Etablissement national de la navigation Aérienne
Second ICAO Meeting on the sustainable development of Air Transport in Africa 28-31 March 2017 Accra
E N N A
![Page 2: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/2.jpg)
EN ROUTE AIR TRAFFIC Algiers FIR
Years Total
2015 240 070
2016 254 439
2017 270 522
2018 282 000
2019 298 000
2020 314 000
2021 332 000
2022 350 000
2023 369 000
2024 389 000
2025 411 000
Average annual growth rate
5 ,5%
2
![Page 3: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/3.jpg)
Airports AIR TRAFFIC
Years
Total
2015 216 101
2016 237 040
2017 255 510
2018 265 730
2019 276 360
2020 287 410
2021 301 780
2022 316 870
2023 332 710
2024 349 350
2025 366 820
Average annual growth rate 5,0%
3
![Page 4: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/4.jpg)
CURRENT TECHNICAL MEANS
40 VOR
47 DME
34 NDB
14 ILS
NAVAIDS TELECOMS
23 VHF Stations
02 HF stations
Radiolinks
PTT links
VSAT links
SURVEILLANCE
01 co mounted PSR/MSSR radar station at
Algiers
04 MSSR radar stations at
Oran (West), Annaba (East),
El Oued (South East)
El Bayadh (South West)
ADS-C and CPDLC 4
![Page 5: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/5.jpg)
Algiers ACC
5
![Page 6: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/6.jpg)
MAJOR PROJECTS
Projects financed by the Algerian State for a total amount of
1. Plan de Développement de la Gestion de l’Espace
Aérien (PDGEA)
2. Control Towers for Algiers, Oran, Constantine,
Ghardaïa and Tamanrasset Airports
3. 20 ILS/DME equipements
Projects financed by the Algerian State for a total amount of :
6
![Page 7: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/7.jpg)
1. Realization of an ACC in Tamanrasset fully equiped
2. Radar coverage strengthening (North of the FIR)
3. Extension of radar coverage to the South of the FIR
4. Introduction of ADS-B means for surveillance
5. Reinforcement and extension of VHF coverage (total FIR)
6. Telecommunications Support (VSAT, radiolinks)
7. Integration and harmonization of the 02 ACCs (Algiers and Tamanrasset)
8. Training of operational and technical staff
1. CONSISTENCY OF THE PDGEA Project
7
![Page 8: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/8.jpg)
MAJOR PROJECTS
- New international terminal (west terminal) with capacity of
10 million passengers at Algiers Airport
This project is financed by the airport management company
(EGSA) for an amount of 50 000 000 Euros
An other project ongoing as well is the
-Intermodality of transport (train, metro) to and from the
Algiers Airport
8
![Page 9: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/9.jpg)
Spliting of the current Algiers FIR (Northen FIR and Southern FIR) project
9
Northen FIR
Southern FIR
![Page 10: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/10.jpg)
10
Current RADAR coverage - FL100
![Page 11: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/11.jpg)
11
Current RADAR coverage- FL200
![Page 12: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/12.jpg)
12
Current RADAR coverage- FL300
![Page 13: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/13.jpg)
13 ADS/B RADAR
FUTUR RADAR AND ADS-B COVERAGE
![Page 14: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/14.jpg)
FUTUR VHF
COVERAGE
FL 300
14
![Page 15: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/15.jpg)
INFRASTRUCTURE PART : 1 – Study and follow-up of the futur ACC of Tamanrasset Contrat signed in December 2012 for an amount of : 534 000 Euros Completion time of 24 mois. To be finalised in december 2017
2 - Realization of civil engineering : Contrat signed in July 2015 for an amount of : 25 450 000 Euros Completion time of 28 mois. To be finalised in december 2017
15
![Page 16: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/16.jpg)
FUTUR COMPLEXE DE LA NAVIGATION AERIENNE DE TAMANRASSET
16
![Page 17: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/17.jpg)
Works of the futur ACC at Tamanrasset
17
![Page 18: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/18.jpg)
Works of the futur ACC at Tamanrasset
18
![Page 19: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/19.jpg)
Air navigation equipments:
This part deals with the supply, installation and commissioning of air navigation equipments as well as training of ENNA controlers and technical engineers.
ATC systems including VCS for the actual ACC (Algiers), the futur ACC (Tamanrasset) and the 05 APPs (Algiers, Oran, Constantine, Annaba, Hassi Messaoud)
Surveillance :
• 02 co mounted PSR/SSR-S S Radar stations, • 02 PSR Radar stations, • 07 SSR-S Radars stations, • 13 ADS-B stations :
• Telecoms : • 30 radio VHF, • 02 VSAT HUB, • 25 VSAT • 24 Radiolinks Stations,
19
![Page 20: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/20.jpg)
This part of the project is ongoing
The call for tenders has been done in september 2016. 03 submissions have been received.
The Counterparty will be known in the next days.
20
![Page 21: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/21.jpg)
2. CONTROL TOWERS for Algiers, Oran, Constantine, Ghardaïa and Tamanrasset Airports
21
Oran
Ghardaia
Constantine
Tamanrasset
![Page 22: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/22.jpg)
ALGIERS CONTROL TOWER
• Contract amount: 22 016 000 Euros
• End of works planned for December 2017
22
![Page 23: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/23.jpg)
ALGIERS CONTROL TOWER
23
![Page 24: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/24.jpg)
CONSTANTINE CONTROL TOWER
• Contract amount: 18 851 000 Euros
• End of works planned for December 2017
24
![Page 25: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/25.jpg)
CONSTANTINE CONTROL TOWER
25
![Page 26: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/26.jpg)
ORAN CONTROL OWER
• Contract amount: 18 225 000 Euros
• End of works planned for December 2017
26
![Page 27: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/27.jpg)
ORAN CONTROL TOWER
27
![Page 28: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/28.jpg)
GHARDAIA CONTROL TOWER
• Contract amount: 27 750 000 Euros
• End of works planned for December 2017
28
![Page 29: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/29.jpg)
GHARDAIA CONTROL TOWER
29
![Page 30: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/30.jpg)
TAMANRASSET CONTROL TOWER
• Contract amount: 21 770 000 Euros
• End of works planned for December 2017
30
![Page 31: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/31.jpg)
TAMANRASSET CONTROL TOWER
31
![Page 32: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/32.jpg)
3. 20 ILS/DME equipments
• Contract amount : 6 100 000 Euros
• These 20 navaids equipments are installed in phase in Alger,
Oran, Bejaïa, Jijel, Batna, Tlemcen, Ghardaïa,
Constantine, Annaba, Tébessa, Adrar, Djanet, In-
Salah, Bordj-Badj-Mokhtar, Chlef, In-Aménas,
Touggourt, Sétif, Tamanrasset, El-Goléa.
• Are currently being installed by ENNA .
32
![Page 33: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/33.jpg)
Prospects for 2019
The concretization of the two major PDGEA and the 5 Control Towers projects registered -- will allow the National Air Navigation Authority to put in place a long-term development strategy, namely:
PDGEA Project :
Creation of a second ACC at Tamanrasset;
Enhanced radar coverage (North);
Extension of radar coverage to the South;
Introduction of ADS-B surveillance for the entire FIR;
Reinforcement and extension of VHF coverage (FIR);
Increase in the availability of telecommunications media by diversifying resources (VSAT, radiolinks, optical fiber);
Non-stop traffic growth;
Integration and harmonization of the two ACCs (Algiers and Tamanrasset);
Training (conrolers aznd technics);
Creation of jobs.
33
![Page 34: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/34.jpg)
Projet Tours de contrôle et Blocs Technique :
Strengthening security through the provision of new control equipment at the airports of Algiers, Oran, Constantine, Ghardaïa and Tamanrasset; Growth in traffic with stopovers; Creation of jobs ;
34
![Page 35: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/35.jpg)
OTHER ACTIONS TAKEN BY ENNA during the last 5 years :
• Acquisition and installation of 25 PAPIs : finalized : 310 000
Euros •Acquisition of an aircraft for inspection and calibration in flight : finalized : 10 630 000 USD •Acquisition of 09 medium-power fire-fighting vehicles for In amenas - Illizi - Constantine - Batna - Hassi Messaoud - Chlef - El Golea - Tebéssa and Djanet airports : finalised : 4 401 000 Euros
35
![Page 36: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/36.jpg)
•Acquisition of 02 VOR / DMEs for Tebéssa and Ghardaïa airports and 05 DMEs for Hassi Messaoud, Boussaâda, Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped for various airport towers : finalised : 1 700 000 GBP •Acquisition of 08 remote VHF sets of 50 W (Advanced Antennas) for various sites : finalised : 326 000 GBP
36
![Page 37: AIR NAVIGATION PROGRAMS · 2017. 3. 29. · Constantine, Djanet and Oran airports : finalised : 1 040 000 Euros •Acquisition of 11 sets of working position towers fully equiped](https://reader036.fdocuments.us/reader036/viewer/2022071420/6119e2c7318ded51c054198e/html5/thumbnails/37.jpg)
37
THANK YOU FOR YOUR KIND ATTENTION