WESTWOOD ESTATES/ST. MARY’S/STEEPLECHASE/ST. PETERS ESTATES SPECIAL SERVICE AREA SANITARY SEWER IMPROVEMENT PROJECT Alignment Design Memorandum January, 2016

Transcript of Alignment Design Memorandum January, 2016 · Alignment Design Memorandum January, 2016 . George...

WESTWOOD ESTATES/ST.

MARY’S/STEEPLECHASE/ST. PETERS

ESTATES SPECIAL SERVICE AREA

SANITARY SEWER IMPROVEMENT

PROJECT

Alignment Design Memorandum

January, 2016

George Butler Associates, Inc. Page ii

TABLE OF CONTENTS

Preliminary Design Memorandum ...............................................................................................1

A. Introduction ....................................................................................................................1

B. Record Data Search .......................................................................................................3

C. Utility Service Provider Coordination .........................................................................3

D. Schematic Design ...........................................................................................................4

1. Ingress-Egress ..............................................................................................................4

2. Easements and Property Owners .................................................................................5

E. Creek Evaluation ...........................................................................................................5

F. Additional Considerations ............................................................................................5

1. St. Peters Golf Course ..................................................................................................5

George Butler Associates, Inc. Page iii

FIGURES

Figure 1 Project Area

George Butler Associates, Inc. Page iv

ATTACHMENTS

ATTACHMENT 1 - UTILITY COORDINATION LOG

ATTACHMENT 2 - LIST OF POTENTIALLY AFFECTED PROPERTY OWNERS

ATTACHMENT 3 – SIPHON LOCATION CREEK NOTES

ATTACHMENT 4 – PRELIMINARY ALIGNMENT

ATTACHMENT 5 - PRELIMINARY ENGINEER’S ESTIMATE OF PROBABLE COST AND

QUANTITY TAKEOFFS

George Butler Associates, Inc. Page 1

PRELIMINARY DESIGN MEMORANDUM

A. Introduction

This Alignment Design Memorandum discusses and transmits work performed to date for the

Westwood Estates/St. Mary’s/Steeplechase/St. Peters Estates Special Service Area Sanitary

Sewer Improvement Project. The project is located in a residential area south of I-70, east of

Highway 79 and the St. Peters Golf Course.

George Butler Associates, Inc. (GBA) completed a Sanitary Sewer Evaluation Study (SSES)

of this area in July 2015 and developed recommendations for sewer improvements. The

recommended improvements include several larger diameter sewer pipes and a new inverted

siphon where the sewer crosses Dardenne Creek to relieve basement backups and sanitary

sewer overflows (SSOs) within the system. GBA has been assigned the task of completing

the design of recommended improvements for the project.

The project area is located in a residential area outside of city limits and is shown on Figure

1. The project reach is generally bounded by Westwood Estates Drive to the north, Hialeah

Drive to the east, St. Peters Golf Course to the west, and common ground to the south.

The majority of the project area development was built in the 1960’s and 1970’s as part of

the Westwood Estates, St. Mary’s, Steeplechase and St. Peters Estates Subdivisions. This

watershed has limited potential for additional development.

Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand),MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

PROJECT NUMBER

13347

FIGUR

E 1PR

ELIM

INAR

Y MEM

ORAN

DUM

PROJ

ECT A

REA M

AP

NOV. 2015

Westwood Estates/St. Mary's/

Steeplechase/ St.Peters Estates SpecialService Area SanitarySewer Improvement

Project

³LegendProject LocationCity LimitsSite AccessParcels

George Butler Associates, Inc. Page 3

GBA’s project approach entails increasing the capacity of the siphon and select sewers to

accomplish the project goals. This submittal includes the following attachments:

Utility Coordination Log

List of Potentially Affected Property Owners

Siphon Location Creek Notes

Preliminary Alignment Sketch

Preliminary Engineers Estimate of Probable Cost and Quantity Takeoffs

B. Record Data Search

Preliminary investigations were performed to assist in the preliminary design. Existing

information was reviewed and field investigations were performed. The field investigations

focused on constructability issues and an evaluation of stream impacts at the siphon location.

GBA received parcel and utility data from the City at the beginning of the project. These data

files were reviewed and in some cases additional data was requested. In cases where data

gaps were identified additional information was requested and utilized as needed. The

following data was provided by the City:

City GIS (including parcels, utilities, etc.)

Project Aerials

C. Utility Service Provider Coordination

A list of utility providers in the project area was obtained from Missouri One Call. The

utilities were contacted by GBA. Some of the utilities responded by providing utility

mapping or highlighting utility conflicts between their infrastructure and the proposed project

area. Based on the mapping provided, significant utility conflicts are not anticipated. GBA

will provide copies of the Preliminary 60% Design Plans to the utilities for review when

available. Initial contact information was recorded in a Utility Coordination Log. A copy of

the Utility Coordination Log is included as Attachment 1. Information was obtained from

the following utility providers:

Ameren Missouri Electric

AT&T

Charter Communications

Laclede Gas Company

CenturyLink

Missouri American Water

City of St. Peters

George Butler Associates, Inc. Page 4

In, addition, GBA’s surveyor sub-consultant for this project, BAX Engineering, Inc. has

surveyed utilities while performing the topographic survey field work. Detailed costs for

potential utility conflicts are not included in the preliminary cost opinion section at this time.

This includes irrigation piping and sprinklers at the City golf course which have not been

surveyed at this time.

D. Schematic Design

Preliminary investigations were performed to assist in the proposed design. Existing

information was reviewed and field investigations were performed. The field investigations

focused on an evaluation of stream impacts at the siphon location.

The preliminary alignment was presented as the recommended alternative in GBA’s July

2015 SSES Report. Adjustments were made to incorporate notes from GBA’s Stream Team

field investigation efforts from September 9, 2015. The proposed alignment includes

upsizing several existing sewers and the inverted siphon at the creek crossing. To relieve the

SSO and basement backups in the Westwood and Steeplechase areas, the sewer carrying flow

from Churchill Downs Dr. to Elm Ct. will be abandoned, along with two existing manholes.

Instead, new sewer will be constructed south along the rear lot lines and turn westward,

connecting to an existing manhole south of 14 Elm Ct. Furthermore, the existing overloaded

siphon will be replaced by a quadruple barrel (one 8-inch and three 12-inch diameter pipes)

siphon to provide adequate capacity and velocity. Based on notes from the Stream Team

evaluation, the new siphon crossing will be located approximately 30 feet upstream of the

existing crossing, which will require construction of new manholes and abandonment of the

existing siphon components. The gravity sewer will then discharge to an existing manhole in

the golf course along the 42-inch Golf Course interceptor. A preliminary design alignment is

included as Attachment 4.

The proposed sewer is planned to be constructed in a manner such that the existing sewers

can be abandoned in place, the amount of bypass pumping can be minimized, and existing

easements can be utilized as much as possible. This could be achieved by offsetting new

sewers by a few feet on one side parallel to existing sewers.

1. Ingress-Egress

In the portion of the project within the golf course (west of Dardenne Creek), the City

owns the access points and temporary construction easements (TCE) are not

anticipated to be a significant concern.

A significant portion of the project will be constructed within subdivision common

ground and existing easement along the rear property lines of parcels between Elm

Ct. and Churchill Downs Dr. The upgraded existing sewers will generally follow the

same alignment, while the new sewers will extend along the rear property lines to the

common ground behind the properties at the end of Elm Ct. A likely access point is

through the Westwood Estates common ground/existing 50-foot Missouri American

George Butler Associates, Inc. Page 5

Water utility easement between 122 and 124 Oak Dr. There is also an access point to

the common ground from Elm Ct. between 14 and 16 Elm Ct.

2. Easements and Property Owners

In general, it appears that sewer construction may be mostly confined within existing

City property, subdivision common ground and existing utility easements. Some new

permanent utility easements and TCEs are anticipated between Elm Ct. and Churchill

Downs Dr. A list of potentially affected property owners is included as Attachment 2.

E. Creek Evaluation

GBA’s Stream Team evaluated the reach of Dardenne Creek where the new inverted siphon

is planned to cross beneath the creek. The purpose of this evaluation was to locate any

existing hydraulic features and to identify possible stabilization measures to ensure the

proposed crossing won’t interfere with existing creek hydraulics. As a result of this

evaluation, it was recommended that the proposed siphon be moved a minimum of 30 feet

upstream of the existing riffle, which is located at the site of the existing sewer crossing. It

was also recommended that a rock toe be placed on the right slope, upstream of the existing

riffle. The existing riprap present on the right bank, 2 feet above the water surface, should

not be disturbed. The Stream Team also added that the slopes should be revegetated with

Zone 1 plantings following construction. Notes and sketches from the creek evaluation are

included as Attachment 3.

Additionally, GBA performed a preliminary on-site delineation of the waters of the United

States and identified impacts on the channel and anticipated permitting issues. Two potential

jurisdictional waters were identified within the project corridor including 1) Dardenne Creek

and 2) emergent wetland swale. Project construction is anticipated to result in only temporary

fill impacts within these two waters; therefore, the project should qualify for a U.S. Army

Corps of Engineers Section 404 Nationwide Permit 12 “Utility Line Activities”. While

agencies including U.S. Fish & Wildlife Service, Missouri Department of Conservation, and

the State Historic Preservation Office have not been contacted at this phase of the project,

GBA does not anticipate any potential issues with endangered/threatened species or historic

resources.

F. Additional Considerations

1. St. Peters Golf Course

A new sewer line is proposed through the golf course, connecting the new siphon to the

existing 42-inch golf course interceptor. Golf course sprinkler locations have not been

surveyed at this time. Based on a previous project that went through the golf course,

GBA understands that construction should be staged to keep the course playable,

preferably during the winter months (December 1st to March 1

st).

George Butler Associates, Inc.

ATTACHMENT 1

UTILITY COORDINATION LOG

PROJECT: -

JOB NUMBER: - -

PROJECT MANAGER: - -

UTIL COORDINATOR: -

CLIENT:

NOTIFICATION OF

Address COORDINATION

MEETING

Beverly Wilson 1901 Chouteau, PO Box 66149

(314) 554-2570 MC 700

[email protected] St. Louis, MO 63166

Joe Pippin 402 N. 3rd

(636) 949-1328 St. Charles, MO 63301

[email protected]

Lisa Ward 941 Charter Commons

(636) 387-6633 Town & Country, MO 63017

[email protected] [email protected]

Laura Bandy 4118 Shrewsbury Ave

[email protected] St. Louis, MO 63119

[email protected]

David Bear One St. Peters Centre Blvd

(636) 477-6600 ext. 1312 St. Peters, MO 63376

[email protected]

Marcia Gay

(636) 332-7261

[email protected]

Katie Stimetz 727 Craig Rd

St. Louis, MO 63141

[email protected]

(VM) Voice Mail; (T) Telephone; (E) Email; (L) Letter; (M) Meeting

GENERAL NOTES

LETTING:

225 S. MAIN, SUITE 200

O'FALLON, MO 63366

(636) 240-2444

EXECUTED

AGREEMENT

FINAL PLAN

SUBMITTAL

UTILITY COORDINATION LOG(version 1.1)

City of St. Peters, MO

Charter Communications

(E) request for maps 9/18/15; received

maps 9/21/15; GBA to submit plans for

review

ANTICIPATED SCHEDULE

Ameren Missouri Electric

PRELIMINARY PLAN

SUBMITTAL

FOLLOW-UP

CONTACT FOR

SURVEY LOCATESPRELIMINARY PLAN SUBMITTALUTILITY COMPANY

Missouri American

Water Company

CenturyLink

City of St. Peters

(Sewer)

(E) request for maps 9/21/15; Maps

received 11/9/15; GBA to submit plans

for review

(E) to Jamie Richardson 9/21/15; reply

9/21/15 indicates that Katie is now

contact for plan review; GBA to submit

plans for review

PROJECT SUMMARY

Steeplechase Sewer Improvements

13347

Matt Auld

Kierstyn Lorince

GIS sewer mapping provided by City at

start of project

mapping not available; GBA to submit

plans for review

PRELIMINARY PLANS:

RIGHT-OF-WAY PLANS:

FINAL CHECK PLANS:

FINAL PLANS:

CONTACT INITIAL CONTACT

RECEIVED

VERIFICATION OF

UTILITIES

BEGIN CONSTRUCTION:

PROJECT COMPLETION:

RECEIVED UTILITY

PLAN OF

ADJUSTMENT

COORDINATION

MEETING

FINAL CHECK PLAN

SUBMITTAL

FINAL CHECK PLAN

SUBMITTAL

FOLLOW-UP

3RD FOLLOW-UP

mapping not available; GBA to submit

plans for reviewAT&T Distribution

(E) request for maps 9/18/15; received

maps 9/24/15; GBA to submit plans for

review

Laclede Gas Company

George Butler Associates, Inc.

ATTACHMENT 2

LIST OF POTENTIALLY AFFECTED PROPERTY OWNERS

Potentially Affected Property Owners

Westwood Estates/St. Mary's/Steeplechase/St. Peters Estates Special Service Area Sanitary Sewer Improvement Project

November 18, 2015

Ingress

/ EgressTCE

Permanent

EasementOwner Name Address County Parcel ID

X X RICHARD L CARR & AVERIL E CARR 5 ELM COURT 2-062A-4969-00-0108

X X WALTER E BOYD & MARY E BOYD 7 ELM COURT 2-062A-4969-00-0107

X X JOHN W BORGMEYER & WANZA J BORGMEYER 9 ELM COURT 2-062A-4969-00-0106

X X AARON WOOLSEY 11 ELM COURT 2-062A-4969-00-0105

X X BENJAMIN R JUNG 13 ELM COURT 2-062A-4969-00-0104

X X DOUG W HOLLINGSHEAD & DONNA S HOLLINGSHEAD 15 ELM COURT 2-062A-4969-00-0103

X X RICHARD A SCHROER & PHYLLIS A SCHROER 17 ELM COURT 2-062A-4969-00-0102

X X MATTHEW EHMAN 14 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0311

X X JOHN C RAY JR 16 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0310

X X S&S KELLER COMPANY IV LLC 18 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0309

X X FRED J MOSES & JEAN M MOSES 20 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0308

X X CITY OF ST. PETERS 22 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0307

X X OLIVIA A LINDSEY & KEITH A LINDSEY & EMILY N LINDSEY 24 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0306

X X STANLEY T SCHOTT & JUDY K SCHOTT, REVOC INTER VIVOS TRUSTS 26 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0305

X X TARAM HERTLEIN 28 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0304

X X GREGORY LARAMIE & SAVANNAH P BALTIMORE 30 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0303

X X

THOMAS SCHWEITZER, KATELYN NELSON, JAMES ANDREW NELSON

& KELLY L NELSON 32 CHURCHILL DOWNS DRIVE 2-062A-4428-00-0302

X X X WESTWOOD ESTATES TRUSTEES OF RECORD ELM COURT 2-062A-4969-00-0111

X X X WESTWOOD ESTATES TRUSTEES OF RECORD OAK DRIVE 2-055D-4969-00-0112

X X X CITY OF ST. PETERS GOLF COURSE/ELM CT 2-062A-4969-00-0111

Property Impact Property Owner Information

Page 1 of 1

George Butler Associates, Inc.

ATTACHMENT 3

SIPHON LOCATION CREEK NOTES

BPJob No._______________

architectsDate

_________________

engineers By Chk’d______

?S AJ.7 Cc-Z/1J-

- ,%— ,.s 6e111 S74f14 T?E- 4Vr,q-V &4rz2 ,12rjt’ -2

214’l ,yre 1s ‘C’ > ‘ Ic ,14iJ4r’ fZcM4 rc

- ZZ TO E/)7,4IJ2/ 74-,4i oi á

____

‘ )r S4Di’ P 7cTJM1 /O ‘- ‘ cfr-L r4/4[EL.-r -AV C,eZTrCI4 L ‘Z- 6’6s6 S

— i/ /. 1Jh’OL M’Z/Z/ f’c41 %W

L)ZC MVk S• rro,V4L ZW2G ç .

44 ,

‘ ‘? 72 ,4e çi o

TL SiA- 4:r cV ÷

( /efr

________

of

z

U.

Dardenne Creek

438437 .

____...........—.

436

___________

i I I

I

___

432

__________

431 — -

_______

I .. . I I I

0 100 200 300 400 500 600 700 800 900 1000

Channel Distance (ft)

• bed I water srf • ban kfull t x-section o riffle crest • pool • run glide x --- + --- - --- Linear (---)

cJ

lb.’ 4k

.

S O

George Butler Associates, Inc.

ATTACHMENT 4

PRELIMINARY ALIGNMENT

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!!!!!!

!

!

!

!!

!

!

!!

!

!

!

!

!!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!(!(!(

!(

!(!( !(

!(

!(

!(

!(!(

!(

!(

!(

!(

!(

!(

476'36IN PVC

394'

12IN

PVC

390'12IN PVC341'18IN PVC

339'18IN PVC

333'

18IN

PVC

328'

12IN

PVC

228'

12IN

PVC

223'18IN PVC

145'

15IN

PVC

120'18IN PVC

61'12IN PVC

200

2

7

3

2

5

6

8

2

5

1

9

14

8

6

5

4

6 4

8

1

3

7

4

3

1

9

1

2

17

2

3

3

97

5

68

14

5

1617

1

2

8 46

13

18 15

4

2

11

38

4

8

6

9

9

4

6

8

10

66

7

32

12

16

5

54

48

12

15

25

40

30

3

64

24

22

36

11

7440

33

10

52

11012

26

30

1

47

13

32

112

13

11

23

39

17

52

2018

28

1513

1012

14

11616

24

122

114

142

118

124

128130

132134

136138

140

35

34

125

126

11

120

42

119

28

10

62

11

37

26 19

10

1715

44

19

46

21

48 50

57

56

59

49

48

55

50

54

23

21

19

17

15

13

12

10

14

16

18

20

24

26

28

30

12

108

46

31

117

32

113115

137

133

129

135

127

139

131

141

53

143

46

145

47

111 28

52

18

21

22

20

60

1615

18

2414

16

14

18109 13

14

30

25

12

16

51

44

10

45

44

743023

8

45

50

Oak Dr

Hialea

h Dr

Elm Dr

Elm Ct

Maple St

Churc

hill Do

wns D

r

Westwood Estates Dr

Jamaica Dr

Home

stead

Dr

Santa Anita Ct

Steeplechase Dr

St Luke Dr

Chestnut Ct

Elm Dr

PROJECT NUMBER

13347

ATTA

CHME

NT 4

PREL

IMIN

ARY A

LIGNM

ENT

NOV. 2015

Westwood Estates/St. Mary's/

Steeplechase/ St.Peters Estates SpecialService Area SanitarySewer Improvement

Project

³

Legend!( Proposed Manhole

Proposed SewerProposed Siphon

!( Existing Manhole AbandonmentExisting Sewer Abandonment

! Existing ManholeExisting Sewer

PROPOSED SIPHON

140'3-12 IN DIP1-8 IN DIP

George Butler Associates, Inc.

ATTACHMENT 5

PRELIMINARY ENGINEER’S ESTIMATE OF PROBABLE COST AND QUANTITY

TAKEOFFS

Average Estimated Capital

Task Units Quantity Unit Cost Cost Cost(1)

Relief Sewers

Mobilization LS 1 $25,000 $25,000 $31,250

Excavation Class "C" CY 6116 $25 $152,900 $191,125

Dewatering AL 1 $8,000 $8,000 $10,000

Bypass Pumping LS 1 $12,000 $12,000 $15,000

Seeding SY 547 $2 $1,094 $1,368

Protection and Restoration of Site LS 1 $55,000 $55,000 $68,750

Street Pavement - Asphaltic Concrete Remove & Replace SY 15 $67 $1,005 $1,256

Street Pavement - Concrete Remove & Replace SY 32 $68 $2,176 $2,720

Granular Backfill CY 43 $36 $1,548 $1,935

Manhole Cover Seals EA 13 $145 $1,885 $2,356

Manhole Frame Seals EA 13 $360 $4,680 $5,850

Manhole-Standard Construction LF 155 $350 $54,250 $67,813

Pipe Sewer 12 inch (Sanitary/Combined) LF 1401 $95 $133,095 $166,369

Pipe Sewer 15 inch (Sanitary/Combined) LF 254 $105 $26,670 $33,338

Pipe Sewer 18 inch (Sanitary/Combined) LF 1372 $120 $164,640 $205,800

Pipe Sewer 36 inch (Sanitary/Combined) LF 476 $320 $152,320 $190,400

Bentonite Plug EA 15 $250 $3,750 $4,688

Abandonment-Pipe Fill CY 15 $190 $2,850 $3,563

Abandon Structure EA 5 $1,100 $5,500 $6,875

Siphon

Ductile Iron Pipe Sewer 08 inch Class 50 LF 140 $150 $21,000 $26,250

Ductile Iron Pipe Sewer 12 inch Class 52 LF 420 $190 $79,800 $99,750

Junction Box EA 2 $25,000 $50,000 $62,500

Encasement- Class "A" Concrete CY 50 $250 $12,500 $15,625

Zone 1 Plantings SY 50 $15 $750 $938

Class I Rock Toe SY 60 $95 $5,700 $7,125

Total $978,113 $1,222,641

Notes:

(1) Capital costs include 25% contingency

(2) Cost does not include property acquisition, easement preparation, rock excavation or bid period/construction

phase services.