Page | 1 28 March 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 AGREEMENT TO ACQUIRE CARRAPATO PROJECT IRON QUADRILATERAL, NEAR BELO HORIZONTE, MINAS GERAIS, BRAZIL Brazilian Metals Group Limited (BMG) is pleased to announce that it has entered into an agreement with Larf Consultoria e Administracao Ltda (“Larf”) to acquire 100% of the Carrapato iron deposit (“Carrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close to Belo Horizonte, Minas Gerais State, Brazil. This acquisition is a significant step in the Company’s strategy to complement its existing large scale Iron projects in Northern Minas Gerais with smaller scale, high grade projects with near term production potential. The Company is also reviewing some other opportunities in the region that meet these criteria. Highlights The advanced Carrapato Project adjoins and is an extension of the Sarzedo mine currently operated by Itaminas. The Sarzedo mine has a reported resource of 1.3 billion tonnes and was recently sold to Chinese state-backed East China Mineral Exploration and Development Bureau (ECE), for $1.2 billion The Carrapato Project is immediately adjacent to Vale’s Corrego do Feijao Mine which produced direct ship iron ore at a grade of 66.6% Fe Continuity of the mineralisation from the Sarzedo and Corrego do Feijao Mines into the Carrapato Project is confirmed and a significant iron ore deposit delineated Proximity to domestic steel mills and rail infrastructure will give future domestic or export options for early development of a significant iron ore operation Project drilled with diamond coring in 28 holes for a total of 2,393.5 metres on 100 metre sections Exploration Target of 53 to 62 million tonnes at 35.2% to 41.1% Fe including a high grade zone at surface of 3.7 to 4.3 million tonnes at 51.1% to 59.7% Fe Following due diligence the Company plans immediate pre-feasibility studies leading to an application for a Special Mining Permit and early production

Transcript of AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file ›...

Page 1: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 1

28 March 2012

The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001

AGREEMENT TO ACQUIRE CARRAPATO PROJECT

IRON QUADRILATERAL, NEAR BELO HORIZONTE, MINAS GERAIS, BRAZIL

Brazilian Metals Group Limited (BMG) is pleased to announce that it has entered into an agreement

with Larf Consultoria e Administracao Ltda (“Larf”) to acquire 100% of the Carrapato iron deposit

(“Carrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close to Belo Horizonte,

Minas Gerais State, Brazil.

This acquisition is a significant step in the Company’s strategy to complement its existing large scale

Iron projects in Northern Minas Gerais with smaller scale, high grade projects with near term

production potential. The Company is also reviewing some other opportunities in the region that

meet these criteria.

Highlights

The advanced Carrapato Project adjoins and is an extension of the Sarzedo mine currently

operated by Itaminas. The Sarzedo mine has a reported resource of 1.3 billion tonnes and

was recently sold to Chinese state-backed East China Mineral Exploration and

Development Bureau (ECE), for $1.2 billion

The Carrapato Project is immediately adjacent to Vale’s Corrego do Feijao Mine which

produced direct ship iron ore at a grade of 66.6% Fe

Continuity of the mineralisation from the Sarzedo and Corrego do Feijao Mines into the

Carrapato Project is confirmed and a significant iron ore deposit delineated

Proximity to domestic steel mills and rail infrastructure will give future domestic or export

options for early development of a significant iron ore operation

Project drilled with diamond coring in 28 holes for a total of 2,393.5 metres on 100 metre

sections

Exploration Target of 53 to 62 million tonnes at 35.2% to 41.1% Fe including a high grade

zone at surface of 3.7 to 4.3 million tonnes at 51.1% to 59.7% Fe

Following due diligence the Company plans immediate pre-feasibility studies leading to an

application for a Special Mining Permit and early production

Page 2: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 2

The Terms of the Agreement

The Company has agreed to acquire the Carrapato Project for US$38m payable over 4 years, subject

to a 4 month evaluation period during which the Company will undertake due diligence.

Exploration in Brazil historically is not undertaken or reported in accordance with the JORC Code and

the Company will undertake infill drilling and supplementary analysis if necessary during the

evaluation period to enable the Company to estimate a Mineralised Resource on the Carrapato

deposit.

If BMG elects to proceed with the acquisition following the evaluation period, BMG will pay the

vendors in stages over 4 years, with the bulk of the acquisition price being paid at the end of the

period (US$22m). The Company will also retain a right to withdraw from the project at any time

without the obligation for further payments, and will retain a pro-rata interest in the project for any

payments already made.

The first payment of US$3m will follow the finalisation of the definitive sale documentation (DSD)

within 1 month after the evaluation period. The next payment of US$3m will be due 8 months after

the DSD; then US$5m 20 months after the DSD; US$5m 26 months after the DSD; and the final

payment of US$22m 44 months after the DSD.

The Carrapato Project

The project area is located in a rural setting on the south western outskirts of Belo Horizonte. The

tenement is immediately north of Vale’s Corrego do Feijao mine. The tenement is also along strike

from Itaminas’ Sarzedo mine which has recently been sold to Chinese state owned interests.

Location of Carrapato Tenement, Itaminas Sarzedo Mine to the east; Vale’s Corrego do Feijao mine to the

south. The tenement is about 1000 metres wide east-west.

Corrego do Feijao

Itaminas Sarzedo Carrapato

Page 3: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 3

Tenement Status

The tenement is held under DNPM Process (Exploration Licence) 830.094/2006 which covers 47.14

hectares and was granted on January 20, 2006.

Exploration Licence 830094/2006 – The Carrapato Project Mining Licence 3035/1963 – Itaminas Sarzedo Mine Mining Licence 4757/1940 – Vale S.A - Corrego do Feijao Mine Other tenements held by Vale S.A.

Regional Setting

The mining district of the Quadrilátero Ferrífero (Iron Quadrilateral) in south eastern Brazil contributes to 70 per cent of the Brazilian iron ore production. Traditionally, four iron ore types were mined in the Iron Quadrilateral region:

1. soft haematite, 2. hard haematite, 3. friable ‘itabirite’ (the Brazilian name for metamorphosed banded iron formation), and 4. canga (an indurated iron-rich crust).

Itaminas Sarzedo

Mine

Corrego do Feijao Mine

Page 4: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 4

With the exception of the hard haematite, these categories are derived from supergene enrichment of the Paleoproterozoic Cauê Formation (itabirite) and the overlying Gandarela Formation (carbonatic itabirite). These units are exposed over a continuous strike length of many tens of kilometres in a series of structures that collectively define a larger synclinorium. The iron ores of the Itabira district occur both as hard 67% grade Fe hematite and as friable 35 – 50% grade Fe itabirite. The ore bodies are often covered by canga (lateritic material) and detrital deposits.

Location and Geological Map of the Quadrilátero Ferrífero, Minas Gerais, Brazil

Local Geology

The main lithologies present in the Carrapato deposit are soft itabirite of the Cauê Formation, and dolomites and weathered iron-manganese formations of the Gandarela Formation, in addition to Tertiary argillaceous sedimentary deposits, cangas and soil coverage.

The extended Carrapato deposit including the Itaminas Sarzedo deposit occurs continuously over several kilometres with a strike length of 1 km within the tenement. In this region, the Cauê and Gandarela Formations are oriented east-west varying to over 500m thick.

Carrapato Project

Page 5: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 5

Local Geology of the Carrapato Project

The adjacent Itaminas Sarzedo deposit is being actively mined a few kilometres along strike from Carrapato. Current production from Sarzedo is 3 mtpy for delivery to local steel mills. The Sarzedo mine has a reported resource of 1.3 billion tonnes and was recently sold to Chinese state-backed East China Mineral Exploration and Development Bureau (ECE), for $1.2 billion. News reports indicate the mine has the capacity to produce 25 mtpa.

Vale’s Corrego do Feijao has been mined up to the Carrapato tenement southern boundary with a reported reserve in 2009 of 35 million tonnes at 66.6% Fe remaining. The mine is currently inactive on care and maintenance status.

Diamond Drilling

Twenty eight diamond drill holes have been completed on the project for a total of 2,393.5 metres.

One hole (FS-8) was found to have been drilled outside the tenement boundary. The deposit was

mainly drilled on 100 metre sections to an average depth of 85 metres. Four holes were drilled into

the Caue Formation from elevated sites approximately 100 metres above the lower cangas and

detritals. There is scope to extend the drilling in the southern part of the tenement to test this zone

at depth. Ten other holes were completed in good grade mineralisation at the end-of-hole. A table

of drill hole locations is included at the end of this announcement.

Page 6: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 6

Location of Diamond Drill Holes

Results of the Drilling

A table of significant intercepts was compiled from the assay results using a lower cut off of 35% Fe.

Every hole intersected high grade mineralisation mostly from the surface with a weighted average

grade for the 28 drill holes of:

44.0% Fe, 23.4% SiO2, 5.1% Al2O3, 0.06% P and 6.6% LOI

The significant intercepts were drawn from a data base of 276 assays distributed as shown in the

following graph. Approximately 31% of the assay values for Fe were above 40% and 13% above 50%.

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

0% 20% 40% 60% 80% 100%

% F

e

Percentile

Cumulative distribution of Assay Values - Fe%

Page 7: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 7

All intercepts are measured down hole. There is insufficient evidence at this stage to determine the

dip of the strata but mineralisation is interpreted to be continuous across the strike and the contacts

steeply dipping. A table of intercepts above 35% Fe in included at the end of this announcement.

A zone of higher grade iron mineralisation at surface is present on the eastern side of the tenement

which will be suitable for start-up production. The significant intercepts for the zone are as follows:

SUMMARY OF HIGH GRADE INTERCEPTS Hole

no. From To Length %Fe %SiO2 %Al2O3 %P %LOI

FS-5 0.00 17.70 17.70 47.78 10.89 11.37 0.069 8.48

FS-6 0.00 26.55 26.55 52.99 7.99 7.96 0.058 6.90

FS-7 0.00 13.05 13.05 49.72 7.70 11.97 0.085 7.66

FS-9 0.00 9.65 9.65 53.49 4.72 8.10 0.048 9.75

FS-10 0.00 5.85 5.85 58.00 5.53 6.11 0.046 5.30

FS-12 0.00 8.15 8.15 57.28 4.15 6.70 0.075 6.46

FS-13 0.00 31.80 31.80 56.89 3.62 4.36 0.048 10.35

FS-16 0.00 5.00 5.00 57.09 5.22 7.67 0.083 4.65

FS-18 0.00 18.20 18.20 55.86 3.43 4.65 0.040 8.97

FS-28 0.00 3.85 3.85 57.52 5.82 3.56 0.063 8.19

Weighted Average Grades 54.05 6.03 7.24 0.058 8.29

Carrapato Project area looking south across the high grade zone. The Corrego do Feijao mine is on the far side of the hill.

Page 8: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 8

Exploration Target

The geological model used to define the Exploration Target of the Carrapato Project is based on a wireframe model constructed in Micromine. This model was used to validate the geological model based on 10 vertical geological sections produced by Larf. The lithologies modelled were those corresponding to ore types recorded in the Serra Azul area.

Four mineralised domains combining lithology and hardness were defined:

1. Detrital iron rich material overlying the Gandarela Formation and parts of the Caue Formation.

2. Lateritised Canga material in the weathered zone. 3. Moderately Friable Cauê Itabirite (Siliceous). 4. Gandarela Itabirite and Colluvium (Carbonate).

This is a fairly simple model and consistent with other mines on the Serra Azul. The lower elevation

limit for the original resource calculation was determined from the cross-sections and a topographic

surface plane (DTM) was created in Micromine.

The interpreted lithological boundaries and mineralised zones were transcribed into Micromine.

These zones were then wireframed to complete three dimensional volumes. The colluviums and

lateritic zones were wireframed together, as was the +35%Fe mineralised horizon.

These two wireframed mineralised zones were then cut to the surface DTM, lower boundary DTM

and the tenement boundary. The wireframes were electronically and visually validated. Density

values were researched from documents relating to the MMX’s deposit 20 kilometres to the south

west on the Serra Azul range in the same stratigraphic units.

MMX conducted three programs of density measurements at its project. The sand flask method was

used for the friable lithotypes and the water displacement method for the competent lithotypes.

Average values were calculated with and without outlier values by lithotype. The densities (tonnes

per cubic metre) by lithotype for the MMX deposit are as follows:

Friable Itabirite 2.70 Ore

Compact Itabirite 3.40 Ore

Mineralized Canga 2.82 Ore

Friable Carbonate Itabirite 2.09 Ore

These values were then averaged proportionally to the lithologies encountered in the Carrapato

geological interpretation. A value of 2.6 tonnes per cubic metre was applied to the

colluviums/laterite zone, and a value of 2.4 tonnes per cubic metre was applied to the mineralised

itabirite zone. A wireframe volume and tonnage report was produced.

An estimate of the material inventory within the tenement boundaries was based on the 27 drill

holes excluding FS-8. The weighted average grade of the drill intercepts was calculated based on

intercept length. A range of grade and tonnage estimated was compiled by considering a lower cut

off of 25% with a range of +5% and -10% with densities consistent with the nearby MMX mine. The

calculations were reviewed and the estimate is considered to represent an Exploration Target in

accordance with the JORC code.

Page 9: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 9

Exploration Target: 53 to 62 million tonnes at 35.2% to 41.1% Fe

The Exploration Target includes a high grade zone at surface which will be sufficient to support the

first few years of production under the current plan. The high grade zone is estimated to be:

High Grade component: 3.7 to 4.3 million tonnes at 51.1% to 59.7% Fe

The exploration targets are estimated from geological information including drill holes, outcrops and geological information and are shown as a range. While the Company remains optimistic that it will report resources in the future, any discussion in relation to exploration targets or resource potential is only conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. Mr Malcolm Castle, a Member of the AusIMM, reviewed the information relating to the estimation of Exploration Targets and is satisfied that it fairly represents the scope of the deposits. He has sufficient experience relevant to the style of mineralization and type of deposits under consideration to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC code).

INFRASTRUCTURE

The Carrapato deposit is 9 kilometres by road from the Sarzedo Multi-use Load Terminal which has facilities to load iron ore on the MRS rail system for transport to a coastal port. This provides easy access for the export of iron ore as the project develops.

The infrastructure and access to the domestic steel market around the Carrapato project is excellent with an experienced mining workforce amongst a population of over 2.3 million people, contract mine operators, excellent infrastructure (including an international airport) and over 100 pig iron smelters within less than 180km radius of the project.

Brazil’s installed steelmaking capacity, among the most advanced in the world today, comprises 25 mills, 11 of which are integrated with iron ore mining, and another 14 are mini-mills (recycling ferrous scrap feedstock), administered by seven corporate groups. Integrated mills currently account for 74% of all Brazilian steel production, with mini-mills producing the remaining 26%. Total Brazilian installed capacity amounts to 36 million tonnes of crude steel per year, 94% of which is produced by strip casting.

Nine large steel mills and over a hundred smaller mills draw feed from the many mines that operate within the region. Iron ore and steel are also transported by rail to ports near Rio de Janeiro and Vitoria from where it is shipped throughout the world. Several domestic steel mills are in the vicinity of the Carrapato Project and supply to these mills will be assessed during the pre-feasibility studies.

Conceptual development plan and start-up

The conceptual plan for the development of Carrapato will be based on a lower cut off of 25% Fe.

Significant elements for the Project include the following:

The mineralisation extends from the surface with no overburden waste.

Internal waste within the mineralised envelope represents about 10% of the volume at

grades of 10% to 20% Fe and could be blended with the mineralised zones.

Page 10: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 10

Half the holes drilled in the deposit were completed with strong mineralization at the end-

of-hole suggesting further mineralisation will be available beneath the current envelope.

The high grade zone represents a coherent unit with sufficient capacity and consistency to

support early mining.

Parts of the high grade zone are considered to be DSO grade in the current market.

BMG intends to complete a pre-feasibility study and enter a pre development phase as soon as

possible with an application for a ‘Special Mining Permit’ based on a Mineral Resource estimated in

accordance with the JORC code and preliminary feasibility test work. While this proposal is

conceptual in nature the target start-up parameters will allow BGM to commence production within

12 to 18 months if the current assumptions are verified.

Initial production conceptual targets are 300,000 tonnes per annum to the domestic market ramping

up to 2.0 million tonnes per annum when the full mining concession is granted. Export options will

be considered at that time. The DNPM may grant a Special Mining Permit prior to the granting of

the full Mining Concession with a gross production of up to three hundred thousand tonnes per year

to allow detailed feasibility studies to continue and marketing of test parcels to prospective off take

partners.

A review of the publicly available NI43-101 report on the MMX mine 20 km to the south west

suggests the operating costs for the Carrapato deposit will be in the range of $3 to $4 for mining, $2

to $3 for processing the 50% to 60% Fe material and $5 to $6 for the 35% to 45% Fe material, and $4

to $5 for transport and loading to domestic steel mills. Transport to the port would add additional

cost and will be evaluated further during pre-feasibility.

The Serra Azul area has been in production for many years and treatment plants may be available for

toll treatment of the material. This will significantly reduce the need for capital expenditure. We

anticipate that most of the activities will be carried out by contract miners and transport companies.

The initial capital requirements to commence production are expected to be restricted to mine

infrastructure and access roads.

ENDS

For further information please contact: Bruce McCracken, Director and CEO Malcolm Castle, Technical Director Brazilian Metals Group Ph: +61 8 9424 9390 Email: [email protected] Website: www.bmgl.com.au

Media and Investor Relations James Moses Mandate Corporate Ph: +61 420 991 574 Email: [email protected]

Page 11: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 11

Competent Persons Statement

The exploration targets are estimated from geological information including drill holes, outcrops and geological information and are shown as a range. While the Company remains optimistic that it will report resources and reserves in the future, any discussion in relation to exploration targets or resource potential is only conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on

information compiled by Malcolm Castle, who is a Member of the Australasian Institute of Mining and

Metallurgy (“AusIMM”). Mr Castle is a director of Brazilian Metals Group Limited. He has sufficient experience

relevant to the style of mineralisation and type of deposits under consideration and to the activity which he is

undertaking to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for

Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Castle consents to the inclusion in

this report of the matters based on his information in the form and context in which it appears.

Page 12: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 12

CARRAPATO PROJECT DIAMOND DRILL HOLE LOCATIONS

HOLE Easting Northing RL Decl. Azi. Depth

FS-1 591,589 7,777,388 1,347.0 -90 0 54.50 FS-2 591,560 7,777,376 1,347.0 -90 0 35.60 FS-3 591,470 7,777,359 1,347.0 -90 0 104.10 FS-4 591,371 7,777,314 1,366.0 -90 0 96.90 FS-5 591,091 7,777,622 1,250.0 -90 0 50.75 FS-6 591,079 7,777,714 1,251.0 -90 0 51.70 FS-7 591,198 7,777,683 1,221.6 -90 0 90.00 FS-8 591,442 7,777,896 1,190.3 -90 0 58.85 FS-9 591,102 7,777,792 1,252.8 -90 0 84.40 FS-10 591,185 7,777,822 1,226.4 -90 0 121.70 FS-11 591,299 7,777,857 1,207.3 -90 0 65.70 FS-12 591,289 7,777,702 1,206.0 -90 0 103.75 FS-13 591,175 7,777,563 1,254.0 -90 0 106.00 FS-14 591,262 7,777,479 1,275.0 -70 0 93.70 FS-15 591,163 7,777,446 1,251.6 -70 0 47.70 FS-16 591,026 7,777,617 1,240.3 -90 0 68.45 FS-17 591,014 7,777,792 1,247.9 -90 0 61.75 FS-18 591,012 7,777,766 1,245.9 -60 20 78.55 FS-19 590,891 7,777,705 1,194.0 -90 0 100.50 FS-20 590,983 7,777,551 1,214.5 -90 0 81.95 FS-21 590,983 7,777,551 1,214.5 -90 0 98.35 FS-22 590,905 7,777,631 1,196.8 -90 0 106.85 FS-23 590,910 7,777,532 1,195.9 -90 0 108.70 FS-24 590,828 7,777,530 1,174.4 -90 0 114.90 FS-25 590,714 7,777,520 1,136.5 -90 0 87.90 FS-26 590,820 7,777,600 1,163.5 -90 0 116.50 FS-27 591,109 7,777,498 1,230.8 -90 0 94.80 FS-28 591,302 7,777,563 1,238.4 -90 0 108.95

Total Metres

2,393.50

Page 13: AGREEMENT TO ACQUIRE CARRAPATO PROJECT … › component › rsfiles › download-file › files...(“arrapato Project”) in the Quadrilátero Ferrífero (Iron Quadrilateral) close

Page | 13

CARRAPATO PROJECT DRILL HOLE INTERCEPTS at +35% Fe CUT OFF

Hole no. From To Length Fe SiO2 Al2O3 P LOI

FS-1 0.00 54.50 54.50 41.40 35.08 0.52 0.036 4.29

FS-2 0.00 29.10 29.10 44.86 28.29 1.07 0.061 5.84

FS-3 0.00 25.45 25.45 43.35 33.81 0.46 0.031 3.30

FS-4 0.00 56.65 56.65 41.90 36.63 0.33 0.031 2.53

FS-4 84.55 90.60 6.05 35.01 45.23 0.36 0.032 3.45

FS-5 0.00 17.70 17.70 47.78 10.89 11.37 0.069 8.48

FS-5 47.00 50.75 3.75 46.09 20.35 5.73 0.039 7.11

FS-6 0.00 31.55 31.55 51.12 10.85 8.12 0.054 6.64

FS-7 0.00 65.30 65.30 36.66 19.19 16.13 0.090 10.23

FS-8 21.75 29.15 7.40 43.00 17.43 12.14 0.046 7.40

FS-8 47.20 52.40 5.20 37.83 15.34 3.790 0.151 13.37

FS-9 0.00 77.00 77.00 49.35 13.42 5.03 0.048 8.16

FS-10 0.00 114.05 114.05 42.59 27.07 3.31 0.039 5.84

FS-11 0.00 65.70 65.70 38.631 27.67 6.316 0.070 7.553

FS-12 0.00 8.150 8.15 57.28 4.15 6.70 0.075 6.46

FS-12 50.50 60.90 10.40 35.67 22.84 14.77 0.073 10.03

FS-12 96.75 103.75 7.00 39.56 36.74 3.17 0.040 2.57

FS-13 0.00 72.90 72.90 53.30 9.67 4.00 0.053 9.48

FS-14 0.00 49.90 49.90 36.48 39.30 1.67 0.038 6.86

FS-15 0.00 5.90 5.90 38.16 22.07 11.79 0.100 8.37

FS-16 0.00 23.85 23.85 42.18 15.39 14.12 0.063 8.73

FS-17 0.00 4.80 4.80 53.06 18.27 2.88 0.025 2.57

FS-18 0.00 34.45 34.45 53.42 6.88 4.93 0.044 8.48

FS-19 0.00 39.05 39.05 42.37 22.47 5.57 0.102 7.50

FS-19 75.45 81.25 5.80 51.57 16.77 3.08 0.050 2.68

FS-20 0.00 29.55 29.55 39.14 21.69 12.91 0.049 8.49

FS-22 27.30 57.95 30.65 45.32 23.24 3.10 0.082 3.64

FS-23 10.30 31.70 21.40 49.51 20.55 3.33 0.064 4.91

FS-24 0.00 9.90 9.90 37.89 41.84 2.14 0.040 2.04

FS-24 27.90 33.30 5.40 35.56 45.72 0.82 0.033 2.84

FS-25 0.00 21.30 21.30 49.67 22.19 1.78 0.067 4.22

FS-26 31.25 47.80 16.55 41.52 33.79 1.19 0.063 2.45

FS-26 80.90 113.75 32.85 41.28 30.94 2.19 0.071 3.08

FS-27 0.00 9.15 9.15 37.08 33.80 5.79 0.059 5.11

FS-28 0.00 38.90 38.90 49.12 14.25 5.42 0.047 9.69

Weighted Average Grades

43.97 23.44 5.12 0.058 6.61