Valmet Corrugated Services(Alignment & Re-alignment)
INTERNAL
• Valmet Tissue HQ
• Part of global Valmet service network
• More than 500 professional employees
2
About Valmet Karlstad, Sweden
August 2014
INTERNAL
3
Alignment checks & realignment
Properly aligned machines components and structures will have a major
impact on the run ability of the machine and the quality of its end products
August 2014
INTERNAL
4
Benefits of proper alignment
• Improved formation
• Improved cross direction profiles
• decreases sheet breaks
• Improved run ability
• Prevention off uneven wear of
machine parts
August 2014
INTERNAL
5
Scope of Valmet alignment services
• Alignment checks and realignment for all machine sections
• Controls off existing building and reference line
• Design and establishing of new reference line
New markers in machine floor
New scales in machine wall
INTERNAL
August 20146
Measuring tools for optical alignment checks
• Alignment is checked with the
help of a leveling instrument, a
tachometer
• We also use a number of
proprietary measuring aids that
have undergone extensive
development work
• Tachometer software is tailored
for paper machine alignment
applications
INTERNAL
7
Measuring tools for optical alignment checksTotal station
• Benefits of total station
• Total station precision
approximately 0.1 mm
• Speed of Total station facilitates
simultaneous horizontal and
vertical measurements
August 2014
INTERNAL
8
Measuring tools for optical alignment checksSoftware
• Metso Paper has designed the
Total station software specifically
for paper and corrugator machine
applications
August 2014
INTERNAL
Alignment
Re alignment
Vibration measurement
Roll temperature measurement(Thermo services)
DB hot plate surface optimization(regrinding and leveling)
Sole plates upgrade or new line installation
Installation services existing/New line
9
Performance package
August 2014
INTERNAL
10
Re-alignment of Corrugators
• Corrugator re-alignment (with assistence of the local maintanence)
• Possible re-alignment reparations are done during the alignment.
August 2014
INTERNAL
• Or existing line in bad condition
11
New reference line
August 2014
INTERNAL
Sole plate preparation for New
machine line installation.
12
Sole plate upgarde
Corrugator sole plate installation
August 2014
INTERNAL
On site regrinding and leveling
Example sketch off how
misaligned rolls will effect the
paper sheet.
Surface optimization and leveling
13
DB hot plate surface optimization
August 2014
INTERNAL
Hot plate surface condition Save energy and belt
Surface condition (RA-measurement)
On-site hotplate grinding
– Leveling
– Alignment
14August 2014
INTERNAL
MX06 PROPERTIES
MX06 is a fluorine based layer
Durability doubled compared to Teflon
Forms a thin layer, normally 0,001-0,002 mm
Teflon-treated surfaceUntreated surface
• Treated surface becomes water-repellent
• Stands all cleaning chemicals, both acid and basic
• Except for metals, polymers and ceramics can be treated with MX06
• Prevents/reduces Headbox contamination and build-ups
• 30h On-site application, 8-12h drying time
August 2014
INTERNAL
Alignment services
16
INTERNAL
17
Alignment & Re-alignment of Corrugators
• Since 2005
• New business area since 2009
• Experiance with corrugator manufactures like, BHS, Fosber, Agnati,
Mitsubishi, Kohler, Langston, Marquip, Peters, Torres, etc.
• More than 50 combined (alignment + re-alignment) projects.
• Customers like, SCA, Smurfit Kappa, DS Smith, Stora Enso, Saica,
Peterson and private companies.
A winning Technology from the Paper Industry to the Corrugated Industry
August 2014
INTERNAL
18
Alignment & Re-alignment of Corrugators
Customers’ feedback:
Monday, 20 August 2012
“Our experience with Metso Paper started back in 2007 when we
measured and realigned our corrugator for the first time. We used their
services again in 2010. When we took the decisions to install our new
corrugator in 2011 there was no doubt that we should use the expertise,
experience and service from Metso Paper to assist and support us during
the different stages of the installation. We were very pleased with Metso's
flexibility and respond to our demands and above all the high standard of
service. We can highly recommend working with Metso when
installing a new corrugator”.
Haim Perri - Plant Manager
I.M.A. Itzur Mutzarei Ariza Ltd.
Israel April 2012
"Metso Paper responded quickly to our request for help, the job was made
very professionally, we were very satisfied and happy with the latest service
and with the service technicians we had on-site.
We have nothing to complain about, well done job.
We can see an improvement in the tension in the paper path, and less
warp.
It is important that the machine elements are align to each other.
I would recommend others to do the same”.
Even Raassum - Corrugator Manager
Smurfit Kappa Norpap
Norway
August 2014
INTERNAL
19
Alignment & Re-alignment of Corrugators
Customers’ feedback:
Increasing in board strength on C and B Flute
E-mail: 15. juni 2011
Hi Ram.
Yes I think so, the miss alignment in our machine probably
gave us more problems than first imagined.
Med vänliga hälsningar/Best regards
Ulf Svensson - Process Technician
SCA Packaging Sweden AB
Mariestad Division
April 2011
Results after corrugator Re-alignment:
a. Satisfied with the work done by Metso Paper and the Metso’s personal on-site.
b. Much better paper tension on the corrugator.
c. Much better temperature distribution across the width on medium and liners at all positions.
d. Big improvement on board quality in manufacturing E-Flute.
e. Corrugator in general is running better.
f. Good results with the re-alignment of the roll-stands
g. Triple stack was the major problem before the project, good improvement after the re-alignment.
h. Metso Paper is much more experience and are using better equipment comparing with BHS.
i. I think it is a very good idea to have Metso Paper on site during installation of a new corrugator. I
believe this could solve us a lot of issues in Värnamo when we installed the corrugator about 8 years
ago.
j. Good value for the investment
Conny Björk - Maintenance Manager
SCA Packaging Värnamo
Sweden
August 2014
INTERNAL
What will be measured and analyse?
Mainly the Wet-end which include:
Existing reference line
Roll-stands
Splicers
Pre-heaters
Wrap arms
Bridge web guiding system
Glue machine
Triplex pre-heaters
Major rolls at the double-backer
Measuring other parts of the corrugator has to be agreed and defined beforehand
20
Alignment Measurements & Survey of Corrugators
August 2014
INTERNAL
Resources & Manpower
Metso will allocate for this project, 2 experienced field service persons.
1 Total Station measurement device.
Time Consume
12 hours x 2 days = for a corrugator with 2 single facers
Reports & Deliverables
Measurement results and recommendations for re-alignment (remedial) will
be delivered for each corrugator.
21
Stage 1: Alignment Measurements & Survey of Corrugators
August 2014
INTERNAL
Customer Responsability
Provide reference / lay-out drawings of machine sections before action
1 Maintenance personal to assist on-site
1 Machine operator to assist on-site if necessary
Scaffold if necessary
Machine has to be clean & cold
Machine area has to be free of any obstacles like paper rolls, trolleys etc
22
Alignment Measurements of Corrugators
August 2014
INTERNAL
23
Stage 2: Re-alignment of Corrugators
The re-alignment process of the corrugator will be based on the
results and finding in stage1 (corrugator alignment measurement)
The most “critical” mis-alignment areas that has been founded in
stage 1 would be re-aligned (adjust)
New or adjustment of the existing reference line for the corrugator
Time consume between 2 to 4 days, depending on how much work is
needed to be done
Help and support from the locale maintenance team
Extensive and detailed report that summarize stage 2 will be
delivered to customer
August 2014
INTERNAL
How to bring a project to be Successful?
• Good scheduling
• Clear definition of the project, what will be measured, what parts of
the corrugator will be measured, etc.
• Contact person at customer & Metso sides
• Lay-out of the corrugator
• Locale support
• Engegement
• Other ongoing or involving projects
• Clean machine
24
Alignment & Re-alignment of Corrugators
August 2014
INTERNAL
25
Why Valmet?
• Brings knowledge, skills and many years of experience in alignment
measurement and machine re-alignment, from the paper and tissue industry.
• Using the best equipment for this job.
• Similarity between paper machine and a corrugator machine.
• Has already performed several complete projects on corrugators.
• Is the only company, who is taking full responsibility from the beginning of
the process (step1) to its end (step2).
August 2014
INTERNAL