![Page 1: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/1.jpg)
ERASMUS+ Workshop call Key Action 2 (KA2)
"Capacity Building’’ project
Dr. Ahmad Al-OmariPh.D. of Bioinformatics Biomedical informatics Eng. Dept.Yarmouk Univ.
![Page 2: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/2.jpg)
University of Santiago de Compostela
Spain
Mediterranean Universities Union
![Page 3: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/3.jpg)
OUTLINEu Capacity Building and Drafting a successful plan u Project Cycle Management-PCMu Analysis Phase
u Stakeholder Analysisu Problem Analysisu Analysis of Objectivesu Strategy Analysis
u Planning Phaseu Logical framework matrixu Activity schedulingu Resource scheduling
u More important , filling the whole application with each other
![Page 4: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/4.jpg)
What are the European Programs?u European Programs(https://www.welcomeurope.com/list-european-funds.html)
u Examples
u HORIZON 2020(Global Budget ~79 billion euros)
u Erasmus+(Divided from A to H)(Annual budget ~2.7 billion euros)
u A,B,Cè Program Guidelines (Theoretical part)
u D-Hè It is the proposal entity(When you come to write the proposal)
u Erasmus+ Program Guide (http://ec.europa.eu/programmes/erasmus-plus/sites/erasmusplus2/files/files/resources/erasmus-plus-programme-guide_en.pdf) :Page 156 to 170
u Proposal( https://eacea.ec.europa.eu/erasmus-plus/funding/capacity-building-higher-education-2019_en)
![Page 5: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/5.jpg)
PART A- GENERAL INFORMATION ABOUT THEERASMUS+ PROGRAMME
PART B – INFORMATION ABOUT THE ACTIONS COVERED BY THIS GUIDE
PART C - INFORMATION FOR APPLICANTS
![Page 6: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/6.jpg)
WHO IMPLEMENTS THE ERASMUS+ PROGRAMME?
u THE EUROPEAN COMMISSION
u The European Commission is ultimately responsible for the running of theErasmus+ Program. It manages the budget and sets priorities, targets andcriteria for the Program on an on-going basis. Furthermore, it guides andmonitors the general implementation, follow-up and evaluation of theProgram at European level. The European Commission also bears the overallresponsibility for the supervision and coordination of the structures in chargeof implementing the Program at national level.
![Page 7: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/7.jpg)
ELIGIBLE COUNTRIES
u The Erasmus+ Program is open to the following countries:
I. PROGRAMME COUNTRIES: The following countries can fully take part in all the Actions of the Erasmus+ Program:
![Page 8: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/8.jpg)
ELIGIBLE COUNTRIES
II. PARTNER COUNTRIES: The following countries can take part in certain Actions of the Program, subject to specific criteria or conditions
![Page 9: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/9.jpg)
ELIGIBLE COUNTRIES
III. OTHER PARTNER COUNTRIES: Some Actions of the Program are open to any Partner Country of the world(e.g. Afghanistan)
![Page 10: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/10.jpg)
PART B – INFORMATION ABOUT THE ACTIONS
u Educations and Training u Youthu Three key actions
u KA1: LEARNING MOBILITY OF INDIVIDUALS
u KA2: COOPERATION FOR INNOVATION AND THE EXCHANGE OF GOOD
u KA3:Support for policy reform
u Jean Monnet Activities u Sport
![Page 11: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/11.jpg)
KA2: COOPERATION FOR INNOVATION AND THE EXCHANGE OF GOOD
u WHICH ACTIONS ARE SUPPORTED?u This Key Action supports:
uStrategic Partnerships in the field of education, training and youth
uKnowledge AlliancesuSector Skills Alliances (implemented through a
specific call for proposals)uCapacity Building in the field of higher educationuCapacity Building in the field of youth
![Page 12: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/12.jpg)
WHAT IS A CAPACITY-BUILDING PROJECT?
u Capacity-building Projects are transnational cooperation projectsbased on more than one partnership, primarily between highereducation institutions (HEIs) from Program and eligible PartnerCountries financed through defined instruments. They can alsoinvolve non-academic partners to strengthen the links withsociety and business and to reinforce the systemic impact of theprojects. Through structured cooperation, exchange of experienceand good practices and individual mobility
![Page 13: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/13.jpg)
Drafting a successful plan: Main Objective and Specific Objectivesu Wider Objective: what is the overall broader objective, to which the
project will contribute to support eligible partner countries by the previous instruments ?
v Modernization, accessibility and internationalization of higher educationin the eligible Partner Countries;
v Address the challenges facing their higher education institutions systems .
v Increase cooperation with the EU
v Promote voluntary convergence with EU developments in highereducation;
v Promote people-to-people contacts, intercultural awareness andunderstanding.
![Page 14: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/14.jpg)
Drafting a successful plan: Main Objective and Specific Objectivesu Specific Project Objectives: what are the specific objectives,
which the project shall achieve?v Improve the quality of higher education and enhance its relevance
for the labor market and society;v Improve the level of skills in HEIs through new education
programsv Enhance the management, administration and innovation
capacities, as well as the internationalization of HEIs;v Increase the capacities of national authorities to modernize their
higher education systems.v Foster regional integration and cooperation across different
regions of the world.
![Page 15: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/15.jpg)
There are two types of Capacity building projectsA. Joint Projects: aimed at producing outcomes that benefit principally and
directly the organizations from eligible Partner Countries involved in the project.
B. Structural Projects: aimed at producing an impact on higher education systems and promoting reforms at national and/or regional level in the eligible Partner Countries.
![Page 16: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/16.jpg)
Capacity-building projects can be implemented as:u National projects, i.e. projects involving institutions from only one eligible
Partner Country;
u Multi-country projects within one single region, involving at least two countries from this region;
u Multi-country projects involving more than one region, involving at least one country from each region concerned.
CAPACITY BUILDING: Coverage
![Page 17: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/17.jpg)
Proposal Overview
![Page 18: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/18.jpg)
PROJECT APPROACH
Project = a series of activities aimed at bringing about clearly specified objectives within a defined time-period and with a defined budget.
A project should have:
•Clearly identified stakeholders (primary target group & final beneficiaries);
•Clearly defined coordination, management and financing arrangements;
•A monitoring and evaluation system;
•An appropriate level of financial and economic benefits (indicating that the project‘s benefits will exceed its costs).
![Page 19: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/19.jpg)
Project has to be
![Page 20: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/20.jpg)
Project Cycle Management-PCM
![Page 21: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/21.jpg)
The Logical Frame Matrix : is a matrix tool used to support the designing, managing,monitoring and evaluating of international projects. It includes all indicators:Objectives(Wider and Specific), Outputs(tangible) and outcomes(intangible),Activities, Inputs, Indicators of progress, assumptions and risks.
![Page 22: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/22.jpg)
The Logical Frame Matrix
![Page 23: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/23.jpg)
➲ Logical framework matrix -defining the project/ program structure, testing its internal logic, formulating objectives in measurable terms, defining means and cost (overall)
➲ Activity scheduling - determining the sequence and dependency of activities; estimating their duration, setting milestones and assigning responsibility
➲ Resource scheduling - from the activity schedule, developing input schedules and a budget
The Logical Framework Approach
PLANNING PHASEANALYSIS PHASE➲ Stakeholder Analysis - identifying &
characterizing major stakeholders, target groups & beneficiaries, defining whose problems will be addressed by future
➲ Problem analysis - identifying key problems, constraints and opportunities; determining cause and effect relationships
➲ Analysis of objectives - developing objectives from the identified problems; identifying means to end relationships
➲ Strategy analysis - identifying the different strategies to achieve objectives; selecting the most appropriate strategy(ies); determining the major objectives (overall objectives and project purpose)
![Page 24: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/24.jpg)
l Identifying Key Stakeholders (beneficiaries, vulnerable groups, possibly adversely affected groups, socio-economic characteristics, relationships etc.)
l Determining Stakeholder Interests (benefits,expectations, resources they could mobilize etc)
l Determining Stakeholder Power and Influence (powerand dependency relationships, control of decisionmaking, resources etc.)
l Formulating a Stakeholder Participation Strategy in viewof analysis, planning and implementation
Stakeholder Analysis
![Page 25: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/25.jpg)
Problem analysis
uIs a procedure which allows to :
u Analyze an existing situation
u ّIdentify key problems in this context
u Visualize the problems in form of a diagram/tree
(cause-effect relationships)
![Page 26: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/26.jpg)
Problem analysis
Causes
Effects
Destruction of coral & mangrove habitats
Illegal fishing methods applied
Decreasing fish stocks
Low price received by fishermen in the village
Processed fish is of bad
quality
Limited access to markets
Decreasing in-comes of fishermen
Establishing cause-effect relations between problems
![Page 27: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/27.jpg)
Problem analysisu Identify major problems existing within a given situation
(brainstorming)u Select a starter problem
u Look for related problems to the starter problemu Establish hierarchy of cause and effects
u Problems which are directly causing the starter problem are put below (Destruction of coral & mangrove habitats……. Limited access to markets)
u Problems which are direct effects of the starter problem are put above(Decreasing fish stocks, Limited access to markets)
u Complete with all other problems accordingly
u Connect the problems with cause-effect arrowsu Review the diagram and verify its validity and completeness
![Page 28: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/28.jpg)
Analysis of objectives
Means
Ends
Coral & mangroves habitats
conserved
Incidence of illegal fishing
reduced
Quality of fish
processing improved
Access to markets improved
Rate of decline in fish stocks stopped
Price received by fishermen increased
Incomes of fishermen increased
Turning the negative aspects into future desired, but realistic situations
![Page 29: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/29.jpg)
Analysis of Strategies
uThe purpose is:
u To identify possible alternative options or ways to contribute to
the overall objectives
u To agree on priority strategies based on an assessment of the
relevance, the feasibility and the sustainability of each of them
u To concentrate the means of the project on what is really
important, effective and feasible
![Page 30: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/30.jpg)
Analysis of Strategies
RESULTS
OVERALLOBJECTIVE
SPECIFICOBJECTIVE
Coral & man-grove habitats conserved
Incidence of illegal fishing reduced
Quality of fish processing improved
Access to markets improved
Rate of decline in fish stocks arrested
Price received by fishermen increased
Incomes of fishermen increased
OUTIN
Decision based on: budget, priorities, human resources available, social acceptability, urgency, ...
![Page 31: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/31.jpg)
➲ Logframe - defining the project/ program structure, testing its internal logic, formulating objectives in measurable terms, defining means and cost (overall)
➲ Activity scheduling - determining the sequence and dependency of activities; estimating their duration, setting milestones and assigning responsibility
➲ Resource scheduling - from the activity schedule, developing input schedules and a budget
The Logical Framework Approach
PLANNING PHASEANALYSIS PHASE➲ Stakeholder Analysis - identifying &
characterizing major stakeholders, target groups & beneficiaries, defining whose problems will be addressed by future
➲ Problem analysis - identifying key problems, constraints and opportunities; determining cause and effect relationships
➲ Analysis of objectives - developing objectives from the identified problems; identifying means to end relationships
➲ Strategy analysis - identifying the different strategies to achieve objectives; selecting the most appropriate strategy(ies); determining the major objectives (overall objectives and project purpose)
![Page 32: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/32.jpg)
The Logical FrameworkuThe Logical Framework Matrix provides a summary of:
● why a project is carried out(Wider objective)● what the project is expected to achieve(Results and
specific objectives)● how the project is going to achieve it(Activities)● which external factors are crucial for its success(risks
and assumptions)● where to find the information required to assess the
success of the project(Evaluation)● which means are required● what the project will cost
![Page 33: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/33.jpg)
Logical framework
uIntervention Objectively Sources of Assumptions Logic Verifiable Indicators VerificationOverall Objective
Specific
Objective
Results
Activities Means Costs
Pre-conditions
![Page 34: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/34.jpg)
Intervention LogicuOverall objective: the project’s contribution to policy or program objectives (impact)uSpecific objective: direct benefits to the target group(s). S.O. is consequence of results, not the sum of the results.uResults: the services or products to be realized by the project.uActivities: the tasks (work program) that need to be carried out to deliver the planned results.u(detailed activities are often better presented seperatly. e.g. Gantt chart format)
![Page 35: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/35.jpg)
T1.1. To train fish handlersT1.2. To install appropriate Equipment etc.T2.1 connect to the internetBy smart phones
Logical framework
Incomes of fishermen increased
Price received by fishermen increased
Means Costs
Pre-conditions
1.Quality of fish processing improved
2.Access to markets improved
�Intervention Objectively Sources of Logic Verifiable Verification Assumptions
Indicators
‘... IF results are delivered, AND assumptions hold true, THEN the project purpose will be achieved ...’
![Page 36: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/36.jpg)
Assumptions
• Assess the importance of the external factors by using
the assessment algorithm
• Check the intervention logic and assumptions on
completeness
![Page 37: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/37.jpg)
Will it be realised?
Almost certainly
Likely
Unlikely
Do not include in logframe
Include as an assumption
Is it possible to redesign the project in order to influence the
external factor?
Yes No
Do not include in logframe
Is the external factor important?
Redesign the project by adding activities or results;
reformulate the Project Purpose if necessary The project is not feasible
NoYes
Assessment of Assumptions
![Page 38: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/38.jpg)
Indicators
uThe goal of Indicators is To:• Clarify the characteristics of the overall objectives,
specific objectives and results • Manage the project more objectively• Provide a basis for performance measurement,
monitoring and evaluation
Objectives verified indicators describe the project’s objectives in operationally measurable terms (quantity, quality, target group, place, time)
uNote:Often, it is necessary to establish several indicators for one objective. Together, these will provide reliable information on the achievement of objectives.
![Page 39: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/39.jpg)
Indicators: An ExampleMy Objective: to reduce the Pollution load of wastewater
discharged into the Blue river
Select the indicator: Concentration of heavy metal compounds (Pb, Cd, Hg) in the water
Define the targets for my indicator:• Define the quantity(The most important): Concentration
of heavy metal compounds (Pb, Cd, Hg) is reduced by 75% compared to year x levels …(particular attention should be paid to the availability of baseline information)
• Define the quality: . to meet the limits for irrigation water ..
• Define the target group: ... , used by the farmers of Blue village, ...
• Define the place : . in the Blue river section of the District ..
• Determine the time: ... 2 years after the project has started
![Page 40: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/40.jpg)
Objective: Efficiency and effectiveness of the learning and administration processes/practices have been enhanced
Select the indicator: Amount of administrative paperwork…
Define the targets:• Define the quantity: …is reduced by 20% annually
paper work ( particular attention should be paid to the availability of baseline information)
• Define the quality: ... • Define the target group: ... , as used by the YU staff
both academic and administrative ...• Define the place : ... at YU...• Determine the time: ... following full implementation
of e-administration
Indicators: An Example
![Page 41: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/41.jpg)
Some criteria for good indicators
Do partners and stakeholders agree that this indicator makes sense to use?
Owned
Will the data have utility for decision-making and learning?
Useful
Can data be collected easily, on a timely basis at reasonable costs?
Accessible
Are the data consistent or comparable over time?Reliable
Is the definition precise and unambiguous about what is to be measured?
Objective
Does the indicator directly represent the objective it is intended to measure?
Valid
![Page 42: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/42.jpg)
Some criteria for good indicators
SMART CRITERIA
S Specific
M Measurable
A Achievable
R Relevant
T Time-bound
![Page 43: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/43.jpg)
Sources of Verification
• They describe where and how to find theinformation with regard to the indicators
• Issues to be analyzed:u Do external sources of verification exist ?u If so, are they specific enough, reliable and
accessible? If not, how can the information withregard to the indicators be obtained? If we cannot, this is not a good indicator
![Page 44: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/44.jpg)
WP2T2.1 To train fish handlersand to install appropriate Equipment etc.T2.2 connect to the internetBy smart phones
Logical framework Activities
AssumptionsIndicators Verification
AssumptionsIndicators Verification
Indicators Verification
Wider Objective
Incomes of fishermen increased
Specific objectives:Price received by
Fishermen increased
ActivitiesAssumptions, risks and pre-conditions:Means Costs
Results(Outputs (tangible) and Outcomes (intangible): )
WPs (1-6)
WP1:Preperations
WP2 Development: Training Sessions and Practical Placements
1.Quality of fish processing improved
2.Access to markets improved
![Page 45: Ahmad YU un - eunitproject.eu · OUTLINE uCapacity Building and Drafting a successful plan uProject Cycle Management-PCM uAnalysis Phase uStakeholder Analysis uProblem Analysis uAnalysis](https://reader030.fdocuments.us/reader030/viewer/2022040907/5e7e771f8ceaa76bc24d039a/html5/thumbnails/45.jpg)
Activity Levelu What is an activity?u A sequence of actions leading to the achievement
of a resultu Each Result is produced by one or more activities
u In the previous example:
u Result 1: “Quality of fish processing improved”
u Is generated by two activities:
u 1.1. To train fish handlersu 1.2. To install appropriate Equipment