ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board...
-
Upload
halie-yarbough -
Category
Documents
-
view
214 -
download
0
Transcript of ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board...
![Page 1: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/1.jpg)
ALASKAALASKA TIDAL TIDAL ENERGY CONFERENCEENERGY CONFERENCE
January 23 – 24, 2007Ketchikan Alaska
Ted Ferry Civic Center Board Room
![Page 2: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/2.jpg)
6
STUDY STUDY AREAAREA
![Page 3: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/3.jpg)
Proposed Northwest Transmission Line
![Page 4: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/4.jpg)
BRITISH BRITISH COLUMBIACOLUMBIA
Proposed Proposed Northwest Northwest TransmissioTransmission Line (NTL)n Line (NTL)
![Page 5: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/5.jpg)
AK-BC INTERTIEAK-BC INTERTIE
• Proposed 26.5-mile transmission line:Tyee Lake Hydroelectric Project to British Columbia border
• Purpose:Interconnect with BCTC’s proposed Northwest Transmission Line to provide access to export markets in BC & Lower 48 for sale of Alaskan-generated electric power
![Page 6: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/6.jpg)
STATUS OF AK-BC INTERTIE STATUS OF AK-BC INTERTIE FEASIBILITY STUDYFEASIBILITY STUDY
• December 2006 Draft Report – AEA Website
• Preparing Draft Final Report – due March 30, 2007
![Page 7: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/7.jpg)
HYDRO, TIDAL AND HYDRO, TIDAL AND GEOTHERMAL PROJECTS: GEOTHERMAL PROJECTS: Factors Influencing Factors Influencing Development Development • New transmission segments in SE
Alaska & BC• Load Growth in SE Alaska• Opportunities to displace current
high-cost diesel• Opportunities to bid Alaskan-
generated power into calls for power in BC & Lower 48
![Page 8: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/8.jpg)
TIDAL POWER: TIDAL POWER: INFORMATION NEEDSINFORMATION NEEDS• Location map including proposed
interconnection• Project layout and description• Generation technology• Installed capacity and annual
generation • Schedule and cost of power• Environmental assessment• Risk assessment
![Page 9: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/9.jpg)
REALITIES OF THE MARKET REALITIES OF THE MARKET IN BC AND LOWER 48IN BC AND LOWER 48• Entry to the Market is the AK-BC
Intertie + Interconnection with BCTC Transmission
• Market opportunities include:–Sale to BC Hydro–Sale to PowerEx, marketing arm of BC Hydro for resale to Lower 48–Sale to mining interests in NW BC to firm up run-of-river projects–Sale to utilities in Pacific Northwest & California
![Page 10: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/10.jpg)
FUTURE GENERATIONFUTURE GENERATIONPROJECT NAME LOCATION CAPACITY 2007 2008 2009 2010 2011 2012 2013 2014 2015 2106Tyee Wrangell 10 MWTyee Expansion Wrangell 10 MWMahoney Lake Ketchikan Borough 9.6 MWReynolds Creek Hydaburg 5.0 MWWhitman Lake Whitman Lake 4.6 MWCascade Creek Petersburg-Wrangell 80 MWNinemile Hyder / Stewart 10 MWSoule River Hyder / Stewart 42 MWRuth Lake Petersburg 20 MWScenery Creek Petersburg 40 – 80 MWWrangell Narrows Tidal Wrangell Narrows 10 – 100 MWTakatz Lake Baranof Island 20 MWGeothermal Revillagigedo Island ?
Total 261 MW
PROJECT NAME LOCATION CAPACITY 2007 2008 2009 2010 2011 2012 2013 2014 2015 2106
Forest Kerr Iskuit 115 MWMore Creek Iskuit 55 MWMcLymount Creek Iskuit 60 MWAnyox Hyder / Stewart 30 MWKitsault & Homestake Hyder / Stewart 26 MWMount Hays Wind Farm Hyder / Stewart 25 MW
Total 311 MW
EARLY-START ON-LINE DATESoutheast Alaska
Northwest British Columbia EARLY-START ON-LINE DATE
![Page 11: ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room.](https://reader035.fdocuments.us/reader035/viewer/2022062620/551b7b50550346a6148b549a/html5/thumbnails/11.jpg)
6
STUDY STUDY AREAAREA