AIM Program Software Status. AIM Program Software Includes: AIM I AIM II AIM Learning Object Module...

21
AIM Program Software Status

Transcript of AIM Program Software Status. AIM Program Software Includes: AIM I AIM II AIM Learning Object Module...

AIM Program Software Status

AIM Program Software Includes:

• AIM I• AIM II• AIM Learning Object Module• Content Planning Module

AIM TrainingTraditional “Buttonology” Courses• AIM I• 2 FY 15 convenings, 1 on each coast

• AIM II• 6 convenings

• CPM/LO Module• 16 convenings

E2E Training• Taught or expected to be taught at every

learning center or fleet concentration area• Approximately 50% of the convenings in the

Hampton Roads area• Distance Learning version of current E2E ILT

course planned for facilitated asynchronous delivery via NETC N7 Sakai instance

E2E TrainingTraining in support of the NETC E2E Process• NAVEDTRAs• NETC End-to-End Process SOP• Three new topics in design:

• BCA – FEA in govt review• R3 (Reuse, Repurpose, Reference) – integrated

into the DL Videos, retrofitting into ILT course• Reengineering – in JDTA currently

AIM Program Updates

AIM Update December 2014

• Fixed summary display in the CMS• Fixed issues with CMS Events for non-CCMM

site• Added support for multiple Volumes in LP• Added support for adding distribution

statements to the cover page of the TPP, TCCD, LP, TG

AIM Update December 2014

(contd)

• LP Preview automatically turns to PDF if over 2500 pages

• Changed the terminology from IMI (Interactive Media Instruction) to IMM (Instructional Media Material)

• Added "Save Source File As..." and a "Save As..." menu items to the Graphics module

AIM Update December 2014

(contd)

• Changed PC Simulation support in the Site RRL, moving it from a separate category to be a subset of IMM.

• Increased the field size for number and supplier fields.

• Fixed issue when printing the TG and the S/HAN contains section breaks

AIM Update December 2014

(contd)

• When editing sheet content, software should no longer hang if trying to edit a document that is blocked by Word 2010's security settings.

• Updated TPP functionality based on feedback from TPP Working Group

• Expanded performance assessment support

CPM Update 2nd QTR FY15

• TPP updates from TPP Working Group

• OCCSTD import into JDTA• Expanded Field Level Help in CPM• Expanded PC Simulation in RRL

CPM Update 2nd QTR FY15

(contd)

• Multicenter Roles for CPM users• Remedy printing, data import, and

JDTA copy issues in CPM• Correct Lesson length• Change IMI to IMM

Future AIM / CPM Updates

• Improved Lesson Plan formatting• Versioning –

• Create new versions of only those Modules/Lessons/Sections that actually need to be modified. Remaining content stays at its current approved version

• Course Master Schedule fixes• Front End Analysis (FEA)• Table of Specifications (TOS)

Future AIM / CPM Updates(contd)

• Track Access/Changes to data in AIM I/AIM II/LO Module

• Data Retention of CPM Data• Versioning Resources / Data /

KSATRs• Portion Marking• OCCSTD Versioning

LO Module Integration into CPM – ‘Webification’

• Long-term NETC plan is to integrate LO Module functions into CPM as a fully web-based application

Phase 1

• Core of LO Module creation in CPM‒ delivered and accepted by govt Jan 14

Phase 2

• Significant improvements in importing LO Module files, “filled in holes” from Phase 1‒ Approved FEB 15

Future Development• Phase 3 (100% of desktop client

functionality and operational replacement for LO Module desktop client): unfunded

• Schedule and required funding are TBD based on several factors, including:‒ ECP to capture functional and technical design, scope

cost, and determine schedule – especially editor and printing issues

‒ freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module

Issues• Replace current Word editor for TG sheets

with web-based editor and migrate existing Word-based TG Sheets into new editor

• Identify, test, and implement new print engine

• Work with NETC N6 to scope server requirements and network bandwidth to support far greater user and data load on CPM than current Plan, Analyze, and Design phases of ISD process

Next Steps• Start work by ‘Webification’ Working Group

chartered by NETC N74 in Dec 14‒ Define functional requirements for the ECP analysis,

functional/technical design, costing, and schedule‒ Begin analysis and design of NETC IT architecture to support

implementation of integrated Web-based CPM/LO Module – especially new SSC NOLA configuration

• N7/FRB/CCB determine when to freeze enhancements to desktop client LO Module

• Task/fund ECP for Phase 3 ‘webification’

AIM Support

• Currently handled by NAWCTSD, with contractor support

• Planning for eventual transition to REMEDY, with appropriate planning and implementation