ALE-(Bldg Techpres Part1)
-
Upload
andro-madrogaba -
Category
Documents
-
view
218 -
download
0
Transcript of ALE-(Bldg Techpres Part1)
![Page 1: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/1.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 1/490
A roofing tile which has the shape of an “S” laid on its side is a
Mission tile
pantile
French tile
![Page 2: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/2.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 2/490
A roofing tile which has the shape of an “S” laid on its side is a
Mission tile
pantile
French tile
![Page 3: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/3.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 3/490
![Page 4: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/4.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 4/490
That part of the building foundation which forms thepermanent retaining wall of the structure below grade is
a
foundation course
grade beam
foundation wall
![Page 5: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/5.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 5/490
Joint employed to reduce restraint by accommodating movementof masonry walls are known as
cold joints
control joints
block outs
![Page 6: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/6.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 6/490
Joint employed to reduce restraint by accommodating movementof masonry walls are known as
cold joints
control joints
block outs
![Page 7: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/7.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 7/490
A system of framing a building in which the studs arecontinuous to roof supporting second floor joints is
known as
post and beam
western framing
balloon framing
![Page 8: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/8.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 8/490
A system of framing a building in which the studs arecontinuous to roof supporting second floor joints is
known as
post and beam
western framing
balloon framing
![Page 9: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/9.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 9/490
Rough plaster finish obtained by flinging plaster on a wall with ahand operated machine is
tryolean finish
trowel finish
broom stripped finish
![Page 10: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/10.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 10/490
Rough plaster finish obtained by flinging plaster on a wall with ahand operated machine is
tryolean finish
trowel finish
broom stripped finish
![Page 11: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/11.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 11/490
A principal member of the truss which extends from one end to theother primarily to resist bending is a
web member
girt
chord
![Page 12: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/12.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 12/490
A principal member of the truss which extends from one end to theother primarily to resist bending is a
web member
girt
chord
![Page 13: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/13.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 13/490
A protein: the chief nitrogenous ingredient in milk is
Casein
Tempera
alabaster
![Page 14: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/14.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 14/490
A protein: the chief nitrogenous ingredient in milk is
Casein
Tempera
alabaster
![Page 15: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/15.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 15/490
a composition of two or more metals fused together usually toobtain a desired property
annealing
alloy
built-up
![Page 16: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/16.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 16/490
a composition of two or more metals fused together usually toobtain a desired property
annealing
alloy
built-up
![Page 17: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/17.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 17/490
The horizontal distance from the face of a lock or latch to thecenter of the knob or lock cylinder
Backset
backfill
built-up
![Page 18: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/18.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 18/490
The horizontal distance from the face of a lock or latch to thecenter of the knob or lock cylinder
Backset
backfill
built-up
![Page 19: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/19.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 19/490
A commercially pure iron of fibrous nature, valued for its corrosionresistance and ductility is
cast iron
black iron
wrought iron
![Page 20: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/20.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 20/490
A commercially pure iron of fibrous nature, valued for its corrosionresistance and ductility is
cast iron
black iron
wrought iron
![Page 21: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/21.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 21/490
The Filipino term for horizontal stud is
Pabalagbag
Tahilan
pilareta
![Page 22: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/22.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 22/490
The Filipino term for horizontal stud is
Pabalagbag
Tahilan
pilareta
![Page 23: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/23.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 23/490
The Filipino term for riser
Muldura
takip silipan
planehuelda
![Page 24: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/24.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 24/490
The Filipino term for riser
Muldura
takip silipan
planehuelda
![Page 25: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/25.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 25/490
The Filipino term for collar plate is
Hardinera
Guililan
sinturon
![Page 26: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/26.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 26/490
The Filipino term for collar plate is
Hardinera
Guililan
sinturon
![Page 27: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/27.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 27/490
The Filipino term for temper (metal work)
Suban
Espolon
poleva
![Page 28: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/28.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 28/490
The Filipino term for temper (metal work)
Suban
Espolon
poleva
![Page 29: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/29.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 29/490
The Filipino term for plumb line is
Pantilya
Asintada
hulog
![Page 30: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/30.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 30/490
The Filipino term for plumb line is
Pantilya
Asintada
hulog
![Page 31: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/31.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 31/490
A beam that projects beyond one or both its support
continuous
cantiliver
tie
![Page 32: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/32.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 32/490
A beam that projects beyond one or both its support
continuous
cantiliver
tie
![Page 33: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/33.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 33/490
A wall (bearing or non-bearing) designed to resist lateral forcesparallel to the wall
non-bearing
prefabricated
shear
![Page 34: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/34.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 34/490
![Page 35: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/35.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 35/490
Using stair tread-riser proportion formula RT = 75, given riserequals 6 ¼ “ how many risers will there be between two floors
having floor line to floor line distance of 7.8125 feet?
15
17
19
![Page 36: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/36.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 36/490
Using stair tread-riser proportion formula RT = 75, given riserequals 6 ¼ “ how many risers will there be between two floors
having floor line to floor line distance of 7.8125 feet?
15
17
19
![Page 37: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/37.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 37/490
A modern method of installing wood parquet flooring on woodenboards sub-flooring is by
gluing/pasting
nailing into battens
wainscoting
![Page 38: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/38.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 38/490
A modern method of installing wood parquet flooring on woodenboards sub-flooring is by
gluing/pasting
nailing into battens
wainscoting
![Page 39: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/39.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 39/490
The standard height of window sills for office rooms in upper floorsis
1.2 meters
0.60 meters
0.90 meters
![Page 40: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/40.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 40/490
The standard height of window sills for office rooms in upper floorsis
1.2 meters
0.60 meters
0.90 meters
![Page 41: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/41.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 41/490
The dimension of commercial acoustic boards foraluminum T-runners used for dropped-ceiling in offices
is
30” x 60” x 1”
24” x 50” x 7/8”
24” x 48” x ½”
![Page 42: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/42.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 42/490
![Page 43: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/43.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 43/490
The total floor area 16 feet wide by 60 feet deep needs one inch(1”) x 4”(commercial size) T & G flooring. Assuming that the
available T & G is 1” x 4” x 16” and the effective width is 3.5” , the
total board feet needed is
1,280 bf
1,098 bf
1,330 bf
![Page 44: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/44.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 44/490
The total floor area 16 feet wide by 60 feet deep needs one inch(1”) x 4”(commercial size) T & G flooring. Assuming that the
available T & G is 1” x 4” x 16” and the effective width is 3.5” , the
total board feet needed is
1,280 bf
1,098 bf
1,330 bf
![Page 45: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/45.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 45/490
In the design of a large shopping centers where space is required,intervals of columns can be wider than the ordinary by adopting a
structural method of construction called
compressioning
post-tensioning
pre-casting
![Page 46: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/46.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 46/490
In the design of a large shopping centers where space is required,intervals of columns can be wider than the ordinary by adopting a
structural method of construction called
compressioning
post-tensioning
pre-casting
![Page 47: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/47.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 47/490
![Page 48: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/48.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 48/490
Humidification and condensation in exterior walls can be minimizedby
providing stud space between exterior finish and interior finish
providing building paper sheathing
providing building paper sheathing and space filled
![Page 49: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/49.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 49/490
Heat gain through the structure of a habitable room occur intropical region at walls and roofs by conduction. This can be
minimized by the use of
wood
concrete
steel
![Page 50: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/50.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 50/490
Heat gain through the structure of a habitable room occur intropical region at walls and roofs by conduction. This can be
minimized by the use of
wood
concrete
steel
![Page 51: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/51.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 51/490
A material used to remedy vapor flow
glossy surfaced asphalt saturated paper, 50 lbs or more
wall paper
asbestos cement board
![Page 52: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/52.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 52/490
A material used to remedy vapor flow
glossy surfaced asphalt saturated paper, 50 lbs or more
wall paper
asbestos cement board
![Page 53: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/53.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 53/490
Dry walls do not require appreciable amount of moisture and theyare customarily finished with
mortar and cement
plywood on studs
lath and plaster
![Page 54: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/54.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 54/490
Dry walls do not require appreciable amount of moisture and theyare customarily finished with
mortar and cement
plywood on studs
lath and plaster
![Page 55: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/55.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 55/490
Wallboards or plywood maybe applied over studs. They can also beapplied over CHB masonry wall by using
wood battens
furring
sheathing
![Page 56: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/56.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 56/490
Wallboards or plywood maybe applied over studs. They can also beapplied over CHB masonry wall by using
wood battens
furring
sheathing
![Page 57: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/57.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 57/490
Identify the miter joint from the following
![Page 58: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/58.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 58/490
![Page 59: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/59.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 59/490
To turn back water whenever joints occur in which dissimilarmaterials come together, it is necessary to provide
flashing material
binding material
counter flushing
![Page 60: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/60.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 60/490
To turn back water whenever joints occur in which dissimilarmaterials come together, it is necessary to provide
flashing material
binding material
counter flushing
![Page 61: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/61.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 61/490
The part of a foundation system which supports the exterior wallsof a superstructure and bears directly on the column footing is a
foundation course
grade beam
foundation wall
![Page 62: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/62.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 62/490
The part of a foundation system which supports the exterior wallsof a superstructure and bears directly on the column footing is a
foundation course
grade beam
foundation wall
![Page 63: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/63.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 63/490
A narrow strip of wood applied to cover a joint along the edges oftwo parallel boards in the same plane is a
fillet
cant strip
batten
![Page 64: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/64.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 64/490
A narrow strip of wood applied to cover a joint along the edges oftwo parallel boards in the same plane is a
fillet
cant strip
batten
![Page 65: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/65.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 65/490
The stressing of unbounded tendons after concrete has cured is
post-tensioning
pre-casting
lift slab
![Page 66: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/66.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 66/490
The stressing of unbounded tendons after concrete has cured is
post-tensioning
pre-casting
lift slab
![Page 67: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/67.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 67/490
The boxing in of covering a joist, beam or girder to give theappearance of a larger beam is known as
beam formworks
beam blocking
grade beam
![Page 68: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/68.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 68/490
The boxing in of covering a joist, beam or girder to give theappearance of a larger beam is known as
beam formworks
beam blocking
grade beam
![Page 69: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/69.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 69/490
A system of framing a building on which floor joists of each storeyrest on the top plates of the storey below and the bearing wallsand partitions rest on the subfloor of each storey is known as
balloon framing
flank framing
western framing
![Page 70: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/70.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 70/490
A system of framing a building on which floor joists of each storeyrest on the top plates of the storey below and the bearing wallsand partitions rest on the subfloor of each storey is known as
balloon framing
flank framing
western framing
![Page 71: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/71.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 71/490
Pressure exerted against the underground portion of a buildingcreated by the presence of water in the soil is known as
soil bearing pressure
hydrostatic pressure
atmospheric pressure
![Page 72: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/72.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 72/490
Pressure exerted against the underground portion of a buildingcreated by the presence of water in the soil is known as
soil bearing pressure
hydrostatic pressure
atmospheric pressure
![Page 73: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/73.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 73/490
A window which projects outside the main line of a building andthe compartment in which it is located extends to the floor is
known as
bay window
hopper window
oriel window
![Page 74: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/74.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 74/490
A window which projects outside the main line of a building andthe compartment in which it is located extends to the floor is
known as
bay window
hopper window
oriel window
![Page 75: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/75.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 75/490
![Page 76: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/76.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 76/490
A form of brick bond in which each course is alternately composedof entirely of headers or of stretchers is known as
common bond
flemish bond
english bond
![Page 77: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/77.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 77/490
A joint formed when a concrete surface hardens before the nextbatch of concrete is placed against it is
block out
cold joint
control joint
![Page 78: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/78.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 78/490
A joint formed when a concrete surface hardens before the nextbatch of concrete is placed against it is
block out
cold joint
control joint
![Page 79: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/79.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 79/490
An iron alloy usually including carbon and silicon which has highcompressive strength but low tensile strength is
pig iron
cast iron
wrought iron
![Page 80: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/80.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 80/490
An iron alloy usually including carbon and silicon which has highcompressive strength but low tensile strength is
pig iron
cast iron
wrought iron
![Page 81: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/81.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 81/490
The Filipino term for plastered course is
lastilyas
moneyka
kusturada
![Page 82: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/82.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 82/490
The Filipino term for plastered course is
lastilyas
moneyka
kusturada
![Page 83: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/83.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 83/490
![Page 84: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/84.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 84/490
![Page 85: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/85.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 85/490
The Filipino term for perlin is
tahilan
balangkas
reostra
![Page 86: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/86.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 86/490
The Filipino term for perlin is
tahilan
balangkas
reostra
![Page 87: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/87.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 87/490
The Filipino term for eave is
sopo
tabike
sibe
![Page 88: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/88.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 88/490
The Filipino term for eave is
sopo
tabike
sibe
![Page 89: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/89.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 89/490
The Filipino term for top chord is
tahilan
baytang
sinturon
![Page 90: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/90.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 90/490
The Filipino term for top chord is
tahilan
baytang
sinturon
![Page 91: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/91.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 91/490
The capacity of a wall to hold moisture is important in the designof dwelling units. Select the best material which will reduce
moisture in a wall when used
CHB S-cut joint finish
1” thick V-cut wood boards
Synthetic adobe finish on R.C. wall
![Page 92: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/92.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 92/490
The capacity of a wall to hold moisture is important in the designof dwelling units. Select the best material which will reduce
moisture in a wall when used
CHB S-cut joint finish
1” thick V-cut wood boards
Synthetic adobe finish on R.C. wall
![Page 93: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/93.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 93/490
Plaster or plywood ceiling on nailers or joists below a ventilatedroof space may show “pattern staining” on the ceiling. This can be
prevented by
cleaning
adequate insulation
re-painting
![Page 94: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/94.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 94/490
Plaster or plywood ceiling on nailers or joists below a ventilatedroof space may show “pattern staining” on the ceiling. This can be
prevented by
cleaning
adequate insulation
re-painting
![Page 95: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/95.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 95/490
Heat gain through the walls in buildings exposed to afternoon sunintensifies discomfort of inhabitants because of conductivity.
However, this can be minimized by the use of
combination of wood boards and plywood with cavity between
thick reinforced concrete wall
steel sheets
![Page 96: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/96.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 96/490
Heat gain through the walls in buildings exposed to afternoon sunintensifies discomfort of inhabitants because of conductivity.
However, this can be minimized by the use of
combination of wood boards and plywood with cavity between
thick reinforced concrete wall
steel sheets
![Page 97: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/97.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 97/490
Sound or noise between bedrooms may be reduced by using lessexpensive materials with the application of construction techniques
double wall plywood on horizontal and vertical studs with absorbents
solid 6” R.C. wall
sawali on 2” x 2” studs
![Page 98: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/98.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 98/490
Sound or noise between bedrooms may be reduced by using lessexpensive materials with the application of construction techniques
double wall plywood on horizontal and vertical studs withabsorbents
solid 6” R.C. wall
sawali on 2” x 2” studs
![Page 99: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/99.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 99/490
The staircase of a house has a total run of 3 meters and a total riseof 2.16 meters, the tread width is 11 inches and riser is 7 7/8”,
therefore, the stringer length is
3.20 meters
3.69 meters
3.75 meters
![Page 100: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/100.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 100/490
The staircase of a house has a total run of 3 meters and a total riseof 2.16 meters, the tread width is 11 inches and riser is 7 7/8”,
therefore, the stringer length is
3.20 meters
3.69 meters
3.75 meters
![Page 101: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/101.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 101/490
Dry walls are customarily finished with
lath and plaster
mortar and hollow blocks
reinforced concrete
![Page 102: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/102.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 102/490
Dry walls are customarily finished with
lath and plaster
mortar and hollow blocks
reinforced concrete
![Page 103: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/103.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 103/490
The riser of a stair is 6 ½ inches. What is the run using formula R/T
= tan (R-3) x 8 degrees
12.2247 inches
12.1000 inches
11.8975 inches
![Page 104: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/104.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 104/490
The riser of a stair is 6 ½ inches. What is the run using formula R/T
= tan (R-3) x 8 degrees
12.2247 inches
12.1000 inches
11.8975 inches
![Page 105: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/105.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 105/490
One method of leveling batterboards without the transit is the useof
¼ Ø plastic hose filled with water
eyesight
plumb bob
![Page 106: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/106.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 106/490
One method of leveling batterboards without the transit is the useof
¼ Ø plastic hose filled with water
eyesight
plumb bob
![Page 107: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/107.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 107/490
A manual method of squaring the corners of a building lines inbuilding layout, is the use of
2-3-4 multiples with the use of transit
3-4-5 multiples with the use of steel tape measure
4-5-4 multiples and strings
![Page 108: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/108.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 108/490
A manual method of squaring the corners of a building lines inbuilding layout, is the use of
2-3-4 multiples with the use of transit
3-4-5 multiples with the use of steel tape measure
4-5-4 multiples and strings
![Page 109: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/109.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 109/490
When dry conditions are demanded of asphalt tile floor finishes onconcrete over earth, apply the waterproofing (WP) steps
felt paper below sub-slab then WP on top of the sub-slab
felt paper below the top slab then WP the earth
WP the earth under slab
![Page 110: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/110.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 110/490
When dry conditions are demanded of asphalt tile floor finishes onconcrete over earth, apply the waterproofing (WP) steps
felt paper below sub-slab then WP on top of the sub-slab
felt paper below the top slab then WP the earth
WP the earth under slab
![Page 111: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/111.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 111/490
Due to temperature effects in materials, concrete walls, slabs oflong buildings, new buildings adjoining existing buildings should be
provided with
flashing
welded joints
expansion joints
![Page 112: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/112.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 112/490
Due to temperature effects in materials, concrete walls, slabs oflong buildings, new buildings adjoining existing buildings should be
provided with
flashing
welded joints
expansion joints
![Page 113: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/113.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 113/490
A typical block or panel type insulating material used in flat roof ofcommercial or industrial building
corkboard
acacia lumber
washed pebbles
![Page 114: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/114.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 114/490
A typical block or panel type insulating material used in flat roof ofcommercial or industrial building
corkboard
acacia lumber
washed pebbles
![Page 115: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/115.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 115/490
What is the height of the RC curtain wall surrounding a water tanklocated at the penthouse whose capacity is 5000 U.S. gallons. The
diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30meters. The wall shall be as high as the water tank.
4.00 meters
4.19 meters
4.16 meters
![Page 116: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/116.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 116/490
What is the height of the RC curtain wall surrounding a water tanklocated at the penthouse whose capacity is 5000 U.S. gallons. The
diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30meters. The wall shall be as high as the water tank.
4.00 meters
4.19 meters
4.16 meters
![Page 117: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/117.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 117/490
Select the grouping one subject of which is a criterion used byarchitects in planning and design of buildings
columns, splices, materials, lot
roofing sheets, function, elevation
concrete, lumber, steel, cement
![Page 118: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/118.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 118/490
Select the grouping one subject of which is a criterion used byarchitects in planning and design of buildings
columns, splices, materials, lot
roofing sheets, function, elevation
concrete, lumber, steel, cement
![Page 119: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/119.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 119/490
Narrow, high ceiling spaces where ceiling area is small comparedto wall area, will normally require acoustical treatment of the
wall or part of several walls
floor and ceiling
ceiling only
![Page 120: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/120.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 120/490
Narrow, high ceiling spaces where ceiling area is small comparedto wall area, will normally require acoustical treatment of the
wall or part of several walls
floor and ceiling
ceiling only
![Page 121: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/121.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 121/490
A ferrous metal that offers great resistance to abrassion and findsimportant use in the cutting edges of heavy digging tools is a
alloy steel
nickel steel
manganese steel
![Page 122: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/122.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 122/490
A ferrous metal that offers great resistance to abrassion and findsimportant use in the cutting edges of heavy digging tools is a
alloy steel
nickel steel
manganese steel
![Page 123: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/123.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 123/490
A building stone of igneous origin and composed of quartz,hornblende and mica is a
travertine
serpentine
granite
![Page 124: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/124.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 124/490
A building stone of igneous origin and composed of quartz,hornblende and mica is a
travertine
serpentine
granite
![Page 125: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/125.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 125/490
A form of brick bond in which the course consists of alternatestretchers and headers in known as
flemish bond
english bond
common bond
![Page 126: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/126.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 126/490
A form of brick bond in which the course consists of alternatestretchers and headers in known as
flemish bond
english bond
common bond
![Page 127: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/127.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 127/490
A system of framing a building on which floor joist ofeach storey rests on the top plates of the storey below
and the bearing walls and partitions rest on the subfloorof each storey is known as
western framing
balloon framing
flank framing
![Page 128: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/128.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 128/490
A system of framing a building on which floor joist ofeach storey rests on the top plates of the storey below
and the bearing walls and partitions rest on the subfloorof each storey is known as
western framing
balloon framing
flank framing
![Page 129: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/129.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 129/490
The Filipino term for rabbet
palitada
asintada
vaciada
![Page 130: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/130.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 130/490
The Filipino term for rabbet
palitada
asintada
vaciada
![Page 131: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/131.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 131/490
The Filipino term for projection is
alahado
bolada
asinta
![Page 132: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/132.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 132/490
The Filipino term for projection is
alahado
bolada
asinta
![Page 133: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/133.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 133/490
Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be
between two levels having a vertical distance of 9’-0”
18 risers
16 risers
17 risers
![Page 134: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/134.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 134/490
Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be
between two levels having a vertical distance of 9’-0”
18 risers
16 risers
17 risers
![Page 135: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/135.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 135/490
A geological or ground condition considered in determining the sizeand type of foundation of the building
soil chemistry
soil bearing pressure
particle size distribution
![Page 136: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/136.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 136/490
![Page 137: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/137.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 137/490
These are materials excellent as vapor barrier in the roofing systemof residential buildings
particle board
lawanit boards
aluminum foil sheets
![Page 138: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/138.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 138/490
These are materials excellent as vapor barrier in the roofing systemof residential buildings
particle board
lawanit boards
aluminum foil sheets
![Page 139: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/139.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 139/490
The chief structural materials, used for tall buildings are
built-up beams, girders, foundations
cement, deformed wrought iron, gravel and sand
reinforced concrete and high grade steel
![Page 140: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/140.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 140/490
The chief structural materials, used for tall buildings are
built-up beams, girders, foundations
cement, deformed wrought iron, gravel and sand
reinforced concrete and high grade steel
![Page 141: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/141.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 141/490
These are classified as good and less expensive insulating materialsused in buildings
glass blocks, 5000 psi concrete
porous concrete, glass fibers, guilt materials
steel plates, marble slabs, granite
![Page 142: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/142.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 142/490
These are classified as good and less expensive insulating materialsused in buildings
glass blocks, 5000 psi concrete
porous concrete, glass fibers, guilt materials
steel plates, marble slabs, granite
![Page 143: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/143.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 143/490
This is a material that holds less moisture, is very light, less waterabsorptive capacity and is very good in sidings of dwelling units
vinyl shingles
asbestos-cement shingles
wood boards
![Page 144: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/144.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 144/490
The toilet bathroom floor finish is designed to be at least one inch
![Page 145: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/145.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 145/490
gbelow the bedroom floor finish. What should be the vertical
distance between the bedroom floor finish and the top line of the2” x 6” yacal floor joists which carry the toilet bath floor systemassuming that ¼” thick mosaic vitrified tiles will be used in the
toilet bathroom on 4” RC slab with membrane waterproofing, usingstandard acceptable measurement of materials for residential
houses
3 ½ inches
3 ¼ inches
6 ¼ inches
The toilet bathroom floor finish is designed to be at least one inch
![Page 146: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/146.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 146/490
gbelow the bedroom floor finish. What should be the vertical
distance between the bedroom floor finish and the top line of the2” x 6” yacal floor joists which carry the toilet bath floor systemassuming that ¼” thick mosaic vitrified tiles will be used in the
toilet bathroom on 4” RC slab with membrane waterproofing, usingstandard acceptable measurement of materials for residential
houses
3 ½ inches
3 ¼ inches
6 ¼ inches
![Page 147: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/147.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 147/490
A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3
horizontal. What is the total length of the top chord, if the span oftruss is 12 meters and the eave is 1.5 meters horizontally?
7.555 meters
7.906 meters
7.567 meters
![Page 148: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/148.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 148/490
A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3
horizontal. What is the total length of the top chord, if the span oftruss is 12 meters and the eave is 1.5 meters horizontally?
7.555 meters
7.906 meters
7.567 meters
![Page 149: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/149.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 149/490
The finished frame surrounding a door is a
door frame
door jamb
door casing
![Page 150: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/150.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 150/490
The finished frame surrounding a door is a
door frame
door jamb
door casing
![Page 151: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/151.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 151/490
A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a
knob bolt
knob latch
knob lock
![Page 152: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/152.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 152/490
A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a
knob bolt
knob latch
knob lock
![Page 153: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/153.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 153/490
A door consisting of two separate leaves, one above the other, thisleaves may operate independently or together is a
dwarf door
dutch door
window door
![Page 154: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/154.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 154/490
![Page 155: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/155.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 155/490
A joint formed by overlapping the edges of metal sheet or platedand joining them by riveting, soldering or brazing is a
lap joint
lap seam
lap splice
![Page 156: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/156.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 156/490
A joint formed by overlapping the edges of metal sheet or platedand joining them by riveting, soldering or brazing is a
lap joint
lap seam
lap splice
![Page 157: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/157.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 157/490
A clay roofing tile approximately semi cylindrical in shape laid incourses with units having their convex side alternately up and
down is a
pantile
mission tile
roman tile
![Page 158: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/158.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 158/490
![Page 159: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/159.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 159/490
The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a
grade beam
foundation wall
foundation course
![Page 160: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/160.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 160/490
The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a
grade beam
foundation wall
foundation course
![Page 161: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/161.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 161/490
![Page 162: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/162.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 162/490
The wall of Intramuros is
an aqueduct
a fortification
a moat
![Page 163: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/163.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 163/490
The wall of Intramuros is
an aqueduct
a fortification
a moat
![Page 164: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/164.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 164/490
The Filipino term for rafter is
guililan
sepo
kilo
![Page 165: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/165.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 165/490
The Filipino term for rafter is
guililan
sepo
kilo
![Page 166: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/166.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 166/490
The Filipino term for baseboard is
rodapis
perdano
batidora
![Page 167: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/167.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 167/490
The Filipino term for baseboard is
rodapis
perdano
batidora
![Page 168: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/168.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 168/490
A climatic factor that is considered in the structural andarchitectural design of tall buildings
thunderstorm
gusts
lightning
![Page 169: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/169.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 169/490
A climatic factor that is considered in the structural andarchitectural design of tall buildings
thunderstorm
gusts
lightning
![Page 170: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/170.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 170/490
This is a ground condition that determines the size, type and shapeof the building footing/foundation
soil bearing pressure
loam and clay formation
adobe underlay
![Page 171: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/171.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 171/490
This is a ground condition that determines the size, type and shapeof the building footing/foundation
soil bearing pressure
loam and clay formation
adobe underlay
![Page 172: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/172.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 172/490
What is the height of a curtain wall for a downfeedwater tank at the deck roof with 60,000 gallons capacity
and diameter of 3 meters, freeboard of 0.30 meters,shall be as high as the water tank
3.513 meters
3.550 meters
3.625 meters
![Page 173: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/173.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 173/490
What is the height of a curtain wall for a downfeedwater tank at the deck roof with 60,000 gallons capacity
and diameter of 3 meters, freeboard of 0.30 meters,shall be as high as the water tank
3.513 meters
3.550 meters
3.625 meters
![Page 174: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/174.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 174/490
Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings
colored roofing sheets, esthetics, symmetry of windows
columns, doors, windows, split type
concrete, steel and wood, type of floor finish
![Page 175: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/175.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 175/490
Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings
colored roofing sheets, esthetics, symmetry of windows
columns, doors, windows, split type
concrete, steel and wood, type of floor finish
![Page 176: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/176.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 176/490
The most common materials used for roofing of urban residentialhouses
R.C. slabs
wood shingles
G.I. sheets
![Page 177: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/177.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 177/490
The most common materials used for roofing of urban residentialhouses
R.C. slabs
wood shingles
G.I. sheets
![Page 178: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/178.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 178/490
For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested
economical solutions
pre-stressed concrete
reinforced concrete
space frames, light steel skeleton structures
![Page 179: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/179.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 179/490
For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested
economical solutions
pre-stressed concrete
reinforced concrete
space frames, light steel skeleton structures
![Page 180: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/180.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 180/490
Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of
two consecutive steps is the
“going”
“string”
“newel”
![Page 181: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/181.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 181/490
Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of
two consecutive steps is the
“going”
“string”
“newel”
![Page 182: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/182.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 182/490
Noise inside the building is o two kinds, namely,airborne noise and impact noise . Insulation must beprovided against both of these by internal walls and
floors. Examples of better sound insulation are
concrete hollow block walls
¼” double wall on 2” x 4” studs
asbestos board walls on wooden studs
![Page 183: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/183.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 183/490
Noise inside the building is o two kinds, namely,airborne noise and impact noise . Insulation must beprovided against both of these by internal walls and
floors. Examples of better sound insulation are
concrete hollow block walls
¼” double wall on 2” x 4” studs
asbestos board walls on wooden studs
![Page 184: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/184.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 184/490
When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be
used which is installed beneath the concrete slab is
pitch or bituminous felt
gravel coarse
aluminum foil
![Page 185: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/185.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 185/490
When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be
used which is installed beneath the concrete slab is
pitch or bituminous felt
gravel coarse
aluminum foil
![Page 186: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/186.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 186/490
This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in
tropical regions
asbestos cement shingles
vinyl shingles
wood shingles
![Page 187: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/187.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 187/490
This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in
tropical regions
asbestos cement shingles
vinyl shingles
wood shingles
![Page 188: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/188.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 188/490
Standard size overlap for corrugated G.I. roofing is
2 corr.
2 ½ corr.
3 corr.
![Page 189: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/189.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 189/490
Standard size overlap for corrugated G.I. roofing is
2 corr.
2 ½ corr.
3 corr.
![Page 190: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/190.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 190/490
![Page 191: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/191.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 191/490
A continuous recess built into a wall to receive pipes, ducts, etc. iscalled
alcove
ductwork
chase
![Page 192: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/192.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 192/490
A twisting force is
torsion
shear
moment
![Page 193: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/193.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 193/490
A twisting force is
torsion
shear
moment
![Page 194: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/194.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 194/490
A barrier or diaphragm formed to prevent the movement of soil tostabilize foundation, etc. is
pile foundation
sheet piling
retaining wall
![Page 195: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/195.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 195/490
A barrier or diaphragm formed to prevent the movement of soil tostabilize foundation, etc. is
pile foundation
sheet piling
retaining wall
![Page 196: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/196.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 196/490
The term stone-cut refers to a
masonry finish
adobe stone work
wood siding
![Page 197: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/197.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 197/490
The term stone-cut refers to a
masonry finish
adobe stone work
wood siding
![Page 198: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/198.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 198/490
Wood with metal cladding is called
channel strip
reinforced wood
kalamein
![Page 199: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/199.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 199/490
Wood with metal cladding is called
channel strip
reinforced wood
kalamein
![Page 200: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/200.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 200/490
![Page 201: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/201.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 201/490
The Filipino term for floor joist is
suelo
guililan
soleras
![Page 202: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/202.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 202/490
The Filipino term for bottom chord is
tirante
tahilan
madre
![Page 203: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/203.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 203/490
The Filipino term for bottom chord is
tirante
tahilan
madre
![Page 204: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/204.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 204/490
Standard concrete mix for beams, girders, slabs, stairs andcolumns is
“ AA ”
“ A ”
“B”
![Page 205: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/205.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 205/490
Standard concrete mix for beams, girders, slabs, stairs andcolumns is
“ AA”
“ A ”
“B”
![Page 206: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/206.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 206/490
Chord splice connectors for trusses is
split-ring
wood block
fish plate
![Page 207: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/207.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 207/490
Chord splice connectors for trusses is
split-ring
wood block
fish plate
![Page 208: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/208.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 208/490
A vertical line check uses a
meter stick
try square
plumb bob
![Page 209: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/209.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 209/490
A vertical line check uses a
meter stick
try square
plumb bob
![Page 210: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/210.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 210/490
A specialized fastener used to pull on to hold mitered jointstogether is
vise
wood screw
clamp nail
![Page 211: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/211.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 211/490
![Page 212: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/212.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 212/490
Most waterproofed type of mortar joints for wall is
raked
struck
weathered
![Page 213: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/213.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 213/490
![Page 214: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/214.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 214/490
Rafters laid diagonally from corner of a plate or girts to the ridge
jack rafter
valley plate
hip rafter
![Page 215: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/215.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 215/490
Rafters laid diagonally from corner of a plate or girts to the ridge
jack rafter
valley plate
hip rafter
![Page 216: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/216.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 216/490
The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called
form boards
box boards
batter boards
![Page 217: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/217.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 217/490
The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called
form boards
box boards
batter boards
![Page 218: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/218.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 218/490
Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is
lally
composite
cast-in-place
![Page 219: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/219.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 219/490
Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is
lally
composite
cast-in-place
![Page 220: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/220.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 220/490
The Filipino term for ceiling joist is
kostilyahe
tirante
espejo
![Page 221: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/221.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 221/490
The Filipino term for ceiling joist is
kostilyahe
tirante
espejo
![Page 222: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/222.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 222/490
The Filipino term for concrete beam is
biga
guilihan
kilo
![Page 223: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/223.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 223/490
The Filipino term for concrete beam is
biga
guilihan
kilo
![Page 224: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/224.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 224/490
Instrument or tool capable of vertical and horizontal line check iscalled
plumb bob
spirit level
try square
caliper
![Page 225: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/225.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 225/490
Instrument or tool capable of vertical and horizontal line check iscalled
plumb bob
spirit level
try square
caliper
![Page 226: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/226.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 226/490
![Page 227: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/227.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 227/490
The vertical and horizontal surface is reinforced concrete whereconcreting was stopped and continued later is called
expansion joint
control joint
cold joint
construction joint
![Page 228: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/228.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 228/490
A twisting force is
shear
bending
moment
torsion
![Page 229: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/229.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 229/490
A twisting force is
shear
bending
moment
torsion
![Page 230: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/230.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 230/490
A continuous recess built into a wall to receive pipes, ducts, etc. iscalled
alcove
chase
ductworks
pipeline
![Page 231: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/231.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 231/490
A continuous recess built into a wall to receive pipes, ducts, etc. iscalled
alcove
chase
ductworks
pipeline
![Page 232: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/232.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 232/490
It is a special type of plate girder consisting of tees, angles andmultiple web
box girder
hybrid girder
T-flange girder
bridging
![Page 233: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/233.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 233/490
It is a special type of plate girder consisting of tees, angles andmultiple web
box girder
hybrid girder
T-flange girder
bridging
![Page 234: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/234.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 234/490
When the ratio of short span to the long span of a slab is less than0.50, slab is a
one-way slab
slab on fill
two-way slab
cantilever slab
![Page 235: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/235.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 235/490
When the ratio of short span to the long span of a slab is less than0.50, slab is a
one-way slab
slab on fill
two-way slab
cantilever slab
![Page 236: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/236.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 236/490
![Page 237: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/237.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 237/490
Longitudinal beams which rest on the top chord and preferably atthe joints of the truss
purlins
jack rafter
rafters
girders
![Page 238: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/238.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 238/490
A three-dimensional structural system without bearingwalls composed of interconnected laterally supported soas to function as a complete self-contained unit with or
without the aids of horizontal diaphragms or floor-bracing system
box system
space frame
freeform
braced frame
![Page 239: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/239.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 239/490
![Page 240: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/240.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 240/490
![Page 241: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/241.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 241/490
Concrete slab should have a minimum clearance of
20 mm
40 mm
15 mm
30 mm
![Page 242: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/242.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 242/490
It is designed to resist lateral forces parallel to the plane of thewall
bearing wall
curtain wall
grade wall
shear wall
![Page 243: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/243.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 243/490
It is designed to resist lateral forces parallel to the plane of thewall
bearing wall
curtain wall
grade wall
shear wall
![Page 244: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/244.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 244/490
The section of which the moment changes from positive tonegative is called
neutral axis
inflection point
section of zero shear
maximum moment
h f h h h h f
![Page 245: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/245.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 245/490
The section of which the moment changes from positive tonegative is called
neutral axis
inflection point
section of zero shear
maximum moment
Wh i h i i i i l f d f ?
![Page 246: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/246.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 246/490
What is the appropriate painting material type for wood surfaces?
zinc chromate
alkyd
latex
polyurethane
![Page 247: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/247.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 247/490
Commercially made corrugated G.I. sheets, of gauge 26, having
![Page 248: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/248.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 248/490
standard corrugation are coated both sides with
aluminum coating
laminations
paints
pure virgin spoiter
Commercially made corrugated G.I. sheets, of gauge 26, having
![Page 249: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/249.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 249/490
standard corrugation are coated both sides with
aluminum coating
laminations
paints
pure virgin spoiter
![Page 250: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/250.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 250/490
Wood flooring finishing material
![Page 251: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/251.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 251/490
7 & 6 wood planks
V cut wood planks
gypsum board
ply board panel
What hardware/material is needed to fasten an asphalt strip roofh l d h / l k
![Page 252: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/252.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 252/490
shingle on wooden sheets/planks?
CV nail
staple wire
tekscrew
fin nail
What hardware/material is needed to fasten an asphalt strip roofhi l d h / l k ?
![Page 253: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/253.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 253/490
shingle on wooden sheets/planks?
CV nail
staple wire
tekscrew
fin nail
The time required for the removal of a form works of a concretef ti
![Page 254: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/254.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 254/490
footing
24 hours
36 hours
48 hours
12 hours
The time required for the removal of a form works of a concretef ti
![Page 255: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/255.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 255/490
footing
24 hours
36 hours
48 hours
12 hours
Identify which figure is a dado wood joint
![Page 256: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/256.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 256/490
Identify which figure is a dado wood joint
![Page 257: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/257.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 257/490
Identify which figure is flemish (double stretcher) brickwork
![Page 258: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/258.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 258/490
![Page 259: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/259.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 259/490
Wall partition wooden framing is called
![Page 260: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/260.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 260/490
joist
jambs
studs
nailers
Wall partition wooden framing is called
![Page 261: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/261.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 261/490
joist
jambs
studs
nailers
How many corrugation is required as the minimum side lap of anordinary standard G I sheet roofing?
![Page 262: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/262.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 262/490
ordinary standard G.I. sheet roofing?
1 ½
2 ½
2
1
How many corrugation is required as the minimum side lap of anordinary standard G I sheet roofing?
![Page 263: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/263.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 263/490
ordinary standard G.I. sheet roofing?
1 ½
2 ½
2
1
![Page 264: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/264.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 264/490
Identify which letter in the target is a valley jack rafter?
![Page 265: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/265.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 265/490
What is the appropriate paint material for G.I. sheet roofing?
![Page 266: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/266.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 266/490
alkyd typeacrylic latex type
lacquer type
urethane
What is the appropriate paint material for G.I. sheet roofing?
![Page 267: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/267.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 267/490
alkyd typeacrylic latex type
lacquer type
urethane
Identify which figure is a dado wood joint
![Page 268: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/268.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 268/490
Identify which figure is a dado wood joint
![Page 269: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/269.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 269/490
The paint finishing material of long-span pre-painted roofing sheetis
![Page 270: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/270.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 270/490
is
acrylic paintduco paint
polyester paint
automotive paint
The paint finishing material of long-span pre-painted roofing sheetis
![Page 271: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/271.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 271/490
is
acrylic paintduco paint
polyester paint
automotive paint
What hardware/material is needed to fasten corrugated asbestoscement roofing sheet on a steel purlin
![Page 272: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/272.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 272/490
cement roofing sheet on a steel purlin
metal screwL hook bolt
m bolt
aluminum screw
What hardware/material is needed to fasten corrugated asbestoscement roofing sheet on a steel purlin
![Page 273: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/273.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 273/490
cement roofing sheet on a steel purlin
metal screwL hook bolt
m bolt
aluminum screw
A common paint film defect where progressive powdering from thesurface inward occurs. It is called
![Page 274: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/274.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 274/490
surface inward occurs. It is called
blisteringpeeling
chalking
alligatoring
A common paint film defect where progressive powdering from thesurface inward occurs. It is called
![Page 275: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/275.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 275/490
blisteringpeeling
chalking
alligatoring
Identify which figure is a blind and sub-mortise and tenon joint
![Page 276: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/276.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 276/490
Identify which figure is a blind and sub-mortise and tenon joint
![Page 277: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/277.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 277/490
![Page 278: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/278.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 278/490
A joint where two successive placement of concrete meet is called
![Page 279: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/279.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 279/490
truss jointcontraction joint
construction joint
expansion joint
A wall which supports vertical loads in addition to its weight
without the benefit of a complete vertical load carrying space
![Page 280: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/280.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 280/490
p y g pframe is called
retaining wallcurtain wall
shearing wall
bearing wall
A wall which supports vertical loads in addition to its weight
without the benefit of a complete vertical load carrying space
![Page 281: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/281.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 281/490
p y g pframe is called
retaining wallcurtain wall
shearing wall
bearing wall
A type of concrete floor which has no beam is called
![Page 282: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/282.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 282/490
flat slab2-way slab
one way slab
ribbed floor
A type of concrete floor which has no beam is called
![Page 283: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/283.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 283/490
flat slab2-way slab
one way slab
ribbed floor
A one-way concrete slab are used when
![Page 284: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/284.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 284/490
the slab is being supported by two parallel beamsthe slab has no cantilevered portion
the concrete slab is reinforced on the near bottom side
the concrete slab is sloping to all side
A one-way concrete slab are used when
![Page 285: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/285.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 285/490
the slab is being supported by two parallel beamsthe slab has no cantilevered portion
the concrete slab is reinforced on the near bottom side
the concrete slab is sloping to all side
Level tool is a
![Page 286: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/286.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 286/490
tool used for guiding and testing the work to a vertical and horizontalposition
a tool for checking height elevation
tool used to check the water level
the tool designated the different ranking of tool usage
Level tool is a
![Page 287: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/287.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 287/490
tool used for guiding and testing the work to a vertical andhorizontal position
a tool for checking height elevation
tool used to check the water level
the tool designated the different ranking of tool usage
Steel square is a
![Page 288: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/288.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 288/490
a small try squaretool for testing and for framing work
a steel square for use of signage
tool of the steel man
Steel square is a
![Page 289: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/289.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 289/490
a small try squaretool for testing and for framing work
a steel square for use of signage
tool of the steel man
The vertical surface on face of a stair step is called
![Page 290: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/290.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 290/490
stair clipstair head
nosing
riser
The vertical surface on face of a stair step is called
![Page 291: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/291.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 291/490
stair clipstair head
nosing
riser
Tin shear is a
![Page 292: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/292.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 292/490
painter toolmasonry tool
tinsmithry tool
electrical tool
Tin shear is a
![Page 293: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/293.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 293/490
painter toolmasonry tool
tinsmithry tool
electrical tool
Auger bit is part of
![Page 294: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/294.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 294/490
fastener toolguiding testing tool
bearing tool
rough facing tool
Auger bit is part of
![Page 295: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/295.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 295/490
fastener toolguiding testing tool
bearing tool
rough facing tool
The complete records of test conduction (slump,
compression test, etc.) shall be preserved and madeavailable for inspection during the progress of
![Page 296: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/296.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 296/490
available for inspection during the progress ofconstruction and after completion of the projects for a
period of not less than
5 years3 years
4 years
2 years
The complete records of test conduction (slump, compression test,
etc.) shall be preserved and made available for inspection duringthe progress of construction and after completion of the projects
![Page 297: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/297.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 297/490
the progress of construction and after completion of the projectsfor a period of not less than
5 years3 years
4 years
2 years
Wood board should have a thickness specification of
![Page 298: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/298.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 298/490
not less than 2” thick x 5” and up widenot less than 1” thick x 4” and up wide
not less than 2” thick x 4” and up wide
not less than 3” thick x 7” and up wide
Wood board should have a thickness specification of
![Page 299: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/299.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 299/490
not less than 2” thick x 5” and up widenot less than 1” thick x 4” and up wide
not less than 2” thick x 4” and up wide
not less than 3” thick x 7” and up wide
Wood plank is a piece of lumber that is
![Page 300: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/300.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 300/490
2” to 5” thick 6” to 8” thick
5” to 7” thick
8” up thick
Wood plank is a piece of lumber that is
![Page 301: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/301.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 301/490
2” to 5” thick 6” to 8” thick
5” to 7” thick
8” up thick
The distance from the first to the last riser of a stair flight is called
![Page 302: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/302.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 302/490
spandrelpitch
run
rise
The distance from the first to the last riser of a stair flight is called
![Page 303: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/303.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 303/490
spandrelpitch
run
rise
![Page 304: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/304.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 304/490
A high-speed rotary shaping hand power tool used to make smooth
cutting and curving on solid wood is called
![Page 305: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/305.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 305/490
surface plannerdado place
portable hand router
lathe machine
The major horizontal supporting member of the floor system is
called
![Page 306: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/306.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 306/490
raftergirder
purlin
girt
![Page 307: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/307.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 307/490
Wood defects are heart shake, cup shake, star shake and
![Page 308: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/308.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 308/490
knotsdiscoloration
deterioration
rotten
Wood defects are heart shake, cup shake, star shake and
![Page 309: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/309.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 309/490
knotsdiscoloration
deterioration
rotten
Dressed lumber is referred to
![Page 310: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/310.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 310/490
covered with plastic for shipmentlumber of exact measurement
smoothed or planed lumber
lumber used for fine carpentry works
Dressed lumber is referred to
![Page 311: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/311.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 311/490
covered with plastic for shipmentlumber of exact measurement
smoothed or planed lumber
lumber used for fine carpentry works
The other kind of handsaw other than rip-cut saw is
![Page 312: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/312.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 312/490
diagonal cut sawcross-cut
circular saw
coping saw
The other kind of handsaw other than rip-cut saw is
![Page 313: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/313.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 313/490
diagonal cut sawcross-cut
circular saw
coping saw
Walls that support weight from above as well as their own dead
weight
![Page 314: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/314.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 314/490
load bearing wallscurtain walls
shoring walls
none of the above
Walls that support weight from above as well as their own dead
weight
![Page 315: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/315.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 315/490
load bearing wallscurtain walls
shoring walls
none of the above
It refers to the occupancy load which either partially or fully in
place or may not be present at all is called
![Page 316: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/316.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 316/490
live loaddead load
concentrated load
distributed load
It refers to the occupancy load which either partially or fully in
place or may not be present at all is called
![Page 317: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/317.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 317/490
live loaddead load
concentrated load
distributed load
The distance between inflection point in the column when it breaks
is called
![Page 318: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/318.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 318/490
development lengthcross sectional area
effective length
equivalent distance
The distance between inflection point in the column when it breaks
is called
![Page 319: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/319.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 319/490
development lengthcross sectional area
effective length
equivalent distance
The amount of space measured in cubic units
![Page 320: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/320.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 320/490
none of theseperimeter
volume
area
The amount of space measured in cubic units
![Page 321: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/321.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 321/490
none of theseperimeter
volume
area
An expansion joints adjacent parts of a structure to permit
expected movements between them is called
![Page 322: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/322.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 322/490
contraction jointtruss joint
construction joint
conduction joint
An expansion joints adjacent parts of a structure to permit
expected movements between them is called
![Page 323: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/323.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 323/490
contraction jointtruss joint
construction joint
conduction joint
To find the volume of water in a cylindrical tank, multiply the area
of its base by its
![Page 324: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/324.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 324/490
diameterradius
height
none of these
To find the volume of water in a cylindrical tank, multiply the area
of its base by its
![Page 325: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/325.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 325/490
diameterradius
height
none of these
The most important component to determine the strength of a
concrete mix is
![Page 326: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/326.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 326/490
cementsand
gravel
lime
The most important component to determine the strength of a
concrete mix is
![Page 327: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/327.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 327/490
cementsand
gravel
lime
A beam that projects beyond one or both its support is called
![Page 328: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/328.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 328/490
overhanging beamcontinuous beam
intermediate beam
cantilever beam
![Page 329: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/329.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 329/490
Jack rafter is used for
![Page 330: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/330.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 330/490
hip roof supportlong span beam
cantilevered truss
none of these
Jack rafter is used for
![Page 331: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/331.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 331/490
hip roof supportlong span beam
cantilevered truss
none of these
The total of all the tread widths in a stair is called
![Page 332: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/332.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 332/490
total risertotal run
winder
none of these
The total of all the tread widths in a stair is called
![Page 333: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/333.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 333/490
total risertotal run
winder
none of these
The face or front elevation of a building
![Page 334: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/334.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 334/490
facadefront view
face plate
frontal approach
The face or front elevation of a building
![Page 335: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/335.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 335/490
facadefront view
face plate
frontal approach
A pit in a basement floor made to collect water into which a pump
is placed to pump the liquid to the sewer pipe
![Page 336: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/336.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 336/490
sumpdrain hole
slump
none of these
A pit in a basement floor made to collect water into which a pump
is placed to pump the liquid to the sewer pipe
![Page 337: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/337.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 337/490
sumpdrain hole
slump
none of these
Prefabrication refers to
![Page 338: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/338.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 338/490
design of a factorypre-construction of components as a part of a whole
a system of material audit
preliminary building procedure
Prefabrication refers to
![Page 339: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/339.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 339/490
design of a factorypre-construction of components as a part of a whole
a system of material audit
preliminary building procedure
An opening in the roof for admitting light is called
![Page 340: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/340.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 340/490
natural lightingocules lighting
none of these
skylight
An opening in the roof for admitting light is called
![Page 341: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/341.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 341/490
natural lightingocules lighting
none of these
skylight
Wood coming out from trees with needle leaves, rather than broad
leaves are called
![Page 342: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/342.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 342/490
ironwoodmahogany
softwood
hardwood
Wood coming out from trees with needle leaves, rather than broad
leaves are called
![Page 343: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/343.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 343/490
ironwoodmahogany
softwood
hardwood
A kind of brick used for high temperature
![Page 344: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/344.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 344/490
fly-ash brick thermal brick
firebrick
cinder block
A kind of brick used for high temperature
![Page 345: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/345.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 345/490
fly-ash brick thermal brick
firebrick
cinder block
The building frame construction system that uses one piece
structural stud from the foundation to the roof
![Page 346: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/346.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 346/490
balloon framinglath framing
wall framing
upright framing
The building frame construction system that uses one piece
structural stud from the foundation to the roof
![Page 347: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/347.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 347/490
balloon framinglath framing
wall framing
upright framing
A nailer strip incorporated in rough concrete wall to be plastered to
act as guide and support for finish trim around openings and nearthe base of the wall
![Page 348: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/348.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 348/490
none of theseplaster ground
gravel stop
trimming guard
A nailer strip incorporated in rough concrete wall to be plastered to
act as guide and support for finish trim around openings and nearthe base of the wall
![Page 349: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/349.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 349/490
none of theseplaster ground
gravel stop
trimming guard
The distance between two structural supports
![Page 350: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/350.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 350/490
overall distancebay
span
none of these
The distance between two structural supports
![Page 351: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/351.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 351/490
overall distancebay
span
none of these
![Page 352: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/352.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 352/490
The scientific name for wood is
![Page 353: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/353.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 353/490
CITEM XYLEM
APTG
TANG
In designing a stair, to find the height of the riser, divide the
height of the stair by the number of
![Page 354: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/354.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 354/490
newel postrisers
balustrade
balusters
In designing a stair, to find the height of the riser, divide the
height of the stair by the number of
![Page 355: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/355.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 355/490
newel postrisers
balustrade
balusters
A kind of roof that has four sloping sides
![Page 356: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/356.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 356/490
gable roof mansard roof
hip roof
lean to
A kind of roof that has four sloping sides
![Page 357: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/357.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 357/490
gable roof mansard roof
hip roof
lean to
Stone placed on a slope to prevent erosion
![Page 358: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/358.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 358/490
rip-rapembankment
flag stone
border stone
Stone placed on a slope to prevent erosion
![Page 359: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/359.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 359/490
rip-rap
embankment
flag stone
border stone
A tough used for carrying off water
![Page 360: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/360.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 360/490
gutter
none of these
moat
valley duet
A tough used for carrying off water
![Page 361: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/361.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 361/490
gutter
none of these
moat
valley duet
The process of removing concrete forms from the cured concrete
![Page 362: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/362.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 362/490
stripping
clearing
none of these
deforming works
The process of removing concrete forms from the cured concrete
![Page 363: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/363.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 363/490
stripping
clearing
none of these
deforming works
A structural member spanning from truss-to-truss or supporting
rafters
![Page 364: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/364.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 364/490
floor joist
purlin
girts
girder
![Page 365: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/365.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 365/490
A threaded steel bent inserted of masonry construction for securing
wood or metal plates to concrete construction
![Page 366: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/366.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 366/490
anchor bolt
U-bolt
gusset plate
strut
A threaded steel bent inserted of masonry construction for securing
wood or metal plates to concrete construction
![Page 367: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/367.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 367/490
anchor bolt
U-bolt
gusset plate
strut
A horizontal piece of wood, stone, steel or concrete across the top
of door or window opening to bear the weight of the walls abovethe opening
![Page 368: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/368.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 368/490
none of these
lintel
transome beam
transverse rafter
A horizontal piece of wood, stone, steel or concrete across the top
of door or window opening to bear the weight of the walls abovethe opening
![Page 369: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/369.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 369/490
none of these
lintel
transome beam
transverse rafter
The placing of glass in windows or doors
![Page 370: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/370.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 370/490
none of these
glazing
puttying
glassing
The placing of glass in windows or doors
![Page 371: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/371.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 371/490
none of these
glazing
puttying
glassing
A rejected building material because of its below standard grade is
called
![Page 372: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/372.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 372/490
out-limber
run-of-the mill
cult
none of these
A rejected building material because of its below standard grade is
called
![Page 373: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/373.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 373/490
out-limber
run-of-the mill
cult
none of these
Another word for handmill on a stair construction
![Page 374: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/374.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 374/490
balustrade
banister
hand guard
stringer
Another word for handmill on a stair construction
![Page 375: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/375.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 375/490
balustrade
banister
hand guard
stringer
A joint produced by lapping two pieces of materials
![Page 376: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/376.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 376/490
sandwiched joint
butt joint
dado joint
lap joint
A joint produced by lapping two pieces of materials
![Page 377: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/377.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 377/490
sandwiched joint
butt joint
dado joint
lap joint
Green lumber is
![Page 378: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/378.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 378/490
wolmanized lumber
creasate treated lumber
talanized lumber
lumber that still contains moisture or sap
Green lumber is
![Page 379: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/379.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 379/490
wolmanized lumber
creasate treated lumber
talanized lumber
lumber that still contains moisture or sap
The internal angle formed by the two roof slopes of a roof is called
![Page 380: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/380.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 380/490
canal
gutter
valley
ridge cap
The internal angle formed by the two roof slopes of a roof is called
![Page 381: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/381.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 381/490
canal
gutter
valley
ridge cap
A vertical board attached on the ends of the rafters. It is a part of
the cornice
![Page 382: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/382.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 382/490
facia
decorative board
face over
construction board
A vertical board attached on the ends of the rafters. It is a part of
the cornice
![Page 383: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/383.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 383/490
facia
decorative board
face over
construction board
A large heavy nail is referred to as
![Page 384: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/384.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 384/490
spike
anchorage hardware
none of these
dowel rod
A large heavy nail is referred to as
![Page 385: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/385.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 385/490
spike
anchorage hardware
none of these
dowel rod
In designing a stair, to find the number of riser divide the height of
the stair by the height of each
![Page 386: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/386.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 386/490
newel post
risers
balusters
nosing
In designing a stair, to find the number of riser divide the height of
the stair by the height of each
![Page 387: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/387.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 387/490
newel post
risers
balusters
nosing
Underwater watertight chamber to allow construction work to be
done
![Page 388: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/388.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 388/490
bent chamber
submersible air chamber
caisson
none of these
Underwater watertight chamber to allow construction work to be
done
![Page 389: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/389.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 389/490
bent chamber
submersible air chamber
caisson
none of these
Stakes and batter board in a construction layouting procedure
refers to
![Page 390: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/390.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 390/490
building components where permanent horizontal and vertical measurement are indicated
initial formworks done in construction
vertical and horizontal wood sticks and lumber used to determine the elevation and ditances of
the reference points of the proposed building
a cliché for layouting work
Stakes and batter board in a construction layouting procedure
refers to
![Page 391: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/391.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 391/490
building components where permanent horizontal and vertical measurement are indicated
initial formworks done in construction
vertical and horizontal wood sticks and lumber used to determine the elevation and
ditances of the reference points of the proposed building
a cliché for layouting work
Lumber specification S4S means
![Page 392: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/392.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 392/490
smooth for surfacing jobs
square on four sides
first class lumber
smooth on four sides
Lumber specification S4S means
![Page 393: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/393.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 393/490
smooth for surfacing jobs
square on four sides
first class lumber
smooth on four sides
The term used to indicate top and lower principal member of a roof
or bridge truss
![Page 394: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/394.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 394/490
rafter
chord
beam
tie
The term used to indicate top and lower principal member of a roof
or bridge truss
![Page 395: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/395.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 395/490
rafter
chord
beam
tie
Strips of hardwood, usually 2x2” laid over a concrete slab floor
![Page 396: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/396.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 396/490
sleepers
leveling blocks
wood anchor blocks
wood saddle
Strips of hardwood, usually 2x2” laid over a concrete slab floor
![Page 397: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/397.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 397/490
sleepers
leveling blocks
wood anchor blocks
wood saddle
Miter square is a guiding and testing tool that has a permanent
blade set at
![Page 398: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/398.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 398/490
30
45
20
60
Miter square is a guiding and testing tool that has a permanent
blade set at
![Page 399: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/399.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 399/490
30
45
20
60
A wall that holds back on earth embankment
![Page 400: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/400.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 400/490
shoring wall
retaining wall
buttress wall
foundation wall
A wall that holds back on earth embankment
![Page 401: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/401.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 401/490
shoring wall
retaining wall
buttress wall
foundation wall
In structural steel section joints, it is recommended NOT to use
![Page 402: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/402.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 402/490
rivets
nuts and bolts
oxy/acetyline welding
electric arch welding
In structural steel section joints, it is recommended NOT to use
![Page 403: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/403.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 403/490
rivets
nuts and bolts
oxy/acetyline welding
electric arch welding
A wall that serves two (2) dwelling units, known also as party wall
![Page 404: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/404.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 404/490
common wall
property wall
exterior wall
perimeter wall
A wall that serves two (2) dwelling units, known also as party wall
![Page 405: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/405.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 405/490
common wall
property wall
exterior wall
perimeter wall
Pertaining to a material description that resembles glass
![Page 406: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/406.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 406/490
alabaster
vitreous
fiberglass
cellulose
Pertaining to a material description that resembles glass
![Page 407: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/407.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 407/490
alabaster
vitreous
fiberglass
cellulose
To allow concrete to dry by keeping it moist to attain maximumstrength
![Page 408: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/408.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 408/490
permentate
stabilize
tempering
cure
To allow concrete to dry by keeping it moist to attain maximumstrength
![Page 409: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/409.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 409/490
permentate
stabilize
tempering
cure
The hardware on a door to accommodate the knob and locksetkeyhole
![Page 410: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/410.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 410/490
escutcheon
embellisher
door lock cup
push plate
The hardware on a door to accommodate the knob and locksetkeyhole
![Page 411: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/411.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 411/490
escutcheon
embellisher
door lock cup
push plate
![Page 412: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/412.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 412/490
The material used for the process of making watertight the roofintersection and other exposed areas on the exterior of a building
![Page 413: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/413.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 413/490
caping
flashing
fascia
gutter
A vertical space in a building intended for ducts, pipes, wire andcables
![Page 414: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/414.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 414/490
niche
crevice
chase
trench
A vertical space in a building intended for ducts, pipes, wire andcables
![Page 415: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/415.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 415/490
niche
crevice
chase
trench
The term to describe the putting up of the skeleton of the building
![Page 416: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/416.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 416/490
roughing-in
stakes and butterboards
shell work
formworks
The term to describe the putting up of the skeleton of the building
![Page 417: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/417.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 417/490
roughing-in
stakes and butterboards
shell work
formworks
The zig-zag rule is a
![Page 418: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/418.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 418/490
a road builder tool for measuring zig-zag
the law governing intricate road network
an all-metal tape measuring tool
carpenter measuring tool
The zig-zag rule is a
![Page 419: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/419.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 419/490
a road builder tool for measuring zig-zag
the law governing intricate road network
an all-metal tape measuring tool
carpenter measuring tool
Keystone is
![Page 420: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/420.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 420/490
a wedge-shaped stone of an arch
a kind of grinding every stone
a stone shaped like a key
a brand of vehicular tire
Keystone is
![Page 421: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/421.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 421/490
a wedge-shaped stone of an arch
a kind of grinding every stone
a stone shaped like a key
a brand of vehicular tire
Kalomein door is
![Page 422: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/422.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 422/490
a fireproof door with metal covering
an indoor decorative door
a door product of Kuala Lumpur
none of these
![Page 423: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/423.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 423/490
Lumber that is notsquared or finished
![Page 424: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/424.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 424/490
green lumber
milled lumber
undressed lumber
scaled lumber
Lumber that is notsquared or finished
![Page 425: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/425.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 425/490
green lumber
milled lumber
undressed lumber
scaled lumber
How is a 90 degree bend standard hook for concrete reinforcementconstructed
![Page 426: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/426.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 426/490
90 degree bend plus 10 db extension, at free end of bar
90 degree bend plus 12 db extension, at free end of bar
90 degree bend plus 6 db extension, at free end of bar
90 degree bend plus 4 db extension, at free end of bar
How is a 90 degree bend standard hook for concrete reinforcementconstructed
![Page 427: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/427.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 427/490
90 degree bend plus 10 db extension, at free end of bar
90 degree bend plus 12 db extension, at free end of bar
90 degree bend plus 6 db extension, at free end of bar
90 degree bend plus 4 db extension, at free end of bar
Good high-strength-bolted connection for steel should have thefollowing physical characteristic for good workmanship. Which of
the following listed is NOT ideal?
High-strength-bolted parts shall fit solidly together when assembled and shall not be separatedby gaskets or any other interposed compressive material
![Page 428: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/428.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 428/490
by gaskets or any other interposed compressive material
Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed
under the nut or bolt head, whichever is the element turned in tightening
When assembled, all joint surfaces, including those adjacent to the washer, shall be free of
scale, except tight mill scale, dirt and burns
Surface in contact with the bolt head and nut shall have a slope of not more than 1:10 with
respect to a plane normal to the bolt axis
Good high-strength-bolted connection for steel should have thefollowing physical characteristic for good workmanship. Which of
the following listed is NOT ideal?
High-strength-bolted parts shall fit solidly together when assembled and shall not be separatedby gaskets or any other interposed compressive material
![Page 429: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/429.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 429/490
by gaskets or any other interposed compressive material
Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed
under the nut or bolt head, whichever is the element turned in tightening
When assembled, all joint surfaces, including those adjacent to the washer, shall be free of
scale, except tight mill scale, dirt and burns
Surface in contact with the bolt head and nut shall have a slope of not more than
1:10 with respect to a plane normal to the bolt axis
What are piles at an inclination to resist forces that are not critical?
id il
![Page 430: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/430.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 430/490
guide piles
batter piles
slope piles
fender piles
What are piles at an inclination to resist forces that are not critical?
id il
![Page 431: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/431.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 431/490
guide piles
batter piles
slope piles
fender piles
Which of the following criteria for bundle bars, do NOT apply?
bars larger than 32 mm shall not be bundled in beams
bundle bars shall not be enclosed within stirrups or ties
![Page 432: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/432.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 432/490
group of parallel reinforcing bars bundled in contact to act as a unit shall be limited to three in
any one bundle
individual bars within a bundle terminated within the span of flexural members shall terminate
at different points with at least 40 db staggered
Which of the following criteria for bundle bars, do NOT apply?
bars larger than 32 mm shall not be bundled in beams
bundle bars shall not be enclosed within stirrups or ties
![Page 433: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/433.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 433/490
group of parallel reinforcing bars bundled in contact to act as a unit shall be limited
to three in any one bundle
individual bars within a bundle terminated within the span of flexural members shall terminate
at different points with at least 40 db staggered
What is a concrete beam placed directly on the ground to providefoundation for the superstructure?
strap beam
![Page 434: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/434.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 434/490
strap beam
gerber beam
grade beam
tie beam
What is a concrete beam placed directly on the ground to providefoundation for the superstructure?
strap beam
![Page 435: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/435.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 435/490
strap beam
gerber beam
grade beam
tie beam
What is a round steel bolt embedded in concrete or masonry use tohold down machinery, steel columns or beams, casting, shoes,
beams plates and engine heads?
retaining bolts
![Page 436: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/436.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 436/490
retaining bolts
foundation bolts
anchor bolts
friction bolts
What is a round steel bolt embedded in concrete or masonry use tohold down machinery, steel columns or beams, casting, shoes,
beams plates and engine heads?
retaining bolts
![Page 437: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/437.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 437/490
retaining bolts
foundation bolts
anchor bolts
friction bolts
A concrete flooring and finish which transforms ordinary plainconcrete into an elegant and decorative textured surface. This isdone by adding dust-on-color pigments to the concrete to give a
fast color and imprinted with a patented pattern and texture whilethe concrete is still plastic to create the look and finish of stone,
slate or brick
impressio crete
![Page 438: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/438.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 438/490
impressio-crete
textfloor-crete
stucco floor finish
concrete block cushion
A concrete flooring and finish which transforms ordinary plainconcrete into an elegant and decorative textured surface. This isdone by adding dust-on-color pigments to the concrete to give a
fast color and imprinted with a patented pattern and texture whilethe concrete is still plastic to create the look and finish of stone,
slate or brick
impressio crete
![Page 439: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/439.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 439/490
impressio-crete
textfloor-crete
stucco floor finish
concrete block cushion
Vernacular term for Concrete Hollow Block (CHB) laying
palitada
![Page 440: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/440.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 440/490
palitada
mitsa
rebokada
asintada
Vernacular term for Concrete Hollow Block (CHB) laying
palitada
![Page 441: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/441.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 441/490
palitada
mitsa
rebokada
asintada
An installation method where the cabinet covers is recessed andflushed with the cabinet sidings
inset or interior
![Page 442: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/442.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 442/490
inset or interior
concealed
party wall or half lap
full lap or over lap
An installation method where the cabinet covers is recessed andflushed with the cabinet sidings
inset or interior
![Page 443: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/443.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 443/490
inset or interior
concealed
party wall or half lap
full lap or over lap
Type of carpet weave important for an architect/designer to knowto guide him as to what type of construction and specification
should he recommend. What simplest type of fiber carpet weavingwhere pile forms as the wrap yarns loop over removable “wires”
inserted consecutively across the loom?
axminster
![Page 444: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/444.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 444/490
axminster
wilton
velvet
knitted
Type of carpet weave important for an architect/designer to knowto guide him as to what type of construction and specification
should he recommend. What simplest type of fiber carpet weavingwhere pile forms as the wrap yarns loop over removable “wires”
inserted consecutively across the loom?
axminster
![Page 445: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/445.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 445/490
axminster
wiltonvelvet
knitted
A pretreatment of poured concrete such as walls beams andcolumns where a thin layer of lean cement grout mixed with
flexible base additives is splattered by tampico brush or masonryspoon to the surface to give a “tooth” for excellent plaster adhesion
scratch coat
![Page 446: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/446.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 446/490
scratch coat
splash coatcement roughing
concrete roughing by chiseling
A pretreatment of poured concrete such as walls beams andcolumns where a thin layer of lean cement grout mixed with
flexible base additives is splattered by tampico brush or masonryspoon to the surface to give a “tooth” for excellent plaster adhesion
scratch coat
![Page 447: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/447.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 447/490
scratch coat
splash coatcement roughing
concrete roughing by chiseling
Local species of wood commonly used for wall studding, cabinetframing, and flush door framing, though scarcely available in the
market now due to forestry ban. This type of species is due tocheaper cost than the other listed below
narra
![Page 448: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/448.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 448/490
narra
molavemahogany
tanguile
Local species of wood commonly used for wall studding, cabinetframing, and flush door framing, though scarcely available in the
market now due to forestry ban. This type of species is due tocheaper cost than the other listed below
narra
![Page 449: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/449.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 449/490
narra
molavemahogany
tanguile
A special coating system with a high gloss shine while maintainingthe natural wood qualities, maintenance free, used to finish and
topcoat wood flooring
polyethylene floor coating
![Page 450: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/450.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 450/490
po ye y e e oo coa g
tile floor coatingepoxy floor coating
polyurethane floor coating
A special coating system with a high gloss shine while maintainingthe natural wood qualities, maintenance free, used to finish and
topcoat wood flooring
polyethylene floor coating
![Page 451: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/451.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 451/490
p y y g
tile floor coatingepoxy floor coating
polyurethane floor coating
A common and cheap masonry finish wherein dry consistencymortar mix is sprayed by mechanical or pneumatic means. The
sprayed cement is left to dry and give a rustic finish. Optional paintcoat maybe required
spraytex
![Page 452: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/452.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 452/490
p y
anay finishstucco finish
sandblast
A common and cheap masonry finish wherein dry consistencymortar mix is sprayed by mechanical or pneumatic means. The
sprayed cement is left to dry and give a rustic finish. Optional paintcoat maybe required
spraytex
![Page 453: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/453.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 453/490
p y
anay finishstucco finish
sandblast
![Page 454: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/454.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 454/490
What criterion conforms to good construction practice for theearliest time to remove scaffolding for concrete flooring other than
early-strength concrete if no anticipated load is expected overpoured floor?
25% of scaffoldings can be removed at slab area after 21 days of pouring and 100% of scaffolds after 28days
![Page 455: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/455.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 455/490
days
50% of scaffolding can be removed after 14 days and 100% of scaffolds after 2 days
50% of scaffoldings can be removed over slab area after 28 days of pouring and 100% of scaffolding after 36
days
21% of scaffolds after100days and14% of scaffoldings can be removed at slab area after25
days after pouring
A type of wood end joint where both wood are cut at equal anglesdiagonally
finger
![Page 456: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/456.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 456/490
lapsplice
scarf
A type of wood end joint where both wood are cut at equal anglesdiagonally
finger
![Page 457: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/457.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 457/490
lapsplice
scarf
When utilizing “knock-down” modular system of cabinets and
furniture, an end user is constrain of using:
longer assembly time
![Page 458: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/458.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 458/490
standard sizes, shapes and formsneeds additional finishing
labor intensive during production and assembly
When utilizing “knock-down” modular system of cabinets and
furniture, an end user is constrain of using:
longer assembly time
![Page 459: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/459.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 459/490
standard sizes, shapes and formsneeds additional finishing
labor intensive during production and assembly
A type of terazzo floor described by its physical appearancewhereby the stone or pebble is intentionally exposed while the
cement matrix is depressed
palladiana terazzo
![Page 460: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/460.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 460/490
rustic terazzovenetian terazzo
standard terazzo
A type of terazzo floor described by its physical appearancewhereby the stone or pebble is intentionally exposed while the
cement matrix is depressed
palladiana terazzo
![Page 461: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/461.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 461/490
rustic terazzovenetian terazzo
standard terazzo
Which of the following concrete handling criterion impairs thequality of concrete?
re-tempting concrete shall not be used and discard by approved means
![Page 462: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/462.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 462/490
concrete shall be carried on at such a rate that concrete is at all times plastic and flows readilyinto space between reinforcement
concrete that has initially set, shall be mixed with new concrete and shall be deposited in the
structure with approved means
top surfaces or vertically formed lifts shall be generally level
Which of the following concrete handling criterion impairs thequality of concrete?
re-tempting concrete shall not be used and discard by approved means
![Page 463: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/463.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 463/490
concrete shall be carried on at such a rate that concrete is at all times plastic andflows readily into space between reinforcement
concrete that has initially set, shall be mixed with new concrete and shall be deposited in the
structure with approved means
top surfaces or vertically formed lifts shall be generally level
A type of window where the ventilating sash rotates 90 degrees to180 degrees about the header and sill or about the side jamb
combination
![Page 464: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/464.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 464/490
pivotedawning
jalousie
A type of window where the ventilating sash rotates 90 degrees to180 degrees about the header and sill or about the side jamb
combination
![Page 465: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/465.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 465/490
pivotedawning
jalousie
To prevent cement plaster from improper adhesion, the substratemust be roughened while observing the following:
cure the cement plaster slowly
![Page 466: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/466.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 466/490
cure the cement plaster rapidlyadd more cement to the cement plaster
keep the cement plaster as thin as possible
To prevent cement plaster from improper adhesion, the substratemust be roughened while observing the following:
cure the cement plaster slowly
![Page 467: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/467.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 467/490
cure the cement plaster rapidlyadd more cement to the cement plaster
keep the cement plaster as thin as possible
A type of “hands of door” where the hinge is at the left and the
door leaf swings inside the room to the left
right hand reverse
![Page 468: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/468.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 468/490
right handleft hand reverse
left hand
A type of “hands of door” where the hinge is at the left and the
door leaf swings inside the room to the left
right hand reverse
![Page 469: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/469.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 469/490
right handleft hand reverse
left hand
What type of joint is used to install a glass into a lite of a Frenchwindow?
dado
![Page 470: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/470.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 470/490
rabbettenon
mortise
What type of joint is used to install a glass into a lite of a Frenchwindow?
dado
![Page 471: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/471.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 471/490
rabbettenon
mortise
An equipment to uniformly distribute tile adhesive at the undersideof a ________ tile during installation
masonry wall
![Page 472: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/472.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 472/490
notch troweledge strip trowel
flat steel trowel
An equipment to uniformly distribute tile adhesive at the undersideof a ________ tile during installation
masonry wall
![Page 473: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/473.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 473/490
notch troweledge strip trowel
flat steel trowel
A water-mixed product mixed to a ratio of 1:20 to stabilize limeactivity in new masonry surface. Without preparing the surface
with this mixture will cause the subsequent painting to be defective
acrylic emulsion
![Page 474: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/474.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 474/490
masonry neutralizeretching solution
aquaseal
A water-mixed product mixed to a ratio of 1:20 to stabilize limeactivity in new masonry surface. Without preparing the surface
with this mixture will cause the subsequent painting to be defective
acrylic emulsion
![Page 475: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/475.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 475/490
masonry neutralizeretching solution
aquaseal
A paint defect which indicates imperfect adhesion of paint to thesurface, with the film getting stripped off in a relatively large pieces
due to application on damp or greasy surface
peeling
![Page 476: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/476.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 476/490
bleedingalligatoring
cracking
A paint defect which indicates imperfect adhesion of paint to thesurface, with the film getting stripped off in a relatively large pieces
due to application on damp or greasy surface
peeling
![Page 477: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/477.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 477/490
bleedingalligatoring
cracking
A type of shutter proof opaque glass used to construct a door withglass to allow natural light only
figured wired glass
![Page 478: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/478.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 478/490
smoked glassetched glass
bevel glass
A type of shutter proof opaque glass used to construct a door withglass to allow natural light only
figured wired glass
![Page 479: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/479.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 479/490
smoked glassetched glass
bevel glass
Vernacular term for rough plastering
baldosa
![Page 480: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/480.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 480/490
asintadarebokada
kostura
Vernacular term for rough plastering
baldosa
![Page 481: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/481.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 481/490
asintadarebokada
kostura
Aggregates should conform to PNS or ASTM standards and must bewell graded, easy workability and method of consolidated are such
that the concrete can be poured without honeycomb or voids.What is the nominal maximum size of a course aggregate whenworking spaces between reinforcements for proper bonding>
Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing barsor wires, bundles of bars, or prestressing tendons or ducts
![Page 482: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/482.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 482/490
Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars
or wires, bundles of bars, or prestressing tendons or ducts
Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars
or wires, bundles of bars, or prestressing tendons or ducts
Course aggregates shall be no larger than ¾ the minimum clear spacing between individual reinforcing bars
or wires, bundles of bars, or prestressing tendons or ducts
Aggregates should conform to PNS or ASTM standards and must bewell graded, easy workability and method of consolidated are such
that the concrete can be poured without honeycomb or voids.What is the nominal maximum size of a course aggregate whenworking spaces between reinforcements for proper bonding>
Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing barsor wires, bundles of bars, or prestressing tendons or ducts
![Page 483: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/483.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 483/490
Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars
or wires, bundles of bars, or prestressing tendons or ducts
Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars
or wires, bundles of bars, or prestressing tendons or ducts
Course aggregates shall be no larger than ¾ the minimum clear spacing between individual
reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts
What is the minimum concrete cover for primary reinforcement ofbeams and columns not exposed to earth or weather for precast
manufactured under plant control conditions?
db but not less than 25 mm
![Page 484: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/484.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 484/490
db but not less than 15 mm and need not exceed 40 mmdb but not less than 20 mm and not to exceed 50 mm
db but not less than 30 mm
What is the minimum concrete cover for primary reinforcement ofbeams and columns not exposed to earth or weather for precast
manufactured under plant control conditions?
db but not less than 25 mm
![Page 485: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/485.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 485/490
db but not less than 15 mm and need not exceed 40 mmdb but not less than 20 mm and not to exceed 50 mm
db but not less than 30 mm
What is the act of excavating or filling of earth or any soundmaterial or combination thereof, in preparation for a finishing
surface such as paving?
cut and fill
d
![Page 486: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/486.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 486/490
gradingbenching
site preparation
What is the act of excavating or filling of earth or any soundmaterial or combination thereof, in preparation for a finishing
surface such as paving?
cut and fill
di
![Page 487: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/487.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 487/490
gradingbenching
site preparation
A floor finish commercially size 1” x 12” x 12” utilizing clay and fired
in traditional manner making interesting and attractive rustic clay
shade patterns. Because of the rustic effect the floor is finishedrough and simply adhere by cement with some irregularities
cement non skid blocks
i til
![Page 488: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/488.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 488/490
vigan tilesadobe cobbled stones
mosaic tiles
A floor finish commercially size 1” x 12” x 12” utilizing clay and fired
in traditional manner making interesting and attractive rustic clay
shade patterns. Because of the rustic effect the floor is finishedrough and simply adhere by cement with some irregularities
cement non skid blocks
i til
![Page 489: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/489.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 489/490
vigan tilesadobe cobbled stones
mosaic tiles
What is a steel element such as wire, cable, bar, rod or strand, or abundle of such elements, used to impart prestress to concrete?
prestress cables
i f t
![Page 490: ALE-(Bldg Techpres Part1)](https://reader031.fdocuments.us/reader031/viewer/2022021319/577cd53b1a28ab9e789a3a41/html5/thumbnails/490.jpg)
8/13/2019 ALE-(Bldg Techpres Part1)
http://slidepdf.com/reader/full/ale-bldg-techpres-part1 490/490
reinforcementtenon cables
tendon
What is a steel element such as wire, cable, bar, rod or strand, or abundle of such elements, used to impart prestress to concrete?