Outline

Detector Layers at CERN Testbeam 2014

> CERN testbeam 2014

Setup

Old Problems

> New DAQ Interface modules

> HBU3 (DESY) and SM_HBU3 (Mainz-DESY)

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 3

CERN testbeam 2014 - Setup

> 11 single-HBU layers, including 3 ScECAL and 1 SM_HBU layers.

> 4 big 2x2-HBU layers.

> More than 3800 detector channels.

> Very stable operation (DAQ talks).

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 4

Old Problems

> Arbitrary operating conditions: Stuck TDC, spontaneous noisy channels,

> SPIROC re-programming/reset does not help, only re-powering helped.

> Big 2x2 layers concerned more often.

> Corrected switch-on procedure did not help as in the past.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 5

One Approach to find the Reason

> Problem still seems to be related to switch-on => Test of supply voltages:

> VDDA and VDDD switch-on time different – but no spikes.

> Cable diameter between MPOD and modules must not be too small!! Currently too high voltage drop.

VDDAVDDDregulator-input (+6V)

Single HBU2x2 HBUs,worst case

VDDAVDDDregulator-input (+6V)

400µs 2ms

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 6

Old problems – status

> Assumption: SPIROCs in undefined state after power-up. Only re-powering changes situation.

> Situation could not be reproduced in Hamburg with 1x2 HBU setup.

> Situation not stable at CERN: Problems could be solved at first (termination of the open-collector signals on DIF), but then situation got worse continuously for big layers (hints: could be temperature-related).

> Needs testing with setup in Hamburg.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 7

Redesign DAQ Interface modules

> (Not only) for 2015 testbeams, new DAQ Interface modules (DIF, CALIB, POWER, CIB) are needed.

> Redesigns will address:

Power pulsing (adaptation blocking capacitors, reduce voltage drop on slab).

Better switch-on procedure (to be discussed with Omega).

Software controlled SiPM bias voltage.

> Redesigned modules compatible to current HBUs/Flexleads.

> DIF needs biggest change: FPGA is outdated => XILINX Zynq from LDA.

> Completion (hard- and software) till May 2015 is a risk!

> Schedule for SPIROC3? This needs a change of the DAQ modules as well.

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 8

HBU3 and SM_HBU3

> 2 new members in the HBU family: HBU3 and SM_HBU3.

> HBU3: improved LED system and special features for power pulsing.

> SM_HBU3: Based on HBU3 design, cooperation Uni Mainz / DESY.

> SM_HBU3 uses Hamamtsu surface mounted SiPMs on the HBU’s backside:

> See details and results in Phi’s talk tomorrow.

SM_HBU3 backsidewith SMD SiPM pad

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 9

Conclusions / Questions

> HBU2 and HBU3 work fine, both boards are in operation.

> Switch-on behavior needs understanding.

> Testbeam Setup will be operated in Hall West for tests.

> New productions (inner- and outer detector) ahead. W/O redesign?

> Slab-Test in FE-lab needed: Conclusions from last slab test are in HBU3, but could not be tested so far!

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 10

Backup

Backup Slides

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 11

DAQ Interface Boards – Redesign Plans

> Open-collector termination voltage (1.1V) switchable by software (switch-on procedure).

> LVDS inputs ac-coupled with initial state definition.

> New FPGA (Zynq? Spartan6?). Cost…

> Regulator enable signals (power_group_enable 1,2) from DIF to POWER (switch-on procedure).

> Enable signals for LVDS outputs (to SPIROCs) with pulldown.

> Use 0603 components, more test points.

DIF changes:

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 12

DAQ Interface Boards – Redesign Plans

> Blinking LED to be switched off (only software change).

> Output (Lemo or jumper) for Trig_Ext (charge-injection tests)

> Enable signals for LVDS outputs.

> Unused input pins to jumper.

CALIB changes:

> Software controlled bias voltage adaptation with linear characteristic.

> Automatic temperature compensation (Prague)?

> Cooling setup for VDDA.

> Unused spare input pins to jumper.

POWER changes:

Mathias Reinecke | AHCAL main meeting | Dec. 16th, 2014 | Page 13

DAQ Interface Boards – Redesign Plans

> Landing fields for VDDA/GND as on HBU3.

> Regulator enable signals (power_group_enable 1,2) from DIF to POWER.

> Enable signals for LVDS outputs.

> Room for cooling pipes?

> Mini-HDMI connector?

> Wire unused traces DIF/POWER/CALIB (spare lines for later functions).

CIB changes: