Name & AddressCapital
InvestmentApplied For Section Page No. Remarks
Resubmission
1
Premier Buildcon "Elite Silverio", Gat No. 114(P) + 124 + 125 + 126 + 127(P) At Village - Chikhali, Tal - Haveli, Dist - Pune 57.52 Crs. Establish RO(HQ) 1 to 16
2Rikki Ronie Developers, CTS No. 6A/16, Jankalyan Nagar, Near Bill Bong School, Malvani, Malad(W)
274.85 Crs. Establish RO(HQ) 17 to 41
3SM Eberspaecher Exhaust Pvt. Ltd., 310, B, Nanekarwadi, Tal- Khed, Dist - Pune 36.0 Crs Establish JD(APC) 42 - 66
4Rajuri Steel Pvt. Ltd., F-12, Addl. MIDC Phase-II, Jalna
55.65 CrsEstablish
(Expansion)JD(APC) 67 - 90
5MSM Steels Pvt. Ltd., A-116, Addl. MIDC Latur
24.55 Crs Operate JD(APC) 91 - 109
6Aditya Shagun Developers "Comfort Zone", S. No. 14, Balewadi, Pune 86.38 Crs. Renewal RO(HQ) 110 - 127
Fresh Agenda
1
Mauli Sai Developers Pvt. Ltd., Ambewadi CHS for S. No. 407, 407/1 to 3, 408, 409, 410, 411, 412, 413, 414, 414/1, 415, 415/1 to 9, 423, 423/1 to 5, 424, 425, 426(pt), 427, 428, 429, 430, 434, 435, 436, 436(t to 3), 441(pt) of village Kurara, Tal - Borivali, Malad (E), Mumbai
58 Crs. Establish RO(HQ) 128 - 150
2Saurabh Vastu Nirman Pvt. Ltd., Survey No. 37(P), Wadachiwadi, Tal - Haveli, Dist- Pune
72 Crs. Establish RO(HQ) 151 - 162
3Kumar Company "Residential Project", S. No. 97 Borhatewadi, Village - Moshi, Tal - Haveli, Dist - Pune
57 Crs. Establish RO(HQ) 163 - 174
4
Kashimira Ceramic Product LLP, CTS No. 1142 to 1146, 1491 to 1511, 1586, 1589 to 1600, 1629, 1630, 1646 to 1652, 1792, 1829, 1882, 1723 to 1726, 1793, 1831 to 1836, 1878 to 1881, 1953 of village Mire, Tal & Dist - Thane
128.98 Crs. Establish RO(HQ) 175 - 193
5
Kallappanna Awade Co-operative Industrial Estate and Integrated Textile Park Ltd., Gat No. 153 to 155 to 176, Hatkanagale, Gat No. 1044 to 1055, Tardal and Gat No. 357, 358 Majale, Tal - Hatkanagale, Dist - Kolhapur
107.10 Crs. Establish RO(HQ) 194 - 207
6
K Raheja Corporation Services Pvt. Ltd., Raheja Tower, C-30, Block "G", Bandra Kurla Complex, Bandra (E), Mumbai
30 Crs.Establish
(Expansion)RO(HQ) 208 - 222
7
Pushpak Ifracon Pvt. Ltd., B-3,4, MIDC Lonand, Tal- Khandala, Dist - Satara 49.0 Crs 1st Operate JD(APC) 223 - 242
8
R Mall Developer (Runwal Developer) Pvt. Ltd., CTS No. 166, 166/1 to 23, R City Mall, LB Marg, Ghatkopar (W), Mumbai
91.32 Crs.1st Operate
(Part)RO(HQ) 243 - 268
List of Cases to be submitted before 23rd Consent Committee Meeting (Part-II) of 2014 scheduled on 11.03.2014 at 3:00 p.m.
9SIM Reality "Swaraj", Gat No. 212 New 1331 Old Gat No. 209 New (P) 1327 Old, Moshi, Tal - Haveli, Dist - Pune
54.72 Crs.1st Operate
(Part)RO(HQ) 269 - 277
10
Hiranandani Construction Pvt. Ltd., Maitri Park, Chembur, CTS No. 1790 to 1811, 1813 & 1815 of cillage Chembur, CTS No. 131, 133 to 140 of vilage Wadhwali, Mumbai
68.05 Crs.1st Operate
(Part)RO(HQ) 278 - 306
11Tekson Ltd., Kolshet Road, Kapurbawadi, PO No.20, Thane
25.3 Crs Renewal JD(APC) 307 - 323
12Tata Motors Ltd., Sr. No. 59-62, Po-Bedeohol, Dist - Pune
50.62 Crs Renewal JD(APC) 324 - 346
13Electronica Tough Carb Ltd., E-1, MIDC Malegaon Sinnar, Dist - Nashik
29.65 Crs Renewal JD(APC) 347 - 360
14Gabriel India Ltd., B-2, MIDC ambad, Nashik
42.77 CrsRenewal
(Amalgamation)JD(APC) 361 - 370
15Sulzer Pumps India Ltd., Plot No. 9, TTC Indl. Area, MIDC Airoli Node, Thane Belapur, Digha, Navi Mumbai
72.35 Crs Renewal JD(APC) 371 - 384
16Dhoot Transmission Pvt. Ltd., Farola, Paithan Road, Aurangabad
31.74 Crs Renewal JD(APC) 385 - 396
17Bellota Agrisolutions and Tools Pvt. Ltd., 267/4, STICE Musalgaon, Sinnar, Nashik 43.60 Crs Renewal JD(APC) 397 - 414
18Balmer Lawrie Van Leer Ltd., Plot No. D-195/2, MIDC TTC Indl. Area, Turbhe, Navi Mumbai
49.65 Crs Renewal JD(APC) 415 - 435
19SM Eberspaecher Exhaust Pvt. Ltd., 310, B, Nanekarwadi, Tal- Khed, Dist - Pune 31.28 Crs Renewal JD(APC) 436 - 460
JD(WPC) 0 `AS(T) 0RO(HQ) 12JD(APC) 13PSO 0Total 25
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 1
CC-Resubmission
Agenda no. 1 Region : RO Pune Section :RO(HQ) Date :
Name & Address M/s Premier Buildcon “ Elite Silverio” Gat No. 114(P) + 124 + 125 + 126 + 127(P) At Village:
Chikhali, Tal : Haveli, Dist : Pune.
Consent For C to E
Capital Investment 57.52 Cr
Industry Type O08 Building and construction projects more than 20,000 Sq mtr.
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-Water Consumption;- 244 CMD, Effluent generated 228 CMD Proposed STP capacity 250 CMD
BG Details Amount : Validity :
BG Obtained against :
Other Relevant Information
1. PP has applied for consent to Establish 2. The Residential project covering total area of around 19306.87 Sq. mt with total built up
area of 50096.69 sq mtrs 3. PP has applied for environment clearance environment clearance From SEIAA on
06/07/2012. 4. Capital investment of the project is 57.52 Cr. 5. Total water consuming 244.0 m3/day of water out of which 162.0 m3/day fresh water
will be supplied by PCMC & generating about 228.0 m3/day of sewage, which PP has proposed to provide STP of capacity 250.0 m3/day, Treated 82.0 m3/day waste water will be used for utilities, and partially of which 21.0 m3/day will be used for gardening and remaining 102 CMD discharged into PMC drainage line.
6. PP has proposed to provide organic waste convertor for bio-degradable waste, Non-biodegradable waste send to authorized vender.
7. 1 no. of DG set having capacity 350 KVA. 8. Proposed site is located more than 1 Km from Indrayani River (A-II, Class). 9. The site is visited by SRO & field officer and observed that the project proponent has
started excavation on the some part. In view of above we may consider consent to establish with BG and subject to EC
Resubmission
The application for consent to establish was discussed in CC meeting held on
13/12/2013 during discussion it was decided to issued SCN for refusal of consent to
establish as PP has started excavation work without C to E and EC.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 2
PP has submitted reply on 28/02/2014 in reply PP stated that “we have started
excavation activity on site for site office compound wall and security office, but after
visit of SRO we have stopped the excavation activity. It will be started only after
obtaining the environment clearance.
In view of above we may consider with BG & BR with affidavit for not to take any effective step.
Recommendation of SRO/RO
RO, Pune has recommended for grant of consent to establish subject to obtaining EC &
not to take any effective stapes prior to EC.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 3
Agenda no. 2 Region : RO Mumbai Section :RO(HQ) Date :
Name & Address M/s.Rikki Ronie Developers ,
CTS No.-6A/16, Jankalyan Nagar,
Near Bill Bong School,Malvani, Malad (W)
Consent For C to E
Capital Investment Rs.274.85 Cr.
Previous Consent Validity
--
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-
Water consumption - 446 CMD.
Sewage Generation -367 CMD
Capacity of STP Proposed(2 Nos)- 290 CMD & 115 CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 4
Other Relevant Information
Application for grant of consent to establish for proposed construction of commercial and residential project for,
Total Plot Area - 16,395.9 Sq.mtrs. Total Construction BUA - 57,178.36 Sq.mtrs
Applicant has not obtained EC from Competent Authority.
Non Hazardous Waste:
Wet Garbage: 986 Kg/Day will be treated in organic waste Converter
Dry Garbage: 423 Kg/Day will be send Authorized party.
STP Sludge:59 Kg/Day will be used as manure
Said Project consist of Sale Bldg (Wing A to F-Gr+Pd+21 Floor) and Public Housing Bldg- (Gr+14 Floor+15(pt) Floor and Gr+13 Floor+14 (Part) Floor Said project consist of 6 Nos of buildings.
SRO Reported that PP has provided metallic fencing wall around the plot & not started any construction activity at the site(Field visit report dated 13.11.13 is enclosed)
The case was discussed in CC Dated 30/1/2014 and It was decided to issue SCN for refusal of C to E, as PP failed to submit approved pan for the BUA 57,178 Sq.Mtrs as applied in EC.Accordingly SCN issued keep case in abeyance and put up in next CC after submission of detail approved plan from PP.
Applicant has submitted following documents vide letter dated 30/12/2013.
1) Copy of IOD Dated 13/8/2013
2) True copy of IOD Plan approved by MCGM in which area statement is mentioned is:
Total Plot Area:16,395.90 Sq.Mtrs. Total BUA proposed: 4749.80 Sq.Mtrs
3) DP Remarks of Project.
Recommendation of SRO/RO
SRO Recommended grant of C to E with condition of EC.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 5
Agenda no. 3 CC/ Item –
Region : Pune │Section : JD(APC) Date
Name & Address
M/s. SM Eberspaecher Exhaust Pvt. Ltd.
(Formerly as SM Eberspaecher Exhaust Systems Pvt. Ltd.)
310 B, Nanekarwadi, Tal: Khed, Dist. Pune
Consent for Applied for consent to establish for modernization of
existing plant.
Capital Investment 36.0 crs
Consent Valid upto 31.10.2013
Industry Type R27
Industry Category RED
Compliance of Water
Pollution Related
Conditions
YES
(√) NO ( )
1. ETP & STP provided for trade & domestic effluent.
Compliance of Air Pollution
Related Conditions
YES
(√ ) NO ( )
Water curtain provided to paint shop & fume extractors at
welding section provided
Water Cess Assessment Done: June
2013 Paid upto: March 2012
BG Details Amount: NIL Validity -
BG obtained against: N.A.
Details of BG forfeited/ enchased, if any:
Submission of
Environmental Statement Period 2011-2012
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 6
Other Relevant Information
o Name of industry change from SM Eberspaecher Pvt.Ltd. to
SM Eberspaecher Exhaust Pvt.Ltd.
o Case was discussed in CC meeting dtd. 13/12/2013 & it was
decided to issue SCN for refusal of consent, as PP carried out
expansion without C to E.
o In this regards industry has submitted reply vide letter dtd.
13/01/2014 received to this office on 26/02/2014.reported
imported machinery arrived at site well in advance .They are
not installed & not in use any way before the prior approval
of the board.
Recommendation of
SRO/RO
RO Pune has recommended for grant of consent to establish for
modernization with change in name.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 7
Agenda no. 4 Region : SRO Auranagbad II Section :JD(APC) Date :
Name & Address Rajuri Steel Pvt. Ltd. , Plot No. F-12, Additional MIDC , Phase-II, Jalna.
Consent For CE for expansion
Capital Investment 5565 Lacs
Previous Consent Validity
30/6/2016
Industry Type R72 Steel and steel products using various furnaces like induction
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES
Details :- Septic tank & soak pit provided, also provided STP
Compliance Of Air Pollution Related Conditions
Yes
Details:- Propose to provide Ventury scrubber with stack of 33 mtr height to induction furnace.
Water Cess Assessment Done :NO Paid Upto :-
BG Details Amount : NIL Validity :NA
BG Obtained against : NA
Details of BG forfeited/encashed , if any :NA
Submission of Environmental Statement
Period
Not submitted
Other Relevant Information
Case was discussed in CC held on 15/1/2014, it was decided to call the verification report from SRO about river distance from industry. Now the reply from SRO is received and reported that river distance is approx. 2.5 km from industry which is physically verified & letter is written to Ex. Eng. Irrigation dept. Aurangabad for distance certificate. The expansion will be having manufacturing of new product MS Billets- 9000 MT/ M and increase in existing product quantity of the product MS TMT Bars by- 10000 MT/ M. The E C is required.
Recommendation of SRO/RO
Grant of consent to establish for expansion with EC condition
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 8
Agenda no. 5 Region : SRO Latur Section :JD APC Date :
Name & Address MSM Steels Pvt. Ltd.,A-116, Addl., MIDC Latur.
Consent For Consent to operate
Capital Investment 2455 lacs
Previous Consent Validity
Upto commissioning of unit
Industry Type Steel
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES
Details :- Indl. Effluent is NIL
Compliance Of Air Pollution Related Conditions
Yes
Details:- Cyclone dust collector to furnace.
Water Cess Assessment Done :-Dec-NA Paid Upto : NA
BG Details Amount : NIL Validity :NA
BG Obtained against : NA
Submission of Environmental Statement
Period NA
Other Relevant Information
Case discussed in CC held on 15/1/2014, it was decided to issue SCN for refusal of consent and not to take any effective steps for production, as violated consent condition & EIA notification. Now this office is in reciept of reply from industry, stated that they have not violated consent condition as they have installed lower capacity project which do not require EC. Also have stated that project is audited by Govt. Authorised Chartered Engineer and apologized for not informing the changes. Previously industry obtained consent to establish from board for product MS Ingots:-8000 MT/M, with CI of Rs. 42.6 crores. Now have applied for first consent to operate with quantity of 2400 MT/M and reduced CI to Rs.24.0 crores, as have installed the machineries of 2400 MT/M capacity and for the same have submitted the Chartered Engineer certificate.
Recommendation of SRO/RO
Recommended grant of consent to operate with lower capacity.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 9
Agenda no. 6 Region : RO PUNE Section :RO(HQ) Date :
Name & Address M/s Aditya Shagun Developers “Comfort Zone”, S. No. 14, Balewadi, Pune. 411052
Consent For C to R
Capital Investment 86.38 Cr.
Previous Consent Validity
----
Industry Type O08 Building & Construction Projects more than 20,000 Sq. mtr.
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-Water Consumption: 379 CMD, Effluent generated 272 CMD. STP Proposed of Capacity : 300 CMD
Other Relevant Information
1. PP has applied for consent to Renewal. 2. Earlier consent was valid upto 31/03/2012. 3. The Residential project covering total area of around 81100.00 sq.mtrs with total built up area
of 27055.91 sq mtrs 4. PP has obtained environment clearance From GoM on 12
th May 2009. & obtained consent to
operate from Board for the same area. 5. Total water consuming for this phase 379 m3/day of water out of which 227.0 m3/day fresh
water will be supplied by Local Body & generating about 272.0 m3/day of sewage, which PP has provided STP of capacity 300.0 m3/day, Treated 113 m3/day waste water will be used for utilities, and partially of which 39 m3/day will be used for gardening.
6. Biogas plant installed by PP for bio-degradable waste which is found not in operation during visit. Non-biodegradable waste will send to authorized vender.
7. 3 no. of DG sets each having capacity, 60 KVA. 8. The cost of the project is increased from 40 Cr to Rs 86.37 Crore for which they have paid Rs.
2,00,000-as consent fees. 9. SRO Pune has visited the site and observed that, PP has submitted the plan of 13 buildings and
applicant has started construction of 2 additional buildings without obtaining consent to establish and EC for the same. (Out of 2, buildings one Building is completed upto 9
th floor and
2nd
upto ground floor). 10. PP has provided STP which is located at 20 to 30 meter approx. from river Mula. 11. RO, Pune has recommended for renewal of consent by imposing condition to shift the STP
100meter from HFL, verification of actual construction done by sanction plan and additional consent fees on increased capital investment.
The application for renewal of consent to establish was discussed in CC meeting held on 13/12/2013 during discussion it was decided to issue SCN for refusal of consent to operate as PP has carried out construction of two additional building without obtaining consent to establish from Board and amendment in EC. And not operating Bio-gas plant as per consent to operate condition. SCN issued on 17/01/2014.
Applicant has submitted reply through E-mail on dated 25/02/2014 in reply applicant stated that “For Expansion of two buildings we have already applied for amendment in Environment clearance on 05/10/2011, for same expansion we will be apply consent to establish for
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 10
additional construction. Also PP assure that we will operate and maintain the Biogas plant on regular basis to achieve the consented norms
In view of above we may consider plain renewal with condition not to take any effective step prior to EC for expansion phase and BG for O & M of Biogas plant of
Recommendation of SRO/RO
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 11
CC-Fresh Agenda
Agenda no. 1 Region : RO Mumbai Section :RO(HQ) Date :
Name & Address M/s.Mauli Sai Developers Pvt.Ltd. ,
“Ambewadi CHS” at S.No.407,407/1 to 3, 408, 409,
410, 411, 412, 413, 414/1,415, 415/1 to9 ,416,416/1 to3,
417 ,417/1, 418, 418/1 to 4, 419 ,419/ 1 to15, 420, 421,
422, 422/1 to9, 423, 423/1to5,424,426(pt), 427,428, 429(pt),
434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai
Consent For C to E
Capital Investment Rs.58 Cr.
Previous Consent Validity
--
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-
Water consumption - 455 CMD.
Sewage Generation - 360 CMD
Capacity of STP Praposed (3 Nos) -205,86,87CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 12
Submission of Environmental Statement
Period
Other Relevant Information
Application for grant of Consent to Establish for construction of residential project under SRA Scheme for Total Plot area - 8,807.19 Sq. mtrs Total Construction BUA -33,836.54 Sq.mtrs
Applicant has not obtained EC dated 4/10/2011 for Dr. Babasaheb Ambedkar Nagar CHS for S.No.407,407/1 to 3,408,409,410,411,412,413,414/1,415, 415/1 to9 ,416,416/1 to3, 417 ,417/1, 418, 418/1 to15, 420, 421, 422, 422/1 to9, 423, 423/1to5,524,424,426(pt),427,428,429(pt),434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai for
Total Plot area - 8807.19 Sq. mtrs Total Construction BUA -33836.54 Sq.mtrs
Applicant has obtained revise EC dated 16/11/2011 for Ambewadi CHS for S.No.407,407/1 to 3, 408, 409, 410, 411, 412, 413, 414/1,415, 415/1 to9 ,416,416/1 to3, 417 ,417/1, 418, 418/1 to 4, 419 ,419/ 1 to15, 420, 421, 422, 422/1 to9, 423, 423/1to5, 524, 424, 426(pt), 427,428,429(pt),434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai
Nonhazardous waste
Wet garbage: 899 Kg/Day(will be treated in organic waste Converter)
Dry garbage:599 Kg/Day(will be handed over to MCGM)
STP Sludge-28 Kg/Day (used as manure)
Total no. of residential buildings is 3 Nos ( 2 Nos. Rehab Bldg & 1 no. sale Bldg. having 22 floors.
SRO reported that, PP has started the demolition work.
(field visit report dated 20/1/2014 is enclosed)
Applicant has submitted,
1.Letter of Intent(LOI) from SRA dated 19/11/2010
Applicant has not submitted architect plan and affidavit for compliance EC/CRZ clearance and C to E.
Recommendation of SRO/RO
SRO Recommended grant of consent to establish.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 13
Agenda no. 2 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 11/10/2013
Ro (HQ) Date of receipt;- 03/01/2013
Name & Address M/s. Saurabh Vastu Nirman Pvt Ltd, Survey No. 37 (P), Wadachiwadi, Tal Haveli, Dist Pune
Consent For C to E
Capital Investment 72.0 Crore
Previous Consent Validity
-
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :- Water Consumption :- 246.0 CMD , Effluent Generated :- 182.0
Proposed STP Capacity :-200 CMD
Water Cess Assessment Done :- Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Other Relevant Information
Applied for C to E Residential
Plot Area 33,100 sq.mt Built up area 59,583.64 sq.mt
EC Status Applied Dated 11/10/2013
River Distance @ 8.0 Km Name of River Mula-Mutha
Water Consumption 246.0 CMD Effluent Generated 182.0 CMD
STP Capacity 200.0 CMD Recycle water 77.0 CMD
Bio-degradable 473.0 Kg/D Treatment OWC
Non-Boi degradable 473.0 Kg/D Treatment Local Body
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 14
No of DG Sets 1 Capacity 400 KVA
Construction status Not started Date of Visit 23/10/2013
We may consider consent to Establish with following condition
1) BG of Rs 5 lakh for compliance of Consent condition
2) Affidavit & BG for Not to take any effective steps prior to EC.
Recommendation of SRO/RO
RO Pune has recommended that PP has not started construction activity in view of above case is recommended for grant of consent to establish.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 15
Agenda no. 3 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 18/11/2013
Ro (HQ) Date of receipt;- 17/01/2014
Name & Address M/s Kumar Company “Residential Project” S. No. 97 Borhatewadi, Village Moshi, Tal-
Haveli, Dist-Pune. 412105
Consent For C to E
Capital Investment 57.0 Crore
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :- Water Consumption :- 312.0 CMD , Effluent Generated :- 283.0
Proposed STP Capacity :-290 CMD
Water Cess Assessment Done :- Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Other Relevant Information
Applied for C to E Residential
Plot Area 21,900 sq.mt Built up area 53,938 sq.mt
EC Status Obtained Dated 26/06/2013
River Distance @ 1.5 Km Name of River Indrayani (A-IV)
Water Consumption 312 CMD Effluent Generated 283.0 CMD
STP Capacity 290.0 CMD Recycle water 103.0 CMD
Bio-degradable 474.0 Kg/D Treatment OWC
Non-Boi degradable 474.0 Kg/D Treatment Local Body
No of DG Sets 3 Capacity (Total) 482.0 KVA
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 16
Construction status Started Date of Visit 11/12/2013
PP has started construction of A1, B1,B2,B3 Buildings
In view of above PP has obtained Environment clearance & started construction we
may consider consent to Establish with following condition
1) BG of Rs 5 lakh for compliance of Consent condition
2) BG of Rs 2 Lakh for submission of BR.
Recommendation of SRO/RO
RO Pune has recommended that PP has not started construction activity in view of above case is recommended for grant of consent to establish.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 17
Agenda no. 4 Region : Thane Section : RO(HQ)-Fresh Case Date : /03/2014
Name & Address M/s. Kashimira Ceramic Product LLP , CTS No 1142 to 1146, 1491 to 1511, 1586, 1589 to 1600, 1629, 1630, 1646 to 1652, 1792, 1829, 1882, 1723 to 1726, 1793, 1831 to 1836, 1878 to 1881, 1953 of Village Mire Tal and Dist Thane
Consent For CE
Capital Investment 12898 Lacs
Previous Consent Validity
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period
Other Relevant Information
M/s. Kashimira Ceramic product LLP, Village: Mire Tal and Dist: Thane has applied for consent to Establish for proposed Residential construction project to MPC Board having area details as under :
For Area Details of Project :-
Total Plot Area : 23,292.83 Sq. meters ( covering phase –I and Phase-2) Total Construction BUA Area : 89,016.83 sq meters ( covering phase –I and Phase-2) Capital investment of Project is Rs. – 128.98 Crs ( Undertaking
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 18
The project proponent has applied for Environment Clearance from Govt of Maharashtra for construction of residential project on 02/06/2011, Environment department had issued Show Cause notice dated 22.4.2013. Personal hearing extended to project proponent before Hon. Principal Secretary, Environment Department, GOM dated 26.7.2013. Principal Secretary, Environment Department had issued Direction on 6.12.2013 U/s. 5 of the Environment ( Protection) Act, 1986 r.w. Environment Impact Assessment Notification dated 14.9.2006.
Details of water consumption as under :-
Water consumption – 486. 00CMD
Sewage Generation –391.00 CMD
Proposed STP of the capacity- 400 CMD for treatment of sewage.
Non-hazardous Waste:
Bio degradable Waste : 724 Kg/day
Non- Bio Degradable : 1086 Kg/day
Proposed MSW Treatment facility (mechanical waste convertor) for treatment and disposal of MSW.
Project proponent has obtained Commencement certificate / permission from Mira Bhyander Municipal Corporation for proposed residential project dated: - 23/02/2011 and 06/08/2012 and submitted approved lay out plan from Mira Bhyander Municipal Corporation.
Proposed to provide DG sets – 225 KVA x 2 Nos.
Project proponent has paid consent fees of Rs. 2,58,062.51/- towards fees for consent to establish.
Present Status of Construction work carried out :-
As reported by the SRO MPC Board Thane-II office,
During visit of the Board official to the site on 02.01.2014 , No construction activity was found in operation, however it is observed that already some construction work of Phase –I and 2 was completed. The present status of Phase No1 and 2 is as below;
A) Phase No.1:- There are 5 Nos of Towes namely A, B, C,D and E.
1) Tower A:- Construction work up to 3rd floor completed.
2) Tower B:- Construction work up to 4th floor completed.
3) Tower C:- Construction work up to 10th floor completed.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 19
4) Tower B:- Construction work up to 10th floor completed.
5) Tower B:- Construction work up to 1st floor completed.
B) Phase No.2:- There are 3 Nos of Towes namely A, B and C. :-
1) Tower A:- Construction work up Stilt floor completed.
2) Tower B:- Construction work up Stilt floor completed.
3) Tower C:- Construction work up Stilt floor completed
Project representative told that, the above mentioned construction work was completed in the month of January 2013 and they have stopped the construction activity voluntarily since then and informed that till they obtain E.C. from competent Authority, no further construction will be undertaken.
Environment department had issued Show Cause notice dated 22.4.2013 to Project proponent and Personal hearing extended to project proponent before Hon. Principal Secretary, Environment Department, GOM dated 26.7.2013.
Principal Secretary, Environment Department had issued Direction on 6.12.2013 U/s. 5 of the Environment (Protection) Act, 1986 r.w. Environment Impact Assessment Notification dated 14.9.2006, in which directions are given to project proponent to stop construction work till obtaining Environmental clearance from competent authority for violation of provisions of EIA notification 2006 by starting construction work at site prior obtaining Environmental clearance
Recommendation of SRO/RO
Environment Department has issued show cause notice and directions to the project proponent because of violation of EIA Notification 2006, and authorized Member Secretary of the Board to file Criminal Case against the project proponent in appropriate Court. RO MPC Board Thane office has filed Criminal Case against M/s. Kashimira Ceramic product LLP, Village: Mire Tal and Dist: Thane before JMFC court Thane and the Court Case no: 293 of 2014.
Since to obtain C to E and Environment Clearance are separate issues as per EIA Notification 2006, consent to establish may be granted and if necessary it may be mentioned in the consent to establish that, the consent is issued without prejudice to legal action.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 20
Agenda no. 5 Region : Kolhapur Section : RO(HQ) Date : /03/2014
Name & Address M/s. Kallappanna Awade Co-Operative Industrial Estate and Integrated Textile Park Ltd. Gat No. 153 to 155 to 176, Hatkanagale, Gta No. 1044 to 1055, Tardal and Gat No. 357,358 Majale, Tal. Hatkanagale, Dist. Kolhapur
Consent For CE
Capital Investment 107. 10 Crs
Previous Consent Validity
Industry Type O39 Infrastructure development project
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period
Other Relevant Information
M/s. Kallappanna Awade Co-Operative Industrial Estate and Integrated Textile Park Ltd. has applied for consent to establish for their Co-Operative Industrial Estate and Integrated Textile Park, at Gat No. 153 to 155 to 176, Hatkanagale, Gta No. 1044 to 1055, Tardal and Gat No. 357,358 Majale, Tal. Hatkanagale, Dist. Kolhapur. Propsed Textile Park having Textile/Engineering and Fabrication/Casting Industries. For Area Details of Project :- Total Area: 200 Acre Total Area of Textile Park-56 Acres(90 Plots) Total Area of Engineering Industries-94 Acres (64 Plots) Total Area under Road-20 Acre
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 21
Total Area Under Open Space-26 Acre Total Area Under Amenities-04 Acre Capital investment of part operate Project is Rs. – 107.10Crs Details of water consumption as under :- Water consumption Domestic – 1080.00 CMD Sewage Generation – 800.00 CMD Industrial - 620.00 CMD Proponent has proposed STP of 1000 CMD capacity. Non-hazardous Waste: Bio degradable Waste: 6000 kg/day – vermi-composting proposed. This project comes under Textile Park of Ministry of Commerce & Industry,Govt. of India.In this Park Weaving & Garments Stitching will be carried out without any process and some part for Engineering Industries.
Recommendation of SRO/RO
SRO Kolhapur has recommended that the case may be granted by incorporate condition for 100 % recycle/gardening .
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 22
Agenda no. 6 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 16/09/2013
Ro (HQ) Date of receipt:- 02/02/2014
Name & Address M/s. K Raheja Corporation Services Pvt. Ltd,
Raheja Tower, C- 30, Block “G”, Bandra Kurla Complex, Bandra (E), Mumbai
Consent For C to E (Expansion)
Capital Investment 30.0 Crore
Previous Consent Validity
28/02/2011
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :- Water Consumption :- 94.0 CMD , Effluent Generated :- 65
Proposed STP Capacity :-85.0 CMD
Water Cess Assessment Done :- Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Other Relevant Information
1. PP applied for consent to Establish for expansion of building from G + 10 Floor to G + 14
floor for IT & Office building.
2. Total plot area 4556.17m2 and total BUA 24,955.29 m2 [Existing 19212.54 m2 + 5742.75
m2.]
3. For this expansion applicant has obtained environment clearance from SEIAA on
02/04/2014. For same area.
4. Capital investment of the existing project 104 Cr and 30 Cr for expansion.
5. Total water consumption 94 m3 effluent generated 65 m3, STP provided capacity 85 m3.
6. Bio-degradable waste generated 279.0 Kg/D,non biodegradable 186.0, for biodegradable
waste PP has provided composting pit.
7. SRO Mumbai-II reported that applicant has obtained consent to operate for existing
building on 20/05/2009 valid upto 28/02/2011 and applicant has submitted application for
renewal of consent dtd 15/02/2011 but presently under process of HQ.
8. Applicant has paid Rs 6, 96,103/- at the time of renewal.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 23
9. During visit observed no any construction activity observed.
10. In view of above we may consider consent to establish expansion.
For existing renewal application not traceable at this office, hence we may call Xerox
copy from RO Mumbai or grant with considering this application as all detail available
with this application.
Recommendation of SRO/RO
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 24
Agenda no. 7 Region : SRO Satara Section : JD(APC) Date: 18.02.2014.
Name & Address M/s Pushpak Ifracon Pvt.Ltd. , Plot No.B-3, B-4, MIDC Lonand, Tal- Khandala, Dist- Satara.
Consent For Ist Consent operate with additional qty.
Capital Investment Rs. 49.00 Crs
Previous Consent Validity
Consent to Establish obtained.
Industry Type R27 Heavy engineering including ship building (With investment o
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES ( √ )
Details :- Industrial Eff: Nil.
Domestic Eff :1.50 CMD septic tank with soak pit provided.
Water Cess Assessment Done :-------- Paid Upto : ----------
BG Details Amount : ------------- Validity :------------
BG Obtained against : ----------------
Details of BG forfeited/encashed , if any : -------------
Submission of Environmental Statement
Period Ist Consent operate
Other Relevant Information
- Industry has applied for grant of consent to Ist consent operate with additional 2500 MT production qty.[ i.e. Consented qty 6250 MT/M to applied for 8750 MT/M ]
- Industry has submitted letter dated 03.12.2013 stating that the increase in CI Rs. 34.20 Crs is because of automated process. And also due to atomization, corresponding production capacity has also increased from 6250 MT/M to 8750 MT/M.
Recommendation of SRO/RO
- RO Pune has recommended case for grant of consent to operate with additional qty up to 31.01.2016.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 25
Agenda no. 8 Region : RO Mumbai Section :RO(HQ) Date :
Name & Address M/s.R Mall Developer
(RunwalDeveloper)Pvt.Ltd ,
CTS No.166,166/1to23,
R City Mall, LB MArg,
Ghatkopar (W).Mumbai400071
Consent For 1st C to O(part)
Capital Investment Rs.91.32Cr
Applicant has submitted Undertaking in which land cost is not mentioned
Previous Consent Validity
COU
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :-
Water consumption - 950 CMD.
Sewage Generation - 793 CMD
Capacity of STP Provided (2 Nos) - 630CMD
400CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 26
Submission of Environmental Statement
Period
Other Relevant Information
Application for grant of Consent to 1st Operate(part) for residential cum commercial mall for
Applicant has not submitted area statement of constriction completed building for part C to O for which applicant has applied alngwith consent processing form.
Applicant has obtained C to E dated 27/10/2005 for 80,873 Sq.Mtrs with condition of obtaining EC from Competent authority
Total Plot area and Total Construction BUA is not mentioned.
Applicant has obtained EC from GOI dated 24/2/2006
for total area 80,873 Sq.Mtrs
Total Plot area and Total Construction BUA is not mentioned in EC.
Nonhazardous waste
Wet garbage: 11550 Kg/Day
Dry garbage:16500 Kg/Day
SRO reported that ,PP is praposed to installation of invessel composting of organic waste at site only.
As mentioned in EC, Said project consist of
1. residential complex comprises of 10towers of 13 floors each having 500 flats.
2. Commercial complex has 240 rooms hotel, shopping mall with seven screens.
Construction Status
SRO reported that,During the visit, it was observed that the construction work of residential complex was found completed and more than 80% occupancy were observed.
The construction work of commercial building (phase –II) was found under construction. The construction work upto fifth floor completed. The construction work of upper floor is going on.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 27
SRO reported that,
1)complaint of nuisance of noise pollution of R city mall from resident of ‘Orchid
residency” located behind the Rcity mall, Ghatkopar(W), .SRO office has carried out the
noise monitoring on dated 14.03.2013, 13.06.2013 & 19.07.2013 and issued the Show cause notice to developer wrt exceeding noise level due to operation of cooling towers on the top of R-city mall.
2)Project proponent has fail to submit the reply alongwith the concrete proposal of installation of acoustic panels to cooling tower.
3)Noise barrier at top of the commercial mall are partially installed.(Chilling tower & AC cooling) and work of L-barrier is going on while inspection.
Applicant has submitted,
1)Part occupancy certificate dated 7/2/2013.
SRO has submitted explanation regarding delay in submission of consent processing(Copy attached)
Recommendation of SRO/RO
SRO Recommended grant of C to O at HQ
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 28
Agenda no. 9 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 26/12/2013
Date RO(HQ):- 28/02/2014
Name & Address M/s. SIM Reality, “Swaraj”
Gat No. 212 New 1331 old Gat No. 209 New (P)1327 old, Moshi, Taluka- Haveli, Dist. Pune.
Consent For C to O (Part)
Capital Investment 54.72 Crore
Previous Consent Validity
COU
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water Pollution Related Conditions
YES ( ) NO ( )
Details :- Water Consumption :- 649.0 CMD , Effluent Generated :- 500.0
Proposed STP Capacity :-500.0 CMD
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/enchased, if any :
Other Relevant Information
Applied for C to O (Part) Residential 16 buildings
Plot Area 40,400.0 m2 Total Built up area 66490.47m2
C to E Obtained (Valid) Dated 24/08/2011
Plot area as per CE 40,400.0 m2 BUA as per CE 66491.0 m2
EC Status Obtained (valid) Dated 21/10/2011
Plot area as per EC 40,400.0 m2 BUA as per EC 66490.87 m2
Water Consumption 649.0 CMD Effluent Generated 500.0 CMD
STP Capacity 500.0 CMD Recycle water 298.25 CMD
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 29
Bio-degradable 1270 Kg/D Treatment OWC
Non-Boi degradable 850.0 Kg/D Treatment Local Body
No of DG Sets 1 Capacity 400.0 KVA
Construction status 16 bldg
completed
Part operate BUA 51688.75 m2
Project proponent has provided Sewage Treatment Plant for treatment which is located about
60 mtr from HFL of River Indrayani. As per consent to establish condition STP location shall
be beyond 100 mtr from HFL.
In view of above we may issue SCN for refusal of consent to establish as PP has installed
STP at 60 meters from HFL and not complied c to E condition.
Recommendation of SRO/RO
Project proponent has submitted undertaking in which reported that, they will shift the STP beyond 100 mtr from HFL, however, time bound action plan in this regard not submitted. In view of above, decision of grant of consent may be taken at HQ level
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 30
Agenda no. 10
CC Item –Fresh
Region : Mumbai │Section : ROHQ Date:
Name & Address
M/s.Hiranandani Construction Pvt. Ltd.,
Maitri Park,Chembur ,CTS No.1790 to 1811,1813 & 1815 of Village Chembur,
CTS No.131,133 to 140 of village Wadhwali:Mumbai.
Consent for C to1st Operate(part).
Capital Investment
68.05 Crs
Consent Valid upto
Commissioning
Industry Type Construction
Industry Category
ORANGE
Compliance of Water Pollution Related Conditions
YES
Water consumption- 105 CMD.
Sewage Generation-70 CMD.
As per Environmental Clearance dated 13/6/2008, STP proposed 500 CMD.
Provided STP having capacity 64 CMD for constructed tower A & B.
Compliance of Air Pollution Related Conditions
YES ( )
Details: - Air pollution control system will be provided to DG set.
Water Cess Assessment Done: NA Paid upto: NA
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 31
BG Details Amount: NA Validity NA
BG obtained against: NA
Details of BG forfeited/ enchased, if any:
There is No BG Condition mentioned in earlier C to E Granted by Board.
Submission of Environmental Statement
Period NA
Other Relevant Information
Application for C to O(Part-for Phase-I) for Construction of Redevelopment of residentail Building Project located at
Village Chembur : CTS No.1790/A and
Village: Wadawali : CTS No.131/ A for,
Construction BUA(As Per FSI) -9887.84 Sq.mtrs.
Total Construction BUA-11,371.016 Sq.mtrs.
Said project obtained EC from GOI Dated 13/6/2008.
Village Chembur: CTS No.1790 to 1811,1813 & 1815.
village Wadhwali: CTS No.131,133 to 140.
Total Plot Area -37,456.00 Sq.mtrs.
Total Construction BUA(praposed)-63,066.00Sq.mtrs.
Board has issued C to E Dated 8/4/2009 for ,
Total Plot Area -37,456.00 Sq.mtrs.
Total Construction BUA -63,066.00Sq.mtrs.
The Case was discussed in CC Meeting dated 13/6/2013 and it was decided to issue refusal of 1st Consent to Operate(part) since PP has not provided STP as as per condition of C to E and EC.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 32
Accordingly final refusal issued on 27/6/2013.
Now applicant has submitted letter dated 12/2/2014 which is received in HQ dated17/2/2014 in which
1) applicant has submitted consent fee of Rs.1,00,000/- 2) Provided STP having capacity 64 CMD for constructed tower A & B. 3) Letter from Dy. Chief Engineer (civil), Environment(civil) regarding
part completion of STP Capacity 64 CMD.
Recommendation SRO/RO
RO recommended C to Operate (Part) for period upto 31/1/2015
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 33
Agenda no. 11 CC Item –
Region : Thane │Section : JD(APC) Date
Name & Address
M/s. Tekson Limited,
Kolshet Road,Kapurbawadi,
P.O. No.-20, Thane.
Consent for renewal of consent
Capital Investment Rs. 25.3 crs
Consent Valid upto 30.09.2013
Industry Type Engineering
Industry Category RED
Compliance of
Water Pollution
Related Conditions
YES () NO (√)
1. Trade effluent generation is 20CMD for which effluent treatment
plant provided.
2. For domestic effluent 60 CMD septic tank soak pit provided
Compliance of Air
Pollution Related
Conditions
YES (√ ) NO ( )
APCS Provided to Lead Bath & Hot water Boiler
Water Cess
Assessment Done:
Submitted up to:
Paid upto:
BG Details Amount: Validity -
BG obtained against:
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 34
Submission of
Environmental
Statement
Period Environmental statement report submitted
Other Relevant
Information
Recommendation
of SRO/RO
Consent may be granted upto 30/09/2014.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 35
Agenda no. 12 Region : Pune Section : JD(APC) Date : 02/2014
Name & Address M/s. Tata Motors Ltd. Sr. No. 59-62, PO Bedeohol, Tal. Maval, Dist: Pune – 410 506.
Consent For Renewal
Capital Investment 50.62 Crs
Previous Consent Validity
30/09/2013
Industry Type R21 Ferrous and Non Ferrous metal extraction
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES
Details :-Domestic Effluent 80 CMD
Industrial Effluent Nil
Water Cess Assessment Done : Sept 2013 Paid Upto : Feb 2013
Compliance Of air Pollution Related Conditions
Fume Extraction and bag filter system is provided.
BG Details Amount : - Validity : -
BG Obtained against : -
Details of BG forfeited/encashed , if any : -
Submission of Environmental Statement
Period 2012-2013
Other Relevant Information
1. M/s. Tata Motors Ltd. has applied for renewal of consent their Maval Foundry unit for SG iron casting activity located at Sr. No. 59-62, PO Bedeohol, Tal. Maval, Dist: Pune – 410 506.
2. Earlier Industry has obtained consent to Operate from MPC Board for SG iron casting activity vide no: BOJD(APC)/EIC No. PN-15699-
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 36
12/O-CC-784 dated 27/12/2012 valid till 30/09/2013
3. Applied for SG Iron Casting - 14,400 MT/A
4. Water Consumption Domestic – 100.00 CMD
Sewage – 80.00 CMD
Industrial – 200.00 CMD
Effluent – NIL
5. Industry has submitted details of raw material consumption, flow diagram of manufacturing process.
6. Industry has submitted consent fee of Rs. 1,25,000/- towards renewal of consent to operate and increase in CI, which is as per Govt. of Maharashtra G.R. for revision of Consent fees dated: 25/08/2011.
Recommendation of SRO/RO
Regional Officer, Pune, MPCB Pune has commented that there is increase in CI by 6.75 Crs. Due to modernization of plant and machinery and the attraction of RRZ policy as the dist. of the unit is about 700 mtrs. From the river Pawana.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 37
Agenda no. 13 Region : SRO Nashik Section : JD(APC) Section Date :28.02.2014.
Name & Address Electronica Tough Carb Ltd. , E-1, MIDC Malegaon Sinnar, Dist. Nashik
Consent For Renewal of consent to operate
Capital Investment Rs.29.65 Lacs
Previous Consent Validity
31/12/2013
Industry Type R27 Heavy engineering including ship building (With investment o
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES ( √ )
- Details :- Industrial effluent: Nil, Domestic Effluent: 8.20 CMD Soak pit
provided.
Water Cess Assessment Done : July -2013 Paid Upto : June-2012
Compliance Of Air Pollution Related Conditions
Dust collector system provided to shaping section.
BG Details Amount : ------- Validity : -------
BG Obtained against : -------
Details of BG forfeited/encashed , if any : -------
Submission of Environmental Statement
Period
2012-2013
Other Relevant Information
-------
Recommendation of SRO/RO
- SRO –Nashik has recommended case for grant of renewal of consent to operate up to 31.12.2014.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 38
Agenda no. 14 Region : SRO Nashik Section :JD(APC) Date: 5.03.2014.
Name & Address M/s Gabriel India Ltd. , B-2, MIDC Ambad, Nashik
Consent For Renewal of consent with amalgamation for consent to operate for expansion.
Capital Investment Rs. 42.77cr
Previous Consent Validity Existing unit consent was valid up to 31/10/2013.
Board has granted Consent to establish for Expansion unit on 8.7.2013 which is valid up to COU or 5 years whichever is earlier.
Industry Type R27 Heavy engineering including ship building (With investment o
Industry Category Red
Compliance Of Water Pollution Related Conditions
NO
1. After expansion ind effluent & dom. eff. will be 14 & 38 CMD.
2. ETP having cap. 30 CMD comprises of pri.sec & tert. Treatment provided for ind.eff.
3. STP having cap-50 CMD provided for dom.eff.
4. Analysis results of effluent sample collected during last 8 months are exceeding the standards for the parameter BOD,COD,TDS,Chloride,sulphate & phosphate.
Compliance Of Air Pollution Related Conditions
Yes
Stack provided to Thermic fluid heated
Water Cess Assessment Done :Sept-2013 Paid Up to :Sept-2013
BG Details Amount : Rs.2.0/- Lakhs Validity :31.07.2013
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period 2012-2013
Industry has not submitted the BG of Rs.4.0 Lakhs towards O & M of
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 39
Other Relevant Information pollution control system as per the condition stipulated in consent to Establish for expansion project.
Recommendation of SRO/RO
SRO recommended to issue show cause notice for refusal of consent as industry has not submitted the BG towards O & M & JVS results are exceeding.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 40
Agenda no. 15
CC Item –
Region : Navi Mumbai │Section : JD(APC) Date
Name & Address
M/s. Sulzer Pumps India Ltd.,Plot No.-9,TTC Indl. Area,MIDC,Airoli
Node,Thane Belapur Road,Digha,Navi Mumbai.
Consent for Renewal of Consent
Capital Investment Rs. – 72.35 Crs.(existing 54.34) increased by 18.01 Crs.
Consent Valid upto Valid upto 31/12/2013.
Industry Type R27 Heavy Engg.
Industry Category RED
Compliance of Water
Pollution Related
Conditions
YES () NO (√)
Indl. Eff – 4 CMD. ETP provided, but existing ETP is in idle condition &
As reported by SRO Up-gradation of ETP will complete in April 2014.
Compliance of Air
Pollution Related
Conditions
YES () NO (√)
Not reported
Water Cess Assessment Done: Sep-13. Paid upto:
BG Details Amount: Rs.10,00,000/-
Validity – 31/12/2014
For Operation & Maintenance of Pollution Control System.
Submission of
Environmental
Statement
Period 2013
Other Relevant
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 41
Information
Recommendation of
SRO/RO
Renewal of consent may be granted with a condition that industry shall
carry spray painting activity after up gradation of ETP.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 42
Agenda no. 16
Region : SRO Aurangabad I Section :JD APC Date :
Name & Address Dhoot Transmission Pvt.Ltd.Farola ,
Consent For CR
Capital Investment 3174.0 Lacs
Previous Consent Validity
31/07/2011 & 31/8/2011
Industry Type R27 Heavy engineering including ship building (With investment o
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES
Details :- Indl effluent is nil.
Domestic 9 CMD, septic tank & soak pit.
Compliance Of Air Pollution Related Conditions
Yes
Fume extraction system followed by chimney to wire enamel machine.
Water Cess Assessment Done :No details Paid Upto :No details
BG Details Amount : NIL Validity :NA
BG Obtained against :NA
Submission of Environmental Statement
Period
NO details
Other Relevant Information
Industry had obtained two consents, one under Green cat. for product Wiring Harness, valid upto 31/7/2011 and other in Red category for product Enameled copper Wire, valid upto 31/8/2011. The total CI of Rs. 31.74 cores is shown. Now have increased the product qty of wiring harness-2500000 Nos./A to 7500000 Nos./A. due to capacity utilisation. Indl. effluent is nil. Provided fume extraction system with chimney to wire enamelling machine. The said application was returned back by RO to SRO for resbmission. Industry have stated that they do not generate HW from process. SRO recommended grant of consent renewal upto 31/7/2014.
Recommendation of SRO/RO
Renewal of consent upto 31/7/2014
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 43
Agenda no. 17 Region : SRO Nashik Section : JD(APC) Section Date : 22.02.2014.
Name & Address Bellota Agrisolutions and Tools Pvt Ltd. , 267/4,STICE Musalgaon, Sinnar, Nashik
Consent For Renewal of consent to operate
Capital Investment Rs.43.60 Crs
Previous Consent Validity
31/10/2013
Industry Type Engineering (Agro base )
Industry Category Red
Compliance Of Water Pollution Related Conditions
YES ( √ )
Details :- Ind. Effluent: Nil, Dom Eff: 8.0 CMD, septic tank soak pit provided.
Compliance Of Air Pollution Related Conditions
Industry has provided air pollution control system to paint booth, powder coating and shot blasting section.
Water Cess Assessment Done : July-2013 Paid Upto : June-2012.
BG Details Amount : 5.0 Lakhs. Validity : 27.11.2014.
BG Obtained against : Earlier consent condition towards O & M.
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period 2012-2013.
Other Relevant Information
-
Recommendation of SRO/RO
Recommended case for grant of renewal of consent to operate up to 31.10.2016.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 44
Agenda no. 18 CC Item –
Region : Navi Mumbai │Section : JD(APC) Date
Name & Address M/s. Balmer Lawrie Van Leer Ltd., Plot No. D-195/2, MIDC TTC Indl.
Area, Turbhe, Navi Mumbai.
Consent for Renewal of consent
Capital Investment Rs. – 49.65 Crs.(existing 20.34) increased by 29.31 Crs.
Consent Valid upto Valid upto 31/12/2013.
Industry Type R27 Heavy Engg.
Industry Category RED
Compliance of Water
Pollution Related
Conditions
YES (√) NO ()
Indl. Eff – 55 CMD. ETP provided & disposal at CETP & Dom Eff – 20.0
CMD .Septic tank provided.
Compliance of Air
Pollution Related
Conditions
YES (√) NO ()
Scrubber to cleaning Section, pickling section, Zinc Section as a provided.
Water Cess Assessment Done: Sep-13. Paid upto: DEC-12
BG Details Amount: Nil
Validity –
Submission of
Environmental
Statement
Period 2012-2013
Other Relevant
Information
Recommendation of
SRO/RO
Renewal of consent may be granted upto 31.12.2018 subject to BG towards
O & M.
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 45
Agenda no. 19 CC/ Item –
Region : Pune │Section : JD(APC) Date
Name & Address
M/s. SM Eberspaecher Exhaust Pvt. Ltd.
(Formerly as SM Eberspaecher Exhaust Systems Pvt. Ltd.)
310 B, Nanekarwadi, Tal: Khed, Dist. Pune
Consent for Applied for Renewal of consent (Same Industry CTE case for
modernization under consideration in CC)
Capital Investment 31.28 crs
Consent Valid upto 31.10.2013
Industry Type R27
Industry Category RED
Compliance of Water Pollution
Related Conditions
YES
(√) NO ( )
2. ETP & STP provided for trade & domestic effluent.
Compliance of Air Pollution
Related Conditions
YES
(√ ) NO ( )
Water curtain provided to paint shop & fume extractors at welding
section provided
Water Cess Assessment Done: June 2013 Paid upto: March 2012
BG Details Amount: NIL Validity -
BG obtained against: N.A.
Details of BG forfeited/ enchased, if any:
Submission of Environmental
Statement Period 2011-2012
Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 46
Other Relevant Information
o Name of industry change from SM Eberspaecher Pvt.Ltd. to SM Eberspaecher Exhaust Pvt.Ltd.
o CTE application of same industry for modernization was discussed in CC meeting dtd. 13/12/2013 & it was decided to issue SCN for refusal of consent, as PP carried out expansion without C to E.
o In this regards industry has submitted reply vide letter dtd. 13/01/2014 received to this office on 26/02/2014 (Copy enclosed).
o RO reported as per CPCB Categorization industry comes in Orange Category
Recommendation of SRO/RO RO Pune has recommended for grant of renewal in Orange Category with