AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

31
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

description

AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD. Agenda. Introduction of all participants – Alan Litz Planned Agenda – Alan Litz Traditional AIM – Jamie Stewart Overview on Content Prototype and Modernized End-state – Jim Ferrall CPS Demo – Paul Graf - PowerPoint PPT Presentation

Transcript of AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Page 1: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

AIM Pre-FRB Webmeeting Session

12 Jun 07

Alan LitzNAVAIR Orlando TSD

Page 2: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Agenda

• Introduction of all participants – Alan Litz• Planned Agenda – Alan Litz

– Traditional AIM – Jamie Stewart– Overview on Content Prototype and Modernized

End-state – Jim Ferrall– CPS Demo – Paul Graf– LO Module Demo – Paul Graf– Overview of Use Cases and Relationship to AIM

Modernization – Richard Garrison

Page 3: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Points of Contact• Alan Litz / 407-381-8607 –

[email protected]• Jamie Stewart / 757-481-2837 /

[email protected]• Jim Ferrall / 703-494-1416 /

[email protected]• Paul Graf / 443-259-9107 /

[email protected]• Richard Garrison / 301-685-3275 /

[email protected]

Page 4: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Traditional AIM Overview

Page 5: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

AIM Background Follows ISD rules of the PADDIE model

AIM I Built on NAVEDTRA 131 Performance Based Curriculum

AIM II Built on NAVEDTRA 130 Task Based Curriculum

Page 6: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

AIM Outputs Printable Materials

PDF

SCORM Compliant Files

Database export for use in other AIM systems

Page 7: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Maint/Surv of Current Curriculum

Manual Process

Checking Resources

Validating Objectives

Id Affected Test Items

LP/TG DP/RIA/Sheet Chgs

Results

Time Consuming

Errors

TPP

CTTL

LO

TESTING

COI

CMS

TCCD

LP

TG

Page 8: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Maint/Surv of AIM CurriculumTPP

CTTL

LO

TESTING

COI

CMS

TCCD

LP

TG

• Relational Database

• Resources Linked to Tasks

• Resources/Tasks Linked to Obj

• Res/Tasks/Obj Linked to Tests

• Res/Tasks/Obj Linked to LP/TG

• Automated

• Minimal Human Error

• Reduces Surv/Maint Time

Page 9: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Additional AIM Benefits

• SCORM XML output for use with LMS• Browsable HTML and PDF for use in the electronic

classroom – tested with Elite and the Navy LMS• IETM interface capabilities many communities are not

yet exploiting• Proven interface with the ILE enterprise repository via

CMAD (including ADL-R registration)• Centralized management capability via Metaframe-

based central site hosted in Orlando

Page 10: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Overview on ILE Content Prototype and AIM

Modernized End-state

Page 11: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

• Both the ILE Content Prototype (performed by AIM team in FY06) and the AIM Modernization Plan share 4 basic assumptions on the ILE design:– All ILE content will be stored and managed in an

application independent enterprise data environment (EDE)

– ILE applications will input, search, and reuse content data in the EDE via Web services (also known as Services-oriented Architecture (SOA))

– All ILE content needs rich metadata in the EDE– Content hierarchy: JTA -> NLOS -> Learning Objects

Page 12: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Position, Resume, Skillset & Reference

Data

LO

ILE ILT Content(LO Module)

Content Planning Data

(NLOS, content outline, content mgmt data)

NLOS, content struct,JTA Links

Perf Obj/JTAData

NLOS,Content

struct,JTA links

Tech Data Repository

New/UpdatedILE Content

NLOSIntegratedMetadata

Repository

NLOS Metadata

LO For Change

CeTARS

Content Gap

Analysis

ContentMgmt Data

LOS/LO Listing

Position & Resume

Data

Learning Gap

Analysis

CMAD

Enterprise Data Environment

LO Data

Tech Data Structure &

Updates

Tech Data Structure

& Updates

Repository

Non-AIM ILEApplication

LO Surveillance

Service(Web service)

ChgImpactReport

(Web service) LO Requiring Change

Modernized AIM

LO Requiring Change

Learning Mgmt

System

Learning Plan

Learning Objects

ILE Outside Scope of AIM Modernization

Traditional LP/TG Content

(AIM I/AIM II)

AIM LP/TG Content

Electronic Classroom

Tech Data Launched from EC

Tech Data Updates

ILTLearning Objects

Learning Objects

ILE Self-paced Content

Development Tools

LO For Change

NLOS, contentstruct, JTA Links

ILT-to-self-paced

JTA & Tech Data Updates

Page 13: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

CURRENT / APPROVED

AIM I/II Rel 3.2.1

MODERNIZEDAIM SYSTEM

ILE, DOD, CIO, BTA TECHNICAL REQTS

(SOA, EDE, .NET)

ILE FUNCTIONAL REQUIREMENTS(per Guidance DocumentsSuch as ILE Content Dvlp

Handbook)

Transitional Phase of AIM Modernization

SPIRALs 2-5

R&D EFFORTS(ISTDAS, CPS, etc)

AIM I/II Rel 3.3With LO ModuleIn NMCI testing

SPIRAL 1

Traditional

Current Situation

Requirements

Proposed Solution

System

NAVEDTRA 130/131(per FRB guidance)

TransitionalSystem

ILE FUNCTIONAL REQUIREMENTS(per C&C FGB guidance /

DODAF artifacts /FRD)

ModernizationPlan

AIM Modernization Scenario

Page 14: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

CPS/LO Module Demos

Page 15: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Video Demos of Content Prototype Project

• Link to video demos of various phases of content prototype project:

http://146.145.253.105/Captivate/ILE%20Tool%20Demonstrations.html

Page 16: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Overview of Use Cases and Relationship to AIM

Modernization

Page 17: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

PURPOSE

• AIM is now modernizing from the traditional AIM I / AIM II baseline to support the new ILE content formats and business rules.

• Use Cases will be used to obtain a broad spectrum of Center and SYSCOM user input on: – detailed definitions of business rules

– detailed definitions of event sequences

– detailed definitions of process used to develop and maintain ILE compliant learning material.

• These will translate into the functionality of the toolset made available.

Page 18: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

RELATION TO R&D• R&D project call Integrated Skills Training Data Aggregation Study

(ISTDAS). This project is chartered to:– Develop skills-centric integrated information model of work

requirements, performance objectives, learning objectives, and learning content

– Develop prototype system that calculates a skills-based training gap of work requirements to Sailor resume of knowledge, skills, and abilities

– Use training gap to select learning objectives and learning content objects in SOA, EDE based architecture

• The AIM team has been working closely with the ISTDAS project to generate key learning content-oriented, government-furnished information (GFI) essential to the effective conduct of that project.

• Use Cases discussed in this document key to support of ISTDAS• Expanding inputs to apply the same value that the AIM FRB has

traditionally provided for Navy ILT to the ILE business rules and data environments being designed and tested by ISTDAS.

Page 19: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

USE CASESFive use cases are planned initially with others added as required:

1) Analyze

2) Design

3) Create

4) Surveillance

5) Audit

Page 20: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

covers the processes – From Ingesting the Performance Requirements

• OCCSTDS per OPNAVINST 1500.74A

– To determining the necessary training to satisfy those requirements

• identifying more specific training tasks via Training Task Analysis process when required

• defining Navy Learning Objective Statements (NLOS) linked to those Performance Requirements

• mapping those NLOS into Course/Module/Lesson/Section learning content outlines.

Analyze

Page 21: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

DesignThis Use Case covers:• Selecting scope of work.• How users develop NLOS and

COI.• How users determine the delivery

method to include if it will be taught in a schoolhouse or on-board

• How those selections can affect the design of the entire position’s training path

• Searching for similar existing NLOS & Los for R3

Page 22: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Create

• Building the Learning Objects (LOs)

– For the tasks identified in the Analyze process as requiring formal training

Page 23: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Surveillance• Review of ILE

compliant material• Identify change

drivers that will impact existing training material

• Evaluating those drivers to determine if the training material requires updating

Page 24: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Audit

Discusses how the ILE content sponsor or support personnel (users) will audit ILE learning content to ensure currency of the learning content linkages [NLOS & JTA]

Page 25: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Backup Slides

Page 26: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD
Page 27: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD
Page 28: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

ILE Content Design & Development• Entering argument for the LO Module is

TOS/EOS developed in Content Planning System (CPS) and imported from ILE repository

• AIM team programming CPS and working closely with Center Style Guide development teams in design and implementation of LO Module

• LO Module provides developer tools to find, store, and organize assets into blocks (grouping of assets) and blocks into ELOs

• Focus is on development of ILE instructor-led training (ILT) content and re-authoring of existing LP/TG content into ILE ILT and/or self-paced content

Page 29: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

Content Asset Generation

• Assets can be imported from existing LP/TG content or from ILE repository or created independently and inserted into LO Module

• IMI Library supports multiple asset types with GUID generation, version information, and metadata generation

• Element structure within Section supports assembly of assets into reusable ELOs supporting one EOS

Page 30: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

LO Module Basic Functions• Import approved TOS and EOS

from repository

• Provide tools to assemble assets into elements, elements into Sections, and Sections into Lessons

• Automatically generate default values for all mandatory metadata at asset, Section, and Lesson level

• Export finish ILT content to ILE repository and in-process self-paced content to ILE-compliant self-paced authoring tools

• Support life-cycle surveillance and update of authored content

Page 31: AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD

ILE Content Design & Development

• Output finished ILT and in-process self-paced content objects in SCORM 2004/Navy SCORM compliant packages

• Publish content packages in variety of XML packages for use with different tools