Alan Daniels Moscow, Russia May 23, 2013 · PDF file• Maintenance, Repair & Overhaul ......
-
Upload
nguyenliem -
Category
Documents
-
view
220 -
download
2
Transcript of Alan Daniels Moscow, Russia May 23, 2013 · PDF file• Maintenance, Repair & Overhaul ......
Alan Daniels Moscow, Russia May 23, 2013
1
Team Leadership Strategy, Focus, Projects Standard Status ISO Liaison 9100 Series Revision Plan Standard Proposal APQP/PPAP - Debbie 9101E Ballot Results - Masa 9100 Usage Survey - Alain
2
IAQG Strategic Focus
Relationship Growth Strategy Civil Authorities - Production Space Defense Maintenance, Repair & Overhaul Trade Associations
Improvement Strategy
Requirements
People Capability
Product & Supply Chain Improvement
Performance
IAQG Operating Management System IAQG Other Party Management Team
Integration Team
3
4
5
Current State Independent release
of standards
Most OEMs deploy 9100
Limited supply chain eligible and required to deploy 9100
Standards supported for deployment presentations
Few measures in place
Strategic Focus Project manage future
integrated standard releases Collaborate with Strategy
Streams IAQG 5 year strategy -
Lead 90% certification Ensure standards are current
and relevant Develop and maintain
document support materials and improve communications
Engage in ISO activities and obtain liaison voting status
Develop future QMS concepts and measures
Future State Integrated release of
future standards
All IAQG member companies use the 9100 series
All eligible supply chain use 9100 series
Standard support is easy to use
Measures drive improvements
IAQG Standards
6
Oversight of Certification Scheme 9104-1 (organization) 9104-2 (surveillance/certs) 9104-3 (auditors)
Maintenance of stds issued by IA
QG
(IA
QG 103)
IAQG OWNERS Data Type DATA B
est practices
Prod
uct &
Su
pply
Cha
in
Stra
tegy
St
ream
People Capability documents (PCAP001) & structure (skills matrix) Peop
le
Cap
abili
ty
Stra
tegy
St
ream
Supply Chain Management Handbook (SCMH)
Sales & Scheduling
Requirement Flow down
Design & Developmt
Plant, skills &
planning
Manufact. &
Inspection
Supplier Mgt.
Control of N/C matl
C/A & P/A
Order Mgt & logistics
Customer Support
Sourcing selection
Business Processes
1 2 3 4 5 6 7 8 9 10 11
9103 Key Char
9102 FAI
9107 DDA
9114 Direct ship
9131 N/C Doc
9132 Marking
9133 Sup.Qual.
9134 Sup risk
9162 Self Ver
9115 Software
9137 AQAP align.
ICO
P C
ertification Scheme
9120 (Distributors)
9100 (General)
9110 (Maintenance) 9101 Audit
Process
Quality Management System
REQ
UIR
EMEN
TS
Stra
tegy
Str
eam
7
22 Standards in Portfolio 14 Active Changes 4 Review Standards in the ballot or publish
phase 4 Development Standards in active team
development 3 New Projects Standards in development 4 Study Standards planning a revision or
past due for reaffirmation 1 Questionnaire Proposal phase to assess support
for the development of a standard 7 Sustain Standards that are published and in
sustain & maintenance phase
8
Complete the ballot and publication process for 10 standards, and initiate the revision process for the 4 behind schedule
Standards in Review (active ballots) 9101 Quality Management Systems Audit Requirements for
Aviation, Space, and Defense Organizations Ballot draft developed, comments incorporated and second ballot has
been completed and passed Changes presentation available
9114 Direct Ship Guidance for Aerospace Companies Ballot draft developed, comments incorporated and ballot has been
initiated. Ballot results in May.
9116 Notification of Change Ballot draft developed, comments incorporated and ballot has been
initiated. Ballot results in May.
9104-2 Requirements for Oversight of Aerospace Quality Management Ballot draft developed, comments incorporated and ballot has been
initiated.
9
IAQG standards in Development (revisions) 9100 Quality Management Systems - Requirements for
Aviation, Space and Defense Organizations Developed design specification, schedule, integrated schedule, etc.
9104-3 Requirements for Aerospace Auditor Competency and Training Courses Team member transition resulted in a delay New resources added and
progressing.
9107 Direct Delivery Authorization Guidance for Aerospace Companies Revision is in work. Will work after 9114 is complete. Judy Lasley to be
engaged.
9102 Aerospace First Article Inspection Requirement Draft complete and steps towards ballot initiated - IAQG Editor
10
IAQG standards in Development (new) 9117 Delegated Product Release Verification (DPRV)
Active and meeting regularly working on the new standard.
9136 Root Cause Analysis and Problem Solving Ballot draft complete Ballot process to begin in the next few
weeks.
9138 Statistical Product Acceptance Standard number issued and meetings have begun on revision.
91XX Advance Product Quality Planning (APQP) / Production Part Approval Process (PPAP) SWG approved - Council vote in Moscow.
11
IAQG standards in Study or Noncompliant 9132 Data Matrix Quality Requirements for Parts Marking
Noncompliant to review requirement No IDR 9133 Qualification Procedure for Aerospace Standard
Parts Noncompliant to review requirement - Working draft complete and SDRs
are reviewing.
9134 Supply Chain Risk Management Guideline Noncompliant to review requirement - Recommendation is to cancel
standard.
9162 Aerospace Operator Self-Verification Programs Noncompliant to review requirement Project plate to be complete.
IDR recommends it be revised.
12
Measure Description Status Comments
Performance to budget allocation Forecast to actual Performing within budget.
Compliance to 5 Year Standard Assessment requirement
IDR compliance 9132, 9133, 9134 and 9162 all behind schedule (TBD, Feldsmann, Stock, Gordon)
Publish an updated Standard Register twice a year
Revision schedule Updated in April and is being published (Daniels)
Deploy and collect data for the 9100 Usage & Flow Down Survey
Sector data on 9100 usage
Data delayed 2012 results but is now complete, 2013 initiated
Track the identification and performance of Standard IDRs and SDRs
IDRs and SDRs assigned
SDR needed for 9120 (EAQG) IDR needed for 9132 (?) SDR needed for 9132 (EAQG) IDR Needed for 9103 (?) SDR needed for 9162 (EAQG) SDRs needed for 9138 (EAQG, APAQG)
9100 manage the initiative, project and revision process
Revision schedule Ahead of schedule, deliverables met (Daniels)
9101 manage the initiative, project and revision process
Revision schedule 2nd ballot complete. (Kawamoto)
Provide proactive ISO Liaison support to the ISO 9001 revision
Coordination IAQG comments accepted, early preview enabled (Daniels)
On Track / Target Behind Schedule Issues Identified 13
14
Presenter: Alan Daniels (Boeing) Subject: Cancellation of the 9134 Supply Chain Risk
Management Guideline. Currently noncompliant to review requirement . This standards is more guidance type material and the topic is currently covered in the SCMH. IDR, SDR and Reqs Team endorse request.
Does the Council accept the proposal to:
Cancel the 9134 standard Supply Chain Risk Management Guideline standard.
A vote in favor means: Cancellation process begins.
Not voting in favor means:
No cancellation and revision will need to be initiated.
Council Decision:
15
9100 Series Revision High Level Plan
The 9100 is based on ISO 9001 and is thus affected by the ISO TC176 revision activity
Several other IAQG standards are based on the IAQG 9100 standard, and will require revision in parallel with the 9100 standard revision activity
The IAQG 9100-series standards are planned for publication in 2016
9100 Series Revision
16
EAQG Leader: Brigitte CLAMENS
(Zodiac Aerospace)
Members: Roberto CIASCHI (ESA) Stuart ANTHONY (RR)
AAQG Leader: Buddy CRESSIONNIE
(Lockheed Martin)
Members: James CLIFFORD (UTC) Mark COVERT (Honeywell)
APAQG Leader: Masahiro KAWAMOTO
(MHI)
Members: Chen ZHONGYUAN (AVIC) Tatsuya SHIRAI (KHI)
IAQG Leader: Alan DANIELS (Boeing)
IAQG Standards Representatives 9101 : Masahiro KAWAMOTO (MHI) 9110 : Agathe MOLL (Airbus) 9120 : Dale GORDON (Aerojet) 9115 : Raymond WRIGHT (Raytheon) 9137 : Juan Ignacio MARTIN (Airbus Military)
IAQG 9100 Series Team
17
18
Companies certified to revised standards
Nagoya 10/2012
Moscow 05/2013
Montreal 10/2013
Preparing
San Antonio 05/2012
Ballots reviews and comments Publications
9100 revision START
For more information, see detailed schedule
END TBD
First Draft Ballot