Outline

• ALICE Christmas break schedule– Access UX25, L3 and MNF

• Services interruption– Gas, cooling and electricity

– DAQ and DCS plans

• Detectors activities• Day-by-day schedule wks 49-7• Visits• AOB

14/1/11 ALICE planning meeting 3

Christmas break schedule

• Start on Tuesday, 7th December. End on Friday, 18th February

• Plan:– Open both L3 doors

– Installation of 3 TRD and 6 EMCal modules

14/1/11 ALICE planning meeting 4

ALICE Christmas break schedule

OpenOpenExperimentExperiment

TRDTRDEMCalEMCal

CloseCloseExperimentExperiment

Open L3 doors

Close L3doors

14/1/11 ALICE planning meeting 5

Access restrictions

• The reasons to restrict the access are:– Handling of shielding blocks– Lowering of heavy structures (yellow-platform, TRD and EMCal rotators and

modules)– Installation of EMCal modules– Removal of L3 ventilation– Evacuation tests– …

• The access restrictions concern the UX25 cavern, MNF, L3 and CRs

• SLIMOS shifts still missing in wks 49-50 and 4-5

• Indications are given (next slides) concerning the access during the whole break – more precise info will be discussed at 5 o’clock daily meetings

14/1/11 ALICE planning meeting 6

UX25 access

Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)

• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25

LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25

No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

14/1/11 ALICE planning meeting 7

L3 (and MNF) access

EMCal EMCal

EMCal

NoVentilation

Wks 50 and 5: access (TPC) to be coordinated with TC (transport)

Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF

Watcher needed in wk 49 and from wk 4 onwards

Wk 7: Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)

31

Evac.

NoVentilation

243NoVentilation

13 7

Lift

Services interruption

14/1/11 ALICE planning meeting 9

Maintenance gas systems

Functional tests

New gas monitoring

13-15/12:• Stop N2, CO2, Neon, Ar (24 hours max N2, CO2 and Neon)• TRD backup (N2 bottle in CR5) – HMPID backup (Ar bottle in SG2)12/1 (during the cooling stop):• Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2)

13

Flowmeters

14/1/11 ALICE planning meeting 10

Gas system status over Christmas

Albin

• TPC: flush CO2• TRD: ON• TOF: ON – stop 11-12/12 and during cooling stop (KNF pump

stopped)• HMPID: ON (Ar backup)• PHOS: N2 flushing• PMD: ON (except 11-12/12 – gas stop)• Muon TRK: backup CO2• Muon TRG: backup Ar

• No flammable gases from 7 Dec until 25 Jan PM (after maintenance UX25, Muon TRK-TRG ventilation)

14/1/11 ALICE planning meeting 11

Maintenance cooling unitsCooling Plants and Primary Network

Cooling towers

Maintenance on production network. No primary water from 12/1 (14:00) to 21/1 (AM)CR1-2-3, the Wiener PS and detector cooling plants affected (plants can RUN, but no cooling power). DCS will be kept running at all times (dedicated chiller)

Maintenanceand

consolidation

17

21

12

TOF/PHOSEMC

HMPID

SPDTPC

TPC 10

Maintenance on cooling plants. Replacement of pneumatic actuators for TOF/TRD/TPC plants + TOF/PHOS flowmeter. CP will be stopped during maintenance

SSD/SDD

TRD

TPC RR

Chillers

L3 and Dipole

24

14/1/11 ALICE planning meeting 12

Maintenance ventilation units

SG2

UX25, Muon

TRK-TRG

17

12

UX25, Muon TRK-

TRG

L3

14/1/11 ALICE planning meeting 13

Safety and electrical systems

UX25 fire detect.20

PX24 fire detect. + red phones

UPS UPS

AUG

UPS

DSO

Evacuation

DSSSNIFFER mainten.Auto-transfert

Evacuation

Evacuation

Early morning/late evening (tbc)

PX24 PAD

LACS doors

31

Guard 8-00 – 18-00Lifts maintenance

Lifts maintenance

UX25 lift

14/1/11 ALICE planning meeting 14

• LHC evacuation tests (7/12 after 18:00 and 24/12 tbc)

– no access UX25

• EN/EL: interruption on auto-transfert network (9/12 from 07:00 till 07:05):

– all wall outlets will be interrupted

– including all non-UPS outlets in the ACR (so essentially all WRs)

– including outlets SXL2, offices and barracks

– non-UPS power for the detector cooling plants will be interrupted

– power to all gas systems will be interrupted

– the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption

– the electronics racks in the cavern and CRs will not be affected.

– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf

• DSS modification (13/1)

– Will stop the full DSS, trigger all interlocks, including stopping power to all racks

• EN/EL: AUG Test (20/1) (Arrêt Urgence General – General Emergency Stop)

– Major electrical perturbation. Also ACR affected

Safety and electrical systemsImpact on ALICE

14/1/11 ALICE planning meeting 15

DAQ upgrade plans• 21st Dec PM till the 04th Jan included

– The DAQ will be OFF during the CERN closure.– The ACR PCs will be left ON to give access to the DCS for the detectors teams

who need it.• 5th to the 11th of January included

– DAQ restarted on the first working day for 1 week. The DAQ will be switched ON with the present version of all software. Allow a quick commissioning after the installation of new detector modules or the intervention on existing detectors.

• 12th to the 23rd Jan included– The DAQ will be OFF during the cooling interruption at P2.– DAQ renovated (see TB December)

• 24th January– The DAQ will be ON again. It will run under SLC5 64 bits unless there would be

an unexpected key problem.

• The electronic logbook will remain available during the whole period. When the DAQ will be OFF, it will be running in the DAQ lab in Meyrin. There will be a few hours of interruption to switch from P2 to Meyrin and back.

Pierre/Uli

14/1/11 ALICE planning meeting 16

DCS plans• Baseline: DCS will be operational all times where technically possible

– With ‘best effort’ support

– With access restrictions during CERN End-of-Year closure (22/12 – 4/1)

• Many activities and upgrades are planned– Will be coordinated with individual detectors to minimise impact

– For central systems, as much as possible in shadow of other perturbations (e.g. cooling stop)

– Perturbations (e.g. for reboots etc.) cannot be excluded

• Detectors are invited to communicate ‘critical periods’, with services needed– Will try to cater for detector needs as much as possible

• Known perturbations:– Tue 7/12 10:00 – 12:00, interruptions of the GPN link to/from P2

• Upgrade of router, test impact on ALICE

– Wk50 (13-17/12) – major updates to all PC (many perturbations to be expected)

– 12/1 – 21/1 (cooling stop), only minimal central services. All detector DCS switched off, except for special requests and if cooling power allows

• More detailed planning at weekly and daily meetings

André / Peter

14/1/11 ALICE planning meeting 17

DCS plans (details)• Wk 50

– Mon 13/12 – Fri 17/12 (daytime): SW upgrades and patches to all systems (Operating system and PVSS)

• Delayed/extended due to problems with automatic PVSS upgrade procedure (several manual operations needed)

• Systems unavailable for short (~hrs) periods, frequent reboots

– Support to detectors restarting/testing their systems after upgrades• Detectors shall test functionality as much as possible

• Wk 51– Contingency for system upgrades– Support to detectors restarting/testing their systems after upgrades

• Detectors shall test functionality as much as possible

– Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure• Register with your SRC if you require access (see message Peter 2/12/2010)

• Wk 52 – Wk 01– Only ‘best effort’ support during CERN closure

• Wk 02– Wed 12/01 – (cooling intervention) shutdown of detector systems

• except special requests, within limits of cooling power

André / Peter

14/1/11 ALICE planning meeting 18

Access requestCavern and surface

• You should submit an ADI and a task procedure

Two persons minimum

Work breakdown structure – risk associated at each step

ADIhttps://edh.cern.ch/Document/ADI

Task procedureTemplate EDMS 1103355

Attach task procedure

Detectors activities

14/1/11 ALICE planning meeting 20

EMCal

• Status of modules:– 6 modules in SXL2

• Test station installed in SXL2

• Requiring a lot of access to connect everything up, test, and debug as they commission the new SMs

– Low voltage, high voltage (CR4), and DAQ operating as much as possible during the installation period in January.

14/1/11 ALICE planning meeting 21

EMCalSurveys

• Zero measurement (wk 51-52), after insertion of 1st module and after the insertion of 2nd module:

– A-side: CALframe feet and rails + modules (adaptors)– C-side (photogrammetry - 1/2 day)

• After insertion of 3rd, after insertion of 4th and after insertion of 5th module: – A-side: points chosen depending on results previous survey– C-side: with theodolite from A-side (or full photogrammetry, depending on results

previous survey)

• After insertion of 6th module:– A-side: full– C-side: full

14/1/11 ALICE planning meeting 22

PMD

• Wk 50:– Lift CROCUS (in order to open L3 doors) - can be done by P2 technicians– disconnect cables (after 16/12)

• Wk 51 (20/1): move PMD in parking position (Pieter)

• Wks 51-4: repair electronics chains– Need Ar/CO2 at all times

• 28/1: move PMD to final position

• Wks 5-6 (after 18:00): access to CROCUS (doors closed, use CROCUS platform)

• Wk 6: survey (transfer survey network to miniframe (Antje))

• Wks 51-1 SPIE: new air cooling system – major installation work in January (should be done by end January)

– Nacelle HAULOTTE needed

14/1/11 ALICE planning meeting 23

TOF/PHOS

• TOF:– HV hardware checks on SM13 (December)– TRM replacement (14 TRMs on the A side) (3/01 – 12/01)– Replacement DC-DC (with no LV spare channels):

• 16/12 (after 18:00)

• PHOS: (A.Vinogradow at CERN 1/12 end January)– Investigate module 2 pedestal issues– Try to understand behavior of unstable branch in Module 3– Remake ISEG crate to connect to the hardware interlock– Maintenance crystal cooling plant (January)

Gilda/Yury

14/1/11 ALICE planning meeting 24

Muon TRG

• RPC Detector/gas system:– Check gas leak on few RPC detectors and repair 2 gas distribution channels.

Replacement of 1 HV cable. From Monday 10/01 (afternoon) to Friday 14/01– Upgrade Sensor gas humidity and pressure regulator (CR5, schedule to be

defined with the gas team)– Replace few RPC modules with high current: under discussion– Will restart the flammable gas flow at end of January/beginning of February, to

check the detectors with HV at least 15 days before the first beam injection

• Electronics:– Maintenance Local decision electronics (December 8th after 18:00) Done– Upgrade FE threshold distributors, higher segmentation (level 4 gangway,

December 8th after 18:00) Done– Upgrade firmware DARC and Regional board in order to speed up MTR decision

electronics configuration (wk 6, after the DAQ upgrade)

Pascal/Ermanno/Paolo/Anna

14/1/11 ALICE planning meeting 25

Muon TRK plans

• December: CROCUS firmware upgrade (protection against spurious busy reset signal):– Access to Crocus, Dipole and FASS. Need nacelle wk 49 Done

• High occupancy bus patches:– Remove one "bad" slat (and replace by one spare) to test it in lab Done

– Access to Dipole and to muon side with nacelle in December Done

– Fix all remaining “bad” slats in January, wks 2-5. Need local DAQ setup (2 tables) + ITECO

• 13 January: replacement 1 quadrant ST2 (faulty wires) Done– Test spare quadrants in lab (December)

Ermanno/Herve

14/1/11 ALICE planning meeting 26

ZDC plans

• Check platform displacement with survey– One week – depending on surveyors availability

Paolo

14/1/11 ALICE planning meeting 27

SPD cooling plans

• Wk 49 (8/12 after 18:00): cut pipes in order to open the doors

• Wks 2-3 (during cooling stop): wash 4 bad sectors (machine installed on I-side, close to HMPID pump). Access to the outer side of MNF (side I) to work on the heater of sector 0 (nacelle or scaffolding needed)

• Wks 3-4 (as soon as the door is closed): reconnect temporarily pipes and test with dummy sector inside MNF (in parallel with shielding in wk 4)

14/1/11 ALICE planning meeting 28

SSD/SDD

SSD:• Ton: remove a cooling pipe from SSD corrosion test setup (week 2)• Replacement CAEN module (C-side) + repair bad temperature

signal at the C-side (week 2)

SDD:• Calibration of 78 pressure sensors in L3 and on miniframe (January

12 to 14)

14/1/11 ALICE planning meeting 29

T0

• Activities planned from 7-19 December (after 18:00): Done– Check/repair the amplifiers from A and C side (inside L3)

– Check the signal cables from A-side

– Check/repair fast electronics modules (racks O18-19)

– Need possibility to do standalone runs in parallel

14/1/11 ALICE planning meeting 30

TRD installation - weeks 51, 52

• 4 modules at P2 (SM2, SM11, SM 15 and SM16)

• Installation sequence: 16 → 15 → 11 (or 16 → 11 → 15)

• 2 technicians (Philippe and Didier) + Survey (Nail from 6/12) + TC permanently at P2

• Connection done right after installation

• Survey:– Space-frame deformations and displacement of beampipe (flange), miniframe

and TPC feet. Before-after each insertion– Modules (2 points/SM on 4/7 SM) in wk 50– Modules (3 points/SM on 10/10 SM) after EMCal (wk 3)

14/1/11 ALICE planning meeting 31

TRD• Week 49:

– LV Wiener ~70 PSU Back-Plane modifications (to improve mechanical stability, same as TPC applied already)

– Netgear switches replacements (1 day)– LV line fixation: installation of improved patch panels on front of module (C-side)

and replacing cables

• Repair pretrigger (A-side, below PMD) – after 20/12

• Week 1:– Finalizing connections, start commissioning

• Week 2:– Stable running with cosmics

• 3 to 4 weeks in January or February:– Stable running with cosmics for alignment and with Krypton for gain calibrations

(to be still discussed)

14/1/11 ALICE planning meeting 32

TPC

• Recover all water inside cooling plant (week 50)• Replacement of 15 damaged FECs (equally distributed A-C sides)

– ~3 days per FEC. Therefore, we would like to use all available time slots where access to the L3 is possible

– At the end of this activity we will need a period of about 2 weeks where all aforesaid systems are available for final verification, and access to the TPC in case something is not working correctly.

• Kr data taking at the end of the shutdown, in wk 7

14/1/11 ALICE planning meeting 33

TPCReplacement of the laser

• Start the dismantling of the Spectron laser (week 50, Th-Sat after 18:00):– dismount back wall of laser hut (help of P2 technician)– stop cooling water (help of P2 technician)– prepare new water connection (electrical power should be OK)

• Install new Ekspla laser (week 1):– remove old laser and install new (use crane to transport laser)– connect cooling water (help of P2 technician)– reinstall back wall (maybe after cutting a hole in it)

• Testing and alignment of new laser (week 2):– possibility to run laser behind closed doors (inside hut)– maybe install laser tube temporarily and shoot into TPC whenever– compatible with other installation work

• Possible further testing and adjustment (week 3)

Borge

14/1/11 ALICE planning meeting 34

ACORDE

• Check some ACORDE modules (PMTs optical conections, connectors, etc) above the magnet

• The plan is to start this activities on January 21st

14/1/11 ALICE planning meeting 35

Other activities

• SPIE + CV: refurbishment ITS dehumidifier in CR – February– Replacement part at P2 in January. Installation – transport needed– Recirculation air - SPIE– New air-flowmeter (connect to ELMB: Frederick)

• EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker.– VIC 16/12 10:30 – Intervention 11/1 whole day

• SPIE: cabling UX25-CR4 – 17/1

• New magnet emergency buttons + flashing lights L3 and dipole

• Frederick: humidity sensor L3 ventilation (extraction) + redo CTP connectors

• Intervention on cavern lift. From 28/1 17:00 to 29/1 (whole day)– One day stop – no access to UX25

14/1/11 ALICE planning meeting 36

Other activities

• Google propose to produce a custom Streetview application for CERN showing both outside and underground areas

– Visit Tuesday 21 December at 16:15

– 18/1 filming

• Philippe: replace rack filters during cooling stop. Install temporary line PHOS cooling (PS rack and crystal cooling plant). Clean all WIENER PS racks with special machine

14/1/11 ALICE planning meeting 37

Magnet control upgrade

• Wk 49: nous devons intervenir dans la MCR pour:– changement des alimentations 24V et 48 V des systèmes MSS et MCR (préventif)– changement des modules convertisseurs PT100 des hots points du Solénoïde (correctif suite à deux

incidents ayant entrainés l'arrêt du Solénoïde) et en UX25, comme Philippe Bouvier l'a déjà signalé:– recâblage des AU du dipôle et du Solénoïde– signalisation du champ magnétique du dipôle et du Solénoïde

• Nous étudions toujours une solution pour le monitoring des températures du Solénoïde.• L'arrêt de fin d'année va permettre de faire une meilleure approche de ce qui est existant en

UX25.

• En ce qui concerne l'alimentation électrique de la MCR, nous dépendons actuellement d'une seule source de courant sous UPS avec secours diesel.

• Afin d'établir une redondance pour l'alimentation de la MCR je souhaiterais installer une seconde source d'alimentation sous UPS.

• Je sais qu'une étude est faite à ALICE pour augmenter la puissance des UPS existants en 2012.• Je souhaiterais que cette demande soit incluse pour le calcul de puissance des nouveaux UPS

(besoin pour la MCR: 16A en monophasé)

Pascal

Day-by-day schedule

UX25 and MNF - Wk 49

14/1/11 ALICE planning meeting 39

• 18:00: end HI program– Ramp down both magnets. !!! Emergency dump !!!

• 18:00 – 22:00: access system test. No access UX25• 22:00: RPE survey (Jiri + 2nd person)

– Then go to restricted mode

Week 49 - 6/12 MondayProgram

14/1/11 ALICE planning meeting 40

Activities in UX25 - Week 49 - 6/12 Monday

No access UX-25 - possibility of access from 22:00

ITECO

HAULOTTE

TRD team at CERN: 6 to 10/12

14/1/11 ALICE planning meeting 41

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)

• 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre)– Collect RP samples (Fernando, Philippe)

– Survey L3 and Dipole

• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode

• 14:00 - 15:00: Portuguese Press visit. 10 persons

Week 49 - 7/12 TuesdayProgram

14/1/11 ALICE planning meeting 42

• ALTEAD: PX24 shielding blocks – top layer removed– 8:00 to 18:00: no access CR5

• Reinstall crane electronics - Problems (ongoing)• 14:00 to 15:00: put SM16 into the rotator - Ongoing• VAC: Neon injection preparation - Started

– Transport needed (EDH 4472100) – Rack moved by hand

– Remove “green fence” (P2 technician) - Done

• Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done• 8:30: Lock L3+Dipole power converter + compensator magnet - Done• Test transmission of alarm lift to FB - Done• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done

(will install temporary line)• 15:15: VIC SPD – Done + Gas VIC• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck.

Investigating why• MCR (Magnet Control Room): HW modifications (Pascal B.) – Started• TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3)

Week 49 - 7/12 TuesdayActivities

14/1/11 ALICE planning meeting 43

Activities in UX25 - Week 49 - 7/12 Tuesday

VA

C

RP samples

PX24 shielding: blocks

TRD Wiener PS

TRD Wiener PS

14/1/11 ALICE planning meeting 44

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)

• From 18:00 - Cavern in General mode

• 18:00: Confined Space Training– Tour in L3 at the end of the course

Week 49 - 8/12 WednesdayProgram

14/1/11 ALICE planning meeting 45

• ALTEAD: PX24 shielding beams (35t) - Done– 8:00 to 16:30: no access CR1-5 and Expo

– Move ITECO C-side - Ongoing

• EN-HE: Reinstall crane electronics – Done. Crane operational• VAC: Neon injection – injection table prepared. Neon injected tomorrow afternoon

– Annular ion pump (PI.45.1L2.X) switched off

Activities after 16:30:• EN-CV: empty TPC tank - Ongoing• TPC: replacement of damaged FECs (C-side) - Ongoing• TRD: pretrigger PS work done. Wiener PS back-plane modification (SXL2, almost

done). Start re-installing Wieners tonight.• SPD: cut inox pipes - Done• Muon TRK: CROCUS firmware upgrade• Muon TRG: Maintenance Local decision electronics and upgrade FE threshold

distributors – Done• T0: investigation broken amplifier (MNF and L4-rack) - Ongoing

Week 49 - 8/12 WednesdayActivities

14/1/11 ALICE planning meeting 46

Activities in UX25 - Week 49 - 8/12 Wednesday

PX24 shielding:

beams (35t)

VA

C

MoveTRD Wiener PS

TRD Wiener PS

Cut SPD pipes

Muon TRG

TP

C F

EC

an

d

TR

D L

V

TPC cooling

Muo

n T

RK

: C

RO

CU

S f

irmw

are

upg

rade

T0

14/1/11 ALICE planning meeting 47

Activities in MNF - Week 49 - 8/12 Wednesday

T0

14/1/11 ALICE planning meeting 48

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC and TC)

• From 18:00 - Cavern in General mode

• Interruption on auto-transfert network (from 07:00 till 07:05). No access underground

– all wall outlets will be interrupted

– including all non-UPS outlets in the ACR (so essentially all WRs)

– including outlets SXL2, offices and barracks

– non-UPS power for the detector cooling plants will be interrupted

– power to all gas systems will be interrupted

– the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption

– the electronics racks in the cavern and CRs will not be affected.

– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf

Week 49 - 9/12 ThursdayProgram

14/1/11 ALICE planning meeting 49

• ALTEAD: MNF shielding – 2/4 “T” blocks removed– 8:00 to 18:00: No access CR1-5 during lifting up of 5 big beams

– Stabilizers (after 18:00) - OK

– Move ITECO I-side

• VAC: Neon injection – Beampipe under Neon• RAMSES: removal of Data Acquisition modules CR5 - Done• EMCal team at CERN: fit rollers on all SMs (SXL2). Start 13:30 - OK• Dipole-Solenoid cooling stopped (Philippe)• Purge TRD cooling flexibles + replace o-rings (Philippe + Frederick) - Done

Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (SXL2)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)

Week 49 - 9/12 ThursdayActivities

14/1/11 ALICE planning meeting 50

Activities in UX25 - Week 49 - 9/12 Thursday

VA

C

MNF shielding

TRD Wiener PS

TRD Wiener PS

Stabilizers

No access CR1-5 during lifting up of 5 big beams

TP

C F

EC

an

d

TR

D L

V

Muo

n T

RK

: C

RO

CU

S f

irmw

are

upg

rade

T0

Stabilizers

Move

14/1/11 ALICE planning meeting 51

Activities in MNF - Week 49 - 9/12 Thursday

T0

14/1/11 ALICE planning meeting 52

• 8:00 - 17:00: UX25 cavern in Restricted mode– No access UX25 (except Transport and TC)

• From 17:00 - Cavern in General mode

• 9:00 – 12:30: functional test gas systems– 9:00 – 11:00: No access UX25 and CR1-5– All gas systems will be stopped-started several times– Stop Ar/H2 at end of test

Week 49 - 10/12 FridayProgram

14/1/11 ALICE planning meeting 53

• ALTEAD: MNF shielding: I-side wall• EMCal: fit rollers on all SMs• Maintenance PX24 MAD (transparent)

Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (L3)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)

Week 49 - 10/12 FridayActivities

14/1/11 ALICE planning meeting 54

Activities in UX25 - Week 49 - 10/12 Friday

LV156

TRD Wiener PS

TRD Wiener PS

TP

C F

EC

an

d

TR

D L

V

MNF shielding

14/1/11 ALICE planning meeting 55

Activities in MNF - Week 49 - 10/12 Friday

14/1/11 ALICE planning meeting 56

• 8:00 - 17:00: UX25 cavern in Restricted mode– No access UX25 (except Transport and TC)

• From 17:00 - Cavern in General mode

• 18 KV Autotransfert tests from 8h00 to 20h00– Frequent power cuts will occur on the Meyrin site. The group EN-EL

recommends that you turn off all your critical equipment, computers and computer equipment.

– For any further information please refer to the "note de coupure":

– https://edms.cern.ch/file/1107011/1/ENNC_2010_203.pdf

Week 49 - 11/12 SaturdayProgram

14/1/11 ALICE planning meeting 57

• ALTEAD: MNF shielding: I-side wall

Activities after 17:00:• TRD: Wiener PS back-plane modification and LV consolidation (L3)

Week 49 - 11/12 SaturdayActivities

14/1/11 ALICE planning meeting 58

Activities in UX25 - Week 49 - 11/12 Saturday

TRD Wiener PS

TRD Wiener PS

TR

D L

V

LV156

MNF shielding

14/1/11 ALICE planning meeting 59

Activities in MNF - Week 49 - 11/12 Saturday

14/1/11 ALICE planning meeting 60

Activities in UX25 - Week 49 - 12/12 Sunday

Access in general mode

14/1/11 ALICE planning meeting 61

Activities in MNF - Week 49 - 12/12 Sunday

Access in general mode

Day-by-day schedule

UX25 and MNF - Wk 50

14/1/11 ALICE planning meeting 63

Access status:• 8:00 - 18:00: UX25 cavern in Restricted mode

– No access UX25 (except Transport and TC)

• From 18:00 - Cavern in General mode• No access L3 (no ventilation)

Activities:• ALTEAD: MNF shielding: O-side wall• Lift PMD CROCUS• SPIE: removal L3 ventilation• Philippe: cut SPD pipe (chillers)

Activities after 18:00:• TRD: access to L4 racks• T0: investigation broken chains

Week 50 - 13/12 Monday

14/1/11 ALICE planning meeting 64

Activities in UX25 - Week 50 - 13/12 Monday

LV156

No access L3(no ventilation)

L3 ventilation

LV156

MNF shielding

14/1/11 ALICE planning meeting 65

Activities in MNF - Week 50 - 13/12 Monday

No

ac

ce

ss L

3(n

o v

en

tila

tio

n)

14/1/11 ALICE planning meeting 66

Access status:• 8:00 - 18:00: UX25 cavern in Restricted mode

– No access UX25 (except Transport and TC)

• From 18:00 - Cavern in General mode

• No access L3 (no ventilation)

Activities:• ALTEAD: MNF shielding: O-side wall

• Opening I-side door done

• Gas upgrade (SG2): stop all gas systems Ar, CO2, N2 and Neon done. The others must be done on January 11!!!

– Evacuation all Ar/H2 bottles (Fayet, morning)– X-ray at night

• SPIE: new PMD ventilation (removal filter)– VIC at 10:00

Activities after 18:00:• T0: investigation broken chains

Week 50 - 14/12 Tuesday

14/1/11 ALICE planning meeting 67

Activities in UX25 - Week 50 - 14/12 Tuesday

Open I-side door

No access L3(no ventilation)

LV156

MNF shielding (green

bridges)

PMD ventilation

Visit 13:30 (Karel)

T0

14/1/11 ALICE planning meeting 68

Activities in MNF - Week 50 - 14/12 Tuesday

No

ac

ce

ss L

3(n

o v

en

tila

tio

n)

T0

14/1/11 ALICE planning meeting 69

Access status:• Cavern in General mode

Activities:• ALTEAD: yellow-platform rails. Put YP on rails. Removal MNF staircase. Shielding on O-side

gone

• TRD: test LV inside magnet

• TPC: replacement FE cards (C-side)

• Release all TOF crates supports (Yannick-Samuel)

• Gas upgrade (SG2): restart gas systems

• EN-CV: maintenance TRD cooling unit

• TPC laser: dismount back wall of laser hut + start removal laser

• TOF: removal DC/DC converters

VIP visit: Finance and Council Delegates – 16:45 (1hour)

Week 50 - 15/12 Wednesday

14/1/11 ALICE planning meeting 70

Activities in UX25 - Week 50 - 15/12 Wednesday

Access in general mode

TRD cooling

TP

C/T

RD

YP rails

Release all TOF crates supports (Yannick-Samuel) +

TOF DC/DC

Laser

EMC

14/1/11 ALICE planning meeting 71

Activities in MNF - Week 50 15/12 Wednesday

Access in general mode

Removal MNF staircase

(access with ladder)

14/1/11 ALICE planning meeting 72

Access status:• Cavern in General mode

Arrival PMD team

Visit (W.Riegler). 14:30

Activities:• ALTEAD: yellow-platform rails• Open O-side door – by afternoon• SPIE: PMD ventilation• Survey: baby-frame zero-measurement + TRD• EN-EL: motorize L3-Dipole-Miniframe circuit breaker (T.Bourrel, VIC at 10:30)• TRD: test LV inside magnet• TPC: replacement FE cards (C-side)• Release all TOF crates supports (Yannick-Samuel)• Re-arrange TPC cooling pipes (MNF, Yannick)• EN-CV: maintenance TRD cooling unit• TPC laser: removal laser + take out laser-hut back door. Take out old power supply• EMCal: installation HV PS (CR4) and LV PS (L4-O-side) Done

Week 50 - 16/12 Thursday

14/1/11 ALICE planning meeting 73

Activities in UX25 - Week 50 - 16/12 Thursday

Laser

TRD cooling

TP

C/T

RD

EN-EL

Release all TOF crates supports (Yannick-Samuel)

PMD ventilation

Open O-side door

LV156

Access in general mode

Sur

vey

14/1/11 ALICE planning meeting 74

Activities in MNF - Week 50 - 16/12 Thursday

Access in general mode

TPC cooling pipes (Yannick)

14/1/11 ALICE planning meeting 75

Access status:• Cavern in General mode

Visit (C-E.Sala)

DAQ: the experiment logbook and data taking will be unavailable from 10:00 to 12:00 for a maintenance operation

Arrival 2 (last) EMCal modules from Grenoble. Unload in SXL2

Activities:• ALTEAD: lower TRD 16. No access low-beta platform• SPIE: PMD ventilation• Survey: baby-frame zero-measurement + TRD• TRD: test LV inside magnet• TPC: replacement FE cards (C-side, and A-side (tbc))• Decoupling TPC-Space-Frame (Yannick-Samuel)• EMC: investigate a part of the EMCal readout that was noisy (~16 channels on one "T-card") (L3)• PMD: disconnect services• EN-CV: maintenance TRD cooling unit

Week 50 - 17/12 Friday

14/1/11 ALICE planning meeting 76

Activities in UX25 - Week 50 - 17/12 Friday

Decoupling TPC-Space-

Frame (Yannick-Samuel) &

EMC

TP

C F

EC

Access in general mode

Sur

vey

PMD ventilation

TP

C F

EC

TRD cooling

14/1/11 ALICE planning meeting 77

Activities in MNF - Week 50 - 17/12 Friday

Dis

con

nec

t P

MD

ser

vice

s

Access in general mode

14/1/11 ALICE planning meeting 78

Activities in UX25 - Week 50 - 18/12 Saturday

Decoupling TPC-Space-Frame

(Yannick-Samuel)

Access in general mode

Sur

vey

14/1/11 ALICE planning meeting 79

Activities in MNF - Week 50 - 18/12 Saturday

Access in general mode

14/1/11 ALICE planning meeting 80

Activities in UX25 - Week 50 - 19/12 Sunday

Access in general mode

TRD team at CERN: 19 (PM) to 23/12

14/1/11 ALICE planning meeting 81

Activities in MNF - Week 50 - 19/12 Sunday

Access in general mode

Day-by-day schedule

UX25 and MNF - Wk 51

14/1/11 ALICE planning meeting 83

GS/ASE: UX25 fire detection maintenance

ALTEAD: unload in SXL2 2 EMCal modules

Activities:• TRD: installation BBF rails SR16-15• Survey: TRD and EMCal survey• TPC: replacement 1 FE card (A-side)• PMD+Pieter: move detector in parking position

Week 51 - 20/12 Monday

14/1/11 ALICE planning meeting 84

Activities in UX25 - Week 51 - 20/12 Monday

TR

D a

nd

EM

Ca

l Sur

vey

Prepare TRD 16 installation

EM

Ca

l Sur

vey

(1/2

day

)

TP

C F

EC

TP

C F

EC

14/1/11 ALICE planning meeting 85

Activities in MNF - Week 51 - 20/12 Monday

Mo

ve P

MD

in

p

arki

ng

p

osi

tio

n

14/1/11 ALICE planning meeting 86

Google Streetview visit (5 people). 16:15

GS/ASE: UX25 fire detection maintenance

DAQ: switch off DAQ. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it

DCS: the access restrictions to the DCS network will be enforced from December 21st towards the end of working hours

Activities:• TRD: install TRD16 + insert TRD15 into rotator• Survey TRD16

– The beampipe (i.e. also ITS and TPC) have moved 0.35mm to the O-side and 0.14mm down during the installation of TRD16. This is consistent with Yannick’s measurements of the spaceframe position with respect to the backframe

• Philippe+Didier: removal ladder BKF• PMD: replacement electronics chains

Week 51 - 21/12 Tuesday

14/1/11 ALICE planning meeting 87

Activities in UX25 - Week 51 - 21/12 Tuesday

Install TRD 16

TR

D S

urve

y

14/1/11 ALICE planning meeting 88

Activities in MNF - Week 51 - 21/12 Tuesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 89

Visit: RIKEN RIBF Accelerator technical coordination group. Ken Oyama

Activities:• TRD: install TRD15 + connect TRD16• Philippe+Didier: removal ladder BKF• PMD: replacement electronics chains

Week 51 - 22/12 Wednesday

14/1/11 ALICE planning meeting 90

Activities in UX25 - Week 51 - 22/12 Wednesday

Connect TRD 16

Install TRD 15

TR

D S

urve

y

14/1/11 ALICE planning meeting 91

Activities in MNF - Week 51 22/12 Wednesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 92

Activities in UX25 - Week 51 - 23/12 Thursday

Connect TRD 15

TR

D S

urve

y

14/1/11 ALICE planning meeting 93

Activities in MNF - Week 51 - 23/12 Thursday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 94

Activities in UX25 - Week 51 - 24/12 Friday

LHC evacuation test. no access UX25

14/1/11 ALICE planning meeting 95

Activities in MNF - Week 51 - 24/12 Friday

LHC evacuation test. no access UX25

14/1/11 ALICE planning meeting 96

Activities in UX25 - Week 51 - 25/12 Saturday

Christmas day

14/1/11 ALICE planning meeting 97

Activities in MNF - Week 51 - 25/12 Saturday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 98

Activities in UX25 - Week 51 - 26/12 Sunday

TRD team at CERN: 26 to 30/12

14/1/11 ALICE planning meeting 99

Activities in MNF - Week 51 - 26/12 Sunday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

Day-by-day schedule

UX25 and MNF - Wk 52

14/1/11 ALICE planning meeting 101

Activities in UX25 - Week 52 - 27/12 Monday

Connect TRD 15

Prepare TRD 11 installation

Including installation BBF rails SR11

TR

D S

urve

y

Diego at CERN (noon)

PMD ventilation

14/1/11 ALICE planning meeting 102

Activities in MNF - Week 52 - 27/12 Monday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 103

Activities in UX25 - Week 52 - 28/12 Tuesday

Prepare TRD 11 installation

PMD ventilation

14/1/11 ALICE planning meeting 104

Activities in MNF - Week 52 - 28/12 Tuesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 105

Activities in UX25 - Week 52 - 29/12 Wednesday

Install TRD 11

TR

D S

urve

y

PMD ventilation

14/1/11 ALICE planning meeting 106

Activities in MNF - Week 52 29/12 Wednesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 107

Activities in UX25 - Week 52 - 30/12 Thursday

Connect TRD 11

TR

D S

urve

yEMCal

infrastructure

Move EMCal rotator + SM5 onto low beta platform, and perform handling test

14/1/11 ALICE planning meeting 108

Activities in MNF - Week 52 - 30/12 Thursday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 109

Activities in UX25 - Week 52 - 31/12 Friday

EMCal infrastructure

14/1/11 ALICE planning meeting 110

Activities in MNF - Week 52 - 31/12 Friday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 111

Activities in UX25 - Week 52 - 1/1/2011 Saturday

New Year day

14/1/11 ALICE planning meeting 112

Activities in MNF - Week 52 - 1/1/2011 Saturday

New Year day

14/1/11 ALICE planning meeting 113

Activities in UX25 - Week 52 - 2/1 Sunday

14/1/11 ALICE planning meeting 114

Activities in MNF - Week 52 - 2/1 Sunday

Day-by-day schedule

UX25 and MNF - Wk 1 - 2011

14/1/11 ALICE planning meeting 116

Activities in UX25 - Week 1 - 3/1 Monday

Connect TRD 11

PMD ventilation

Install EMCal 40deg-C (PM)

Lower SM6 onto low beta platform

SM5

TOF TRM

Move HAULOTTE

14/1/11 ALICE planning meeting 117

Activities in MNF - Week 1 - 3/1 Monday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 118

Activities in UX25 - Week 1 - 4/1 Tuesday

PMD ventilation

EM

C S

urv

ey

EM

C S

urv

ey

(AM

)

Install EMCal 40deg-A (PM)

SM6

TOF TRM

Reconnect PMD cooling

14/1/11 ALICE planning meeting 119

Activities in MNF - Week 1 - 4/1 Tuesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 120

Activities in UX25 - Week 1 - 5/1 Wednesday

TPC RR cooling

RAMSES: reinstallation of Data Acquisition modules CR5

Maintenance UPS ESS307/2X (transparent)

GS/ASE: PX24 fire detection maintenance

PMD ventilation

EM

C S

urv

ey

TOF TRM

TP

C F

EC

EN-CV: maintenance chillers (transparent)

Lower SM7 onto low beta platform

14/1/11 ALICE planning meeting 121

Activities in MNF - Week 1 - 5/1 Wednesday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 122

Activities in UX25 - Week 1 - 6/1 Thursday

TPC cooling PMD ventilation

Install EMCal 60deg-C

SM7

Lower SM8 onto low beta platform

EM

C S

urv

ey

TOF TRM

GS/ASE: PX24 fire detection + red phones maintenance

TP

C F

EC

EN-CV: maintenance chillers (transparent)

14/1/11 ALICE planning meeting 123

Activities in MNF - Week 1 - 6/1 Thursday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 124

Activities in UX25 - Week 1 - 7/1 Friday

TPC cooling

Install EMCal 60deg-A

SM8

EM

C S

urv

ey

TOF TRM

GS/ASE: PX24 fire detection + red phones maintenance

TP

C F

EC

EN-CV: maintenance chillers (transparent)Lower SM9 onto low beta platform

14/1/11 ALICE planning meeting 125

Activities in MNF - Week 1 - 7/1 Friday

PM

D:

rep

lace

men

t el

ectr

on

ics

chai

ns

14/1/11 ALICE planning meeting 126

Activities in UX25 - Week 1 - 8/1 Saturday

Visit (6 people at 15:30). P.Kuijer

14/1/11 ALICE planning meeting 127

Activities in MNF - Week 1 - 8/1 Saturday

14/1/11 ALICE planning meeting 128

Activities in UX25 - Week 1 - 9/1 Sunday

Visit (1 person at 11:00). C.Blume

14/1/11 ALICE planning meeting 129

Activities in MNF - Week 1 - 9/1 Sunday

Day-by-day schedule

UX25 and MNF - Wk 2

14/1/11 ALICE planning meeting 131

Activities in UX25 - Week 2 - 10/1 Monday

TPC cooling

VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25

Mu

on

TR

G:

RP

C (

PM

)

Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles)

SDD/SSD

Laser

SDD: calibration of 78 pressure sensors (10-12/1)SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side)

TOF TRM

TP

C F

EC

Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda

Install new Ekspla laser

Philippe: install PHOS temporary cooling pipes

Yannick: re-install TPC cooling pipes MNF (I-side)

14/1/11 ALICE planning meeting 132

Activities in MNF - Week 2 - 10/1 Monday

14/1/11 ALICE planning meeting 133

Activities in UX25 - Week 2 – 11/1 Tuesday

SSD/SDD cooling

Mu

on

TR

G:

RP

C

SPD cooling

Laser

TOF TRM

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side

Visit (15 people at 14:00). Werner

Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water

Wash 4 bad sectors + repair heater (nacelle)

2 tables (DAQ)

Use RED nacelle

15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6

SSD: removal of cooling pipe from corrosion test setup

Move new laser down to platform

TRD cables

Power cut: 9:05 – 9:45

14/1/11 ALICE planning meeting 134

Activities in MNF - Week 2 - 11/1 Tuesday

14/1/11 ALICE planning meeting 135

Activities in UX25 - Week 2 - 12/1 Wednesday

Cooling towers maintenance (start 14:00) (No primary water)

SNIFFER maintenance

Install EMCal 80deg-C

SM9

Lower SM10 onto low beta platform

EM

C S

urv

ey

Mu

on

TR

G:

RP

C

SPD cooling

Laser

Cleaning rack filters (Philippe)

Maintenance UPS EBS106/2X and EBS128/2X (transparent)

PH-DT: new gas monitoring. Restart Ar/H2 afterwards

TP

C F

EC

Euronews visit 10.20 - 11.30

Mu

on

TR

K:

bu

s-p

atch

es

TPC cooling

Visit (P-A.Giudici + 3 persons)

14/1/11 ALICE planning meeting 136

Activities in MNF - Week 2 - 12/1 Wednesday

14/1/11 ALICE planning meeting 137

Activities in UX25 - Week 2 - 13/1 Thursday

Cooling towers maintenance (No primary water)

HM

PID

c

oo

lin

g

RAMSES: radiation source testsEN/CV: maintenance SG2 ventilation

DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks

SNIFFER maintenance

Install EMCal 80deg-A

SM10E

MC

Su

rve

y

SPD cooling

Visit: (15 p.) Danish high school class (C. Søgaard)

TP

C F

EC

Mu

on

TR

G:

RP

C

Mu

on

TR

K:

bu

s-p

atch

es

Laser

TR

D L

V

ST2: replace chamber 3BR

ST

2

14/1/11 ALICE planning meeting 138

Activities in MNF - Week 2 - 13/1 Thursday

PM

D:

new

T

sen

sors

14/1/11 ALICE planning meeting 139

Activities in UX25 - Week 2 - 14/1 Friday

Cooling towers maintenance (No primary water)

SNIFFER maintenance

EN/CV: maintenance SG2 ventilation

RAMSES: radiation source tests

VA

C

EM

C S

urv

ey

EM

C S

urv

ey

SPD cooling

LACS: revision UX25 access doors

Removal EMCal

infrastructure

TP

C F

EC

Start pumping out

Mu

on

TR

K:

bu

s-p

atch

es

Laser

Visit (2 people). Resp. L.Pinsky

TR

D L

V

TOF: HV test SM13 + move SM15

TOF

Mu

on

TR

G:

RP

C

14/1/11 ALICE planning meeting 140

Activities in MNF - Week 2 - 14/1 Friday

PM

D:

new

T

sen

sors

14/1/11 ALICE planning meeting 141

Activities in UX25 - Week 2 - 15/1 Saturday

Cooling towers maintenance (No primary water)

Laser

14/1/11 ALICE planning meeting 142

Activities in MNF - Week 2 - 15/1 Saturday

14/1/11 ALICE planning meeting 143

Activities in UX25 - Week 2 - 16/1 Sunday

Cooling towers maintenance (No primary water)

D.Budnikov at CERN

PHOS: maintenance crystal cooling plant

PHOScooling

14/1/11 ALICE planning meeting 144

Activities in MNF - Week 2 - 16/1 Sunday

Day-by-day schedule

UX25 and MNF - Wk 3

14/1/11 ALICE planning meeting 146

Activities in UX25 - Week 3 - 17/1 Monday

Cooling towers maintenance (No primary water)

Maintenance UX25, Muon TRK-TRG ventilation

SPD cooling

SPIE: cabling UX25-CR4

TR

D/E

MC

S

urve

yRemoval EMCal

infrastructure

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

Maintenance ITECO (9:00 to 11:00)

SPD cooling

14/1/11 ALICE planning meeting 147

Activities in MNF - Week 3 - 17/1 Monday

TRD pre-

trigger

PM

D:

new

T

sen

sors

14/1/11 ALICE planning meeting 148

Activities in UX25 - Week 3 – 18/1 Tuesday

Cooling towers maintenance (No primary water)

Maintenance UX25, Muon TRK-TRG ventilation

SPD cooling

TR

D/E

MC

S

urve

y

TP

C F

EC

TO

F/

PH

OS

/EM

C

co

oli

ng

Mu

on

TR

K:

bu

s-p

atch

es

Google Street View from 12:00 on (until evening)

SPIE: cabling UX25-CR4

Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30Maintenance AS 715 (CRs) 9:30 to 11:30

Visit 10:00 (16 persons). Resp. Naomi van der Kolk

Start 9:30

14/1/11 ALICE planning meeting 149

Activities in MNF - Week 3 - 18/1 Tuesday

14/1/11 ALICE planning meeting 150

Activities in UX25 - Week 3 - 19/1 Wednesday

Cooling towers maintenance (No primary water)

Maintenance UX25, Muon TRK-TRG ventilation

Maintenance harmonic filter (EOF128/2X)

TR

D/E

MC

S

urve

y

TP

C F

EC

TO

F/

PH

OS

/EM

C

co

oli

ng

PHOScooling

Mu

on

TR

K:

bu

s-p

atch

es

Visit: (23 students). Dutch high school. About 14:00-17:00. (P. Kuijer)

Google Street View ZDF (9:00)

SPIE: cabling UX25-CR4

TOF

TOF: re-cable 2 crates SM2-3

14/1/11 ALICE planning meeting 151

Activities in MNF - Week 3 - 19/1 Wednesday

14/1/11 ALICE planning meeting 152

Activities in UX25 - Week 3 - 20/1 Thursday

Cooling towers maintenance (No primary water)

Maintenance L3, UX25, Muon TRK-TRG ventilation

AUG test. No access UX25

VIP visit (12:00: 12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany

14/1/11 ALICE planning meeting 153

Activities in MNF - Week 3 - 20/1 Thursday

14/1/11 ALICE planning meeting 154

Activities in UX25 - Week 3 - 21/1 Friday

Restart primary water

Maintenance L3, UX25, Muon TRK-TRG ventilation

Clo

se 1

doo

r

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Check ACORDE modules (PMTs optical connections, connectors, etc)

TP

C F

EC

14/1/11 ALICE planning meeting 155

Activities in MNF - Week 3 - 21/1 Friday

No

acc

ess

L3

(no

ven

tila

tio

n)

14/1/11 ALICE planning meeting 156

Activities in UX25 - Week 3 - 22/1 Saturday

No access L3(no ventilation)

Clo

se d

oors

ACO

14/1/11 ALICE planning meeting 157

Activities in MNF - Week 3 - 22/1 Saturday

No

acc

ess

L3

(no

ven

tila

tio

n)

14/1/11 ALICE planning meeting 158

Activities in UX25 - Week 3 - 23/1 Sunday

No access L3(no ventilation)

14/1/11 ALICE planning meeting 159

Activities in MNF - Week 3 - 23/1 Sunday

No

acc

ess

L3

(no

ven

tila

tio

n)

Day-by-day schedule

UX25 and MNF - Wk 4

14/1/11 ALICE planning meeting 161

Activities in UX25 - Week 4 - 24/1 Monday

No access L3(no ventilation)

L3 and PMD

ventilation

Maintenance UX25, Muon TRK-TRG ventilation and L3-Dipole cooling

SPD cooling

Reconnect pipes

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Peter Ginter. Whole week

14/1/11 ALICE planning meeting 162

Activities in MNF - Week 4 - 24/1 Monday

No

acc

ess

L3

(no

ven

tila

tio

n)

PMD ventilation

SPD cooling

SPD: test with dummy sector

14/1/11 ALICE planning meeting 163

Activities in UX25 - Week 4 – 25/1 Tuesday

L3 and PMD

ventilation

No access L3(no ventilation)

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Maintenance UX25, Muon TRK-TRG ventilation and L3-Dipole cooling

14/1/11 ALICE planning meeting 164

Activities in MNF - Week 4 - 25/1 Tuesday

SPD cooling

PMD ventilation

No

acc

ess

L3

(no

ven

tila

tio

n)

14/1/11 ALICE planning meeting 165

Activities in UX25 - Week 4 - 26/1 Wednesday

Green bridge

TP

C F

EC

PMD ventilation

Reinstall CROCUS platform

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Maintenance L3-Dipole cooling

HMPID

Pneumatic valves, and fix radiator

Replace the heat exchanger module and the filters

TPC RR

14/1/11 ALICE planning meeting 166

Activities in MNF - Week 4 - 26/1 Wednesday

SPD cooling

PMD ventilation

14/1/11 ALICE planning meeting 167

Activities in UX25 - Week 4 - 27/1 Thursday

Green bridge

TP

C F

EC

PMD ventilation

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Maintenance L3-Dipole cooling

L3-Dipole powering test (after 17:00). Tbc

HMPID

TPC RR

14/1/11 ALICE planning meeting 168

Activities in MNF - Week 4 - 27/1 Thursday

SPD cooling

PMD ventilation

14/1/11 ALICE planning meeting 169

Activities in UX25 - Week 4 - 28/1 Friday

MNF wall

TP

C F

EC

Green bridge

Mu

on

TR

K:

bu

s-p

atch

es

ACO

Intervention L3 lift. No access UX25 after 17:00

HMPID

TPC RR

14/1/11 ALICE planning meeting 170

Activities in MNF - Week 4 - 28/1 Friday

PM

D:

mo

ve

det

ecto

r to

fin

al

po

siti

onSPD

cooling

Move PMD to final position

14/1/11 ALICE planning meeting 171

Activities in UX25 - Week 4 - 29/1 Saturday

Intervention L3 lift. No access UX25 whole day

14/1/11 ALICE planning meeting 172

Activities in MNF - Week 4 - 29/1 Saturday

14/1/11 ALICE planning meeting 173

Activities in UX25 - Week 4 - 30/1 Sunday

14/1/11 ALICE planning meeting 174

Activities in MNF - Week 4 - 30/1 Sunday

Day-by-day schedule

UX25 and MNF - Wk 5

14/1/11 ALICE planning meeting 176

Activities in UX25 - Week 5 - 31/1 Monday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

Maintenance PX24 PAD (guard 8:00 to 18:00)

TP

C F

EC

Normal hours

Mu

on

TR

K:

bu

s-p

atch

es

Normal hours

14/1/11 ALICE planning meeting 177

Activities in MNF - Week 5 - 31/1 Monday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PM

D:

acce

ss t

o

CR

OC

US

Use CROCUS platform

PM

D s

urv

ey

14/1/11 ALICE planning meeting 178

Activities in UX25 - Week 5 – 1/2 Tuesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

14/1/11 ALICE planning meeting 179

Activities in MNF - Week 5 - 1/2 Tuesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PM

D:

acce

ss t

o

CR

OC

US

14/1/11 ALICE planning meeting 180

Activities in UX25 - Week 5 - 2/2 Wednesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

Continue the work with amplifiers (from C-side) and with the electronics (rack 018,019). After 18:00

T0

14/1/11 ALICE planning meeting 181

Activities in MNF - Week 5 - 2/2 Wednesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PM

D:

acce

ss t

o

CR

OC

US

14/1/11 ALICE planning meeting 182

Activities in UX25 - Week 5 - 3/2 Thursday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

T0

14/1/11 ALICE planning meeting 183

Activities in MNF - Week 5 - 3/2 Thursday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PM

D:

acce

ss t

o

CR

OC

US

14/1/11 ALICE planning meeting 184

Activities in UX25 - Week 5 - 4/2 Friday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

TP

C F

EC

Mu

on

TR

K:

bu

s-p

atch

es

T0

Return to Meyrin

14/1/11 ALICE planning meeting 185

Activities in MNF - Week 5 - 4/2 Friday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PM

D:

acce

ss t

o

CR

OC

US

14/1/11 ALICE planning meeting 186

Activities in UX25 - Week 5 - 5/2 Saturday

Access in general mode

14/1/11 ALICE planning meeting 187

Activities in MNF - Week 5 - 5/2 Saturday

Access in general mode

14/1/11 ALICE planning meeting 188

Activities in UX25 - Week 5 - 6/2 Sunday

Access in general mode

14/1/11 ALICE planning meeting 189

Activities in MNF - Week 5 - 6/2 Sunday

Access in general mode

Day-by-day schedule

UX25 and MNF - Wk 6

14/1/11 ALICE planning meeting 191

Activities in UX25 - Week 6 - 7/2 Monday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

MNF shielding

ITECO

HAULOTTE

14/1/11 ALICE planning meeting 192

Activities in MNF - Week 6 - 7/2 Monday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

14/1/11 ALICE planning meeting 193

Activities in UX25 - Week 6 – 8/2 Tuesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PX24 shielding beams

8:00 to 18:00: no access CR1-5 and Exhibition

14/1/11 ALICE planning meeting 194

Activities in MNF - Week 6 - 8/2 Tuesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

14/1/11 ALICE planning meeting 195

Activities in UX25 - Week 6 - 9/2 Wednesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PX24 shielding beams

8:00 to 18:00: no access CR1-5 and Exhibition

Muon TRG

Upgrade firmware DARC and Regional board in order to speed up MTR decision electronics configuration. Might need some short (~1/2 hours) access during the restricted access hours

14/1/11 ALICE planning meeting 196

Activities in MNF - Week 6 - 9/2 Wednesday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

14/1/11 ALICE planning meeting 197

Activities in UX25 - Week 6 - 10/2 Thursday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PX24 shielding blocks

8:00 to 18:00: no access CR5

Muon TRG

14/1/11 ALICE planning meeting 198

Activities in MNF - Week 6 - 10/2 Thursday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

14/1/11 ALICE planning meeting 199

Activities in UX25 - Week 6 - 11/2 Friday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

PX24 shielding blocks

8:00 to 18:00: no access CR5

14/1/11 ALICE planning meeting 200

Activities in MNF - Week 6 - 11/2 Friday

8:00 – 18:00 access in restricted mode

18:00 – 8:00 access in general mode

14/1/11 ALICE planning meeting 201

Activities in UX25 - Week 6 - 12/2 Saturday

DSO test – NO ACCESS

14/1/11 ALICE planning meeting 202

Activities in MNF - Week 6 - 12/2 Saturday

DSO test – NO ACCESS

14/1/11 ALICE planning meeting 203

Activities in UX25 - Week 6 - 13/2 Sunday

DSO test – NO ACCESS

14/1/11 ALICE planning meeting 204

Activities in MNF - Week 6 - 13/2 Sunday

DSO test – NO ACCESS

Day-by-day schedule

UX25 and MNF - Wk 7

14/1/11 ALICE planning meeting 206

Activities in UX25 - Week 7 - 14/2 Monday

TPC: Kr data taking

Sur

vey

ST

4-5

Sur

vey

ST

2

14/1/11 ALICE planning meeting 207

Activities in MNF - Week 7 - 14/2 Monday

14/1/11 ALICE planning meeting 208

Activities in UX25 - Week 7 – 15/2 Tuesday

TPC: Kr data taking

14/1/11 ALICE planning meeting 209

Activities in MNF - Week 7 - 15/2 Tuesday

14/1/11 ALICE planning meeting 210

Activities in UX25 - Week 7 - 16/2 Wednesday

Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30Maintenance AS 715 (CRs) 9:30 to 11:30

TPC: Kr data taking

14/1/11 ALICE planning meeting 211

Activities in MNF - Week 7 - 16/2 Wednesday

14/1/11 ALICE planning meeting 212

Activities in UX25 - Week 7 - 17/2 Thursday

TPC: Kr data taking

14/1/11 ALICE planning meeting 213

Activities in MNF - Week 7 - 17/2 Thursday

14/1/11 ALICE planning meeting 214

Activities in UX25 - Week 7 - 18/2 Friday

Patrol UX25 cavern

TPC: Kr data taking

14/1/11 ALICE planning meeting 215

Activities in MNF - Week 7 - 18/2 Friday

14/1/11 ALICE planning meeting 216

Activities in UX25 - Week 7 - 19/2 Saturday

Restart LHC – NO ACCESS

14/1/11 ALICE planning meeting 217

Activities in MNF - Week 7 - 19/2 Saturday

Restart LHC – NO ACCESS

14/1/11 ALICE planning meeting 218

Activities in UX25 - Week 7 - 20/2 Sunday

Restart LHC – NO ACCESS

14/1/11 ALICE planning meeting 219

Activities in MNF - Week 7 - 20/2 Sunday

Restart LHC – NO ACCESS

14/1/11 ALICE planning meeting 220

VIP visits

• 7/12 14:00 to 15:00: portuguese press visit to CERN. 10 persons.F.Baltasar

• 15/12 16:30: finance and Council Delegates

• 10/1 (16:15): Mr Herman Josef Lamberti, Deutsche Bank, Germany

• 20/1 (12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany

14/1/11 ALICE planning meeting 221

AOB

• -