Agile/Scrum Case study Code name: ninja. 2 scrum teams One product backlog 8 months so far Long...

6
Agile/ Scrum Case study Code name: ninja

Transcript of Agile/Scrum Case study Code name: ninja. 2 scrum teams One product backlog 8 months so far Long...

Page 1: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.

Agile/Scrum

Case studyCode name: ninja

Page 2: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.

2 scrum teams One product backlog 8 months so far Long term project External integrations R&D and QA Off shore

About the Project

Page 3: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.

Getting The Project Rolling

PlanningRelease planningBacklog groomingPre planningTech planningContent planningCapacity calculations Sprint lengthTeam work Day to day

Intense workDaily monitoringDaily meetingsVisible valueEffort estimationFocus & time management

QualityAccurate test planContinuous BuildsAutomationOn going BUG fixingStabilization sprintSystem testHandover to QA

Page 4: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.

Two teams, one backlog, one sprint review

EmpowermentDaily meetingSprint reviewRetrospectiveScrum philosophyKnowledge sharingPersonal opportunities

Intensive relationshipsPO/PdMQAScrum masterDevelopersPjMTech writersGroup manager

Benefits and ChallengesHyper productiveVisible valueOff shoreStabilizationIntegrationsShared code ownership

Page 5: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.

PBL Developer

/s

Agile as a Rich Tool Box

In sprint QA

Architecture

design

Stab

iliza

tio

n Sp

rint

Auto

mat

ed

test

ing

Design Review

Release Planning

Technical

PlanningPre-

Plan

ning

Backlo

g

gro

om

ing

Sprint Review

Retro

spec

tive

Scr

um

of

Scr

um

Cross teams

Sprint Review

Page 6: Agile/Scrum Case study Code name: ninja.  2 scrum teams  One product backlog  8 months so far  Long term project  External integrations  R&D and.