Airodek System

1
B - Approved with comments Method statement is approved based on system described in attached document. CALLC is responsible for erection, stability and integrity of decking system. CALLC shall be submit inspection request for decking level for each pour along with check certificate signed by RMD site engineer. Decking system shall not remove from the pour strip area after cast until get the approval from concern engineer’s approval. Contractor has to ensure all the decking system shall done as per Airodek erection method& standards. Airodek engineer/foreman to present at site while executing decking work.

description

airodeck scaffolding system

Transcript of Airodek System

B - Approved with comments Method statement is approved based on system described in attached document. CALLC is responsible for erection, stability and integrity of decking system. CALLC shall be submit inspection request for decking level for each pour along with check certificate signed by RMD site engineer. Decking system shall not remove from the pour strip area after cast until get the approval from concern engineers approval. Contractor has to ensure all the decking system shall done as per Airodek erection method& standards. Airodek engineer/foreman to present at site while executing decking work.