Sport Across Staffordshire and Stoke-on-Trent Board
AGENDA
14 May 2014 at 2.00pm (light lunch at 1.15pm) Training Room, Stafford Leisure Centre, ST16 3TA
1. Apologies
2. Declarations of Interest
3. Andrew Donald, Chief Officer for Stafford & Surrounds and Cannock Chase CCGs
4. Active Staffordshire Presentation – Janene Cox & Tilly Flanagan
5. Minutes of last meeting (29/01/14)
6. Matters arising
7. Year 2013/14 reporting:
a. Sport England Annual Performance Report – MT (Enc 1) b. Delivery Plan progress report 2013/14 – MT (Enc 2) c. Financial report to 31st March 2014 – MT (Enc 3)
8. 2014/15 Delivery Plan, Budget, Risk Assessment – MT (Enc 4)
9. SASSOT Vision 2020 Working Group Update - (Enc 5) – To Follow
Items for information:
1. SASSOT Partner Satisfaction Survey 2013 – Naomi Bird (Enc 6)
2. Review of Sportivate Year 3 & Year 4 Plan– Claire Greenwood (Enc 7)
3. Sportshire Update – Jude Ford (Enc 8)
4. Date, time and theme(s) of future meetings
Page 1 of 5
Sport Across Staffordshire & Stoke-on-Trent
Board Meeting 29 January 2014, 2.00pm, Craddock Room, Stafford Borough Council
Meeting Minutes
Present Attendees Apologies
Also
Distributed
To:
Laurence O’Neill (LO’N)Andy Weston (AW)
Tilly Flanagan (TF)
Adam Hill (AH)
Stephen Brown (SB)
Sheila Fulford (SFu)
Russell Turner (RT)
Trevor Humphreys (TH)
Mark Thornewill (MT)
Leigh Morton (LM) notes
SASSOT – Chair
Staffordshire FA
Staffordshire Public Health
Stafford Borough Council
Cannock Chase Council
Entrust
Sport England
NuL College
Partnership Director, CSP
Admin Officer, CSP
Angela Dale
David Pinnock
Malcolm Duncan
Fiona Roberts
Janene Cox
Sajid Hashmi
Mark Deaville
Carl Bennett
Michelle Adams
Simon Dickie
Sue Finnigan
SASSOT
Core Team
In attendance: Sharon Moore, County Commissioner For Safer Communities
Jude Ford, Sportshire Coordinator, Staffordshire County Council
Chris Austen, Stoke-on-Trent City Council
Summary of Issues and Action
No. Item Topic Action Date
Due
The Chair welcomed Trevor Humphries, Russell Turner, Jude Ford, Chris
Austen and Sheila Fulford to their inaugural Board meeting and Members
introduced themselves.
1. Apologies as above.
2. Declarations of Interest – none.
3. SCC Youth Offer, Strategy and Commissioning Plans - Sharon Moore,
County Commissioner For Safer Communities
Achieving Excellence for Young People presentation given (copy attached) to
inform on SCC’s current and proposed new Youth Offer that is out for consultation until 26 Feb. SCC’s Cabinet will meet mid-March and, if they
agree, there will be a £50k commissioning budget to build community
capacity in each borough/district. The money will fund a new approach to
working together, providing resource and delivery.
SCC Youth Offer Presentation.pptx
Discussion focused around:
The need to review the service and maximise impact on young people and
families
Resources - transition plans
Consultation to inform of the radical change on what should be delivered.
Young people’s needs are diverse and we need the intelligence to be able
Page 2 of 5
to respond to them quickly.
The need to avoid duplication - some elements public health will be
looking to cover
Opportunity for alignment – collaborative working between SCC & CSP.
Good commissioning examples highlighted: Sportivate, Aiming High,
work with FE, Primary School Sport, public health research and support
for the voluntary sector (Sport Makers, Sports Leadership training)
SCC to visit boroughs/districts at a local level. £50k resources needs to be
‘needs- led’ Offer extended to use facilities at Newcastle-under-Lyme College in the
evening. TH to liaise with Sharon Moore.
Action
All to take part in the consultation
http://www.snapsurveys.com/swh/surveylogin.asp?k=138910695408 Any
questions contact Sharon Moore 01785 277033
MT to liaise with Sharon re collaborative working and report back to the
Board
TH
All
MT
Feb
By
26Feb
Feb
4. Welcome to new Board Member – LO’N (Enc 1)Paper presented to introduce and welcome new Board Member Trevor
Humphreys, Academy of Sport Manager at Newcastle under Lyme
College as the representative from the Further Education sector.
5. Minutes of last meeting (23/10/13) - agreed
6. Matters arising
6.2 Community Sport Networks (CSNs) – MT distributed a written
response that informed of the current picture of CSNs; that is no
formal CSNs are currently in place, many of the groups continue to
meet and work together but through other wider thematic
partnerships rather than the CSN.
7.
7.1
Year 2013/14 reporting:
Q3 Delivery Plan progress report for 2013/14 – MT (Enc 2)
Report and Delivery Plan presented. Good progress against the Delivery Plan
targets continues to be made.
7.3 Financial report to 31st December 2013 including Sport England funding
allocation – MT (Enc 3)
Financial performance report presented that had, prior to the meeting, been
consulted on with the Board Finance Champions (MD & DP).
Items to note:
Overall on track with the budget; there were no issues to report
Finance Champions had been consulted on and agreed to additional
expenditure of £17k for Sport England to carry out Facility Planning
Modelling work for the Sub-Regional Sports Facilities Framework. Draft
report due mid-Feb and full report in April. Sub-Regional Facilities
Framework will provide an evidence base to demonstrate strategic demand
Page 3 of 5
when submitting bids. Data will be available for use by local authorities,
universities, schools, clubs etc giving potential ROI opportunities and a
value added proposition for partners and users of the SASSOT service.
Report accepted.
8. Board Representation – MT (Enc 4)
Report presented to inform on the request from 2 organisations (S&S/CC CCGs
& SCC) and potential benefits for them to join the Board.
Discussion focused around:
Whether the representatives should be appointed, co-opted for a project
period, be invited for specific agenda items or be part of sub-groups.
The Chair informed that a representative from the Staffordshire & SoT
Partnership had also expressed an interest in joining the Board.
The need to be clear of the purpose of the Board and the danger of becoming
too big. (Governance work - part of the Vision 2020 / future direction sub-
group)
It was agreed that:
MT to liaise with Andrew Donald, Chief Officer for Stafford & Surrounds
and Cannock Chase CCGs to establish if he can represent the CCG network.
Andrew to be invited to next Board meeting to present on what opportunities
CCGs can offer and the benefits of becoming a Board Member. MT to
decide whether this is appropriate before or after the 26th February Board
meeting i.e. when a more future facing profile is consulted on.
MT to liaise with Sharon Moore, County Commissioner for Safer
Communities to establish if she wishes to join or if she is happy to feed into
the Board via the existing 2 SCC representatives
MT
MT
Feb
Feb
9. Eventbrite – Lee Booth (Enc 5)
Report presented to inform of the proposal to introduce Eventbrite as the online
bookings and payments system for the education and training programme.
The introduction of Eventbrite would mean a slight increase in workshop costs,
but would be more beneficial to customers and save on SASSOT staff time.
Workshop delegates would still be able to make postal and over the phone
bookings/payments. This is a sound investment to improve efficiency and
effectiveness of operations whilst offsetting the costs.
The report was accepted and it was agreed to implement Eventbrite with effect
from April 2014.
SASSOT April
10. SASSOT Vision 2020 – Balanced Scorecard SWOT Exercise (Enc 6)
Report presented to inform of the Vision 2020 working group meeting and
facilitated Board workshop organised for 26 Feb, 2-5pm at Stafford Borough
Council to carry out a PESTLE exercise.
Action
LM to ascertain Board members’ commitment to attend PESTLE workshop
on 26 Feb prior to engaging outside facilitator as there will be a £450 charge.
CA to enquire if there is an experienced person at Staffordshire University
who could carry out the facilitated workshop and inform the Chair
LO’N to check with CB the facilitator’s workshop content, minimum and LO’N Feb
Page 4 of 5
maximum delegate numbers
The outcome of the workshop would inform the Vision 2020 sub-group
meeting on 5 March.
The Board concluded that depending on the suitability of the facilitator, the
number of confirmed attendees and spread across sector organisations that the
workshop goes ahead.
MT &
LO’NFeb
11. Girls Active Project – Naomi Bird (Enc 7)
Information report presented to inform of the new and recently commissioned
£20k piece of work from SCC Youth & Community Service to coordinate a
women and girls’ grants programme in Burton, Rugeley, Chase and Tamworth. .
The pilot project will be monitored and recommended improvements fed back to
SCC’s Youth & Community Service. Contact Naomi Bird on [email protected] for more information.
12. Active People Survey 7 Results – Naomi Bird (Enc 8)
Information report presented with a comprehensive review of the latest APS 7
results.
Overall the results show a positive picture of achievement and progression but
there is still a lot of work to be done.
Action:
Volunteering – some results are significantly different to that in the past.
SASSOT to carry out comparison work with VAST’s figures to identify if there is a reason
Volunteering - MT to meet with TH re a volunteer strategy (BTEC students
have to do 60 hours per year as part of their course).
Club Membership and Volunteering – SASSOT to look at trends and take to
NGB Forum to see if they can rationalise any declining APS 7 results
Naomi
MT
Naomi
Feb
Feb
Feb
13. Sport & Physical Activity Project – Ben Hollands (Enc 9)
Information report presented and accepted.
Pilot research taking place that looks at very detailed data on what sport and
physical activity is provided across Stafford Borough. This will help identify
gaps and where to target future provision. Hoping to next map Cannock and
once research for both districts is complete it will be used to support a joint
sport and health proposal to Stafford and Cannock CCGs. It was pointed out
that Stafford and Cannock also includes a tip of South Staffordshire
Action:
Ben Hollands to attend a Board meeting to inform on the research process and
sport and health proposal.
Ben 14.05.14
14. Sportshire Update – Jude Ford (Enc 10)
Information report presented and accepted.
2012 Legacy Report – recommendations approved by SCC’s Corporate Review Select Committee – copy available from JF
Page 5 of 5
Staffordshire Talented Athlete Fund – LM to forward information to AW
and SFu for dissemination to schools
Kitting Out process ahead of the Commonwealth Games- AW to provide JF
with contact details for St George’s Park.
LM
AW
Feb
Feb
15. AOB
MT circulated an update prepared by Cllr Mark Deaville as he had sent his
apologies for this meeting.
The Chair congratulated Carl Bennett on his appointment of interim chair
of CIMPSA and Michelle Adams as Acting Assistant Director of
Economic Development, Culture & Sport at SoTCC
The Chair requested that the Vision 2020 sub group also looked at
frequency, dates and timings of meetings i.e. do we still need 4 meetings a
year as we struggling with attendance in the summer.
The Chair welcomed any feedback from the Board regarding the content
and format of the meetings i.e. do they work for you? Contact
Vision
2020 sub
group
All
March
March
16. Date, time and theme(s) of future meetings
SASSOT Vision 2020 Exercise
Weds 26 Feb 2014, 2.00pm
Walton Room
Stafford Borough Council
Weds 14 May 2014, 2.00pm Stafford Leisure Centre
Provisional 16 July 2014, 2.00pm Stafford Borough Council
Weds 22 October 2014, 2.00pm Stafford Borough Council
All 26.02.14
Prepared By: Date Checked By File Code
Leigh Morton 3 Feb 2014 Laurence O’Neill Executive Board Minutes 290114
1 of 3
Report to the Board – Enclosure 1
Report Title Sport England Six Monthly Performance Report
Date 14 May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information relating to:
Contact Officer Name: Mark Thornewill
Tel: 01785 619896
For Information X
For Decision
1. Purpose of Report
To provide a copy of SASSOT’s annual performance report as submitted to Sport England.
2. Recommendation(s)
For information.
3. Executive Summary
Sport England requires that each CSP completes a six monthly and annual Performance Management Template in October and April.
The Performance Management system involves two sections:
Delivery
Infrastructure
Participation rates, as provided by the latest Active People Survey results, are also taken into consideration as an indicator but the CSP is not performance managed
2 of 3
on this.
Delivery includes the following:
Coaching
NGB Delivery
School Games
Sport Makers
Sportivate
Strategic Networking
Infrastructure includes the following:
Board Effectiveness
Efficiency
Financial Planning
Leadership
Relationship with Host
Risk Management
Structure
CSPs carry out a self-assessment against the criteria for green, amber or red ratings in each of the sections apart from Sport Makers and Sportivate which is ranked according to data taken from the central information portal.
Sport England then assess the evidence provided, carry out a moderation exercise to ensure that the assessments are consistent across the CSP Network and then the Sport England Strategic Lead in each area meets with the appropriate CSP Directors to discuss the results.
An individual green, amber, red rating is awarded to each of the areas above (a gold rating can also be awarded for programmes such as Sportivate where the CSP has exceeded the agreed target). A rating is then awarded for both the Delivery and Infrastructure sections. Originally the combination of these two results was used to give the CSP an overall rating this no longer applies and each area is considered on its own merits allowing improvement to be focussed on the appropriate area.
For the period April 2013 to March 2014 SASSOT has received the following performance rating for each of the sections:
Delivery:
Coaching - GreenNGB Delivery - GreenSchool Games - GreenSport Makers - Green (Gold)Sportivate - Green (Gold)Strategic Networking - GreenDelivery - Green
3 of 3
Infrastructure:
Board Effectiveness - GreenEfficiency - GreenFinancial Planning - GreenLeadership - GreenRelationship with Host - GreenRisk Management - GreenStructure - GreenInfrastructure - Green
Participation Amber (based on the results of the latest Active People Survey which show that participation in sport at least once per week by the 14 + population in Staffordshire remains unchanged).
Our NI 8 participation rates I e the % of the 16 + population who participate in sport and active recreation on at least 3 x 30 minutes per week has seen an increase. In 2006, the first Active People Survey our % was 20.5% the latest figures show 26.7% a % increase over 8 years.
Overall feedback from Sport England was strongly positive in terms of our performance and the fact that our newly introduced tracker system allows us to demonstrate impact in terms of our work areas relating to NGB engagement & support, Strategic Networking, Coaching Services and our programme delivery.
A copy of the full report can be found on the Board Member area of the SASSOT web site and a copy will be available at the meeting.
CSP Name Sport Across Staffordshire and Stoke - on - Trent
CSP Director Mark Thornewill
2011-15 Funding URN 2011001435
Delivery Agreed Actions
Coaching 0Green
NGB Delivery 0
Green
Primary School Support 0Green
Satellite Clubs 0Green
School Games 0Green
Sportivate 0Gold
Strategic Networking 0Green
Infrastructure
Board Effectiveness 0Green
Efficiency 0Green
Equality 0Green
Financial Planning 0Green
Leadership 0Green
Relationship with Host 0Green
Risk Management 0Green
Safeguarding 0Green
StructureMark to quantify costs for creating and managing account.
Green
Delivery Intelligence 0Participation Rating
Audit (where applicable) 0 Amber
Sign Off
Name Signature
CSP Director
CSP Chair
CSP Host (where hosted)
County Sports Partnerships Report Q4 2013-14
We agree that this report represents a true reflecton of the CSP performance for
Sport Across Staffordshire and Stoke - on - TrentIMPROVEMENT ACTIONS
Please provide a brief update against the improvement actions agreed at Q2
Action Update
Notes of Q4 Meeting with Sport England
We discussed the convention and key messages.
We discussed the use of the additional core fundign and noted the focus on insight and research and NGB capacity. We discussed the geographical focus of this work.
Actions Agreed Please list these in Actions section on appropriate tab.
INFRASTRUCTURE Sport Across Staffordshire and Stoke - on - Trent
Please provide a RAG and a justification for the RAG selected against each element using the criteria provided.
Board Effectiveness
Green
The CSP board has and implements clear, up to date terms of reference (or equivalent) that clearly set out:- chair and member terms of office, - a role in measuring CSP performance, - independent decision making (distinct from the host alone where appropriate) and - clear connections to local stakeholders. These should be reviewed annually.Board members are willing and able to advocate on behalf of CSP and other stakeholders.
Amber
The CSP board has clear, up to date terms of reference (or equivalent) that clearly set out:- chair and member terms of office, - a role in measuring CSP performance, - independent decision making (distinct from the host alone where appropriate) and - clear connections to local stakeholders. These should be reviewed annually.
RedThe CSP has terms of reference for the board that set out some, but not all of the above areas and/or are in need of updating / or the CSP has no up to date terms of reference for its board.
Justification RAG
The Board has clear TOR which set out the role of the Board and Board Members. Roles of Chair, Vice Chair are set out in a written document as are the roles of Board Members and our Champion Roles. The Board Champion roles were reviewed recently and agreed by the Board GreenThe Board receives a progress report on the CSP's Delivery Plan and Sport England performance report at each meeting. The Board receives the results of our annual Partnership satisfaction survey. The Board has established a Vision 20/20 Working Group to examine how the Partnership can develop further.The Partnerships Constitution clearly sets out that the Board is the independent decision making body for the partnerships work and is accountable for performance
Local Stakeholders from local authorities, NGB's Health, HE, Education, private sector and the voluntary sector are represented on the Board. A new Board member has been recruited from the FE sector.The Partnership has formal links with Staffordshire Chief Leisure officers Forum, University Sports Board and Health. The Board LA Chief Executive Representative takes regular updates to the Staffordshire CEO Forum and advocates for the partnership and its role.Actions Agreed at Q4 meeting
Efficiency
GreenThe CSP can provide evidence of efficiencies that they have both identified and realised during the 13-14 financial year.
Amber The CSP has identified potential areas for efficiency savings and plans to implement these.
Red The CSP has not given consideration to efficiency savings
Justification RAG
We have procured a new programme to improve the booking and payments service ref our events and training and workshop programme. A greater percentage of bookings and payments will now be made on line providing a better service to customers and giving efficiency savings of 52.50 hours staff time per annum which can be reinvested in organising and promoting additional courses. Green
Additional resources have been obtained to support the development of Girls Activity Programmes in 3 areas of the County. The majority of this funding will be used for direct delivery.
We have combined the duties of one post to support NGB delivery and our volunteer coordinator role
We offered a placement to a visiting professor from the University of Turin to help her understand the delivery of sport in England in return for her developing a comprhensive sports data collection software toolkit for us. This will be used to enhance our local insight remit.Actions Agreed at Q4 meeting
Equality
Green The CSP has achieved the foundation level of the Equality Standard
Amber The CSP can demonstrate that it is working towards the Foundation level of the Equality Standard
Red The CSP has no evidence of progress against the Foundation level of the Equality Standard.
Justification RAG Achieved both the foundation and preliminary levels Green
Actions Agreed at Q4 meeting
Financial Planning
Green
The CSP has a medium to long term financial plan (min 3 years) in place which is regularly and openly presented to the board. CSP financial planning includes: - policies on contingencies, reserves and cash flow and - maintaining up to date payment claims for Sport England.
AmberThe CSP has a medium to long term financial plan in place (min 3 years) and is up to date on all payment claims for Sport England.
RedThe CSP is spending more in the financial year than it will receive as income and/or has no long term plan in place and/or the CSP board is not aware of the current financial situation and/or has not kept up to date with Sport England award claims.
Justification RAG An annual budget is approved by the Board. The Board has two Financial Champions who work with the Director and oversee finance and report to the Board on financial matters GreenWe have a 3 Year forward budget plan in place. All but 1 of our 12 local partners has confirmed funding for 2014/15
A continency/reserve fund is in place and is at a sufficient level to cover the partnerships liabilities including staff redundancies should the need arise. The partnerships liabilities are reported to the Board at the annual budget setting meeting and the Board agrees the level of Reserves held.
We adopt our hosts Financial Regulations and are audited annually. We are up to date with our claims to Sport England. A recent Audit found the organisation to be EFFECTIVE the highest level of ranking.Actions Agreed at Q4 meeting
Leadership
Green
The CSP has a clearly defined strategy and business/improvement plan and can provide evidence that these are having an impact on the performance of the CSP.These should include a clear improvement plan that includes examples such as a stakeholder survey, use of an improvement tool such as CSIT. Appropriate performance review processes for the staff team are in place and implemented.
AmberThe CSP has an out of date strategy and/or a plan towards improvement that is not clearly being implemented.Appropriate performance review processes for the staff team are in place and implemented.
RedThe CSP has no clear strategy and/or no improvement plan in place. No performance review process for staff is in place.
Justification RAG
We have a three year Business Plan and an annual delivery plan that sets out how we will monitor our performance and identify areas for improvement We have an annual Performance Development Review for staff. We have committed to the WMCSP Peer Review process for 2014/15. Staff Team has carried out a Balanced Scorecard SWOT analysis to inform our improvement plans for 2014/15. Green
Performance and areas for improvement are idetified through our annual partner satisfaction survey, the results of this are reported to the Board. Overrall satisfaction from Partners for 2013/14 is 97.6%.The Board has established a vision 20/20 working group to review our delivery and look at improvements for the future. PESTEL review carried out with Board and Team. In March.
Areas for improvement planning are discussed at team meetings, this year we have reviewed and implemented changes to our NGB engagement recording and Impact documents.Actions Agreed at Q4 meeting
Relationship with Host (hosted CSPs only, Independent CSPs should leave this section blank)
Green
CSP has a current, signed MOU in place with the host agency. The host has a clear responsible officer for working with the CSP, has clear roles and responsibilities which are being delivered and is engaged with the CSP board. The CSP can demonstrate added value from its relationship with the host.
Amber The CSP has a current, signed MOU in place with the host agency.Red The CSP does not have a current, signed MOU in place with the host organisation.
Justification RAG We have a current signed MOU with our Host seting out the arrangements, this is also reflected in the Partnerships Constitution. Green
The Head of Leisure Services is the reponsible officer, The Head is a member of the Partnerships BoardThe CSP demonstrates added value to the host through a close working relationship in terms of programme delivery and intelligence provision. A number of NGB's who work closely with the CSP across the County are hosted in the same office which presents opportunities for programme development. The LA share the hosting income with the CSP. The CSP has worked with the host to develop the Stafford and Surrounds Health and wellbeing strategy relating to sport and physical activity.The Head of Leisure is Chair of the Staffs Chief Leisure Officers group and the CSP provides the secartariat for the group and develops a joint agenda for each meeting including the latest updates from Sport England.Actions Agreed at Q4 meeting
Risk Management
Green
TheCSPhasa‘live’riskregisterandariskstrategy/clearapproachtodealingwithrisk.The CSP board is actively involved in risk management and the CSP can demonstrate that there is a link between managing risk and business improvement. The CSP is able to evidence mitigation measures that have reduced or removed identified risks
AmberTheCSPhasa‘live’riskregisterandariskstrategy/clearapproachtodealingwithrisk.The CSP board is informed and engaged in risk management.
Red The CSP is not clear about its approach to risk and does not have an up to date risk register.
Justification RAG The Risk Strategy and Register was reviewed in April 2013. GreenThe Risk Strategy and Register is presented to the Board for approval together with the Budget and Delivery Plan (approved by the Board at the May meeting). Each Board meeting has a key theme whereby we review our current performance re service delivery and identify necessary improvements and associated risks.The Risk Strategy identifies the measures we implement to mitigate against risk. The Measures are reviewed at least annually and more often if circumstances warrant.The Risk Strategy and register has formed part of a recent Internal Audit from which the organisation was rated as EFFECTIVE the highest level possible.Actions Agreed at Q4 meeting
Safeguarding
Green
Comprehensive self-assessment undertaken, with outcomes reflected in robust, comprehensive and detailed implementation/action plan.The organisation is effectively engaged with CPSU. No significant areas of concern have been identified.The organisation can demonstrate active implementation across the safeguarding plan.
Amber
self-assessmenthasbeenundertakenwhichhasnotaddressedallsafeguardingareas–oracomprehensive self-assessment has been undertaken but has not been entirely reflected in a robust, comprehensive and detailed implementation plan. There is an agreed process/timescale to address these issues. The organisation is effectively engaged with CPSU. There are no significant areas of safeguarding concern identified. ORThe organisation is not able to demonstrate active implementation across the safeguarding plan.
Red
The organisation has not carried out a self-assessment, and/or has failed to produce a comprehensive safeguarding implementation plan, and/or there are significant concerns regarding safeguarding, and/or the organisation has failed to undertake the review meeting. The CSP has not engaged with the CPSU.The organisation is not able to demonstrate active implementation across an adequate plan.
Justification RAG Comprehensive self assessment completed and Action Plan developed and signed off by CPSU. The priority areas in the Action Plan have been actioned. Evidence provided to CPSU and areas of good practice identified GreenSafeguarding Officer has met with the local Safeguarding Childrens Board to review the availability of safeguarding training and agreement reached that SASSOT can access training available through the Safeguarding Board.Safeguarding Officer has sent progress review update to CPSU in August.No areas for concern identified. Safeguarding Officer sits on Regional Safeguarding Group.SASSOTS Education and Training Programme provides regular opportunities for clubs, coaches and volunteers to attend safeguarding trainingActions Agreed at Q4 meeting
Structure
GreenCSP has delivery arrangements agreed with Sport England. CSP is flexible and responsive enough to make appropriate changes to these as required and notify Sport England where these are significant.
Amber CSP has agreed delivery arrangements in place with Sport England.
RedCSP has no agreed delivery arrangements in place with Sport England and/or the CSP has not adapted these appropriately to changing local circumstance which has been detrimental to performance against Sport England awards.
Justification RAG Our Delivery arrangements were signed off by Sport England. GreenOur structure and hosting arrangements allow flexibility and the timely implementation if appropriate delivery changes are required. A good example is how we were quickly able to amend staff responsibilites for the implementation of programmes and ccnfirm roles for continued delivery into 2014/15We have reviewed our structure to ensure that we have the necessary resources in place to deliver on all aspects of our core contract and programmes. The resources are in place.
Actions Agreed at Q4 meetingMark to quantify costs for creating and managing account.
Notes of Q4 Meeting with Sport England
We discussed the new award letter and noted MT had spoken with head of leisure at host, legal team of host ok. Queried separate bank account. Never had miscoding problems in past. Funding is ring fenced. Can go down new bank account but will generate more work to get to where are now - lead to more overhead charges from SBC and will take more time. not a deal breaker but request for some slack on efficiency targets if have to set up account due to increase in costs.
Extra funding - used for insight (interesting databasee system being developed here). Risk strategy reviewed at each board meeting and then rewritten for next yrs delivery plan at start of financil year.
Additional core funding - Creation of P/t research officer - insight focus. NGB activation and volunteer coordinator - extension of work beyond core helping NGBs land products from WSPs - 5 NGBs athletics, netball, badminton, football and cricket. F/t role. Stoke, Cannock and East Staffs initial focus.
Diversification of funding target - 12/13 picture same as this year as programmes havent changed. Havesoughtmentalhealthfundingbuthasn’tcomeoff.Staffsyouthservicechangingmighthaveimpact. SASSOT vision 20/20 board working group to look at improvement/governance. Need to focus on added value to what delivering this is driver for their planning going forwards - ie with Staffs youth services investment to added value to things like sportivate, school games.
20/20 working group - work over summer. Improving quality of impact documents to show impact to stakeholders. Refreshing to meet better with community plans, public health agenda etc.
Some board member changes but well managed. RT attending board.
COACHING Sport Across Staffordshire and Stoke - on - Trent
Green
• The CSP is delivering a responsive and up to date coaching plan which demonstrates a clear link to NGB and programme priorities and takes into account local intelligence. It is ambitious in its intent, with delivery of the majority of targets set. • The delivery of this plan is resulting in clear impact for coaching locally and offers tangible returns from the coaching investment
Amber
• The CSP is delivering most elements of a responsive and up to date coaching plan which demonstrates a clear link to NGB and programme priorities and takes into account local intelligence. Plans are in place to address areas where there is an issue with delivery AND/OR• The delivery of this plan shows some impact locally but there is scope to either better evidence impact or increase it by being more ambitious
Red
• The CSP is having difficulty in delivering the key elements of their coaching plan AND/OR• The link to NGB and programme priorities is minimal and it is not strong is responding to local intelligence AND/OR• There has been no meaningful attempt to ensure this is a ‘live’ document AND/OR• The delivery of this plan has limited impact locally and there is little tangible evidence that the coaching investment is of real value
Overall Summary Statement - Provide a statement to summarise the progress/success of the CSP in delivering the 2013-14 Coaching Plan. Please include a summary of the work you are delivering to support the Sport England programmes and any other local needs.
Overall RAG
The direction in the Plan for this strand of work has been met and exceeded, with additional impact witnessed as the year has gone on and the Plan matured. There has been a clear and realistic link to NGB programme priorities that has been met as a result of close working between the Coaching Lead and the NGB Lead and through having a clear rationale and flex for a programme of work within the Plan. We provide a comprehensive coach support system and work as a team to ensure the coaching strand runs through all work programmes. Tangible progress has been made, ensuring that outcomes in the Plan targeted up to Quarter 4 have been met in return for the coaching investment and overall rating is Green. Green
Notes of Q4 Meeting with Sport England
Have achieved the majority of the 13/14 Coaching Plan but both scUK and SE believe plan has been transactional in its focus. SE set the new coaching lead the challenge of making the plan more robust and with improved alignment to supporting NGBs rather than “generic coaching activity” for 14/15, pleased this has been acheived with pace and scale and alignment we are looking for.
Overall RAG Criteria
Please click here and complete the column on the NGB tab for the NGBs where you have been
working on specific coaching actions
Please click here to complete the Coaching Data tab
Then please use the criteria provided give the overall RAG status and provide an overall summary statement
Click here for further
guidance
Ongoing need to deliver quality work at scale and pace which is key.Alignment to NGB plans helped.
Actions Agreed
GUIDANCE FOR COACHING
When completing the Coaching column on the NGB tab, please ensure that you include the following details:
1.The support offered. Eg. Funding, Recruitment, CPD, Facility use brokered/value in kind2. How many coaches that impacts on. 3. What qualification level they are at/aspiring to be at. 4. What WSP plan intervention the coaches will be delivering in.5. How many sessions of the intervention.
Guidance for Coaching RAGs
Rating Criteria Meaning
The CSP is delivering a responsive and up to date coaching plan which demonstrates a clear link to NGB and programme priorities and takes into account local intelligence. It is ambitious in its intent, with delivery of the majority of targets set.
The CSP has a clear rationale how it has prioritised activity, with the ability to respond to, reprioritise and flex their delivery plan. The plan should aim to raise the bar for coaching and set ambitions targets for achievement. They deliver on most of these and have an acceptable approach to risk.
The delivery of this plan is resulting in clear impact for coaching locally and offers tangible returns from the coaching investment
There is a strong connection between the coaching and the NGB lead as well as those responsible for Sport England programmes which include a coaching element. The CSP Coaching lead can demonstrate impact against agreed NGB priorities and has evidence from the NGB to support this. Where there is a disconnect between national-to-local messaging and activity, the CSP has immediately alerted their Sport England CSRM.
The CSP is adopting an intelligence and insight-led approach to the development of an active, skilled and qualified coaching workforce. The work of CSPs will be strategically informed.
The CSP is making full use of the coaching support available to them from sports coach UK and has regular meetings to inform interventions and use of technical solutions. They can provide a clear rationale for those instances when they do devise local solutions without reference to sports coach UK
The CSP can clearly evidence the impact of their activity through the use of a range of qualitative and quantitative measures. They are effective in their deployment of a data management system to improve insight, planning and evaluation.
The CSP is delivering most elements of a responsive and up to date coaching plan which demonstrates a clear link to NGB and programme priorities and takes into account local intelligence. Plans are in place to address areas where there is an issue with delivery AND/OR
The CSP has an adequate rationale for how it has prioritised activity, with some ability to respond to, reprioritise and flex their delivery plan. The plan is solid but largely sets targets which are achievable, the majority of which are delivered.
The delivery of this plan shows some impact locally but there is scope to either better evidence impact or increase it by being more ambitious
There is some connection between the coaching and the NGB lead as well as those responsible for Sport England programmes which include a coaching element. Where there is a disconnect between national-to-local messaging and activity, the CSP has alerted their Sport England CSRM.
The CSP is largely adopting a needs-led approach to the development of an active, skilled and qualified coaching workforce. Some of the work of CSPs is strategically informed.
The CSP is making some use of the coaching support available to them from sports coach UK to inform all interventions and use of technical solutions. There is not always clarity for those instances when they do devise local solutions without reference to sports coach UK.
The CSP can partially evidence the impact of their activity through the use of a range of qualitative and quantitative measures. They are attempting to use a data management system to improve insight, planning and evaluation but there is room for improvement.
The CSP is having difficulty in delivering the key elements of their coaching plan AND/OR
The CSP has no clear rationale for how it has prioritised activity, with little ability to respond to, reprioritise and flex their delivery plan. The plan is adequate but largely sets targets which are achievable, lacking in challenge, stretch and ambition.
The link to NGB and programme priorities is minimal and it is not strong is responding to local intelligence AND/OR
There is minimal connection between the coaching and the NGB lead as well as those responsible for Sport England programmes which include a coaching element. Where there is a disconnect between national-to-local messaging and activity, the CSP has sometimes alerted their Sport England CSRM.
There has been no meaningful attempt to ensure thisisa‘live’documentND/OR
The CSP is attempting to adopt a needs-led approach to the development of an active, skilled and qualified coaching workforce but there is a tendency to undertake activity that is not needs-drive. The work of the CSP is not strategically informed.
The delivery of this plan has limited impact locally and there is little tangible evidence that the coaching investment is of real value
The CSP is making limited use of the coaching support available to them from sports coach UK to inform their interventions and use of technical solutions. They have a tendency to devise local solutions, without reference to sports coach UK, with no clear rationale to explain their ways of working.
The CSP is limited in its ability to evidence the impact of their activity through the use of a range of qualitative and quantitative measures. They are attempting to use a data management system to improve insight, planning and evaluation but there is significant room for improvement.
Green
Amber
Red
COACHING DATA Sport Across Staffordshire and Stoke - on - Trent
Data Collection required at Q4 - note that this should cover the 12 months April 2013 - March 2014
Please insert whole numbers and no symbols
1Number of coaches on data base management system
1035
2Increase (number) of coaches on database management system from 1 April 2013 152
3
Number of NGBs actively using CSP insight/workforce reports/workforce development plans
10
4Number of coaches accessing needs led formal CPD provided by the CSP 1090
5Number of coaches accessing needs led informal CPD provided by the CSP 65
6% of active coaches accessing CPD (this is calculated automatically) 112
7Non Sport England funding accessed and made available to support coaching delivery (£) 25500
8
Number of Leaders/Activators supported directly by a CSP intervention to move on to a coaching qualification 117
9
* Number of disability coaches supported through a CSP coaching intervention (supported relates to whether the coach has been recruited, reactivated, developed or retained) 12
10
* Number of female coaches supported through a CSP coaching intervention (supported relates to whether the coach has been recruited, reactivated, developed or retained) 156
This data will be passed to scUK so that it can be combined with that from other CSPs to help show the combined value of the England Coaching Network.
Please note, the data is not being used to assess individual CSP performance via the RAG rating system. It is being used to demonstrate the value of the network. We understand that CSPs will have different impact measures as plans are based on local need and therefore you may not be able to provide data for all categories in which no interventions took place (e.g. Talent). The data required is not about increasing numbers, we expect CSPs to support coaches based on local insight and identified needs from NGBs and Sport England Programmes.
Please complete the table below.
11
* Number of coaches working on a talent pathway supported through a CSP coaching intervention (supported relates to whether the coach has been recruited, reactivated, developed or retained)
41
12
** Number of additional coaching hours delivered across the CSP as a result of direct CSP interventions
6400
13
** Number of additional participants coached as a direct resut of coaching interventions across the CSP
7100
*The KPI is for number of coaches supported. E.g. if the same coach is recruited, developed and deployed this will just count as 1 coach supported.**Number of additional hours and participants coached is linked to recruitment and qualification. E.g. as a result of the CSP recruiting a coach for a specific programme or supporting a coach to qualify they have delivered an additional XX hours / supported XX participants that would not have happened had the CSP had not recruited or qualified them.
scUK will also be taking data from CoachWeb to support the evidence base. CSPs not using CoachWeb may be asked by scUK to submit further data.
NGB DELIVERY Sport Across Staffordshire and Stoke - on - Trent
Green
Amber
Red
Blank
Blue
Coaching Satellite Clubs
Sport
Impact - please ensure this relates back to actions which are specific to each NGB's priorities and avoid generic statements
Challenges RAGCSP has no relationship with the NGB or is only working on non WSP activity (pick yes from dropdown)
Coaching - please briefly describe actions during Oct 2013 -
Mar 2014 specific to coaching for the NGBs you have been
working with. This should be specifically in relation to the NGB
work in your coaching plan that has been directly requested by
NGBs via the NPS or through a local/regional meeting.
See the Coaching Guidance tab for more information.
Club Link Maker Measure 2 - NGBs engaged with and supported to deliver satellite clubs. Please list the nature of support/engagement against each NGB below. Leave blank if there has been no engagement.
Sport
Example for Hockey to show the level of detail required
10 CSP actions identified - 5 delivered - 2 in progress - 3 not started. CSP Focus areas as per SW Localities.NPS Priorities - Rush Hockey: 5 programmes in CSP focus areas, Back to Hockey: 2 new B2H projects started using Sportivate funding
Rush Hockey – 2 L2 Coaches - £1000 bursary support to deliver programme. B2H – 5 activators qualified and supported. County Coaches Forum – 30 coaches attended for informal CPD
Worked to broker links with x schools/colleges to establish x satellite clubs. Additional L2 coach identified to deliver at the satellite club'
Example for Hockey to show the level of detail required
Angling
Engaged NGB in CRI consultation and River Trail developments with Canoeing to ensure needs of local anglers are reflected in this development. Amber Angling
Archery
Community Participation:'Trent Vally Archery Club identified as a key focus club for NGB. Worked with club on their development plan, linked club to local programmes and partners. SASSOT have also rolled out NGB CYP investment locally by identifying credible local delivers and managing grant and associated monitoring on behalf of NGB. 1 new school engaged with 24 participants taking part since October
Green £200 Coach Development Grant has been awarded to 2 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.Satellite Club to be held at Stoke College with Lyme Valley Archers. Meeting scheduled to complete funding application Archery
Athletics
Athletics Networks/Run Leaders: Management and employment of Athletics Network Coordinator. Brokered new relationships with NHS and Groundwork to deliver Beginner Running programme. 20 new beginner running groups established240 runners all new to running23 leaders trained. Secured an additional £12k towards next years plan. Attended network group meetings.
Level of finanacial support into the local network and beginner running project is insufficient to maintain current levels of growth. Green
In partnership with Athletics Network Implement Leader to Coach conversion project, convert existing Leaders to Coaches and increasing paticipation in the national priority areas of Running 14 - 25 and Running 26+. 5 Coaches have been recruited and are in the final stages of the qualification and have increased participation by 30 people as part of this development. Coaches have delivered on the Sportivate programme, helping to meet the Sportivate 11+ participation
Satellite Club has started at Trentham High School linked to Trentham Running Club. Satellite Club running with 15 attendees Athletics
Badminton
CBN: Restablished CBN. CSP identified and contacted local partners to attend group , coordinated meeting in partnership with NGB, attended meetings, worked with group to develop local plan and linked group to relevant programmes. CBN Group fully operational.Smash Up: Incorporated Smash Up into Year 4 Sportivate plan.Play Badminton: CSP coordinated facility managers forum provided a platform for NGB to promote Play Badminton, 8 sign ups from LA's. Green
Smash Up Activators course recruitment. Proactive promotion via networks and marcomms locally. 13 attended, although 25 were recruited and booked to attend. Funding awarded to Congleton Badminton Club to develop coaches to develop a new satellite club.
Met with England Badminton RDOs who helped id club to link Biddulph Sports College. Meeting held between Biddulph Sports College and Potteries Performance Centre. Satellite Club has started at Biddulph Sports College linked to Potteries Performance Centre. Satellite Club running with 15 participants Badminton
Baseball / Softball Generic Services only during this period Blank Yes Baseball / Softball
Basketball
Collation of local schools competition data and reported back to NGB. Promotion of EB school affliation package to schools taking part in L2 and L3 school games. L3 Basketball event organised with 70 young people taking part. Blue
Met with Newcastle Knights Basketball Club and Newcastle Commuity High School to set up Satellite Club. Satellite c lub has started at Newcastle Community High School linked to Newcastle Knights Basketball Club. Satellite Club running with 15 particpants Basketball
Boccia
Club Development: New Boccia club now formed in Tamworth following taster sessions organised by SASSOT. SASSOT has also coordinated a Boccia leader recruitment project in partnership with local day care centres leading to 8 new Boccia sessions being established with c80 participants. Green
Coach recruitment, training and deployment project with the aim of impacting national priority participation outcome on Disability and 14+.Boccia Leaders course organised with 19 attending. 8 sessions of boccia activity being ran across the County, with a total of 82 people attending Boccia
Bowls No engagement or agreed actions with NGB this period. Yes Bowls
The CSP is providing generic services only for the NGB.
The CSP has clear, smart actions, measures and targets and is able to demonstrate impact as a result of putting these in place.
The CSP has clear, smart actions, measures and targets. There is expected impact from actions taken that has yet to be realised.
The CSP is not clear whether the NGB wants to work in the CSP area and/or has not agreed clear, smart actions, measures and targets and/or has failed to deliver on actions agreed with the NGB
The CSP has an agreed action plan to work with the NGB but has had no agreed actions within the last six months for measurement
Please read the guidance before completing this page.
If your CSP is using the CSP-NGB Reporting Local Log, then this information can be cut and pasted directly from the summary page.
Please complete the table below, showing the impact you have had and any challenges for each of the sports you are working with. An example for Hockey has been included to indicate how this could be completed.
If you are not working with an NGB, please select "yes" in the final column. This will grey-out the cells.
Please also provide a RAG for the work with these sports. The criteria for these are given below.
Please note that the information you supply for the Coaching and Satellite Clubs columns below will not directly impact on the overall RAG for NGB Delivery
NGB Core Delivery
Then provide an overall RAG in the box below the table.
Boxing
Club Development: 2 Sportivate Projects agreeed with NGB to grow local clubs. 32 participants retained. Promotion of BOX via social media, local networks, website and newsletter.Sportivate? Green
£250 Coach Development Grant awarded to 2 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Application for funding received from Round House Boxing Club following conversation with club contact and relationship brokered with Stoke College Boxing
Canoeing
Project Development: CSP facilitated engagement of NGB in the consultation process for the redevelopment of a network of waterays and gravel pits in East Staffs. This has lead to outline local agreement for a new river trail for canoeist's and the establishment of a steeering group to drive this foward. Amber
Award of a Coach Development Grant of £845 to increase the number of qualified coaches and the number of participants at Burton Canoe Club. 7 coaches trained using grant. Club has seen a 50% improvement in training sessions following training equating to 40 additional participants. Canoeing
Cricket
Insight: Attendence at both Eureka insight sessions as requested by NGB. Reviewed and provided feedback into CCB's local plan. Sportivate projects developed to support girls and womens club development initiatives from April.Capital Investment: Coordinated meeting between Rolleston CC and SCC to negotiate section 106 funding, new cricket ground created as a result. Green
Working with SCB to ensure focus clubs for disabled and female cricket development have coaches that meet MSD.£2,160 subsidy provided by SASSOT. 80 volunteers trained ensuring they and the participants are retained at the Clubs ensuring recommended minimum standards are met.
Satellite Club to be run at Stoke College to follow on from Sportivate run by Meir Heath Cricket Club. Funding agreed. Satellite Club running with 15 participants Cricket
Cycling
Sky Rides:Sourced funding for 2013/14 Sky Ride Programme on behalf of NGB leading to delivery of 45 rides with c500 people attending. Negotiated a further £35k of local funding for 2014/15 Sky Ride programme. Events: In partnership with Forestry Commsion, BC & local event management company wrote bid for MTB national champs leading to this event being secured for 2014 in Staffs. Sourced £2k of local funding to support this event. Green Cycling
Dance No Agreed actions this reporting period. Generic Services only Blank Yes Dance
Equestrian
Facility Development: NGB engaged in the design and roll out of a equestrian centre feasibility study to assess the viability of a new world class equestrian centre in Staffs. The study is being used to inform NGB decision making ref captal investment. Feasibility study completed and findings shared with NGB. Hoof: Local promotion of Hoof through networks and marcomms. Green Equestrian
Fencing No contact with NGB this reporting period. Blank Yes Fencing
Football
County Disability Leagues:Coordinated meeting with local partners and FA to develop new Downs Syndrome team. First session held with 19 participants making use of FA Growth Fund. Join our Club: Coordinated and attended meetings with local Youth Service to develop new teams/leagues in support of local FA plan/targets. Green
Coordinate a targeted CPD programme for coaches to support Club growth. CPD completed with full attendance of 30 coaches from local clubs. Promotion of FA coach education and CPD via SASSOT coaching and local networks. £1300 Coach Development Grant awarded to 10 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Satellite Clubs have started at Tamworth Enterprise College linked to Cottage Farm Rangers and Discovery Academy linked to Futsal UK. Chesyln Hay linked to Great Wyrley FC is yet to start Football
Goalball No Relationship with NGB this period Blank Yes Goalball
Golf
Get into Golf: Brokered pilot between NHS provider services and NGB to test Get into Golf product with a weight management service. This has lead to a successful pilot involving the delivery of 19 Get into Golf and Street Golf sessions with c 120 participants. More sessions scheduled.Further work now developing with other health partners in Stoke on Trent and Cannock. 16 Sportivate funded projects with 88 participants taking part. Green
Satellite Clubs have started at Cannock Chaslea Youth Centre, Norton Canes High School, Rugeley Youth Centre linked to The Academy Golf Centre Golf
Gymnastics
Facilities:CAT for City of Stoke GC, CSP linked club to NGB and reviewed clubs business plan as part of CAT submission. I'M IN: Promotion of Tamworth I'm IN club to local disability networks. Linked club and NGB to relevant local providers. Marcomms support to new club.
Amber
Implement coach recruitment, training and deployment project via a Coach development grant award to support workforce needs as identified by the NGB and local partners. Coordinated coach education course with NGB. 23 coaches recruited and trained. Coaches now operational in LA facilities delivering to 160 new participants.
Satellite Club to be held at Excel Academy linked to Stoke Elite Trampolining Club. Coaches need to be trained and therefore Coaching Courses need to be sourced in order to provide additional capacity Gymnastics
HandballSportivate project to develop handball team at Staffs Uni. 1 activity block with 10 retained particpants. Green
£795 Coach Development Grant has been awarded to 7 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS. Handball
Hockey
Club/Facility Development: Working with Stafford HC, Stone HC and Leek HC ref major facility developments. CSP has cpordinated several meetings with local partners and NGB, advised on funding and advised clubs on necessary steps they need to complete to put themselves in a position to apply for funding. Liaised with NGB ref satellite club developments (see tab). Amber
£320 Funding awarded to 1 coach at Burton Hockey Club to develop coaches to develop a new satellite club.
Funding has been allocated to all satellite clubs jointly with England Hockey and clubs are due to start soon. Satellite Club has started at Burton College Hockey
Judo No engagement or agreed actions with NGB this period. Blank Yes Judo
Lacrosse
Bespoke Local Plans: 3 Sportivate projects delivered with 28 retained participants. Satellite Club: Working with NGB to develop workforce and satellite club at Staffs Uni. Initial consultation with uni complete awaiting further info from NGB to move forward.
A number of actions were agreed with this NGB in period 1 but since initial meeting provision of information and completion of actions has not been forth coming from the regional officer. Green
Undertake workforce audit for City of Stoke Lacrosse Club and in partnership with NGB and local partners coordinate a coach recruitment and education programme to prepare club to engage in YR 2 of Satellite Club programme. Audit complete and action to address this extended to next year's Plan, with workforce requirements met by Nov 14. Lacrosse
Modern PentathlonPromotion of "Have a Go Pent" via newsletter, website and social media as requested by NGB Blue Modern Pentathlon
Mountaineering
Rockout: 2 BMC Rockout Courses supported through Sportivate. 22 participants retained.Approacheds by BMC to identify local quarry sites for climbing development. Signed posted to relevant contacts at Staffs County Council and local aggregate contacts. Resolved that there are currently no suitable sites. Green Mountaineering
Netball
Back 2 Netball: 2 back to netball groups estbalished with CDM support and Sportivate funding. 40 new participants. Hosting services provided to NGB. Coach Development: Coach Bursary Grant to develop workforce to maintain new Back 2 Netball clubs. Further funding and local networking support provided to establish a new Back 2 Group in Burton (in progress) Green
Workforce audit completed for NGB. £960 grant awarded to address needs identified through audit. 2 coaches qualified through this funding to date and supporting Back 2 Netball sessions, increasing participation by 60 people. Funding awarded to Stafford Netball Club and Uttoxeter Netball Club to develop coaches to develop a new satellite club. £170 Coach Development Grant warded to 1 coach to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Met with CNO and Stafford Netball Club to fulfill a request from King Edward VI High School and Thomas Alleynes High School for a Netball Satellite Club. Satellite Clubs have started at King Edward VI High School linked to Stafford Netball Club and Thomas Alleynes High School linked to Uttoxeter Netball Club. Satellite Club running with 30 attendees over 2 clubs Netball
Orienteering No engagement or agreed actions with NGB this period. Blank Yes Orienteering
Rounders
Local Area Relationship: Brokered initial relationshiops and contributed to development of local plan. Establisjhed links for NGB to local college and Burton Albion FC to improve project this period. 26 new participants this reporting period. Local partners committed to reapplying for funding for 2014/15. Green Rounders
Rowing
Local Advocacy: Brokered involvment of NGB in feasibility study which is assessing viability of major new watersports facility in Lichfield. Stage 1 report produced reflecting needs/views of NGB. Club Development: 2 Sportivate projects supported to develop North Staffs Rowing Club, 26 participants retained. Satellite club support (see tab) Green Additional Satellite Club agreed at Leek High School. This has started Rowing
Rugby League Generic Services only this period. Blue Rugby League
Rugby Union
Locally requested support from NGB: Attendance at Club Carousel support events as requested by NGB. Worked with NGB and Burton Rugby Club (organised meetings with local stakeholdersa nd liaised with Sport England) to help negotiate £400k of funding for the relocation of Rugby Club. Work ongoing. Director chairing local development group to manage this process.Touch: Incorporated RFU Touch offer in workplace health offer. Marketing and promotion of local 02 Touch sessions in Stoke and Stafford. Green
Conduct Facility audit for coach educations courses. Audit has been completed and communicated to NGB. Meetings have been attended to set the scene for future engagement. £255 Coach Development Grant awarded to 2 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS. Burton Rugby Club met with and schools to contact identified.
Schools contacted and satellite club delivery agreed. Satellite clubs have started at Abbot Beyne, De Ferrers and Paget High Schools. Satellite Clubs running ith 45 participants Rugby Union
Sailing
Local Advocacy: Brokered involvement (coordinated local meeting, briefed developer and designed feasibility study brief) of NGB in feasibility study whichis assessing viability of major new watersports facility. Stage 1 report produced reflecting needs/views of NGB. Go Sailing: Linked NGB to local colleges to deliver new Go Sailing activity at Stanley Head. Delivery scheduled for Spring. Coach mentoring project supported with grant and CDM input (see tab) Amber
Coach development project to develop club coaches. This has been developed to run an update CPD day on 15th Feb and a Dinghy Instructor course over three weekends in March utilising £600 funding allocated by SASSOT. Aim for developing 18 coaches, impacting on 216 participants Sailing
Shooting No actions or engagement this quarter. Blank Yes Shooting
Snowsport
Go Ski Go Board: 2 Sportivate projects delivered with 15 people retained at local club. Promotion of Slide to Sochi event thorugh local networks and Marcomms activity, event fully suubscribed at Tamworth. Green
Agreed to undertake club workforce audit on behalf of NGB. This now being undertaken nationally. Awaiting outcomes of national audit to progress local actions and identified needs. £300 Coach Development Grant awarded to 1 coach to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Satellite Clubs have started at Abbot Beyne, De Ferrers, Robert Sutton linked to Swadlincote Ski Centre, Newcastle College and Stoke 6th Form College linked to Stoke Ski Centre. Satellite Clubs running with 60 attendees over 5 clubs Snowsport
Squash
Engagement with NGB around Satellite Club Development (see tab). Promotion of events and training via local networks and marcomms Blue
Satellite Club has started at Stone Alleynes High School linked to Stone Squash Club. Satellite Club running with 15 particpants Squash
Swimming
Local Intelligence. Holden Lane High School Closure: Provided local intelligence, APS data, FPM data and market segmentation data to help ASA develop a business case to prevent closure of Holden Lane school pool. Working with NBGB to increase usage of pool at Trentham ncluding brokering relationship wih local Tri Club to access this pool and supporting new sportivate funded Swimmfit delivery.. SwimmFIT:2 Sportivate funded Swimm Fit courses delivered with 24 retained. PSSP: Facilitated meeing with school swimming service re ASA PSSP offer. Green
Provided specific CPD for Swimming, including Safeguarding and Reflect and Practice workshops with 44 attending. £400 Coach Development Grant awarded to 2 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS. Swimming
Table Tennis No Relationship with NGB this period Blank Yes
Funding awarded to Penkhull Table Tennis Club, Burton Uxbridge Table Tennis Club and Norton Table Tennis Club to develop coaches to develop a new satellite club. Table Tennis
Taekwondo No Relationship with NGB this period Blank Yes Taekwondo
Tennis
Tennis Futures Programme: Promotion of tennis futures programme to local networks and to participants on SASSOT's own leadership programme. Tennis Futures programme fully subscribed. Working with NGB on the development of local satellite clubs (see Satellite Clubs tab)
Having agreed a region wide action with CSP's to jointly promote/recruit to the Tennis Futures programme the NGB failed to provide information in a timely manner until chased by CSP. Indicative of overall level of engagement with this NGB. Red
Funding awarded to Cheslyn Hay Tennis Club to develop coaches to develop a new satellite club.Satellite club now operational. £200 Coach development Grant awarded to 1 coach to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Satellite Club has started at Cheslyn Hay High School linked to Cheslyn Hay Tennis Club. Satellite Club running with 15 attendees Tennis
Triathlon
Go Tri/Simply Tri: Promotion of regional events through social media, newsletter, website and local networks. Club Capacity: Sourced additional pool pace for Tamwoth Tri Club. Additional space offered to the club but turned down! Provided NGB with athletic track intelligence. Brokering relationship with Newcastle Tri Club and Trentham High School ref access to local pool. Green
Funding awarded to Necastle Tri Club to develop coaches to develop a new satellite club.
Approached by Newcastle Tri Club to broker links with Newcastle Community High School. Link brokered and funding agreed. Satellite Club has started with 15 participants Triathlon
Volleyball
Volleyball Investment Zone: Input into development plan including provision of APS data and local intelligence. Worked with VRM to develop Sportivate bids to support Go Spike delivery at local Universities.Identified and contacted local partners to establish new Volleyball IV Steering Group.2 meetings held. Attendance at Steering Group meetings. Hosting of VRM. Hosted VRM and attended VRM interviews. Green
Volleyball Invetsment Zone: Working with local partners and NGB to coordinate a workforce CPD programme at a subsidised cost, with the CSP allocating a £1000 coach development grant towards this. Dates for workshops and courses set and communicated to local partners. Funding awarded to Tamworth Spartans Volleyball Club to develop coaches to develop a new satellite club. £460 Coach Development Grant awarded to 2 coaches to ensure delivery on the Sportivate programme, helping to meet the Sportivate 11+ participation focus outlined in NGB's NPS.
Approached by NGB Officer to part fund Satellite Club at Tamworth Enterprise College linked to Tamworth Spartans Volleyball Club. Funding Agreed Volleyball
Water Skiing
Network Development: 7 Sportivate projects supported and delivered with 27 retained participants. Sportivate projects supporting the developmnent of the Chasewater priority site which CSP helped negotiate the development of with Staffs County Council and NGB. Green Water Skiing
WeightliftingPromotion of Strength and Power series to local partners. 1 local authority engaging in promotion. Blue Weightlifting
Wheelchair Basketball No engagement or agreed actions with NGB this period. Yes Wheelchair Basketball
Wheelchair Rugby No engagement or agreed actions with NGB this period. Yes Wheelchair Rugby
Wrestling No engagement or agreed actions with NGB this period. Yes WrestlingTotal 18
Overall RAG Criteria for NGB Delivery
Green
Amber
Red
Justification for RAG selected RAG
Good level of engagement across 27 NGB's, with clear impact linked to national NGB prioirties and programmes for 22 of these. This represents excellent progress against actions identified in period 1 with significant increase in the number of NGB's moving from Amber to Green RAG rating. Strong engagement and demonstrable impact with large NGB's including Cycling, Athletics, Netball, Golf and Badminton. Agreed actions in place moving forward with these NGB's into 2014/15. GreenSignifcant added value to NGB support being provided through Coaching and Satellite Club work strands with good synergy running through all aspects of SASSOT's work with NGB's. Overall reporting of NGB work ampungst core team has improved following a revision to how this is managed internally.
Some concerns over level of engagement with Rugby and Tennis despite meeting with these NGB's on several occasions.
The CSP is making very good progress overall on NGB delivery and is demonstrating impact across the range of NGB provision. The CSP adds clear value to the delivery of NGB WSPs in the county area.
The CSP is making good progress with NGB delivery but has outlined improvement against a number of NGBs with identified actions in place and prospect of success
CSP has significant under performance with a number of NGBs and support is required to support them to get back on track with this work area.
There has been positive progress with the link up between local health organisations and NGB work this period which will hopefully provide a platform for more signifcant work in this area. We recognise that there is a significant challenge around the scale of delivery in the sub region and this is something we hope to address through developing our links with health and economic regeneration agendas and a strong focus on big participation sports.
Notes of Q4 Meeting with Sport England
A significant improvement from Q2. Internal tracker document much improved to deploy the full team in supporting NGB work. Some very strong examples of supporting NGBs to land WSP delivery and this is translating to participation, across many sports with scale and pace. Ben’s approach to completing the commentary within the NGB column was very clear, easy to use and a good example for others to follow.
Actions Agreed
INDIVIDUAL NGB RAG
What constitutes working with a NGB?
What is impact?
Categories – when do we know when to measure a NGB?
Green
Amber
Red
Blank
OVERALL NGB RAG We are seeking to measure the work that CSPs do to support the 09-12 delivery on WSP at local level.
We are measuring the activity of the CSP, not the NGB. These are the descriptions for the overall CSP NGB RAG:
The diagram below summarises where it is appropriate to RAG rate delivery for a specific NGB and highlights the different categories of relationship that a CSP can have with the variety of NGBs they work with:
The CSP has clear, smart actions, measures and targets and is able to demonstrate impact as a result of putting these in place.
The CSP has clear, smart actions, measures and targets. There is expected impact from actions taken that has yet to be realised.
The CSP is not clear whether the NGB wants to work in the CSP area and/or has not agreed clear, smart actions, measures and targets and/or has failed to deliver on actions agreed with the NGB
The CSP has an agreed action plan to work with the NGB but has had no agreed actions within the last six months for measurement
This should be something that has happened that would not have happened should the CSP not taken the action – there should be clear cause and effect.
NGB RAG Guidance
A CSP is working with an NGB when it has smart actions on the tracker that are beyond generic services1
provided for all sports. This can include specific actions to link the NGB to a programme such as Sportivate or Sport Makers (school games should not be included in this unless the NGB has requested activity as part of a clear delivery plan for their competition framework)
The work should be NGB requested and agreed
Impact should be against specifically agreed actions. It can be qualitative or quantitative
CSP is working with one of the WSP funded NGB’s
CSP has no relationship with the NGB or is working on non WSP activity
CSP is providing generic services to the NGB2
The CSP should RAG rate work with this NGB
Clear, smart actions should be entered onto the tracker
RATE BLUEThis NGB should be GREYED OUT on the performance spreadsheet
Green
Amber
Red
Factors that will be taken into account when calculating the overall RAG include:o The CSPs overall approach to working with NGBs, is this clear and joined up?o Is the CSP proactive in wanting to work with NGBs?o Are CSPs adding value to NGB WSP delivery with their own local programmes?o Does the CSP really understand what NGBs are trying to achieve nationally?o Quality of generic services1 providedo Also consider:
Number of NGB sthe CSP is working with Ratings of individual NGBs Progress with priority NGBs Content of tracker – impact is clear and aligned to national priorities
1. Generic Services includes NGB forums, inclusion in CSP comms, promotion of activity on web sites and access to
2. When a CSP is considered to be working on a ‘bottom up’ approach i.e. on activity that has been generated locally as opposed to through the WSP they should mark the NGB as blue. The CSP should do everything possible to understand the WSP, align the local activity to the WSP and get the support of the NGB in doing so. Where this is the case the NGB would then move across to being RAG rated as working with the NGB on WSPs.
The CSP is making very good progress overall on NGB delivery and is demonstrating impact across the range of NGB provision. The CSP adds clear value to the delivery of NGB WSPs in the county area.
Notes
The CSP is making good progress with NGB delivery but has outlined improvement against a number of NGBs with identified actions in place and prospect of success
CSP has significant under performance with a number of NGBs and support is required to support them to get back on track with this work area.
Please note there is no formula to determine an overall RAG for NGB delivery. It is a qualitative assessment from an external body (Sport England). It should be an overall impression of the CSP’s ability to work with NGBs effectively.
PRIMARY SCHOOL SUPPORT
Please provide a progress comment in the text box and then add a RAG using the criteria below.
Green
The CSP has a clear approach to co-ordinating and sharing sporting opportunities with schools. Sporting opportunities are actively promoted through local appropriate networks or directly to schools throughout the CSP area. NGBs are linked effectively to this summary offer. The CSP has identified which schools in the area are in need of support regarding use of the primary premium and has a clear approach to providing this which is being implemented.
Amber
The CSP has a clear approach to coordinating and sharing sporting opportunities with schools but has yet to promote this through local appropriate networks or directly to schools across the CSP areaand/or the CSP can identify which schools are in need of support regarding use of primary premium but has yet to implement this
Red The CSP has yet to coordinate and share sporting opportunities for schools and/or the CSP cannot identify schools which are in need of support regarding use of primary premium
Please comment on the progress of the CSP against the objectives for this funding, and select the appropriate RAG RAG
SASSOT has commisioned Entrust (ex schools advisory service) to support our work around co-ordinating and sharing opportunities with schools. This has led to 133 schools being given direct support. SASSOT has designated area on the website with various guidance document including Staffs & Stoke specific guidance document. NGBs have been engaged with and Staffs & Stoke specific offers have been put together and communicated through the Staffs & Stoke Guidance Document. Around 50 action plans have been gained from schools and key areasd of support have been identified thorugh these. This information is proving to be invaluable in terms of tailoring furture resources and uses of CSP capacity funding. Green
Notes of Q4 Meeting with Sport England
Working with Entrust, YST, CSP together meeting regularly to review progress. Approx 50%. Completed full audit for schools in terms of needs - links to clubs a key one so putting resources in here to do this. Survey via entrust talking to heads. Helen Moores (former SGO) established small business to support - she is working with CSP and Entrust in the City - feeds into steering group as well.Chris Milward CSP lead.AfPE evaluation model opportunity alongside model CSP working with BCC developed.
Actions Agreed
Sport Across Staffordshire and Stoke - on - Trent
SATELLITE CLUBS Sport Across Staffordshire and Stoke - on - Trent
Green
Amber
Red
RAG
Schools and colleges have been very engaging and have been more than happy to have an initial discussion about Satellite Clubs and the possibility of hosting one. Largely due to this, and being 'SMART' with the schools that we have made contact with, we have exceeded our year 1 engagement target. Challenges still centre around the immediate availability of workforce from the clubs point of view and some NGBs are still unclear as to their remit locally (others are very clear!) and we are trying to resolve this by working closely with all NGBs. Green
Yr 1 Target Actual %No. of Schools Engaged 17 35 206No. of colleges engaged 3 5 167
Total 20 40 200
Section 2 Progress against Club Link Maker objectives (identified through your delivery plan) Please provide a headline summary of progress made and activity to date against each Club Link Maker objective
Objective Progress/Activity to date
Engage with every secondary school and FE college (as well as other potential satellite club venues) through relevant networks across the CSP area to advocate and champion satellite club delivery and the establishment of new satellite clubs.
35 Secondary Schools and 5 Colleges have been engaged with, exceeding the 1st year target. We have also engaged with 2 Youth Centres. Schools and Colleges have been very receptive to hosting a Satellite Club - possibly as we have been very specific with the schools that we have targetted in the 1st year as we have tried to contact the proactive ones and the ones that have linked with programmes external to their school before
Broker links between NGBs and local secondary schools, colleges and other potential satellite club host venues, to match demand (i.e. from schools) and supply (from NGBs) by:•uditingandprovideinsightoflocaldemand for sports from potential satellite club host venues.•ProvidesupporttoNGBstomapschools, local clubs and their requirements.•UnderstandandinterpretNGBsatellite club delivery plans.•WorkingwithNGBsandotherkeypartners to support the development of new community clubs, where there is demand.
A large number of the schools and colleges that we have engaged with have had a very specific idea about what sports they would like to utilise for their Satellite Club(s). This information has been gathered through one-to-one meetings with schools and colleges and has largely informed what there is demand in. We have had a number of meetings with local NGBs who have given us the proactive clubs or the clubs that they would like to target through their existing plans. Meetings have been held with these clubs to gain their support and determine their requirements which have largely been around development of existing workforce to increase capacity. SGOs have been very proactive and supportive with this area of work and have been instrumental in terms of identifying where the proactive schools are
Connect local workforce development/deployment initiatives to support the delivery and sustainability of satellite clubs.
As clubs become active we are intending to place volunteers who we have trained to CSLA level and NGB qualifications in appropriate clubs.
CSPs who have achieved 80% or more of their year one target of the number of secondary schools and colleges which have been engaged with and supported to offer a satellite club.
CSPs who have achieved 60-79% of their year one target of the number of secondary schools and colleges which have been engaged with and supported to offer a satellite club.
Please outline the number of schools and colleges you have engaged with and supported to date.
Section 1Club Link Maker KPI1 - School/College Engagement
CSPs who have achieved 59% or less of their year one target of the number of secondary schools and colleges which have been engaged with and supported to offer a satellite club
Please refer to the 'Satellite clubs guidance' worksheet for more information.
Please fill in the progress summary and RAG, and complete sections 1 to 7 below
Please provide a summary of progress achieved to date, any key challenges, identified solutions or further support required, and select the appropriate RAG
Broker links with wider community sport providers (where relevant) to support satellite club delivery.
We have worked closely with Local Authority Sport Development Teams to help identify proactive clubs, Stoke City FC and local community groups such as Engage Communities
Co-ordinate delivery with NGBs, satellite club host sites and other deliverers to encourage a multi-sport approach to satellite club delivery (where relevant).
Link satellite club delivery to other programmes/activities (where relevant) which CSPs are responsible for (i.e. NGB delivery, Sportivate, School Games, Sport Makers).
We have collaborated with Sportivate and a number of Satellite Clubs have been generated particularly at the colleges following on from Sportivate activities that have generated interest and have identified a need for more formal and ongoing activity
Advocate and provide relevant intelligence on community access to school facilities (In conjunction with SportEngland’sinvestmentintoincreasing community access to school facilities).
SASSOT has commissioned KKP to refresh our Sub Regional Sports Facilities Framework. Part of this work has included a audit of 200 school sites to identify opportunities and challenges for increasing access to school facilities for community use. The results of the work will be available in April and will be used to support the work in this area
Sections 4 and 5 Please click here to complete sections 4 and 5 on the
'Satellite Club Data' worksheet.
Name of sport/NGBPick from list or add other sports belowArchery 1Athletics 1Badminton 1Basketball 1Boxing 2Cricket 1Football 9Golf 4Gymnastics 1Hockey 3Netball 2Rowing 1Table Tennis 6Rugby Union 3Snowsport 6Squash 1Tennis 2Triathlon 1Volleyball 1Dance 2Taekwondo 1add other sport hereadd other sport hereadd other sport hereadd other sport hereadd other sport hereadd other sport hereTotal 50
Section 7
Notes of Q4 Meeting with Sport England
Overall going well, picked up on 6 snowsport clubs - focus for Snowsport sports NGB. Basing club at the centre rather than on a school site but nature of sport dictates. Focus on transport service.
Actions Agreed
Please click here to complete section 7 on the "Satellite clubs data" worksheet
Please click here to complete the table column on the NGB tab for each NGB you have
supported.
Section 3Club Link Maker Measure 2 - NGBs engaged with and suported to deliver satellite clubs.
Section 6 Club Link Maker Measure 3 - The number of community sports clubs (hub Clubs) engaged in delivering satellite clubs
No. of hub clubs
Sport Across Staffordshire and Stoke - on - TrentSection 4 Satellite clubs established as part of NGB Whole Sport Plans (WSP) in 2013-14Please use this section to detail the satellite clubs which you have provided additional funding for as part of NGB WSP reported delivery.If you need to add rows please do so by copying row 32 and then inserting it above row 32 - this should ensure that the formatting stays the same and no formulae are lost.
Sport / NGB Name of community hub club Satellite club venue name Postcode Establishment Type Target age group (if
known )Satellite club status Notes
Hockey Burton Hockey Club Burton College DE14 3RL FE College 17 to 18 ActiveHockey Lichfield Hockey Club The Friary School WS13 7EW Secondary School 14 to 16 ActiveHockey Stone Hockey Club Alleynes High School ST15 8DT Secondary School 14 to 16 ActiveGolf The Academy Cannock Youth Centre WS11 1LH Youth/Community Centre 14 to 16 ActiveGolf The Academy Norton Canes High School WS11 9SF Secondary School 14 to 16 ActiveGolf The Academy Rugeley Youth Centre WS15 2HX Youth/Community Centre 14 to 16 Active
Volleyball Tamworth Spartans Volleyball Club Tamworth Enterprise College B77 2NE Secondary School 14 to 16 Active
Section 5 Satellite clubs established outside of NGB whole sport plans Please use this section to detail the satellite clubs which you have provided 100% funding for and are outside of NGB WSP reported delivery. If you need to add rows please do so by copying row 64 and then inserting it above row 64 - this should ensure that the formatting stays the same and no formulae are lost.
Sport / NGB Name of Hub Club Name of Satellite Club Venue Post Code Establishment Type Target age group (if
known )Satellite club status Notes Target number of
participants engaged
Actual number of participants engaged (to date)
Snowsport Stoke Ski Centre Newcastle College ST5 2GB FE College 17 to 18 Active 12 17Snowsport Stoke Ski Cente Stoke 6th Form College ST4 2RU FE College 17 to 18 Active 12 11Snowsport Swadlincote Ski Centre Abbot Beyne DE15 0BA Secondary School 14 to 16 Active 12 8Snowsport Swadlincote Ski Centre De Ferrers DE13 3DR Secondary School 11 to 13 Active 12 9Snowsport Swadlincote Ski Centre Robert Sutton DE13 0AS Secondary School 14 to 16 Active 12 7Snowsport Tamworth Snowdome Landau Forte 6th Form B79 8AA Sixth Form College Planned 12Archery Lyme Valley Archers Stoke-on-Trent College ST4 2RU FE College Planned 15Cricket Meir Heath Cricket Club Stoke-on-Trent College ST4 2RU FE College 17 to 18 Active 15 13Dance Dance Nuvo Stoke 6th Form College ST4 2RU FE College 17 to 18 Active 15 17Football Cottage Farm Rangers Tamworth Enterprise College B77 2NE Secondary School 11 to 13 Active 15 14Football Futsal UK Horizon Academy ST2 0GA Secondary School 11 to 13 Active 15 13Football Great Wyrley FC Cheslyn Hay Sports College WS6 7JQ Secondary School 11 to 13 Active 15 16Football Bradwell Belles FC Clayton Hall School ST5 3DN Secondary School 11 to 13 Active 15 14Football Lichfield Diamonds FC King Edwards VI WS14 9EE Secondary School 11 to 13 Active 15 16Football Tunstall Tigers Community FC Stoke-on-Trent College ST4 2RU FE College 17 to 18 Active 15 29Football Tunstall Tigers Community FC The Co-operative Academy ST6 4LD Secondary School 14 to 16 Active 15 22
Football Stoke City Kicks Ormiston Sir Stanley Matthews Academy ST3 3JD Secondary School 14 to 16 Active 15 18Football Stoke City Kicks Discovery Academy ST2 0GA Secondary School 14 to 16 Active 15 17Badminton Potteries Performance Centre Biddulph Sports College ST8 7AR Secondary School 14 to 16 Active 15 22Table Tennis Penkhull Table Tennis Club Newcastle Community High School ST5 2QY Secondary School 11 to 13 Active 15 15Table Tennis Penkhull Table Tennis Club Chesterton Community Sports College ST5 7LP Secondary School 11 to 13 Active 15 15
Table Tennis Burton Uxbridge Table Tennis Club Burton College DE14 3RL FE College 17 to 18 Active 15 19Table Tennis Norton Table Tennis Club Excel Academy ST1 6LG Secondary School Planned 15
Table Tennis Burton Uxbridge Table Tennis Club De Ferrers DE13 3DR Secondary School 14 to 16 Active 15 21
Table Tennis Burton Uxbridge Table Tennis Club Paulet High School DE15 9RT Secondary School 14 to 16 Active 15 21Dance Birmingham Basketball Club Wolgarston High School ST19 5RX Secondary School 14 to 16 Active 15 18Basketball Newcastle Knights Basketball Club Newcastle Community High School ST5 2QY Secondary School 14 to 16 Active 15 21Taekwondo Round House Taekwondo Club The Co-operative Academy ST6 4LD Secondary School 14 to 16 Active 15 17Boxing Round House Boxing Club The Co-operative Academy ST6 4LD Secondary School 14 to 16 Active 15 16
Boxing Round House Boxing Club The Discovery Academy ST2 0GA Secondary School 14 to 16 Active 15 16Tennis Cheslyn Hay Tennis Club Cheslyn Hay Sports College WS6 7JQ Secondary School 14 to 16 Active 15 13Squash Stone Squash Club Alleynes High School ST15 8DT Secondary School 14 to 16 Active 15 11Netball Stafford Netball Club King Edward VI High School ST17 9YJ Secondary School 14 to 16 Active 15 8Athletics Trentham Running Club Trentham High School ST4 8PQ Secondary School 14 to 16 Active 15 16Netball Uttoxeter Netball Club Thomas Alleynes High School ST14 8DU Secondary School 11 to 13 Active 15 19Gymnastics Stoke Elite Trampolining Club Excel Academy ST1 6LG Secondary School Planned 15Golf Drayton Golf Club Rawlett Sports College B79 9AA Secondary School 14 to 16 Active 15 19Rowing North Staffs Rowing Club Leek High School ST13 6EU Secondary School 14 to 16 Active 15 17Rugby Union Burton Rugby Club Abbot Beyne DE15 0BA Secondary School 11 to 13 Active 15 11Rugby Union Burton Rugby Club Paget High School DE13 3DR Secondary School 11 to 13 Active 15 23Rugby Union Burton Rugby Club De Ferrers DE13 0AS Secondary School 14 to 16 Active 15 11Tennis Burton Tennis Club De Ferrers DE13 0AS Secondary School Planned 15Triathlon Newcastle Tri Club Newcastle Community High School ST5 2QY Secondary School 14 to 16 Active 15 21
Total 627 611Section 7 Summary of progress against the 2013-14 objectives in your local delivery funding plan.Please insert your targets. Actuals will automatically populate on completion of sections 4 and 5.
Target Actual number % Target achievement
7 7 100%
43 43 100%
627 611 97%
MeasureNumber of satellite clubs established in partnership with an NGB as part of their WSP reporting.Number of satellite clubs established outside of WSP reporting.
Number of satellite club participants engaged (outside of NGB WSP reporting)
No.1
2
3
4
•One-to-one/face-to-facemeetingwithidentified/relevant key contact within the school/college with SMART meeting outcomes.
•Developmentandsign-offofagreeddeliveryplan.•Developmentandsign-offofanyorSL/fundingagreements.
•Regularreviewmeetingsorwiderstakeholdergroupmeetings.•Monitoring/reportingondelivery.
Guidance on using the frameworkWhilst the steps within the framework are sequential, we appreciate that the process of engagement and support will be different from CSP to CSP and fromschooltoschool,sotheremaywellbecrossoverbetweensomeofthestepsoutlined.Theframeworkalsodoesn’tincludetheinteractionandengagement with other partners (NGBs, Community Clubs, Premier League Co-ordinators etc), nor does it try and list every potential action within the process. We also see this as an evolving framework which can be further developed where necessary, and in conjunction with CSPs over time.
What constitutes engagement?Whilst being an important element of engagement, we see initial contact and awareness raising as not usually being enough on its own to constitute having engaged with and supported a school or college. We would expect CSPs to at least have worked to understand demand and priorities (i.e. as outlined in the description and examples identified in stage two) from an individual school or college to be able to be classed as being engaged, and in order for a demand-led satellite club to be offered to the school/college in question.
Other questions:
What if a school/college isn’t interested in hosting a satellite club? Consultation with Club Link Makers suggests that, in year one, CSPs have tended to target schools and colleges who are already more engaged. If by the end of the funding period, CSPs have exhausted all options with a school/college and there is no interest or potential to host a satellite club (i.e. the school/college does not have relevant access or facilities) and CSPs cannot get past the initial contact an raising awareness stage (i.e. stage one), only then would we consider this school to have been appropriately engaged.
What if a school or college is already hosting a satellite club (i.e. through existing PL4S delivery)?We see a relationship with a school or college as an on-going partnership. If a school is already hosting a satellite club (i.e. through existing delivery), we would still expect CSPs to engage with that school in the same way to understand other priorities or opportunities to develop satellite clubs.
Satellite Clubs Guidance
Club Link Maker engagement frameworkFurther information and definition around what constitutes engagement and support for a school or college is set out in the engagement framework below which was completed with support from the CSPn CYP Group. Please refer to this information when completing your quarter four report.
BackgroundThe Club Link Maker engagement framework builds on the engagement definition provided for quarter two reporting and provides additional information on the activities that constitute school and college engagement and support. Consultation with CSPs to date has highlighted four broad steps when working with schools and colleges to offer a satellite club. These steps are outlined below:
Engagement framework
Stage DescriptionInitial contact and raising awareness
•Promoting,introducingandraisingtheawarenessofthe satellite club intervention to targeted schools/colleges across a CSP area. •Gauginginitialinterestfromschoolsandcolleges.•Identifyingkeycontactsandengagementstrategiesfor each school/college.
Understanding demand and priorities
•Gatheringinsightbyunderstandingparticipantdemand for sports/activities and type of participation offer/environment.•Understandingschool/collegeprioritiesanddemographics.•Understandingcurrentprovision,offersanduptake.•Reviewfacilityprovisionandavailability.•IdentifyingbarriersandopportunitiesforsatelliteclubDetailed joint
delivery planning•Offeringtheopportunitytohostasatelliteclub.•Detaileddeliveryplanning/brokeringwhichmayinclude other delivery partners (i.e. hub club, NGB staff, Premier League Co-ordinator).•Identifyingandagreeingkeycomponentsofdelivery(target group, workforce, equipment, venue, monitoring/targets, sustainability, exit routes, promotion etc).
Examples
Satellite club established
•On-goingcommunication/supportandreview.•Identifyingadditionalopportunities/needs/exampleof good practice.•Sustainingdeliveryandpromotingtransitionopportunities.
•Initialcontactbysendingcommunications,newsletters and updates to relevant networks following any initial mapping work.•Providingbriefingsandupdatestorelevantgroupsand forums to influence and promote buy-in.
SCHOOL GAMES
Please provide a progress comment in the text box and then add a RAG using the criteria below.
Green
CSP has delivered exceptionally well against their responsible areas, as identified in the LOC Guidance, which has in turn led to the successful delivery of the Level 3 event/s. NGBs are fully engaged, with the Level 3 event connecting well to local community sports clubs to provide pathways for young people. The CSP is fully engaged and working with all SGOs.
AmberCSP has delivered against most of their responsible areas, as identified in the LOC Guidance, with some success, although there is still more progress to make engaging with partners, in particular NGBs and SGOs.
RedCSP has supported the delivery of the Level 3 event, although there has been little/sporadic engagement with NGBs and community clubs, and there are some challenges working with the LOC to deliver the event. Relationships with SGOs need to be strengthened.
Please comment on the progress of the CSP in fulfilling the specific roles in helping to organise and deliver the Level 3 events, as published in the Local Organising Committee Guidance RAG
The membership of the LOC continues to evolve and offers the opportunity to a different SGO each year. The LOC continues to meet regularly to ensure a strategic approach to the Level Three Games is taken. Sub-groups also meet regularly to tackle the operational side of organisation and feed back to the LOC where necessary. Consultation takes place annually with SGOs which has lead to a winter festival as well as a summer festival being scheduled in 2014. This annual consultation with SGOs ensures that Level Two events feed in to Level Three and that all teams at Level Three have qualified through the competition pathway. Green
All special schools were invited to a consultation meeting to try and tackle disability issues that we experienced in year two. The meeting raised awareness that the School Games festival experience was not suitable for the majority of children in the special schools due to the size and length of the event and venue. Taking this on board, along with other suggestions from the special schools, we are now in the process of re-vamping the School Games disability offer. Consultation took place with NGBs to discuss a format of competitions that would be suitable locally and the majority of NGBs were utilised to deliver the Level Three competitions.
Cross-curricular competitions were run prior to the Level Three winter festival including 'design a poster' and 'School Games Got Talent'. The winner from the 'School Games Got Talent' competition was invited to perform at the opening ceremony. The school Games values were incorporated into their performance at the opening ceremony as well as in the posters that were submitted. We also ran a graffitti 'come and try' workshop that centred around the School Games values. A young local sporting talent was invited to speak at the opening ceremony along with Sporting Champion, Charlotte Hartley from Engalnd Hockey, and Claudia Walker (Liverpool Ladies FC), who were all on hand to meet and motivate participants and present medals.
The winter festival was a success, despite the weather having an impact on the outdoor sports, resulting in the football and the cross country being postponed. All teams at the Level Three winter festival had qualified through a Level Two event run by the SGOs in their respective areas. Despite the impact of the weather, 7 competitions still took place in 4 different sports involving over 600 participants. Over 50% of the workforce were young people who were trained and deployed at the Level Three, many of these were trained prior to the Level Two event to also officiate at Level Two in preparation for the Level Three event. Media students also received training prior to Level Three and were deployed to report and photograph each competition as well as updating social media throughout the day.
Notes of Q4 Meeting with Sport England
progress noted.
Sport Across Staffordshire and Stoke - on - Trent
Actions Agreed
Sport Across Staffordshire and Stoke - on - TrentSportivate Please note the RAG rating for Sportivate will be supplied by Sport England when the figures become availableNotes of Q4 Meeting with Sport England
Actions Agreed
STRATEGIC NETWORKING Sport Across Staffordshire and Stoke - on - Trent
Please name local partner – Local Authority or otherwise
Headlines of strategic work carried out in past 6 months - please provide short bullet points with tangible examples of impact
Staffordshire and Stoke Partnership Trust (NHS)
Engagement of health provider services in NGB delivery. Successfully landed Golf amd Athletics products in weight management services with good results. Brokered by CSP.
Cannock and Stafford CCG
High level engagemnt with Chief officer leading to provsional agreement for a joint sport and health initiative in 2014/15.
Staffordshire Police
Initial meeting held with Chief Inspector with regard connection to young people programmes and work place health initiative. Outline agreement for joint working in 2014/15.
Central Rivers Initiative
Ongoing support to CRI board (consisting of a wide range of stakeholders including aggregate companies, local government, third sector and commercial organisations) and staff to develop sport and recreation as a key elemnt of the redevelopment of large area of gravel pit mining and rivers in East Stafffs, Tamworth and Lichfield. Sport and Recreation Plan developed and agreed with the CRI Board.
Staffordshire County Council/Stoke City Council
In partnership with Staffordshire County Council and Stoke on Trent City Council, a bid was submitted to host the 2015 National Road Race Championships. Successful implementation of this event allows British Cycling to deliver their domestic competition pathway and would also raise the profile of the sport to local residence. While the feedback from British Cycling was positive, the tender was unsuccessful. Discussions regarding a 2016 tender are on-going.
Staffs CC
In partnership with SCC, SASSOT facilitated discussions between St Georges Park and CommonwealthEnglandregardingtheteamSfinalpreparationevent-“KittingOut”.saresult of this facilitation, we have secured community access to the event and a VIP tour with members, raising the profile of sport with local politicians. The events adds to areas credibility as a host for international teams and events. Please note this has not been formally announced as yet.
Staffs CC/Cannock Chase
CannockChasewillhostthefinalraceofthe2014NationalCrossCountrySeries–acrucial event on the domestic mountain biking calendar. In order to improve the overall quality of the event and provide a meaningful legacy for leisure users, it was identified a 100mtechnicalextensionofcurrent“TackerooTrail”wasnecessary.
Staffs CC
In partnership, SASSOT and SCC provided 2K of funding to Chasetrails (a voluntary trail building group) to pay for raw materials, while the Forestry Commission committed the use of machinery free of charge, making it a value for money investment. It is hoped that this will generate additional capacity on the course for recreational cyclists and will secure the event for future years. Secured funding from Sustainable Transport Fund for Sky Rides prog
Staffs CC
Brokered meeting with Twin Rivers Water Sports Centre proposal developer and Sport England following receipt of phase 1 of the feasibillity study which SASSOT provided the brief for. On the evidence from phase 1 Phase 2 of Feasibilty study commissioned by developer
Staffordshire CC Public Health
Meeting held with Director of Partnerships and Policy Team re sports intelligence which will help form part of the Councils Outcome Plan.
Staffordshire CC/Newcastle under Lyme BC
Provided evidence and attended Scrutiny Committee on Young Peoples Sports Participation and PE and School Sport. Raised profile of Sport with County Council Cabinet Lead for Education and Training and NULBC Members and CEO.
Staffordshire CC
Provided evidence and attended Scrutiny Committee on Staffordshires Legacy from 2012. Raised awareness of Sport England Strategy and the work of SASSOT with Cabinet Lead for Cultural Services and Scrutiny Members
Stoke City Council
Support ref Strategy development, Sub Regional facilities Framework and FPM runs commissioned . Support for developing a volunteer support programme. Consultation on facility refurbishments. Inclusive Sport Fund Application prepared and submitted. Level 3 School games held in the City. Plus see above in conjunction with Staffs CC. CSLA training course provided for StreetGames programme. Established Disability Sport Forum
Please read the guidance before completing this sheet
Cannock Chse DC
Support with disability Funding application. Commenced discussions with CCG and Wigan Leisure Trust on research data collection. CEO is Staffs and Stoke CEO rep on SASSOT Board prepared reports for presentation at 1/4ly CEO meetings. Consultee on proposals for development of Cannock Stadium. Sub Regional Facility Framework and FPM runs commissioned. Aiming High Disability Sports Club and Forum supported. Girls Active Project commissioned. Inclusive Sport Fund application prepared and submitted. Joint mental health improvement Sports Particiipation bid with MiIND prepared and submitted. Met with CEO of CCG to present proposal on working together on increasing participation in sport, evidence presented to support future commissioning
East Staffordshire BC
BC Sky Rides for 2014/15 contract secured and funding confirmed. Supporting the implementation of Outdoor Sports Facility Investment Strategy. Brokered meeting with SE, ESBC and Rugby Club for potential major strategic facility development. Sub Reg Facility Framework FPM runs commissioned. Aiming High Disability Sports Club and Forum supported. Girls Active Project Commissioned. Joint mental health improvement Sports Particiaption bid with MIND prepared and submitted. Boccia Leaders course organised for the council
Lichfield DC
Sub Regional Facility Framework FPM runs commissioned. Aiming High Disability Sports Club and Forum supported. Joint mental health improvement Sports Participation bid with MIND prepared and submitted.
Newcastle Under Lyme Borough Council
Sub Regional Facility Framework FPM runs commissioned. Aiming High Disability Sports Club and Forum supported. Joint mental health improvement Sports Participation bid with MIND prepared and submitted. Prepared evidence for an attended Scrutny Panel meeting on young peoples sports participation and PE and School Sport. Brokered meeting with SE on potential facility development, FPM runs to be used as evidence of need. Sky Rides programme for 2014/15 secured and funding sourced.
Stafford Borough Council
Sub Regional Facilty Framework FPM runs commissioned, Aiming High Disability Sports Club and Forum supported. Joint mental health improvement sports particiaption bid with MIND prepared and submitted. Provided evidence for Health and Well being Strategy, attended check and challege scrutiny meeting to provide evidence and proposed actions for the future. Sky rides programme for 2014/15 secured and funding sourced. Advice and evidence provided ref two potential facility developments. Sports provision research exercise carried out across the Borough to support future delivery plans.
South Staffordshire DC
Sub Regional Facility Framework FPM runs commissioned. Aiming High Disability Sports Club and Forum supported. Joint mental health improvement sports participation bid with MIND prepared and submitted. Advice and evidence provided ref potential facility development.
Staffordshire Moorlands DC
Sub Regional Facility Framework FPM runs commissioned. Aiming High Disability Sports Club supported. Supported the council in establishing an overarching Sports Council for the area. Feasibility Study into the need for a Disability Equestrian Centre in the District completed. Joint mental health improvement sports participation bid with MIND prepared and submitted
Tamworth
Sub Regional Facility Framework FPM runs commissioned. Attended discussions with coucil Sport England on closure of golf course and potential new sports facility development in the town.Aiming High Disability Sports Club and Forum supported. Joint mental health improvement sports participation bid with MIND prepared and submitted.
Staffordshire University
Attended Sports Board meetings and Estates Development Steering Group meeting. Initial meeting with Director of Finance and Resources to discuss future of Sports Facilities on Stafford Campus following the announcement that the University plans to relocate the majority of courses currently delivered in Stafford to Stoke. Sub Regional Facilities Framework and FPM runs will provide evidence for future decisions. Brokered link between Staffs Uni and University of Turin for lecturer and student exchange.
Keele University
Sub Regioanl Facilities Framework and FPM runs will provide evidence for the Universities future development plans. Meetings held ref usage of the Universities facilities for Level 3 Summer School Games.
Staffordshire Facility Managers Forum
Coordination of NGB Coaching Quals training in Gymnastics and Trampolining following review of training needs to support our leisure centres.
Please use the RAG criteria below to select the appropriate RAG status for your CSP, and also complete the justification section.
Green
- The CSP builds and enhances relationships, making a pro-active effective contribution to the majority of relevant strategic boards and groups in the area demonstrating impact for sport. - Makes effective use of high quality intelligence. - Can evidence the promotion and effective use of Sport England's core offer across the area.
Amber
- The CSP makes some contribution to relevant strategic boards and groups ensuring sport's views are represented often on a reactive basis with limited examples of community sport benefit. -IsinconsistentinthesharingoflocalintelligenceandthepromotionofSportEngland’score offer but can demonstrate some application.
Red
- The CSP is unable to demonstrate sufficient influence with local stakeholders and sport is poorly positioned to benefit from local opportunities with no engagement with strategic boards and groups. - Local intelligence is not shared or used effectively and there is little/no promotion of Sport England's core offer.
Justification for RAG and further comments RAG
Member of LA Chief Leisure Officers Group, SDO and Facility managers Forum. Member of County Council Cultural Strategy Review Group, Staffordshire University Sports Board. Developing the "Sportshire" Programme. Member of several district/borough council steering groups. Brokering of NGB activity for inclusion in LA sports dev and facility programmes and developments. e.g Sportivate. Working with Staffordshire Public Health on the development of a Staffordshire Physical Activity Strategy inc Sport. Green
Links with developers of potential major sports projects e g Twin Rivers Water Sports Centre. Input from all strategic partners into the refresh of the Sub Regional Facilities Framework. Forming a strategic partnership with Education Advisory Service re delivery of the Primary School Sport Premium . Cooridnation and funding of sub regional facilities framwrok reflecting needs of all LA's. Securing funding and coordinating of feasibility study into world classs equestrian facility in north Staffordshire.
Notes of Q4 Meeting with Sport England
NI8 gone up 5% since baseline. 1x30 fluctuating - seeing peaks and troughs on this. Need to get scale of countywide activity to manage these peaks and troughs better.
Noted diversity of partnerships and ability of partnership as strong. Sportshire part funded by CSP (local authority contributions) and County Council to ensure sport fully embeded in Staffs CC plans going forwards -major events, facilities, tourism, visitor attractions through sport. Keen to use the SE economic impact tool. Commonwealth England - fitting out St Georges park - access for sportivate young people to access England team etc.
New fcaility developemnts ie Jubille 2 in Cannock doing really well. Working with British Cycling on poss closed road curcuit at Chasewater. Developing world champs Iron Man event over next three years - start at Chasewater end at Shugborough - confidential at present. Strong leverage with County Council for events into County. Sportshire agenda - making staffs an atttractivce place for events, improving natural environment to draw in events - ie Cannock Chase - UCI world mountain bike champs bid in future once done some further works to tracks.
Good NGB activity on the ground need to understand in more detail of what is driving figures. Good active student progammoing seeing good numbers in Keele and Staffs, good FE sport programmes. Some local authorities still undertaking focus on young people, CSP working to get better balance here.
Actions Agreed
Rating Criteria Meaning The CSP builds and enhances relationships, making proactive, effective contribution to the majority of relevant strategic boards and groups in the area demonstrating impact for sport
The CSP has a clear rationale for: its strategic relationships with all LAs, and other key partners, in the area; the form the support takes; and can evidence theimpactit’sworkhasmade.
Makes effective use of high quality intelligence Evidence/examples in the last 6 months may include:
Can evidence the promotion and effective use of Sport England’scoreofferacrossthearea.
- The CSP can evidence it has influenced/had an impact on the development of a local area’s sport strategy/ formulation of a LAs leisure facilities strategy. It canshow that provision of a focused set of intelligence and data shaped the evidence base of the strategy and directly influenced the action planning/delivery of theStrategy. The Strategy is completed and has been adopted by the Cabinet and is being actively implemented by partners.
- The CSP can evidence it has influenced/had impact on the sport element of wider corporate strategies, including as appropriate the action planning/delivery ofthestrategye.g.Lvision,healthandwell-beingstrategy,andsecuredalignmentwithSportEngland’sstrategy.- The CSP has led and secured commitment, funding or pooling of resources for development of a sports strategy, facility strategy, new sport activity,
programmes, posts, etc benefiting a local area/or across a number of LAs.- Intelligence flows regularly between the CSP and Sport England and examples exists of more effective use of staff resource and better intervention from
partners.
The CSP makes some contribution to relevant strategic boards and groupsensuringsport’sviewsarerepresented,oftenonareactivebasiswith limited examples of community sport benefit
The CSP has a clear rationale for: the relationships with a majority of LAs ,and other key partners, in the area; and has tangible plans in place to improve relationships with the rest.
Is inconsistent in the sharing of local intelligence and the promotion of SportEngland’scoreofferbutcandemonstrate some application.
Evidence/examples in the last 6 months may include:
-TheCSPisseekingtoinfluencethedevelopmentoflocalarea’ssportstrategy/formulationofaLsleisurefacilitiesstrategy.Ithasprovidedafocusedsetofintelligence and data to shape the evidence base of the strategy. Drafting is in progress and due to be shared in future quarter for comments and feedback. Aiming for a member-decision with adoption and action plan following which impact can be evidenced.
- The CSP has provided comment/data/intelligence to influence wider corporate strategies and plans e.g. LA Vision, Health and Well-being strategy/JSNA. Awaiting final version to confirm impact of intelligence provided. - The CSP has some arrangements in place for consistently updating local partners - Intelligence flows, intermittently , between the CSP and Sport England with some examples of this intelligence shaping resource allocation and partner intervention.
The CSP is unable to demonstrate sufficient influence with local stakeholders and sport is poorly positioned to benefit from local opportunities, with no engagement with strategic boards and groups
The CSP has no rationale for the relationships with LAs in the area and other key partners. Relationships are operation / programme-based and not strategic.
Local intelligence is not shared or used effectively and there is little/no promotionofSportEngland’scoreoffer
Evidence/examples in the last 6 months may include:
-Thereisalackofsupport/‘buyin’fortheCSPfromLsandotherstrategicpartners.SEmaybeawareofthisfromthepartnersdirectly. - The CSP cannot evidence any impact or influence on LA/key partners sport activity or decision-making - CSP has no formal mechanism for consistently updating local partners - Intelligence flows between CSP/Sport England are inconsistent, not timely and yield no impact.
Green
Amber
Red
Sport Across Staffordshire and Stoke - on - TrentDELIVERY INTELLIGENCE
Please answer the questions below . We find the answers very helpful as they increase our understanding of local delivery.
HE and FE
1. Please briefly outline any HE or FE requests related to student participation that you have had from NGBs which are linked to delivery of their Whole Sport Plan in the last 6 months.
2. Have you facilitated or been involved in any local FE networks or events for colleges in your CSP area?FE represenative has joined the SASSOT Board to represent FE. Director has held meeting to agree how we will develop our work with the FE sector. Discussions held with Stafford College on community use access to their sports facilities, facilities now available for use.
National Trust
Have you had any interaction in the last 6 months with the National Trust locally around activities at their properties? If so please could you briefly outline this. We only anticipate that this will apply to a few CSPs
Asset Transfer
Please provide a brief update on any asset transfer intelligence or activity in your area during the last six months.
Community Asset Transfer of Stoke Gymnastics Club is continuing. East Staffordshire Borough Council are looking to transfer an ATP to a local hockey club
Insight
Who leads on this at your CSP ? Please give name, role and email addressMark Thornewill Director [email protected]
Clubs
1. Who is the lead for Club Development Support at your CSP? Please give name, role and email addressNadine Barnard . Club Development Manager [email protected]
2. What products and resources (Sport England and others) do you value in the support of club development in your county (please list these)Clubmark support resources (Templates), Club Leaders Workshops
3. Clubmark: What is the greatest value you see in Clubmark?
Developing a network of sustainable, well run community clubs who partners have confidence to work with on the delivery of programmes and we can sign post to. Developing our community capital.
4. What changes would you want to see to Clubmark?
Clubmark data base - 1 spreadsheet of all sports that we can filter ourselves by area/sport. Ensuring that the relevant CSPs name is on the database for each entry.
Volunteering Funding 2013-14This relates to the additional volunteering funding which was awarded to CSPs in November 2013.
1. How have you used the funding so far, and what impact has this had both in terms of:
a. Existing Sport Makers and volunteersMaintained communication and dialogoue with Sportmakers. Recruited 55 volunteers to the coaching pathway, provided CPD support to 33 volunteers.
b. New volunteers
Recruited, developed and deployed 58 volunteers to local and Sport England funded activity programmes. Advice and signposting service accessed by 75 volunteers
c. Volunteering opportunities in your area
Developed links with Volunteer Action and Support Staffordshire to work in partnership to advertise opportunities available. Supporting the development of the Northwood Stadium Stoke - on - Trent Development Group in preparation for a volunteer ofer in 2014/15. SASSOT has recently been awarded Sports Leaders UK Leadership Academy Status in recognition of our excellent standards of delivery of Sports Leaders Courses to volunteers and the pathway provided to NGB qualifications and employment opportunities.
2. If you are carrying funding forward into 2014-15 please explain briefly why you need to do so and how you intend to the use the funding. Also, what the intended impact of this work is.a. How much funding you are carrying forward
£10,000
b. Why you need to do so
To ensure we continue to connect with our Sportmakers, provide a support package to support their development needs and link them to the delivery work of NGBs particularly Athletics, Badminton, Football, Netball and Swimming
c. How you intend to use the fundingWe have appointed a postholder to a combined role of NGB Activation and Volunteer Coordinator to deliver the above services. We have included a delivery budget to support the development of the volunteers and NGBs in the delivery of appropriate programmes.
d. The intended impact of this work
To deploy volunteers and to support the delivery of NGBs programmes in order to recruit new and retain existing participants. An example of a specific project is the Northwood Stadium Stoke - on - Trent Development Group which aims to develop and employ 50 volunteers to support Athletics development and particiaption in Stoke.
Notes of Q4 Meeting with Sport England
Actions Agreed
INVESTMENT Sport Across Staffordshire and Stoke - on - Trent
Source of Funding
1. Funding into non-Sport England funded projects - record the total sum invested into sport for the project
2. Partnership funding sourced for Sport England funded projects - record the partnership funding only
3. Total amount of non-Sport England investment brought into sport (this column completes automatically)
4. Sport England funding into CSP area - record Sport England funding only (eg Inspired, Small Grants)
Summary of what the funding is for
Type of CSP Core Team Intervention - eg supporting applicant to complete application, attending meetings, bringing partners together
Local Authority Sustainable Transport & Local Authority Leisure budgets £35,000 35000 Sky Ride delivery
Sourced and negotiated funding from local partners
Staffordshire County Council 1000 1000Mountain Bike National Champs course development
Sourced and negotiated funding from local partners
Groundwork UK 1000 1000 Athletics NetworkSourced and negotiated funding from local partners
Staffordshire County Council 20000 20000To delivery Women & Girls Projects
Approached County with a project proposal for SASSOT to co-ordinate and implement funding for projects targetting women and girls
Staffordshire County Council 40000 40000 Funding for Disability Multi Sport Developing the programme, identifying
Wigan Leisure Trust 500 500To deliver a CSLA Course targetting women and girls
Identifying the need and negotiating the funding
0000000000000000
TOTAL 62500 35000 97500 0
Please provide any comments below
Please complete the table below with funding that the CSP has drawn into local sport throughout the past 6 months (ie September 2013 - March 2014).This table is designed to collect additional investment into sport locally (Column 3).We want to ensure that the figures are robust and can stand up to scrutiny, but also to gather information about other activity of the CSP in the area of investment. Therefore we would like you to record Sport England funding separately in column 4 (this is not Core Funding or programme specific funding such as Sportivate).Projects should only be included where a member of the CSP Core Team has had significant input and either (a) supported the development of a bid to draw funding into local sport or (b) influenced a mainstream investment to benefit sport. For each "project" the total amount of investment should be noted only once - during the 6 month period in which it was achieved.
Notes of Q4 Meeting with Sport England
Actions Agreed
Sport Across Staffordshire and Stoke - on - TrentAdditional Core Funding
Please provide a brief update of activity carried out using the additional Core Funding you were awarded for 2012-13 and 2013-14.This should include evidence of the impact the activity has had.
Get Active - Linked to the Workplace Challenge we have 67 employees from 17 businesses engaged. NGBs engaged include football, swimming, netball,badminton, volleyball, hockey, golf & Nordic Walking. 118 people have completed an online survey the results of which will assist in shaping future delivery. A Stafford Town Centre activity day targetted at local businesses is being planned. A local college has now opened its Sports Facilities to community/workplace use. 4 free taster sessions of Nordic Walking are being implemented (48) places. Challenges exist around lack of NGB funding available to support the delivery of taster sessions. We are looking to partly address this through links with our new NGB Activation funding pot and emerging links with 2 of our CCGs who are interested in targetted work around the family and older adult activity.
NGB Activation - Post holder appointed, Target NGBs agreed -Athletics, Football, Netball, Swimming and Badminton.Work is underway to support the development of the Northwood Stadium Stoke - on - Trent Development Group which aims to develop and employ 50 volunteers to support Athletics development and particiaption in Stoke.
Notes of Q4 Meeting with Sport England
Actions Agreed Please list these in Actions section on appropriate tab.
Sport Across Staffordshire and Stoke - on - TrentAudit Please provide a brief update of actions against the action plan resulting from the Moore Stephens Audit.
Notes of Q4 Meeting with Sport England
Actions Agreed
1 of 5
Report to the Board – Enclosure 2
Report Title Delivery Plan Progress Report – Quarter 4 2013-14
Date 14 May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information relating to:
Contact Officer Name: Mark Thornewill
Tel: 01785 619896
For Information X
For Decision
1. Purpose of Report
This report provides a summary of the work of the Sport Across Staffordshire and Stoke-on-Trent Core Team for the fourth quarter of 2013/14.
2. Recommendation(s)
N/A
3. Executive Summary
In order to provide the Board with an overview of the work of the Core Team across all work areas, the achievements for the period April 2013 to March 2014 have been summarised in the attached document. These achievements have been mapped against the Partnership’s 2013-14 Delivery Plan to illustrate the progress the Core Team has made against the Partnership’s core functions of:
1. National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity
2 of 5
2. Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions
3. Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes. To increase investment in sport, PE and physical activity within the sub-region by advocating their value
4. Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
5. Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
6. Marketing and Communications – Supporting the promotion of community sport programmes
7. Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place
Highlights for the Quarter
It is pleasing to report that good progress continues to be made against the Delivery Plan targets.
This periods highlights include:
1. Being awarded a Green rating (Gold for Sportivate) at our Sport England annual
performance review.
2. Being awarded Sports Leaders UK Academy Status for our work in delivering Sports Leadership training and qualifications. SASSOT is currently one of a small number of organisations throughout the UK to be awarded this status.
3. Research into sport and physical activity providers in Stafford and Cannock commenced. To be presented at July Board meeting.
4. The Work Place Challenge (WPC) that has been developed by the CSPN,
British Heart Foundation and is supported by funding from Sport England’s Health Improvement Fund is underway with 19 businesses signed up.
5. Sportshire - MOU signed with Commonwealth Games England regarding their
final preparation camp to be held at Saint George’s Park. Ironman tender process is drawing to a conclusion and is looking positive, currently in contract negotiation phase. Staffordshire Talented Athlete Fund has been awarded 33 athletes from across the county have received grants of up to £1000
3 of 5
A bid to host National Road Race Championships was unsuccessful.
6. Equity and Disability Sport
i. The £20,000 secured from Staffordshire County Council to co-ordinate a ‘Girls Active Fund’ has been awarded to projects in Burton, Rugeley and Tamworth areas. Over 160 girls are engaged in activity including 16 who are taking leadership qualifications.
ii. Aiming High Inspire Disability Multi Sport Clubs Project:
94 children accessed the clubs last quarter exceeding the target of 56
20 new participants attended clubs in the quarter
The combined total of children accessing Inspire Multi Sports Clubs for the past 4 quarters is 397 which is 187 above the annual target of 210.
The number of children that were supported into Universal Services was 12 exceeding the planned target of 7.
iii. SASSOT is recognised by English Federation of Disability Sport “ for good practice in incorporating the Inclusive Club Hub into club development projects such as Satellite Clubs assessment.
iv. Links made with disability support focused organisations such as Linkage and Contact A Family, along with organisations such as Healthy Kid5, Samuel Johnson Community Hospital and Disability Employment Advisers-all invited to the next county forum.
v. Disability club audit undertaken – Directory to be updated by June 14
vi. The Abbey Hulton anti-social behaviour project that was supported via SASSOT’s ACCESS Across Staffordshire Fund has witnessed a throughput of 700 participants during the year. The programme is to be maintained through Doorstep Club funding via Stoke-on-Trent City Council and StreetGames.
vii. 60 participants, aged 8–76 engaged, engaged in the bowls programme that was funded via SASSOT’s ACCESS Across Staffordshire Fund which is focussed on areas of deprivation in Burton upon Trent.
7. NGB Engagement
i. Rated Green by Sport England for NGB engagement, delivery support andability to be able to show impact. 27 NGBs engaged.
ii. Volleyball England:
Facilitated integration of Volley Relationship Manager plan with local programmes. Activities now being rolled out. Ongoing attendance at steering group. Attended Volleyball Roadshow consultation events.
iii. British Cycling - SASSOT arranged a consultation/presentation opportunity for British Cycling to present on the future development of the Sky Rides
4 of 5
Programme in Staffordshire 7 partner LAs and PH attended.Following engagement event support secured for Sky Rides in Newcastle, Stafford and East Staffs.
iv. England Athletics and Staffordshire Athletics Network - Supported Network with application of funding for 2014-15. Provisional offer of £9150 to support the network from the NGB. An additional 1350 secured from Groundwork UK for 2014-15. Alongside the c/f and contributions from SASSOT this means the network coordinator post will be sustained for a further 12 months. Beginner Running project now has over 1000 participants.
8. Club Development
i. Clubmark is being promoted via club development evenings and in conjunction with the re-launch of the SASSOT Sports Club Accreditation Funding Scheme. Currently 365 clubs are accredited. 16 clubs have applied for funding support from the SASSOT Clubmark Accreditation Fund.
From the results of a club survey, a new annual programme of workshops has been created based on the needs of the clubs. The first Funding for your club workshop this quarter ran in February and attracted 28attendees.
9. Coaching and Workforce Development
i. 1035 coaches are currently registered with SASSOT (an increase of 38 on the previous quarter). The 1035 exceeds the 900 target set out in the Coaching Network Plan.
ii. 167 coaches accessed targeted CPD (target is 100 for the year)iii. 14 workshops for volunteers and coaches organised in the quarter. A total of
1090 people attended 70 coach, volunteer and club development workshops in the first three quarters of the year.
iv. 88 young people have been trained in level 1 or 2 Sports Leaders Awards and Level 1 Dance. 53 young people have been deployed into community sport settings.
v. 146 volunteers aged 16+ have been recruited to support levels 1 and 2 School Games
10. Investment
i. SASSOT has been involved in supporting a number of partners throughout the year access external funding for various facilities and programmes. The total for the year is £1,960,259.
ii. SASSOT co-ordinated, prepared and submitted an application on behalf of several partners to the Sport England Inclusive Sport Fund for a disability sport project. Unfortunately the application was not successful.
iii. England Athletics and Staffordshire Athletics Network - Supported Network with application of funding for 2014-15. Provisional offer of £9150 to support the network from the NGB. An additional 1350 secured from Groundwork UK.
iv. £41,000 secured for the delivery of Sky Local Rides
5 of 5
v. SASSOT supported Wigan Leisure Trust with a successful application to Sport England’s Community Sport Activation Fund for £60,000
11. Marketing and Knowledge Management
i. 12 sport-e newsletters issued with a total of 706 articles. Mail distribution list has reached over 3,000 recipients.
ii. 12 coaching e-newsletters issued with 990 recipients.iii. 12 disabilit-e sport e-newsletters issued with 798 recipients iv. The Partnership Satisfaction Survey 2013 reported a satisfaction level by
partners of 98.1% compared to the national average of 91.7%v. West Midlands Community Sports Awards – Confirmed for 2014
12. Level 3 School Games
A successful Level Three winter festival was delivered despite the weather having an impact on the outdoor sports. Satellite events have all been successful and supported. Plans are in place for a summer festival
13. Sportivate
Projects across Staffordshire & Stoke-on-Trent exceeded the targets set by Sport England. Over the course of the year 3,994 young people have been engaged in Sportivate projects (a rise of 862 from Year 2), and 3,686 of those young people have been retained (i.e. attending all or all-but-one of the 6-8 activity sessions), a rise of 803 from year 2. These figures exceed the target set by 1,964 young people, and equates to a retention rate of 92% achieving a Gold rating from Sport England.
14. Community Games
The Community Games programme has been promoted through partners and through the website. 45 Community Games were registered by 31/3/14 hitting the target.
15. Satellite Clubs
66 Middle/ High Schools, 5 Colleges and 2 Independent Schools engaged. 96 Satellite Clubs confirmed to date (38 part funded with NGB’s, 58 fully funded by SASSOT).The year 1 target was 17 clubs.
16. Sub Regional Facilities Framework
Facility Planning Modelling of sports halls, swimming pools and artificial turf pitches for the sub region completed. Full Sub Regional Facility Framework report expected mid-May.
4. Report
Please see attached Delivery Plan update.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 1 of 77
Increasingly Active, Healthy and Successful Communities
County Sport and Physical Activity Partnership
Sport Across Staffordshire and Stoke-on-Trent
Delivery Plan
Board Update – 01.04.13 to 31.03.14
Quarter 4
Objective 1 - = 46 = 2 = 0
Objective 2 - = 57 = 8 = 0
Objective 3 - = 29 = 7 = 1
Objective 4 - = 6 = 0 = 0
Introduction
The tables below provide a summary of the achievements of the Core Team for 01.04.13 - 31.03.14. These achievements are outlined in the ‘progress to date’ column, with the ‘key tasks’ and ‘milestones’ columns taken from the Annual Delivery Plan 2013/14. The ‘face’ ratings reflect actual progress against expected progress. Where progress is behind what was expected by this point in time, brief notes regarding remedial actions have been included.
www.sportacrossstaffordshire.co.uk
Delivery Plan April 13 1to March 14: Updated March 2014 Page 2 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
SASSOT to review individual groups as and when necessary
SASSOT to support SLCOF, SDO & Facility Managers Forums, Disability Sport Forums, Staffordshire University Sports Board, Aiming High Short Breaks, Sport Specific Development Groups, CSPANs , sub-regional NGB Forum, Central rivers Initiative Board, Equality Group, Marketing & Communications Group, Sportivate Leads Events and Steering Group, Workforce Development Group, Safeguarding Group, Regional CSP / NGB Engagement Meetings, SGO Meetings, Regional Coaching Leads Meetings, School Games Local Organising Committee and sub-groups
On-going
All Core Team Meetings
heldStaffordshire Leisure OfficersID – attend April meeting and presented example intelligence documents – final versions given out at NGB-Partner Event + email.
SASSOT updates presented at each SLCOF
SLAC
SASSOT (ID/TB) chairing and coordinating meeting; format changed to make more interactive and developmental.
No meeting held in Q4. SASSOT held online consultation with SLAC members to gage interest regarding the continuation of SLAC meetings, due to membership replication attending the County Disability Sport Forum.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 3 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
SASSOT to influence and actas an advocate for sport and physical activity
Maintain and further develop effective working relationships with Staffordshire and Stoke partnership networks, Leaders & CEO networks, Public Health and Clinical Commissioning Groups, Children & Young People partnerships
On -Going
All MT
Core Team
Strategic groups aware of SASSOT’s role and agenda. Sport & physical activity recognised in LA Community Plans and Health Strategies
Staffordshire CC Youth & Community Servicemet with to discuss findings and next steps following report publication on women and girls; ACCESS Fund round focussing on W&G; possible conf with SCCY&CS with W&G focus in October.
Staffordshire CC commissioned SASSOT (£20k inc capacity) to lead and sub commission W&G activity in Tamworth, Cannock, and Burton.
Programme delivery commenced.
SASSOT working with Staffordshire CC PH to research and develop a PH physical activity strategySASSOT consulted as part of the development of the Active Staffordshire concept
Staffordshire and Stoke-on-Trent CEOs updated on the work of the Partnership.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 4 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Support the development and coordination of a Staffordshire wide Physical Activity ‘Framework’
Work with the Staffordshire and Stoke-on–Trent public health teams to develop Physical Activity Strategies and engage with the new Health & Well-being Boards.
12/13 3 Staffordshire and Stoke–on–Trent Public Health supported by SASSOT
MT, ID, BH, NBi
Strategy developed
Staffordshire CC-Public HealthBH/ID – met with SCC-PH in order to scope and develop intelligence to inform PH ‘strategy’; data collection on-going.Data collection template developed with input from PH. Links established with SCC Sustainable Transport department re cycling strategy. Next phase will be to start collating data.
Draft PH high level strategy produced and consultation planned. SASSOT consulted
Sportshire Co-ordinator has arranged a Cycling/Walking Working Group to develop joint working around this agenda. SASSOT, Public Health, Staffordshire County Council Transport and Tourism engaged.
Sally Kendrick appointed to pilot data collection process. Sally Kendrick has gathered local data for Stafford District to prepare a local supply and demand report.Research into sport and physical activity providers in Stafford and Cannock commenced. To be presented at July Board meeting
Delivery Plan April 13 1to March 14: Updated March 2014 Page 5 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Support the development and coordination of a Staffordshire wide Physical Activity ‘Framework’
Work with the Staffordshire and Stoke-on–Trent public health teams to develop Physical Activity Strategies and engage with the new Health & Well-being Boards.
12/13 3 Staffordshire and Stoke–on–Trent Public Health supported by SASSOT
MT, ID, BH, NBi
Strategy developed
Stafford and Cannock CCG engaged. Draft joint health and sport proposal developed and shared with CCG Consultation on this taking place with Chief Officer in the New Year.
SASSOT has supported the development of the Stafford and Surrounds Health and Wellbeing Strategy and are a designated lead for certain areas of delivery. Director attended a Health Challenge event with Head of SBC Leisure and Cultural Services to make the case for sport and physical activity in the strategy.
Provisionally agreed a joint health and sport proposal with Cannock and Stafford CCG. Next step to develop a steering group to move forward proposal. Waiting for CCG to coordinate this.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 6 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
To ensure there are appropriate networks in place to support the delivery of sport and physicalactivity.
Support the sustainability of existing CSPANs to support the following agendas
Increasing participation
Widening access
Implementing equity and CSP workforce development plans
On-going All
GAM
Number of CSPANs who continue to advocate and support the delivery of sport in their area.
There are no longer any proactive CSPANs that meet
ID – submitted data required to LRS with regards to CSPn ‘Get Active’ portal. ID leading on Workplace Challenge for SASSOT (from 7th October) linking to Get Healthy, Get into Sport fund – led by CSPn / LRS
Work Place Challenge (WPC) started January 2014 for 2yr period. Business recruitment started and engagement with NGBs re WPC offer to employees
Link in wider strategic partners to the CSPAN networks as appropriate eg NGBs
On-going
All ID Not relevant this year
Delivery Plan April 13 1to March 14: Updated March 2014 Page 7 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
To represent the interests of the region at CSPN PA meetings
Attend CSPN PA meetings. On-going
All MT
ID
NA Quarterly meetings attended
Group has not met during the past 6 months.SASSOT has signed up to the CSPn “Get Active” pilot project.Next meeting planned for November.
ID attended February meeting and disseminated info across WM; next meeting 6
thMay
ID leading on Workplace Challenge for SASSOT (from 7th October) linking to Get Healthy, Get into Sport fund – led by CSPn / LRS
SASSOT support and representation on the “Sportshire”Development Group
Develop “Sportshire” Strategy and Implementation Plan
On-going
All Staffs County Council
MT
Strategy Developed and Implementation plan prepared
Sportshire Coordinator commenced work.
Brief for Twin Rivers Feasibility Study produced for developer. Consultant appointed to carry out feasibility study.
See update report from Sportshire co-ordinator in later report for Board on progress to date.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 8 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Staffordshire and Stoke – on –Trent 2012 Legacy Charter
Support partners with the implementation of the Charter
On-going
All Core Team
Sportivate 1964 retained
604 Young People retained in first Sportivate delivery period (Target 520)
A Free Running Project from the YMCA in Stoke won the Regional Sportivate Project of the year, and went on to be placed second in the country at the National Awards Ceremony at the Houses of Parliament in July. The project has grown enormously since the initial Sportivate sessions, and now has over 70 participants enjoying the activity over 3 sessions per week.
Annmarie Hordell from Aston 101 Disability Cricket Club in Stone, won the Regional Sportivate Participant of the Year. A celebration event, attended by Sport England, took place at the Cricket club to recognise Annemarie’s contribution and the success of the project as a whole, with over 25 young disabled people still participating long after the initial Sportivate activity took place last year.
Q3 Programme on track and Year 3 Delivery Plan in development.
Sportivate has achieved a Gold rating for delivery total participants 3994 of whom 3,686 retained (Target 1,964)
Delivery Plan April 13 1to March 14: Updated March 2014 Page 9 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Delivery of relevant programmes eg. Sportivate, School Games, Satellite Clubs, Primary School Links programme, number of accredited clubs, increasing volunteering in sport, Disability Sports Clubs programme and Community Games Programme.
NBa
Level 3 School games held
Level Three School Games successfully staged at Keele University and Fenton Manor on 28
thJune 2013.
Plans are in place for the 2014 School Games. There will be a winter festival held on 11
thFebruary at Fenton
Manor, St Peters Academy and Northwood Stadium and a summer festival on 20
thJune at Keele
University.
Plans are in place for Level Three satellite events which start on 13
thJanuary and a winter Festival to
take place at Fenton Manor on 11th
February
The inaugural School Games winter festival took place on 11
thFebruary at Fenton Manor and Northwood
Stadium. Unfortunately the weather had an impact on outdoor sports which had to be postponed. 9 Competitions in 4 sports took place involving 558 participants
Delivery Plan April 13 1to March 14: Updated March 2014 Page 10 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
NBa
Increase in number of accredited clubs to 260
There are currently 267 Accredited Clubs and 80 working towards accreditation in Staffordshire and Stoke-on-TrentThere are currently 267 Accredited Clubs and 80 working towards accreditation in Staffordshire and Stoke-on-Trent
There are currently 365 accredited clubs in Staffordshire and Stoke-on-Trent
CGro
Satellite Clubs
24 schools and 4 colleges engaged. 20 Satellite Clubs confirmed to date.
Through further consultation with NGB’s and other partners it has been confirmed that 40 schools and colleges have been engaged and that 50 Satellite Clubs are confirmed to date.
66 Middle/ High Schools, 5 Colleges and 2 Independent Schools engaged. 96 Satellite Clubs confirmed to date (38 part funded with NGB’s, 58 fully funded by SASSOT). Target over achieved for year 1.
19 satellite clubs from Year 1 delivery will be receiving additional support.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 11 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Nos volunteer-ing Active People %
NBa
Nos of Community Games - 35
At present there are 41 Community Games registered, 6 of these took place in this quarter. There have been 43 Community Games registered to date, 26 run in this quarter. The target is 44 registered by 30.12.13The target of 44 Community Games to be registered to take place before 30.12.13 was hit. 45 were registered in total with 6 being held in the last quarter
Community Games targets were achieved
Advocacy re “Creating a Sporting Habit for Life” strategy
Promotion and advocacy of “Creating a Sporting Habit for Life” strategy at all sub regional forums
On-going
All Core Team
Present-ations presented to relevant sub regional groups and partners
Presentation to Staffordshire Moorlands Sports Councils
Presentation to CRI Workshop
CRI future sports facility and programme development plans presented to CRI Board following second consultation event.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 12 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
To develop working relationships between partners and to ensure an effective signposting
Develop and support regional networks where appropriate and disseminate information across the sub-region. eg. Workforce, CSP/NGB regional engagement days, marketing & comms, investment, P2P, C&YP, CDM, PA, Coaching, Regional NGB Forum, CSP Directors, SGO’s
On-going
All Core Team
Engagement event organised between NGBs, Central Rivers Initiative and other local partners to commence development of a Sports Strategy and implementation plan for the CRI area.
CRI future sports facility and programme development plans presented to CRI Board following second consultation event.
SASSOT will be hosting a work placement on behalf of the CRI to develop a Marketing and Communications Plan for the CRI
Delivery Plan April 13 1to March 14: Updated March 2014 Page 13 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
To manage the advocacy and training elements within the 2013 Community Games contract
Maintain and grow a Community Games network structure in the sub-region and promote the CG through SASSOT website / e-newsletter / email and through partner networks
On-going
1 NBa
Number of Community Games organised –35 by 31.8.13
At present there are 41 Community Games registered. With a target of 44 to be reached by 31.12.13. There have been 43 Community Games registered to date, exceeding the target of 35 by 31.8.13. The target is 44 registered by 30.12.13. The Community Gamesprogramme is promoted to partners, community groups and clubs through the newsletter and the website as well as email groups directly.The Community Games programme has been promoted through partners and through the website. 45 Community Games were registered by 30.12.13, hitting the target. Nationally the future of the programme is uncertain, although SASSOT have agreed to continue to supportCommunity Games funding has now ceased a baseline level of service will continue to support the programme
Establish links with: Sports Makers Wider SASSOT
programmes
On-going
1 NBa
Links have been made with SASSOT programmes in order to help reach the target of Community Games registered
As above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 14 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Ensure Community Games organisers planning an event register their games on the CG website and promote support available
On-going
1-4 NBa
44 CG registered by 30.12.13
At present 41 Community Games have been registered. Support in terms of resources and funding has been promoted to Games organisers and at present 7 Games have been awarded funding.To date 43 Community Games have been registered and offered support. Support has also been offered in the form of online workshops. This quarter 3 organisers have applied for and have been awarded funding.Support is continued to be offered in terms of resources and funding in this quarter and Games Organisers are encourages to register their event. 45 Games were registered by 30.12.13Previous Community Games Organisers have been in contact and 3 Community Games have already been registered for 2014/15 despite no funding being available for the programme
Track progress in the sub-region by ensuring completion of monitoring and evaluation
On-going
All NBa
All CG’s evaluated
Monitoring and evaluation is submitted on a monthly basis. Links to Organiser and volunteer questionnaires are also sent out after each Games has taken place.OngoingAs aboveMonthly monitoring will continue
Delivery Plan April 13 1to March 14: Updated March 2014 Page 15 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Connecting NGBs with CSP and local partners
Organise Partnership Conference, including Speed Networking Session.
Collate partner priorities from conference intelligence
Organise further events if appropriate, informed by consultation at conference
04/13
TBC
TBC
1 JK
BH
Conference with 40 attendees
ID – 63 people in attendance; partner interactions and working ambitions recorded and circulated on email to parties concerned.
Engagement event organised between NGBs, Central Rivers Initiative and other local partners to commence development of a Sports Strategy and implementation plan for the CRI area.
Outline strategy produced and agreed by CRI Board following second consultation event.
SASSOT arranged a consultation/presentation opportunity for British Cycling to present on the future development of the Sky Rides Programme in Staffordshire 7 partner Las and PH attended.Following engagement event support secured for Sky rides in Newcastle, Stafford and East Staffs
Delivery Plan April 13 1to March 14: Updated March 2014 Page 16 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Ensure NGBs have access to network groups and are signposted to key partners as and when appropriate
Ensure the NGB Forum continues to operate effectively
On-going
BH
4 NGB Forums held
1 NGB Forum held this quarter. Attendance remains good.1 NGB Forum held this quarter. Next meeting scheduled for Dec. 1 NGB Forum held this quarter. NGB attendance flagged as a problem. Working with Black Country CSP to develop a shared forum to increase numbers next quarter.
No NGB Forum this quarter but date set in May for a joint SASSOT/Black Country Forum. Meeting to be supported by Sport England.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 17 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Active Universities Social Sports Participation Project
Support the project by Chairing the Steering Group and ensuring that there is appropriate engagement with NGBs
On-going
All BH
All meetings attended by SASSOT rep
All SDO, SLCOF and Facility Managers Forums support by SASSOT in this period.
No meetings this quarter. Next meeting scheduled for November.
Attendance at steering group this quarter. University reviewing long term options. SASSOT attending Sport England new HE Activation Fund briefing in Jan with a view to supporting Staffs and Keele Uni’s to access this funding.
No meeting held this quarter. Both Universities submitting bids to Sport England’s Active Uni’s fund. Support in the application process offered by ID.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 18 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Develop & agree actions with NGBs that reflect the Core Offer and Enhanced Services offered by CSP
Green RAG-rating (in Sport England six-monthly report) for all NGBs where clear actions have been agreed
09/13 & 03/14
2,4 BH
25 Green Ratings
17 NGB rated green on engagement activities. NGB priorities for 13-17 plans still emerging.
Provisionally rated green by SE for 6 month period. Still a lack of clear demands from NGB’s.
Rated Green in last period by Sport England. Further actions agreed with NGB’s. Review meeting scheduled with Sport England.
Significant overhaul of NGB engagement monitoring process undertaken. New system developed and integrated into teams work. Identified as best practice by Sport England.
27 NGB’s engaged in last 6 months with 23 rated green. Improved integration of teams work areas to support NGB’s noted at 6 month review meeting with Sport England. Greater focus on 7 largest NGB Forums.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 19 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
All team members recording agreed support and outcomes in the NGB Tracker
On-going
All BH
Updated at Sept team meeting NGB tracker process to be reviewed by core team at Oct Team meeting to improve reporting. SASSOT NGB tracker revised to improve reporting process and core team engagement in reporting process.
See above.
Attend Regional CSP / NGB Engagement Meetings or arrange one-to-one meetings with appropriate NGBs on a regular basis
On-going
All BH
8 regional meetings
All meetings attended this quarterAll (3) regional NGB engagement events attended this quarter.All (1) Regional Engagement Event attended
Provide hosting arrangements for NGBs as required
Provide hosting arrangements for NGB staff as required, reviewing annually
On-going
All BH
10 NGB Officers Hosted
10 officers currently hosted. Changes to regional NGB staffing arrangements may lead to a reduction in hosted officers next year.
Currently agreeing hosting arrangements for 2013/14 with NGB’. Likely to be a small reduction in numbers.
Hosting arrangements agreed with all but one NGB. Minimum of 8 officers will be hosted in 2014-15.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 20 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Support the Staffordshire Athletics Network
Provide employment for Co-ordinator and manage budgetProvide support to Network as requireHelp to secure funding to continue the Network beyond 31.03.14
03/14 All BH
Funding secured for 14-15 –minimum £28,000
Progress remains good for this programme but there is uncertainty over future funding from SE putting longer term future of project at risk.
Working with chair and officer to explore funding options. £7,000 worth of funding secured to date.
An additional £7600 of funding secured this quarter. Some concerns over long term viability of project due to priority placed by NGB on the project. Reviewing long term organisational structure of organisation with a view to outsourcing hosting arrangements in order to create a more sustainable network structure.
Supported Network with application of funding for 2014-15. Provisional offer of £9150 to support the network from the NGB. An additional 1350 secured from Groundwork UK for 2014-15. Alongside the c/f and contributions from SASSOT this means the network coordinator post will be sustained for a further 12 months.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 21 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Support the role out of the Volleyball Investment A Zone
Officer recruited and employed
Officer hosted
Steering Group for Investment Zone (IV) established
Action Plan for IV developed.Outcomes from year 1 plan delivered
03/14 All BH
Investment Zone Targets Achieved
Supported NGB with recruitment of officer.
Provided hosting arrangements for new officer.
In partnership with NGB and Black Country CSP established new steering group.
Supported officer with development of three year plan which has been signed off by local steering group.
Facilitated integration of VRM plan with local programmes. Activities now being rolled out. Ongoingattendance at steering group. Attended Volleyball Roadshow consultation events.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 22 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
To implement the Equality &Diversity Action Plan
Organisational development and governance
Q1-4 All NBi
Relevant training delivered.
Currently identifying appropriate training provider in line with staff training needs.Initial training provider research undertakenTraining needs currently being reviewed due to time lapse
Club and workforce development
Q1-4 All NBi
Audit undertaken. Club audit to be undertaken.Next ACCESS Fund is Women and girls.Training offer to be reviewed and mapped 08-09/13Disability club audit undertaken – Directory to be updated by March 14
Engagement, networking and communication
Q1-4 All NBi
Appropriate communication methods used.
VAST now member of Board to enable wider network of engagement with voluntary sector.Consultation with disability groups initiated as part of the Inclusive Sport Fund. Consultation untaken with ‘Youth Action Kouncil’ as part of the Girls Active fund
Delivery of specific projects Q1-4 All NBi
Projects delivered engaging people from under-represented groups
ACCESS Fund – Abbey Hulton: on-going; UKBDA: funding withdrawn and reallocated; Bowls East Staffs: funding awarded.Women and girls projects developed and awarded in next round – August. 19 applications – 6 awarded.Inspire Clubs Contract – ahead of ½ yr target.Sp8 – Of the 31 projects that have taken place 25 were aimed at our target groups (2 x disability projects, 3 women only projects and 20 targeting
Delivery Plan April 13 1to March 14: Updated March 2014 Page 23 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
disadvantaged communities)Sport Makers – boccia specific workshop delivered Comm Games – on-going promotion; funding available to aid delivery; 28 CGs delivered in Q1&2 School Games – festival delivered; 1,000 competitors; 250 volunteersVolunteer Programme – redefining and developing programme due to change of funding; 5 courses set-up for summer delivery£20,000 secured from SCC to co-ordinate ‘Girls Active Fund’ following recently commissioned research. Projects have been established and awarded in two of the three target areas, Burton and Cannock. Projects for the Tamworth area will be agreed in January. Sports Leaders qualifications and coach bursaries will also be implemented as part of the fund.
Six projects initiated through the Girls Active fund over 160 girls engaged in projects based in Burton, Cannock and Tamworth. 16 girls engaged in leadership qualifications and 12 to receive coach bursaries
Delivery Plan April 13 1to March 14: Updated March 2014 Page 24 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
To support the development of targeted programmes through theACCESS Across Staffordshire fund
Support and monitor the implementation of the awarded ACCESS Across Staffordshire projects
UK Dodgeball Association – Stoke-on-Trent
Abbey Hulton Partnership – Stoke-on-Trent
April / May 2013
All NBi
9,800 throughput.750 throughput....attendees from target group(s) UKDBA project – withdrawn funding
Abbey Hulton Project – started 03/13 and is progressing well and is close to ‘on target’
The Abbey Hulton project has witnessed a throughput of 375 participants for Q1&2 of project delivery
700 attendances at Abbey Hulton (Stoke-on-Trent) anti-social behaviour multi-sport project, funded through ACCESS Across Staffordshire. Activity to be maintained through Doorstep Club funding(S-o-T CC)
60 participants, aged 8-76 engaged in 60 hours ofbowls activity in deprived communities in East Staffordshire, funded through ACCESS Across Staffordshire
Implement an additional round of funding
Q1 All NBi
Women and girls round opening in July, closing date 23
rdAugust.
6 projects awarded £ 9,300 worth of funding. Delivery to commence from October 2013.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 25 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
All 6 projects have been initiated and initial data collation shows engagement and retention of 110 women and girls
To support the development of targeted programmes:
Aiming High For Disabled Children
SASSOT representation on Aiming High Board when requested. SASSOT Chair Sport, Leisure, Arts & Culture Group
On-going
1 TB & NBi
SASSOT represent-ation on Board SASSOT chair SLAC group
SASSOT chairing and coordinating meeting; format changed to make more interactive and developmental.
No meeting held in Q4. SASSOT held online consultation with SLAC members to gage interest regarding the continuation of SLAC meetings, due to membership replication attending the County Disability Sport Forum.
Maintain and update Disability Sports Directory
On-going
All TB
Directory produced & live on SASSOT website
Data collected.
Publication date due June 14.
Audit of Disability club, mainstream provision, after school and holiday provision
12/12 3 TB Access / provision established
On-going (09/13)
Mapping document created, data inputted for each local authority as well as county wide provision.
To support the development of targeted programmes:
Aiming High For
Provide information and support to parents and disabled children
On-going
All TB
All identified parents and children offered information and support
Information and support provided both electronically and verbally to parents, children, teachers and carers.
Special schools visited, attendance at disability conferences in order to promote SASSOT projects.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 26 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
Disabled Children
To support the development of targeted programmes:
Aiming High For
Maintenance of Disability Forums in each local authority area
On-going
1 TB Keep all forums maintained
Forums continuing to run in Stafford, Newcastle, Tamworth, Lichfield, Cannock and East Staffs.New forum introduced at Staffordshire Uni focusing on providing opportunities for the disabled students.Stafford forum constitutionalised and now applying for funding.
Continued Development of Countywide Disability Sport Forum
On-going
All TB One Countywide meeting run with representatives from all Disability Sport Forums
Successful County forum held on 26th
March with guest speakers from Action For Blind, National Deaf Children Society and Goalball UK presenting to local providers.
Next County forum to be held on Wednesday 25th
June
Work with EFDS around roll out of Inclusive Toolkit and ‘Clubmark’
07/12 3 TB
Submit completed Toolkits to EFDS and wait on their release of Initiative
2 disability clubs to have achieved Clubmark
Information sent to all clubs explaining the Inclusive Toolkit. 5 clubs submitted to EFDS currently.
SASSOT recognised by EFDS for good practice in relation to incorporating the Inclusion Club Hub into club development projects such as satellite clubs.
Continue to develop Inspire Disability Multi Sport clubs
On-going
All TB Enable clubs to be sustainable
Q4 results: 94 children accessed the 7 Inspire clubs during Q4.20 new disabled children12 children supported into universal services
Delivery Plan April 13 1to March 14: Updated March 2014 Page 27 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Bod of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and High Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.4 Equality and Diversity
Key Tasks MilestonesTimescales
Who Q3 Q4 TargetProgress update01.04.13-31.03.14
Date Qtr
Disabled Children
Develop Disability Training Programme for coaches, staff and volunteers
09/10 2 TB 96 coaches received training
Boccia Leaders Award course planned for Q2.
Boccia course ran, fully booked, planned to run again in 2014
(ID/TB) Effective Communications workshop planned and promote to run in Q3.
18 coaches completed Effective Communications workshop
Develop links with non-sporting disability groups, organisations and services
On-going
All TB Links made with disability support focused organisations such as Linkage and Contact A Family, along with organisations such as Healthy Kid5, Samuel Johnson Community Hospital and Disability Employment Advisers- all invited to the next county forum.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 28 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing andmaintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.5 Safeguarding & Protecting Young People in Sport
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Ensure SASSOT meets safeguarding requirements of the Sport England CSP core specification
Develop and deliver annual safeguarding action plan.
04/13 4 BH
Green RAG rating in quarterly report
Action plan developed.Green RAG rating achieved in 6 month Sport England report.Review meeting with CPSU scheduled for next quarter.
Positive w review meeting held with CPSU and Green RAG rating given. CPSU highlighted support work to Satellite Club providers as national recognised good practice.
Review progress against safeguarding action plan and cross reference to
03/14 4 BH Revised action plan in place
Some actions delivered but currently limited officer capacity due to secondment.
Officer redeployment has effected time allocated to this work. Some actions delivered from plan.
Revised action plan developed and signed off by CPSU
Delivery Plan April 13 1to March 14: Updated March 2014 Page 29 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing andmaintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.5 Safeguarding & Protecting Young People in Sport
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Deliver the outcomes of SASSOT’s annual safeguarding action plan
Deliver the following priority actions:
Ensure SASSOT’s safeguarding policies and procedures reflect current best practice and are fit for purpose
Ensure all SASSOT led delivery involving young people and vulnerable groups meets the safeguarding standards outlined in our safeguarding procedures
Strengthen links with LSCB’s and statutory services
03/14 1 BH Action Plan Priority actions delivered
Action plan developed and signed off by CPSU
Meeting held with LSCB and SCYVS. SG Events delivered in line with policies. Ongoing delivery of SPC workshops.
SLA’s for new projects reflect safeguarding requirements for Sportivate
Safeguarding minimum standards agreed and reflected in SLA’s for Satellite Clubs
Spot checks to be undertaken on Sportivate and Aiming High projects this quarter in line Action Plan,
Reviewing SASSOT’s safeguarding policy
Delivery Plan April 13 1to March 14: Updated March 2014 Page 30 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing andmaintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.5 Safeguarding & Protecting Young People in Sport
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Full details of action plan outcomes can be viewed in the SASSOT Safeguarding Action Plan.
Ensure that safeguarding is embedded into contracting and commissioning arrangements for delivery involving young people and vulnerable adults
Develop and maintain a safeguarding action plan
Provide partners with the opportunity to learn about safeguarding through sharing information resources and through the provision of an education and training programme
SASSOT Safeguarding policy reviewed and updated.
TNA for team members developed and scheduled for implementation in April.
265 Volunteers given safeguarding training in 2013-14
Revised action plan developed and signed off by CPSU
All Satellite Club policies checked against minimum standards and support given to update where required.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 31 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
SportivateManage the Sportivate programme to ensure effective delivery across the sub-region
Year Three plans in place, all funding downloaded and KPIs met, with a wide range of delivers included
03/14 4 CGre, JK,NH-G
1964 Retain All capacity and delivery finance payments have now been made. Training to new deliverers has also taken place.
SASSOT nominated projects for the Sportivate ‘Project of the Year’ and ‘Participant of the Year’ awards. Stoke YMCA FreeRunning project won the Regional award and came 2nd in the National Awards. Annmarie Hordell from Aston Disability Cricket Team won the Regional Participant Award.
An additional pot of Sportivate Funding was advertised, (incorporating new /additional funding from Sport England along with Year 2 underspend) for Sportivate delivery between September 2013 and end of March 2014. There were over 80 applications for the fund and a further £53,000 has been allocated to 59 additional projects.
77% of the retain target for the year met already with more KPIs from this quarter still to be completed, so on track to achieve this by April 2014.
Currently assessing annual Sportivate plans for 2014/15 – to be sent to Sport England by 5
th
February 2014. 115 project applications
Delivery Plan April 13 1to March 14: Updated March 2014 Page 32 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
received totalling over £150,000.
Sportivate has achieved a Gold rating for delivery total participants 3994 of whom 3,686 retained (Target 1,964)
Steering Group continues to operate effectively
On-going
All 3 meetings The Steering Group met to decide on an additional round of Sportivate funding (£40,000 new money). The amount of applications outweighed the funding available so thanks to those that assisted with the process.
Steering group meeting set for end Jan to ratify year 4 plan prior to being sent to Sport England early Feb.
Review processes for Year Four and ensure Year Four planning process is completed to deadlines
01/14 4 Plan approved by SE Planning for Year 4 will commence in October 2013.
Applications in and currently being assessed. Steering group meeting set to discuss planning improvements.
School GamesEnsure successful deliver of Level Three with effective links to
Ensure the Local Organising Committee and its sub-groups operate effectively, with appropriate membership
On-going
All JK, NBa
All meetings attended Regular meetings took place in the lead up to, and post-Games for the LOC and the Sub-group.As aboveAs above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 33 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Levels One and Two
Ensure Project Delivery Plan is followed to deadlines
06/13 2 JK, NBa
Deadlines were all met to ensure a successful level Three Festival was delivered.Plans are now in place for a winter festival, summer festival and satellite events.As aboveAs above
Deliver a successful 2012 Level Three festival and support identified satellite events
06/13 2 JK, NBa
One festival with 2000 participants
Successful Level Three Festival delivered, although the weather did have an impact on various sports. All Satellite events were supportedSatellite events are confirmed for year three and will be supportedPlans are in place to support Level Three satellite events and deliver a winter and a summer festivalA successful Level Three winter festival was delivered despite the weather having an impact on the outdoor sports. Satellite events have all been successful and supported. Plans are in place for a summer festival
Review 2013 Festival, processes etc. in conjunction with partners / stakeholders
09/13 2 JK, NBa
A review of the 2013 festival took place at the LOC meeting, as well as the SGO meeting. Issues identified in the previous year were addressed successfullyAs aboveAs above
Develop a Project Delivery Plan for 2014, incorporating
12/13 3 JK, NBa Plan agreed by LOC A year three delivery plan is now in place
As Above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 34 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
review findings As Above. The year three delivery plan now includes a winter festival
SGO Support
Effective support of SGOs, and links to NGBs where appropriate
Support the SGO Meetings through attendance, leading on agenda items linked to SASSOT work areas (i.e. Level 3, C4L club support etc.)
On-going
All BH/CM 6 meetings All meetings have been attended and relationship is very positive. SASSOT input into the make-up of the agenda which also includes areas wider than school games to allow for discussion about the wider youth sport area
Collate and circulate monthly ‘NGB Newsletters for SSPs’ and ensure there is an SGO representative on the NGB Forum
Month-ly
All JK
12 newsletters Reviewing newsletter arrangements with NB. SGO rep has tendered resignation from NGB Forum. Alternative rep to be agreed at next SGO meeting
SGO’s have agreed for CM to be link to NGB Forum on their behalf.
Requested information from NGB’s for SGO newsletter every month this quarter however no information provided in Feb or March.
Change 4 Life ClubsSupport the delivery of the Change 4 Life Secondary Sports Clubs
Audit and maintain existing provision of Change 4 Life Secondary School Sports Clubs and facilitate a formal school (secondary) club link
6/13 1 NBa
Audit completed Audit of C4L clubs was completed and final monitoring has been completed and submittedC4L final audit was submitted. This project is now finished and no further reporting is required. Awaiting further National Guidance As above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 35 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
programme Map current community club infrastructure (location / typesof club / within locality of Change 4 Life Club
6/13 1 NBa
Mapping completed There is a limited number of Community Clubs available in the sports identified by Change 4 Life. Some school-club links have been made with an official agreement in place.This project is now finished and no further reporting is required. Awaiting further National GuidanceAs above
Provide coordination and identification of NGB training / coaching scholarships to enable appropriate capacity to sustain Change 4 Life Clubs.
On-going
All NBa, BH, LB
Training needs identified and training prog delivered
Training in line with the Change 4 Life sports has been identified and offered. Delivery of training has also taken place.The C4L sports are very specific and many areas do not have clubs to feed in to which reduces the sustainability of the C4L club.
This project is now finished and no further reporting is required.As above
Primary Sport Offer
Develop a clear offer to Primary schools to ensure that Schools best use Primary School Funding
10/13 2 CM Offer developed and delivery mechanism identified
Delivery mechanism has been agreed and agreement has been signed by entrust. Offer is ongoing through work with entrust and other local partners
Satellite ClubsManage the Satellite Clubs programme to
Audit School and NGB requirements, plus club capacity and map to produce list of potential satellite clubs
09/13 2 CGro 17 schools and 3 colleges targeted
Mapping currently on going between NGB’s, Local Authorities, Clubs, College Sport Makers, Schools and Colleges. School lists have been created using intelligence from working closely
Delivery Plan April 13 1to March 14: Updated March 2014 Page 36 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
ensure effective delivery across the sub-region
40 Middle/ High Schools and 3 colleges targeted
with partners.
As above - Schools engagement target for the Year 2 delivery is now complete
24 schools and 4 colleges engaged. 20 Satellite Clubs confirmed to date
66 Middle/ High Schools, 5 Colleges and 2 Independent Schools engaged. 96 Satellite Clubs confirmed to date (38 part funded with NGB’s, 58 fully funded by SASSOT).
SGO’s have played a key role in signposting proactive schools and clubs. Other partners listed above have contributed incredibly to the success of the satellite clubs during year 1 delivery.
NGB’s have a bigger involvement during the Year 2 delivery with joint funding satellite clubs. It is evident that the support from NGB’s will be crucial to delivering and sustaining satellite clubs.
40 schools and colleges engaged. 50 Satellite Clubs confirmed to date
66 Schools engaged and 5 Colleges
Delivery Plan April 13 1to March 14: Updated March 2014 Page 37 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Work with priority schools / clubs to set up satellite clubs
03/14 4 CGro
A number of schools and clubs have been identified as a priority for Satellite Clubs. First Satellite club is due to be launched in September, Clubs and Schools that have been identified through mapping will be approached first with the Satellite Club Offer.
The first of the Year 2 satellite clubs are due to launch after Easter during the summer term. Same as above with the approach to schools through mapping and collecting intelligence from NGB’s, LA’s, SGO’s and Clubs etc.
24 schools and 4 colleges engaged. 20 Satellite Clubs confirmed to date.
66 Middle/ High Schools, 5 Colleges and 2 Independent Schools engaged. 96 Satellite Clubs confirmed to date (38 part funded with NGB’s, 58 fully funded by SASSOT).
As schools have been identified through mapping it has been evident that additional schools want to be involved within the initiative, because of this 40 schools and colleges have been engaged and 50 Satellite Clubs are confirmed to date.
As schools have been identified through
Delivery Plan April 13 1to March 14: Updated March 2014 Page 38 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
2.1 Children & Young People
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
mapping it has been evident that additional schools are looking to be involved within the initiative, because of this 71 schools and colleges have been engaged and 96 Satellite Clubs are planned to date.
Matalan Sporting Communities
Support UK Dodgeball, UK Cheerleading Association and UK Ultimate Frisbee to successfully establish 5 community clubs through the Matalan Sporting Communities Pilot Project
31/1 1&2 CM 5 Community Clubs
established and run for 25 weeks
Programme has finished – not had any info from national leads about next steps
School-Club Links
Report on number of formal school-club links and production of case studies to YST
09/12 2 NBa
Report produced A final monitoring and evaluation report has been completed and submittedAs aboveAs above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 39 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.2 Club Development
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14
Date Qtr
Update Club Support Plan
Implement review & consultation process.Update as required.Communicate updated plan to partners
09/13 2 NBa
Club support plan has been updated and communicated. As aboveAs above
Maintain and promote SASSOT’s club database
Maintain SASSOT’s web-based sports club database to include all Clubmark/NGB accredited/SASSOT QualityMark
On-going
All NBa
Comprehensive database updated and promoted
Database is continuously updated as clubs become accredited or change details. As aboveThe database has a major update annually and is also updated as and when required
Raise the profile of club accreditation
Promotion of Clubmark and SASSOT QualityMark to partners and clubs. Maintain Clubmark license and promote to NGBs that don’t award it
On-going
All NBa
SASSOT Website/e-newsletter/ social media highlighting club accreditation
Clubmark is promoted and a new Clubmark license has been awarded.SASSOT Clubmark protocol and procedures have been updated and submittedAs AboveAs above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 40 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.2 Club Development
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14
Date Qtr
Increase the number of accredited clubs and enhance the support network available to them
Continue to provide ‘SASSOT Sports Club Accreditation Funding Scheme’
On-going
All NBa
20 clubs financially supported to achieve accreditation by 31/03/13
The accreditation funding scheme has been revamped and was re-launched in January 2013. The new scheme has been promoted and 11 Clubs so far have applied for funding.This quarter 2 clubs have applied for funding and been successful in their applications.Club accreditation scheme is continually being promoted to clubs and NGBsThe accreditation funding scheme continues and three clubs this quarter have applied for funding
Provide face-to-face support for clubs via engagement events
Provide support for club development forums / evenings in local authority / partner areas as requested or lead as appropriate
On-going
All NBa
8 forums attended/supported
Club Development evenings have been organised although the uptake through the summer period has been disappointing leading to cancellation of the workshops. Further Club Development evenings are arranged for the Autumn / Winter. Club Development evenings have been organised, but only one run due to a low attendance.A club workshop survey has been developed and circulated amongst clubs to determine their needs in this areaFrom the results of the club workshop survey, a new annual programme of workshops has been created based on the needs of the clubs. The first workshop this quarter ran in February and attracted 28 attendees.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 41 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.2 Club Development
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14
Date Qtr
Develop a planned and coordinated programme of club development training opportunities
Identify appropriate Club Development workshops to be integrated into the annual SASSOT Education and Training programme including Sports Marketing Network workshops
On-going
All NBa &KW
Comprehensive club and volunteer training programme implemented, promoted and communicated
Club Development Workshops have been identified and will be run during the Autumn / winter. The workshops have been promoted to Clubs.
A club development evening was run this quarter with 9 clubs booked on.
An annual Club workshop plan has been devised and implemented based on the findings from the club workshop survey. A new pricing structure has also been implemented to create an affordable workshop package
Promote and support Community Amateur Sports Clubs
Raise awareness via positive promotion and advocacy of the benefits of being a Community Amateur Sports Club and signpost to expertise and develop local case studies
On-going
All NBa
Number of clubs supported to become CASC
The benefits of becoming a CASC are promoted to clubs. Clubs are signposted to gain further knowledge.As aboveAs above
Delivery Plan April 13 1to March 14: Updated March 2014 Page 42 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Provide local strategic coordination for workforce development activity for the sports sector
Develop and maintain partnership workforce development plan
On-going
3 LB
New plan in place No progress in this area.
Work area now lead by LB under new staffing arrangements. Initial meeting held with NGB/CM to review youth sport element to new workforce plan.
Plan now split between Coaching Delivery Plan, Volunteer Development Plan and Safeguarding Action Plan. Aim for 2014-15 to bring together the key elements of these Plans to an overarching Workforce Development Plan.
Maintain partnership workforce development group. Review membership and function of group on an annual basis
On-going
4 LB Group reviewed Discussion regarding on-going remit of this group scheduled for next NGB forum
Support the development and growth of the sports volunteer workforce
Use Sport Makers, DFE, and CRT volunteer recruitment programmes to support workforce requirements of other SASSOT delivery programmes i.e. satellite clubs
On-going
4 LBCM
50 volunteers deployed onto other programmes
Meeting with NGB’s and other stakeholders planned for October to discuss workforce support for Satellite Clubs. Meeting took place and actions around best use of Satellite Clubs Delivery Budget to support Workforce Development of this programme agreed. Leadership course scheduled for Street Games coaches/volunteers with 10 booked on.Recruitment, training and deployment of volunteers in place and set to meet targets.
Targets met.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 43 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Maintain a volunteer development plan as part of workforce plan
On-going
1 LB
New plan in place No progress in this area
Volunteer Development Plan in place as a result of funding award from Sport England. The Plan is in its infancy and will be developed and implemented over the next 12 months with CD in post as new Volunteering and NGB Activation Officer.
Contribute to the development and delivery of the cross sector Staffordshire Volunteer Strategy and ensure it reflects the needs of the sports sector
On-going
4 LB Strategy launched + SASSOT input reflected
Strategy launched, on-going support provided to strategy group. Engagement meeting with VAST held.
Recognise volunteers and their work through supporting volunteer awards e.g. Unsung Hero
On-going
4 NBiLB At least 1 volunteer
award supportedOn track - BBC Award opens in October 2013
County Awards event held at Port Vale FC – 16th
November
Regional Awards held in association with West Midlands CSPs, BBC West Midlands and Association of Colleges – 4
thDecember
Strengthen links to 3rd
sector infrastructure organisations and ensure sports sector partners are aware of resources available
On-going
4 LB Meetings held with VCO lead officers
Engagement meeting held with VAST in Aug. actions agreed.
Further meeting held and progression of actions agreed.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 44 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
through these organisations
Through direct provision and effective signposting provide sports volunteers with access to education and training that meets their training needs.
On-going
4 KW
1000 attendees on workshops
During this quarter –21 Workshops across the county and 171 attendees
16 Workshops held with 250 attendees
19 Workshops held with 169 attendees
70 workshops over the year with 1,090 attendees
Work with partners and local training providers to ensure workforce training needs are met
Plan and deliver a comprehensive education and training programme to meet the needs of coaches and volunteers.
Undertake annual planning and partner consultation exercise in order to prepare a programme for 2012/13
Incorporate Club s Leaders and KKP workshops
04/14 4 KWLB
40 workshops & 1000 attendee’s
Programme is in place for 2013 -2014.New price structure came into force as of 1
st
April 2013 Marketing promotional plan is currently under review.
To date 56 Workshops have been organised with 590 participants
70 workshops over the year with 1,090 attendees
KWLB
25% of bookings made online
20% during quarter one29% during quarter two
30% of bookings now made online
Delivery Plan April 13 1to March 14: Updated March 2014 Page 45 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Introduce new pricing structure
Develop a comprehensive marketing and promotion plan for the education and training programme
Deliver a minimum of 40 workshops
Provide CPD training support to at least 1000 coaches and volunteers number of coaches
Provide workforce development support to local partners.
Work with Local Authority Leisure Departments to complete TNA’s to identify opportunities to share training.
Use outcomes of TNA to work with local training provider network
09/13 2 LB TNA completed& report provided to SLCOF with outline costs
No progress in this area.
Workforce audits completed for several LAs.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 46 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
and Skills Active to negotiate a better value and higher quality training offer.
Work with partners and local training providers to ensure workforce training needs are met
Signpost and promote NGB courses and the SASSOT Education and Training programme via SASSOT Coaching, including online bookings for the SASSOT Education and Training programme.
On-going
All LBKW Links visible Links are in place for the courses on the
SASSOT website and the SASSOT.
Coaching website and online bookings are functional and being utilised
Work with the FE sector to identify and exploit opportunities to access funding for sports qualifications and training.
Sept 2013
2 LB
Mtgs held with colleges
Meeting held with Newcastle ULC. Developing training proposal for leadership courses.
No progress this quarter
Meeting held with Newcastle Under Lyme College, with action agreed to explore developing Apprenticeships and CPD delivery linked to Primary School Sport Premium
Meeting held with Stafford College with action to develop volunteering offer and CPD opportunities with students
Ensure the SASSOT Sports Club
On-going
All NBa 30 coaches receive awards
Since the revamp of the accreditation scheme, the scheme is more flexible, including funding
Delivery Plan April 13 1to March 14: Updated March 2014 Page 47 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Accreditation Funding Scheme includes awards for coaching qualifications
awards for coaching qualifications and many other aspects including equipment and workshops. Since the re-vamp of the scheme funding for 7 Level one qualifications has been awarded.The Club accreditation scheme includes coaching awards; however, none have been applied for by clubs this quarter.The accreditation includes funding for coaching courses and of the three clubs that have applied for funding this quarter, all have stated that they will be using some of the funding for coaching qualifications.
Support an increase in the number of qualified coaches
Implement Coach Development Fund, ensuring a close working relationship with successful applications to demonstrate significant impact and value for money
3/14 4 LB 30 people trained impacting on NGB and Sport England priorities.
4 applications have been approved that will train 44 people in coaching and leadership qualifications that will then deliver on NGB and Sport England prioritiesAll funding associated with the Grant has now been allocated that will train a total of 151 coaches and leaders that will deliver on NGB and Sport England priorities
Maintain signposting service to NGB Coach Education courses both online and through individual requests
On-going
All LB Maintain online service for 46 sports
Service is up to date on SASSOT Coaching and SASSOT websites
Deliver Outcomes of the Coaching Delivery Plan
Facilitate a Community of Learning for coaches within the
On-going
All LB Produce Monthly e-newsletter to reach 800 by Q2 and 900 by Q4
910 people currently receive the e-newsletter each month926 people currently receive the e-newsletter each month
Delivery Plan April 13 1to March 14: Updated March 2014 Page 48 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
CSP area
970 people currently receive the e-newsletter each month990 people currently receive the e-newsletter each month
100 coaches accessing targeted CPD needs
60 coaches have accessed targeted CPD, with target of 100 projected to be met by the end of the year95 coaches have accessed targeted CPD, with target of 100 projected to be met by the end of the year167 coaches have accessed targeted CPD
125 coaches receiving targeted communication each quarter
240 coaches received targeted communication in Q1155 coaches received targeted communication in Q2180 coaches received targeted communication in Q3140 coaches received targeted communication in Q4
Deliver Outcomes of the Coaching Delivery Plan
Maintain Data Management System for coaches
On-going
All LB
800 coaches registered by Q2 and 900 coaches registered by Q4
872 coaches registered on the system915 coaches registered on the system997 coaches registered on the system1,035 coaches registered on the system
Delivery Plan April 13 1to March 14: Updated March 2014 Page 49 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Identify and promote funding schemes / grants that will aid coaches in accessing CPD at reduced cost
Quart-erly
All LB ‘Funding Opportunities for Coaching’ guide produced quarterly
Guide produced in conjunction with SCUK and Coaching Leads nationally
Ensure that partners including clubs fully understand the support available to them by registering with their local Volunteer centre
Deliver the outcomes of the Sport Makers programme
Organise and deliver a programme of Sport Makers workshops and conventions across the sub region
9/13 1&2 CM 1 convention5 workshops
1100 workshop attendees
5 events this quarter
1162 attendees as at 23.08.13
1 convention and 18 workshops delivered in quarter 2 with 1221 workshop attendees
This project is now complete. Target exceeded
Support Sport Makers Workshop attendees to achieve and log 10 hours of Sport-making utilising existing incentive scheme and volunteering opportunities
9/13 1&2 CM 830 Sport Makers achieving and logging 10 hours
788 Sport Makers have achieved 10 hours as of 23.08.13. On course to hit target938 Sport Makers have achieved 10 hours at the end of the programme. This project is now complete. Target exceeded
Delivery Plan April 13 1to March 14: Updated March 2014 Page 50 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Provide all Sport Makers with opportunities to continue volunteering in sport once the Sport Makers programme has finished
9/13 1&2 CMBH 100 Sport Makers
actively retained and integrated into existing volunteer workforce
Integration of Sport Makers programme into wider volunteer work on-going. Discussion held with VAST re potential links to their delivery. Supporting NULC with the development of a new leadership academy.
Additional funding received from Sport England to maintain contact and engagement with Sport Makers to ensure the volunteer resource continues to deliver sports opportunities in the community. NGB Activation and Volunteer Officer post to be employed to deliver these services.
SASSOT Volunteering and Leadership programme
Provide on-going support to volunteers trained in Year 1 of the programme.
On-going
BHCD Contact maintained
with previous leaders and opportunities offered.
Volunteers from year one of the programme have been updated with opportunities that are relevant such as jobs and volunteering. Some have been supported to complete their volunteering hours for their CSLA2 and placements have been found for them. Some have been supported to complete NGB specific qualifications.
40 leaders trained as Level 1 Sports Leaders
03/14 4 BHCD 40 Level 1 Sports
LeadersFour Level 1 courses were planned. However, only two courses were organised as a dance course was requested in another area.
17 leaders have completed their Level1.
The number of leaders trained is lower than expected as one course did not run due to one
Delivery Plan April 13 1to March 14: Updated March 2014 Page 51 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
area cancelling. They did this a few days before the course was due to start not allowing any time to rearrange the course elsewhere.
40 leaders trained as Level 2 Community Sports Leaders
03/14 4 BHCD 40 Level 2 Community
Sports LeadersThree Level 2 courses have run and 22 leaders have been trained.
Although the first 2 courses were almost full (14 on one course and 12 on another) and the last course had 9 registered to take part, the number of leaders trained is lower than expected as some young people failed to turn up on the first day of the course and some dropped out after one day. This number may also be lower as the learners had to pay a small deposit towards attending the course due to the funding being reduced.
40 leaders deployed into community settings for a minimum of 10 hours
03/14 4 CD 40 leaders deployed into community settings for a minimum of 10 hours
So far 53 leaders have been deployed into community settings.
32 have completed a minimum of 10 hours. 6 more leaders have started their hours after their Level 2 course finished in February 2014.
20 leaders retained in those community settings through linking with partners and other relevant participation programmes
03/14 4 CGro
20 leaders retained in those community settings
Workforce for Satellite Clubs is currently in the planning stage. Satellite Workforce Development meeting is planned for 01/10/13.
Satellite Workforce Development meeting completed and support was given by satellite clubs for CD to feed young leaders in to.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 52 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
Satellite Workforce Development meeting has identified a clear pathway to how we distribute funding towards coaching courses and training. Clear direction has been identified to how we can use the young leaders within the delivery of the satellite clubs. A full list of satellite clubs will be sent to CD to which young leaders can be signposted.
As Above
15 volunteers trained in a pilot as Level 1 Dance leaders
03/14 4 CD 15 Level 1 Dance Leaders
14 Dance leaders have completed their Level 1.
This is slightly lower than expected as some young people failed to turn up on the first day of the course and some dropped out after one day.
20 volunteers (aged 16+) recruited and deployed to support levels 1 and 2 of the school games
05/14 3 BHCD 20 volunteers recruited
and deployedThere are currently 146 volunteers aged 16+ who have been recruited and deployed to support levels 1 and 2 of the school games.
School games workforce audit completed in conjunction with SGO’s
03/14 1 BHCD Workforce audits
completedSecond volunteer audit completed March 2014 and figures have been reported back to DFE.
SGO’s supported to address needs identified in school games
Ongoing All BHCD Courses organised
and tutored as and when needed for the
SGO volunteer training needs have been assessed and the SGO’s have been supported to set up the relevant training courses.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 53 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
workforce audit through the provision of training SGO’s. This training will include a Community Sports
Leaders Level 2 course which will take place in 14
th-17
thApril 2014.
Deliver a successful Local Beginner Running Project to the criteria set by Sport England
Identify new and existing partners / Leaders to run beginners running groups for 9-13 weeks
03/14 4 BH
617 new, regular runners, 579 new to running43 new Running Leaders trained40 beginners running courses
Workplace Health project
In conjunction with NGBs and other relevant delivery partners develop a strategy for and manage the implementation of the Staffordshire ‘Get Active’ work based sports participation programme.
09/13 2 ID
Strategy Produced Get Active Participation Manger commenced work on 7 Oct and work will now start on the Workplace Health project
Project initiation document producedSASSOT has signed up to implement the Work Place Challenge that has been developed by the CSPN, British Heart Foundation and issupported by funding from Sport England’s Health Improvement Fund.
110 people completed WPC survey to tailor activity offer in Stafford to workplaces; mainly completed by SBC based people and Stafford College. Activities being put in place as a response. Survey also sent to Keele Uni, Staffs Uni, and SCC.
To recruit businesses to the Staffordshire ‘Get Active’ Programme.
10/13 3 &4 ID 15 Businesses Recruited
Conversations have taken place with SCC and Stafford Chambers re employer engagement
Conversations on going with Stafford Chambers
Delivery Plan April 13 1to March 14: Updated March 2014 Page 54 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
– accessing with local business network; discussions also with SBC, SCC and Stafford College.
People from 19 workplaces engaged in the web portal.
To identify, link and co –ordinate the delivery of relevant NGB Workplace Health interventions in businesses.
On-going
2,3 &4
ID
15 Businesses Recruited with links to NGBs
Conversations on going with Stafford Chambers – accessing with local business network; discussions also with SBC, SCC and Stafford College.
Activities in response to survey being put in place linked to relevant NGBs.
To support NGBs locally to develop their Workplace Health interventions.
Ongoing 2,3 &4 Engaged with Netball, Swimming, football,
hockey, badminton, Nordic walking, volleyball, golf. Support offers devised and links to NGB products.
Workplace Health project
To support NGBs in the implementation of the relevant interventions including assisting with the sourcing of resources to deliver the programmes. Explore options and make recommendations to widen and target
Ongoing 3&4 NGB delivery due to commence in 2014-15 in line with survey results.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 55 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones TimescalesWho Q3 Q4
Target Progress update01.04.13-31.03.14Date Qtr
relevant NGB interventions to other non-traditional sports markets across Staffordshire.
To develop a Marketing and Communications Plan to promote knowledge, understanding and participation in the Staffordshire ‘Get Active’ scheme
09/13 2 IDNBi Plan produced &
implementedTo be developed in Q3
Plan being developed – on-going
Delivery Plan April 13 1to March 14: Updated March 2014 Page 56 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Marketing & Communica-tions plan2013-15
Write MarComms Plan for 2013-15
Q2-3 All NBiLM Plan produced,
distributed and in operation
Plan developed
Implement internal communications plan
Q2-3
All Not progressedInternal communication responsibilities being delivered by core team Internal communications review to take place in May/June 14
Implement Marketing & Communications Steering Group meetings
Q2-3
All Next meeting October 2013
Role of group to be reviewed
Implement Mini Marketing Plans to support project delivery, M&C and delivery
Q2 All Being developed with new projects as coming online – PSSP; Sat Clubs.Discussions started – to be followed up in Q3Marketing priorities and key actions agreed with core team members
Delivery Plan April 13 1to March 14: Updated March 2014 Page 57 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Maintain a central Information hub to provide a one-stop shop to signpost organisations to key partners
Promotion of central information hub and dissemination of information via established processes such as e-Newsletters and networks.
All LM Central hub hosted on website
Information disseminated via website, sport-e newsletters, disabilit-e sport newsletters, forums and, where appropriate, social media.
Maintain and organise a comprehensive meeting and network structure
Meeting networks implemented to service all areas of sport, PE and physical activity eg. NGB Forum, , CSPANs, SLCOF etc
All Core Team
LM
Meetings held Meetings held
Production of e-newsletters
Production of SASSOT monthly sport-e newsletter
Monthly
All LM 12 editions of e-newsletter released
12 sport-e newsletters issued with a total of 706articles. Mail distribution list has reached over 3,000 recipients
Production of SASSOT Coaching e- newsletter
LB Issued monthly, reaching 910 peopleIssued monthly, reaching 926 peopleIssued monthly, reaching 990 people
Production of Disability monthly e newsletter
TB Issued monthly, reaching 767 peopleIssued monthly, reaching 798 people
Delivery Plan April 13 1to March 14: Updated March 2014 Page 58 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Production of NGB/SSP newsletter
JK
Maintain and continue to develop CSP website
Developments implemented as per Marketing & Comms plan
Monthly
All NBiLM 500,000 hits to the
website per yearOn-going 40,409 unique visitors in 2013/2014 with jobs & careers, clubs, funding, contacts & workshops being the most popular pages.Website developments agreed and budget committed. Work to be completed by August 14.
Review Google analytics and other development tools eg. Link in with CoachWeb
Ongoing
All NBi Demo-graphic data of website use
Produce Annual Report
Annual Report produced 04/12 to 03/13
1 NBi
LM
Articles from all funding partners achieved
2012-2013 ‘Working In Partnership’ Annual Report produced. Contributions received from 32 different partner agencies who highlighted specific projects they have worked in partnership with SASSOT on. Annual Report disseminated via post and electronically to partners.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 59 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Implement a partner satisfaction survey
Implement the Partnership Satisfaction Survey Analyse and communicate the results
Oct 13
3 NBi
To maintain satisfaction level from last year’s survey
Partnership satisfaction survey distributed to over 150 key partners, results will be available in December. A national NGB/CSP satisfaction survey will be completed in November.49 respondents completed the SASSOT Stakeholder Satisfaction Survey which was a 33% response rate. Results will be available in January 2014.The Partnership Satisfaction Survey 2013 reported a satisfaction level by partners of 98.1%compared to the national average of 91.7%
Delivery Plan April 13 1to March 14: Updated March 2014 Page 60 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Social media Development
Maintenance of Social Media including Facebook and Twitter (profile to page switch over)
Production of monthly schedule of posts
Continued research of ‘Best Practice’
Increase our usage of YouTube for Social Media purposes
Use of Animoto and Issuu as additional promotion methods
Ongoing
All NBi
Pilots implement-end Facebook and twitter on-going; Sport Maker FB removedAnimoto used for conference and annual report.Annual report to be put into Issuu formatUse of social media sites maintained Increased number of Twitter followers to 893. Regular posting of news items maintained.Regular posting through social media channels with over 1,000 followers on twitter
Delivery Plan April 13 1to March 14: Updated March 2014 Page 61 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
West Midlands Community Sports Awards
Implement county awards: - Community Club of
the Year- Community Coach of
the Year - Newcomer of the
Year - Community Project of
the Year
Q2-3 Q2-3 NBi
Awards event held with S&SoT nominees
Criteria defined. Date 4th
December.SASSOT awards 16
thNov.
Nominations received for new award categories, judging to take place on 17
thOctober with winners
announced on the 8th
November live on BBC Radio Stoke. Newcomer of The Year Award will close for nominations on 23
rdOctober
Local award winner announced live on BBC Radio Stoke and formal presentations made at Port Vale FC on the pitch at half time. All winners attended the West Midlands Community Sports Awards, organised and co-ordinated by West Midlands CSPs and the BBC.Agreed continuation of the West Midlands Community Sports Awards and confirmation of 2014 event date.
Ensuring that News Releases are sent as appropriate
Distribution of News Releases All NBi Min of 6 News Releases per year
Releases for: Awards, School Games, Shine a Light, Sportivate x3, Legacy, Releases for Sports Awards x 2, School Games x 3. Five radio interviews achieved.
Provide articles for inclusion in partner newsletters
On-going
All On-going releases and FB/Twitter posts shared with partners
Delivery Plan April 13 1to March 14: Updated March 2014 Page 62 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Support the School Games andSport Makers programmes re regular News updates
On-going
All
On-going releases and FB/Twitter postsSchool Games website review completed and work initiated on a new event programme Media training delivered to young volunteers and media hub co-ordinated at event. New event programme developed.Website content updated and web developments to be initiated May 14
Delivery Plan April 13 1to March 14: Updated March 2014 Page 63 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Knowledge and Data Management
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Collate relevant data to indicate the direction of travel re: agreed KPI’s
Monitor projects via data collection to evaluate delivery and provide evidence re outcomes
Quarter-ly
All NBi
MTLM
Indicator information collated
Investigating Sported. Toolkit
Trialling Sported Toolkit for Aiming High and Volunteer development programmes
Delivery Plan April 13 1to March 14: Updated March 2014 Page 64 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Knowledge and Data Management
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Monitor and evaluate the impact of appropriate programmes
Sportivate, Sports Makers, Aiming High, Community Games programmes
Quarter-ly
All NBi
CGreCMTBNBa
M&E reports produced and provided to funders and Exec
Reports returned and projects on target.Sportivate – 31 projects completed with 312 participants retained (target 391).
Reports submitted to Aiming High for Q2.Inspire clubs- 99 attendees overall (target 49)
24 new children accessing Inspire (target 14).Monthly reports are submitted to report on
Community Games and registered Games are recorded
Sportivate – 61 Blocks of activity completed with 580 participants retained (target 527).
Sportivate - 153 Blocks of activity now completed with 1526 participants retained (target 1964).
Community Games are reported monthlyCommunity Games are continued to be reported monthly
Delivery Plan April 13 1to March 14: Updated March 2014 Page 65 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Knowledge and Data Management
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Maintain ‘Relationship Managers’ for each core funding partner
Team members assigned relationship manager roles
10/11
3 MTNBiID
Mgrs / Officers allocated roles
Being reviewed Meetings held with Cannock and South Staffs
ID meeting with WLCT re Cannock in February 2014 re 2014-15 contract
Review meetings arranged and actions implemented Review value of process and organise meeting accordingly
Quarter-ly
All Team Mem-bers
Review meetings held and actions agreed
Roles and procedure to be reviewed
Support partners to access Active People & Market Active People and Market Segmentation Data
Provide a gateway to data such as Active People and Market Segmentation
Ongoing
All NBi LA Sports Profiles produced
Support offered to partners. Report sent to New Horizons (SoT).
Report compiled for ASA on Holden Lane and Trentham HS Pools
Active People Survey 7 data distributed to partners.
Produce individual key stakeholder reports for LAs
Ongoing
Q2 NBi Reports produced Distributed as part of April conference
Provide training accordingly Ongoing
NBi None requested or provided to date. Planned co-ordination of training offer in 14/15
Delivery Plan April 13 1to March 14: Updated March 2014 Page 66 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Knowledge and Data Management
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Sport England LA Toolkit
Advocacy and promotion of Sport England’s ‘In it for the long run’ Tool Kit to all sub regional network groups
Ongoing
All MTNBi Support 5 NGBs in
using tools to deliver WSPs
Targeted support with Swimming in Lichfield – to be defined and timeframe
Establish the need for future research programmes as required
Commission appropriate research subject to available funding
TBC NBi TBC None to date
Collate relevant data to indicate the direction of travel re: Agreed KPI’s
Implement national Case Study Search ToolCollate & circulate good practice i.e. Sportivate
12/13
3 NBi Cases studies live on website
To be reviewed Case studies collated locally, promotion still to be actioned.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 67 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.3 Facilities
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Hold up to date knowledge of and understand the sport, PE & physical activity facility requirements for the CSP area
Updating of the sub-regional Facilities Strategy
12/13
3 MTBH
Sub-regional Facilities Framework produced & available to partners.
KKP Consultancy commissioned.Work commencing Oct 2013
FPM run January – February 2014 booked
Delivery Plan April 13 1to March 14: Updated March 2014 Page 68 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.3 Facilities
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Asset Transfer Promote and advocate the use of the Community Sport Asset Transfer toolkit with local partners and signpost partners to expertise where required
Ongoing
MTNBa Number of community
groups supported to use the Asset Transfer toolkit
Meeting with Football club and Stoke City Council held to investigate potential Asset Transfer opportunity. Further progress likely in new Financial Year
SASSOT working with Sport England and ASA ref possibly swimming pool Asset Transfer. Transfer will not progress as the LA/School have decided to close the facility
Gymnastics Club in Stoke - transfer progressing
To be an advocate for sport on education sites
Advocate and promote Sport England’s “Win Win” toolkit to local partners.
On-going
All Increase in NGBs / sports groups accessing school sport facilities
Sub Regional Facilities Framework will identify opportunities and challenges.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 69 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.3 Facilities
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Link with Satellite Clubs action plan and Incorporate facility audit work ref priority schools, FE and HE institutions into Sub Regional Facilities Refresh ref what usage is currently available to the public / community groups etc and help to identify school sites with facilities that are suitable to host NGB and community clubs.
On-going
All CMCGroBHNBa,
Audit completed and communicated to NGBs increased usage of school / FE facilities by community clubs
Satellite Clubs plans to be submitted by the end of October. As Satellite Clubs are developed these will be incorporated in to the plan. On Target for completion.
Targets have been met in year 1 plan – 50 Satellite Clubs up and running
Satellite Clubs plans submitted on 15/04/14 for Year 2 delivery.
On target for completion
Satellite Clubs Plan has been written, submitted and signed off.
Funding is now being released to help support the delivery of the satellite clubs through funding applications. These are being signed off and approved as we receive these.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 70 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Provide a comprehensive range of support services that will assist partners, clubs and community groups to access funding and new investment
To support partners, clubs and other community groups in the development of appropriate funding applications.
Provide one to one support as appropriate and update SASSOT investment log
On-going
All GAM
Core Team
Partners supported & feedback via Satisfaction Survey
10 number of organisations supported during this period.
£1,862,759 secured with support from SASSOT
Coordinated application to Inclusive Sport Fund. Assisted and advised WLCT (awarded) and Lichfield DC (unsuccessful) plus Norton FC amongst others
Inclusive Sports Fund bid unsuccessful
Application submitted to SCC Mental and PA/Sport
To identify and promote funding opportunities (local/regional/national), including GrantFinder, to partners, clubs and other community groups to support their projects
On-going
All
Production of funding information pack
Promotion of CSAF to partners and latest rounds of Inspired/Improvement Fund.
Promotion of new disability fund and extension of Inspired Facilities
Website maintained and content in newsletter
Funding workshop delivered in Feb 2014 – 28 attended; plus 4 attendees at follow-up clinics
Delivery Plan April 13 1to March 14: Updated March 2014 Page 71 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Maintain an up to date list of local, sub-regional, regional and national funding schemes and opportunities for sports clubs on the SASSOT website and e-newsletter
On-going
GAM On-line information is accurate & up to date
Website up to date
Up to date and ongoing
To advise Sport England and other external funding organisations on the merits and local fit of applications for funding
On-going
All Core Team Response times re
feedback achievedNo action this quarter
Q4 – advice given on 4 CSAF applications back to Sport England
Delivery Plan April 13 1to March 14: Updated March 2014 Page 72 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Develop existing SASSOT Data Intelligence Funding Support Guide.
Provide one to one support to partners as required to help them evidence the need for specific projects.
Continue to develop resources and strategic documents that will that will assist partners when applying for funding i.e. facility plan
On going
All GAM
NBi
Intelligence Data Support Guide is up to date and available for partners
10 number of organisations received one to one support to help them with funding applications
No work has been undertaken on funding guide this quarter
Website maintained and workshop planned
Delivery Plan April 13 1to March 14: Updated March 2014 Page 73 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Identify and apply for additional funding that willsupport the SASSOT and its partners to deliver sport and physical activity objectives
Engage Staffordshire Public Health to influence the commissioning of Physical Activity services linked to a wider strategic plan for an integrated sport and physical activity offer.
Sept 13
2 MTBH
New investment into sport from Public Health or CCG sources
Support provided by Maria Caire, a visiting academic, to develop a comprehensive data collection template. Several engagement meetings held with PH to agree format. Work also discussed as part of facilities framework consultation with KKP.
Sally Kendrick appointed to pilot data collection process. Sally Kendrick has gathered local data for Stafford District to prepare a local supply and demand report.
Stafford and Cannock CCG engaged. Draft joint health and sport proposal developed and shared with CCG. Consultation on this taking place with Chief Officer in the New Year.
Provisionally agreed a joint health and sport proposal with Cannock and Stafford CCG. Next step to develop a steering group to move forward proposal. Waiting for CCG to coordinate this.
Delivery Plan April 13 1to March 14: Updated March 2014 Page 74 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Proactively identify and apply for funding to sustain Aiming High and CRT volunteering delivery
Dec 13
4 NBiBH Applications made to
relevant external funding pots
Currently seeking – Activation Fund; Big Lottery.Developing bid for new Sport England disability funding pot.Application to Sport England’s Inclusive Sports Fund submitted
Delivery Plan April 13 1to March 14: Updated March 2014 Page 75 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place.
4.1 CSP Governance
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Regular Executive Board meetings
Meetings held quarterly On-going
All Chair &MT
Partner satisfaction rating of good achieved for governance
Q1 meeting held 22 May 2013Q2 meeting postponed. Q3 meeting scheduled for 23 Oct 2013Q4 Meeting 29 Jan 2014
Publish minutes Minutes published On-going
All MT&LM
Minutes published on time
22 May minutes published on 11 June 2013. 23 Oct minutes published on 7 Nov 2013Papers presented to the Board have been uploaded onto website.29 Jan minutes published on 19 Feb 2014
Board Development
Implement Board Development update sessions as agreed at January 2013 meeting
On-going
Chair &MT
Programme of updates implemented
Public Health update included in Q1 meeting.Children and Young People update to be arranged for Q4 meeting.Youth Service update took place.CCG and Active Staffordshire updates arranged for May meeting
Prepare reports for Executive Board as required
Reports presented to Executive Board
Quarterly
All MT Meetings held & reports produced
Q1 meeting held 22 May 2013Q2 meeting postponed. Q3 meeting scheduled for 23 Oct 2013Q4 Meeting 29 Jan 2014
Delivery Plan April 13 1to March 14: Updated March 2014 Page 76 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place.
4.1 CSP Governance
Key Tasks Milestones Timescales Who Q3 Q4 Target Progress update01.04.13-31.03.14Date Qtr
Internal SBC CSP audit
Assimilate and deliver recommendations from audit
8/13 2 Board & MT
Recommendations implemented
Awaiting Audit report.Audit report received and signed off that based on the findings of the review Audit has assessed the internal control environment as Effective. This is the highest level of sign off.
Strategic plans are in place which address all areas of the partnership’s operations
The partnership has identified and is monitoring all relevant risks
Effective Governance arrangements are in place
Funds received by way of grants are only used for the purposes intended and comply with Sport England conditions
Only valid and bona fide creditors are paid
Income received is correct and is promptly posted to the Council’s bank account
Debtor accounts are raised promptly
Delivery Plan April 13 1to March 14: Updated March 2014 Page 77 of 77
DELIVERY PLAN 2013-2014
Increasingly Active, Healthy and Successful Communities
Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place.
4.2 CSP Operations
Key Tasks MilestonesTimescales
Who Q3 Q4 Target Progress update01.04.13-31.03.14
Date Qtr
Manage individuals and team
Work programmes agreed for core team
4/13 1 MT&Chair& PeopleCham-pion
Partner satisfaction rating for team - to achieve good
Delivery Plan with work programme areas agreed by Board at May meeting.
Progress report for Board prepared
97.7% of respondents were very or satisfied with the quality of support and advice provided by SASSOT and 97.7% of respondents were very or satisfied with the helpfulness and professionalism of the SASSOT Team
Invest in team building
Organisational and training needs & knowledge gaps analysis reviewed and updated
6/13 1 Training plan developed & implemented
Training needs identified via PDRs, budget in place. Training provided as courses identified.
Invest in personal development
Training plan and knowledge gaps implemented
6/13 1
Review structure of CSP as appropriate to emerging agenda and priorities
Team meetings held Monthly
All Team meetings held On track
Support and mentor team members
On-going
All
Team away day to review the SASSOT 20/20 Vision and carry out a balanced Score Card review to help inform future development/improvement areas took place in December.PESTEL exercise took place in February. Vision 20/20 Working Group ongoing. Meeting scheduled for 8 May rescheduled for 14 May.
1 of 5
Report to the Board – Enclosure 3
Report Title Financial Report - 1 April 2013 to 31 March 2014
Date 14 May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information relating to:
Contact Officer Name: Mark Thornewill
Tel: 01785 619896
For Information X
For Decision
1. Purpose of Report
To advise the Board Finance Champions on the financial position 1 April 2013 to 31 March 2014.
2. Recommendation(s)
Not applicable.
3. Executive Summary
The report has been produced to compare the actual financial performance for the period 1 April 2013 to 31 March 2014 against the budget. The Board Finance Champions have been consulted on the preparation of the report.
2 of 5
The budget summary is as follows:
Budget to 31 March Actual to 31 March Variance
£ £ £
Expenditure 1,484,585 (Includes contingency) 1,088,762 - 205,993Income 1,484,585 (Includes b/fwd 12/13) 1,615,303 +130,718
4. Report
The attached figures show a detailed breakdown of the financial performance against the budget from 1 April 2013 to 31 March 2014
Explanatory notes with reference to budget headings and performance are shown below.
Explanatory Notes
1. Partnership Services
Expenditure - Overall expenditure is showing an under spend on the estimated budget of £48,862 which excludes the contingency fund to cover liabilities.The one area that is over budget is subscriptions to outside bodies, as explained at the last Board meeting after agreement with the Chair, Vice Chair and the Finance Champions SASSOT became a full member of the Central Rivers Initiative in order to maximise the sporting opportunities this project offers.Employee costs are underspent due to combining duties of post holders to cover for maternity leave and the costs been apportioned to other service areas.Expenditure on upgrading IT systems has not proved as costly as originally envisaged.Professional Fees is under spent, due to the Sportshire Co-ordinators post commencing part way through the year.
Income - Grants income is higher than originally estimated due to the recent of an additional grant from Sport England to support NGB delivery.Partnership funding is higher than originally estimated due to the receipt of additional income relating to Sky Local Rides which will be utilised to extend the programme into 2014/15. And the receipt of one local partners 2014/15
3 of 5
contribution up front.NGB hosting income has reduced due to the fact that a number of NGBs have re organised their team structure and therefore no longer require permanent office accommodation but have moved to hot deskarrangements.
2. Equity
Expenditure - Employee costs are underspent by £4,040 due to the new post holder starting part way through the period.
Income - No exceptions to report.
3. Workforce Development
Expenditure - Employee costs are showing an under spend due to the post holder not commencing until part way through the quarter.Grants are currently below budgeted levels. Another grant round for coaching bursaries will therefore be implemented in the new financial year.
Income - Grants – an additional £13,000 was received from DfE to for the delivery of School Games volunteer support.
4. Sports Volunteering Project
Expenditure - Employee costs are slightly above budget due to the post holder taking on additional responsibilities to cover for maternity leave arrangements. The increase is offset by underspends within other areas of the budget.
Income - Income is some £6,058 higher than budgeted due to the carry forward being higher than originally anticipated and significant additional income from leadership courses has been generated.
5. Club Development and Community Games
Expenditure - Grants – are underspent by £11,781. A number of rounds of club accreditation grants have been introduced during the year and the funding will be carried forward to continue this grant fund in 2014/15Professional fees - are under budget by £7,817. This related to the secondary school Change For Life Clubs
4 of 5
project. This funding will be utilised in the next financial year.
Income - No exceptions to report.
6. Sportivate
Expenditure - Activity Grants are underspent due to the phased start of projects and claims being awaited. The funding will be carried forward.
Income - Grants are slightly above original budget due to the receipt of additional funding during the year.
7. Education and Training
Expenditure - Small under spends on each budget heading but no significant exceptions to report
Income - No exceptions to report
8. Coaching Development Support Network
Expenditure - No exceptions to report
Income - No exceptions to report
9. Level 3 School Games
Expenditure - Overall expenditure is under spent by £9,895 on the estimated budget. Employee costs are above budget by £1,367 as a result of the Level 3 School Games Co-ordinator having to cover additional hours as a result of the Local Organising Committee agreeing to organise a Winter Games in February, support from the Athletics network coordinator and designer of the programme.The under spend will be carried forward to support the 2014/15 Level 3 Games.
Income - No exceptions to report.
5 of 5
10. Youth Sport and Satellite Clubs
Expenditure - Employee costs are underspent by £3,729 due to the new Youth Sport Manager starting part way through the quarterand the new Satellite Clubs Officer not starting employment until the second quarter.Grants have been allocated but not yet claimed the funding will be carried forward to 2014/15
Income - Income is £51,000 above the original budget due to the receipt of an additional grant relating to CSPs role in the Primary School PE and School Sport programme
11. Athletics Network and Beginner Running Project
This budget has been re-profiled due to the receipt of an additional grant for the Athletics Network Beginner Running in 2014.
Expenditure - Underspend on employee costs relates to an amount to cover redundancy payment which has not had to be utilised.Underspends on a number of budget headings which relate to the extension of the Beginner Running project which will be carried forward to 2014/15.
Income - An additional grant of £7,590 has been awarded by England Athletics to the Athletics Network.Running Leaders training courses have also generated additional income.
12. Get Active Workforce Participation Project
Expenditure - The project started in October the actual underspend on the employees budget reflects the start date which was originally scheduled for a slightly earlier start.
Income - No exceptions to report.
Sport Across Staffordshire and Stoke-on-Trent
1st April 2013 - 31st March 2014 Budget
1. Partnership Services
Expenditure £ £ £ £
Employee costs 239,500 239,500 230,489 -9,011
Premises costs & Insurance 30,850 30,850 28,790 -2,060
Clothing & uniform 500 500 - -500
Equipment 2,000 2,000 - -2,000
Printing, stationery and postage 2,500 2,500 1,283 -1,217
Telephones 2,000 2,000 1,318 -682
Computer Services 5,000 5,000 413 -4,587
Conferences, Training, Subsistence 4,400 4,400 1,613 -2,787
Education & Training Programme 4,540 4,540 4,534 -6
Professional Fees Facility Strat & Sportshire 61,250 61,250 51,255 -9,995
Physical Activity Development Sky Rides & Running prog 66,660 66,660 53,860 -12,800
Marketing 9,000 9,000 4,200 -4,800
Subs to Outside Bodies 2,500 2,500 4,083 1,583
Young Persons Sports Awards 2,000 2,000 2,000 0
Contribution Sportivate & Get Active Sportivate & Get Active 46,360 46,360 46,360 0
Contingency Fund 189,830 189,830 - -189,830
668,890 668,890 430,198
Income
Grants 200,000 200,000 230,000 -30,000
Partnership Funding 164,405 164,405 207,671 -43,266
Other Income 9,250 9,250 3,900 5,350
Joint Financing Contributions 295,235 295,235 295,224 11
Total 668,890 668,890 736,795 -67,905
2. Equity
Expenditure £ £ £ £
Employee Costs 30,500 30,500 26,460 -4,040
Telephone 260 260 113 -147
Conferences, Training & Subsistence 500 500 138 -362
Grants
Access Across
Staffordshire/Aiming High 40,000 40,000 38,058 -1,942
Equipment 2,000 2,000 250 -1,750
Clothing 100 100 41 -59
Printing and Stationery 3,000 3,000 735 -2,265
Hosting 2,500 2,500 2,500 0
Contribution to P/Services KCME Salary contribution 8,045 8,045 8,045 0
Professional Fees 1,000 1,000 1,895 895
87,905 78,235 -9,670
Income
Government Grants 40,000 40,000 40,000 0
Joint Financing Contributions 47,905 47,905 48,098 -193
Total 87,905 87,905 88,098 -193
Budget
2013/14 Variance
VarianceDescription Work Area
Budget
01/04/13 -
31/03/14
Actual
01/04/13-
31/03/14Budget 13/14
Budget
01/04/13-
31/03/14
Actual
01/04/123-
31/03/14
-238,692Total
Description Work Area
Total 87,905
Sport Across Staffordshire and Stoke-on-Trent
1st April 2013 - 31st March 2014 Budget
3. Workforce Development
Expenditure £ £ £ £
Employee Costs Workforce Dev 12,990 12,990 10,284 -2,706
Printing and Stationery 200 200 0 -200
Telephone 70 70 106 36
Hospitality 300 300 0 -300
Professional Fees 620 620 253 -367
Promotions Sport Makers 3,250 3250 2888 -362
Grants
Coach Scholarship/Sport
Makers Scheme 9,000 9,000 5,315
-3,685
Contribution to work areas
Ed & Train and Volunteer
Project 10,750 10,750 10,750
0
Rents 500 500 0 -500
Total 37,680 37,680 29,596 -8,084
Income
Government Grants 0 0 13,000 -13,000
Joint Financing Contributions Balance B/F 37,680 37,680 37,827 -147
Total 37,680 37,680 37,827 -13,147
4. Sports Volunteering Project
Description Work Area
Budget
2013/14
Budget
01/04/13-
31/03/14
Actual
01/04/13
31/03/14 Variance
Expenditure £ £ £ £
Employee costs 26,950 26,950 28,061 1,111
Grants 4,500 4,500 5,412 912
Rents 880 880 0 -880
Telephone 150 150 53 -97
Equipment 430 430 64 -366
Professional Fees 3,500 3,500 2,552 -948
Promotions 250 250 - -250
Contingency 0
Total 36,660 36,660 36,142 -518
Income
Government Grants 4,130 4,130 4,132 -2
Joint Financing Contributions Balance b/fwd 32,530 32,530 38,632 -6,102
Total 36,660 36,660 42,764 -6,104
Budget
2013/14Description Work Area
Budget
01/04/13 -
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Sport Across Staffordshire and Stoke-on-Trent
1st April 2013 - 31st March 2014 Budget
5. Club Development and Community Games
Description Work Area
Budget
2013/14
Budget
01/04/13-
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Expenditure £ £ £ £
Employee costs Club Development 17,300 17,300 17,075 -225
Grants Club Development Grants 16,730 16,730 4,949 -11,781
Telephone 80 80 - -80
Professional Fees 8,750 8,750 933 -7,817
Total 42,860 42,860 22,957 -19,903
Income
Government Grants 12,000 12,000 12,000 0
Joint Financing Contributions Balance b/fwd 30,860 30,860 30,858 2
Total 42,860 42,860 42,858 2
6. Sportivate
Description Work Area
Budget
2013/14
Budget
01/04/13 -
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Expenditure £ £
Employee Costs 32,070 32,070 31,511 -559
Telephone 150 150 124 -26
Travel & Subsistence 50 50 252 202
Grants 231020 231,020 179,797 -51,223
Total 263,290 263,290 211,684 -51,606
Income
Government Grants Sportivate 156,420 156,420 163,349 -6,929
Joint Financing C/Fwd & Partner Services 106,870 106,870 104,871 1,999
Total 263,290 263,290 268,220 -4,930
7. Education & Training Programme
Description Work Area
Budget
2013/14
Budget
01/04/13
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs Wokshop Programme 18,526 18,526 18,412 -114
Travel Workshop Programme 50 50 - -50
Training Programme Costs Workshop Programme 13,000 13,000 13,247 247
Rents Workshop Programme 1,520 1,520 589 -931
Promotions Workshop Programme 764 764 - -764
Hospitality Workshop Programme 1000 1,000 127 -873
Total 34,860 24,256 32,375 -2,485
Income
Grants 1,730 1,730 1,730 0
Joint Financing Contributions Income 14,000 14,000 13,625 375
Joint Financing Contributions Contributions PS/WD 13,938 13,938 13,938 0
Joint Financing Contributions Balance C/Fwd 5,192 5,192 5,192 0
Total 34,860 34,860 34,485 375
Sport Across Staffordshire and Stoke-on-Trent
1st April 2013 - 31st March 2014 Budget
8. Coaching Development Support Network
Description Work Area
Budget
2013/14
Budget
01/04/13
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs 37,500 37,500 37,814 314
Telephone 150 150 115 -35
Professional Fees 1,000 1,000 600 -400
Total 38,650 38,650 38,529 -121
Income
Sport England Grant 38,270 38,270 38,270 0
Joint Financing Contributions 380 380 391 -11
Total 38,650 38,650 38,661 -11
9. Level 3 School Games Competition
Description Work Area
Budget
2013/14
Budget
01/04/13-
31/03/14
Actual
01/04/13-
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs School Games Coordinator 17,810 17,810 19,177 1,367
Premises Costs 5,000 5,000 5,842 842
Clothing and Uniform 150 150 - -150
Equipment 13,200 13,200 17,866 4,666
Printing,stationery and postage 1,000 1,000 351 -649
Telephone 80 80 105 25
Hospitality 1,750 1,750 1,312 -438
Promotions 2,150 2,150 2,095 -55
Professional Fees 5,000 5,000 5,217 217
Contribution to Partnership Services Sports Manager Input 2,110 2,110 2,110 0
Contingency 15,720 15,720 - -15,720
Total 63,970 63,970 54,075 -9,895
Income
Sport England Grant 45,000 45,000 44,927 73
Joint Financing Contributions Balance C/f & sponsorship 18,970 17,971 17,971 0
Total 63,970 62,971 62,898 73
10. Youth Sport and Satellite Clubs
Description Work Area
Budget
2013/14
Budget
01/04/13-
31/03/14
Actual
01/04/13-
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs 56,600 56,600 52,871 -3,729
Telephone 450 450 191 -259
Printing, stationery & post 600 600 190 -410
Computer Services 1300 1300 1073 -227
Clothing and Uniform 200 200 75 -125
Rents 300 300 0 -300
Hospitality 300 300 0 -300
Grants/Professional Fees 60,000 100000 55,959 -44,041
Promotions 250 250 249 -1
Total 120,000 160,000 110,608 -49,392
Income
Grants 120,000 171,030 171,025 5
Total 120,000 171,030 171,025 5
Sport Across Staffordshire and Stoke-on-Trent
1st April 2013 - 31st March 2014 Budget
11. Athletics Network and Beginner Running Project
Description Work Area
Budget
2013/14
Budget
01/04/13 -
31/03/14
Actual
01/04/13 -
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs
Athletics Network and
Running Project 25,750 25,750 21,752
-3,998
Telephone 420 420 380 -40
Travel and Subsistence 400 400 442 42
Equipment 920 920 374 -546
Rents 400 400 400 0
Professional Fees 8,890 8,890 6,601 -2,289
Promotions 2,320 2,320 417 -1,903
Grants 2,000 2,000 750 -1,250
Hospitality 200 200 12 -188
Contingency Athletics Network Delivery 8,520 8,520 - -8,520
Total 49,820 49,820 31,128 -18,692
Income
England Athletics Grant 7,590 7,590 7,590 0
Income 950 950 4,154 -3,204
Joint Financing Contributions Bal b/fwd& contri from p/s 41,280 41,280 39,928 1,352
Total 49,820 49,820 51,672 -1,852
12. Get Active Workforce Participation Project
Description Work Area
Budget
2013/14
Budget
01/04/13-
31/03/14
Actual
01/04/13-
31/03/14 Variance
Expenditure £ £ £ £
Employee Costs 36,325 36,325 16,160 -20,165
Telephone 225 225 128 -97
Printing, stationery & post 500 500 0 -500
Computer Services 650 650 185 -465
Clothing and Uniform 100 100 0 -100
Travel and Subsistence 150 150 367 217
Rents 150 150 0 -150
Hospitality 300 300 40 -260
Promotions 1,600 1,600 - -1,600
Total 40,000 40,000 16,880 -23,120
Income
Grants 40,000 40,000 40,000 0
Joint Financing 1,000 -1,000
Total 40,000 40,000 40,000 -1,000
Note:Expenditure - a minus sign indicates an underspend on budgetIncome - a minus sign indicates an increase on budget
1 of 3
Report to the Board – Enclosure 4
Report Title Sport Across Staffordshire and Stoke-on-Trent
Delivery Plan, Budget and Risk Assessment for 2014/15
Date 14 May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information relating to:
Contact Officer Name: Mark Thornewill
Tel: 01785 619896
For Information
For Decision X
1. Purpose of Report
To provide Board members with information on the Partnership’s Delivery Plan, Budget and Risk Assessment for 2014/15.
2. Recommendation(s)
That the Board approve the Delivery Plan, Budget and Risk Management Plan.
2 of 3
3. Executive Summary
The attached Delivery Plan (appendix 1), Budget (appendix 2), and Risk Register (appendix 3) have been developed following confirmation of the Sport England Core Specification, details of delivery programmes and consultation with key partners.
The Business Plan provides an overview of the strategic direction of the Partnership and reflects the context and landscape that we work in.
The Delivery Plan provides details of the work programmes of the partnership team and indicates clearly how the team will work with key partners and stakeholders to deliver the services required in order that we can support them in our joint aim of increasing participation and improving levels of satisfaction in sport, physical education and physical activity and supporting those with talent to reach their potential.
The format of the plan is based on aligning it clearly to the Sport England Core Contract:
1. National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity
2. Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions
3. Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes. To increase investment in sport, PE and physical activity within the sub-region by advocating their value
4. Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
5. Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
6. Marketing and Communications – Supporting the promotion of community sport programmes
7. Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place
8. Programme Delivery – CSPs are expected to coordinate delivery of these programmes locally to achieve maximum benefit for increasing participation and to ensure connection to NGB Whole Sport Plans. Programmes include
3 of 3
Sportivate, Satellite Clubs and Level 3 School Games.
The Delivery Plan identifies key tasks to be achieved, milestones, timescales, lead agency, partners involved, resources required and annual targets.
The Risk Management Plan (appendix 3) has been updated as part of the Delivery Plan development exercise.
4. Report
1. Delivery Plan (appendix 1) – The plan has been developed to include the contracted services that are required from Sport Across Staffordshire and Stoke-on-Trent by national partners such as Sport England, and through consultation with local core funding partners on their requirements.
2. Staff – The staff structure is in place to ensure that we have the capacity to deliver the plan. A staffing structure is shown for Board Members information in the Delivery Plan.
Job descriptions have been updated to take account of the services required to be delivered.
3. 2014/15 Budget (appendix 2) – The budget sets out the expenditure requirements to deliver the specific services and where the income will from to cover the partnerships costs associated with delivery. The Board Finance Champions have been involved with the development of the Budget and have recommended its adoption by the Board.
4. The Risk Register (appendix 3) has been reviewed as part of the Business and Delivery Plan development exercise
Delivery Plan April 14 to March 15: Updated April 2014 Page 1 of 4
Increasingly Active, Healthy and Successful Communities
Sport Across Staffordshire and Stoke-on-Trent
Delivery Plan
April 2014 – March 2015
www.sportacrossstaffordshire.co.uk
Delivery Plan April 14 to March 15: Updated April 2014 Page 2 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Contents Page
1.0 National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value
1.1 Strategic influencing and networking 5
1.2 Connecting Partners 10
1.3 National Governing Body support 13
1.4 Equality and Diversity 15
1.5 Safeguarding and Protecting Young People in Sport 19
2.0 Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.1 Children & Young People 21
2.2 Club Development 24
2.3 Workforce Development (including Volunteering and Coaching) 26
3.0 Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing and Communications 32
3.2 Research and Insight 36
3.3 Facilities 40
Delivery Plan April 14 to March 15: Updated April 2014 Page 3 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Contents Page
3.4 Funding and Investment 42
4.0 Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place
4.1 CSP Governance 44
4.2 CSP Operations 45
Consultation, Funding Partners & Contributing Consultees 46
Core Team structure 47
Glossary 48
Introduction
Sport Across Staffordshire and Stoke-on-Trent is a partnership of agencies “working together to champion participation, enjoyment and success through sport, physical education and physical activity”.
County Sports and Physical Activity Partnerships are uniquely positioned to support partners in the delivery of sustaining current participants and increasing participation in sport and physical activity.
We are funded by and deliver a range of services on behalf of national and local partners including Sport England our Local Authorities and Universities.
This Delivery Plan evidences what services the Partnership will provide to sustain current participants in sport through high quality experiences and increase regular participation in sport and physical activity.
Delivery Plan April 14 to March 15: Updated April 2014 Page 4 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Core Functions
1. National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity
2. Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions
3. Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes. To increase investment in sport, PE and physical activity within the sub-region by advocating their value
4. Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
5. Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
6. Marketing and Communications – Supporting the promotion of community sport programmes
7. Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place
8. Programme Delivery – Coordination of delivery of a range of programmes to achieve maximum benefit for increasing participation and to ensure connection to NGB Whole Sport Plans as appropriate. Examples of programmes include Sportivate, Satellite Clubs, Level 3 School Games, Volunteering support and Primary School PE and School Sport initiative.
Delivery Plan April 14 to March 15: Updated April 2014 Page 5 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
SASSOT to review individual groups as and when necessary
SASSOT to support SLCOF, SDO & Facility Managers Forums, Disability Sport Forums, Staffordshire University Sports Board, Aiming High Short Breaks, Sport Specific Development Groups, sub-regional NGB Forum, Central rivers Initiative Board, Equality Group, Marketing & Communications Group, Sportivate Leads Events and Steering Group, Safeguarding Group, Regional CSP / NGB Engagement Meetings, SGO Meetings, Regional Coaching Leads Meetings, School Games Local Organising Committee and sub-groups
On-going
All Core Team Core Team time Meetings held
Delivery Plan April 14 to March 15: Updated April 2014 Page 6 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
SASSOT to influence and act as an advocate for sport and physical activity
Maintain and further develop effective working relationships with Staffordshire and Stoke partnership networks, Leaders & CEO networks, Public Health and Clinical Commissioning Groups, Children & Young People partnerships
Proactively develop and maintain new high level strategic partnerships with external agencies such as the Police and Clinical Commissioning Groups that will assist SASSOT to drive the local participation agenda and secure new investment into sport.
On –Going
Ongoing
All Director supported by the Core Team
Director/Investment Manager
Core Team & Board Champion time
Strategic groups aware of SASSOT’s role and agenda. Sport & physical activity recognised in LA Community Plans and Health Strategies.
Support the development and coordination of a Staffordshirewide Physical Activity ‘Framework’
Work with the Staffordshire and Stoke-on-Trent public health teams to develop Physical Activity Strategies and engage with the new Health & Well-being Boards.
12/14 3 Staffordshire and Stoke–on–Trent Public Health to lead on strategy development and implementation supported by SASSOT
Director, Get Active Manager, Investment and Workforce Dev Manager and Board Champion timeSupported by KCEM
Strategy developed
Delivery Plan April 14 to March 15: Updated April 2014 Page 7 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
To ensure there are appropriate networks in place to support the delivery of sport and physical activity..
Support the sustainability of existing local network groups to support the following agendas
Increasing participation
Workplace Challenge
On-going All
Get Active Manager Officer and Board Champion time
SASSOT support and representation on the “Sportshire”Development Group
Support the continued development of the “Sportshire” Strategy and Implementation of the agreed Plan
On-going
All Staffordshire County Council/SASSOT.
Sportshire Coordinator. Director and other appropriate Officer time.
Strategy completedImplementation plan preparedand acted upon.Number of major events attracted to the sub region
Delivery Plan April 14 to March 15: Updated April 2014 Page 8 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Staffordshire and Stoke – on –Trent 2012 Legacy Charter
Support SLCOF in collating information and evaluating the impact of the Legacy Charter
On-going
All Chair Staffordshire 2012 Group
Officer & Partner time.
Impact of Charter on delivery of Sport at LA level
Delivery of relevant programmes eg. Sportivate, School Games, Satellite Clubs, Primary School Links programme, number of accredited clubs, increasing volunteering in sport, Disability Sports Clubs programme and Community Games Programme.
Programme funding
Level 3 School games held
Number of young people retained on Sportivate prog 2037
Increase in number of accredited clubs to400
Delivery Plan April 14 to March 15: Updated April 2014 Page 9 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.1 Strategic Influencing & Networking
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
58 Satellite Clubsoperational
Nos volunteering Active People %
Nos of Community Games - 15
Advocacy re “Creating a Sporting Habit for Life” strategy
Promotion and advocacy of “Creating a Sporting Habit for Life” strategy at all sub regional forums
On-going
All Core Team Officer Time Update presentations presented to relevant sub regional groups and partners
Delivery Plan April 14 to March 15: Updated April 2014 Page 10 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
To develop working relationships between partners and to ensure an effective signposting
Develop and support regional networks where appropriate and disseminate information across the sub-region. eg. Workforce, CSP/NGB regional engagement days, marketing & comms, investment, P2P, C&YP, CDM, PA, Coaching, Regional NGB Forum, CSP Directors, SGO’s
On-going
All Core Team Core Team time
To manage the advocacy and training elements within the 2013 Community Games contract
Maintain a Community Games network structure in the sub-region
On-going
1 Club Development Manager
£20,426 Officer time
Number of Community Games registered
Respond to Community Games organisers that have registered their games on the CG website and promote support available
On-going
1-4 Club Development Manager
Officer Time
Completion of monthly monitoring and evaluation
On-going
All Club Development Manager
Officer Time
Delivery Plan April 14 to March 15: Updated April 2014 Page 11 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Use SPA research and knowledge of partner plans to inform and positively influence delivery of NGB plans in the sub region.
Use SASSOT/Black Country Forum to establish NGB priorities and support requirements for 2014-15
Provide quarterly updates on NGB work being supported by SASSOT to SLCOF using NGB engagement tracker.
Complete a simple audit of local authority priority sports to inform local planning with NGB’s
Ongoing
9th
May
8TH
April
1st
July
1 Sports Manager Sports Manager time
4 NGB LA updates provided to SLCOF.
Joint Forum held and priorities document collated.
Local Authorities priorities collated
Connecting NGBs with CSP and local partners
Ensure NGBs have access to network groups and are signposted to key partners as and when appropriate
Ensure the NGB Forum continues to operate effectively. Pilot joint NGB Forum with Black Country CSP
On-going
Sports Manager Sports Manager timeSports Manager time
4 NGB Forums held including a shared forum with Black Country
Delivery Plan April 14 to March 15: Updated April 2014 Page 12 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 2 Connecting Partners
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Provide support to Keele and Staffs Universities with the transition from current HE Activation funding arrangements to new delivery arrangements funded by the Universities and/or by the latest round of Sport England HE funding.
Maintain clear understanding of opportunities within the HE environment and proactively support NGB’s to land their products at Staffordshire University and Keele University.
Develop a structured forum that will support HE/FE network to plan and share good practice
On-going
All Sports Manager/Investment Manager
Sports Manager
Sports Manager
Active Universities coordinator resource retained
A minimum of 5 NGB supported to land products with FE/HE providers
FE/HE group developed with at least 2 meetings a year
Delivery Plan April 14 to March 15: Updated April 2014 Page 13 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Develop & agree actions with NGBs that reflect the Core Offer and Enhanced Services offered by CSP
Green RAG-rating (in Sport England six-monthly report) for all NGBs where clear actions have been agreed
All team members recording agreed support and outcomes in the NGB Tracker
Attend Regional CSP / NGB Engagement Meetings or arrange one-to-one meetings with appropriate NGBs on a regular basis
Clear actions in place with the 7 NGB’s that receive the largest investment from Sport England.
09/14 & 03/15
On-going
On-going
2,4
All
All
Sports Manager Sports Manager time
20 Green RAG ratings
6 regional meetings
Action Plan developed and implemented
Provide hosting arrangements for NGBs as required
Provide hosting arrangements for NGB staff as required, reviewing annually
On-going
All Sports Manager, NGB Officers & Host
Officer time & office accommodation
9 NGB Officers Hosted
Delivery Plan April 14 to March 15: Updated April 2014 Page 14 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 3 National Governing Body Support
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Support the Staffordshire Athletics Network
Provide employment for Co-ordinator and manage budgetProvide support to Network as requireHelp to secure funding to continue the Network beyond 31.03.15. Specifically develop relationship with NHS and Groundwork.Work with Network to become independent of SASSOT and SBC arrangements and to become a constituted group with a formal organisational status.
03/14 All Sports Manager, Network Co-ordinator
Sports Manager time
Funding secured for 2015-16 –minimum £30000
SAN constituted group with organisational status
Effective roll out of NGB Activation Officer post and associated projects.
NGB Activation Officer work programme developed in consultation with local partners and NGB’s.
Participation projects developed and delivered with a minimum of 5 NGB’s including Athletics, Football andCycling
05/14
03/15
1
All
Sports Manager/Workforce Manager/Activation Officer
Officer Time
£15000
Work programme in place
5 new NGB participation projects delivered
Delivery Plan April 14 to March 15: Updated April 2014 Page 15 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 4 Equality and Diversity
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
To implement the Equality & Diversity Action Plan
Review core team training needs and organise training accordingly
Ensure continued delivery against the Equality & Diversity Action Plan
Review action required to achieve Intermediate Level of the Equality Standard for Sport
June 14
Dec 14
Mar 15
1
3
4
Knowledge, Communications & Equality Manager
Officer & Partner time
Relevant training delivered.
To support the development of targeted programmes through theACCESS Across Staffordshire fund
Support and monitor the implementation of the fivecurrent women and girls ACCESS projects
Agree implementation of any future rounds of funding
Oct 14
Mar 15
3
4
Knowledge, Communications & Equality Manager
Supported by:Partnership Director, Board Equity Champion,
Knowledge, Communications & Equality Manager
£5,000
120 participants 60 retained
Implementation of the ‘Girls Active’ Programme (Commissioned by SCC)
Seven projects delivered through the ‘Girls Active’ programme in Cannock, Burton & Tamworth
Delivery of 2 CSLA courses
Implementation of coach bursary scheme
Produce project report and case studies
July 14
May 14
July 14
July 14
2
1
2
2
Knowledge, Communications & Equality Manager
£20,000 150 Participants 60 girls retained 12 attended course 12 received bursaries
Delivery Plan April 14 to March 15: Updated April 2014 Page 16 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 4 Equality and Diversity
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Support the development of the FA Inclusion Advisory Group
Attend group meetings and support the group recruitment process
Sep 14 All
To support the development of targeted programmes:
Aiming High For Disabled Children
SASSOT to produce ‘Ability Strategy’’ along with 7 localised action plans, created and driven through local disability forums.
March 2015
All Disability Sport Officer
Knowledge, Communications & Equality Manager
Local Authority leads
Officer & Partner time.
Overarching strategy document with 7 localised plans
Maintain and update Disability Sports Directory June 14 1 Disability Sport Officer Officer & Partner time.
Directory produced & live on SASSOT website
Mapping document created, highlighting disability sport opportunities and existing support groups to target for future provision.
On-going
All Disability Sport Officer Officer & Partner time.
Document created.
Provide information and support to parents and disabled children
On-going
All Disability Sport Officer Officer & Partner time.
All identified parents and children offered information and support
Delivery Plan April 14 to March 15: Updated April 2014 Page 17 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 4 Equality and Diversity
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Maintenance of Disability Forums in each local authority area
Formalise Disability Forums and support with funding bids.
On-going
Dec 14
1
3
Disability Sport OfficerSupported by: LAs
Disability Sport Officer
Officer & Partner time.
Officer & Partner time.
Keep all forums maintained
3 additional constitutionalised forums.
Continued development of Countywide Disability Sport Forum inviting NDSOs, NGBs and disability focused charities.
On-going
All Disability Sport Officer
Supported by: LAs
Officer & Partner time.
One County Forum meeting chaired per quarter.
Work with EFDS around roll out of Inclusive Toolkit. Dec 14 3 Disability Sport Officer
Supported by: NGBs, LAs & Club Development Manager
Officer & Partner time.
Additional 10 clubs to have completed the toolkit
Delivery Plan April 14 to March 15: Updated April 2014 Page 18 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1. 4 Equality and Diversity
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Continue to develop Inspire Disability Multi Sport clubs
Produce service level agreement with partners and mange Aiming High budget.
On-going
On going
All
All
Disability Sport Officer
Supported by: SGOs, NGBs
Officer & Partner time.
Enable clubs to be sustainable
Agreements signed and budget managed successfully
Develop Disability Training Programme for coaches, staff and volunteers
09/10 2 Disability Sport Officer
Supported by:Workforce Manager
110 coaches received training
Develop links with non-sporting disability groups, organisations and services
On-going
All Disability Sport Officer
Delivery Plan April 14 to March 15: Updated April 2014 Page 19 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.5 Safeguarding & Protecting Young People in Sport
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Ensure SASSOT meets safeguarding requirements of the Sport England CSP core specification
Develop and deliver annual safeguarding action plan. 05/14 4 Workforce & Investment Manager, Board Safeguarding Champion, Core Team
Officer timeGreen RAG rating in quarterly report
Review progress against safeguarding action plan and cross reference to national safeguarding children in sport framework
03/15 4 Officer time Revised action plan in place
Delivery Plan April 14 to March 15: Updated April 2014 Page 20 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
National Governing Body of Sport Delivery – Taking clear action to support the delivery of NGB plans at local level and developing and maintaining strategic alliances and local networks for the development of sport, PE and physical activity.
Strategic Networking – Brokering relationships between NGBs and other partners with local stakeholders including Local Authorities, Further Education and Higher Education.
Increasing investment in sport, PE and physical activity within the sub-region by advocating their value.
1.5 Safeguarding & Protecting Young People in Sport
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Deliver the outcomes of SASSOT’s annual safeguarding action plan
Deliver the following priority actions:
Ensure SASSOT’s safeguarding policies and procedures reflect current best practice and are fit for purpose
Ensure all SASSOT led delivery involving young people and vulnerable groups meets the safeguarding standards outlined in our safeguarding procedures
Undertake team safeguarding TNA and address training needs identified through this process
Maintain links with LSCB’s and statutory services Ensure that safeguarding is embedded into
contracting and commissioning arrangements for delivery involving young people and vulnerable adults
Develop and maintain a safeguarding action plan
Provide partners with the opportunity to learn about safeguarding through sharing information resources and through the provision of an education and training programme
Full details of action plan outcomes can be viewed in the SASSOT Safeguarding Action Plan.
03/15 1 Workforce Development Manager, Local Authorities, NGB’s and Children and Lifelong Learning
Officer time
cost of education and training plan
Action Plan Priority actions delivered
Delivery Plan April 14 to March 15: Updated April 2014 Page 21 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes
2.1 Children & Young People
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
SportivateManage the Sportivate programme to ensure effective delivery across the sub-region
Year4 plans in place, all funding downloaded and KPIs met, with a wide range of delivers included
03/15 4 Sportivate Manager, Sports Manager, Sportivate Admin Officer, Local Leads
£190,441(Lottery)
2037 Retain
Steering Group continues to operate effectively On-going
All 2 meetings
Review processes for Year 5 and ensure Year 5planning process is completed to deadlines
01/15 4 Plan approved by SE
Delivery Plan April 14 to March 15: Updated April 2014 Page 22 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.1 Children & Young People
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
School GamesEnsure successful deliver of Level Three with effective links to Levels One and Two
Ensure the Local Organising Committee and its sub-groups operate effectively, with appropriate membership
On-going
All Youth Sport Manager /School Games Co-ordinator with support from other Core Team members as appropriate
Officer Time£45,000 (2013)
All meetings attended
Ensure Project Delivery Plan is followed to deadlines
06/14 2
Deliver a successful 2014 Level Three summer festival and 2015 Level Three winter festival support identified satellite events
02/15 2 Two festivals with 1500participants
Review 2013 Festival, processes etc. in conjunction with partners / stakeholders
09/14 2
Develop a Project Delivery Plan for 2015, incorporating review findings
12/14 3 Plan agreed by LOC
SGO Support
Effective support of SGOs, and links to NGBs where appropriate
Support the SGO Meetings through attendance, leading on agenda items linked to SASSOT work areas (i.e. Level 3, Satellite Clubs, Primary School Sport Premium etc.)
On-going
All Youth Sport Manager Officer Time 6 meetings
Collate and circulate monthly ‘NGB Newsletters for SSPs’ and ensure there is an SGO representative on the NGB Forum
Monthly All Sports Manager Officer Time 12 news-letters
Delivery Plan April 14 to March 15: Updated April 2014 Page 23 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.1 Children & Young People
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Primary Sport Offer Support primary schools to use their Primary School Sport Funding effectively
03/15 All Youth Sport Manager/ School Games Co-ordinator
£51,025 Delivery mechanism agreed andoffer to schools produced
Satellite ClubsManage the Satellite Clubs programme to ensure effective delivery across the sub-region
Submission of year 2 Satellite Club Link Makers Delivery Plan
Delivery of year 2 Satellite Club Link Makers Delivery Plan
05/14
03/15
1
All
Youth Sport Manager/Satellite Club Links Manager
£60,000 40 schools and 3 colleges targeted58 Satellite Clubs operational
Delivery Plan April 14 to March 15: Updated April 2014 Page 24 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.2 Club Development
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Update Club Support Plan
Implement review & consultation process.Update as required.Communicate updated plan to partners
09/13 2 Club Development ManagerKey funding partners
Officer time
Maintain and promote SASSOT’s club database
Maintain SASSOT’s web-based sports club database to include all Clubmark/NGB accredited/SASSOT QualityMark
On-going
All Club Development Manager
NGBs
Officer time Comprehensive database updated and promoted
Raise the profile of club accreditation
Promotion of Clubmark and SASSOT QualityMark to partners and clubs. Maintain Clubmark license and promote to NGBs that don’t award it
On-going
All Club Development ManagerBoard Champion
Officer time SASSOT Website / e-newsletter / social media highlighting club accreditation
Increase the number of accredited clubs and enhance the support network available to them
Continue to provide ‘SASSOT Sports Club Accreditation Funding Scheme’ and ensure that the Funding Scheme includes awards for coaching qualifications
On-going
All Club Development ManagerWorkforce Steering Group
Officer time10 clubs financially supported to achieve accreditation by 31/03/15
Delivery Plan April 14 to March 15: Updated April 2014 Page 25 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.2 Club Development
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Develop a planned and coordinated programme of club development training opportunities
Identify appropriate Club Development workshops to be integrated into the annual SASSOT Education and Training programme
On-going
All Club Development Manager
Education & Training Officer
NGBs
Officer time Comprehensive club and volunteer training programme implemented, promoted and communicated
Promote and support Community Amateur Sports Clubs
Raise awareness via positive promotion and advocacy of the benefits of being a Community Amateur Sports Club and signpost to expertise and develop local case studies
On-going
All Club Development Manager
Officer Time Clubs signposted to become CASC
Delivery Plan April 14 to March 15: Updated April 2014 Page 26 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners Resources Performance Measurement
Date Qtr Target Actual
Provide local strategic coordination for workforce development activity for the sports sector
Develop and maintain partnership workforce development plan, including links to Coaching, Volunteering and Education & Training
On-going 3 Workforce/ & Coaching Manager
Officer time New plan in place
Support the development and growth of the sports volunteer workforce
Use Sport Makers, DFE, and NGB Activation recruitment programmes to support workforce requirements of other SASSOT delivery programmes i.e. satellite clubs
On-going 4 Workforce & Coaching Manager, , NGB Activation & Volunteering Officer
Officer time 50 volunteers deployed onto other programmes
Maintain a volunteer development plan as part of workforce plan
On-going 1 Workforce & CoachingManager, SGO’s, NGB’s
Officer time
Contribute to the development and delivery of the cross sector Staffordshire Volunteer Strategy and ensure it reflects the needs of the sports sector
On-going 4 Workforce & Coaching Manager, Volunteer Centres
Officer time Strategy launched + SASSOT input reflected
Recognise volunteers and their work through supporting volunteer awards e.g. Unsung Hero
On-going 4 Marketing and Coms Manager/Workforce & Coaching Manager
Officer Time At least 1 volunteer award supported
Through direct provision and effective signposting provide sports volunteers with access to education and training that meets their training needs.
On-going 4 Education and Training Officer
Officer Time £20,000
100 attendees on workshops
Work with partners and local training providers to ensure workforce training
Plan and deliver a comprehensive education and training programme to meet the needs of coaches and volunteers.
Undertake annual planning and partner consultation exercise in order to prepare a
On-going 4 Education and Training Officer
Workforce Development& Coaching
Officer time
£19,000 delivery budget
40 workshops & 1000 attendee’s
Programme is set from now to
Delivery Plan April 14 to March 15: Updated April 2014 Page 27 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners Resources Performance Measurement
Date Qtr Target Actual
needs are met programme for 2014/15
Incorporate Club s Leaders, Disability Sport and Primary School Sport workshops
Introduce new pricing structure
Develop a comprehensive marketing and promotion plan for the education and training programme
Deliver a minimum of 40 workshops
Provide CPD training support to at least 1000 coaches and volunteers number of coaches
Develop new online booking and payment system
Manager 31st
March 2015
1st
April new on-line booking system – with new pricing structure
Facility available to book multiple bookings
Work with partners and local training providers to ensure workforce training needs are met
Signpost and promote NGB courses and the SASSOT Education and Training programme via SASSOT Coaching, including online bookings for the SASSOT Education and Training programme.
On-going All Workforce & Coaching Development Manager, Education and Training Officer, Sports Coach UK, NGBs
Officer time,CoachWeb licence
Links visible
Work with the FE sector to identify and exploit opportunities to access funding for sports qualifications and training, specifically supporting workforce needs associated with the Primary School Sport Premium
Dec 2014 3 Workforce and CoachingManager, Youth Sport Manager
Officer time Mtgs held with colleges 1 course organised for local school staff
Support an increase in the number of qualified coaches
Implement Coach Development Fund, ensuring a close working relationship with NGB’s to deliver on workforce priorities
3/15 4 Workforce & Coaching Development Manager, Assessment Panel
Officer time, £4,000 funding
30 people trained impacting on NGB and Sport England priorities.
Maintain signposting service to NGB Coach Ongoing All Workforce & Coaching Officer time, Maintain online
Delivery Plan April 14 to March 15: Updated April 2014 Page 28 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners Resources Performance Measurement
Date Qtr Target Actual
Education courses both online and through individual requests
Development Manager, NGB’s
Website licence, CoachWeb licence
service for 46 sports
Deliver Outcomes of the Coaching Delivery Plan
Facilitate a Community of Learning for coaches within the CSP area
Ongoing All Workforce & Coaching Development Manager, Education & Training Officer Sports Coach UK, Staffordshire University
Officer time, CoachWeb licence
Produce Monthly e-newsletter to reach 1.000 by Q2 and 1,1000 by Q4
100 coaches accessing targeted CPD needs
Deliver Outcomes of the Coaching Delivery Plan
Ensure close working relationship with identified NGB’s to meet workforce needs in relation to participation programmes
Ongoing All Workforce & Coaching Development Manager, NGB Activation & Volunteer Officer
£10,000 Coaching and Volunteer Delivery budget
80 people trained to deliver on NGB participation programmes
Maintain Data Management System for coaches
Ongoing All Workforce & Coaching Development Manager
Officer time, CoachWeb licence
1075 coaches registered by Q2 and 1125coaches registered by Q4
Identify and promote funding schemes / grants that will aid coaches in accessing CPD at reduced cost
Quarterly All Workforce & Coaching Development Manager
Officer time ‘Funding Opportunities for Coaching’ guide produced quarterly
Delivery Plan April 14 to March 15: Updated April 2014 Page 29 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners Resources Performance Measurement
Date Qtr Target Actual
Ensure that partners including clubs fully understand the support available to them by registering with their local Volunteer centre
SASSOT Volunteering and Leadership programme
Provide on-going support to volunteers trained in Year 1-3 of the programme.
On-going Workforce Development Manager & Volunteer Development Officer
Officer Time Contact maintained with previous leaders and opportunities offered.
8 Level 1 Dance Leaders trained as part of Girls Active.
August 2014
2 Workforce Development Manager & Volunteer Development Officer, Knowledge and Communications Manager.
8 Level 1 Dance Leaders
30 volunteers (aged 16+) recruited and deployed to support levels 1 and 2 of the school games
July 2015 3Officer time
30 volunteers recruited and deployed
School games workforce audit completed in conjunction with SGO’s
September 2014
2 Workforce Development Manager Volunteer Development Officer/SGO’s
Workforce Development Manager, Volunteer Development Officer r and SGO’s
Workforce audits completed
Delivery Plan April 14 to March 15: Updated April 2014 Page 30 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners Resources Performance Measurement
Date Qtr Target Actual
SGO’s supported to address needs identified in school games workforce audit through the provision of training
Ongoing All Workforce Development Manager /Volunteer Development Officer
Workforce Development Manager, Volunteer Development Officer and SGO’s
Courses organised and tutored as and when needed for the SGO’s.
Delivery Plan April 14 to March 15: Updated April 2014 Page 31 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Coaching – Supporting an appropriate, skilled coaching workforce for the delivery of NGB, Sport England and local programmes.
2.3 Workforce Development (including Volunteering and Coaching)
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Workplace Health project
In conjunction with NGBs and other relevant delivery partners develop a plan for and manage the implementation of the Staffordshire Workplace Challenge programme.
09/13 2 Get Active Manager Staff Time Plan Produced
Workplace Health project
To recruit businesses to the Staffordshire Workplace Challenge programme.
Ongoing all Get Active Manager Staff Time 15 Businesses Recruited
To identify, link and co–ordinate the delivery of relevant NGB Workplace Health interventions in businesses.
Ongoing All Get Active Manager Staff time 15 Businesses Recruited with links to NGBs
To support NGBs locally to develop their Workplace Health interventions.
Ongoing All Get Active Manager Staff time Number of NGBs engaged
To support NGBs in the implementation of the relevant interventions including assisting with the sourcing of resources to deliver the programmes.
Ongoing All Get Active Manager Staff time£1,000
Number of NGBs engaged
Workplace Health project
To develop a Marketing and Communications Plan to promote knowledge, understanding and participation in the Staffordshire ‘Get Active’ scheme
06/14 2 Get Active Manager and Knowledge and Comms Manager
Staff Time Plan produced & implemented
To utilize a variety of media outlets to promote the Workplace Challenge programme in order to raise profile and promote recruitment
Ongoing all Get Active Manager and Knowledge and Comms Manager
£1,300 Targeted coverage
Delivery Plan April 14 to March 15: Updated April 2014 Page 32 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Marketing Planning & Development
Refresh the MarComms Plan for 2014-16 Jul 14 All Knowledge, Communications & Equality Manager, Admin Officer & Board Champions
£7,000 + Officer & Board Champions’ time
Plan produced, distributed and in operation
Co-ordinate a ‘Communications’ review with partners and core team members
Jul 14 Q2
Implement recommendations of communications review
Sep 14 Q2
Website Maintenance and Development
Complete a web information architecture review with the core team
Work with the website company to develop a new website structure
Implement developments
Review Google analytics and other development tools eg. Link in with CoachWeb
July 14
July 14
Sept 14
2
2
2
Knowledge, Communications & Equality Manager
Admin Officer
Delivery Plan April 14 to March 15: Updated April 2014 Page 33 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Maintain and organise a comprehensive meeting and network structure
Meeting networks implemented to service all areas of sport, PE and physical activity eg. NGB Forum, SDO/Facility Mangers Forum, SLCOF etc
All All Core Team members
Supported by: Admin Officer
Officer Time Meetings held
Production of e-newsletters
Production of SASSOT monthly sport-e newsletter
Production of SASSOT Coaching e- newsletter
Production of Disability monthly e newsletter
Production of NGB/SSP newsletter
Monthly All Admin Officer
Workforce Manager
Disability Officer
Sports Manager
Officer Time & Partners Time
12 editions of e-newsletter released
NGB Support Publicise NGB products, programmes and media campaigns as appropriate
Ongoing All Knowledge, Communications & Equality Manager
Admin Officer
Officer Time
Produce Annual Report
Annual Report produced 04/13 to 03/14 Jun 14 1 Knowledge, Communications & Equality Manager
Admin Officer
Officer Time Articles from all funding partners achieved
Delivery Plan April 14 to March 15: Updated April 2014 Page 34 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Implement a partner satisfaction survey
Implement the Partnership Satisfaction Survey Analyse and communicate the results
Nov 14 3 Knowledge, Communications & Equality Manager
Officer time and CSPN support
To maintain satisfaction level from last year’s survey
Social Media Development
Maintenance of Social Media including Facebook and Twitter
Up skill core team members to utilise social media channels
Continued research of ‘Best Practice’
Ongoing All Knowledge, Communications & Equality Manager
Admin Officer
Supported by Team Members
Staff time 500 FB Likes 1,500 Twitter Followers
SASSOT Community Sports Awards
Implement county awards: - Community Club of the Year- Community Coach of the Year - Newcomer of the Year - Community Project of the Year
Organisation of a presentation event and relevant media
Aug-Nov 14
Nov 14
Q3
Q3
Knowledge, Communications & Equality Manager supported by Team MembersCSPN WM
Officer time Winners selected and awards event held with S&SoT nominees
Delivery Plan April 14 to March 15: Updated April 2014 Page 35 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.1 Marketing & Communications
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
West Midlands Community Sports Awards
Work with the West Midlands Marcomms Group to coordinate the WMCSA (Website / Budget)
Nov 14 Q3 Knowledge, Communications & Equality Manager
Officer Time Awards evening held
Producing MediaReleases To Advocate The Work of the CSP
Distribution of Media Releases Mar 14 All Knowledge, Communications & Equality Manager and Core Team Members
Officer Time Min of 6 News Releases per year
School Games Support
Deliver media training to young School Games volunteers
Develop event programme
Support development and maintenance of School Games website
Co-ordinate media hub at School Games event
Jun 14
Jun 14
Ongoing
Jun 14
Q2
Q2
All
Q2
Knowledge, Communications & Equality Manager and Core Team Members
Officer Time Programme produced
Website updated
Media report produced
Delivery Plan April 14 to March 15: Updated April 2014 Page 36 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Research & Insight
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Create a hub of local information and resources
Collate data to provide intelligence on the follow:
Current levels of participation Current levels of provision Local demographics Lifestyle / needs and influences
Review how the information should be categorised for easy reference / access
Create a central resource of information hosted on both the PDrive and SASSOT website
Mar 15
Sep 14
Oct 14
4
3
3
Knowledge, Communications & Equality Manager and Sport & Physical Activity Data Researcher
Officer Time Data collated and ‘Info Hub’ available
Additional analysis
Analyse data sourced to establish the following
Differs to national / population norms Identify gaps Identify opportunities Map local priorities
Ongoing AllKnowledge, Communications & Equality Manager and Sport & Physical Activity Data Researcher
Officer Time Insight recommendations established and communicated to key partners
Delivery Plan April 14 to March 15: Updated April 2014 Page 37 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Research & Insight
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Consult with partner organisations to expand current data sources
Work with Staffordshire County Council Insight team to access additional data sources
Assess any additional data sources held by non-sporting organisation that can support insight
May
Sept
1
2
Knowledge, Communications & Equality Manager and Sport & Physical Activity Data Researcher
Officer Time Additional data sourced
Localised Sport & Physical Activity Research
(Understanding of local demand and supply)
Research completed and report compiled for Stafford
Report presented to key localised partners to inform planning
Research completed and report compiled for Cannock
Report presented to key localised partners to inform planning
Agree roll out of additional localities and initiatedresearch accordingly
May 14
May /June 14
June 14
July 14
June 14
1
1
1
2
1
Sport & Physical Activity Data Researcher
Officer Time Reports produced
Delivery Plan April 14 to March 15: Updated April 2014 Page 38 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Research & Insight
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Monitor andevaluate the impact of appropriate programmes
Sportivate, Satellite Clubs, Primary School Sport Premium, Aiming High, School Games, Community Games programmes
Quarterly All All programme mangers Officer Time M&E reports produced and provided to funders and Exec
Review the role and allocation of ‘Relationship Managers’
Re allocate relationship manager roles if appropriate
Review value of process and organise meeting accordingly
May 14
Quarterly
3
All
Director/ Knowledge, Communications & Equality Manager
Team members
Officer Time
Officer Time
Mgrs / Officers allocated rolesReview meetings held and actions agreed
Collate and report Active People Survey data
Provide a gateway to the Active people data and provide year data summary
Ongoing All Knowledge, Communications & Equality Manager
Officer Time LA Sports Profiles produced
Advocacy and promote Sport England’s data tools
Maintain and develop knowledge of SE data tools
Communicate developments to partners and provide training where appropriate
Ongoing
Ongoing
All
All
Director, Knowledge, Communications & Equality Manager
Officer Time Support 5 NGBs in using tools to deliver WSPs
Delivery Plan April 14 to March 15: Updated April 2014 Page 39 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.2 Research & Insight
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Review the need for additional research to compliment headline programmes / work areas
Establish the need for additional research / monitoring as part of the Primary School Sport Premium programme
Support disability sport activity /organisation mapping exercise
May 14
Dec 14
All
3
Knowledge, Communications & Equality ManagerYouth Sport Manager
Disability Sport Officer
Officer Time TBC
Delivery Plan April 14 to March 15: Updated April 2014 Page 40 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.3 Facilities
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Hold up to date knowledge of and understand the sport, PE & physical activity facility requirements for the CSP area
Finalise and distribute as appropriate the refreshed sub-regional Facilities Strategy
06/14 1 Director, Board Champion & Communications, Knowledge Management & Equality ManagerInvestment Manager
Officer & Board member time.Funding to be confirmed.
Sub-regional Facilities Framework produced & available to partners.
Asset Transfer Promote and advocate the use of the Community Sport Asset Transfer toolkit with local partners and signpost partners to expertise where required
Ongoing Partnership DirectorClub Development Manager
Officer TimeSport England resources
Number of community groups supported to use the Asset Transfer toolkit
To be an advocate for sport on education sites
Advocate and promote Sport England’s “Win Win” toolkit to local partners.
On-going All Officer Time Increase in NGBs / sports groups accessing school sport facilities
Delivery Plan April 14 to March 15: Updated April 2014 Page 41 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.3 Facilities
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Link with Satellite Clubs action plan and Incorporate facility audit work ref priority schools, FE and HE institutions into Sub Regional Facilities Refresh ref what usage is currently available to the public / community groups etc and help to identify school sites with facilities that are suitable to host NGB and community clubs.
On-going All Youth Sport Manager Satellite Clubs link Officer, Workforce and Investment Manager, Club Development Manager
Officer Time Audit completed and communicated to NGBsincreased usage of school / FE facilities by community clubs
Delivery Plan April 14 to March 15: Updated April 2014 Page 42 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Provide a comprehensive range of support services that will assist partners, clubs and community groups to access funding and new investment
To support partners, clubs and other community groups in the development of appropriate funding applications.
Provide one to one support as appropriate and update SASSOT investment log
On-going All Workforce/Investment Manager
Core Team
SDOs & NGBs
Officer & Board Champion time
Partners supported & feedback via Satisfaction Survey
To identify and promote funding opportunities (local/regional/national), including GrantFinder, to partners, clubs and other community groups to support their projects
On-going All Officer & Board Champion time
Production of funding information pack
Maintain an up to date list of local, sub-regional, regional and national funding schemes and opportunities for sports clubs on the SASSOT website and e-newsletter
On-going Investment/Workforce Manager
Officer time On-line information is accurate & up to date
To advise Sport England and other external funding organisations on the merits and local fit of applications for funding
To proactively advocate at a strategic level the value of local projects with Sport England and other funding bodies
On-going All Core Team & Board Champions
Investment Manager
Officer & Board Champion time
Response times re feedback achieved
Delivery Plan April 14 to March 15: Updated April 2014 Page 43 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Providing Local Insight – Demonstrating high levels of understanding of the local area and applying the insight to the delivery of services and programmes to ‘grow’, ‘sustain’ and ‘excel’ in sport and physical activity and providing the intelligence to enable partners to make evidence-based decisions.
Marketing and Communications – Supporting the promotion of community sport programmes.
Facilities – Supporting NGBs to access appropriate facilities, advocating for access to educational facility sites, knowledge of asset transfer and strategic facility development needs for the sub region.
3.4 Funding and Investment
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Develop existing SASSOT Data Intelligence Funding Support Guide.
Provide one to one support to partners as required to help them evidence the need for specific projects.
Continue to develop resources and strategic documents that will that will assist partners when applying for funding i.e. facility plan
On going All Workforce/Investment Manager
Knowledge Communications & Equalities Manager
Officer time Intelligence Data Support Guide is up to date and available for partners
Identify and apply for additional funding that will support the SASSOT and its partners to deliver sport and physical activity objectives
Continue to engage with Staffordshire Public Health to influence the development of the Active Staffordshire Plan and commissioning of Physical Activity services linked to a wider strategic plan for an integrated sport and physical activity offer.
Sept 2014
2 Director/Investment Manager
Officer Time New investment into sport from Public Health or CCG sources
Proactively identify and apply for funding to sustain Aiming High delivery
Dec 2014
3 Applications made to relevant external funding pots
Delivery Plan April 14 to March 15: Updated April 2014 Page 44 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place.
4.1 CSP Governance
Key Tasks Milestones Timescales Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Regular Executive Board meetings
Meetings held quarterly On-going All Chair to lead supported by Strategy, Value & Continuous Improvement Champion &Partnership Director
Chair, Officer and Board member time
Partner satisfaction rating of good achieved for governance
Publish minutes Minutes published On-going All Director & Admin Officer Officer time Minutes published on time
Board Development
Continue to implement Board Development update sessions as agreed at January 2013 meeting
On-going Chair & Director Board member time
Programme of updates implemented
Prepare reports for Board as required
Reports presented to Executive Board Quarterly All Director Officer time Meetings held & reports produced
Future Proofing Vision 20/20 Board Working Group to consider future Governance and Delivery options and report back to Board with recommendations
Sept 14 3 Vision 20/20 Working Group Members and Director
Board and Officer time
Report with recommendations produced and presented to the Board
Internal SBC CSP audit
Assimilate and deliver recommendations from audit 03/14 4 Board & Director Board members & officer time
Recommendations implemented
Delivery Plan April 14 to March 15: Updated April 2014 Page 45 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Governance - To manage and operate the CSP to ensure sound governance arrangements and compliance with funding conditions are in place.
4.2 CSP Operations
Key Tasks MilestonesTimescales
Lead/Partners ResourcesPerformanceMeasurement
Target ActualDate Qtr
Manage individuals and team
Work programmes agreed for core team 4/14 1 Partnership Director to lead. Supported by Chair & People Champion
Core budget for staff and Board Champion time
Partner satisfaction rating for team -to achieve good
Invest in team building
Organisational and training needs & knowledge gaps analysis reviewed and updated
8/14 1 Training plan developed & implemented
Invest in personal development
Training plan and knowledge gaps implemented 8/14 1
Review structure of CSP as appropriate to emerging agenda and priorities
Team meetings held Monthly All Team meetings held
Support and mentor team members On-going All
Delivery Plan April 14 to March 15: Updated April 2014 Page 46 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Consultation
This Delivery Plan has been developed following extensive consultation with key partners. We are therefore confident that it is needs based and will make a significant contribution to achieving our target of increasing participation in sport and physical activity and developing player pathways.
Our partners and consultees are acknowledged:
Funding Partners:
Sport England Cannock Chase District Council East Staffordshire Borough Council Lichfield District Council Newcastle-under-Lyme Borough Council South Staffordshire District Council Stafford Borough Council Staffordshire County Council Staffordshire Moorlands District Council Stoke-on-Trent City Council Keele University Staffordshire University
Contributing Consultees
Board Members, Local Authorities, School Games Organisers, Sport England, Higher Education, Further Education, National Governing Bodies of Sport, Voluntary Sector, Staffordshire and Stoke-on-Trent Public Health, English Federation of Disability Sport, Sports Coach UK.
Delivery Plan April 14 to March 15: Updated April 2014 Page 47 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Sport Across Staffordshire & Stoke-on-Trent
Core Team
www.sportacrossstaffordshire.co.uk CSP
Director
Administration Officer
Knowledge, Communications &
Equalities Manager
Sports Manager
School Games Coordinator &
Club Development Manager
Education & Training Officer
SportivateManager
SportivateAdmin Officer
Disability Sport Officer
NGB Activation& Volunteer
Development Officer
Physical Activity(Get Active) Mgr
& Investment
Manager
Youth Sport Manager
SportshireCo-ordinator
Satellite ClubLinks Officer
Acting Workforce& Coaching
Development Manager
Sport & Physical Activity Research
Officer
Delivery Plan April 14 to March 15: Updated April 2014 Page 48 of 48
DELIVERY PLAN 2014-2015
Increasingly Active, Healthy and Successful Communities
Glossary
BDMC Business Development, Marketing and Communications NHS National Health Service
CC City Council PDR Performance & Development Review
CEO Chief Executive Officer PE Physical Education
CPD Continuous Professional Development PIs Performance Indicators
CSPAN Community Sport and Physical Activity Networks PM Performance Management
CSP County Sports Partnership PSA Public Service Agreement
Ed Education SASSOT Sport Across Staffordshire & Stoke-on-Trent
ID Identification scUK Sports Coach UK
KPI Key Performance Indicator from Sport England: Monitoring & Evaluation Toolkit SCP Strategic Coordination and Planning
LA Local Authority SE Sport England
LEA Local Education Authority SLCOF Staffordshire Leisure & Culture Officers Forum
Sport Across Staffordshire and Stoke-on-Trent Annual Budget 2014 – 2015
The report sets out the Partnership’s proposed budget for the period 1st April 2014 to 31st March 2015.
The report provides information on the budgets necessary to support the Partnership’s core services and implementation of the Delivery Plan. Explanatory notes are attached to the report.
In order to provide a comprehensive overview of the budget the report highlights income and expenditure across our core work areas:
1. Partnership Services 2. Equity 3. Research and Insight 4. NGB Activation and Sports Volunteering Project 5. Club Development and Community Games 6. Sportivate 7. Education and Training Programme 8. Coaching Development Support Network 9. Youth Sport and Satellite Clubs 10. Level 3 School Games Competition 11. Athletics Network and Beginner Running Project 12. Get Active Workforce Participation Project
Budget Summary
2014/15 £
Total expenditure 1,607,244
Total income 1,607,244
2013/14 £
Total expenditure
1,416,205
Total income 1,416,205
The reason for the increase in the budget compared to last year is as follows:
1. Funding to support the delivery of the Primary School PE and Sport programme 2. Increased delivery grants for the Satellite Club Links programme 3. Implementation of the NGB Activation project 4. Partner contributions for the delivery of the Sky Local Rides programme
Sport England Income Diversification and Administration Spend Targets
Sport England and the CSPN has written to each CSP setting out targets relating to CSP income diversification and the amount which should be spent on administration.
Income Diversification
At present Sport England’s investment represents an average of 70% of CSPs income nationally (SASSOTs current figure is 72%). Sport England would like to see the average reliance reduced to around 50-60% by March 2017. Sport England are not expecting all CSPs to reach the 50-60% mark by March 2017, they feel that this would be unrealistic and they wish to agree individual targets with each CSP based on where they currently are and where they can realistically reach by March 2017. CSPs will be expected to agree individual diversification targets at the quarter 2 review in September 2014. It is therefore proposed that the Director and two Board Finance Champions meet to agree our target to be presented to Sport England taking into account the findings of the Vision 20/20 Working Group which is due to report back to the Board in July.
Administration Spend
The overall aim of the administration targets is to drive efficiencies which will be
retained locally by individual CSPs and redirected to frontline delivery driving weekly
participation in sport.
The measure will be administration costs (as defined below) as a percentage of the total CSP expenditure. The baseline will be 2013-14 out-turn figures.
CSPs will be given time to work towards their individual target by March 2017
(the end of the current core funding settlement), and at the end of 2014-15, and
2015-16 they will be expected to have demonstrated progress towards their 2017
target.
The measure and the delivery of the individual CSP target should be owned by the individual CSP's Board.
CSPs which are already operating within the target range will not be required to set
a lower target, but are nevertheless encouraged to review their administration costs
from time to time to ensure as much funding as possible is directed to frontline
delivery.
March 2017 administration t a r g e t
hosted CSP should be no more than 5-6% of total CSP expenditure
independent CSP should be no more than 7-8%.
Research undertaken by the CSPN shows that current spend on administration varies greatly across the network. For hosted CSPs administration costs range from 2.6% of total expenditure to 12.6% with an average of 6.1%. For independent CSPs costs are higher and range from 5.4% to 16% with an average of 9.4%. SASSOTs figure is 5.6% which is within the target range.
Definitions of CSP Administration Costs
What to include as Administration Costs What to include as Delivery Costs
Admin and finance staff
• Salaries
• On-Costs (National Insurance, Pension,
Travel/Subsistence and Training costs etc)
Finance & Admin Costs
• Audit
• Accountancy and Financial Services
• Stationery and Photocopying
Office Costs
• Rent and or lease services
• Office telephony costs
Governance Costs (including Board expenses)
HR Costs
ICT Infrastructure and systems
legal services
Insurance
Management and delivery staff (including
Directors and Marcoms- their salaries, National
Insurance, Pension, Travel and Subsistence,
Training, staff phone costs)
Marketing expenditure (Website, PR and
publicity)
Programme Expenditure including grants, Venue Hire, Costs of events, Casual staff/coaches, Volunteer expenses and administration directly attributable and required for the delivery of a specific project or service.
Administration or finance services provided as a
service to a third party as opposed to an
organisational overhead.
Page 4 of 16
A detailed breakdown of the individual budgets is shown below.
1. Partnership Services
Description Work AreaBudget 2014/15
Expenditure £
Employee costs Core Team 250,000
Premises costs Hosting, Hospitality and rent of rooms
30,000
Clothing & uniform 500
Equipment 2,000
Printing, stationery and postage 2,500
Telephones 2,000
Computer Services 3,000
Conferences, Training, Subsistence 4,000
Education & Training Programme Contribution to Ed and Train 4,310
Physical Activity Development -Sky Rides and Mountain Bike CyclingContribution
34,000
Contribution to Young Persons Sports Awards
2,000
Contribution to Equity Budget Access Across Staffordshire 6,374
Marketing 12,000
Subs to CSP Network & CRI 4,500
Insurances 1,000
Facility Strategy Development & Sportshire projects
60,000
Contingency Fund Includes Employee Liabilities 239,023
Total657,207
Income
Grants Sport England 262,000
Partnership Funding Local Partners 90,000
Other Income NGB Hosting 6,000
Joint Financing Contribution School Games contribution to Sports Manager
500
Joint Financing Contribution Balance b/fwd 300,607
Total 657,207
Page 5 of 16
2. Equity
Description Work Area Budget2014/15
Expenditure £
Employee Costs 30,500
Telephone 260
Grants
Access Across Staffordshire Grants/Aiming High MultiSports Clubs 31,200
Printing and Stationery 3,000
Total 64,960
Income
Grants Aiming High 43,000
Joint Financing Contributions Bal c/fwd 7,936
Joint Financing Contribution from Youth Sport 7,650
Joint FinancingContribution from Partnership Services 6,374
Total 64,960
3. Research and Insight
Description Work Area Budget 2014/15
Expenditure £
Employee Costs 15,839
Telephone 150
Contingency 743
Total 16,732
Income
Joint Financing Contributions Balance b/fwd from workforce 16,732
Total 16,732
Page 6 of 16
4. NGB Activation and Volunteer Coordinator
Description Work Area Budget2014/15
ExpenditureNGB Activation and Volunteer
support £
Employee Costs 31,167
Telephone 150
Grants
NGB delivery £12,500, Vol Grant commitments £2,500, £2500 School Games Vol Grants 17,500
Professional Fees 7,500
Rents 500
Travel and Subsistence 90
Printing and Stationery 200
Promotions 2500
Hospitality 500
Subscriptions Volunteer Web System 2828
Total 62,935
Income
Grants
Sport England additional grant £30,000 plus volunteering £22,935 plus DFE volunteering £10,000 62,935
Total 62,935
5. Club Development and Community Games
Description Work Area Budget2013/14
Expenditure £
Employee Costs Club Development Manager 17,620
Grants
Club Development commitments £2,500 14/15 Grants £5,500 8,000
Contribution to Ed and Training 3,377
Contribution to CDM 4,904
Total 33,901
Income
Grants Youth Sport 14,000
Joint Financing Contributions Balance b/fwd 19,901
Total 33,901
Page 7 of 16
6. Sportivate
Description Work Area Budget2014/15
Expenditure £
Employee CostsSportivate Manager and Admin Officer 28,360
Telephone 150
Grants
District Delivery (inc £57,046 commitments) and Capacity Grants to District Leads 218,876
Travel & Subsistence 100
Total 247,486
Income
Grants Sportivate Grant 190,440
Joint Financing Contribution Balance b/fwd 57,046
Total 247,486
7. Education & Training Programme
Description Work Area Budget2013/14
Expenditure £
Employee Costs Education and Training Officer 18,360
Training Workshop Programme delivery 13,000
Rents Workshop Programme 500
Hospitality Workshop Programme 200
Promotions Workshop Programme 250
Total 32,310
Income
Government Grants Contribution from CDM Grant 2,000
Joint Financing Contributions Income from workshop programme 13,889
Joint Financing Contributions
Contribution from Partnership Services £4,310, Volunteer Budget £6,623 b/fwd and Club Dev £3,377 b/fwd 14,310
Joint Financing Contributions Balance b/fwd 2,111
Total 32,310
Page 8 of 16
8. Coaching Development Support Network
Description Work Area Budget2013/14
Expenditure £
Employee Costs Coaching Dev Manager 38,150
Telephone CDSN 150
Professional FeesCoach CPD and Bursaries inc £4,500 commitments 9,236
Total 47,536
Income
Grants Sport England Grant 38,000
Joint Financing Contributions Balance b/fwd 132
Joint Financing ContributionsContribution from Volunteer Budget 4,904
Joint Financing ContributionsContribution from Workforce Dev Budget b/fwd 4,500
Total 47,536
9. Youth Sport and Satellite Clubs
Description Work Area Budget2013/14
Expenditure £
Employee Costs Youth Sport and Satellite Club 70,860
Telephone 300
Printing, stationery and postage 400
Professional Fees 57,244
Virement to Club Development Primary School Club Links Dev 14,000
Virement to Equity
Support Disability Satellite Clubs and Primary School PE/sport 7,650
Travel and Subsistence 100
Rents Room Hire for events 500
Hospitality Events 300
Promotions 1,000
GrantsSatellite Club Grants inc commitments 150,000
Total 302,354
Income
302,354
Grants Satellite Clubs 189,000
Grants Primary School PE and Sport 51,025
Joint Financing Bal/bfwd 60,416
Joint Financing Contribution from School Games to Youth Sport Manager 1,913
Total
Page 9 of 16
10. Level 3 School Games Competition
Description Work AreaBudget2013/14
Expenditure £
Employee costs School Games Co-ordinator 18,690
Premises costs Rent of facilities 6,379
Clothing & uniform 1060
Equipment 7,942
Printing, stationery and postage 750
Telephones 100
Hospitality 3,062
Professional Fees 8,152
Promotions 520
Use of Hired Vehicles 470
Contribution to Partnership Servicesand Youth Sport
Sports Manager and Youth Sport Manager Input
2,413
Contingency 4,284
Total53,822
Income
Grants Sport England 45,000
Joint Financing Contributions Balance b/fwd 8,822
Total 53,822
Page 10 of 16
11. Athletics Network and Beginner Running Project
Description Work Area Budget2013/14
Expenditure £
Employee CostsAthletics Network & Running Project 21,770
Printing and Stationery 200
Telephone 420
Travel & Subsistence 350
Equipment 1,500
Rents Satellite Clubs, Sports Hall Athletics, Athlefit 1,500
Professional Fees Run Leaders Training, Network Workshops. 2,000
General Volunteer expenses 300
Grants Leaders and Coaching Grants 4,000
Promotions 340
Hospitality Leaders Event 50
Hosting 1,870
Contingency 3,701
Total38,001
Income
Grants England Athletics 9,150
Joint Financing Contributions Bal c/fwd 20,551
IncomeCourses, Sportivate, NGB Activation 8,300
Total 38,001
Page 11 of 16
12. Get Active Workforce Participation Project and Provision of Service Level Agreement for Marketing and Communications to Energize Shropshire Telford and Wrekin
Description Work Area Budget2014/15
Expenditure £
Employee CostsGet Active Participation Manager 36,000
Telephone 225
Printing, stationery and postage 500
Computer Services 650
Travel and Subsistence 150
Rents Room Hire for events 150
Hospitality Events 300
Promotions 1700
Total 40,000
Income
40,000
Joint Financing Balance B/fwd 24,120
Joint FinancingContribution from Energize STW CSP 15,880
Total
Page 12 of 16
Explanatory Notes
1. Partnership Services
Expenditure
Employees includes:
i. CSP core team employees (The Club Development Manager, Youth Sport Manager, Satellite Club Officer, Get Active Participation Manager, Education and Training Officer, Sportivate Administrator, Coaching Development Manager, School Games Co-ordinator, Athletics Network Officer, Disability Sports Officer and Volunteer Co-ordinator’s salary costs are shown within the appropriate Budgets as a separate cost centre).
ii. Salary increments as appropriate at 01/04/14 iii. National Insurance and Superannuation contribution increases. iv. Allowances for transport expenses.
Premises Costs (Hosting)
i. Contribution to host agency for office accommodation and central support services such as HR, payroll, finance, IT and legal services
Education & Training Programme
Contribution to the Education and Training Programme.
Physical Activity Development
Contribution and partner funding into the Sky Ride Local Cycling project and extension to the Mountain Bike Trail at Birches Valley to enable hosting of the National Mountain Bike Cross Country Championships in 2014.
Staffordshire Young Peoples Sports Awards
Contribution to the project
Equity
Contribution to ACCESS Across Staffordshire Grants and Disability Sport
Subscriptions to CSP National Network and Central Rivers Initiative
Under a national agreement each of the 49 CSP’s contribute to the National CSP Infrastructure. Continued membership of the CRI to support the development of sport and recreation in the initiative area.
Facility Strategy and Sportshire Development
Commitment payments for the Sub Regional Sports Facilities Strategy and contribution to the Sportshire project coordinator post.
Page 13 of 16
Contingency Fund
As agreed by the Board and local core funding partners a contingency fund has been established with the aim of being able to cover for unforeseen expenditure and such items as employee liabilities should the Partnership be dissolved or require less staff to operate. The budget amounts provide that we have sufficient level of reserves to cover for our employee redundancy liabilities and other potential unforeseen expenditure.
Income
£
Grants 262,000 Sport England Core Specification £262,000.
Partnership Funding
90,000 11 Sub-Regional Partners’ contributions. Tamworth has confirmed that they are unable to continue with the £8,000 contribution to the Partnership. Proposals are discussed in a further report.
Otherincome
6,000 £6000 NGB hosting.
Joint financing contributions
300,607 Carry Forward from 2013/14 (Includes current Contingency Fund plus unspent and uncommitted expenditure). Contribution from School Games budget to Sports Manager work in this area
2. Equity
Expenditure
Employee Costs – Disability Sports Development Officer Grants – £4,000 ACCESS Across Staffordshire grants and £27,200 Aiming High Multi Sport
Club programme Printing and Stationery Professional Fees – Relate to the implementation of the Aiming High project
Income
Grants - £40,000 - Aiming High Multi Sports Clubs Joint Financing Contributions – Balance carried forward from 2012/13
3. Research and Insight
Expenditure
Employee Costs – Sport and Physical Activity Research Officer post to enable the
Partnership to provide for the additional Knowledge Management and Insight role detailed in the Sport England Core Specification
Income
Joint Financing Contributions – Balance carried forward from 2013/14
Page 14 of 16
4. NGB Activation and Volunteer Coordinator
Expenditure
Employee costs - Relating to the employment of the NGB Activation and Volunteer Co-ordinator Officer as specified in our additional funding application to Sport England ref NGB support and as detailed in our volunteer programme with Sport England. Grants – Support for NGB delivery locally. DFE Volunteering Grants to support School Games Subscriptions – Maintenance of our Volunteer Web IT system.
Income
Grants – £30,000 additional Sport England Grant for NGB Activation work. £22,935
Volunteering Grant and £10,000 DfE Volunteering.
5. Club Development, Community Games
Expenditure
Employee costs – Relating to the employment of the Club Development Manager Grants – Grant fund to support club accreditation.
Income
Grants – £14,000 from Youth Sport to support Club Development in Primary Schools Joint financing – £19,901 Balance b/fwd
6. Sportivate
Expenditure
Employee Costs - Relating to the employment of the Sportivate Manager Sportivate Administration Officer’s posts Grants – Delivery project grant
Income
Grants – £190,440 Sport England grant to support delivery and capacity Joint financing – £57,046 Balance b/fwd
7. Education and Training
Expenditure
Employee Costs – Relating to the employment of the Education and Training Officers post. Training – Delivery of the workshop programme Rents – Hire of venues for delivery of programme Hospitality – Provision of refreshments on Education and Training Programme Promotions – Delivery of the training programme
Page 15 of 16
Income
Grant – £2,000 contribution from the Coaching Development Manager budget towards the
training programme for coaches. Joint financing contribution – £13,889 Income from participants, £4,310 contribution from
Partnership Services, £4,750 £10,000 balance b/fwd.
8. Coaching Development Support Network
Expenditure
Employee Costs – Relating to the employment of the Coaching Development Manager. Professional Fees – Relating to coaching CPD and coach Bursary
Income
Grant – £38,000 Sport England Coaching Development Grant Joint Financing Contributions – £4,904 from Volunteer Budget, £4,500 from Workforce Dev Budget., £132 balance/bfwd.
9. Youth Sport and Satellite Clubs
Expenditure
Relates to the employment of the Youth Sports Manger and Satellite Clubs Link Officer and other costs related to the implementation of the Satellite Clubs and Primary School PE and Sport programme.
Income
Grants – £189,000 Sport England Satellite Clubs capacity and delivery grants. £51,025
Primary School PE and Sport programme. Joint Financing - £60,416 balance b/fwd including delivery grant commitments.
10. Level 3 School Games Competition
Expenditure
Employee Costs – Relating to the employment of the Level 3 School Games Co-ordinator Premises Costs – Hire of facilities for the Level 3 School Games Festival Clothing and Uniforms – Volunteers clothing Equipment – Provision of equipment for running the events Hospitality – Volunteers and event refreshments Professional Fees – Event operational fees and volunteer training
Income
Grants – £45,000Sport England Grant Joint Financing Contributions – £8,822 balance b/fwd from 2013/14
Page 16 of 16
11. Athletics Network and Beginner Running Project
Expenditure
Employee Costs – Relating to the employment of the Athletics Network Co-ordinator Rents – Hire of rooms for training events Equipment and Professional Fees – Project costs associated with the Beginner Running
Project Promotions – Promotion of Beginner Running Project Contingency – holding Budget for 2015/16 Athletics Network Project Delivery
Income
Grants - £9,150 England Athletics Grant to the Network Joint Financing Contributions – £20,551 Balance b/fwd from 2013/14 Income – £8,300 Fees from Beginner Running Project and contributions from Sportivate and
NGB Activation for delivery of running projects.
12. Get Active Workforce Participation Project
Expenditure
Budget relates to the employment of the Get Active Workplace Participation project Manager and delivery of the programme with employers. Plus delivery of Marketing and Communications SLA to Energize Shropshire Telford and Wrekin CSP
Income
Joint Financing – £24,120 balance b/fwd and £15,880 contribution from Energize STW CSP for Marketing and Communications SLA to March 2015
April 2014 1
RISK REGISTER AND RISK MANAGEMENT PLAN 2014/15
Strategic
1. National changes reducing the role of CSP’s2. Not recruiting, engaging and retaining the right level of Board members 3. Over ambitious remit and/or lack of focus resulting low impact/inability to demonstrate impact to
partners. 4. Lack of partner engagement or commitment 5. Lack of political commitment
Compliance
6. Non compliance with governance procedures 7. Non compliance with Sport England and other funding agencies’ reporting requirements
Financial
8. Partnership Funding not sustained leading to the risk of staff redundancies 9. Inability to raise new funding 10. Poor financial accounting
Operational
11. Not recruiting the right calibre of staff or maintaining their motivation 12. Non identification and engagement of those NGBs who wish to focus on Staffordshire 13. High staff turnover 14. Unclear roles and responsibilities with partner agencies 15. Withdrawal of host agency.
RISK CONTROL The risk map model
Imp
act
10 ‘Oh
no!’
9
8
7
6 ‘Oh
dear!’5
4
3
2 ‘Oh
well!’1
1 2 3 4 5 6 7 8 9 10
Not likely Less than evens
More than evens
Almost certain
Probability
Critical 60+ High 30-59
Medium 16-29
Low 1-15
April 2014 2
Strategic
1 National changes affecting the role of CSPs
Risk Controls Evaluation Action Resource and Time Risk Owner
1
Probability 7Impact 8
(Score = 56)
Ok Not ok
Evidence of track record of delivery across the ‘sport and the wider agenda that increasing
participation can impact on. Value to partners and
influence at regional level
SASSOT involved in high level consultation with Sport England and other CSP’s;
Supporting strategic partners with the development and implementation of high level
strategic plans such as “Sportshire”
Providing evidence of the CSP’s impact on the Sports participation and contribution to the wider local agenda including economic
prosperity, health improvement, community safety and development.
Partner satisfaction survey Annual Impact Statements
prepared for partners
Establishment of Vision 20/20 Board Working Group
Staff & Board Time Director
Delivery of Sport
England Core Specification, achievement of
targets and monitoring report for SE
Development of a clear,
attributable and costed Delivery Plan.
Implementation of new NGB and
partner engagement tracker. Employment of core team with
necessary skills and expertise to
deliver. Regular monitoring process in
place with 1/4ly reporting of
progress to Board and 6 monthly to Sport England
Annual Partner satisfaction survey
carried out and acted upon
Budget secured and
apportioned.Core team employedDelivery Plan Developed and
approved by BoardSatisfaction survey completed.
Director
Delivery and sustainability of
People, Places, Play programmes such as Sportivate,
Satellite ClubsDelivery of Coaching
Development and support Primary School PE and
Sport programme. Monitoring report to Board and SE.
Employment of core team members with necessary skills
and experience to delivery and manage programmes to required parameters.
Development of costed and attributable Delivery Plan.
Continue to develop positive
working relationships with delivery partners
Implement and monitor workforce
development and coaching plans. Regular monitoring process in
place with 1/4ly reporting of
progress to Board and 6 monthly to Sport England
Core team members with clear responsibility for delivering the
programme outputs and outcomes.Local Partner Relationship
Manager initiative continued.Workforce Training and Development plan to support
DirectorSports
ManagerWorkforce Development
ManagerMarketing and
Communications ManagerYouth Sport
Manager
April 2014 3
2 Not recruiting, engaging and retaining the right level of Board members
Risk Controls Evaluation Action Resource and Time Risk Owner
2
Probability 4Impact 8
(Score = 32)
Ok Not ok
Recruitment process
Ensure speedy recruitment by agreed process
Partnership DirectorOngoing
ChairDirector
Board membership Ensure wide-ranging representation from key partners who impact the sport, PE and
school sport and health agenda. Ensuring board membership represents local community.
Chair & Partnership DirectorOngoing
ChairDirector
Attendance at Board meetings
Ensure Board’s influence on strategic delivery of sport, school
sport and physical activity both regionally and sub-regionally and ensure strategies are embedded.
Monitoring of attendance at Board
Meetings
Chair & Partnership Director by Ongoing
ChairDirector
Engage Board in
Strategic Delivery
Review and further develop
Board Champions/Critical friendroles with clear Terms of Reference and scope.
Refresh Board member Skills Audit
Board Champions to be consulted
on relevant programmes and progress reports.
Vision 20/20 Board Working
Group to review Governance arrangements and report to Board on future options and delivery
developments
Chair & Partnership Director
Vision 20/20 Working Group MembersOngoing
Chair
Director
3 Over ambitious remit and/or lack of focus resulting low impact
Risk Controls Evaluation Action Resource and Time Risk Owner
3
Probability 4Impact 8
(Score = 32)
Ok Not ok
Business planning process
Development of a clear, attributable and costed
annual Delivery, Budget and Risk register with wide-ranging consultation.
1/4ly performance monitoring reports to Board and 6
monthly to Sport England
Board & Core Team via quarterly and annual reportsOngoing
Director
Leadership and
Management of Core Team
Development of Delivery Plan,
Training & Development Programmes and Risk Register
providing direction to team and individual work programmes
Board Members identified as
“Critical Friends” to support team members in key work areas
Partnership Director
Team meetings – monthly PDR’s – 6 monthlyCPD implemented as per T & D
plan
Director
April 2014 4
4 Lack of partner engagement or commitment
Risk Controls Evaluation Action Resource and Time Risk Owner
4
Probability 4Impact 9
(Score = 36)
Ok Not ok
Partner Engagement
Engage with countywide strategies
and networks and maintain relationships with a broad cross-sector of agencies.
Support partners with the delivery of strategic plans and programmes
that impact on the sport and wider agenda such as economic prosperity and health
Communication through new and
established channels (meetings, newsletter and web) and ongoing
review of Marketing & Communications Strategy.
Sustain local partner funding into
the CSP for delivery of Core Offer Services. Prepare new Core
Services offer for partners.
Continue to develop the Local
Partner Relationship Manager initiative.
Improve Impact Statement
presentation and communication to partners
Board Members, Director, Sports Manager, Workforce and
Investment Manager, Youth Sport Manager, Knowledge Communications and Equalities
Manager, Youth Sport Manager& Sportshire coordinatorOngoing
Vision 20/20 Working Group to review Core Offer to local partners and Impact Statements
Web Site to be further developed.
Director
Core Offer Service Level Agreements
with partners to be developed
Prepare new Core Services offer for local funding partners.
Memorandum of Understanding with host to be reviewed annually
Partnership Director, Core Team and Vision 20/20 Working
GroupOngoing
Director
Partnership Events Events to be planned and
delivered to agreed schedule.
Core Team and Vision 20/20
Working GroupOngoing
Director
Annual satisfaction survey of partners
Annual partner satisfaction survey to be undertaken and analysed with improvements agreed and
incorporated into future delivery plans.
Knowledge, Communications and Equalities Manager Annually June
Director
5 Lack of political commitment
Risk Controls Evaluation Action Resource and Time Risk Owner
5
Probability 5Impact 9
(Score = 45)
Ok Not ok
Officer - member interface
Member representation on Board ensuring delivery.
Staffordshire CEO’s represented on Board
Influence through SLCOF supporting partners to achieve aims with SASSOT adding value
Include in communication audience
Ensure that SASSOT is an active supporter/ partner of implementing
Staffordshire and Stoke – on –Trent strategic plans relating to sport, health, youth, crime
reduction, volunteering and economic prosperity
Chair, Partnership Director & Ongoing
ChairDirector
April 2014 5
Organise appropriate
Partnership events and support local partners organise
major events e gLevel 3 School Games Sports
Festival.
SE “Creating a Sporting Habit for Life” and “In It For The Long Run” Tool Kit advocated and promoted to local partners
Influential appointments on Board
Events to include cross cutting themes
Members to attend events
Regular updates to Members on programme delivery
Support the LOC in the delivery of
a successful Level 3 School Games
Chair, Partnership Director & Core Team
Ongoing
ChairDirector
Advocacy for
sport,PE and physical activity participation
agenda to be included in local partners wider
agenda strategies
Partnership’s work to be recognised in supporting Local Authorities
Involvement in Sub Regional
Networks re Health Improvement, Economic Prosperity, Community Safety and Community
Development Ensure strong links with
Staffordshire Leisure and Cultural
Officers Forum. Continue to develop two way
intelligence exchange with Sport
England
Partnership Director
Ongoing
Director
Compliance
6 Non compliance with governance procedures
Risk Controls Evaluation Action Resource and Time Risk Owner
6
Probability 2Impact 8
(Score = 16)
Ok Not ok
Procedures,
including Stafford Borough Councils where appropriate,
in place and adhered to
Processes to comply with
government procedures implemented inline with Delivery Plan – finance, H&S, data
protection, CRB, grant aid forms and conditions.
Hosting Agreement with SBC in
place and reviewed annually.
Partnership Director
Ongoing
Director
Constitution to set out purpose and
governance operations
Board to keep Constitution under review
Chair & Partnership DirectorConstitution reviewed annually
ChairDirector
7 Non compliance with Sport England & other funding agency reporting requirements
Risk Controls Evaluation Action Resource and Time Risk Owner
7
Probability 2Impact 8
(Score = 16)
Ok Not ok
Submission of reports
Confirm information requirements Partners to provide information
Partnership Core Team to collate, undertake analysis and report findings for Delivery Plan.
Quarterly performance reporting framework to Board and Sport England in place
Partnership DirectorOngoing
Director
April 2014 6
Financial
8 Funding not sustained and the risk of staff redundancies
Risk Controls Evaluation Action Resource and Time Risk Owner
8
Probability 6Impact 10
(Score = 60)
Ok Not ok
Benefit of CSP
proven to partners via delivery of action plan
Production of Core Services Offer
for local partners that show the benefit and VFM, add value and support delivery of services
against action plans Annual satisfaction survey and
meetings between Director and
Core Partners Continue to develop the local
partner Relationship Manager
initiative Improve presentation and
communication of annual Impact
Statements for local funding partners
Production of Annual Report
highlighting the achievements of the Partnership.
Partnership Director
Knowledge, Communications and Equalities Manager, Vision 20/20 Working Group.
To March 2014
Director
Production of
Partnership Core Offer and Service Level Agreements
establishing length and level of funding arrangements
Establish partner buy in via
development of a Core Services Offer above.
Partnership Director
To March 2013
Director
Develop and sustain a contingency fund to
cover employee liabilities
Increase the contingency fund to £200,000 to cover the Partnership’s liabilities.
Partnership Director and Board Finance Champions.Financial year 2014/15
Director
Annual satisfaction
survey of partners
Annual partner satisfaction survey
to be undertaken and analysed with improvements agreed and incorporated into future delivery
plans.
Knowledge, Communications
and Equalities ManagerAnnually
Director
April 2014 7
9 Inability to raise new funding
Risk Controls Evaluation Action Resource and Time Risk Owner
9
Probability 7Impact 8(Score = 56)
Ok Not ok
Director to meet
regularly with local core funding partners to review
delivery and needs
Identify future markets and role of
CSP Development of annual core offer
for local partners
Partnership Director and
Executive Board ChampionsOngoing
Director
Design and
implement funding strategy to engage wider partnership
contributions
Identify additional funding
partners via broad range of value propositions. See core offerabove
Partnership Director and Board
Vision 20/20 Working Group + ChampionsOngoing
Chair
Director
Expand programmes
Improve communication of the CSP offer to other Partners eg.
clubs & volunteers
Partnership Director supported by core team
Director
10 Poor financial accounting
Risk Controls Evaluation Action Resource and Time Risk Owner
10
Probability 2Impact 10(Score = 20)
Ok Not ok
Stafford Borough
Council (Host Agency) procedures in place
and adhered to
Maintain existing accounting processes
for effectiveness and efficiency.Implement appropriate recommendations from audits
Partnership Director, Sports
Manager, SBC Finance & Board Finance ChampionsOngoing
Director
Sports Manager
Financial reports Updated report to be presented to each meeting of the Board
Partnership Director & Board Finance Champions
Ongoing
Director
Operational
11 Not recruiting and retaining the right calibre of staff or maintaining their motivation
Risk Controls Evaluation Action Resource and Time Risk Owner
11
Probability 5Impact 9(Score = 54)
Ok Not ok
Recruitment & restructuring
process
Ensure rigorous and robust recruitment processes are in
place. Well specified job descriptions and person specifications with appropriate
Terms and conditions to attract the correct calibre of applicant
Partnership DirectorOngoing
Director
Managing staff Ensure team and individuals have
appropriate work programmes and development plans via delivery plans and Personal
Development Reviews
Partnership Director, Chair and
Host
Director
Sports Manager
Investing in core and extended team
staff
Training and development programmes
Implementation of CPD programme via regional & national CSP network
Partnership Director & Workforce Development
Manager
Director
April 2014 8
12 Non identification and engagement of those NGBs who wish to focus on Staffordshire
Risk Controls Evaluation Action Resource and Time Risk Owner
12
Probability 2Impact 9(Score = 18)
Ok Not ok
Gain full understanding of NGB requirements
and of those NGBs who are going to focus on
Staffordshire
Continue regional and sub-regional discussions with NGBs via regional and the new joint sub-regional
forum with Black Country CSP.
Continue to utilise the new
SASSOT NGB Tracker
Communicate NGB requirements
to SASSOT team and partners via local networks
Support delivery via the
employment of an NGB Activation Officer.
Director, Sports Manager, Core Team and appropriate NGB officers
Director
Invite NGBs who wish to focus on Staffordshire to present at local network meetings. Audit LA NGB
priorities. Development of Action Plans with Sports Manager, NGB Activation Officer and appropriate
partners
Sports Manager, NGB Activation Officer. Knowledge and Communications Manager
Sports Manager
Agree actions to support individual NGB’ to support their delivery in Staffs
Sports Manager Sports Manager
13 High staff turnover
Risk Controls Evaluation Action Resource and Time Risk Owner
13
Probability 7Impact 8(Score = 56)
Ok Not ok
Succession
planning
To develop the Partnership core
and extended team staff and partnership network for promotional opportunities through
the implementation of a CPD programme
Partnership Director, Board
Champions and Workforce Development ManagerOngoing
Chair
Director
Cross reference: not recruiting the right calibre of staff or maintaining their motivation (Risk 11)
14 Unclear roles and responsibilities with partner agencies
Risk Controls Evaluation Action Resource and Time Risk Owner
14
Probability 4Impact 8(Score = 32)
Ok Not ok
Annual Core Services Offer for
local partnership funding developed.
Appropriate Core Services Offer developed and Impact Statements
produced to show evidence and demonstrate VFM to partners
Partnership DirectorOngoing
Director
Annual Delivery Plan
Plan consulted upon and implemented
Partnership Director and Core Team
Director
Partner satisfaction
surveys
Annual partner satisfaction survey
to be undertaken and analysed with improvements agreed and incorporated into future delivery
plans.
Knowledge, Communications
and Equalities ManagerAnnually
Director
Terms of Reference for the
networks sub-groups
Terms of reference agreed, in place and acted upon.
Sub-group leadsOngoing
Director
Future
Responsibility of CSP’s
Contracts agreed with Sport
England and local funding partners.
Board & Partnership Director Chair
Director
Cross reference: funding partners, including Sport England, withdrawal (see Risk 8)
April 2014 9
15 Withdrawal of host agency
Risk Controls Evaluation Action Resource and Time Risk Owner
15
Probability 1Impact 10(Score = 10)
Ok Not ok
Hosting arrangements
reviewed annually via hosting agreement. SASSOT
contribution to hosting costs
Incorporated into Delivery Plan Review hosing MOU with SBC
Head of Leisure and Culture annually.
Chair, Partnership Director and Host Agency
ChairDirector
Service Level Agreement with Host
In place Partnership Director and Host Director & Host
Host represented on
Board
In place Partnership Director and Host Director &
Host
Overall Score = 539
Reviewed by the Partnership Director April 2014 Date of Next Review: April 2015
1 of 11
Report to the Executive Board – Enclosure 6
Report Title SASSOT Partner Satisfaction Survey 2013
Date 14th May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information
relating to:
Contact Officer Name: Naomi Bird
Tel: (01785) 619585
For Information X
For Decision
1. Purpose of Report
To inform the board of the key results from the Partner Satisfaction Survey 2013 and the national benchmarking.
2. Recommendation(s)
- To agree any key recommendations based on the results presented.
- To incorporate the partner priority data collected within the 2014/15 Delivery Plan.
- To review the promotion / use of SASSOT communication tools.
3. Executive Summary
Using‘SurveyMonkey’SSSOThasdistributedapartnersatisfactionsurveyandcollated52responses.The report outlines the key results and comments collated.
2 of 11
4. Report
Introduction:For the last six years SASSOT has implemented a partner satisfaction survey. The last survey was conducted in November 2012. This year saw SASSOT continue to be part of the national benchmarking process co-ordinated by the County Sports Partnership Network (CSPN). Adopting the national survey means that information is collected in a consistent way, with a core set of questions which individual CSPs can supplement with their own additional questions. The national survey has been implemented by all 49 CSPs allowing for local conclusion to be drawn as well as national benchmarking of performance and satisfaction.
The survey set out core questions to provide consistency, key areas covered included:-
Overall levels of satisfaction Contact with the CSP – levels of satisfaction Understanding and knowledge of the CSP Key services provided by the CSP – levels of satisfaction Key services provided by the CSP – levels of importance Communication tools - levels of satisfaction Organisational (respondents) priorities for the next 12 months What has worked particularly well
Who answered the survey?
A total of 49 CSP’stookpart in the survey. SASSOT’ssurveyresponseratewas40.8% compared to a national average response rate of 41.3% (however, only 33 CSPs returned response rate data)
The number of invites sent to partners to complete the survey significantly varied between CSPs. The largest number or recipients for a CSP was 950 whilst the lowest number of recipients was 34 (SASSOT number of recipients =120). The average number of recipients nationally was 162.
The highest percentage of responses rate in the SASSOT survey came from Local Authorities (36.7%) followed by NGBs (26.5%) and Higher/Future Education (10.2%). This was reflective of the national picture.
The Results: Thesurveywasimplementedusing‘SurveyMonkey’whichhasproduced an analysis of the results. This report highlights headline results as well as comparisons to 2012 data and national results.
1. Partnership Working
97.5% of partners were either very satisfied or satisfied with SASSOT compared to the national average of 95.5% (SASSOT 2012 Result: 98.1%)
80% of partners rated their level of understand of the role of the CSP as either good or very good compared to the national result of 84.7% (SASSOT 2012 Result: 91.7%)
3 of 11
93.3% of respondents were very satisfied or satisfied with SASSOT adding value to the services that they provide compared to the national average of 93.6% (SASSOT 2012 Result: 95%)
91.2% % of respondents were very satisfied or satisfied with SASSOT providing a lead role for sport and physical activity compared to the national result of 93.8% (SASSOT 2012 Result: 96.7%)
91.1% ofrespondentswereverysatisfiedorsatisfiedwithSSSOT’sunderstandingofneedcompared to the national average of 96.1% (SASSOT 2012 Result: 100%)
2. Our People
97.7% of respondents were very satisfied or satisfied with the quality of support and advice given by SASSOT compared to the national average of 96.8% (SASSOT 2012 Result: 100%)
97.8% of respondents were very satisfied or satisfied with the helpfulness and professionalism of staff compared to the national result of 97.9% (SASSOT 2012 Result: 100%)
95.6% of respondents were very satisfied or satisfied with the speed of response to telephone and email enquiries compared to the national result of 96.9% (SASSOT 2012 Result: 100%)
4 of 11
Satisfied / Very Satisfied
SASSOT Results
Satisfied / Very
Satisfied
National Results
Key Service
100% 96.2 Supporting local partnerships with governing bodies
97.6% 95.6 Coordinating and promoting coach development opportunities
97.6% 95 Co-ordinating and promoting volunteer develop and deployment opportunities (e.g Sport Makers)
97.6% 96.8 Promoting local funding sources and providing advice and support, (including Sport England Lottery Funding opportunities
95.2% 96.6 Providing child protection guidance and support
100% 94 Undertaking research and providing information (eg mapping, Active People, market segmentation)
97.6% 95.1 Marketing and promotion of sport and physical activity (eg website, e-newsletter)
97.6% 95.7 Brokering relationships and providing support for local/county networks (eg CSNs)
100% 95.8 Enabling partners to share information and knowledge (meetings, workshops, electronically)
100%97.6 Co-ordination of the Sportivate programme
97.6% 96.1 Promoting and supporting the local delivery of the community games e.g. provision of training, promotional material, additional grant aid
97.6% No Data Providing support and information for specific disability sport programmes
95.2% 96.4 Providing equality and diversity advice
85.7% No Data Developing links between sport and physical activity with health partners
97.6% No Data Providing wider support for clubs & volunteers (eg Clubmark)
97.6% 94.3 Supporting SGOs to deliver Level 2 of the School Games, helping to find and deploy volunteers
100 93.1 Organising county, youth or Level 3 school games activities
100% Providing wider support for school sport
97.9% 94 Advocate for sport on school sites
3. Service Support Respondents were asked their level of satisfaction against each of the core services they have received from SASSOT. The results are detailed in the table below:
5 of 11
4. Service Support Continued
Respondents were asked how important core services are in terms of assisting them with their aims. Areas are listed below in order of priority (Those that state eitherVeryImportant’or‘Important’):
%2013
%2012
Rank Core Service
100% 100% 1 Promoting local funding sources and providing advice and support, (including Sport England Lottery Funding opportunities
88.3% 97.9% 6 Coordinating and promoting coach development opportunities
90.9% 97.9% 5 Developing links between sport and physical activity with health partners
91.2% 95.8% 4 Providing wider support for clubs & volunteers (eg Clubmark)
91.2% 93.6% 4 Supporting local partnerships with governing bodies
94.1% 93.6% 3 Co-ordination of the Sportivate programme
85.3% 91.5% 8 Co-ordinating and promoting volunteer develop and deployment opportunities (e.g Sport Makers)
94.1% 91.4% 3 Providing support and information for specific disability sport programmes (eg Playground to Podium, Aiming High)
97% 89.3% 2 Enabling partners to share information and knowledge (meetings, workshops, electronically)
87.9% 87.2% 7 Undertaking research and providing information (eg mapping, Active People, market segmentation)
91.2% 87% 4 Brokering relationships and providing support for local/county networks (eg CSNs)
94.1% 84.8% 3 Marketing and promotion of sport and physical activity (eg website, e-newsletter)
79.4% 83% 9 Providing child protection guidance and support
61.8% 76.6% 12 Promoting and supporting the local delivery of the community games e.g. provision of training, promotional material, additional grant aid
79.4% 76.1% 9 Providing equality and diversity advice
82.3% 74.5% 8 Providing wider support for school sport
73.5% 73.9% 10 Co-ordination of a club support programme (e.g. Clubmark)
73.5% 72.3% 10 Advocate for sport on school sites
64.7% 66% 11 Organising county, youth or Level 3 school games activities
64.7% 65.3% 11 Supporting SGOs to deliver Level 2 of the School Games, helping to find and deploy volunteers
6 of 11
5. Communication
Satisfaction levels were collated against each of the key communication tools use by SASSOT, the results are detailed below:
The satisfaction levels detailed below of refer to those survey respondents that have accessed SASSOT communication tools.
- Website: 100%
- Email: 100%
- E-Newsletter: 100%
- Social Media: 100%
- Telephone: 100%
- Meeting Forums: 100%
The following percentage of respondents were unaware of SASSOT communication tools:
- Website: 2.6% Unaware
- E-Newsletter: 7.7% Unaware
- Social Media: 38.5% Unaware
- Meeting Forums: 5.1%Unaware
6. Partner Priorities
Respondents were asked to list their top 5 key priorities for the next 12 months to allow SASSOT to check and challenge priorities. A summary of these priorities have been provided to team members to be incorporated into the 2014/15 delivery plan (Appendix One)
7. Engagement of Under-represented groups
Respondents were asked if their organisation / group was currently working with / supporting young people / adults from Black and Minority Ethnic (BME) Groups. 64.7% stated that they were and the remaining 35.3% stating that they were not or did not wish to disclose.
Respondents were also asked if their organisation / group was currently working with / supporting disabled young people / adults. 85.3% stated that they were with the remaining 14.7% stating that they were not.
7 of 11
8. General Comments – Strengths
Respondents were asked what they felt works particularly well at SASSOT. Comments received are listed below:
Always keen to develop opportunities. Focus on the needs of children and young people with disabilities. Very profession in delivery. Always keen to develop and improve. Good working relationships across the County. Work well with partners across the County to ensure good joint delivery.
CSP do good work. Feel the links with Health & Funding could be better. I think the work with disability sport is very good.
I have found the information available and the connection with the staff to be good.
We work closely with the CSP and share an office space and so this helps maintain an understanding of what is going go both Nationally and across the County
Proactive relationship, healthy regard for assisting in local delivery of national objectives based around agreed outcomes
They always delivery on any question asked and promote all services and access to these services well. They work really well as a team and are always eager to help.
Whilst I think the quality of service and support is really good, would like to see more NGB engagement and impact to delivering their priorities
There is a really high quality coaching system that is in place, engaging local partners
Good knowledge of staff and ability to deliver and support delivery of key projects.
I value the work of the CSP and recognise the professionalism and expertise of its staff.
Think generally they do a good job however because we don't have a sports development team we don't make full use of SASSOT
I have been delighted with how SASSOT has taken such a meaningful role in Central Rivers Initiative's recreation work, providing support from officers and administrative help for our joint work.
SASSOT are a 'can-do' organisation, really politically aware and very supportive
Fantastic knowledge based on which to draw upon
8 of 11
The CSP acts as a key link for us, staff always helpful and they provide us with assistance when we require it. They encourage collaborative working and offer leadership where appropriate.
General Comments - Improvements
Respondents were asked to provide comments or suggestions on how SASSOT as a whole or a specific service could improve. Comments received are listed below:
I feel that it would be of benefit if a clear annual SLA was established setting out in a more specific manner the services and contributions which we should expect to see from the CSP in exchange for its investment and providing greater clarity with respect to the CSPs expectations of us.
Officers sometimes forget that there are capacity issues within local authorities and some of the timescales / deadlines are too short. It would be good to discuss timescales prior to making requests for information as there is often a clash in priorities.
Co-ordinate all CSP meetings with neighbouring regions - especially the WM to avoid the long list of meeting dates. Offer some grouped sports meetings - water sports, health etc and have a place on the web where it is easy to access boundary information & maps that can be printed/downloaded
FE representation on the CSP board.
Funding to employ sports development officer/s
Additional funding is always positive for us, being a not for profit group. Links with NGB's, school and sporting celebrities are always welcomed.
9 of 11
Organisation Top 5 Priorities
Stoke-on-Trent City Council
1. Ensuring that a suitable model is developed to preserve services. 2. Completing the refresh of the sports strategy. 3. Continuing to lever in funding and external resources to support services. 4. Continue to improve participation levels in the city. 5. Sustaining and enhancing existing partnerships plus developing new areas of partnership work.Children and adults are supported to have a BMI within a healthy range and engage in regular physical activity (Stafford and Surrounds Health and Wellbeing Strategy 2013-15)
RFU
1. Recruitment and retention of 16-24 players. 2. Volunteer recruitment and training. 3. Club Governance - Club Accreditation award 4 Facility improvements including social space - RWC2015 5 Community links/working with educational establishments
Stafford Borough Councilbudget reduction management and partnership working benchmarking and good practice exploration and review of alternative delivery vehicles for leisure and culture obesity and participation improvement
South Staffordshire Council Funding Investment into facilities. Achieving budget. Increase physical activity. Disability Sport Young People
Staffordshire University
Facilities Development Increasing opportunities for students to involved in sport Having Staffordshire University better placed in the Staffordshire sporting environment Increase our disability sport offering Improve our coaching for the university teams
British Rowing
Indoor rowing - school games inclusion at level 3 - development of adult indoor rowing as an activity leading to water access -could be work place etc. education and training for coaches and volunteers promotion of Explore Rowing - recreational, adult focused scheme increasing the number of disabled people accessing rowing - indoor and water if possible
Newcastle-under-Lyme College Increase participation Membership of FE rep on board Coach education Volunteering and leading ExcellenceBadminton England Schools Offer CBN network Colleges Offer Universities Satellite Clubs
Keele universityCoach development Funding sourcing Facilitating opportunities to share knowledge Provision of child protraction Providing wider support for clubs and volunteers
sports coach UK
Ensuring NGB national priorities are delivered locally Understanding local workforce requirements - to deliver NGB interventions and priorities Ensuring an appropriately skilled workforce is in place to deliver Sport England programmes Effective use of data management and intelligence local partners have quality, effective and safe systems to deploy and develop their workforce
APPENDIX ONE
10 of 11
Badminton England
Role of Smash Up to schools (funding through Sportivate). Support to set up and create investable CBN's. Sign up of leisurecentres to the Playbadminton programme. Promotion of Centre Parcs National Schools competition and delivery of level 2 and 3 events
South Staffs CouncilSourcing funding for facilities and sport projects, developing sport participation, training staff to become good coaches, health issues, inclusion of non-activity people
Sporting Communities
- Provide community sport to decrease ASB - Increasing links with schools - Increase the number of qualified staff volunteers through NGB, First Aid and Safeguarding training - Increase Healthy Lifestyle opportunities for young people and communities - Increase the awareness of Sporting Communities to communities and partners1. Increase the number of sport opportunities for 16-19 years. 2. Develop Coach Education system. 3. Develop Volunteer Academy.Developing and implementing Sportshire Strategy Building Staffs reputation as an excellent sporting venue Attracting additional Sport England funding
WLCT
1. Deliver and Integrate Chase It Young Persons Activity programme (5-13yrs). 5. Five Focus Sports (Cricket, Swimming, Football, Netball, Golf. 3. Access external funding. 4. Provide support for those individuals with access issues (Low income/Disabled). 2. Develop schemes/activities that have the potential to generate income/reduce costs
Staffs FA
1. Promoting local funding sources and providing advice and support, (including Sport England Lottery Funding opportunities, Sportivate, Community Games). 2. Supporting local partners to connect with Governing Bodies of Sport. 3. Undertaking analysis and providing information (e.g. Partner priorities and plans, mapping, Active People, market segmentation) 4.Supporting local partners to connect with Governing Bodies of Sport 5.Brokering relationships and providing support for local/county networks (e.g. CSNs)School Games Sports Leadership Club links
Newcastle-under-Lyme Borough Council Funding school sport - linked to child hood obesity school club links competition Coach education
Supporting sports club/organisations Increase participation rates of residentsCity of Stoke-on-Trent Sixth form College
Women in Sport Greater opportunities for students to participate Satellite clubs Funding Team 19/ Just play football sessions
11 of 11
Delivering the Chase It! Activity programme Delivering the Sportivate programme Accessing external funding opportunities Working with our focus sports Increasing the number of volunteers in the district
Tamworth SSPSchool Games Club Links Change 4 Life Clubs Primary Sport Premium Leadership and Coaches opportunities for young peopleDevelop links with Health Funding Opportunities Sportivate Disability Sport Connect with NGB's
1 of 3
Report to the Executive Board – Enclosure 7
Report Title Sportivate – Year Three Results and Summary of Year Four Plan
Date 14 May 2014
Open Agenda item X
Private and Confidential Agenda item
By virtue of containing confidential information relating to:
Contact Officer Name: Claire Greenwood
Tel: 01785 619258
For Information X
For Decision
1. Purpose of Report
To inform the Executive Board of the successful results for Year Three of Sportivate.To inform the Executive Board of the Sportivate Delivery Plan for Year Four
2. Recommendation(s)
For information only.
3. Executive Summary
Sportivate Year Three key performance indicators (KPIs) were submitted to Sport England on Friday 22nd April 2014 showing that projects across Staffordshire & Stoke-on-Trent had exceeded the targets set by Sport England, for retaining participants in the Sportivate activities. Over the course of the year 3,994 young people had been engaged in Sportivate projects (a rise of 862 from Year 2), and 3,686 of those young people had been retained (i.e. attending all or all-but-one of
2 of 3
the 6-8 activity sessions), a rise of 803 from year 2. These figures exceed the target set by 1,964 young people, and equates to a retention rate of 92%.
SASSOT has also submitted to Sport England and subsequently received approval for the Year Four plan for delivery of Sportivate activity between April 2014 and March 2015. A summary of the Year Four plan is attached.
4. Report
Sportivate is part of ‘Places People Play’, the 2012 mass participation legacy programme which is lottery-funded and being delivered by Sport England. A nation-wide initiative, Sportivate targets 11-25 year olds who are non or semi-sporty and offers them the chance to take part in 6-8 weeks of sporting activity, introducing them to a new sport or giving them the chance to improve their skills in something they’ve previously tried and enjoyed.
Nationally, £56 million is being invested in this programme nationally over four years via County Sports Partnerships who are managing the programme within each sub-region. Over the duration of the programme, Sport Across Staffordshire and Stoke-on-Trent will receive £625,680 of Lottery Funding, with a target of 5865 young people completing a block of sessions (measured as those attending all sessions or only missing one) and then at least 40% of these participants continuing to take part in sport afterwards.
Sport Across Staffordshire and Stoke-on-Trent is responsible for submitting an annual Sub-Regional Sportivate Plan to Sport England and is accountable for the funding and monitoring and evaluation. However, to ensure that the decision-making process takes into account the views of Partners, a Sportivate Steering Group makes policy recommendations related to the programme within the sub-region.
In June 2013 SASSOT advertised a further opportunity to apply for Sportivate funding, which was underspend from year 2 along with an additional £32,000 Sport England funding for the programme. This was very well received and we enticed new partners and NGBs to apply.
So, in total with the additional funding in Year Three, over 140 different projects and 360 blocks of activity took place across Staffordshire and Stoke-on-Trent. 3,686 young people were ‘retained’ (attended all or all-but-one of the activity sessions), exceeding the target of 1,964 which Sport England set for the sub-region. This equates to a retention rate of 92% of those who attended at least one session.
For Year Four, as previously, the programme will be co-ordinated at a local level by a Lead Organisation for each District, who is responsible for ensuring that what is offered locally is what young people want, and for engaging with other local organisations to deliver activity. There is also a sub-regional pot which has been top-sliced from the Delivery Funding and which is for organisations such as National Governing Bodies who will be delivering activity in three or more Districts.
3 of 3
25% of the Year Three budget has been allocated to Capacity, with SASSOT keeping some funding to employ a Sportivate Administrator and SportivateManager post. The remainder of the Capacity Funding is to be paid to each Local Lead Organisation, split based on each area’s share of the 11-24 population (taken from the 20011 mid-year census, the same data used by Sport England to determine each CSP’s share of the funding).
You will notice that we have allocated far more than our budget of £142,831.36 for the year. £10,030 is being allocated from a separate Sport England Sportivate Innovation pot, and over £25,000 of underspend from year 3 has been identified.We were absolutely inundated with applications for year 4 which has enabled us to allocate underspend straight away.
Delivery of Year Four is now underway. The year 4 plan includes over 130 different projects and over 400 blocks of activity.