSTALLATION OF WATER SUPPLY PUMPS, EMERGENCY COOLING TOWERS, COMPRESSED AIR PIPING SYSTEM AND CLOSED COOLING MEDIUM SYSTEM AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

20,420,000

• Fabrication and erection of pipes and connection to potable, process and fire water tanks.• In water supply area.• Installation of water supply pumps.• Installation of emergency cooling tower.• Fabrication and erection of compressed air piping system.• Fabrication and erection of closed cooling medium system.

September, 2010

Client

EPC Contractor

Value (USD$)

Project Scope

Completion Date

Qatar Aluminium Company (Qatalum)

24,240,000

• Excavation for foundations• Filling to structures and embankment• Fire rated concrete works and surface painting• Water proofing, and fencing works• miscellaneous metal works

March, 2010

Client

Value (USD$)

Project Scope

Completion Date

MAJOR GROUND AND CIVIL WORKS FOR RECTIFIER STATIONS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

ALJABER ENGINEERING | CORPORATE PROFILE 57

EPIC FOR TWO NEW KANGAROO CRANES AND UPGRADING OF EXISTING GABBRO BERTHS CRANE FACILITIES INCLUDING ALL MECHANICAL AND ELECTRICAL WORKS AT MESAIEED PORT.

Qatar Petroleum

31,336,000

The Scope includes engineering, procurement, construction and commissioning of two kangaroo cranes with a rated capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:

• Two kangaroo crane with a rated capacity of 1,100 ton/hour• HV electrical power supply for the new kangaroo cranes• Four new grabs and ropes for the two existing kangaroo cranes• Fresh-water based dust suppression systems for the two existing kangaroo cranes• Video camera system

The scope also includes all related mechanical and electrical works to upgrade the following:

• A mobile harbour crane• A hopper• LV electrical power supply and sockets for mobile hopper

March, 2009

Client

Value (USD$)

Project Scope

Completion Date

Qatar Aluminium Company (Qatalum)

SNC - Lavalin

7,850,000

All associated mechanical, piping, electrical and instrumentation works to install the following:

• Cathode roding equipment• Induction furnace• Overhead cranes• Emergency water pumps

January, 2009

Client

EPC Contractor

Value (USD$)

Project Scope

Completion Date

INSTALLATION OF CATHODE ROADING EQUIPMENT AND INDUCTION FURNACE INCLUDING SUPPLY AND ERECTION OF ALL MECHANICAL, PIPING, ELECTRICAL AND INSTRUMENTATION WORKS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

ALJABER ENGINEERING | CORPORATE PROFILE 59

CIVIL, INFRASTRUCTURE AND ELECTROMECHANICAL WORKS FOR CAMPS AND OTHER FACILITIES INCLUDING UNDERGROUND PIPING NETWORKS, ROAD WORKS, INSTALLATION OF TREATED EFFLUENT TANKS, WASTE WATER TREATMENT UNITS AND SLUDGE TREATMENT UNITS.

Chiyoda - Technip J.V.

33,455,000

This project consists of the following:

Civil and Infrastructure works:

• Underground networks(HDPE 40 to 410 mm)• GRP pipeline 10” diameter• Foundations for the waste water treatment, potable water/ firewater and power generation units• Road works and street lighting• Sludge building• Galvanized fence• Construction of secondary substations and diesel generators buildings

Mechanical, Electrical and Instrumentation works:

• Installation of secondary package substations• Cable laying• Instrumentation works• Diesel storage tanks• Structural steel works• Above ground galvanized steel piping• Supply and installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) each, with aluminium dome cover• Supply and Installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) each, with aluminium dome cover• Installation of the waste water treatment units• Installation of sludge treatment unit

November, 2007

Client

Value (USD$)

Project Scope

Completion Date

General Electric (GE)

1,600,000

• Fabrication and erection of structural steel• “Dust Collection Towers” 201 Ton• Checkered plates 18 Ton• Gratings 190 m2

• Supply and installation of H2 sunshade 28 Ton• Aluminium sheeting 430 m2

August, 2007

Client

Value (USD$)

Project Scope

Completion Date

ENGINEERING, PROCUREMENT, FABRICATION AND INSTALLATION OF DUST COLLECTION TOWERS AND SUNSHADES.

ALJABER ENGINEERING | CORPORATE PROFILE 61

EPIC OF POTABLE WATER TRANSMISSION SYSTEM AND LANDSCAPING MAINS TO DISTRIBUTE WATER PRODUCED BY RLPC TO VARIOUS FACILITIES WITHIN RAS LAFFAN.

Qatar Petroleum

13,600,000

Detailed engineering, procurement, construction, installation, testing and commissioning of:

• Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan power company to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

• Water landscaping (WL) transmission system (FRP, uPVC & CS) to distribute water from Ras Laffan power company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment plant to various facilities.

October, 2005

Client

Value (USD$)

Project Scope

Completion Date

Qatar General Electricity & Water Co. (KAHRAMAA)

436,650,000

The scope of this Contract is to provide and complete the corridor pipelines (Corridor Mains) and fibre optic cable ducts within the southern length of the Qatar Utility Corridor (QUC) between PRPS 3 (Rawdat Rashed) and PRPS 4 (Abu Nakhla), transmission mains and corridor main pipework and connections at both PRPS 3 and 4 for Package A and northern length of the Qatar Utility Corridor (QUC) between the Dukhan Road and PRPS 3 (Rawdat Rashed) for Package BThe Major Quantities:Main Utility Corridor from Rawdat Rashed ( PRPS3) to Abu Nakhla ( PRPS4):23.95km of twin 1600mm diameter water corridor main | 10.40km of single 1200mm diameter transmission main0.35km of twin 1600mm diameter branches water corridor mainNorthern length between the Dukhan Road and PRPS 3 (Rawdat Rashed):1600 mm dia.: 22.9 km of twin pipeline from the Dukhan Road to PRPS 3.1200 mm dia.: 10.7 km of pipeline from the Dukhan Road to PRPS 3900 mm dia.: 1.5 km of pipeline from the QUC water corridor to the west edge of the QUCConstruction of all washout, air valve and other chambersDesign and construction of Trenchless road and utility crossingsSupply, installation & testing of the ducts in parallel with the pipelines for FOC.The pipeline (DI) quantities are: 1600mm dia Pipes - 94,292m 1400mm dia Pipes - 32,866m 1200mm dia Pipes - 33,970m 900mm dia Pipes - 1,5361m

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

(0.3) PIPELINE CONSTRUCTIONGTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C &GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A

ALJABER ENGINEERING | CORPORATE PROFILE 63

DESIGN AND CONSTRUCTION OF 1200 MM OF 30 KM TRANSMISSION MAIN FROM DOHA WEST STW TO AL RAKHIYA FARM.

Public Works Authority (Ashghal)

44,370,000

The project consists of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:

• 1200 mm diameter GRP main 30 Km• 500 mm diameter GRP main 720 M• Air valves, washout and connection chambers• Flow control valves and flow meters.

December, 2011

Client

Value (USD$)

Project Scope

Completion Date

Qatar Electricity & Water Co. (KAHRAMAA)

32,000,000

Replacement of 1200 mm, 900 mm rising mains and associated pipe works from Old Salwa reservoir station and New Salwa reservoir station.

Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment including all associated pipe works from New Salwa to immigration interchange.

Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa Stadium.

September, 2007

Client

Value (USD$)

Project Scope

Completion Date

UPGRADING OF NEW AND OLD SALWA DISTILLATE AND RISING MAINS (22 KM OF PIPES)

ALJABER ENGINEERING | CORPORATE PROFILE 65

Hitachi Zosen Corporation

95,800,000

The Major Scope of the Project consists of:For Package A (Civil & Building Works)MSF Plant Area• MSF Switchgear Building – 3,540 m2• Demister Acid Cleaning Unit• MSF Unit – 1 Nos.• Roads & PavingPWT (Remine) Plant Area• Remine Switchgear Building - 1,747 m2 Cable Trenches Equipment Foundations• Generator System Building - 168 m2 Underground PipelinesRO Plant AreaCivil WorksDAF - 7,648 m2 DAF Sunshades HVAC Works Cable Trenches Underground Piping Roads & PavingBuilding WorksUF Building – I & II - 3,837 m2 each RO Building - 9,264 m2 RO Electrical Building - 4,737 m2Control Building - 305 m2 Chemical Building - 1,075 m2Waste Water Treatment Building - 450 m2 Ongoing

Client

Value (USD$)

Project Scope

Completion Date

(0.4) POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTSUMM AL HOUL POWER PROJECT - PACKAGE A (CIVIL & BUILDING WORKS) & PACKAGE B (HVAC WORKS)

MAJOR CIVIL WORKS RELATED TO THE CONSTRUCTION OF DISTILLERS AND BOILERS AREAS, INTAKE STRUCTURE AND POTABLE WATER RESERVOIRS FOR 45 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS ABU FONTAS.

Fisia Italimpianti

75,500,000

Distillers area and intake structure• Intake and outfall structures & Equipment and pipe rack foundations• Road works / Pipe trenches• Local control room, Chlorination building and C02 production building• Water basins and pumps well• Seawater screening and pumping stationBoilers area• Storage tanks• Local control rooms, switchgear and control room buildings• Pipe rack and equipment foundations, boilers and stack foundationsPotable water reservoirs• Potable water reservoirs 102,000 m2 (2 Nos.)• Potable water pumping station• Equipment foundations & Flow meters and valve pits

March, 2010

Client

Value (USD$)

Project Scope

Completion Date

ALJABER ENGINEERING | CORPORATE PROFILE 67

Fisia Italimpianti and Enel Power

20,437,000

All associated civil works to build 40 million gallons per day desalination, blending and demineralization plants.

• Installation of temporary facilities and lay down area for this project and future expansion• Bulk earth works• Concrete foundations for 4 main desalination units• Supply and discharge stations including U.G. GRP pipe works• Onsite GRP pipelines of various diameters• Main pumps structure and chemical dosing units• Re-mineralization structure including water tight structure• Main switchgear and control buildings (3 Nos.)• Electro-chlorination building (1 No.)• New roads and walkways with all associated civil works• Construction of cooling tower• Construction of 220 KVA cable corridor involves 80,000 m3 of excavation

May, 2003

Client

Value (USD$)

Project Scope

Completion Date

CIVIL WORKS RELATED TO THE CONSTRUCTION OF 40 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS LAFFAN.

Qatar District Cooling Q.C.S.

60,994, 300

The Works include the design, supply, delivery, erection and installation on site of a district cooling plant with a guaranteed capacity of 35,000tons of mechanical refrigeration plus 5,000 tons thermal energy storage tank (TES) capacity, serving the West Bay area including architectural and civil works and all necessary mechanical, electrical, plumbing and fire (“MEPF”) equipment and installations, associated structures, and the civil works of Kahramaa substation.The major elements are: • Construction of plant building including all civil and architectural works• MEP services complying with the final plant capacity• District Cooling Process work serving 35,000 RT plus 5,000 RT TES tank• Construction of Primary Substation

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

(0.5) SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONSENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF THE DISTRICT COOLING PLANT-3 IN WEST BAY

ALJABER ENGINEERING | CORPORATE PROFILE 69

REFURBISHMENT AND UPGRADING WORKS FOR VARIOUS FOUL AND STORMWATER PUMPING STATIONS INCLUDING CIVIL, MECHANICAL ELECTRICAL AND HVAC WORKS.

Public Works Authority (Ashghal)

53,295,000

The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:

• Civil works• Temporary bypass works, wet and dry well works• Rising main works and mechanical works

February, 2016 (Ongoing)

Client

Value (USD$)

Project Scope

Completion Date

Ministry of Municipal Affairs and Agriculture (MMAA)

13,000,000

Construction of 48 Km of treated sewage effluent network to service the north of Doha area including:

• Various TSE mains HDPE pipes 300 - 600 (mm)• D.I. pipes laid over the channel hung on the parapet of the bridge• Air valves circular type• Gate valves circular type• Washouts circular type• Distribution chambers rectangular type• TSE pipes installed by non-disruptive method• Partial TSE mains HDPE ducts installed by NDM• Remote control irrigation systems for primary and secondary roads

April, 2004

Client

Value (USD$)

Project Scope

Completion Date

CONSTRUCTION OF TREATED SEWAGE EFFLUENT NETWORK (TSE) T6 TO T7 INCLUDING 48 KM OF TSE MAINS

ALJABER ENGINEERING | CORPORATE PROFILE 71

(0.6) LANDMARK BUILDINGSBARWA FINANCIAL DISTRICT (A JOINT VENTURE WITH BOUYGUES AND MIDMAC CONTRACTING).

Barwa Real Estate Company

1,301,370,000

The Barwa Financial District (BFD) is situated in Doha’s new business district in West Bay with approximately built-up area of 700,000 m2 as detailed below:

• Elevated car parking• 15 Podiums: Retail + Technical• 9 Towers: Offices - Shell & Core• Hotel & Convention Center• Primary substation• Energy Center

May, 2016 (Ongoing)

Client

Value (USD$)

Project Scope

Completion Date

Sama Dubai

400,000,000

Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail, offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will be the tallest building in Doha housing both residential and commercial establishments.

The scope consists an 84-storey tower with total built-up area of 295,000 m2 detailed as below:

• Residential space 31 floors• Office space 29 floors• Five-star boutique hotel 13 floors• Retail space 2 floors• Ballroom• Meeting facilities• Business center• Swimming pool and Spa• Associated facilities

Ongoing

Client

Value (USD$)

Project Scope

Completion Date

DUBAI TOWERS (A JOINT VENTURE WITH AL HABTOOR).

ALJABER ENGINEERING | CORPORATE PROFILE 73

ALWAHA CLUB

RasGas

7,400,000

Construction of one storey concrete structure building with a total buit up area of 7300 m2 includes a metal decking roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.

• Restaurant, snack bar and private dining room• Lounge and meeting rooms• Recreational rooms• Multi-purpose hall that functions as a theatre• Gymnasium• Children’s nursery• Administration offices• External swimming pool• Shaded paddling pools• Play areas and mini golf course

March, 2002

Client

Value (USD$)

Project Scope

Completion Date

RESOURCES

ALJABER ENGINEERING | CORPORATE PROFILE 75

OFFICESJEC’s head office is located Foxhills, Lusail. Our offices are equipped with latest IT infrastructure to meet the international standards and requirements in order to meet our local and international clients’ expectations.

FABRICATION WORKSHOPJEC’s philosophy is to achieve maximum efficiency of fabrication productivity. JEC has established state of art fabrication workshop facilities equipped with new machines, equipment and tools.

Our fabrication workshop is situated in Al Khor Industrial Area close to the Ras Laffan Industrial City where all the major clients are located.

PMV FACILITIESJEC has invested heavily in purchasing new equipment to be able to execute the upcoming mega projects. In addition, JEC has established two central PMV workshops located in Salwa Industrial Area and Al Khor Industrial Area. Our continuous preventative maintenance is carried out by a dedicated and trained team. JEC has the largest fleet count in the State of Qatar exceeding 1,700 pieces of machinery.

ALJABER ENGINEERING | CORPORATE PROFILE 77

Description No. Description No

Lifting Equipment 73 Others 925

Mobile Crane 27 Generator 205

Tower Crane 3 Tower Lights 342

Man Lift 3 Concrete Mixer 18

Forklift &Tele Handler 19 Power Floats 11

Self-Loader 21 High Water Pressure Pump 20

Earth Works 825 Asphalt Cutters 7

Trencher / Surface Miner 5 Vibrators 58

Bulldozer 30 Hydro Testing Pump 20

Back Hoe (JCB) 31 Air Compressor 17

Excavator 168 Dewatering Pump (6” & 3”) 154

Wheel Loader 60 Welding Machine 39

Uni-Loader 33 Power Screen & Vibratory Screen 13

Water Tank Truck 3 Mobile Jaw Crusher & Impact Crushers 18

Roller 74 Sand Plant 1

Compactor 80 Kerb Casting Machine 1

Grader 28 Interlock Laying Machine 1

Tipper Truck & Trailer 281 Vehicles 514

Articulated Dump Truck 32 Buses 96

Transport Equipment 25 Pickups 264

Trailer with Low Bed & Flat Bed) 22 Cars 154

Recovery Truck & Pickup 3

Grand Total 2362

EQUIPMENT FLEET

ALJABER ENGINEERING | CORPORATE PROFILE 79

Description No

Management Staff 259

Top Management 8

Business Development 2

Estimation Department 43

Procurement Department 39

Commercial and Contract Department 50

Planning & Cost Control Department 29

Technical Department 6

Finance & Accounts Department 32

Information Technology 17

Human Resources Department 33

Projects Staff 9,620

Operation Civil 854

Operation MEP 901

Quality, Health, Safety & Environment 345

Project Technical Staff 50

HR Department Support Staff (Site Admin & Camps) 74

Project Workforce (Skilled & Unskilled Labor) 3,986

Drivers & Operators 2,065

PMV Department 1,172

Crusher Operations 28

Main Store Operations 86

Security Department 59

Grand Total 9,879

STAFF & MANPOWER

SUSTAINABILITY

INTEGRATED MANAGEMENT SYSTEM (IMS)

Quality, Health, Safety and EnvironmentJEC places emphasis on internally improving the physical and social environments in which employees operate in. We

constantly perform risk management techniques to identify the dangers employees can encounter in the workplace.

Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has

led to a higher productivity. Our standards of procedure and policies are implemented to ensure employee safety and

health is an action taken proactively and controlled by the top management.

In QHSE (Quality, Health, Safety and Environment), JEC continues to be one of the leading performers within our

industry sectors.

JEC is striving to continually improve the performance in QHSE management system and continually improving our

Quality, Health, Safety and Environment performance is one of our key strategic objectives. AlJaber Engineering’s

QHSE objectives are given equal value with other business objectives and being monitored by top management.

The quality of everything we make and do brings value to our customers and justifies their decision to do business

with us.

The protection of human health, personal safety and environmental rank at the highest level of importance to JEC.

We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our

stated QHSE business goals and policy.

JEC empowers and supports our associates in their ongoing efforts to prevent accidents of all kinds and to promote a

safe environment where-ever they go. We use comprehensive management systems to demonstrate our commitment

to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing

value to our associates, customers and the community.

Responsibility for Quality, Health, Safety and Environment rests at the top management level of AlJaber Engineering

and is transferred to down the line for implementation. Everyone in our organization is accountable for QHSE

performance in their respective area. JEC embarked upon a number of behavioral safety initiatives to complement

our procedures and to seek to ensure that everyone engages fully in matters.

ALJABER ENGINEERING | CORPORATE PROFILE 81

CERTIFICATIONS• ISO & OHSAS Certifications• Quality & HSE Policies• Safety Certifications & Achievements• 2 Million Man Hours without a lost time incident. Presented By NDIA.• 20,000,000 Man Hours with no lost time incidents. Presented by CTJV.• 1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.• 5,000,000 Man Hours without LTI at Ras Abu Fontas - A1 Project.Presented by Fisia Italimpianti• 1,000,000 Man Hours without LTI & with outstanding Safety Performance. Presented By LUSAIL.• 250,000 Man-hours without LTI under Onshore Flow Assurance Project Contract. Presented by RasGas.• Appreciations

ARABIAN SPECIALIZED MATERIALS

Arabian Specialised Materials Company ASMA is part of the Al Jaber Group and specializes in trading, supply and manufacture of a wide range of quality products and services to a diverse sphere of sectors and industries.

ASMA has the ability to deliver the right product from the right supplier. ASMA achieve this through many partnerships and associations with world-class companies in Europe, America, Canada and India. ASMA has been serving the market for more than sixteen years. ASMA provided construction materials and solutions to numerous clients in several industries including infrastructure, buildings, railway, water, electricity, Oil & Gas, and petrochemicals. ASMA provides a wide range of products such as:Formwork & ScaffoldingGRP & Steel Sectional Water TanksGarbage & Linen Chute SystemGeneral Fabrication WorksHVAC Ducts and accessoriesAluminum access covers Power CablesStreet Lighting Poles, Fixtures, Luminaries street safety furnitureWelded and safety fences Granite curbs and paversGRP, HDPE pipesHDPE LiningPassive Fire Stopping systemIronmongery & High security Locks

Contact Details:P.O. Box: 55289Tel: +974 4421 3636 Fax: +974 4421 3737Email: [email protected] www.asmaqatar.com

AL WATANIYA CONCRETE

Al Wataniya Concrete is the first company in the market to receive certification from the National Ready Mix Concrete Association (NRMCA) and from Qatar General Organization for Standard and Metrology (QGSM).

The Al-Wataniya Concrete corporate strategy is to integrate processes and services to ensure deliver high-quality, customer-centric timely products. Al-Wataniya prides itself for being the first company in the market to acquire NRMCA and QGSM certifications. Al-Wataniya’s commitment to excellence and quality is sustained by the dedication of its team-oriented, highly qualified and experienced team of engineers and professionals who utilize their know-how of the gulf market to deliver concrete efficiently and in a timely manner. To this effect, Al-Wataniya Concrete, established in July 2005, has positioned itself as one of the leading producers and suppliers of ready-mix concrete in Qatar. Al-Wataniya currently operates 9 plants that are spread across the State of Qatar to fulfill the country’s escalating construction and infrastructure needs.

Contact Details:P.O. Box: 24381Tel: +974 4483 8751Fax: +974 4483 2334Email: [email protected]

AFFILIATES

ALJABER ENGINEERING | CORPORATE PROFILE 83

CONFIDENCEEQUIPMENT & TRANSPORTATION CO WLL

Confidence Equipment and Transportation (CET) offers solutions for water tankers, sewage removal, garbage material as well as the transportation of these activities. With more than 170 employees at their disposable, they are one of the market leaders in catering to various sectors and provide assistance for any rental of equipment that aid companies in their operations.

CORE COMPETENCE:Confidence Equipment and Transportation (CET) offers solutions for the supply of sweet water and Treated Water (TSE) tanker rentals, removal of Sewage water, Garbage material, construction wastes, Hazardous & non-hazardous wastes as well as the transportation of these activities since its inception from the year 2002 operating 150 plus vehicles all corners of State of Qatar with more than 320 plus employees at their disposable, we are one of the market leaders in waste management industry & Equipment rental catering to various sectors and provide assistance that aid companies in their operations.

NATURE OF SERVICES:• Rental of Treated water tankers (TSE)• Rental of Sweet water tankers• Supply of Sweet water• Removal of Sewage water• Removal of Garbage Material, Construction waste, mixed waste and other wastes.• Supply of 7m3 Skip boxes

Contact Details:P.O.Box 24430, Industrial Area 41, Doha -QatarTel: +974 44690714Fax: +974 44690735Email: [email protected]

ARABIAN SUPPLY CENTER

Established in 2008, Arabian Supply Center (ASC) caters to the Qatari market’s need for quality spare parts, accessories and allied products. Initially providing only its affiliates with a limited range of spare parts for trucks and trailers, it soon expanded as it obtained exclusive distributor rights for world-class brands and equipment.By 2012, within only four years of its founding, ASC became the exclusive dealer for AKSA generators in Qatar, followed by Sandvik rock tools (Rammer and Bretec) in 2013. One year later ASC acquired exclusive dealership for its flagship product: Hitachi construction equipment. This year, ASC’s success story continues with its appointment as the sole distributor of LUK lubricants in Qatar.ASC’s reputation is based on three principles: providing quality products, at the right prices, and following it with excellent customer service. Our team of experts has extensive experience with our products and is fully prepared to meet all customer needs. With continued investment in people, processes and resources, ASC is well positioned to remain one of the leading suppliers of construction, industrial and transport equipment, spare parts and allied products in both the Qatari market and throughout the region.ASC offers following products & services:

Contact Details:P.O. Box: 10882Tel: +974 4458 0623, +974 4458 0635Fax: +974 4458 0562Email: [email protected]

ALJABER & MAKHLOUF

AL JABER & MAKHLOUF W.L.L. is a Grade Contractor for Road Works and Infrastructure in Qatar.

The Company has proven track record of executing large scale, multi-dimensional projects, of expressways, development of urban & rural infrastructure, road maintenance & safety improvements, infrastructure and road works for airports, educational institutions, real estate developments, industrial & petro-chemical plants, sports stadium, commercial and residential communities.

Al Jaber & Makhlouf’s core business activities comprises of earth works, Infrastructure works , road works , road marking works , asphalt texturing and coating works and landscaping works .

The Company owns large fleet of latest equipment and qualified workforce to deliver the works to the highest quality and safety standards.

Al Jaber & Makhlouf motto is satisfaction of its Clients adopting safe working practices and protection of environment.

Contact details :Al Jaber & Makhlouf W.L.L.P.O.Box 22801, Lusail, Doha – Qatar T +974 4040 9600 F +974 4040 9797E-mail:[email protected] / [email protected]

DELMON SCAFFOLDING

Delmon Scaffolding & Formwork has been operating in the Gulf for more than 30 years. It manufactures, supplies and hires various types of scaffolding and formwork systems. Over those years this division has developed a name in the market place for its technical expertise, quality products and ability to deliver. It has branches in the U.A.E, Oman, Qatar, and Saudi Arabia.In addition to D-Lock systems for Scaffolding, Delmon is the exclusive distributor of ULMA products in Qatar which can proved solutions to client achieve their targets in a timely manner and within budget, for almost all types of projects..Delmon’s scaffolding & formwork system are manufactured according to specifications of the International Construction Standards and the Society of Engineers.Delmon has a reputation for providing a reliable and dependable service backed up by its vast products range, its management and sales teams, experienced design engineers, supervisors and inspectors.Please contact us so we can become part of your team.

Contact Details:Qatar Office:P.O.Box: 17096, Doha-QatarC Ring Road, Office 6A, 6th Floor,Al Mana Business TowerTel: +974 4 4353131Fax: +974 4 [email protected]

ARABIAN PROJECTSDEVELOPMENT COMPANY

APDC is involved in Business Development and offers marketing strategies for foreign companies aiming to sell their products and services in the Qatari Market. They have partnered with many international companies in the Qatari market and have a standing reputation that has attracted more companies within the region.

ADPC offers the following services:

• Establishing all ground work needed to facilitate daily operations for a new company• Provides support in understanding legislation and legal systems in Qatar• Offers expertise in analyzing short - term and long - term trends• Assistance in development of planning to foster growth in a dynamic environment

Contact Details:P.O. Box: 55289Tel: +974 4421 3636Fax: +974 4421 3737E-mail: [email protected]

BIMTEC

BIMTEC is a “Vendor free” Client driven firm specialized in Building Information Modelling, Value engineering and Project Management Services.With more than 43 Billion Qatari Riyals using BIMTEC’s BIM through our certified engineers in the MENA region, we have engaged in Railway/Towers/Hotels/Theme park/infrastructure Projects and more. BIMTEC’s services covers:

· Virtual Design Construction· Vertical Planning· Project Management· Health and Safety· Facilities Management Integration· Scan to BIM· Road Scanning and Mapping· Lidar and Marine Scanning· BIM Consultancy and Training

Contact Details:ContractsEmail: [email protected]

Arabian Projects Development Co.

ALJABER ENGINEERING | CORPORATE PROFILE 85

EMCON

Emirates Concrete & Steel Protective Coating Works (EMCON) was established in 1978 and started its Painting and Special Coating Division in 1987. Today EMCON is one of the leaders in Qatar & UAE in the following fields:

• Fireproofing• Protective Coating for Concrete & Steel• Pipe Coating• GRP Lining• Surface Preparation• Epoxy & Traffic Floor Coatings• Special effect paints, Calligraphy and Multicolor paints• Tank Coatings• Concrete Repairs• Crack/Leakage Injections• Structural Strengthening• Guniting/Shotcrete

EMCON has manpower exceeding 300 highly skilled employees and access to additional workforce in Dubai/Doha. EMCON has Airless Spray equipment, Injection Equipment, Floor Grinders, Shot Blasting Machines, Water Jetting equipment, Compressors, Sand Blasting equipment, Guniting and Shotcreting Equipment.

Contact Details:P.O Box: 124288Tel: +971 4347 3400Fax: +971 4347 3402Email: [email protected]

STREAM ACOUSTIC & THERMAL

Stream Acoustic & Thermal (SAT) was established in 2005 as a reliable providers of acoustic and insulation solutions. By applying their vast experience and support of first class manufacturers, SAT became in no time one of the major solution providers in the state of Qatar.

In 2013, SAT became a member of Al Jaber Group of companies, one of the most reputable business groups in Qatar, which shall strengthen our presence in the market.

SAT is a specialized solution provider of sound absorption, sound insulation, and isolation for both vibration and structural born noise. It is also specialized in thermal and water proofing for International Contractors as well as grade A local contractors targeting high end / prestigious projects.

We offer our clients solutions empowered with the latest standards and technologies and in compliance with international standards and building codes.

Our products and solutions cover:

• Sound Absorption• Sound & Impact Insulation• Thermal Insulation• Vibration Isolation• Water Proofing Insulation

Contact Details:P.O. Box: 30486Tel: +974 4413 3735Fax: +974 4413 3799E-mail: [email protected]

HYDROSERV

HYDROSERV is a leading name in dewatering and specialized in ground water treatment, pumping services for fluid handling applications. With vast knowledge and experience of the complex hydrogeological conditions encountered, Hydroserv can engineer a solution to safely manage the risks associated for any dewatering project. Hydroserv offers a complete line ground water treatment, water pumps and related equipment for a range of applications, including diesel, hydraulic and electric powered centrifugals, electric submersibles, light towers and diesel generators.The principle that we can support the growth of industry, infrastructure and community while protecting the integrity of the natural environment is highly important to us. Our approach, our equipment and our services cater to site specific environmental sensitivities.Services:• DEWATERING• OVER PUMPING WORKS• SEWAGE WORKS• EMERGRNCY PUMPING• PIPE LAYING• RENTAL AND SALES• PRESSURE WASHERS & WHEEL WASHERS• GROUND WATER TREATMENT

Contact Details:HYDROSERV HEAD OFFICEP.O. Box 209403SALWA ROAD, DOHA QATARTel No: +974 4421 1325Fax No: +974 4472 7315www.hydroserv.qa

INTERNATIONAL DRILLING GROUP

IDG is a leading specialized contractor serving the Trenchless pipeline industry using the most advanced techniques in Horizontal Directional Drilling, Micro Tunneling and Pipe Bursting.IDG services cover the whole project from Consultation, Planning, Management and Execution based on IDG’s four corner-stone philosophies, Flexibility, Mobility, Reliability and Quality.IDG main activities include:• Horizontal Directional Drilling• Micro Tunneling • Pipe Bursting

Contact Details:PO. Box: 45730Tel : +974 4480 5247Fax:+974 44029 6258Email. [email protected]

VIJAY ARABIA FIRE & SECURITYSYSTEMS WLL

Vijay Arabia Fire & Security Systems WLL (VASS) is one of the fastest growing integrated Fire & Security Specialist Company. Established in Qatar in 2007, VASS specializes in turnkey industrial and commercial projects. From conceptualizing, design, supply, installation, testing, commissioning & maintenance – complete array of solution is offered to the customers through a professional team of more than 200 personnel.

Solution Constellation offered by VASS includes -• Fire Detection System – Addressable, Conventional, Enterprise Solutions• Fire Protection System – Hydrant, Sprinkler, Foam, Gas Suppression (FM200, Novec), Pre-action & Deluge Systems• Passive Fire Protection Contractor & Supplier of Fire Door, Sealant, Cable coating, Mortar. • Security Systems - Access Control, CCTV, Intruder Alarm & AV systems.• Access Control Systems.• Annual Maintenance for Fire Fighting and Fire Alarm Systems.Contact Details:

P.O.Box : 31146, Doha, Qatar.Tel : (+974) 44365529 / 44982275.Fax : (+974) 44364993Mob : (+974) 74438012Email. [email protected] www.vijayarabia.com

URBAN COCEPT W.L.L

Urban Concept W.L.L. is a Design and Contractor of Landscape and Urban Spaces.It has a long history in designing large scale landscape and urban projects, such as New Doha International Airport, Barwa City, Oxyen Park Qatar Foundation, Ras Abou Abboud Interchange.Presently we are building a Horse race track and all facilities around it for the Ministry of Youth and Sports.We have a plant nursery for outdoor plants.Our primary activities are:- Landscape design and construction.- Hardscape design and construction- irrigation Design and construction- Garden lighting design and construction.

Contact Details:PO Box 24363Tel: +974 4414 1198Fax: +974 4414 1124Email: [email protected]

www.jec.qa