Alarm Optimization Action List

7
Sep Oct Nov Dec Quality Tony Song Echo Chen Y SE JianTao Xiao Y Dev(SW) Li Wang GaoFeng Pan Y HW Luo Gang Dong Ming Y FW Zhang Kevin Edward Wang Y

description

Alarm Optimization Action List

Transcript of Alarm Optimization Action List

Page 1: Alarm Optimization Action List

Sep Oct Nov DecQuality Tony Song

Echo Chen YSE JianTao Xiao YDev(SW) Li Wang

GaoFeng Pan YHW Luo Gang

Dong Ming YFW Zhang Kevin

Edward Wang Y

Page 2: Alarm Optimization Action List

Alarm Priority Alarm Description Owner

1 IAS99 Alarm (Flood alarm)

2 Alarm Interface (Separate window?)

3 DRI86/87/91

4 DRI192/193 Alarm5 CEB28 Alarm (DB mismatch)? CBUS Alarm (RSL Disconnect)

Edward Wang

Jiantao Xiao

Jiantao Xiao

Page 3: Alarm Optimization Action List

Sep.10_Options to resolve this with priority:1. FPGA side 2. FW side 3 SW side

Sep.10_ the current Alarm Windows has provided the "filter" function which could sort the alarms by type, severity and so on. So we do not see the necessity to add new window.

Sep.10_Proposals:1. Remove 91 but leave 862. Change 91 from "Major"to "intermittent"

Page 4: Alarm Optimization Action List

LL-MM

9 9/10 M-H O13 5 H C 7

Description Owner Priority Status Due Date Close Date

Org Owner Item Number Description White Chen Priority Status Due Date Close Date

GSM SE Meeting 0910-003 M O10-Sep-09 8-Oct-09

BTS FW Meeting 0910-002 M O

10-Sep-09 8-Oct-09

BTS FW Meeting 0910-001

Find the right FPGA person for IAS 99.

M O

10-Sep-09 8-Oct-09

Other Meeting 0709-004Tony Song

M O9-Jul-09 13-Aug-09

BTS HW Meeting 0709-001Dong Ming

M O9-Jul-09 13-Aug-09

Org Owner

Origin From

Item Number

OpenDate

OpenDate

Evaluate the feasibility/risk of removing DRI 91 which is similar to DRI86 under support of DongMing.

Jiantao Xiao

Evaluate the work effort if change the IAS 99 alarm frequency from FW side.

Edward Wang

Edward Wang

Discuss with CSIS team to get CSIS OMC expert invovled (Zhang Weiming?)

Investigate the CBUS alarm and report back to team on the detailed info

Page 5: Alarm Optimization Action List

Meeting GSM SWOther BTS FW

BTS HWGSM SEOther

Comments

Comments

One proposal is to postpone the timeslot from alarm clear to read again in FW side.Jan.13: Edward_"FW canceled the report of alarm 99 is not the best way to resolve this problem. If decided FW do that, I think an enhancement SR should be opened and we need 1 week to change code and test it. Also we need an environment for this SR, and IST's support."

Then Quality to follow up with FPGA team for details.Jan.13: No response from FPGA till now. Edward will keep on contacting with them

Page 6: Alarm Optimization Action List

Raritan Engineering Closed Action Item ListAs of 04/18/2023 09:49:18

Raritan Computer, Inc. Proprietary Page 6 of 7

4 99

Description Owner Priority Status Open Date Due Date Close Date

Org Owner Item Number Description Owner Priority Status Open Date Due Date Close Date

GSM SE Meeting 0709-003 M C 7/9/2009 8/13/2009 9/8/2009

Other Meeting 0709-005 Echo Chen M C 7/9/2009 8/13/2009 7/9/2009

Other Meeting 0709-002 Tony Song M C 7/9/2009 8/13/2009 7/10/2009

Org Owner

Origin From

Item Number

Investigate the possibility of initiating new features and feedback to team(Alarm interface)

Jiantao Xiao

Set up regular montly meeting to review the progress

Find out FW reps and ask the invetigate flood alarm such as IAS99

Page 7: Alarm Optimization Action List

Raritan Engineering Closed Action Item ListAs of 04/18/2023 09:49:18

Raritan Computer, Inc. Proprietary Page 7 of 7

Comments

Comments

Sep.8: JianTao sent email out. ("filter" function already exist which could sort the alarms by type, severity and so on.)

Monthly meeting every second Thur. is scheduled.

Kevin Zhang is assigned as the rep.