Alan Daniels Moscow, Russia May 23, 2013 · PDF file• Maintenance, Repair & Overhaul ......

download Alan Daniels Moscow, Russia May 23, 2013 · PDF file• Maintenance, Repair & Overhaul ... 9162 Self Ver 9115 Software 9137 ... Roberto CIASCHI (ESA) Stuart ANTHONY (RR) AAQG

If you can't read please download the document

Transcript of Alan Daniels Moscow, Russia May 23, 2013 · PDF file• Maintenance, Repair & Overhaul ......

  • Alan Daniels Moscow, Russia May 23, 2013

    1

  • Team Leadership Strategy, Focus, Projects Standard Status ISO Liaison 9100 Series Revision Plan Standard Proposal APQP/PPAP - Debbie 9101E Ballot Results - Masa 9100 Usage Survey - Alain

    2

  • IAQG Strategic Focus

    Relationship Growth Strategy Civil Authorities - Production Space Defense Maintenance, Repair & Overhaul Trade Associations

    Improvement Strategy

    Requirements

    People Capability

    Product & Supply Chain Improvement

    Performance

    IAQG Operating Management System IAQG Other Party Management Team

    Integration Team

    3

  • 4

  • 5

    Current State Independent release

    of standards

    Most OEMs deploy 9100

    Limited supply chain eligible and required to deploy 9100

    Standards supported for deployment presentations

    Few measures in place

    Strategic Focus Project manage future

    integrated standard releases Collaborate with Strategy

    Streams IAQG 5 year strategy -

    Lead 90% certification Ensure standards are current

    and relevant Develop and maintain

    document support materials and improve communications

    Engage in ISO activities and obtain liaison voting status

    Develop future QMS concepts and measures

    Future State Integrated release of

    future standards

    All IAQG member companies use the 9100 series

    All eligible supply chain use 9100 series

    Standard support is easy to use

    Measures drive improvements

  • IAQG Standards

    6

  • Oversight of Certification Scheme 9104-1 (organization) 9104-2 (surveillance/certs) 9104-3 (auditors)

    Maintenance of stds issued by IA

    QG

    (IA

    QG 103)

    IAQG OWNERS Data Type DATA B

    est practices

    Prod

    uct &

    Su

    pply

    Cha

    in

    Stra

    tegy

    St

    ream

    People Capability documents (PCAP001) & structure (skills matrix) Peop

    le

    Cap

    abili

    ty

    Stra

    tegy

    St

    ream

    Supply Chain Management Handbook (SCMH)

    Sales & Scheduling

    Requirement Flow down

    Design & Developmt

    Plant, skills &

    planning

    Manufact. &

    Inspection

    Supplier Mgt.

    Control of N/C matl

    C/A & P/A

    Order Mgt & logistics

    Customer Support

    Sourcing selection

    Business Processes

    1 2 3 4 5 6 7 8 9 10 11

    9103 Key Char

    9102 FAI

    9107 DDA

    9114 Direct ship

    9131 N/C Doc

    9132 Marking

    9133 Sup.Qual.

    9134 Sup risk

    9162 Self Ver

    9115 Software

    9137 AQAP align.

    ICO

    P C

    ertification Scheme

    9120 (Distributors)

    9100 (General)

    9110 (Maintenance) 9101 Audit

    Process

    Quality Management System

    REQ

    UIR

    EMEN

    TS

    Stra

    tegy

    Str

    eam

    7

  • 22 Standards in Portfolio 14 Active Changes 4 Review Standards in the ballot or publish

    phase 4 Development Standards in active team

    development 3 New Projects Standards in development 4 Study Standards planning a revision or

    past due for reaffirmation 1 Questionnaire Proposal phase to assess support

    for the development of a standard 7 Sustain Standards that are published and in

    sustain & maintenance phase

    8

    Complete the ballot and publication process for 10 standards, and initiate the revision process for the 4 behind schedule

  • Standards in Review (active ballots) 9101 Quality Management Systems Audit Requirements for

    Aviation, Space, and Defense Organizations Ballot draft developed, comments incorporated and second ballot has

    been completed and passed Changes presentation available

    9114 Direct Ship Guidance for Aerospace Companies Ballot draft developed, comments incorporated and ballot has been

    initiated. Ballot results in May.

    9116 Notification of Change Ballot draft developed, comments incorporated and ballot has been

    initiated. Ballot results in May.

    9104-2 Requirements for Oversight of Aerospace Quality Management Ballot draft developed, comments incorporated and ballot has been

    initiated.

    9

  • IAQG standards in Development (revisions) 9100 Quality Management Systems - Requirements for

    Aviation, Space and Defense Organizations Developed design specification, schedule, integrated schedule, etc.

    9104-3 Requirements for Aerospace Auditor Competency and Training Courses Team member transition resulted in a delay New resources added and

    progressing.

    9107 Direct Delivery Authorization Guidance for Aerospace Companies Revision is in work. Will work after 9114 is complete. Judy Lasley to be

    engaged.

    9102 Aerospace First Article Inspection Requirement Draft complete and steps towards ballot initiated - IAQG Editor

    10

  • IAQG standards in Development (new) 9117 Delegated Product Release Verification (DPRV)

    Active and meeting regularly working on the new standard.

    9136 Root Cause Analysis and Problem Solving Ballot draft complete Ballot process to begin in the next few

    weeks.

    9138 Statistical Product Acceptance Standard number issued and meetings have begun on revision.

    91XX Advance Product Quality Planning (APQP) / Production Part Approval Process (PPAP) SWG approved - Council vote in Moscow.

    11

  • IAQG standards in Study or Noncompliant 9132 Data Matrix Quality Requirements for Parts Marking

    Noncompliant to review requirement No IDR 9133 Qualification Procedure for Aerospace Standard

    Parts Noncompliant to review requirement - Working draft complete and SDRs

    are reviewing.

    9134 Supply Chain Risk Management Guideline Noncompliant to review requirement - Recommendation is to cancel

    standard.

    9162 Aerospace Operator Self-Verification Programs Noncompliant to review requirement Project plate to be complete.

    IDR recommends it be revised.

    12

  • Measure Description Status Comments

    Performance to budget allocation Forecast to actual Performing within budget.

    Compliance to 5 Year Standard Assessment requirement

    IDR compliance 9132, 9133, 9134 and 9162 all behind schedule (TBD, Feldsmann, Stock, Gordon)

    Publish an updated Standard Register twice a year

    Revision schedule Updated in April and is being published (Daniels)

    Deploy and collect data for the 9100 Usage & Flow Down Survey

    Sector data on 9100 usage

    Data delayed 2012 results but is now complete, 2013 initiated

    Track the identification and performance of Standard IDRs and SDRs

    IDRs and SDRs assigned

    SDR needed for 9120 (EAQG) IDR needed for 9132 (?) SDR needed for 9132 (EAQG) IDR Needed for 9103 (?) SDR needed for 9162 (EAQG) SDRs needed for 9138 (EAQG, APAQG)

    9100 manage the initiative, project and revision process

    Revision schedule Ahead of schedule, deliverables met (Daniels)

    9101 manage the initiative, project and revision process

    Revision schedule 2nd ballot complete. (Kawamoto)

    Provide proactive ISO Liaison support to the ISO 9001 revision

    Coordination IAQG comments accepted, early preview enabled (Daniels)

    On Track / Target Behind Schedule Issues Identified 13

  • 14

    Presenter: Alan Daniels (Boeing) Subject: Cancellation of the 9134 Supply Chain Risk

    Management Guideline. Currently noncompliant to review requirement . This standards is more guidance type material and the topic is currently covered in the SCMH. IDR, SDR and Reqs Team endorse request.

    Does the Council accept the proposal to:

    Cancel the 9134 standard Supply Chain Risk Management Guideline standard.

    A vote in favor means: Cancellation process begins.

    Not voting in favor means:

    No cancellation and revision will need to be initiated.

    Council Decision:

  • 15

  • 9100 Series Revision High Level Plan

    The 9100 is based on ISO 9001 and is thus affected by the ISO TC176 revision activity

    Several other IAQG standards are based on the IAQG 9100 standard, and will require revision in parallel with the 9100 standard revision activity

    The IAQG 9100-series standards are planned for publication in 2016

    9100 Series Revision

    16

  • EAQG Leader: Brigitte CLAMENS

    (Zodiac Aerospace)

    Members: Roberto CIASCHI (ESA) Stuart ANTHONY (RR)

    AAQG Leader: Buddy CRESSIONNIE

    (Lockheed Martin)

    Members: James CLIFFORD (UTC) Mark COVERT (Honeywell)

    APAQG Leader: Masahiro KAWAMOTO

    (MHI)

    Members: Chen ZHONGYUAN (AVIC) Tatsuya SHIRAI (KHI)

    IAQG Leader: Alan DANIELS (Boeing)

    IAQG Standards Representatives 9101 : Masahiro KAWAMOTO (MHI) 9110 : Agathe MOLL (Airbus) 9120 : Dale GORDON (Aerojet) 9115 : Raymond WRIGHT (Raytheon) 9137 : Juan Ignacio MARTIN (Airbus Military)

    IAQG 9100 Series Team

    17

  • 18

    Companies certified to revised standards

    Nagoya 10/2012

    Moscow 05/2013

    Montreal 10/2013

    Preparing

    San Antonio 05/2012

    Ballots reviews and comments Publications

    9100 revision START

    For more information, see detailed schedule

    END TBD

    First Draft Ballot