14/1/11 ALICE planning meeting 2
Outline
• ALICE Christmas break schedule– Access UX25, L3 and MNF
• Services interruption– Gas, cooling and electricity
– DAQ and DCS plans
• Detectors activities• Day-by-day schedule wks 49-7• Visits• AOB
14/1/11 ALICE planning meeting 3
Christmas break schedule
• Start on Tuesday, 7th December. End on Friday, 18th February
• Plan:– Open both L3 doors
– Installation of 3 TRD and 6 EMCal modules
14/1/11 ALICE planning meeting 4
ALICE Christmas break schedule
OpenOpenExperimentExperiment
TRDTRDEMCalEMCal
CloseCloseExperimentExperiment
Open L3 doors
Close L3doors
14/1/11 ALICE planning meeting 5
Access restrictions
• The reasons to restrict the access are:– Handling of shielding blocks– Lowering of heavy structures (yellow-platform, TRD and EMCal rotators and
modules)– Installation of EMCal modules– Removal of L3 ventilation– Evacuation tests– …
• The access restrictions concern the UX25 cavern, MNF, L3 and CRs
• SLIMOS shifts still missing in wks 49-50 and 4-5
• Indications are given (next slides) concerning the access during the whole break – more precise info will be discussed at 5 o’clock daily meetings
14/1/11 ALICE planning meeting 6
UX25 access
Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)
• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25
LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25
No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)
14/1/11 ALICE planning meeting 7
L3 (and MNF) access
EMCal EMCal
EMCal
NoVentilation
Wks 50 and 5: access (TPC) to be coordinated with TC (transport)
Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF
Watcher needed in wk 49 and from wk 4 onwards
Wk 7: Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)
31
Evac.
NoVentilation
243NoVentilation
13 7
Lift
14/1/11 ALICE planning meeting 9
Maintenance gas systems
Functional tests
New gas monitoring
13-15/12:• Stop N2, CO2, Neon, Ar (24 hours max N2, CO2 and Neon)• TRD backup (N2 bottle in CR5) – HMPID backup (Ar bottle in SG2)12/1 (during the cooling stop):• Stop C2H2F4, Isobutane, CH4 and SF6 -> will affect TOF and purifiers (no Ar/H2)
13
Flowmeters
14/1/11 ALICE planning meeting 10
Gas system status over Christmas
Albin
• TPC: flush CO2• TRD: ON• TOF: ON – stop 11-12/12 and during cooling stop (KNF pump
stopped)• HMPID: ON (Ar backup)• PHOS: N2 flushing• PMD: ON (except 11-12/12 – gas stop)• Muon TRK: backup CO2• Muon TRG: backup Ar
• No flammable gases from 7 Dec until 25 Jan PM (after maintenance UX25, Muon TRK-TRG ventilation)
14/1/11 ALICE planning meeting 11
Maintenance cooling unitsCooling Plants and Primary Network
Cooling towers
Maintenance on production network. No primary water from 12/1 (14:00) to 21/1 (AM)CR1-2-3, the Wiener PS and detector cooling plants affected (plants can RUN, but no cooling power). DCS will be kept running at all times (dedicated chiller)
Maintenanceand
consolidation
17
21
12
TOF/PHOSEMC
HMPID
SPDTPC
TPC 10
Maintenance on cooling plants. Replacement of pneumatic actuators for TOF/TRD/TPC plants + TOF/PHOS flowmeter. CP will be stopped during maintenance
SSD/SDD
TRD
TPC RR
Chillers
L3 and Dipole
24
14/1/11 ALICE planning meeting 12
Maintenance ventilation units
SG2
UX25, Muon
TRK-TRG
17
12
UX25, Muon TRK-
TRG
L3
14/1/11 ALICE planning meeting 13
Safety and electrical systems
UX25 fire detect.20
PX24 fire detect. + red phones
UPS UPS
AUG
UPS
DSO
Evacuation
DSSSNIFFER mainten.Auto-transfert
Evacuation
Evacuation
Early morning/late evening (tbc)
PX24 PAD
LACS doors
31
Guard 8-00 – 18-00Lifts maintenance
Lifts maintenance
UX25 lift
14/1/11 ALICE planning meeting 14
• LHC evacuation tests (7/12 after 18:00 and 24/12 tbc)
– no access UX25
• EN/EL: interruption on auto-transfert network (9/12 from 07:00 till 07:05):
– all wall outlets will be interrupted
– including all non-UPS outlets in the ACR (so essentially all WRs)
– including outlets SXL2, offices and barracks
– non-UPS power for the detector cooling plants will be interrupted
– power to all gas systems will be interrupted
– the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption
– the electronics racks in the cavern and CRs will not be affected.
– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf
• DSS modification (13/1)
– Will stop the full DSS, trigger all interlocks, including stopping power to all racks
• EN/EL: AUG Test (20/1) (Arrêt Urgence General – General Emergency Stop)
– Major electrical perturbation. Also ACR affected
Safety and electrical systemsImpact on ALICE
14/1/11 ALICE planning meeting 15
DAQ upgrade plans• 21st Dec PM till the 04th Jan included
– The DAQ will be OFF during the CERN closure.– The ACR PCs will be left ON to give access to the DCS for the detectors teams
who need it.• 5th to the 11th of January included
– DAQ restarted on the first working day for 1 week. The DAQ will be switched ON with the present version of all software. Allow a quick commissioning after the installation of new detector modules or the intervention on existing detectors.
• 12th to the 23rd Jan included– The DAQ will be OFF during the cooling interruption at P2.– DAQ renovated (see TB December)
• 24th January– The DAQ will be ON again. It will run under SLC5 64 bits unless there would be
an unexpected key problem.
• The electronic logbook will remain available during the whole period. When the DAQ will be OFF, it will be running in the DAQ lab in Meyrin. There will be a few hours of interruption to switch from P2 to Meyrin and back.
Pierre/Uli
14/1/11 ALICE planning meeting 16
DCS plans• Baseline: DCS will be operational all times where technically possible
– With ‘best effort’ support
– With access restrictions during CERN End-of-Year closure (22/12 – 4/1)
• Many activities and upgrades are planned– Will be coordinated with individual detectors to minimise impact
– For central systems, as much as possible in shadow of other perturbations (e.g. cooling stop)
– Perturbations (e.g. for reboots etc.) cannot be excluded
• Detectors are invited to communicate ‘critical periods’, with services needed– Will try to cater for detector needs as much as possible
• Known perturbations:– Tue 7/12 10:00 – 12:00, interruptions of the GPN link to/from P2
• Upgrade of router, test impact on ALICE
– Wk50 (13-17/12) – major updates to all PC (many perturbations to be expected)
– 12/1 – 21/1 (cooling stop), only minimal central services. All detector DCS switched off, except for special requests and if cooling power allows
• More detailed planning at weekly and daily meetings
André / Peter
14/1/11 ALICE planning meeting 17
DCS plans (details)• Wk 50
– Mon 13/12 – Fri 17/12 (daytime): SW upgrades and patches to all systems (Operating system and PVSS)
• Delayed/extended due to problems with automatic PVSS upgrade procedure (several manual operations needed)
• Systems unavailable for short (~hrs) periods, frequent reboots
– Support to detectors restarting/testing their systems after upgrades• Detectors shall test functionality as much as possible
• Wk 51– Contingency for system upgrades– Support to detectors restarting/testing their systems after upgrades
• Detectors shall test functionality as much as possible
– Tue 21/12 PM: Limit access to DCS cluster during end-of-year closure• Register with your SRC if you require access (see message Peter 2/12/2010)
• Wk 52 – Wk 01– Only ‘best effort’ support during CERN closure
• Wk 02– Wed 12/01 – (cooling intervention) shutdown of detector systems
• except special requests, within limits of cooling power
André / Peter
14/1/11 ALICE planning meeting 18
Access requestCavern and surface
• You should submit an ADI and a task procedure
Two persons minimum
Work breakdown structure – risk associated at each step
ADIhttps://edh.cern.ch/Document/ADI
Task procedureTemplate EDMS 1103355
Attach task procedure
14/1/11 ALICE planning meeting 20
EMCal
• Status of modules:– 6 modules in SXL2
• Test station installed in SXL2
• Requiring a lot of access to connect everything up, test, and debug as they commission the new SMs
– Low voltage, high voltage (CR4), and DAQ operating as much as possible during the installation period in January.
14/1/11 ALICE planning meeting 21
EMCalSurveys
• Zero measurement (wk 51-52), after insertion of 1st module and after the insertion of 2nd module:
– A-side: CALframe feet and rails + modules (adaptors)– C-side (photogrammetry - 1/2 day)
• After insertion of 3rd, after insertion of 4th and after insertion of 5th module: – A-side: points chosen depending on results previous survey– C-side: with theodolite from A-side (or full photogrammetry, depending on results
previous survey)
• After insertion of 6th module:– A-side: full– C-side: full
14/1/11 ALICE planning meeting 22
PMD
• Wk 50:– Lift CROCUS (in order to open L3 doors) - can be done by P2 technicians– disconnect cables (after 16/12)
• Wk 51 (20/1): move PMD in parking position (Pieter)
• Wks 51-4: repair electronics chains– Need Ar/CO2 at all times
• 28/1: move PMD to final position
• Wks 5-6 (after 18:00): access to CROCUS (doors closed, use CROCUS platform)
• Wk 6: survey (transfer survey network to miniframe (Antje))
• Wks 51-1 SPIE: new air cooling system – major installation work in January (should be done by end January)
– Nacelle HAULOTTE needed
14/1/11 ALICE planning meeting 23
TOF/PHOS
• TOF:– HV hardware checks on SM13 (December)– TRM replacement (14 TRMs on the A side) (3/01 – 12/01)– Replacement DC-DC (with no LV spare channels):
• 16/12 (after 18:00)
• PHOS: (A.Vinogradow at CERN 1/12 end January)– Investigate module 2 pedestal issues– Try to understand behavior of unstable branch in Module 3– Remake ISEG crate to connect to the hardware interlock– Maintenance crystal cooling plant (January)
Gilda/Yury
14/1/11 ALICE planning meeting 24
Muon TRG
• RPC Detector/gas system:– Check gas leak on few RPC detectors and repair 2 gas distribution channels.
Replacement of 1 HV cable. From Monday 10/01 (afternoon) to Friday 14/01– Upgrade Sensor gas humidity and pressure regulator (CR5, schedule to be
defined with the gas team)– Replace few RPC modules with high current: under discussion– Will restart the flammable gas flow at end of January/beginning of February, to
check the detectors with HV at least 15 days before the first beam injection
• Electronics:– Maintenance Local decision electronics (December 8th after 18:00) Done– Upgrade FE threshold distributors, higher segmentation (level 4 gangway,
December 8th after 18:00) Done– Upgrade firmware DARC and Regional board in order to speed up MTR decision
electronics configuration (wk 6, after the DAQ upgrade)
Pascal/Ermanno/Paolo/Anna
14/1/11 ALICE planning meeting 25
Muon TRK plans
• December: CROCUS firmware upgrade (protection against spurious busy reset signal):– Access to Crocus, Dipole and FASS. Need nacelle wk 49 Done
• High occupancy bus patches:– Remove one "bad" slat (and replace by one spare) to test it in lab Done
– Access to Dipole and to muon side with nacelle in December Done
– Fix all remaining “bad” slats in January, wks 2-5. Need local DAQ setup (2 tables) + ITECO
• 13 January: replacement 1 quadrant ST2 (faulty wires) Done– Test spare quadrants in lab (December)
Ermanno/Herve
14/1/11 ALICE planning meeting 26
ZDC plans
• Check platform displacement with survey– One week – depending on surveyors availability
Paolo
14/1/11 ALICE planning meeting 27
SPD cooling plans
• Wk 49 (8/12 after 18:00): cut pipes in order to open the doors
• Wks 2-3 (during cooling stop): wash 4 bad sectors (machine installed on I-side, close to HMPID pump). Access to the outer side of MNF (side I) to work on the heater of sector 0 (nacelle or scaffolding needed)
• Wks 3-4 (as soon as the door is closed): reconnect temporarily pipes and test with dummy sector inside MNF (in parallel with shielding in wk 4)
14/1/11 ALICE planning meeting 28
SSD/SDD
SSD:• Ton: remove a cooling pipe from SSD corrosion test setup (week 2)• Replacement CAEN module (C-side) + repair bad temperature
signal at the C-side (week 2)
SDD:• Calibration of 78 pressure sensors in L3 and on miniframe (January
12 to 14)
14/1/11 ALICE planning meeting 29
T0
• Activities planned from 7-19 December (after 18:00): Done– Check/repair the amplifiers from A and C side (inside L3)
– Check the signal cables from A-side
– Check/repair fast electronics modules (racks O18-19)
– Need possibility to do standalone runs in parallel
14/1/11 ALICE planning meeting 30
TRD installation - weeks 51, 52
• 4 modules at P2 (SM2, SM11, SM 15 and SM16)
• Installation sequence: 16 → 15 → 11 (or 16 → 11 → 15)
• 2 technicians (Philippe and Didier) + Survey (Nail from 6/12) + TC permanently at P2
• Connection done right after installation
• Survey:– Space-frame deformations and displacement of beampipe (flange), miniframe
and TPC feet. Before-after each insertion– Modules (2 points/SM on 4/7 SM) in wk 50– Modules (3 points/SM on 10/10 SM) after EMCal (wk 3)
14/1/11 ALICE planning meeting 31
TRD• Week 49:
– LV Wiener ~70 PSU Back-Plane modifications (to improve mechanical stability, same as TPC applied already)
– Netgear switches replacements (1 day)– LV line fixation: installation of improved patch panels on front of module (C-side)
and replacing cables
• Repair pretrigger (A-side, below PMD) – after 20/12
• Week 1:– Finalizing connections, start commissioning
• Week 2:– Stable running with cosmics
• 3 to 4 weeks in January or February:– Stable running with cosmics for alignment and with Krypton for gain calibrations
(to be still discussed)
14/1/11 ALICE planning meeting 32
TPC
• Recover all water inside cooling plant (week 50)• Replacement of 15 damaged FECs (equally distributed A-C sides)
– ~3 days per FEC. Therefore, we would like to use all available time slots where access to the L3 is possible
– At the end of this activity we will need a period of about 2 weeks where all aforesaid systems are available for final verification, and access to the TPC in case something is not working correctly.
• Kr data taking at the end of the shutdown, in wk 7
14/1/11 ALICE planning meeting 33
TPCReplacement of the laser
• Start the dismantling of the Spectron laser (week 50, Th-Sat after 18:00):– dismount back wall of laser hut (help of P2 technician)– stop cooling water (help of P2 technician)– prepare new water connection (electrical power should be OK)
• Install new Ekspla laser (week 1):– remove old laser and install new (use crane to transport laser)– connect cooling water (help of P2 technician)– reinstall back wall (maybe after cutting a hole in it)
• Testing and alignment of new laser (week 2):– possibility to run laser behind closed doors (inside hut)– maybe install laser tube temporarily and shoot into TPC whenever– compatible with other installation work
• Possible further testing and adjustment (week 3)
Borge
14/1/11 ALICE planning meeting 34
ACORDE
• Check some ACORDE modules (PMTs optical conections, connectors, etc) above the magnet
• The plan is to start this activities on January 21st
14/1/11 ALICE planning meeting 35
Other activities
• SPIE + CV: refurbishment ITS dehumidifier in CR – February– Replacement part at P2 in January. Installation – transport needed– Recirculation air - SPIE– New air-flowmeter (connect to ELMB: Frederick)
• EN-EL (T.Bourrel): motorize L3-Dipole-Miniframe circuit breaker.– VIC 16/12 10:30 – Intervention 11/1 whole day
• SPIE: cabling UX25-CR4 – 17/1
• New magnet emergency buttons + flashing lights L3 and dipole
• Frederick: humidity sensor L3 ventilation (extraction) + redo CTP connectors
• Intervention on cavern lift. From 28/1 17:00 to 29/1 (whole day)– One day stop – no access to UX25
14/1/11 ALICE planning meeting 36
Other activities
• Google propose to produce a custom Streetview application for CERN showing both outside and underground areas
– Visit Tuesday 21 December at 16:15
– 18/1 filming
• Philippe: replace rack filters during cooling stop. Install temporary line PHOS cooling (PS rack and crystal cooling plant). Clean all WIENER PS racks with special machine
14/1/11 ALICE planning meeting 37
Magnet control upgrade
• Wk 49: nous devons intervenir dans la MCR pour:– changement des alimentations 24V et 48 V des systèmes MSS et MCR (préventif)– changement des modules convertisseurs PT100 des hots points du Solénoïde (correctif suite à deux
incidents ayant entrainés l'arrêt du Solénoïde) et en UX25, comme Philippe Bouvier l'a déjà signalé:– recâblage des AU du dipôle et du Solénoïde– signalisation du champ magnétique du dipôle et du Solénoïde
• Nous étudions toujours une solution pour le monitoring des températures du Solénoïde.• L'arrêt de fin d'année va permettre de faire une meilleure approche de ce qui est existant en
UX25.
• En ce qui concerne l'alimentation électrique de la MCR, nous dépendons actuellement d'une seule source de courant sous UPS avec secours diesel.
• Afin d'établir une redondance pour l'alimentation de la MCR je souhaiterais installer une seconde source d'alimentation sous UPS.
• Je sais qu'une étude est faite à ALICE pour augmenter la puissance des UPS existants en 2012.• Je souhaiterais que cette demande soit incluse pour le calcul de puissance des nouveaux UPS
(besoin pour la MCR: 16A en monophasé)
Pascal
14/1/11 ALICE planning meeting 39
• 18:00: end HI program– Ramp down both magnets. !!! Emergency dump !!!
• 18:00 – 22:00: access system test. No access UX25• 22:00: RPE survey (Jiri + 2nd person)
– Then go to restricted mode
Week 49 - 6/12 MondayProgram
14/1/11 ALICE planning meeting 40
Activities in UX25 - Week 49 - 6/12 Monday
No access UX-25 - possibility of access from 22:00
ITECO
HAULOTTE
TRD team at CERN: 6 to 10/12
14/1/11 ALICE planning meeting 41
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• 8:30 - 9:30: RP liquid (and gas) sampling (Adeline, Pierre)– Collect RP samples (Fernando, Philippe)
– Survey L3 and Dipole
• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode
• 14:00 - 15:00: Portuguese Press visit. 10 persons
Week 49 - 7/12 TuesdayProgram
14/1/11 ALICE planning meeting 42
• ALTEAD: PX24 shielding blocks – top layer removed– 8:00 to 18:00: no access CR5
• Reinstall crane electronics - Problems (ongoing)• 14:00 to 15:00: put SM16 into the rotator - Ongoing• VAC: Neon injection preparation - Started
– Transport needed (EDH 4472100) – Rack moved by hand
– Remove “green fence” (P2 technician) - Done
• Stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12) - Done• 8:30: Lock L3+Dipole power converter + compensator magnet - Done• Test transmission of alarm lift to FB - Done• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe, Sasha) – Done
(will install temporary line)• 15:15: VIC SPD – Done + Gas VIC• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2 – Done. DCS got stuck.
Investigating why• MCR (Magnet Control Room): HW modifications (Pascal B.) – Started• TRD (after 21:00): Wiener PS back-plane modification and LV consolidation (L3)
Week 49 - 7/12 TuesdayActivities
14/1/11 ALICE planning meeting 43
Activities in UX25 - Week 49 - 7/12 Tuesday
VA
C
RP samples
PX24 shielding: blocks
TRD Wiener PS
TRD Wiener PS
14/1/11 ALICE planning meeting 44
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)
• From 18:00 - Cavern in General mode
• 18:00: Confined Space Training– Tour in L3 at the end of the course
Week 49 - 8/12 WednesdayProgram
14/1/11 ALICE planning meeting 45
• ALTEAD: PX24 shielding beams (35t) - Done– 8:00 to 16:30: no access CR1-5 and Expo
– Move ITECO C-side - Ongoing
• EN-HE: Reinstall crane electronics – Done. Crane operational• VAC: Neon injection – injection table prepared. Neon injected tomorrow afternoon
– Annular ion pump (PI.45.1L2.X) switched off
Activities after 16:30:• EN-CV: empty TPC tank - Ongoing• TPC: replacement of damaged FECs (C-side) - Ongoing• TRD: pretrigger PS work done. Wiener PS back-plane modification (SXL2, almost
done). Start re-installing Wieners tonight.• SPD: cut inox pipes - Done• Muon TRK: CROCUS firmware upgrade• Muon TRG: Maintenance Local decision electronics and upgrade FE threshold
distributors – Done• T0: investigation broken amplifier (MNF and L4-rack) - Ongoing
Week 49 - 8/12 WednesdayActivities
14/1/11 ALICE planning meeting 46
Activities in UX25 - Week 49 - 8/12 Wednesday
PX24 shielding:
beams (35t)
VA
C
MoveTRD Wiener PS
TRD Wiener PS
Cut SPD pipes
Muon TRG
TP
C F
EC
an
d
TR
D L
V
TPC cooling
Muo
n T
RK
: C
RO
CU
S f
irmw
are
upg
rade
T0
14/1/11 ALICE planning meeting 48
• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC and TC)
• From 18:00 - Cavern in General mode
• Interruption on auto-transfert network (from 07:00 till 07:05). No access underground
– all wall outlets will be interrupted
– including all non-UPS outlets in the ACR (so essentially all WRs)
– including outlets SXL2, offices and barracks
– non-UPS power for the detector cooling plants will be interrupted
– power to all gas systems will be interrupted
– the UPS powered systems will not be affected, but will run on batteries for the 2 min. interruption
– the electronics racks in the cavern and CRs will not be affected.
– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf
Week 49 - 9/12 ThursdayProgram
14/1/11 ALICE planning meeting 49
• ALTEAD: MNF shielding – 2/4 “T” blocks removed– 8:00 to 18:00: No access CR1-5 during lifting up of 5 big beams
– Stabilizers (after 18:00) - OK
– Move ITECO I-side
• VAC: Neon injection – Beampipe under Neon• RAMSES: removal of Data Acquisition modules CR5 - Done• EMCal team at CERN: fit rollers on all SMs (SXL2). Start 13:30 - OK• Dipole-Solenoid cooling stopped (Philippe)• Purge TRD cooling flexibles + replace o-rings (Philippe + Frederick) - Done
Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (SXL2)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)
Week 49 - 9/12 ThursdayActivities
14/1/11 ALICE planning meeting 50
Activities in UX25 - Week 49 - 9/12 Thursday
VA
C
MNF shielding
TRD Wiener PS
TRD Wiener PS
Stabilizers
No access CR1-5 during lifting up of 5 big beams
TP
C F
EC
an
d
TR
D L
V
Muo
n T
RK
: C
RO
CU
S f
irmw
are
upg
rade
T0
Stabilizers
Move
14/1/11 ALICE planning meeting 52
• 8:00 - 17:00: UX25 cavern in Restricted mode– No access UX25 (except Transport and TC)
• From 17:00 - Cavern in General mode
• 9:00 – 12:30: functional test gas systems– 9:00 – 11:00: No access UX25 and CR1-5– All gas systems will be stopped-started several times– Stop Ar/H2 at end of test
Week 49 - 10/12 FridayProgram
14/1/11 ALICE planning meeting 53
• ALTEAD: MNF shielding: I-side wall• EMCal: fit rollers on all SMs• Maintenance PX24 MAD (transparent)
Activities after 18:00:• TPC: replacement of damaged FECs (C-side)• TRD: Wiener PS back-plane modification and LV consolidation (L3)• Muon TRK: CROCUS firmware upgrade• T0: investigation broken amplifier (MNF and L4-rack)
Week 49 - 10/12 FridayActivities
14/1/11 ALICE planning meeting 54
Activities in UX25 - Week 49 - 10/12 Friday
LV156
TRD Wiener PS
TRD Wiener PS
TP
C F
EC
an
d
TR
D L
V
MNF shielding
14/1/11 ALICE planning meeting 56
• 8:00 - 17:00: UX25 cavern in Restricted mode– No access UX25 (except Transport and TC)
• From 17:00 - Cavern in General mode
• 18 KV Autotransfert tests from 8h00 to 20h00– Frequent power cuts will occur on the Meyrin site. The group EN-EL
recommends that you turn off all your critical equipment, computers and computer equipment.
– For any further information please refer to the "note de coupure":
– https://edms.cern.ch/file/1107011/1/ENNC_2010_203.pdf
Week 49 - 11/12 SaturdayProgram
14/1/11 ALICE planning meeting 57
• ALTEAD: MNF shielding: I-side wall
Activities after 17:00:• TRD: Wiener PS back-plane modification and LV consolidation (L3)
Week 49 - 11/12 SaturdayActivities
14/1/11 ALICE planning meeting 58
Activities in UX25 - Week 49 - 11/12 Saturday
TRD Wiener PS
TRD Wiener PS
TR
D L
V
LV156
MNF shielding
14/1/11 ALICE planning meeting 60
Activities in UX25 - Week 49 - 12/12 Sunday
Access in general mode
14/1/11 ALICE planning meeting 63
Access status:• 8:00 - 18:00: UX25 cavern in Restricted mode
– No access UX25 (except Transport and TC)
• From 18:00 - Cavern in General mode• No access L3 (no ventilation)
Activities:• ALTEAD: MNF shielding: O-side wall• Lift PMD CROCUS• SPIE: removal L3 ventilation• Philippe: cut SPD pipe (chillers)
Activities after 18:00:• TRD: access to L4 racks• T0: investigation broken chains
Week 50 - 13/12 Monday
14/1/11 ALICE planning meeting 64
Activities in UX25 - Week 50 - 13/12 Monday
LV156
No access L3(no ventilation)
L3 ventilation
LV156
MNF shielding
14/1/11 ALICE planning meeting 65
Activities in MNF - Week 50 - 13/12 Monday
No
ac
ce
ss L
3(n
o v
en
tila
tio
n)
14/1/11 ALICE planning meeting 66
Access status:• 8:00 - 18:00: UX25 cavern in Restricted mode
– No access UX25 (except Transport and TC)
• From 18:00 - Cavern in General mode
• No access L3 (no ventilation)
Activities:• ALTEAD: MNF shielding: O-side wall
• Opening I-side door done
• Gas upgrade (SG2): stop all gas systems Ar, CO2, N2 and Neon done. The others must be done on January 11!!!
– Evacuation all Ar/H2 bottles (Fayet, morning)– X-ray at night
• SPIE: new PMD ventilation (removal filter)– VIC at 10:00
Activities after 18:00:• T0: investigation broken chains
Week 50 - 14/12 Tuesday
14/1/11 ALICE planning meeting 67
Activities in UX25 - Week 50 - 14/12 Tuesday
Open I-side door
No access L3(no ventilation)
LV156
MNF shielding (green
bridges)
PMD ventilation
Visit 13:30 (Karel)
T0
14/1/11 ALICE planning meeting 68
Activities in MNF - Week 50 - 14/12 Tuesday
No
ac
ce
ss L
3(n
o v
en
tila
tio
n)
T0
14/1/11 ALICE planning meeting 69
Access status:• Cavern in General mode
Activities:• ALTEAD: yellow-platform rails. Put YP on rails. Removal MNF staircase. Shielding on O-side
gone
• TRD: test LV inside magnet
• TPC: replacement FE cards (C-side)
• Release all TOF crates supports (Yannick-Samuel)
• Gas upgrade (SG2): restart gas systems
• EN-CV: maintenance TRD cooling unit
• TPC laser: dismount back wall of laser hut + start removal laser
• TOF: removal DC/DC converters
VIP visit: Finance and Council Delegates – 16:45 (1hour)
Week 50 - 15/12 Wednesday
14/1/11 ALICE planning meeting 70
Activities in UX25 - Week 50 - 15/12 Wednesday
Access in general mode
TRD cooling
TP
C/T
RD
YP rails
Release all TOF crates supports (Yannick-Samuel) +
TOF DC/DC
Laser
EMC
14/1/11 ALICE planning meeting 71
Activities in MNF - Week 50 15/12 Wednesday
Access in general mode
Removal MNF staircase
(access with ladder)
14/1/11 ALICE planning meeting 72
Access status:• Cavern in General mode
Arrival PMD team
Visit (W.Riegler). 14:30
Activities:• ALTEAD: yellow-platform rails• Open O-side door – by afternoon• SPIE: PMD ventilation• Survey: baby-frame zero-measurement + TRD• EN-EL: motorize L3-Dipole-Miniframe circuit breaker (T.Bourrel, VIC at 10:30)• TRD: test LV inside magnet• TPC: replacement FE cards (C-side)• Release all TOF crates supports (Yannick-Samuel)• Re-arrange TPC cooling pipes (MNF, Yannick)• EN-CV: maintenance TRD cooling unit• TPC laser: removal laser + take out laser-hut back door. Take out old power supply• EMCal: installation HV PS (CR4) and LV PS (L4-O-side) Done
Week 50 - 16/12 Thursday
14/1/11 ALICE planning meeting 73
Activities in UX25 - Week 50 - 16/12 Thursday
Laser
TRD cooling
TP
C/T
RD
EN-EL
Release all TOF crates supports (Yannick-Samuel)
PMD ventilation
Open O-side door
LV156
Access in general mode
Sur
vey
14/1/11 ALICE planning meeting 74
Activities in MNF - Week 50 - 16/12 Thursday
Access in general mode
TPC cooling pipes (Yannick)
14/1/11 ALICE planning meeting 75
Access status:• Cavern in General mode
Visit (C-E.Sala)
DAQ: the experiment logbook and data taking will be unavailable from 10:00 to 12:00 for a maintenance operation
Arrival 2 (last) EMCal modules from Grenoble. Unload in SXL2
Activities:• ALTEAD: lower TRD 16. No access low-beta platform• SPIE: PMD ventilation• Survey: baby-frame zero-measurement + TRD• TRD: test LV inside magnet• TPC: replacement FE cards (C-side, and A-side (tbc))• Decoupling TPC-Space-Frame (Yannick-Samuel)• EMC: investigate a part of the EMCal readout that was noisy (~16 channels on one "T-card") (L3)• PMD: disconnect services• EN-CV: maintenance TRD cooling unit
Week 50 - 17/12 Friday
14/1/11 ALICE planning meeting 76
Activities in UX25 - Week 50 - 17/12 Friday
Decoupling TPC-Space-
Frame (Yannick-Samuel) &
EMC
TP
C F
EC
Access in general mode
Sur
vey
PMD ventilation
TP
C F
EC
TRD cooling
14/1/11 ALICE planning meeting 77
Activities in MNF - Week 50 - 17/12 Friday
Dis
con
nec
t P
MD
ser
vice
s
Access in general mode
14/1/11 ALICE planning meeting 78
Activities in UX25 - Week 50 - 18/12 Saturday
Decoupling TPC-Space-Frame
(Yannick-Samuel)
Access in general mode
Sur
vey
14/1/11 ALICE planning meeting 79
Activities in MNF - Week 50 - 18/12 Saturday
Access in general mode
14/1/11 ALICE planning meeting 80
Activities in UX25 - Week 50 - 19/12 Sunday
Access in general mode
TRD team at CERN: 19 (PM) to 23/12
14/1/11 ALICE planning meeting 83
GS/ASE: UX25 fire detection maintenance
ALTEAD: unload in SXL2 2 EMCal modules
Activities:• TRD: installation BBF rails SR16-15• Survey: TRD and EMCal survey• TPC: replacement 1 FE card (A-side)• PMD+Pieter: move detector in parking position
Week 51 - 20/12 Monday
14/1/11 ALICE planning meeting 84
Activities in UX25 - Week 51 - 20/12 Monday
TR
D a
nd
EM
Ca
l Sur
vey
Prepare TRD 16 installation
EM
Ca
l Sur
vey
(1/2
day
)
TP
C F
EC
TP
C F
EC
14/1/11 ALICE planning meeting 85
Activities in MNF - Week 51 - 20/12 Monday
Mo
ve P
MD
in
p
arki
ng
p
osi
tio
n
14/1/11 ALICE planning meeting 86
Google Streetview visit (5 people). 16:15
GS/ASE: UX25 fire detection maintenance
DAQ: switch off DAQ. The ACR PCs will be left ON to give access to the DCS for the detectors teams who need it
DCS: the access restrictions to the DCS network will be enforced from December 21st towards the end of working hours
Activities:• TRD: install TRD16 + insert TRD15 into rotator• Survey TRD16
– The beampipe (i.e. also ITS and TPC) have moved 0.35mm to the O-side and 0.14mm down during the installation of TRD16. This is consistent with Yannick’s measurements of the spaceframe position with respect to the backframe
• Philippe+Didier: removal ladder BKF• PMD: replacement electronics chains
Week 51 - 21/12 Tuesday
14/1/11 ALICE planning meeting 87
Activities in UX25 - Week 51 - 21/12 Tuesday
Install TRD 16
TR
D S
urve
y
14/1/11 ALICE planning meeting 88
Activities in MNF - Week 51 - 21/12 Tuesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 89
Visit: RIKEN RIBF Accelerator technical coordination group. Ken Oyama
Activities:• TRD: install TRD15 + connect TRD16• Philippe+Didier: removal ladder BKF• PMD: replacement electronics chains
Week 51 - 22/12 Wednesday
14/1/11 ALICE planning meeting 90
Activities in UX25 - Week 51 - 22/12 Wednesday
Connect TRD 16
Install TRD 15
TR
D S
urve
y
14/1/11 ALICE planning meeting 91
Activities in MNF - Week 51 22/12 Wednesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 92
Activities in UX25 - Week 51 - 23/12 Thursday
Connect TRD 15
TR
D S
urve
y
14/1/11 ALICE planning meeting 93
Activities in MNF - Week 51 - 23/12 Thursday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 94
Activities in UX25 - Week 51 - 24/12 Friday
LHC evacuation test. no access UX25
14/1/11 ALICE planning meeting 95
Activities in MNF - Week 51 - 24/12 Friday
LHC evacuation test. no access UX25
14/1/11 ALICE planning meeting 97
Activities in MNF - Week 51 - 25/12 Saturday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 98
Activities in UX25 - Week 51 - 26/12 Sunday
TRD team at CERN: 26 to 30/12
14/1/11 ALICE planning meeting 99
Activities in MNF - Week 51 - 26/12 Sunday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 101
Activities in UX25 - Week 52 - 27/12 Monday
Connect TRD 15
Prepare TRD 11 installation
Including installation BBF rails SR11
TR
D S
urve
y
Diego at CERN (noon)
PMD ventilation
14/1/11 ALICE planning meeting 102
Activities in MNF - Week 52 - 27/12 Monday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 103
Activities in UX25 - Week 52 - 28/12 Tuesday
Prepare TRD 11 installation
PMD ventilation
14/1/11 ALICE planning meeting 104
Activities in MNF - Week 52 - 28/12 Tuesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 105
Activities in UX25 - Week 52 - 29/12 Wednesday
Install TRD 11
TR
D S
urve
y
PMD ventilation
14/1/11 ALICE planning meeting 106
Activities in MNF - Week 52 29/12 Wednesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 107
Activities in UX25 - Week 52 - 30/12 Thursday
Connect TRD 11
TR
D S
urve
yEMCal
infrastructure
Move EMCal rotator + SM5 onto low beta platform, and perform handling test
14/1/11 ALICE planning meeting 108
Activities in MNF - Week 52 - 30/12 Thursday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 110
Activities in MNF - Week 52 - 31/12 Friday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 116
Activities in UX25 - Week 1 - 3/1 Monday
Connect TRD 11
PMD ventilation
Install EMCal 40deg-C (PM)
Lower SM6 onto low beta platform
SM5
TOF TRM
Move HAULOTTE
14/1/11 ALICE planning meeting 117
Activities in MNF - Week 1 - 3/1 Monday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 118
Activities in UX25 - Week 1 - 4/1 Tuesday
PMD ventilation
EM
C S
urv
ey
EM
C S
urv
ey
(AM
)
Install EMCal 40deg-A (PM)
SM6
TOF TRM
Reconnect PMD cooling
14/1/11 ALICE planning meeting 119
Activities in MNF - Week 1 - 4/1 Tuesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 120
Activities in UX25 - Week 1 - 5/1 Wednesday
TPC RR cooling
RAMSES: reinstallation of Data Acquisition modules CR5
Maintenance UPS ESS307/2X (transparent)
GS/ASE: PX24 fire detection maintenance
PMD ventilation
EM
C S
urv
ey
TOF TRM
TP
C F
EC
EN-CV: maintenance chillers (transparent)
Lower SM7 onto low beta platform
14/1/11 ALICE planning meeting 121
Activities in MNF - Week 1 - 5/1 Wednesday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 122
Activities in UX25 - Week 1 - 6/1 Thursday
TPC cooling PMD ventilation
Install EMCal 60deg-C
SM7
Lower SM8 onto low beta platform
EM
C S
urv
ey
TOF TRM
GS/ASE: PX24 fire detection + red phones maintenance
TP
C F
EC
EN-CV: maintenance chillers (transparent)
14/1/11 ALICE planning meeting 123
Activities in MNF - Week 1 - 6/1 Thursday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 124
Activities in UX25 - Week 1 - 7/1 Friday
TPC cooling
Install EMCal 60deg-A
SM8
EM
C S
urv
ey
TOF TRM
GS/ASE: PX24 fire detection + red phones maintenance
TP
C F
EC
EN-CV: maintenance chillers (transparent)Lower SM9 onto low beta platform
14/1/11 ALICE planning meeting 125
Activities in MNF - Week 1 - 7/1 Friday
PM
D:
rep
lace
men
t el
ectr
on
ics
chai
ns
14/1/11 ALICE planning meeting 126
Activities in UX25 - Week 1 - 8/1 Saturday
Visit (6 people at 15:30). P.Kuijer
14/1/11 ALICE planning meeting 128
Activities in UX25 - Week 1 - 9/1 Sunday
Visit (1 person at 11:00). C.Blume
14/1/11 ALICE planning meeting 131
Activities in UX25 - Week 2 - 10/1 Monday
TPC cooling
VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25
Mu
on
TR
G:
RP
C (
PM
)
Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles)
SDD/SSD
Laser
SDD: calibration of 78 pressure sensors (10-12/1)SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side)
TOF TRM
TP
C F
EC
Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda
Install new Ekspla laser
Philippe: install PHOS temporary cooling pipes
Yannick: re-install TPC cooling pipes MNF (I-side)
14/1/11 ALICE planning meeting 133
Activities in UX25 - Week 2 – 11/1 Tuesday
SSD/SDD cooling
Mu
on
TR
G:
RP
C
SPD cooling
Laser
TOF TRM
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side
Visit (15 people at 14:00). Werner
Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water
Wash 4 bad sectors + repair heater (nacelle)
2 tables (DAQ)
Use RED nacelle
15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6
SSD: removal of cooling pipe from corrosion test setup
Move new laser down to platform
TRD cables
Power cut: 9:05 – 9:45
14/1/11 ALICE planning meeting 135
Activities in UX25 - Week 2 - 12/1 Wednesday
Cooling towers maintenance (start 14:00) (No primary water)
SNIFFER maintenance
Install EMCal 80deg-C
SM9
Lower SM10 onto low beta platform
EM
C S
urv
ey
Mu
on
TR
G:
RP
C
SPD cooling
Laser
Cleaning rack filters (Philippe)
Maintenance UPS EBS106/2X and EBS128/2X (transparent)
PH-DT: new gas monitoring. Restart Ar/H2 afterwards
TP
C F
EC
Euronews visit 10.20 - 11.30
Mu
on
TR
K:
bu
s-p
atch
es
TPC cooling
Visit (P-A.Giudici + 3 persons)
14/1/11 ALICE planning meeting 137
Activities in UX25 - Week 2 - 13/1 Thursday
Cooling towers maintenance (No primary water)
HM
PID
c
oo
lin
g
RAMSES: radiation source testsEN/CV: maintenance SG2 ventilation
DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks
SNIFFER maintenance
Install EMCal 80deg-A
SM10E
MC
Su
rve
y
SPD cooling
Visit: (15 p.) Danish high school class (C. Søgaard)
TP
C F
EC
Mu
on
TR
G:
RP
C
Mu
on
TR
K:
bu
s-p
atch
es
Laser
TR
D L
V
ST2: replace chamber 3BR
ST
2
14/1/11 ALICE planning meeting 139
Activities in UX25 - Week 2 - 14/1 Friday
Cooling towers maintenance (No primary water)
SNIFFER maintenance
EN/CV: maintenance SG2 ventilation
RAMSES: radiation source tests
VA
C
EM
C S
urv
ey
EM
C S
urv
ey
SPD cooling
LACS: revision UX25 access doors
Removal EMCal
infrastructure
TP
C F
EC
Start pumping out
Mu
on
TR
K:
bu
s-p
atch
es
Laser
Visit (2 people). Resp. L.Pinsky
TR
D L
V
TOF: HV test SM13 + move SM15
TOF
Mu
on
TR
G:
RP
C
14/1/11 ALICE planning meeting 141
Activities in UX25 - Week 2 - 15/1 Saturday
Cooling towers maintenance (No primary water)
Laser
14/1/11 ALICE planning meeting 143
Activities in UX25 - Week 2 - 16/1 Sunday
Cooling towers maintenance (No primary water)
D.Budnikov at CERN
PHOS: maintenance crystal cooling plant
PHOScooling
14/1/11 ALICE planning meeting 146
Activities in UX25 - Week 3 - 17/1 Monday
Cooling towers maintenance (No primary water)
Maintenance UX25, Muon TRK-TRG ventilation
SPD cooling
SPIE: cabling UX25-CR4
TR
D/E
MC
S
urve
yRemoval EMCal
infrastructure
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
Maintenance ITECO (9:00 to 11:00)
SPD cooling
14/1/11 ALICE planning meeting 147
Activities in MNF - Week 3 - 17/1 Monday
TRD pre-
trigger
PM
D:
new
T
sen
sors
14/1/11 ALICE planning meeting 148
Activities in UX25 - Week 3 – 18/1 Tuesday
Cooling towers maintenance (No primary water)
Maintenance UX25, Muon TRK-TRG ventilation
SPD cooling
TR
D/E
MC
S
urve
y
TP
C F
EC
TO
F/
PH
OS
/EM
C
co
oli
ng
Mu
on
TR
K:
bu
s-p
atch
es
Google Street View from 12:00 on (until evening)
SPIE: cabling UX25-CR4
Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30Maintenance AS 715 (CRs) 9:30 to 11:30
Visit 10:00 (16 persons). Resp. Naomi van der Kolk
Start 9:30
14/1/11 ALICE planning meeting 150
Activities in UX25 - Week 3 - 19/1 Wednesday
Cooling towers maintenance (No primary water)
Maintenance UX25, Muon TRK-TRG ventilation
Maintenance harmonic filter (EOF128/2X)
TR
D/E
MC
S
urve
y
TP
C F
EC
TO
F/
PH
OS
/EM
C
co
oli
ng
PHOScooling
Mu
on
TR
K:
bu
s-p
atch
es
Visit: (23 students). Dutch high school. About 14:00-17:00. (P. Kuijer)
Google Street View ZDF (9:00)
SPIE: cabling UX25-CR4
TOF
TOF: re-cable 2 crates SM2-3
14/1/11 ALICE planning meeting 152
Activities in UX25 - Week 3 - 20/1 Thursday
Cooling towers maintenance (No primary water)
Maintenance L3, UX25, Muon TRK-TRG ventilation
AUG test. No access UX25
VIP visit (12:00: 12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany
14/1/11 ALICE planning meeting 154
Activities in UX25 - Week 3 - 21/1 Friday
Restart primary water
Maintenance L3, UX25, Muon TRK-TRG ventilation
Clo
se 1
doo
r
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Check ACORDE modules (PMTs optical connections, connectors, etc)
TP
C F
EC
14/1/11 ALICE planning meeting 155
Activities in MNF - Week 3 - 21/1 Friday
No
acc
ess
L3
(no
ven
tila
tio
n)
14/1/11 ALICE planning meeting 156
Activities in UX25 - Week 3 - 22/1 Saturday
No access L3(no ventilation)
Clo
se d
oors
ACO
14/1/11 ALICE planning meeting 157
Activities in MNF - Week 3 - 22/1 Saturday
No
acc
ess
L3
(no
ven
tila
tio
n)
14/1/11 ALICE planning meeting 158
Activities in UX25 - Week 3 - 23/1 Sunday
No access L3(no ventilation)
14/1/11 ALICE planning meeting 159
Activities in MNF - Week 3 - 23/1 Sunday
No
acc
ess
L3
(no
ven
tila
tio
n)
14/1/11 ALICE planning meeting 161
Activities in UX25 - Week 4 - 24/1 Monday
No access L3(no ventilation)
L3 and PMD
ventilation
Maintenance UX25, Muon TRK-TRG ventilation and L3-Dipole cooling
SPD cooling
Reconnect pipes
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Peter Ginter. Whole week
14/1/11 ALICE planning meeting 162
Activities in MNF - Week 4 - 24/1 Monday
No
acc
ess
L3
(no
ven
tila
tio
n)
PMD ventilation
SPD cooling
SPD: test with dummy sector
14/1/11 ALICE planning meeting 163
Activities in UX25 - Week 4 – 25/1 Tuesday
L3 and PMD
ventilation
No access L3(no ventilation)
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Maintenance UX25, Muon TRK-TRG ventilation and L3-Dipole cooling
14/1/11 ALICE planning meeting 164
Activities in MNF - Week 4 - 25/1 Tuesday
SPD cooling
PMD ventilation
No
acc
ess
L3
(no
ven
tila
tio
n)
14/1/11 ALICE planning meeting 165
Activities in UX25 - Week 4 - 26/1 Wednesday
Green bridge
TP
C F
EC
PMD ventilation
Reinstall CROCUS platform
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Maintenance L3-Dipole cooling
HMPID
Pneumatic valves, and fix radiator
Replace the heat exchanger module and the filters
TPC RR
14/1/11 ALICE planning meeting 166
Activities in MNF - Week 4 - 26/1 Wednesday
SPD cooling
PMD ventilation
14/1/11 ALICE planning meeting 167
Activities in UX25 - Week 4 - 27/1 Thursday
Green bridge
TP
C F
EC
PMD ventilation
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Maintenance L3-Dipole cooling
L3-Dipole powering test (after 17:00). Tbc
HMPID
TPC RR
14/1/11 ALICE planning meeting 168
Activities in MNF - Week 4 - 27/1 Thursday
SPD cooling
PMD ventilation
14/1/11 ALICE planning meeting 169
Activities in UX25 - Week 4 - 28/1 Friday
MNF wall
TP
C F
EC
Green bridge
Mu
on
TR
K:
bu
s-p
atch
es
ACO
Intervention L3 lift. No access UX25 after 17:00
HMPID
TPC RR
14/1/11 ALICE planning meeting 170
Activities in MNF - Week 4 - 28/1 Friday
PM
D:
mo
ve
det
ecto
r to
fin
al
po
siti
onSPD
cooling
Move PMD to final position
14/1/11 ALICE planning meeting 171
Activities in UX25 - Week 4 - 29/1 Saturday
Intervention L3 lift. No access UX25 whole day
14/1/11 ALICE planning meeting 176
Activities in UX25 - Week 5 - 31/1 Monday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
Maintenance PX24 PAD (guard 8:00 to 18:00)
TP
C F
EC
Normal hours
Mu
on
TR
K:
bu
s-p
atch
es
Normal hours
14/1/11 ALICE planning meeting 177
Activities in MNF - Week 5 - 31/1 Monday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PM
D:
acce
ss t
o
CR
OC
US
Use CROCUS platform
PM
D s
urv
ey
14/1/11 ALICE planning meeting 178
Activities in UX25 - Week 5 – 1/2 Tuesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
14/1/11 ALICE planning meeting 179
Activities in MNF - Week 5 - 1/2 Tuesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PM
D:
acce
ss t
o
CR
OC
US
14/1/11 ALICE planning meeting 180
Activities in UX25 - Week 5 - 2/2 Wednesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
Continue the work with amplifiers (from C-side) and with the electronics (rack 018,019). After 18:00
T0
14/1/11 ALICE planning meeting 181
Activities in MNF - Week 5 - 2/2 Wednesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PM
D:
acce
ss t
o
CR
OC
US
14/1/11 ALICE planning meeting 182
Activities in UX25 - Week 5 - 3/2 Thursday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
T0
14/1/11 ALICE planning meeting 183
Activities in MNF - Week 5 - 3/2 Thursday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PM
D:
acce
ss t
o
CR
OC
US
14/1/11 ALICE planning meeting 184
Activities in UX25 - Week 5 - 4/2 Friday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
TP
C F
EC
Mu
on
TR
K:
bu
s-p
atch
es
T0
Return to Meyrin
14/1/11 ALICE planning meeting 185
Activities in MNF - Week 5 - 4/2 Friday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PM
D:
acce
ss t
o
CR
OC
US
14/1/11 ALICE planning meeting 186
Activities in UX25 - Week 5 - 5/2 Saturday
Access in general mode
14/1/11 ALICE planning meeting 191
Activities in UX25 - Week 6 - 7/2 Monday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
MNF shielding
ITECO
HAULOTTE
14/1/11 ALICE planning meeting 192
Activities in MNF - Week 6 - 7/2 Monday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
14/1/11 ALICE planning meeting 193
Activities in UX25 - Week 6 – 8/2 Tuesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PX24 shielding beams
8:00 to 18:00: no access CR1-5 and Exhibition
14/1/11 ALICE planning meeting 194
Activities in MNF - Week 6 - 8/2 Tuesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
14/1/11 ALICE planning meeting 195
Activities in UX25 - Week 6 - 9/2 Wednesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PX24 shielding beams
8:00 to 18:00: no access CR1-5 and Exhibition
Muon TRG
Upgrade firmware DARC and Regional board in order to speed up MTR decision electronics configuration. Might need some short (~1/2 hours) access during the restricted access hours
14/1/11 ALICE planning meeting 196
Activities in MNF - Week 6 - 9/2 Wednesday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
14/1/11 ALICE planning meeting 197
Activities in UX25 - Week 6 - 10/2 Thursday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PX24 shielding blocks
8:00 to 18:00: no access CR5
Muon TRG
14/1/11 ALICE planning meeting 198
Activities in MNF - Week 6 - 10/2 Thursday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
14/1/11 ALICE planning meeting 199
Activities in UX25 - Week 6 - 11/2 Friday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
PX24 shielding blocks
8:00 to 18:00: no access CR5
14/1/11 ALICE planning meeting 200
Activities in MNF - Week 6 - 11/2 Friday
8:00 – 18:00 access in restricted mode
18:00 – 8:00 access in general mode
14/1/11 ALICE planning meeting 206
Activities in UX25 - Week 7 - 14/2 Monday
TPC: Kr data taking
Sur
vey
ST
4-5
Sur
vey
ST
2
14/1/11 ALICE planning meeting 210
Activities in UX25 - Week 7 - 16/2 Wednesday
Maintenance AS 703 (UX-25) 7:30 to 9:30. No access to UX-25 from 7:30 to 9:30Maintenance AS 715 (CRs) 9:30 to 11:30
TPC: Kr data taking
14/1/11 ALICE planning meeting 214
Activities in UX25 - Week 7 - 18/2 Friday
Patrol UX25 cavern
TPC: Kr data taking
14/1/11 ALICE planning meeting 216
Activities in UX25 - Week 7 - 19/2 Saturday
Restart LHC – NO ACCESS
14/1/11 ALICE planning meeting 217
Activities in MNF - Week 7 - 19/2 Saturday
Restart LHC – NO ACCESS
14/1/11 ALICE planning meeting 218
Activities in UX25 - Week 7 - 20/2 Sunday
Restart LHC – NO ACCESS
14/1/11 ALICE planning meeting 220
VIP visits
• 7/12 14:00 to 15:00: portuguese press visit to CERN. 10 persons.F.Baltasar
• 15/12 16:30: finance and Council Delegates
• 10/1 (16:15): Mr Herman Josef Lamberti, Deutsche Bank, Germany
• 20/1 (12:00): Mr Michael Boddenberg, Hessischer Minister für Bundesangelegenheiten und Bevollmächtigter des Landes beim Bund, Hessen, Germany