Transcript of Airier Bio Mass 2 MW Example
![Page 1: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/1.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 1/35
Credentials & Technology
A PRESENTATION
![Page 2: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/2.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 2/35
WHO ARE WE
• We are a leading player in the clean-tech
energy
• We have been leading innovation in clean-
tech energy for over a decade
• We have pioneered the wind ventilator in India
• We have partnered with the biggest names inIndian industry
![Page 3: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/3.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 3/35
WHERE DO WE SEE OURSELVES
To be the most trusted renewable energy brand
across markets, offering innovative, zero
emission products, profiting & benefiting the
company , customers , employees &
community at large.
![Page 4: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/4.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 4/35
WHAT DO WE DO
• We are pioneers and innovators
• in wind
• solar
• and bio-mass energy.
![Page 5: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/5.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 5/35
HOW WE DO IT
With our spirit of non-conventional
entrepreneurship and clear processes enable us
to think smarter & move faster to offer
superior renewable energy solutions.
![Page 6: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/6.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 6/35
WHY WE DO IT
Because we believe in ‘change for good’ for
the individual, the organization, the customer,
industry & the planet.
![Page 7: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/7.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 7/35
![Page 8: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/8.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 8/35
WHY CHANGE FOR GOOD
• Because fossil fuels like diesel and coal is fast
dwindling
• They cause immense environmental damage
• They are expensive to extract
• Power produced from fossil fuels costs almost
twice of fuels produced from bio mass
![Page 9: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/9.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 9/35
WHY CHANGE FOR GOOD
• The power situation in India is near critical
• The power shortage is likely to get worse
• The cost of conventional power is likely to seean upward trend
• Power distribution in India is likely to become
more inefficient in the future with poorinfrastructure
![Page 10: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/10.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 10/35
CHANGE FOR GOOD
• To a decentralised power and energy system
• To captive power plants run on Bio Mass
• To run in parallel with the existing centralisedgrid systems
• To become energy independent
• To become eco-friendly and reduce carbonemission
![Page 11: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/11.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 11/35
2 MW Bio Mass Power Plant
A PRESENTATION
![Page 12: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/12.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 12/35
HOW DOES IT WORK
• Bamboo is cut to size and dried to be fed into
the reactor
• The solid bio mass inside the reactor converts
to a gaseous fuel having a composition of:
CO : 20 ± 1 %
H2 : 20 ± 1 %
CH4 : 3 ± 1 %CO2 : 12 ± 1 %
N2 : Balance
Average lower heating value : 4.8 ± 0.2 MJ / kg
Avg. density of producer gas : 1.095 kg / Nm3 ( at 00 C &
760 mmHg)
![Page 13: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/13.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 13/35
HOW DOES IT WORK
• This gaseous fuel contains dust and tar
particulates which is cleaned using water by
coolers and scrubbers
• Moisture traps are used to remove the moisture
• Gas is further filtered through a sawdust and
fabric filter
• The clean gas emerges out as per the engine
requirements
![Page 14: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/14.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 14/35
HOW DOES IT WORK
• This gas is connected to the Engine by a
pipeline
• The engine is connected to an alternator for
production of electricity
• Power from the alternator is fed to the grid
through panels which sync with the grid
![Page 15: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/15.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 15/35
![Page 16: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/16.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 16/35
FUEL REQUIREMENT FOR 2 MW
BIO MASS
POWER PLANT
• 45-55 Tonne/Day for 24 Hr operation
• Bio mass of density 300-400 Kg/m3
• 2” – 3.5” in Dia and 3”-3.5” in length
![Page 17: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/17.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 17/35
CHANGE FOR GOOD
To Airier Bio-Mass Power Plant
Save Money. Save The Future.
![Page 18: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/18.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 18/35
AIRIER BIO-MASS POWER
PLANT
• During continuous operation, all filtration
equipments have standby for cleaning
purposes
• All pumps have standby in case of failure
• Oxygen levels monitored using Oxygen
monitors for any ingress of Oxygen into the
system
![Page 19: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/19.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 19/35
AIRIER BIO-MASS POWER
PLANT
• Compatible with Diesel Generator Sets
• Good quality of gas
• Minimal maintenance for engine
![Page 20: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/20.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 20/35
AIRIER BIO-MASS POWER
PLANT
• Stringent quality control
• Quality standards
• Reduced installation time
![Page 21: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/21.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 21/35
AIRIER 2 MW BIO MASS
PLANT
Gasifier Size: 4 x 550 Kg/Hr
Specific fuel consumption is 1.15 Kg/Kwh
(appx.)
Continuous operation for 24 Hrs withallowance for breakdown maintenance
![Page 22: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/22.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 22/35
2MW BIO-MASS
POWER PLANT
Schematic Drawing
![Page 23: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/23.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 23/35
Stage 1 Stage 3Stage 2 Stage 4 Stage 5
Processing
Chopping
Briquetting
Dehydration
Drying
Gasification Gas cleaning
Boiler/Furnace/k
iln
Turbine
Engine
Biomass
Harvesting
Complete Gasification Process
![Page 24: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/24.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 24/35
2MW BIO-MASS
POWER PLANT
General Description
![Page 25: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/25.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 25/35
Materials of construction
• IS 2062 for Reactor, flanges & fine filter
• SS316L for cyclone, reactor air nozzles, outlet pipe &
reactor bottom plate
• SS304 for all other components
Laser cut of materials in SS304, SS316L & flanges in
IS2062
Reactor top cover is a hinged cover (manually operated) & provided with a biomass feeding hopper of cap 175kg
![Page 26: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/26.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 26/35
![Page 27: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/27.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 27/35
Gasifier cooling towers 3x100TR with induced draft
Solenoid activated valves in ash & charcoal discharge
waterline
Cooling water pump 4+2
Gas suction blowers Static pressure 1250 mmwc and flowrate of 1775 m3/hr each
![Page 28: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/28.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 28/35
Structural's: 2 level for all equipments with provision of
platform for service & refill
Pressure transducer for reactor pressure drop measurement
& operation of Screw conveyer in parallel with timedoperation of conveyer
Skip charger 2x160kg for each reactor
![Page 29: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/29.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 29/35
ECONOMICS
![Page 30: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/30.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 30/35
Power & Heat purchase agreement
• Rs. 6.50/ unit for 12 hrs/Day
• Rs. 4 / unit for remaining 12 Hrs
• Heat- Rs. 2/Kw @ 8 hrs/day
![Page 31: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/31.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 31/35
Assumptions
• 55 Tonne of fuel per day is available @
Rs.3/Kg
• Plant is connected to the grid
• Charcoal is sold at Rs. 20/Kg
• 600 Kw of thermal energy is continuously
utilized
Approximate project cost Rs. 16,00,00,000
![Page 32: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/32.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 32/35
pp p j , , ,
Expenditure: Plant running expenses (Per day) Rs. / Day
Input fuel/ Day 165000
(55 Tonnes @ Rs.3000/Tonne)
Processing 27500
(Appx. Rs. 0.50/Kg)
Generation/Labor Charges 15000
(30 members @ Rs.10,000 each per month)
Maintenance 10000
(Engine & Gasifier Maintenance)
Water treatment charges 5000
Dryer charges 10000
Others 10000
Total running cost per day Rs. 2,42,500
![Page 33: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/33.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 33/35
Income Rs / Day
Power1 (Rs. 6.50/Kwh) 128000
Power2 ( Rs. 4/Kwh) 78720
(Considering 18% power for gasifier operation)
Heat 28800
(Rs.2/Kw @ 600 Kw)
Charcoal 66000(6% of fuel input @ Rs.20/Kg)
Carbon Credits @ Rs.0.70/Unit 33600
335120
Profit/Day Rs.92,620
Appx. ROI 5 Years
![Page 34: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/34.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 34/35
OUR RELATIONSHIPS
• L&T
• L&T ECC
• Toyota• Volvo
• Asahi Glass
![Page 35: Airier Bio Mass 2 MW Example](https://reader030.fdocuments.us/reader030/viewer/2022021321/577cc65c1a28aba7119e0456/html5/thumbnails/35.jpg)
8/11/2019 Airier Bio Mass 2 MW Example
http://slidepdf.com/reader/full/airier-bio-mass-2-mw-example 35/35