Ali Nov 016

9
ALI MOHAMED OMAR Member of Association of Proposal Management Professional Riyadh +966-562944551 [email protected] [email protected] Career summery I am a Senior Mechanical Engineer. Experience of 20 Years. Work field is M.E.P Construction (Implementation Technical Office Tendering ). Currently working in AICC as MEP Manager. Education Bachelor of, Mechanical Engineering (Power Dept.), 1996 Helwan University, Egypt. Experience Summery

Transcript of Ali Nov 016

Page 1: Ali Nov 016

ALI MOHAMED OMAR

Member of Association of Proposal Management Professional Riyadh

[email protected]

[email protected]

Career summery I am a Senior Mechanical Engineer. Experience of 20 Years. Work field is M.E.P Construction (Implementation – Technical

Office – Tendering). Currently working in AICC as MEP Manager.

Education Bachelor of, Mechanical Engineering (Power Dept.), 1996Helwan University, Egypt.

Experience Summery

As a Design & Studies Manager: I Evaluated project related design costs and advice on cost reduction and

control measures. I Guided design team through the process, check for code compliance, and

maintained Reporting required at different phases of project.  Supervise CAD designers for the preparation of Shop drawings.  Supervise and provide guidance and direction to team engineers.  Liaising with internal and external stakeholders including; other team

members, clients, contractors, other consultants, local authorities.  Direct, evaluate and develop staff. Producing contractual documents for any variations, sub-contractors and

future prospects. I contributed in establishing Dept. Policy & Procedures in coordination

with other levels of supervision.

Page 2: Ali Nov 016

As a Project Manager: Working out various requirements & monitoring overall project operations

for ensuring timely completion. Supervising on-site construction activities to ensure completion of project

within time & cost parameters and effective resource utilization to maximize the output.

Manage day-to-day operational aspects of a project and scope Ensures project documents are complete, current, and stored appropriately.  Ensure timely and accurate invoicing and Monitor receivables for project. Time Scheduling for all relative activities.

Current Job

Al Ayuni Investment & Contracting Saudi Arabia – Riyadh

MEP Manager (Execution)Reporting to: Building & Industrial Construction Director (BID).

Duration: 1st of March - 2016 – till now

Participate in establishing the MEP Division Processes & work flow, Job descriptions, in addition to the Look ahead Capability improvement plans.

Working out various requirements & monitoring overall project operations.

Supervising on-site construction activities and effective resource utilization to maximize the output.

Ensures project documents are complete, current, and stored appropriately.  Ensure timely and accurate invoicing and Monitor Deliverables of projects.

Previous Jobs:

DOMATHAH FOR M.E.P. CONTRACTING Saudi Arabia – Riyadh

Studies ManagerReporting to: General Manager.

Duration: Dec. - 2013 – Jan. 2016

(I have successfully submitted near 150 proposals - Total Value (1.7+) Billion SR)

I managed Tendering engineers to estimate projects costs, for MEP scope.

Page 3: Ali Nov 016

Deep study of technical documents and drawings, to make sure proposals are accurate.

Contribution in developing Templates and Sheets for Price analysis (involving; Materials, Accessories, Labor, Handling, site mobilization, etc.).

Preparing Data Base sheets for Material Prices (Updated). Keeping record for projects awarded, and Monitoring lost projects (with

justification of loss).

Design ManagerMy work Involves:

 Managing CAD designers for the preparation of design drawings. Supervising & Guiding Department engineers to successfully produce

required Drawings, Technical Submittals, calculations, design checking, .  Coordinating with related stakeholders including; other team members,

clients, Procurement , consultants, local authorities Improving the dept. team using more responsibility strategy and more

Delegation.

SEDER Construction. Saudi Arabia – RiyadhHead of Mechanical Dept.

For the following projects (King Fahad Medical City, Qatif special Security Forces Head Quarter)

M.E.P. Project ManagerReporting to: M.E.P Division Manager

October 2011up to June 2013

Special Security Forces Facility Head Quarter – Salboukh.(Project Value is: 100 M SR)

I have been managing Execution of All MEP Disciplines includes (HVAC, Fire Fighting, Plumbing, Refrigeration, All Mechanical Works like Dock Levelers, Washing Hoist, Petrol Station equipment's, Compressed Air system, Swimming Pools, irrigation system)

I monitored and controlled all MEP activities, the project was completed within the schedule time with minor snags.

Day-to-day operational aspects were managed closely. Ensure timely and accurate invoicing

Page 4: Ali Nov 016

I Effectively managed Resources (Manpower, Equipment’s, Tools subcontractor)

Abd Al Rahim Anbar Est. for Contracting Saudi Arabia – Riyadh

Projects ManagerReporting to: General Manager

11/2009 Up to 10-2011

Supervising on-site construction activities to ensure completion of project within time & cost parameters and effective resource utilization to maximize the output

Dar Al Khiyoul for Contracting (AL OTHAIM) Saudi Arabia – Riyadh

MEP Dept. DirectorReporting to: C.E.O

Nov. / 2006 Up To Nov. /2009

Project: Most of Al Othaim Projects (Dammam Mall, Rabwa Mall. Vegetable & Meat Cold Store Factory, Al Othaim ResidentialCompound,) (Gulf Hygienic Stores)Job Description : Responsible for Managing the Electromechanical Dpt., Projects Study Technically & Financially, Contractors Evaluation, Pricing, Following up with all Mechanical Engineers in the Department, Evaluation Reports for their Performance. Work includes (HVAC, Fire Fighting, Plumbing, Refrigeration, and All Mechanical Works Related to Each Project, such as, Elevators, Escalators, Hydraulic Dock Levelers & Shelters, Sectional Doors, RO Plants, Air Compressors, and Boilers.)

AL AHRAM CONTRACTING Co. Saudi Arabia – Riyadh

Technical Office director.May 10 / 2006 to Nov. 12 / 2006

Page 5: Ali Nov 016

Job Description : Supervise CAD designers for the preparation of design drawings for Fire Fighting and Fire Alarm Systems installations for all Company Projects

Egypt Experience:

SALAH IMAM for Trading & Contracting Cairo - Egypt Project Mechanical Engineer.

12th of August 2003 to 5th May 2006.

Rehabilitation of Revolution Leadership Council Building.Job Description: HVAC, Fire Fighting & Plumbing.

CLIMATEAssistant Project Manager for HVAC Work.

1st of June 2001 to April 2003.

EGPC New Administration building Alexandria. EgyptJob Description: Supervise Installation of Chilled Water System (700 TR CoolingCapacity) Using ABSORPTION WATERCOOLED CHILLERS

Club house (El Obour City). Cairo EgyptTitle : Project Engineer for HVAC Work.Job Description: Installation of Chilled Water System.

EMIRATES TRADING AGENCY (E.T.A.) Site Engineer.

1st of July 1999 till 30th of June 2001 Four Seasons Resort. Sharm Al Sheikh - Egypt Job Description: Installation of Different HVAC Systems (VRV System, Chilled Water System, DX Split System)

Other Experience

2 Years' experience in Sales, Caterpillar MANTRAC, and

Page 6: Ali Nov 016

Mercedes MCV

Language Skills

Mother Tongue Language Arabic.Fluent in Written and Spoken English.

Training Courses.

(Member of Association of Proposal Management Professional ) PMP Preparation Certificate 2016 FIDIC Standard Contracts 2015 Preparation LEED Green Associate examination preparation 2015 Planning Management 2010 Performance Management 2010 Delegation Skills 2010 HVAC Design Course in the Engineers Syndicate 2003 Fire Fighting Design Course in the Engineers Syndicate 2003

Personal Data

Date of Birth : 1972 Place of Birth : Cairo. Nationality : Egyptian. Marital Status : Married. 3 Children

ReferencesAvailable Upon Request.