    Tel (Home): +20222634299 (Egypt)Cell: +971502356433 (UAE); +20101695576(Egypt)E-mail:[email protected]. Box 45674, Abu Dhabi, UAE

    Ahmed Mahmoud Arafia, PMP

    Experience

    Jun 07- Present Senior Electrical Engineer Plant Engineering Department (PED)

    Consolidated Contractors International Company (CCC)Mussafah Industrial Area, Abu Dhabi, UAE.

    Example of Handled Projects (Major Projects):

    EPIC for Berths and Port Infrastructure for Ras Laffan PortExpansion Project, (USD1.7 billion project). Client: Qatar Petroleum

    Participated in preparation of all detailed design and engineeringanalyses, calculations and progress engineering deliverables as requiredto Approved for Construction.

    Participated in FEED package verification and site survey visits.

    Prepared engineering documents register (EDR) for electrical activities.

    Prepared electrical general specification, equipment specification& datasheet for different electrical equipment such as power and distributiontransformers, 33kV Gas Insulated Switchgear, 33& 11kV Air InsulatedSwitchgear, AC& DC UPS, 11kV secondary distribution ring main units,low and medium voltage cables.

    Prepared electrical power system sizing calculations (load analysis,cable sizing, UPS sizing, DC system sizing).

    Prepared electrical single line diagrams and equipment protectionschemes.

    Prepared cable layouts (cable routing layouts, cable sections layouts,road crossings details, cable trays layouts, power cable block diagrams).

    Prepared lighting calculation, lighting plans and block diagrams.

    Prepared lighting, grounding and lightning power and protection layouts.

    Prepared interconnection and wiring diagrams.

    Prepared equipment arrangement layouts.

    Prepared purchase specifications, fabrication drawings, specifications

    and procedures for fabrication, transportation, installation, hook-up, pre-commissioning and testing of the facilities.

    Prepared material requisitions for quotation for electrical equipment andmaterials and technical bid evaluation of electrical equipments andmaterials.

    Reviewed relay coordination studies, vendor prints for electricalequipments and materials, issued technical queries for electricalequipments and materials.

    mailto:[email protected]:[email protected]:[email protected]
  • 7/28/2019 Ahmed Arafia

    2/6

    Prepared material requisition for purchasing for electrical equipmentsand materials.

    Prepared electrical power system studies using electrical transientanalyzer program (ETAP) PowerStation Software (short circuit calculation,dynamic and static motor starting analysis, power flow studies, groundingcalculation).

    EPIC for Al Khafji FDP Phase-1 Facilities Oil & Gas (onshore),(USD1.5 billion project). Client: KJO; Saudi Arabia

    Reviewed and validated of client submitted information (FEED). Thisincluded some site visits to the existing facilities.

    Prepared electrical studies/calculations such as sizing of AC and DCUPS, cable sizing calculation, Earthing & Lightning protection systemstudy, load flow study, short circuit study, motor starting study.

    Prepared several electrical documents such as basis of electrical systemdesign, construction / installation specification, transformers specification&data sheets, 13.8kV, 4.16kV& 480V switchgear specification& datasheets, UPS specification, NGR specification, cables specification& datasheets, earthing specification and MTO, lighting specification, load and

    cable schedules. Provided electrical input to mechanical and instrumentation packages.

    Prepared several drawings such as key single line diagrams, symboland legend drawings, cable routing and trench layouts, typical installationdetails, hazardous area classification, earthing layouts, small panelboards schedules, electrical and other disciplines interface drawings.

    Prepared material requisitions, technical bid evaluation, vendor drawingsand documents review and purchase requisitions of transformers, 13.8kVswitchgear, 4.16kV switchgear, 480V switchgear, 125V DC batterycharger, 120V AC UPS, neutral ground resistor (NGR), powermanagement system (PMS), bulk items, lighting, grounding & smallpower, electrical cables.

    Provided engineering support during construction phase, pre-commissioning and commissioning and prepared As-Built drawings.

    Sep 06- May 07 Senior Electrical Projects Engineer Schneider Electric GulfCountriesJebel Ali Free Zone, Dubai, UAE.

    Example of Handled Projects (Major Projects):

    Global Recall Recovery Rework (G3R) of Ringmaster Ring MainUnits in Gulf Area, (EUR1.2 billion project).

    I was responsible for all potential quality issues involving Global RecallRecovery Rework (G3R). Managing the G3R process, evaluating thesafety risks, developing, validating and implementing action plans.

    The Project calls for SF6 Gas Reduction & Retrofit Kits Installation ofRingmaster SF6 Ring Main Units supplied and installed in Gulf Area andreplacement of ring main units that has lost gas due to a prematurefracture of the safety membrane due to hot climatic conditions.

    Assigned and acted as project manager for the retrofit and upgrade ofring main units sold and installed in Gulf Area.

    Managed a group of subcontractors to carry out the works in UAE,Qatar, Oman& Kuwait.

  • 7/28/2019 Ahmed Arafia

    3/6

    Coordinated with electrical authorities and end users for the plannedshutdown schedules to execute the modification and (or) replacement ofthe units.

    Reduced the SF6 gas fill pressure from 0.8barg (at 20C) to 0.55barg (at20C) of Ringmaster RN2c (and RE2c, RE6c and RN6c) ring main unitsthat were at either the customer stores or premises or installed on site.

    Installed outdoor and indoor venting kits for internal arc proof protection.

    Feb 06- Aug 06 Senior Electrical QA/QC Engineer TARGET EngineeringConstruction Company LLC

    Abu Dhabi, UAE.

    Example of Handled Projects (Major Projects):

    Construction Works for Jebel Dhanna Tank Farm Facilities Upgrade,(USD60 Million project). Client: Abu Dhabi Company For Onshore OilOperations (ADCO)

    The Project calls for supply and installation of new pipelines and thereplacement of existing line pipe, installation of valves and fire fighting

    systems, instrumentation, electrical, telecommunication and civil works. The electrical scope of work includes cathodic protection, lightning

    protection, cables and cable trenching, power supply arrangement, controlroom modification, CCTV system, earthing, lighting etc.

    My role within the project was the implementation of related QA/QCactivities for the works as detailed in relevant Inspection and Testing Plans(ITPs).

    Ensure that the activities on site are done according to the projectspecifications in compliance with approved method statement.

    Inspect and satisfy myself with the completed work before requestingADCO approval or inspection.

    Receive the request for inspections from Site Engineer / Foreman for

    necessary inspection of completed work with ADCO and release it forfurther activity.

    Regularly conduct site inspections and monitor the activities for theirconformance with applicable specifications and drawings.

    Maintain quality records of inspections certified by ADCO for any futurereference.

    May 04- Nov 05 Electrical Projects Engineer Industrial and Petroleum Division

    Schneider Electric EgyptJob Duties and Responsibilities

    Preparation of technical offers, reviewing customer specification /

    requirement, issuing clarification / deviation sheets if required,investigating technical risks if any, etc.

    Preparation of commercial offer including all commercial terms andconditions, terms of payment, financing, credit terms, customs, hardcurrency exposure, respected due dates, convenient delivery periods,delivery point and achieving competitive price, investigating commercialand technical risks, etc.

    Preparation of risk management plan, risk assessment chick list,probability and impact risk rating matrix.

  • 7/28/2019 Ahmed Arafia

    4/6

    Plan and manage project communication to ensure timely andappropriate generation, collection, dissemination, storage and ultimatedisposition of project information and provide the critical links amongpeople.

    Follow up with planning and procurement to ensure the delivery ofmaterials on time.

    Ensuring that equipment manufacturing in due dates according toplanned schedule and respecting the quality standard.

    Manage expediting visits and progress meetings with client as well asprogressive invoices as per contract.

    Conduct expediting visits and random audits with the client to thesupplied equipment such as transformers, bus duct, UPS, etc.

    Ensure that the finished equipment must pass successfully the clientinspection tests (FAT).

    Prepare the commercial invoices, delivery notes, certificates ofguarantee, etc.

    Clear all the contractual documents related to delivery such as letter of

    guarantees, invoices, etc. Follow up with packing, order delivery as per contract terms, etc.

    Manage the commission team at site to ensure the full operability of thesupplied system and the full satisfaction of the client.

    Example of Handled Projects (Major Projects):

    Subsea Development of the Simian/Sienna Gas Fields OffshoreEgypt, (USD6 Million project). Client: ENPPI on behalf of BG/Burullus Gas Company

    The scope of work includes the Supply, commissioning and start up ofMV/LV electrical switchgear, power transformers, UPS, and DC systemfrom the onshore facility to supply the offshore controls platform which willbe equipped with similar switchgear.

    Follow up Engineering, materials delivery/fabrication and subcontractors'progress. Prepare coordination meetings with Clients and Subcontractors.Prepare progress reports.

    Carry out the same scope of work for The Scarab and Saffron gas fields,the first deepwater development to be undertaken in the EasternMediterranean.

    Oct 2000- Apr 04 Electrical Maintenance and Projects Engineer

    Egyptian Petroleum Maintenance Co. (EMC)a Joint Venture Company Between Egyptian General PetroleumCorporation (EGPC) and ABB

    Site Execution (Major Projects):

    GUPCO Gas Plant substation retrofit and upgrading. Headed a teamof two electrical technician and electricians to execute the following:

    The installation of the power station main switchgear, which included thecontrol panels of two different types of generators, the distribution panels,MCC and the accessory panels in a pressurized shelter.

    The power cabling, including cable termination and cable trayinstallation.

    The interconnection cabling inside the pressurized shelter.

  • 7/28/2019 Ahmed Arafia

    5/6

    The turbines control cabling.

    New electrical network at ZEITCO (ex- Ocean Energy):

    Followed up the fabrication of the substation in our workshops. Installedthe panels and the room electrical equipment.

    Headed a team of one electrical technician and 6 others and installed the

    substation on the offshore platform. Installed the cable trays allover the platform and the MCT on the

    substation room.

    Lay and terminate cables. Carried out tests and handover.

    Overhead transmission lines at Qarun Petroleum Company (QPC-Lagoon area). Headed a similar team as above to execute thefollowing:

    Determine the overhead line route.

    Erect the pole.

    Install the overhead line.

    Install the step down transformers and the electrical accessories,

    including the termination of cables connecting to the pumps on theproduction wells.

    Well A-16 ESP Surface Facilities Hookup at ZEITCO (ex- OceanEnergy):

    Headed a team of electrical technicians, welders, riggers, grinders andothers and carried out the construction activities for the hookup andinstallation of well A-16 electrical submersible pump Reda (ESP) surfacefacilities under supervision of Schlumberger.

    Completed all construction activities in a safe and professional mannerduring the planned schedule without any production interruption and up tothe full satisfaction of ZEITCO.

    Site Execution (Other Projects):

    AGIBA (Ashrafi WHP-2 platform): Platform upgrading project.

    Ocean Energy (Zeitco): Installation of gas detection system at oil tanksarea.

    Ocean Energy (Zeitco): Retrofit and upgrading of lighting system.

    Ocean Energy (Zeitco): Upgrading and maintenance of main officeelectrical network.

    Petrobel (Port Foad) fields: Installation of rental power station.

    Pipelines Petroleum Company PPC (Shokeir Base): Maintenance ofoverhead transmission lines.

    Khalda Petroleum Company (KPC-Tarek Fields): Trouble shooting of firefighting and gas detection panel.

  • 7/28/2019 Ahmed Arafia

    6/6

    Education B.Sc. in Electrical Power and Machines Engineering, 1999, from AinShams University, Cairo, Egypt.

    Professional

    Certification

    Project Management Professional, PMP- Certified, Sep 05.

    Training Courses Project Management Professional Course at the American University in

    Cairo Engineering Services.

    ETAP PowerStation Version 6, OTI training Center, Dubai, UAE.

    AutoCAD (2D) course, Cairo, Egypt.

    Automatic control course at Instituto Salesiano Don Bosco.

    Primavera P3 Course, American University in Cairo.

    Contractual Risk Management, Schneider Electric Training Center,Egypt.

    Communication skills, Schneider Electric Training Center, Egypt.

    Computer Skills Proficient in the use of various computer software, including AutoCAD

    (2D), Primavera and all Microsoft Office components.

    Familiar with electrical engineering software (PSCAD, EDSA, ETAB,CYME, CALCULUX and Matlab).

    Good knowledge of Programmable Logic Control (PLC).

    Regular Internet User.

    Language Skills Arabic: Mother Tongue.

    English: Fluent.

    Croatian: Under Study.

    French: Poor.

    Personal data Date of Birth: April, 13, 1977

    Place of Birth: Cairo, Egypt

    Country of Residence: UAE

    Marital Status: Single