ALICE PROJECT REPORT N°4 – SEPTEMBRE 2016 Attn : SHINING HOPE FOUNDATION SARNATH SCHOOL Extension of the school The work of the extension of the school is still going on. The rooms are being plastered from inside and the work of fixing the water pipes in the walls for the water supply is going on there. As well as they are fixing the pipes for the electricity. The toilets for two floors ready now they are making the toilets for the third floor. The floors are still to be prepared. The painters are doing the painting work of the doors and windows frames. Here we are sending you some of the images of the work going on there. Image of the room ready with the plastered walls and the pipes for the electricity

Transcript of Alice Project - Report 4 (Sep. 2016)

Page 1: Alice Project - Report 4 (Sep. 2016)

ALICE PROJECT REPORT N°4 – SEPTEMBRE 2016 Attn : SHINING HOPE FOUNDATION

SARNATH SCHOOL

Extension of the school

The work of the extension of the school is still going on. The rooms are being plastered from inside and the work of fixing the water pipes in the walls for the water supply is going on there. As well as they are fixing the pipes for the electricity. The toilets for two floors ready now they are making the toilets for the third floor. The floors are still to be prepared. The painters are doing the painting work of the doors and windows frames. Here we are sending you some of the images of the work going on there.

Image of the room ready with the plastered walls and the pipes for the electricity

Page 2: Alice Project - Report 4 (Sep. 2016)

The rooms with floors not ready. Workers painting the frames of the windows

Toilets being ready on each floor of the new building. Ready blocks for the toilets

New guest rooms are under construction

The classrooms which were behind the stupa, now they are being converted in the guest houses. The two classrooms are going to me be modified in 4 guestrooms with the attach bathrooms. Here we are sending you some of the images of the work going on there.

The image of rooms being divided in the guestrooms. Opening of the guest rooms

Page 3: Alice Project - Report 4 (Sep. 2016)

Interior view of the guestrooms Interior view of the guestrooms

The library is being repainted

The library is also being repainted. The workers are painting the building and the furniture with different colors suggested by Grazeilla ji.

! !

Upper part of the library Lower part of the library

Page 4: Alice Project - Report 4 (Sep. 2016)

! ! Steps leading to the upper part The cupboards painted with new colors

BODHGAYA SCHOOL

New Junior Bodhagaya High School

Construction has been delayed a lot (finances, weather…) but is almost finished! They are beginning to work with the inside set-up.