ALE-(Bldg Techpres Part1)

491
 A roofing tile which has the shape of an S laid on its side is a Mission tile pantile French tile

Transcript of ALE-(Bldg Techpres Part1)

Page 1: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 1/490

 A roofing tile which has the shape of an “S” laid on its side is a

Mission tile

pantile

French tile

Page 2: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 2/490

 A roofing tile which has the shape of an “S” laid on its side is a

Mission tile

pantile

French tile

Page 3: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 3/490

Page 4: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 4/490

That part of the building foundation which forms thepermanent retaining wall of the structure below grade is

a

foundation course

grade beam

foundation wall

Page 5: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 5/490

Joint employed to reduce restraint by accommodating movementof masonry walls are known as

cold joints

control joints

block outs

Page 6: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 6/490

Joint employed to reduce restraint by accommodating movementof masonry walls are known as

cold joints

control joints

block outs

Page 7: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 7/490

 A system of framing a building in which the studs arecontinuous to roof supporting second floor joints is

known as

post and beam

western framing

balloon framing

Page 8: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 8/490

 A system of framing a building in which the studs arecontinuous to roof supporting second floor joints is

known as

post and beam

western framing

balloon framing

Page 9: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 9/490

Rough plaster finish obtained by flinging plaster on a wall with ahand operated machine is

tryolean finish

trowel finish

broom stripped finish

Page 10: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 10/490

Rough plaster finish obtained by flinging plaster on a wall with ahand operated machine is

tryolean finish

trowel finish

broom stripped finish

Page 11: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 11/490

 A principal member of the truss which extends from one end to theother primarily to resist bending is a

web member

girt

chord

Page 12: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 12/490

 A principal member of the truss which extends from one end to theother primarily to resist bending is a

web member

girt

chord

Page 13: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 13/490

 A protein: the chief nitrogenous ingredient in milk is

Casein

Tempera

alabaster

Page 14: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 14/490

 A protein: the chief nitrogenous ingredient in milk is

Casein

Tempera

alabaster

Page 15: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 15/490

a composition of two or more metals fused together usually toobtain a desired property

annealing

alloy

built-up

Page 16: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 16/490

a composition of two or more metals fused together usually toobtain a desired property

annealing

alloy

built-up

Page 17: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 17/490

The horizontal distance from the face of a lock or latch to thecenter of the knob or lock cylinder

Backset

backfill

built-up

Page 18: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 18/490

The horizontal distance from the face of a lock or latch to thecenter of the knob or lock cylinder

Backset

backfill

built-up

Page 19: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 19/490

 A commercially pure iron of fibrous nature, valued for its corrosionresistance and ductility is

cast iron

black iron

wrought iron

Page 20: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 20/490

 A commercially pure iron of fibrous nature, valued for its corrosionresistance and ductility is

cast iron

black iron

wrought iron

Page 21: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 21/490

The Filipino term for horizontal stud is

Pabalagbag

Tahilan

pilareta

Page 22: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 22/490

The Filipino term for horizontal stud is

Pabalagbag

Tahilan

pilareta

Page 23: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 23/490

The Filipino term for riser

Muldura

takip silipan

planehuelda

Page 24: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 24/490

The Filipino term for riser

Muldura

takip silipan

planehuelda

Page 25: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 25/490

The Filipino term for collar plate is

Hardinera

Guililan

sinturon

Page 26: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 26/490

The Filipino term for collar plate is

Hardinera

Guililan

sinturon

Page 27: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 27/490

The Filipino term for temper (metal work)

Suban

Espolon

poleva

Page 28: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 28/490

The Filipino term for temper (metal work)

Suban

Espolon

poleva

Page 29: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 29/490

The Filipino term for plumb line is

Pantilya

 Asintada

hulog

Page 30: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 30/490

The Filipino term for plumb line is

Pantilya

 Asintada

hulog

Page 31: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 31/490

 A beam that projects beyond one or both its support

continuous

cantiliver

tie

Page 32: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 32/490

 A beam that projects beyond one or both its support

continuous

cantiliver

tie

Page 33: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 33/490

 A wall (bearing or non-bearing) designed to resist lateral forcesparallel to the wall

non-bearing

prefabricated

shear

Page 34: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 34/490

Page 35: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 35/490

Using stair tread-riser proportion formula RT = 75, given riserequals 6 ¼ “ how many risers will there be between two floors

having floor line to floor line distance of 7.8125 feet?

15

17

19

Page 36: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 36/490

Using stair tread-riser proportion formula RT = 75, given riserequals 6 ¼ “ how many risers will there be between two floors

having floor line to floor line distance of 7.8125 feet?

15

17

19

Page 37: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 37/490

 A modern method of installing wood parquet flooring on woodenboards sub-flooring is by

gluing/pasting

nailing into battens

wainscoting

Page 38: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 38/490

 A modern method of installing wood parquet flooring on woodenboards sub-flooring is by

gluing/pasting

nailing into battens

wainscoting

Page 39: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 39/490

The standard height of window sills for office rooms in upper floorsis

1.2 meters

0.60 meters

0.90 meters

Page 40: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 40/490

The standard height of window sills for office rooms in upper floorsis

1.2 meters

0.60 meters

0.90 meters

Page 41: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 41/490

The dimension of commercial acoustic boards foraluminum T-runners used for dropped-ceiling in offices

is

30” x 60” x 1”

24” x 50” x 7/8”

24” x 48” x ½”

Page 42: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 42/490

Page 43: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 43/490

The total floor area 16 feet wide by 60 feet deep needs one inch(1”) x 4”(commercial size) T & G flooring. Assuming that the

available T & G is 1” x 4” x 16” and the effective width is 3.5” , the

total board feet needed is

1,280 bf 

1,098 bf 

1,330 bf 

Page 44: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 44/490

The total floor area 16 feet wide by 60 feet deep needs one inch(1”) x 4”(commercial size) T & G flooring. Assuming that the

available T & G is 1” x 4” x 16” and the effective width is 3.5” , the

total board feet needed is

1,280 bf 

1,098 bf 

1,330 bf 

Page 45: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 45/490

In the design of a large shopping centers where space is required,intervals of columns can be wider than the ordinary by adopting a

structural method of construction called

compressioning

post-tensioning

pre-casting

Page 46: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 46/490

In the design of a large shopping centers where space is required,intervals of columns can be wider than the ordinary by adopting a

structural method of construction called

compressioning

post-tensioning

pre-casting

Page 47: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 47/490

Page 48: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 48/490

Humidification and condensation in exterior walls can be minimizedby

providing stud space between exterior finish and interior finish

providing building paper sheathing

providing building paper sheathing and space filled

Page 49: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 49/490

Heat gain through the structure of a habitable room occur intropical region at walls and roofs by conduction. This can be

minimized by the use of 

wood

concrete

steel

Page 50: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 50/490

Heat gain through the structure of a habitable room occur intropical region at walls and roofs by conduction. This can be

minimized by the use of 

wood

concrete

steel

Page 51: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 51/490

 A material used to remedy vapor flow

glossy surfaced asphalt saturated paper, 50 lbs or more

wall paper

asbestos cement board

Page 52: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 52/490

 A material used to remedy vapor flow

glossy surfaced asphalt saturated paper, 50 lbs or more

wall paper

asbestos cement board

Page 53: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 53/490

Dry walls do not require appreciable amount of moisture and theyare customarily finished with

mortar and cement

plywood on studs

lath and plaster

Page 54: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 54/490

Dry walls do not require appreciable amount of moisture and theyare customarily finished with

mortar and cement

plywood on studs

lath and plaster

Page 55: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 55/490

Wallboards or plywood maybe applied over studs. They can also beapplied over CHB masonry wall by using

wood battens

furring

sheathing

Page 56: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 56/490

Wallboards or plywood maybe applied over studs. They can also beapplied over CHB masonry wall by using

wood battens

furring

sheathing

Page 57: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 57/490

Identify the miter joint from the following

Page 58: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 58/490

Page 59: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 59/490

To turn back water whenever joints occur in which dissimilarmaterials come together, it is necessary to provide

flashing material

binding material

counter flushing

Page 60: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 60/490

To turn back water whenever joints occur in which dissimilarmaterials come together, it is necessary to provide

flashing material

binding material

counter flushing

Page 61: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 61/490

The part of a foundation system which supports the exterior wallsof a superstructure and bears directly on the column footing is a

foundation course

grade beam

foundation wall

Page 62: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 62/490

The part of a foundation system which supports the exterior wallsof a superstructure and bears directly on the column footing is a

foundation course

grade beam

foundation wall

Page 63: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 63/490

 A narrow strip of wood applied to cover a joint along the edges oftwo parallel boards in the same plane is a

fillet

cant strip

batten

Page 64: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 64/490

 A narrow strip of wood applied to cover a joint along the edges oftwo parallel boards in the same plane is a

fillet

cant strip

batten

Page 65: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 65/490

The stressing of unbounded tendons after concrete has cured is

post-tensioning

pre-casting

lift slab

Page 66: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 66/490

The stressing of unbounded tendons after concrete has cured is

post-tensioning

pre-casting

lift slab

Page 67: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 67/490

The boxing in of covering a joist, beam or girder to give theappearance of a larger beam is known as

beam formworks

beam blocking

grade beam

Page 68: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 68/490

The boxing in of covering a joist, beam or girder to give theappearance of a larger beam is known as

beam formworks

beam blocking

grade beam

Page 69: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 69/490

 A system of framing a building on which floor joists of each storeyrest on the top plates of the storey below and the bearing wallsand partitions rest on the subfloor of each storey is known as

balloon framing

flank framing

western framing

Page 70: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 70/490

 A system of framing a building on which floor joists of each storeyrest on the top plates of the storey below and the bearing wallsand partitions rest on the subfloor of each storey is known as

balloon framing

flank framing

western framing

Page 71: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 71/490

Pressure exerted against the underground portion of a buildingcreated by the presence of water in the soil is known as

soil bearing pressure

hydrostatic pressure

atmospheric pressure

Page 72: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 72/490

Pressure exerted against the underground portion of a buildingcreated by the presence of water in the soil is known as

soil bearing pressure

hydrostatic pressure

atmospheric pressure

Page 73: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 73/490

 A window which projects outside the main line of a building andthe compartment in which it is located extends to the floor is

known as

bay window

hopper window

oriel window

Page 74: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 74/490

 A window which projects outside the main line of a building andthe compartment in which it is located extends to the floor is

known as

bay window

hopper window

oriel window

Page 75: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 75/490

Page 76: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 76/490

 A form of brick bond in which each course is alternately composedof entirely of headers or of stretchers is known as

common bond

flemish bond

english bond

Page 77: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 77/490

 A joint formed when a concrete surface hardens before the nextbatch of concrete is placed against it is

block out

cold joint

control joint

Page 78: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 78/490

 A joint formed when a concrete surface hardens before the nextbatch of concrete is placed against it is

block out

cold joint

control joint

Page 79: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 79/490

 An iron alloy usually including carbon and silicon which has highcompressive strength but low tensile strength is

pig iron

cast iron

wrought iron

Page 80: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 80/490

 An iron alloy usually including carbon and silicon which has highcompressive strength but low tensile strength is

pig iron

cast iron

wrought iron

Page 81: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 81/490

The Filipino term for plastered course is

lastilyas

moneyka

kusturada

Page 82: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 82/490

The Filipino term for plastered course is

lastilyas

moneyka

kusturada

Page 83: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 83/490

Page 84: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 84/490

Page 85: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 85/490

The Filipino term for perlin is

tahilan

balangkas

reostra

Page 86: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 86/490

The Filipino term for perlin is

tahilan

balangkas

reostra

Page 87: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 87/490

The Filipino term for eave is

sopo

tabike

sibe

Page 88: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 88/490

The Filipino term for eave is

sopo

tabike

sibe

Page 89: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 89/490

The Filipino term for top chord is

tahilan

baytang

sinturon

Page 90: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 90/490

The Filipino term for top chord is

tahilan

baytang

sinturon

Page 91: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 91/490

The capacity of a wall to hold moisture is important in the designof dwelling units. Select the best material which will reduce

moisture in a wall when used

CHB S-cut joint finish

1” thick V-cut wood boards

Synthetic adobe finish on R.C. wall

Page 92: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 92/490

The capacity of a wall to hold moisture is important in the designof dwelling units. Select the best material which will reduce

moisture in a wall when used

CHB S-cut joint finish

1” thick V-cut wood boards

Synthetic adobe finish on R.C. wall

Page 93: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 93/490

Plaster or plywood ceiling on nailers or joists below a ventilatedroof space may show “pattern staining” on the ceiling. This can be

prevented by

cleaning

adequate insulation

re-painting

Page 94: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 94/490

Plaster or plywood ceiling on nailers or joists below a ventilatedroof space may show “pattern staining” on the ceiling. This can be

prevented by

cleaning

adequate insulation

re-painting

Page 95: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 95/490

Heat gain through the walls in buildings exposed to afternoon sunintensifies discomfort of inhabitants because of conductivity.

However, this can be minimized by the use of 

combination of wood boards and plywood with cavity between

thick reinforced concrete wall

steel sheets

Page 96: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 96/490

Heat gain through the walls in buildings exposed to afternoon sunintensifies discomfort of inhabitants because of conductivity.

However, this can be minimized by the use of 

combination of wood boards and plywood with cavity between

thick reinforced concrete wall

steel sheets

Page 97: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 97/490

Sound or noise between bedrooms may be reduced by using lessexpensive materials with the application of construction techniques

double wall plywood on horizontal and vertical studs with absorbents

solid 6” R.C. wall

sawali on 2” x 2” studs

Page 98: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 98/490

Sound or noise between bedrooms may be reduced by using lessexpensive materials with the application of construction techniques

double wall plywood on horizontal and vertical studs withabsorbents

solid 6” R.C. wall

sawali on 2” x 2” studs

Page 99: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 99/490

The staircase of a house has a total run of 3 meters and a total riseof 2.16 meters, the tread width is 11 inches and riser is 7 7/8”,

therefore, the stringer length is

3.20 meters

3.69 meters

3.75 meters

Page 100: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 100/490

The staircase of a house has a total run of 3 meters and a total riseof 2.16 meters, the tread width is 11 inches and riser is 7 7/8”,

therefore, the stringer length is

3.20 meters

3.69 meters

3.75 meters

Page 101: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 101/490

Dry walls are customarily finished with

lath and plaster

mortar and hollow blocks

reinforced concrete

Page 102: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 102/490

Dry walls are customarily finished with

lath and plaster

mortar and hollow blocks

reinforced concrete

Page 103: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 103/490

The riser of a stair is 6 ½ inches. What is the run using formula R/T

= tan (R-3) x 8 degrees

12.2247 inches

12.1000 inches

11.8975 inches

Page 104: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 104/490

The riser of a stair is 6 ½ inches. What is the run using formula R/T

= tan (R-3) x 8 degrees

12.2247 inches

12.1000 inches

11.8975 inches

Page 105: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 105/490

One method of leveling batterboards without the transit is the useof 

¼ Ø plastic hose filled with water

eyesight

plumb bob

Page 106: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 106/490

One method of leveling batterboards without the transit is the useof 

¼ Ø plastic hose filled with water

eyesight

plumb bob

Page 107: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 107/490

 A manual method of squaring the corners of a building lines inbuilding layout, is the use of 

2-3-4 multiples with the use of transit

3-4-5 multiples with the use of steel tape measure

4-5-4 multiples and strings

Page 108: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 108/490

 A manual method of squaring the corners of a building lines inbuilding layout, is the use of 

2-3-4 multiples with the use of transit

3-4-5 multiples with the use of steel tape measure

4-5-4 multiples and strings

Page 109: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 109/490

When dry conditions are demanded of asphalt tile floor finishes onconcrete over earth, apply the waterproofing (WP) steps

felt paper below sub-slab then WP on top of the sub-slab

felt paper below the top slab then WP the earth

WP the earth under slab

Page 110: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 110/490

When dry conditions are demanded of asphalt tile floor finishes onconcrete over earth, apply the waterproofing (WP) steps

felt paper below sub-slab then WP on top of the sub-slab

felt paper below the top slab then WP the earth

WP the earth under slab

Page 111: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 111/490

Due to temperature effects in materials, concrete walls, slabs oflong buildings, new buildings adjoining existing buildings should be

provided with

flashing

welded joints

expansion joints

Page 112: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 112/490

Due to temperature effects in materials, concrete walls, slabs oflong buildings, new buildings adjoining existing buildings should be

provided with

flashing

welded joints

expansion joints

Page 113: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 113/490

 A typical block or panel type insulating material used in flat roof ofcommercial or industrial building

corkboard

acacia lumber

washed pebbles

Page 114: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 114/490

 A typical block or panel type insulating material used in flat roof ofcommercial or industrial building

corkboard

acacia lumber

washed pebbles

Page 115: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 115/490

What is the height of the RC curtain wall surrounding a water tanklocated at the penthouse whose capacity is 5000 U.S. gallons. The

diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30meters. The wall shall be as high as the water tank.

4.00 meters

4.19 meters

4.16 meters

Page 116: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 116/490

What is the height of the RC curtain wall surrounding a water tanklocated at the penthouse whose capacity is 5000 U.S. gallons. The

diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30meters. The wall shall be as high as the water tank.

4.00 meters

4.19 meters

4.16 meters

Page 117: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 117/490

Select the grouping one subject of which is a criterion used byarchitects in planning and design of buildings

columns, splices, materials, lot

roofing sheets, function, elevation

concrete, lumber, steel, cement

Page 118: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 118/490

Select the grouping one subject of which is a criterion used byarchitects in planning and design of buildings

columns, splices, materials, lot

roofing sheets, function, elevation

concrete, lumber, steel, cement

Page 119: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 119/490

Narrow, high ceiling spaces where ceiling area is small comparedto wall area, will normally require acoustical treatment of the

wall or part of several walls

floor and ceiling

ceiling only

Page 120: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 120/490

Narrow, high ceiling spaces where ceiling area is small comparedto wall area, will normally require acoustical treatment of the

wall or part of several walls

floor and ceiling

ceiling only

Page 121: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 121/490

 A ferrous metal that offers great resistance to abrassion and findsimportant use in the cutting edges of heavy digging tools is a

alloy steel

nickel steel

manganese steel

Page 122: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 122/490

 A ferrous metal that offers great resistance to abrassion and findsimportant use in the cutting edges of heavy digging tools is a

alloy steel

nickel steel

manganese steel

Page 123: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 123/490

 A building stone of igneous origin and composed of quartz,hornblende and mica is a

travertine

serpentine

granite

Page 124: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 124/490

 A building stone of igneous origin and composed of quartz,hornblende and mica is a

travertine

serpentine

granite

Page 125: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 125/490

 A form of brick bond in which the course consists of alternatestretchers and headers in known as

flemish bond

english bond

common bond

Page 126: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 126/490

 A form of brick bond in which the course consists of alternatestretchers and headers in known as

flemish bond

english bond

common bond

Page 127: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 127/490

 A system of framing a building on which floor joist ofeach storey rests on the top plates of the storey below

and the bearing walls and partitions rest on the subfloorof each storey is known as

western framing

balloon framing

flank framing

Page 128: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 128/490

 A system of framing a building on which floor joist ofeach storey rests on the top plates of the storey below

and the bearing walls and partitions rest on the subfloorof each storey is known as

western framing

balloon framing

flank framing

Page 129: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 129/490

The Filipino term for rabbet

palitada

asintada

vaciada

Page 130: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 130/490

The Filipino term for rabbet

palitada

asintada

vaciada

Page 131: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 131/490

The Filipino term for projection is

alahado

bolada

asinta

Page 132: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 132/490

The Filipino term for projection is

alahado

bolada

asinta

Page 133: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 133/490

Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be

between two levels having a vertical distance of 9’-0”

18 risers

16 risers

17 risers

Page 134: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 134/490

Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be

between two levels having a vertical distance of 9’-0”

18 risers

16 risers

17 risers

Page 135: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 135/490

 A geological or ground condition considered in determining the sizeand type of foundation of the building

soil chemistry

soil bearing pressure

particle size distribution

Page 136: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 136/490

Page 137: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 137/490

These are materials excellent as vapor barrier in the roofing systemof residential buildings

particle board

lawanit boards

aluminum foil sheets

Page 138: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 138/490

These are materials excellent as vapor barrier in the roofing systemof residential buildings

particle board

lawanit boards

aluminum foil sheets

Page 139: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 139/490

The chief structural materials, used for tall buildings are

built-up beams, girders, foundations

cement, deformed wrought iron, gravel and sand

reinforced concrete and high grade steel

Page 140: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 140/490

The chief structural materials, used for tall buildings are

built-up beams, girders, foundations

cement, deformed wrought iron, gravel and sand

reinforced concrete and high grade steel

Page 141: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 141/490

These are classified as good and less expensive insulating materialsused in buildings

glass blocks, 5000 psi concrete

porous concrete, glass fibers, guilt materials

steel plates, marble slabs, granite

Page 142: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 142/490

These are classified as good and less expensive insulating materialsused in buildings

glass blocks, 5000 psi concrete

porous concrete, glass fibers, guilt materials

steel plates, marble slabs, granite

Page 143: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 143/490

This is a material that holds less moisture, is very light, less waterabsorptive capacity and is very good in sidings of dwelling units

vinyl shingles

asbestos-cement shingles

wood boards

Page 144: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 144/490

The toilet bathroom floor finish is designed to be at least one inch

Page 145: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 145/490

gbelow the bedroom floor finish. What should be the vertical

distance between the bedroom floor finish and the top line of the2” x 6” yacal floor joists which carry the toilet bath floor systemassuming that ¼” thick mosaic vitrified tiles will be used in the

toilet bathroom on 4” RC slab with membrane waterproofing, usingstandard acceptable measurement of materials for residential

houses

3 ½ inches

3 ¼ inches

6 ¼ inches

The toilet bathroom floor finish is designed to be at least one inch

Page 146: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 146/490

gbelow the bedroom floor finish. What should be the vertical

distance between the bedroom floor finish and the top line of the2” x 6” yacal floor joists which carry the toilet bath floor systemassuming that ¼” thick mosaic vitrified tiles will be used in the

toilet bathroom on 4” RC slab with membrane waterproofing, usingstandard acceptable measurement of materials for residential

houses

3 ½ inches

3 ¼ inches

6 ¼ inches

Page 147: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 147/490

 A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3

horizontal. What is the total length of the top chord, if the span oftruss is 12 meters and the eave is 1.5 meters horizontally?

7.555 meters

7.906 meters

7.567 meters

Page 148: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 148/490

 A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3

horizontal. What is the total length of the top chord, if the span oftruss is 12 meters and the eave is 1.5 meters horizontally?

7.555 meters

7.906 meters

7.567 meters

Page 149: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 149/490

The finished frame surrounding a door is a

door frame

door jamb

door casing

Page 150: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 150/490

The finished frame surrounding a door is a

door frame

door jamb

door casing

Page 151: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 151/490

 A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a

knob bolt

knob latch

knob lock 

Page 152: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 152/490

 A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a

knob bolt

knob latch

knob lock 

Page 153: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 153/490

 A door consisting of two separate leaves, one above the other, thisleaves may operate independently or together is a

dwarf door

dutch door

window door

Page 154: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 154/490

Page 155: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 155/490

 A joint formed by overlapping the edges of metal sheet or platedand joining them by riveting, soldering or brazing is a

lap joint

lap seam

lap splice

Page 156: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 156/490

 A joint formed by overlapping the edges of metal sheet or platedand joining them by riveting, soldering or brazing is a

lap joint

lap seam

lap splice

Page 157: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 157/490

 A clay roofing tile approximately semi cylindrical in shape laid incourses with units having their convex side alternately up and

down is a

pantile

mission tile

roman tile

Page 158: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 158/490

Page 159: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 159/490

The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a

grade beam

foundation wall

foundation course

Page 160: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 160/490

The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a

grade beam

foundation wall

foundation course

Page 161: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 161/490

Page 162: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 162/490

The wall of Intramuros is

an aqueduct

a fortification

a moat

Page 163: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 163/490

The wall of Intramuros is

an aqueduct

a fortification

a moat

Page 164: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 164/490

The Filipino term for rafter is

guililan

sepo

kilo

Page 165: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 165/490

The Filipino term for rafter is

guililan

sepo

kilo

Page 166: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 166/490

The Filipino term for baseboard is

rodapis

perdano

batidora

Page 167: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 167/490

The Filipino term for baseboard is

rodapis

perdano

batidora

Page 168: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 168/490

 A climatic factor that is considered in the structural andarchitectural design of tall buildings

thunderstorm

gusts

lightning

Page 169: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 169/490

 A climatic factor that is considered in the structural andarchitectural design of tall buildings

thunderstorm

gusts

lightning

Page 170: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 170/490

This is a ground condition that determines the size, type and shapeof the building footing/foundation

soil bearing pressure

loam and clay formation

adobe underlay

Page 171: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 171/490

This is a ground condition that determines the size, type and shapeof the building footing/foundation

soil bearing pressure

loam and clay formation

adobe underlay

Page 172: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 172/490

What is the height of a curtain wall for a downfeedwater tank at the deck roof with 60,000 gallons capacity

and diameter of 3 meters, freeboard of 0.30 meters,shall be as high as the water tank 

3.513 meters

3.550 meters

3.625 meters

Page 173: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 173/490

What is the height of a curtain wall for a downfeedwater tank at the deck roof with 60,000 gallons capacity

and diameter of 3 meters, freeboard of 0.30 meters,shall be as high as the water tank 

3.513 meters

3.550 meters

3.625 meters

Page 174: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 174/490

Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings

colored roofing sheets, esthetics, symmetry of windows

columns, doors, windows, split type

concrete, steel and wood, type of floor finish

Page 175: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 175/490

Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings

colored roofing sheets, esthetics, symmetry of windows

columns, doors, windows, split type

concrete, steel and wood, type of floor finish

Page 176: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 176/490

The most common materials used for roofing of urban residentialhouses

R.C. slabs

wood shingles

G.I. sheets

Page 177: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 177/490

The most common materials used for roofing of urban residentialhouses

R.C. slabs

wood shingles

G.I. sheets

Page 178: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 178/490

For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested

economical solutions

pre-stressed concrete

reinforced concrete

space frames, light steel skeleton structures

Page 179: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 179/490

For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested

economical solutions

pre-stressed concrete

reinforced concrete

space frames, light steel skeleton structures

Page 180: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 180/490

Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of

two consecutive steps is the

“going”

“string”

“newel”

Page 181: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 181/490

Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of

two consecutive steps is the

“going”

“string”

“newel”

Page 182: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 182/490

Noise inside the building is o two kinds, namely,airborne noise and impact noise . Insulation must beprovided against both of these by internal walls and

floors. Examples of better sound insulation are

concrete hollow block walls

¼” double wall on 2” x 4” studs

asbestos board walls on wooden studs

Page 183: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 183/490

Noise inside the building is o two kinds, namely,airborne noise and impact noise . Insulation must beprovided against both of these by internal walls and

floors. Examples of better sound insulation are

concrete hollow block walls

¼” double wall on 2” x 4” studs

asbestos board walls on wooden studs

Page 184: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 184/490

When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be

used which is installed beneath the concrete slab is

pitch or bituminous felt

gravel coarse

aluminum foil

Page 185: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 185/490

When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be

used which is installed beneath the concrete slab is

pitch or bituminous felt

gravel coarse

aluminum foil

Page 186: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 186/490

This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in

tropical regions

asbestos cement shingles

vinyl shingles

wood shingles

Page 187: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 187/490

This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in

tropical regions

asbestos cement shingles

vinyl shingles

wood shingles

Page 188: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 188/490

Standard size overlap for corrugated G.I. roofing is

2 corr.

2 ½ corr.

3 corr.

Page 189: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 189/490

Standard size overlap for corrugated G.I. roofing is

2 corr.

2 ½ corr.

3 corr.

Page 190: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 190/490

Page 191: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 191/490

 A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

alcove

ductwork 

chase

Page 192: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 192/490

 A twisting force is

torsion

shear

moment

Page 193: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 193/490

 A twisting force is

torsion

shear

moment

Page 194: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 194/490

 A barrier or diaphragm formed to prevent the movement of soil tostabilize foundation, etc. is

pile foundation

sheet piling

retaining wall

Page 195: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 195/490

 A barrier or diaphragm formed to prevent the movement of soil tostabilize foundation, etc. is

pile foundation

sheet piling

retaining wall

Page 196: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 196/490

The term stone-cut refers to a

masonry finish

adobe stone work 

wood siding

Page 197: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 197/490

The term stone-cut refers to a

masonry finish

adobe stone work 

wood siding

Page 198: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 198/490

Wood with metal cladding is called

channel strip

reinforced wood

kalamein

Page 199: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 199/490

Wood with metal cladding is called

channel strip

reinforced wood

kalamein

Page 200: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 200/490

Page 201: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 201/490

The Filipino term for floor joist is

suelo

guililan

soleras

Page 202: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 202/490

The Filipino term for bottom chord is

tirante

tahilan

madre

Page 203: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 203/490

The Filipino term for bottom chord is

tirante

tahilan

madre

Page 204: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 204/490

Standard concrete mix for beams, girders, slabs, stairs andcolumns is

“ AA ”

“ A ”

“B”

Page 205: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 205/490

Standard concrete mix for beams, girders, slabs, stairs andcolumns is

“ AA”

“ A ”

“B”

Page 206: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 206/490

Chord splice connectors for trusses is

split-ring

wood block 

fish plate

Page 207: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 207/490

Chord splice connectors for trusses is

split-ring

wood block 

fish plate

Page 208: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 208/490

 A vertical line check uses a

meter stick 

try square

plumb bob

Page 209: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 209/490

 A vertical line check uses a

meter stick 

try square

plumb bob

Page 210: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 210/490

 A specialized fastener used to pull on to hold mitered jointstogether is

vise

wood screw

clamp nail

Page 211: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 211/490

Page 212: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 212/490

Most waterproofed type of mortar joints for wall is

raked

struck 

weathered

Page 213: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 213/490

Page 214: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 214/490

Rafters laid diagonally from corner of a plate or girts to the ridge

 jack rafter

valley plate

hip rafter

Page 215: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 215/490

Rafters laid diagonally from corner of a plate or girts to the ridge

 jack rafter

valley plate

hip rafter

Page 216: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 216/490

The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called

form boards

box boards

batter boards

Page 217: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 217/490

The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called

form boards

box boards

batter boards

Page 218: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 218/490

Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is

lally

composite

cast-in-place

Page 219: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 219/490

Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is

lally

composite

cast-in-place

Page 220: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 220/490

The Filipino term for ceiling joist is

kostilyahe

tirante

espejo

Page 221: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 221/490

The Filipino term for ceiling joist is

kostilyahe

tirante

espejo

Page 222: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 222/490

The Filipino term for concrete beam is

biga

guilihan

kilo

Page 223: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 223/490

The Filipino term for concrete beam is

biga

guilihan

kilo

Page 224: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 224/490

Instrument or tool capable of vertical and horizontal line check iscalled

plumb bob

spirit level

try square

caliper

Page 225: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 225/490

Instrument or tool capable of vertical and horizontal line check iscalled

plumb bob

spirit level

try square

caliper

Page 226: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 226/490

Page 227: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 227/490

The vertical and horizontal surface is reinforced concrete whereconcreting was stopped and continued later is called

expansion joint

control joint

cold joint

construction joint

Page 228: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 228/490

 A twisting force is

shear

bending

moment

torsion

Page 229: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 229/490

 A twisting force is

shear

bending

moment

torsion

Page 230: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 230/490

 A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

alcove

chase

ductworks

pipeline

Page 231: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 231/490

 A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

alcove

chase

ductworks

pipeline

Page 232: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 232/490

It is a special type of plate girder consisting of tees, angles andmultiple web

box girder

hybrid girder

T-flange girder

bridging

Page 233: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 233/490

It is a special type of plate girder consisting of tees, angles andmultiple web

box girder

hybrid girder

T-flange girder

bridging

Page 234: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 234/490

When the ratio of short span to the long span of a slab is less than0.50, slab is a

one-way slab

slab on fill

two-way slab

cantilever slab

Page 235: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 235/490

When the ratio of short span to the long span of a slab is less than0.50, slab is a

one-way slab

slab on fill

two-way slab

cantilever slab

Page 236: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 236/490

Page 237: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 237/490

Longitudinal beams which rest on the top chord and preferably atthe joints of the truss

purlins

 jack rafter

rafters

girders

Page 238: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 238/490

 A three-dimensional structural system without bearingwalls composed of interconnected laterally supported soas to function as a complete self-contained unit with or

without the aids of horizontal diaphragms or floor-bracing system

box system

space frame

freeform

braced frame

Page 239: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 239/490

Page 240: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 240/490

Page 241: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 241/490

Concrete slab should have a minimum clearance of 

20 mm

40 mm

15 mm

30 mm

Page 242: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 242/490

It is designed to resist lateral forces parallel to the plane of thewall

bearing wall

curtain wall

grade wall

shear wall

Page 243: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 243/490

It is designed to resist lateral forces parallel to the plane of thewall

bearing wall

curtain wall

grade wall

shear wall

Page 244: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 244/490

The section of which the moment changes from positive tonegative is called

neutral axis

inflection point

section of zero shear

maximum moment

h f h h h h f

Page 245: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 245/490

The section of which the moment changes from positive tonegative is called

neutral axis

inflection point

section of zero shear

maximum moment

Wh i h i i i i l f d f ?

Page 246: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 246/490

What is the appropriate painting material type for wood surfaces?

zinc chromate

alkyd

latex

polyurethane

Page 247: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 247/490

Commercially made corrugated G.I. sheets, of gauge 26, having

Page 248: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 248/490

standard corrugation are coated both sides with

aluminum coating

laminations

paints

pure virgin spoiter

Commercially made corrugated G.I. sheets, of gauge 26, having

Page 249: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 249/490

standard corrugation are coated both sides with

aluminum coating

laminations

paints

pure virgin spoiter

Page 250: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 250/490

Wood flooring finishing material

Page 251: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 251/490

7 & 6 wood planks

 V cut wood planks

gypsum board

ply board panel

What hardware/material is needed to fasten an asphalt strip roofh l d h / l k

Page 252: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 252/490

shingle on wooden sheets/planks?

CV nail

staple wire

tekscrew

fin nail

What hardware/material is needed to fasten an asphalt strip roofhi l d h / l k ?

Page 253: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 253/490

shingle on wooden sheets/planks?

CV nail

staple wire

tekscrew

fin nail

The time required for the removal of a form works of a concretef ti

Page 254: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 254/490

footing

24 hours

36 hours

48 hours

12 hours

The time required for the removal of a form works of a concretef ti

Page 255: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 255/490

footing

24 hours

36 hours

48 hours

12 hours

Identify which figure is a dado wood joint

Page 256: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 256/490

Identify which figure is a dado wood joint

Page 257: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 257/490

Identify which figure is flemish (double stretcher) brickwork 

Page 258: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 258/490

Page 259: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 259/490

Wall partition wooden framing is called

Page 260: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 260/490

 joist

 jambs

studs

nailers

Wall partition wooden framing is called

Page 261: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 261/490

 joist

 jambs

studs

nailers

How many corrugation is required as the minimum side lap of anordinary standard G I sheet roofing?

Page 262: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 262/490

ordinary standard G.I. sheet roofing?

1 ½

2 ½

2

1

How many corrugation is required as the minimum side lap of anordinary standard G I sheet roofing?

Page 263: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 263/490

ordinary standard G.I. sheet roofing?

1 ½

2 ½

2

1

Page 264: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 264/490

Identify which letter in the target is a valley jack rafter?

Page 265: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 265/490

What is the appropriate paint material for G.I. sheet roofing?

Page 266: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 266/490

alkyd typeacrylic latex type

lacquer type

urethane

What is the appropriate paint material for G.I. sheet roofing?

Page 267: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 267/490

alkyd typeacrylic latex type

lacquer type

urethane

Identify which figure is a dado wood joint

Page 268: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 268/490

Identify which figure is a dado wood joint

Page 269: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 269/490

The paint finishing material of long-span pre-painted roofing sheetis

Page 270: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 270/490

is

acrylic paintduco paint

polyester paint

automotive paint

The paint finishing material of long-span pre-painted roofing sheetis

Page 271: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 271/490

is

acrylic paintduco paint

polyester paint

automotive paint

What hardware/material is needed to fasten corrugated asbestoscement roofing sheet on a steel purlin

Page 272: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 272/490

cement roofing sheet on a steel purlin

metal screwL hook bolt

m bolt

aluminum screw

What hardware/material is needed to fasten corrugated asbestoscement roofing sheet on a steel purlin

Page 273: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 273/490

cement roofing sheet on a steel purlin

metal screwL hook bolt

m bolt

aluminum screw

 A common paint film defect where progressive powdering from thesurface inward occurs. It is called

Page 274: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 274/490

surface inward occurs. It is called

blisteringpeeling

chalking

alligatoring

 A common paint film defect where progressive powdering from thesurface inward occurs. It is called

Page 275: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 275/490

blisteringpeeling

chalking

alligatoring

Identify which figure is a blind and sub-mortise and tenon joint

Page 276: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 276/490

Identify which figure is a blind and sub-mortise and tenon joint

Page 277: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 277/490

Page 278: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 278/490

 A joint where two successive placement of concrete meet is called

Page 279: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 279/490

truss jointcontraction joint

construction joint

expansion joint

 A wall which supports vertical loads in addition to its weight

without the benefit of a complete vertical load carrying space

Page 280: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 280/490

p y g pframe is called

retaining wallcurtain wall

shearing wall

bearing wall

 A wall which supports vertical loads in addition to its weight

without the benefit of a complete vertical load carrying space

Page 281: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 281/490

p y g pframe is called

retaining wallcurtain wall

shearing wall

bearing wall

 A type of concrete floor which has no beam is called

Page 282: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 282/490

flat slab2-way slab

one way slab

ribbed floor

 A type of concrete floor which has no beam is called

Page 283: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 283/490

flat slab2-way slab

one way slab

ribbed floor

 A one-way concrete slab are used when

Page 284: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 284/490

the slab is being supported by two parallel beamsthe slab has no cantilevered portion

the concrete slab is reinforced on the near bottom side

the concrete slab is sloping to all side

 A one-way concrete slab are used when

Page 285: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 285/490

the slab is being supported by two parallel beamsthe slab has no cantilevered portion

the concrete slab is reinforced on the near bottom side

the concrete slab is sloping to all side

Level tool is a

Page 286: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 286/490

tool used for guiding and testing the work to a vertical and horizontalposition

a tool for checking height elevation

tool used to check the water level

the tool designated the different ranking of tool usage

Level tool is a

Page 287: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 287/490

tool used for guiding and testing the work to a vertical andhorizontal position

a tool for checking height elevation

tool used to check the water level

the tool designated the different ranking of tool usage

Steel square is a

Page 288: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 288/490

a small try squaretool for testing and for framing work 

a steel square for use of signage

tool of the steel man

Steel square is a

Page 289: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 289/490

a small try squaretool for testing and for framing work 

a steel square for use of signage

tool of the steel man

The vertical surface on face of a stair step is called

Page 290: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 290/490

stair clipstair head

nosing

riser

The vertical surface on face of a stair step is called

Page 291: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 291/490

stair clipstair head

nosing

riser

Tin shear is a

Page 292: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 292/490

painter toolmasonry tool

tinsmithry tool

electrical tool

Tin shear is a

Page 293: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 293/490

painter toolmasonry tool

tinsmithry tool

electrical tool

 Auger bit is part of 

Page 294: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 294/490

fastener toolguiding testing tool

bearing tool

rough facing tool

 Auger bit is part of 

Page 295: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 295/490

fastener toolguiding testing tool

bearing tool

rough facing tool

The complete records of test conduction (slump,

compression test, etc.) shall be preserved and madeavailable for inspection during the progress of

Page 296: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 296/490

available for inspection during the progress ofconstruction and after completion of the projects for a

period of not less than

5 years3 years

4 years

2 years

The complete records of test conduction (slump, compression test,

etc.) shall be preserved and made available for inspection duringthe progress of construction and after completion of the projects

Page 297: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 297/490

the progress of construction and after completion of the projectsfor a period of not less than

5 years3 years

4 years

2 years

Wood board should have a thickness specification of 

Page 298: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 298/490

not less than 2” thick x 5” and up widenot less than 1” thick x 4” and up wide

not less than 2” thick x 4” and up wide

not less than 3” thick x 7” and up wide

Wood board should have a thickness specification of 

Page 299: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 299/490

not less than 2” thick x 5” and up widenot less than 1” thick x 4” and up wide

not less than 2” thick x 4” and up wide

not less than 3” thick x 7” and up wide

Wood plank is a piece of lumber that is

Page 300: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 300/490

2” to 5” thick 6” to 8” thick 

5” to 7” thick 

8” up thick 

Wood plank is a piece of lumber that is

Page 301: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 301/490

2” to 5” thick 6” to 8” thick 

5” to 7” thick 

8” up thick 

The distance from the first to the last riser of a stair flight is called

Page 302: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 302/490

spandrelpitch

run

rise

The distance from the first to the last riser of a stair flight is called

Page 303: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 303/490

spandrelpitch

run

rise

Page 304: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 304/490

 A high-speed rotary shaping hand power tool used to make smooth

cutting and curving on solid wood is called

Page 305: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 305/490

surface plannerdado place

portable hand router

lathe machine

The major horizontal supporting member of the floor system is

called

Page 306: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 306/490

raftergirder

purlin

girt

Page 307: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 307/490

Wood defects are heart shake, cup shake, star shake and

Page 308: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 308/490

knotsdiscoloration

deterioration

rotten

Wood defects are heart shake, cup shake, star shake and

Page 309: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 309/490

knotsdiscoloration

deterioration

rotten

Dressed lumber is referred to

Page 310: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 310/490

covered with plastic for shipmentlumber of exact measurement

smoothed or planed lumber

lumber used for fine carpentry works

Dressed lumber is referred to

Page 311: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 311/490

covered with plastic for shipmentlumber of exact measurement

smoothed or planed lumber

lumber used for fine carpentry works

The other kind of handsaw other than rip-cut saw is

Page 312: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 312/490

diagonal cut sawcross-cut

circular saw

coping saw

The other kind of handsaw other than rip-cut saw is

Page 313: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 313/490

diagonal cut sawcross-cut

circular saw

coping saw

Walls that support weight from above as well as their own dead

weight

Page 314: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 314/490

load bearing wallscurtain walls

shoring walls

none of the above

Walls that support weight from above as well as their own dead

weight

Page 315: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 315/490

load bearing wallscurtain walls

shoring walls

none of the above

It refers to the occupancy load which either partially or fully in

place or may not be present at all is called

Page 316: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 316/490

live loaddead load

concentrated load

distributed load

It refers to the occupancy load which either partially or fully in

place or may not be present at all is called

Page 317: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 317/490

live loaddead load

concentrated load

distributed load

The distance between inflection point in the column when it breaks

is called

Page 318: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 318/490

development lengthcross sectional area

effective length

equivalent distance

The distance between inflection point in the column when it breaks

is called

Page 319: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 319/490

development lengthcross sectional area

effective length

equivalent distance

The amount of space measured in cubic units

Page 320: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 320/490

none of theseperimeter

volume

area

The amount of space measured in cubic units

Page 321: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 321/490

none of theseperimeter

volume

area

 An expansion joints adjacent parts of a structure to permit

expected movements between them is called

Page 322: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 322/490

contraction jointtruss joint

construction joint

conduction joint

 An expansion joints adjacent parts of a structure to permit

expected movements between them is called

Page 323: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 323/490

contraction jointtruss joint

construction joint

conduction joint

To find the volume of water in a cylindrical tank, multiply the area

of its base by its

Page 324: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 324/490

diameterradius

height

none of these

To find the volume of water in a cylindrical tank, multiply the area

of its base by its

Page 325: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 325/490

diameterradius

height

none of these

The most important component to determine the strength of a

concrete mix is

Page 326: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 326/490

cementsand

gravel

lime

The most important component to determine the strength of a

concrete mix is

Page 327: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 327/490

cementsand

gravel

lime

 A beam that projects beyond one or both its support is called

Page 328: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 328/490

overhanging beamcontinuous beam

intermediate beam

cantilever beam

Page 329: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 329/490

Jack rafter is used for

Page 330: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 330/490

hip roof supportlong span beam

cantilevered truss

none of these

Jack rafter is used for

Page 331: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 331/490

hip roof supportlong span beam

cantilevered truss

none of these

The total of all the tread widths in a stair is called

Page 332: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 332/490

total risertotal run

winder

none of these

The total of all the tread widths in a stair is called

Page 333: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 333/490

total risertotal run

winder

none of these

The face or front elevation of a building

Page 334: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 334/490

facadefront view

face plate

frontal approach

The face or front elevation of a building

Page 335: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 335/490

facadefront view

face plate

frontal approach

 A pit in a basement floor made to collect water into which a pump

is placed to pump the liquid to the sewer pipe

Page 336: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 336/490

sumpdrain hole

slump

none of these

 A pit in a basement floor made to collect water into which a pump

is placed to pump the liquid to the sewer pipe

Page 337: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 337/490

sumpdrain hole

slump

none of these

Prefabrication refers to

Page 338: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 338/490

design of a factorypre-construction of components as a part of a whole

a system of material audit

preliminary building procedure

Prefabrication refers to

Page 339: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 339/490

design of a factorypre-construction of components as a part of a whole

a system of material audit

preliminary building procedure

 An opening in the roof for admitting light is called

Page 340: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 340/490

natural lightingocules lighting

none of these

skylight

 An opening in the roof for admitting light is called

Page 341: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 341/490

natural lightingocules lighting

none of these

skylight

Wood coming out from trees with needle leaves, rather than broad

leaves are called

Page 342: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 342/490

ironwoodmahogany

softwood

hardwood

Wood coming out from trees with needle leaves, rather than broad

leaves are called

Page 343: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 343/490

ironwoodmahogany

softwood

hardwood

 A kind of brick used for high temperature

Page 344: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 344/490

fly-ash brick thermal brick 

firebrick 

cinder block 

 A kind of brick used for high temperature

Page 345: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 345/490

fly-ash brick thermal brick 

firebrick 

cinder block 

The building frame construction system that uses one piece

structural stud from the foundation to the roof 

Page 346: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 346/490

balloon framinglath framing

wall framing

upright framing

The building frame construction system that uses one piece

structural stud from the foundation to the roof 

Page 347: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 347/490

balloon framinglath framing

wall framing

upright framing

 A nailer strip incorporated in rough concrete wall to be plastered to

act as guide and support for finish trim around openings and nearthe base of the wall

Page 348: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 348/490

none of theseplaster ground

gravel stop

trimming guard

 A nailer strip incorporated in rough concrete wall to be plastered to

act as guide and support for finish trim around openings and nearthe base of the wall

Page 349: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 349/490

none of theseplaster ground

gravel stop

trimming guard

The distance between two structural supports

Page 350: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 350/490

overall distancebay

span

none of these

The distance between two structural supports

Page 351: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 351/490

overall distancebay

span

none of these

Page 352: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 352/490

The scientific name for wood is

Page 353: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 353/490

CITEM XYLEM

 APTG

TANG

In designing a stair, to find the height of the riser, divide the

height of the stair by the number of 

Page 354: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 354/490

newel postrisers

balustrade

balusters

In designing a stair, to find the height of the riser, divide the

height of the stair by the number of 

Page 355: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 355/490

newel postrisers

balustrade

balusters

 A kind of roof that has four sloping sides

Page 356: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 356/490

gable roof mansard roof 

hip roof 

lean to

 A kind of roof that has four sloping sides

Page 357: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 357/490

gable roof mansard roof 

hip roof 

lean to

Stone placed on a slope to prevent erosion

Page 358: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 358/490

rip-rapembankment

flag stone

border stone

Stone placed on a slope to prevent erosion

Page 359: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 359/490

rip-rap

embankment

flag stone

border stone

 A tough used for carrying off water

Page 360: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 360/490

gutter

none of these

moat

valley duet

 A tough used for carrying off water

Page 361: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 361/490

gutter

none of these

moat

valley duet

The process of removing concrete forms from the cured concrete

Page 362: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 362/490

stripping

clearing

none of these

deforming works

The process of removing concrete forms from the cured concrete

Page 363: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 363/490

stripping

clearing

none of these

deforming works

 A structural member spanning from truss-to-truss or supporting

rafters

Page 364: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 364/490

floor joist

purlin

girts

girder

Page 365: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 365/490

 A threaded steel bent inserted of masonry construction for securing

wood or metal plates to concrete construction

Page 366: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 366/490

anchor bolt

U-bolt

gusset plate

strut

 A threaded steel bent inserted of masonry construction for securing

wood or metal plates to concrete construction

Page 367: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 367/490

anchor bolt

U-bolt

gusset plate

strut

 A horizontal piece of wood, stone, steel or concrete across the top

of door or window opening to bear the weight of the walls abovethe opening

Page 368: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 368/490

none of these

lintel

transome beam

transverse rafter

 A horizontal piece of wood, stone, steel or concrete across the top

of door or window opening to bear the weight of the walls abovethe opening

Page 369: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 369/490

none of these

lintel

transome beam

transverse rafter

The placing of glass in windows or doors

Page 370: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 370/490

none of these

glazing

puttying

glassing

The placing of glass in windows or doors

Page 371: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 371/490

none of these

glazing 

puttying

glassing

 A rejected building material because of its below standard grade is

called

Page 372: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 372/490

out-limber

run-of-the mill

cult

none of these

 A rejected building material because of its below standard grade is

called

Page 373: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 373/490

out-limber

run-of-the mill

cult

none of these

 Another word for handmill on a stair construction

Page 374: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 374/490

balustrade

banister

hand guard

stringer

 Another word for handmill on a stair construction

Page 375: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 375/490

balustrade

banister

hand guard

stringer

 A joint produced by lapping two pieces of materials

Page 376: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 376/490

sandwiched joint

butt joint

dado joint

lap joint

 A joint produced by lapping two pieces of materials

Page 377: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 377/490

sandwiched joint

butt joint

dado joint

lap joint

Green lumber is

Page 378: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 378/490

wolmanized lumber

creasate treated lumber

talanized lumber

lumber that still contains moisture or sap

Green lumber is

Page 379: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 379/490

wolmanized lumber

creasate treated lumber

talanized lumber

lumber that still contains moisture or sap

The internal angle formed by the two roof slopes of a roof is called

Page 380: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 380/490

canal

gutter

valley

ridge cap

The internal angle formed by the two roof slopes of a roof is called

Page 381: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 381/490

canal

gutter

valley

ridge cap

 A vertical board attached on the ends of the rafters. It is a part of

the cornice

Page 382: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 382/490

facia

decorative board

face over

construction board

 A vertical board attached on the ends of the rafters. It is a part of

the cornice

Page 383: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 383/490

facia

decorative board

face over

construction board

 A large heavy nail is referred to as

Page 384: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 384/490

spike

anchorage hardware

none of these

dowel rod

 A large heavy nail is referred to as

Page 385: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 385/490

spike

anchorage hardware

none of these

dowel rod

In designing a stair, to find the number of riser divide the height of

the stair by the height of each

Page 386: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 386/490

newel post

risers

balusters

nosing

In designing a stair, to find the number of riser divide the height of

the stair by the height of each

Page 387: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 387/490

newel post

risers

balusters

nosing

Underwater watertight chamber to allow construction work to be

done

Page 388: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 388/490

bent chamber

submersible air chamber

caisson

none of these

Underwater watertight chamber to allow construction work to be

done

Page 389: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 389/490

bent chamber

submersible air chamber

caisson

none of these

Stakes and batter board in a construction layouting procedure

refers to

Page 390: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 390/490

building components where permanent horizontal and vertical measurement are indicated

 initial formworks done in construction

 vertical and horizontal wood sticks and lumber used to determine the elevation and ditances of

the reference points of the proposed building

 a cliché for layouting work 

 

Stakes and batter board in a construction layouting procedure

refers to

Page 391: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 391/490

building components where permanent horizontal and vertical measurement are indicated

 initial formworks done in construction

 vertical and horizontal wood sticks and lumber used to determine the elevation and

ditances of the reference points of the proposed building

 a cliché for layouting work 

 

Lumber specification S4S means

Page 392: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 392/490

smooth for surfacing jobs

square on four sides

first class lumber

smooth on four sides

Lumber specification S4S means

Page 393: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 393/490

smooth for surfacing jobs

square on four sides

first class lumber

smooth on four sides

The term used to indicate top and lower principal member of a roof

or bridge truss

Page 394: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 394/490

rafter

chord

beam

tie

The term used to indicate top and lower principal member of a roof

or bridge truss

Page 395: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 395/490

rafter

chord

beam

tie

Strips of hardwood, usually 2x2” laid over a concrete slab floor

Page 396: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 396/490

sleepers

leveling blocks

wood anchor blocks

wood saddle

Strips of hardwood, usually 2x2” laid over a concrete slab floor

Page 397: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 397/490

sleepers

leveling blocks

wood anchor blocks

wood saddle

Miter square is a guiding and testing tool that has a permanent

blade set at

Page 398: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 398/490

30

45

20

60

Miter square is a guiding and testing tool that has a permanent

blade set at

Page 399: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 399/490

30

45

20

60

 A wall that holds back on earth embankment

Page 400: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 400/490

shoring wall

retaining wall

buttress wall

foundation wall

 A wall that holds back on earth embankment

Page 401: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 401/490

shoring wall

retaining wall

buttress wall

foundation wall

In structural steel section joints, it is recommended NOT to use

Page 402: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 402/490

rivets

nuts and bolts

oxy/acetyline welding

electric arch welding

In structural steel section joints, it is recommended NOT to use

Page 403: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 403/490

rivets

nuts and bolts

oxy/acetyline welding

electric arch welding

 A wall that serves two (2) dwelling units, known also as party wall

Page 404: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 404/490

common wall

property wall

exterior wall

perimeter wall

 A wall that serves two (2) dwelling units, known also as party wall

Page 405: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 405/490

common wall

property wall

exterior wall

perimeter wall

Pertaining to a material description that resembles glass

Page 406: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 406/490

alabaster

vitreous

fiberglass

cellulose

Pertaining to a material description that resembles glass

Page 407: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 407/490

alabaster

vitreous

fiberglass

cellulose

To allow concrete to dry by keeping it moist to attain maximumstrength

Page 408: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 408/490

permentate

stabilize

tempering

cure

To allow concrete to dry by keeping it moist to attain maximumstrength

Page 409: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 409/490

permentate

stabilize

tempering

cure

The hardware on a door to accommodate the knob and locksetkeyhole

Page 410: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 410/490

escutcheon

embellisher

door lock cup

push plate

The hardware on a door to accommodate the knob and locksetkeyhole

Page 411: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 411/490

escutcheon

embellisher

door lock cup

push plate

Page 412: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 412/490

The material used for the process of making watertight the roofintersection and other exposed areas on the exterior of a building

Page 413: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 413/490

caping

flashing

fascia

gutter

 A vertical space in a building intended for ducts, pipes, wire andcables

Page 414: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 414/490

niche

crevice

chase

trench

 A vertical space in a building intended for ducts, pipes, wire andcables

Page 415: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 415/490

niche

crevice

chase

trench

The term to describe the putting up of the skeleton of the building

Page 416: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 416/490

roughing-in

stakes and butterboards

shell work 

formworks

The term to describe the putting up of the skeleton of the building

Page 417: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 417/490

roughing-in

stakes and butterboards

shell work 

formworks

The zig-zag rule is a

Page 418: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 418/490

a road builder tool for measuring zig-zag

the law governing intricate road network 

an all-metal tape measuring tool

carpenter measuring tool

The zig-zag rule is a

Page 419: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 419/490

a road builder tool for measuring zig-zag

the law governing intricate road network 

an all-metal tape measuring tool

carpenter measuring tool

Keystone is

Page 420: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 420/490

a wedge-shaped stone of an arch

a kind of grinding every stone

a stone shaped like a key

a brand of vehicular tire

Keystone is

Page 421: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 421/490

a wedge-shaped stone of an arch

a kind of grinding every stone

a stone shaped like a key

a brand of vehicular tire

Kalomein door is

Page 422: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 422/490

a fireproof door with metal covering

an indoor decorative door

a door product of Kuala Lumpur

none of these

Page 423: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 423/490

Lumber that is notsquared or finished

Page 424: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 424/490

green lumber

milled lumber

undressed lumber

scaled lumber

Lumber that is notsquared or finished

Page 425: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 425/490

green lumber

milled lumber

undressed lumber

scaled lumber

How is a 90 degree bend standard hook for concrete reinforcementconstructed

Page 426: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 426/490

90 degree bend plus 10 db extension, at free end of bar

90 degree bend plus 12 db extension, at free end of bar

90 degree bend plus 6 db extension, at free end of bar

90 degree bend plus 4 db extension, at free end of bar

How is a 90 degree bend standard hook for concrete reinforcementconstructed

Page 427: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 427/490

90 degree bend plus 10 db extension, at free end of bar

90 degree bend plus 12 db extension, at free end of bar

90 degree bend plus 6 db extension, at free end of bar

90 degree bend plus 4 db extension, at free end of bar

Good high-strength-bolted connection for steel should have thefollowing physical characteristic for good workmanship. Which of

the following listed is NOT ideal?

High-strength-bolted parts shall fit solidly together when assembled and shall not be separatedby gaskets or any other interposed compressive material

Page 428: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 428/490

by gaskets or any other interposed compressive material

 Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed

under the nut or bolt head, whichever is the element turned in tightening

 When assembled, all joint surfaces, including those adjacent to the washer, shall be free of

scale, except tight mill scale, dirt and burns

 Surface in contact with the bolt head and nut shall have a slope of not more than 1:10 with

respect to a plane normal to the bolt axis

Good high-strength-bolted connection for steel should have thefollowing physical characteristic for good workmanship. Which of

the following listed is NOT ideal?

High-strength-bolted parts shall fit solidly together when assembled and shall not be separatedby gaskets or any other interposed compressive material

Page 429: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 429/490

by gaskets or any other interposed compressive material

 Bolts tightened by means of a calibrated wrench shall be installed with a hardened washed

under the nut or bolt head, whichever is the element turned in tightening

 When assembled, all joint surfaces, including those adjacent to the washer, shall be free of

scale, except tight mill scale, dirt and burns

 Surface in contact with the bolt head and nut shall have a slope of not more than

1:10 with respect to a plane normal to the bolt axis

What are piles at an inclination to resist forces that are not critical?

id il

Page 430: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 430/490

guide piles

batter piles

slope piles

fender piles

What are piles at an inclination to resist forces that are not critical?

id il

Page 431: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 431/490

guide piles

batter piles

slope piles

fender piles

Which of the following criteria for bundle bars, do NOT apply?

bars larger than 32 mm shall not be bundled in beams

 bundle bars shall not be enclosed within stirrups or ties

Page 432: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 432/490

 group of parallel reinforcing bars bundled in contact to act as a unit shall be limited to three in

any one bundle

 individual bars within a bundle terminated within the span of flexural members shall terminate

at different points with at least 40 db staggered

 

Which of the following criteria for bundle bars, do NOT apply?

bars larger than 32 mm shall not be bundled in beams

 bundle bars shall not be enclosed within stirrups or ties

Page 433: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 433/490

 group of parallel reinforcing bars bundled in contact to act as a unit shall be limited

to three in any one bundle

 individual bars within a bundle terminated within the span of flexural members shall terminate

at different points with at least 40 db staggered

 

What is a concrete beam placed directly on the ground to providefoundation for the superstructure?

strap beam

Page 434: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 434/490

strap beam

gerber beam

grade beam

tie beam

What is a concrete beam placed directly on the ground to providefoundation for the superstructure?

strap beam

Page 435: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 435/490

strap beam

gerber beam

grade beam

tie beam

What is a round steel bolt embedded in concrete or masonry use tohold down machinery, steel columns or beams, casting, shoes,

beams plates and engine heads?

retaining bolts

Page 436: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 436/490

retaining bolts

foundation bolts

anchor bolts

friction bolts

What is a round steel bolt embedded in concrete or masonry use tohold down machinery, steel columns or beams, casting, shoes,

beams plates and engine heads?

retaining bolts

Page 437: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 437/490

retaining bolts

foundation bolts

anchor bolts

friction bolts

 A concrete flooring and finish which transforms ordinary plainconcrete into an elegant and decorative textured surface. This isdone by adding dust-on-color pigments to the concrete to give a

fast color and imprinted with a patented pattern and texture whilethe concrete is still plastic to create the look and finish of stone,

slate or brick 

impressio crete

Page 438: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 438/490

impressio-crete

textfloor-crete

stucco floor finish

concrete block cushion

 A concrete flooring and finish which transforms ordinary plainconcrete into an elegant and decorative textured surface. This isdone by adding dust-on-color pigments to the concrete to give a

fast color and imprinted with a patented pattern and texture whilethe concrete is still plastic to create the look and finish of stone,

slate or brick 

impressio crete

Page 439: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 439/490

impressio-crete

textfloor-crete

stucco floor finish

concrete block cushion

 Vernacular term for Concrete Hollow Block (CHB) laying

palitada

Page 440: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 440/490

palitada

mitsa

rebokada

asintada

 Vernacular term for Concrete Hollow Block (CHB) laying

palitada

Page 441: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 441/490

palitada

mitsa

rebokada

asintada

 An installation method where the cabinet covers is recessed andflushed with the cabinet sidings

inset or interior

Page 442: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 442/490

inset or interior

concealed

party wall or half lap

full lap or over lap

 An installation method where the cabinet covers is recessed andflushed with the cabinet sidings

inset or interior

Page 443: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 443/490

inset or interior

concealed

party wall or half lap

full lap or over lap

Type of carpet weave important for an architect/designer to knowto guide him as to what type of construction and specification

should he recommend. What simplest type of fiber carpet weavingwhere pile forms as the wrap yarns loop over removable “wires” 

inserted consecutively across the loom?

axminster

Page 444: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 444/490

axminster

wilton

velvet

knitted

Type of carpet weave important for an architect/designer to knowto guide him as to what type of construction and specification

should he recommend. What simplest type of fiber carpet weavingwhere pile forms as the wrap yarns loop over removable “wires” 

inserted consecutively across the loom?

axminster

Page 445: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 445/490

axminster

wiltonvelvet

knitted

 A pretreatment of poured concrete such as walls beams andcolumns where a thin layer of lean cement grout mixed with

flexible base additives is splattered by tampico brush or masonryspoon to the surface to give a “tooth” for excellent plaster adhesion

scratch coat

Page 446: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 446/490

scratch coat

splash coatcement roughing

concrete roughing by chiseling

 A pretreatment of poured concrete such as walls beams andcolumns where a thin layer of lean cement grout mixed with

flexible base additives is splattered by tampico brush or masonryspoon to the surface to give a “tooth” for excellent plaster adhesion

scratch coat

Page 447: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 447/490

scratch coat

splash coatcement roughing

concrete roughing by chiseling

Local species of wood commonly used for wall studding, cabinetframing, and flush door framing, though scarcely available in the

market now due to forestry ban. This type of species is due tocheaper cost than the other listed below

narra

Page 448: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 448/490

narra

molavemahogany

tanguile

Local species of wood commonly used for wall studding, cabinetframing, and flush door framing, though scarcely available in the

market now due to forestry ban. This type of species is due tocheaper cost than the other listed below

narra

Page 449: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 449/490

narra

molavemahogany

tanguile

 A special coating system with a high gloss shine while maintainingthe natural wood qualities, maintenance free, used to finish and

topcoat wood flooring

polyethylene floor coating

Page 450: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 450/490

po ye y e e oo coa g

tile floor coatingepoxy floor coating

polyurethane floor coating

 A special coating system with a high gloss shine while maintainingthe natural wood qualities, maintenance free, used to finish and

topcoat wood flooring

polyethylene floor coating

Page 451: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 451/490

p y y g

tile floor coatingepoxy floor coating

polyurethane floor coating

 A common and cheap masonry finish wherein dry consistencymortar mix is sprayed by mechanical or pneumatic means. The

sprayed cement is left to dry and give a rustic finish. Optional paintcoat maybe required

spraytex

Page 452: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 452/490

p y

anay finishstucco finish

sandblast

 A common and cheap masonry finish wherein dry consistencymortar mix is sprayed by mechanical or pneumatic means. The

sprayed cement is left to dry and give a rustic finish. Optional paintcoat maybe required

spraytex

Page 453: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 453/490

p y

anay finishstucco finish

sandblast

Page 454: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 454/490

What criterion conforms to good construction practice for theearliest time to remove scaffolding for concrete flooring other than

early-strength concrete if no anticipated load is expected overpoured floor?

25% of scaffoldings can be removed at slab area after 21 days of pouring and 100% of scaffolds after 28days

Page 455: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 455/490

days

 50% of scaffolding can be removed after 14 days and 100% of scaffolds after 2 days

 50% of scaffoldings can be removed over slab area after 28 days of pouring and 100% of scaffolding after 36

days

 21% of scaffolds after100days and14% of scaffoldings can be removed at slab area after25

days after pouring

 A type of wood end joint where both wood are cut at equal anglesdiagonally

finger

Page 456: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 456/490

lapsplice

scarf 

 A type of wood end joint where both wood are cut at equal anglesdiagonally

finger

Page 457: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 457/490

lapsplice

scarf 

When utilizing “knock-down” modular system of cabinets and

furniture, an end user is constrain of using:

longer assembly time

Page 458: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 458/490

standard sizes, shapes and formsneeds additional finishing

labor intensive during production and assembly

When utilizing “knock-down” modular system of cabinets and

furniture, an end user is constrain of using:

longer assembly time

Page 459: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 459/490

standard sizes, shapes and formsneeds additional finishing

labor intensive during production and assembly

 A type of terazzo floor described by its physical appearancewhereby the stone or pebble is intentionally exposed while the

cement matrix is depressed

palladiana terazzo

Page 460: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 460/490

rustic terazzovenetian terazzo

standard terazzo

 A type of terazzo floor described by its physical appearancewhereby the stone or pebble is intentionally exposed while the

cement matrix is depressed

palladiana terazzo

Page 461: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 461/490

rustic terazzovenetian terazzo

standard terazzo

Which of the following concrete handling criterion impairs thequality of concrete?

re-tempting concrete shall not be used and discard by approved means

 

Page 462: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 462/490

concrete shall be carried on at such a rate that concrete is at all times plastic and flows readilyinto space between reinforcement

 concrete that has initially set, shall be mixed with new concrete and shall be deposited in the

structure with approved means

 top surfaces or vertically formed lifts shall be generally level

Which of the following concrete handling criterion impairs thequality of concrete?

re-tempting concrete shall not be used and discard by approved means

 

Page 463: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 463/490

concrete shall be carried on at such a rate that concrete is at all times plastic andflows readily into space between reinforcement

 concrete that has initially set, shall be mixed with new concrete and shall be deposited in the

structure with approved means

 top surfaces or vertically formed lifts shall be generally level

 A type of window where the ventilating sash rotates 90 degrees to180 degrees about the header and sill or about the side jamb

combination

Page 464: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 464/490

pivotedawning

 jalousie

 A type of window where the ventilating sash rotates 90 degrees to180 degrees about the header and sill or about the side jamb

combination

Page 465: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 465/490

pivotedawning

 jalousie

To prevent cement plaster from improper adhesion, the substratemust be roughened while observing the following:

cure the cement plaster slowly

Page 466: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 466/490

cure the cement plaster rapidlyadd more cement to the cement plaster

keep the cement plaster as thin as possible

To prevent cement plaster from improper adhesion, the substratemust be roughened while observing the following:

cure the cement plaster slowly

Page 467: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 467/490

cure the cement plaster rapidlyadd more cement to the cement plaster

keep the cement plaster as thin as possible

 A type of “hands of door” where the hinge is at the left and the

door leaf swings inside the room to the left

right hand reverse

Page 468: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 468/490

right handleft hand reverse

left hand

 A type of “hands of door” where the hinge is at the left and the

door leaf swings inside the room to the left

right hand reverse

Page 469: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 469/490

right handleft hand reverse

left hand

What type of joint is used to install a glass into a lite of a Frenchwindow?

dado

Page 470: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 470/490

rabbettenon

mortise

 

What type of joint is used to install a glass into a lite of a Frenchwindow?

dado

Page 471: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 471/490

rabbettenon

mortise

 

 An equipment to uniformly distribute tile adhesive at the undersideof a ________ tile during installation

masonry wall

Page 472: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 472/490

notch troweledge strip trowel

flat steel trowel

 An equipment to uniformly distribute tile adhesive at the undersideof a ________ tile during installation

masonry wall

Page 473: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 473/490

notch troweledge strip trowel

flat steel trowel

 A water-mixed product mixed to a ratio of 1:20 to stabilize limeactivity in new masonry surface. Without preparing the surface

with this mixture will cause the subsequent painting to be defective

acrylic emulsion

Page 474: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 474/490

masonry neutralizeretching solution

aquaseal

 A water-mixed product mixed to a ratio of 1:20 to stabilize limeactivity in new masonry surface. Without preparing the surface

with this mixture will cause the subsequent painting to be defective

acrylic emulsion

Page 475: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 475/490

masonry neutralizeretching solution

aquaseal

 A paint defect which indicates imperfect adhesion of paint to thesurface, with the film getting stripped off in a relatively large pieces

due to application on damp or greasy surface

peeling

Page 476: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 476/490

bleedingalligatoring

cracking

 A paint defect which indicates imperfect adhesion of paint to thesurface, with the film getting stripped off in a relatively large pieces

due to application on damp or greasy surface

peeling

Page 477: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 477/490

bleedingalligatoring

cracking

 A type of shutter proof opaque glass used to construct a door withglass to allow natural light only

figured wired glass

Page 478: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 478/490

smoked glassetched glass

bevel glass

 A type of shutter proof opaque glass used to construct a door withglass to allow natural light only

figured wired glass

Page 479: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 479/490

smoked glassetched glass

bevel glass

 Vernacular term for rough plastering

baldosa

Page 480: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 480/490

asintadarebokada

kostura

 Vernacular term for rough plastering

baldosa

Page 481: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 481/490

asintadarebokada

kostura

 Aggregates should conform to PNS or ASTM standards and must bewell graded, easy workability and method of consolidated are such

that the concrete can be poured without honeycomb or voids.What is the nominal maximum size of a course aggregate whenworking spaces between reinforcements for proper bonding>

Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing barsor wires, bundles of bars, or prestressing tendons or ducts

Page 482: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 482/490

 Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars

or wires, bundles of bars, or prestressing tendons or ducts

 Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars

or wires, bundles of bars, or prestressing tendons or ducts

 Course aggregates shall be no larger than ¾ the minimum clear spacing between individual reinforcing bars

or wires, bundles of bars, or prestressing tendons or ducts

 Aggregates should conform to PNS or ASTM standards and must bewell graded, easy workability and method of consolidated are such

that the concrete can be poured without honeycomb or voids.What is the nominal maximum size of a course aggregate whenworking spaces between reinforcements for proper bonding>

Course aggregates shall be no larger than ½ the minimum clear spacing between individual reinforcing barsor wires, bundles of bars, or prestressing tendons or ducts

Page 483: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 483/490

 Course aggregates shall be no larger than 5/8 the minimum clear spacing between individual reinforcing bars

or wires, bundles of bars, or prestressing tendons or ducts

 Course aggregates shall be no larger than 7/8 the minimum clear spacing between individual reinforcing bars

or wires, bundles of bars, or prestressing tendons or ducts

 Course aggregates shall be no larger than ¾ the minimum clear spacing between individual

reinforcing bars or wires, bundles of bars, or prestressing tendons or ducts

What is the minimum concrete cover for primary reinforcement ofbeams and columns not exposed to earth or weather for precast

manufactured under plant control conditions?

db but not less than 25 mm

Page 484: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 484/490

db but not less than 15 mm and need not exceed 40 mmdb but not less than 20 mm and not to exceed 50 mm

db but not less than 30 mm

What is the minimum concrete cover for primary reinforcement ofbeams and columns not exposed to earth or weather for precast

manufactured under plant control conditions?

db but not less than 25 mm

Page 485: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 485/490

db but not less than 15 mm and need not exceed 40 mmdb but not less than 20 mm and not to exceed 50 mm

db but not less than 30 mm

What is the act of excavating or filling of earth or any soundmaterial or combination thereof, in preparation for a finishing

surface such as paving?

cut and fill

d

Page 486: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 486/490

gradingbenching

site preparation

What is the act of excavating or filling of earth or any soundmaterial or combination thereof, in preparation for a finishing

surface such as paving?

cut and fill

di

Page 487: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 487/490

gradingbenching

site preparation

 A floor finish commercially size 1” x 12” x 12” utilizing clay and fired

in traditional manner making interesting and attractive rustic clay

shade patterns. Because of the rustic effect the floor is finishedrough and simply adhere by cement with some irregularities

cement non skid blocks

i til

Page 488: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 488/490

vigan tilesadobe cobbled stones

mosaic tiles

 A floor finish commercially size 1” x 12” x 12” utilizing clay and fired

in traditional manner making interesting and attractive rustic clay

shade patterns. Because of the rustic effect the floor is finishedrough and simply adhere by cement with some irregularities

cement non skid blocks

i til

Page 489: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 489/490

vigan tilesadobe cobbled stones

mosaic tiles

What is a steel element such as wire, cable, bar, rod or strand, or abundle of such elements, used to impart prestress to concrete?

prestress cables

i f t

Page 490: ALE-(Bldg Techpres Part1)

8/13/2019 ALE-(Bldg Techpres Part1)

http://slidepdf.com/reader/full/ale-bldg-techpres-part1 490/490

reinforcementtenon cables

tendon

What is a steel element such as wire, cable, bar, rod or strand, or abundle of such elements, used to impart prestress to concrete?