Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Premier Buildcon "Elite Silverio", Gat No. 114(P) + 124 + 125 + 126 + 127(P) At Village - Chikhali, Tal - Haveli, Dist - Pune 57.52 Crs. Establish RO(HQ) 1 to 16 2 Rikki Ronie Developers, CTS No. 6A/16, Jankalyan Nagar, Near Bill Bong School, Malvani, Malad(W) 274.85 Crs. Establish RO(HQ) 17 to 41 3 SM Eberspaecher Exhaust Pvt. Ltd., 310, B, Nanekarwadi, Tal- Khed, Dist - Pune 36.0 Crs Establish JD(APC) 42 - 66 4 Rajuri Steel Pvt. Ltd., F-12, Addl. MIDC Phase-II, Jalna 55.65 Crs Establish (Expansion) JD(APC) 67 - 90 5 MSM Steels Pvt. Ltd., A-116, Addl. MIDC Latur 24.55 Crs Operate JD(APC) 91 - 109 6 Aditya Shagun Developers "Comfort Zone", S. No. 14, Balewadi, Pune 86.38 Crs. Renewal RO(HQ) 110 - 127 Fresh Agenda 1 Mauli Sai Developers Pvt. Ltd., Ambewadi CHS for S. No. 407, 407/1 to 3, 408, 409, 410, 411, 412, 413, 414, 414/1, 415, 415/1 to 9, 423, 423/1 to 5, 424, 425, 426(pt), 427, 428, 429, 430, 434, 435, 436, 436(t to 3), 441(pt) of village Kurara, Tal - Borivali, Malad (E), Mumbai 58 Crs. Establish RO(HQ) 128 - 150 2 Saurabh Vastu Nirman Pvt. Ltd., Survey No. 37(P), Wadachiwadi, Tal - Haveli, Dist- Pune 72 Crs. Establish RO(HQ) 151 - 162 3 Kumar Company "Residential Project", S. No. 97 Borhatewadi, Village - Moshi, Tal - Haveli, Dist - Pune 57 Crs. Establish RO(HQ) 163 - 174 4 Kashimira Ceramic Product LLP, CTS No. 1142 to 1146, 1491 to 1511, 1586, 1589 to 1600, 1629, 1630, 1646 to 1652, 1792, 1829, 1882, 1723 to 1726, 1793, 1831 to 1836, 1878 to 1881, 1953 of village Mire, Tal & Dist - Thane 128.98 Crs. Establish RO(HQ) 175 - 193 5 Kallappanna Awade Co-operative Industrial Estate and Integrated Textile Park Ltd., Gat No. 153 to 155 to 176, Hatkanagale, Gat No. 1044 to 1055, Tardal and Gat No. 357, 358 Majale, Tal - Hatkanagale, Dist - Kolhapur 107.10 Crs. Establish RO(HQ) 194 - 207 6 K Raheja Corporation Services Pvt. Ltd., Raheja Tower, C-30, Block "G", Bandra Kurla Complex, Bandra (E), Mumbai 30 Crs. Establish (Expansion) RO(HQ) 208 - 222 7 Pushpak Ifracon Pvt. Ltd., B-3,4, MIDC Lonand, Tal- Khandala, Dist - Satara 49.0 Crs 1st Operate JD(APC) 223 - 242 8 R Mall Developer (Runwal Developer) Pvt. Ltd., CTS No. 166, 166/1 to 23, R City Mall, LB Marg, Ghatkopar (W), Mumbai 91.32 Crs. 1st Operate (Part) RO(HQ) 243 - 268 List of Cases to be submitted before 23rd Consent Committee Meeting (Part-II) of 2014 scheduled on 11.03.2014 at 3:00 p.m.

Transcript of Agenda no. 3

Page 1: Agenda no. 3

Sr. No.

Name & AddressCapital

InvestmentApplied For Section Page No. Remarks

Resubmission

1

Premier Buildcon "Elite Silverio", Gat No. 114(P) + 124 + 125 + 126 + 127(P) At Village - Chikhali, Tal - Haveli, Dist - Pune 57.52 Crs. Establish RO(HQ) 1 to 16

2Rikki Ronie Developers, CTS No. 6A/16, Jankalyan Nagar, Near Bill Bong School, Malvani, Malad(W)

274.85 Crs. Establish RO(HQ) 17 to 41

3SM Eberspaecher Exhaust Pvt. Ltd., 310, B, Nanekarwadi, Tal- Khed, Dist - Pune 36.0 Crs Establish JD(APC) 42 - 66

4Rajuri Steel Pvt. Ltd., F-12, Addl. MIDC Phase-II, Jalna

55.65 CrsEstablish

(Expansion)JD(APC) 67 - 90

5MSM Steels Pvt. Ltd., A-116, Addl. MIDC Latur

24.55 Crs Operate JD(APC) 91 - 109

6Aditya Shagun Developers "Comfort Zone", S. No. 14, Balewadi, Pune 86.38 Crs. Renewal RO(HQ) 110 - 127

Fresh Agenda

1

Mauli Sai Developers Pvt. Ltd., Ambewadi CHS for S. No. 407, 407/1 to 3, 408, 409, 410, 411, 412, 413, 414, 414/1, 415, 415/1 to 9, 423, 423/1 to 5, 424, 425, 426(pt), 427, 428, 429, 430, 434, 435, 436, 436(t to 3), 441(pt) of village Kurara, Tal - Borivali, Malad (E), Mumbai

58 Crs. Establish RO(HQ) 128 - 150

2Saurabh Vastu Nirman Pvt. Ltd., Survey No. 37(P), Wadachiwadi, Tal - Haveli, Dist- Pune

72 Crs. Establish RO(HQ) 151 - 162

3Kumar Company "Residential Project", S. No. 97 Borhatewadi, Village - Moshi, Tal - Haveli, Dist - Pune

57 Crs. Establish RO(HQ) 163 - 174

4

Kashimira Ceramic Product LLP, CTS No. 1142 to 1146, 1491 to 1511, 1586, 1589 to 1600, 1629, 1630, 1646 to 1652, 1792, 1829, 1882, 1723 to 1726, 1793, 1831 to 1836, 1878 to 1881, 1953 of village Mire, Tal & Dist - Thane

128.98 Crs. Establish RO(HQ) 175 - 193

5

Kallappanna Awade Co-operative Industrial Estate and Integrated Textile Park Ltd., Gat No. 153 to 155 to 176, Hatkanagale, Gat No. 1044 to 1055, Tardal and Gat No. 357, 358 Majale, Tal - Hatkanagale, Dist - Kolhapur

107.10 Crs. Establish RO(HQ) 194 - 207

6

K Raheja Corporation Services Pvt. Ltd., Raheja Tower, C-30, Block "G", Bandra Kurla Complex, Bandra (E), Mumbai

30 Crs.Establish

(Expansion)RO(HQ) 208 - 222

7

Pushpak Ifracon Pvt. Ltd., B-3,4, MIDC Lonand, Tal- Khandala, Dist - Satara 49.0 Crs 1st Operate JD(APC) 223 - 242

8

R Mall Developer (Runwal Developer) Pvt. Ltd., CTS No. 166, 166/1 to 23, R City Mall, LB Marg, Ghatkopar (W), Mumbai

91.32 Crs.1st Operate

(Part)RO(HQ) 243 - 268

List of Cases to be submitted before 23rd Consent Committee Meeting (Part-II) of 2014 scheduled on 11.03.2014 at 3:00 p.m.

Page 2: Agenda no. 3

9SIM Reality "Swaraj", Gat No. 212 New 1331 Old Gat No. 209 New (P) 1327 Old, Moshi, Tal - Haveli, Dist - Pune

54.72 Crs.1st Operate

(Part)RO(HQ) 269 - 277

10

Hiranandani Construction Pvt. Ltd., Maitri Park, Chembur, CTS No. 1790 to 1811, 1813 & 1815 of cillage Chembur, CTS No. 131, 133 to 140 of vilage Wadhwali, Mumbai

68.05 Crs.1st Operate

(Part)RO(HQ) 278 - 306

11Tekson Ltd., Kolshet Road, Kapurbawadi, PO No.20, Thane

25.3 Crs Renewal JD(APC) 307 - 323

12Tata Motors Ltd., Sr. No. 59-62, Po-Bedeohol, Dist - Pune

50.62 Crs Renewal JD(APC) 324 - 346

13Electronica Tough Carb Ltd., E-1, MIDC Malegaon Sinnar, Dist - Nashik

29.65 Crs Renewal JD(APC) 347 - 360

14Gabriel India Ltd., B-2, MIDC ambad, Nashik

42.77 CrsRenewal

(Amalgamation)JD(APC) 361 - 370

15Sulzer Pumps India Ltd., Plot No. 9, TTC Indl. Area, MIDC Airoli Node, Thane Belapur, Digha, Navi Mumbai

72.35 Crs Renewal JD(APC) 371 - 384

16Dhoot Transmission Pvt. Ltd., Farola, Paithan Road, Aurangabad

31.74 Crs Renewal JD(APC) 385 - 396

17Bellota Agrisolutions and Tools Pvt. Ltd., 267/4, STICE Musalgaon, Sinnar, Nashik 43.60 Crs Renewal JD(APC) 397 - 414

18Balmer Lawrie Van Leer Ltd., Plot No. D-195/2, MIDC TTC Indl. Area, Turbhe, Navi Mumbai

49.65 Crs Renewal JD(APC) 415 - 435

19SM Eberspaecher Exhaust Pvt. Ltd., 310, B, Nanekarwadi, Tal- Khed, Dist - Pune 31.28 Crs Renewal JD(APC) 436 - 460

JD(WPC) 0 `AS(T) 0RO(HQ) 12JD(APC) 13PSO 0Total 25

Page 3: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 1

CC-Resubmission

Agenda no. 1 Region : RO Pune Section :RO(HQ) Date :

Name & Address M/s Premier Buildcon “ Elite Silverio” Gat No. 114(P) + 124 + 125 + 126 + 127(P) At Village:

Chikhali, Tal : Haveli, Dist : Pune.

Consent For C to E

Capital Investment 57.52 Cr

Industry Type O08 Building and construction projects more than 20,000 Sq mtr.

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-Water Consumption;- 244 CMD, Effluent generated 228 CMD Proposed STP capacity 250 CMD

BG Details Amount : Validity :

BG Obtained against :

Other Relevant Information

1. PP has applied for consent to Establish 2. The Residential project covering total area of around 19306.87 Sq. mt with total built up

area of 50096.69 sq mtrs 3. PP has applied for environment clearance environment clearance From SEIAA on

06/07/2012. 4. Capital investment of the project is 57.52 Cr. 5. Total water consuming 244.0 m3/day of water out of which 162.0 m3/day fresh water

will be supplied by PCMC & generating about 228.0 m3/day of sewage, which PP has proposed to provide STP of capacity 250.0 m3/day, Treated 82.0 m3/day waste water will be used for utilities, and partially of which 21.0 m3/day will be used for gardening and remaining 102 CMD discharged into PMC drainage line.

6. PP has proposed to provide organic waste convertor for bio-degradable waste, Non-biodegradable waste send to authorized vender.

7. 1 no. of DG set having capacity 350 KVA. 8. Proposed site is located more than 1 Km from Indrayani River (A-II, Class). 9. The site is visited by SRO & field officer and observed that the project proponent has

started excavation on the some part. In view of above we may consider consent to establish with BG and subject to EC

Resubmission

The application for consent to establish was discussed in CC meeting held on

13/12/2013 during discussion it was decided to issued SCN for refusal of consent to

establish as PP has started excavation work without C to E and EC.

Page 4: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 2

PP has submitted reply on 28/02/2014 in reply PP stated that “we have started

excavation activity on site for site office compound wall and security office, but after

visit of SRO we have stopped the excavation activity. It will be started only after

obtaining the environment clearance.

In view of above we may consider with BG & BR with affidavit for not to take any effective step.

Recommendation of SRO/RO

RO, Pune has recommended for grant of consent to establish subject to obtaining EC &

not to take any effective stapes prior to EC.

Page 5: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 3

Agenda no. 2 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s.Rikki Ronie Developers ,

CTS No.-6A/16, Jankalyan Nagar,

Near Bill Bong School,Malvani, Malad (W)

Consent For C to E

Capital Investment Rs.274.85 Cr.

Previous Consent Validity

--

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-

Water consumption - 446 CMD.

Sewage Generation -367 CMD

Capacity of STP Proposed(2 Nos)- 290 CMD & 115 CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Page 6: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 4

Other Relevant Information

Application for grant of consent to establish for proposed construction of commercial and residential project for,

Total Plot Area - 16,395.9 Sq.mtrs. Total Construction BUA - 57,178.36 Sq.mtrs

Applicant has not obtained EC from Competent Authority.

Non Hazardous Waste:

Wet Garbage: 986 Kg/Day will be treated in organic waste Converter

Dry Garbage: 423 Kg/Day will be send Authorized party.

STP Sludge:59 Kg/Day will be used as manure

Said Project consist of Sale Bldg (Wing A to F-Gr+Pd+21 Floor) and Public Housing Bldg- (Gr+14 Floor+15(pt) Floor and Gr+13 Floor+14 (Part) Floor Said project consist of 6 Nos of buildings.

SRO Reported that PP has provided metallic fencing wall around the plot & not started any construction activity at the site(Field visit report dated 13.11.13 is enclosed)

The case was discussed in CC Dated 30/1/2014 and It was decided to issue SCN for refusal of C to E, as PP failed to submit approved pan for the BUA 57,178 Sq.Mtrs as applied in EC.Accordingly SCN issued keep case in abeyance and put up in next CC after submission of detail approved plan from PP.

Applicant has submitted following documents vide letter dated 30/12/2013.

1) Copy of IOD Dated 13/8/2013

2) True copy of IOD Plan approved by MCGM in which area statement is mentioned is:

Total Plot Area:16,395.90 Sq.Mtrs. Total BUA proposed: 4749.80 Sq.Mtrs

3) DP Remarks of Project.

Recommendation of SRO/RO

SRO Recommended grant of C to E with condition of EC.

Page 7: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 5

Agenda no. 3 CC/ Item –

Region : Pune │Section : JD(APC) Date

Name & Address

M/s. SM Eberspaecher Exhaust Pvt. Ltd.

(Formerly as SM Eberspaecher Exhaust Systems Pvt. Ltd.)

310 B, Nanekarwadi, Tal: Khed, Dist. Pune

Consent for Applied for consent to establish for modernization of

existing plant.

Capital Investment 36.0 crs

Consent Valid upto 31.10.2013

Industry Type R27

Industry Category RED

Compliance of Water

Pollution Related

Conditions

YES

(√) NO ( )

1. ETP & STP provided for trade & domestic effluent.

Compliance of Air Pollution

Related Conditions

YES

(√ ) NO ( )

Water curtain provided to paint shop & fume extractors at

welding section provided

Water Cess Assessment Done: June

2013 Paid upto: March 2012

BG Details Amount: NIL Validity -

BG obtained against: N.A.

Details of BG forfeited/ enchased, if any:

Submission of

Environmental Statement Period 2011-2012

Page 8: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 6

Other Relevant Information

o Name of industry change from SM Eberspaecher Pvt.Ltd. to

SM Eberspaecher Exhaust Pvt.Ltd.

o Case was discussed in CC meeting dtd. 13/12/2013 & it was

decided to issue SCN for refusal of consent, as PP carried out

expansion without C to E.

o In this regards industry has submitted reply vide letter dtd.

13/01/2014 received to this office on 26/02/2014.reported

imported machinery arrived at site well in advance .They are

not installed & not in use any way before the prior approval

of the board.

Recommendation of

SRO/RO

RO Pune has recommended for grant of consent to establish for

modernization with change in name.

Page 9: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 7

Agenda no. 4 Region : SRO Auranagbad II Section :JD(APC) Date :

Name & Address Rajuri Steel Pvt. Ltd. , Plot No. F-12, Additional MIDC , Phase-II, Jalna.

Consent For CE for expansion

Capital Investment 5565 Lacs

Previous Consent Validity

30/6/2016

Industry Type R72 Steel and steel products using various furnaces like induction

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :- Septic tank & soak pit provided, also provided STP

Compliance Of Air Pollution Related Conditions

Yes

Details:- Propose to provide Ventury scrubber with stack of 33 mtr height to induction furnace.

Water Cess Assessment Done :NO Paid Upto :-

BG Details Amount : NIL Validity :NA

BG Obtained against : NA

Details of BG forfeited/encashed , if any :NA

Submission of Environmental Statement

Period

Not submitted

Other Relevant Information

Case was discussed in CC held on 15/1/2014, it was decided to call the verification report from SRO about river distance from industry. Now the reply from SRO is received and reported that river distance is approx. 2.5 km from industry which is physically verified & letter is written to Ex. Eng. Irrigation dept. Aurangabad for distance certificate. The expansion will be having manufacturing of new product MS Billets- 9000 MT/ M and increase in existing product quantity of the product MS TMT Bars by- 10000 MT/ M. The E C is required.

Recommendation of SRO/RO

Grant of consent to establish for expansion with EC condition

Page 10: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 8

Agenda no. 5 Region : SRO Latur Section :JD APC Date :

Name & Address MSM Steels Pvt. Ltd.,A-116, Addl., MIDC Latur.

Consent For Consent to operate

Capital Investment 2455 lacs

Previous Consent Validity

Upto commissioning of unit

Industry Type Steel

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :- Indl. Effluent is NIL

Compliance Of Air Pollution Related Conditions

Yes

Details:- Cyclone dust collector to furnace.

Water Cess Assessment Done :-Dec-NA Paid Upto : NA

BG Details Amount : NIL Validity :NA

BG Obtained against : NA

Submission of Environmental Statement

Period NA

Other Relevant Information

Case discussed in CC held on 15/1/2014, it was decided to issue SCN for refusal of consent and not to take any effective steps for production, as violated consent condition & EIA notification. Now this office is in reciept of reply from industry, stated that they have not violated consent condition as they have installed lower capacity project which do not require EC. Also have stated that project is audited by Govt. Authorised Chartered Engineer and apologized for not informing the changes. Previously industry obtained consent to establish from board for product MS Ingots:-8000 MT/M, with CI of Rs. 42.6 crores. Now have applied for first consent to operate with quantity of 2400 MT/M and reduced CI to Rs.24.0 crores, as have installed the machineries of 2400 MT/M capacity and for the same have submitted the Chartered Engineer certificate.

Recommendation of SRO/RO

Recommended grant of consent to operate with lower capacity.

Page 11: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 9

Agenda no. 6 Region : RO PUNE Section :RO(HQ) Date :

Name & Address M/s Aditya Shagun Developers “Comfort Zone”, S. No. 14, Balewadi, Pune. 411052

Consent For C to R

Capital Investment 86.38 Cr.

Previous Consent Validity

----

Industry Type O08 Building & Construction Projects more than 20,000 Sq. mtr.

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-Water Consumption: 379 CMD, Effluent generated 272 CMD. STP Proposed of Capacity : 300 CMD

Other Relevant Information

1. PP has applied for consent to Renewal. 2. Earlier consent was valid upto 31/03/2012. 3. The Residential project covering total area of around 81100.00 sq.mtrs with total built up area

of 27055.91 sq mtrs 4. PP has obtained environment clearance From GoM on 12

th May 2009. & obtained consent to

operate from Board for the same area. 5. Total water consuming for this phase 379 m3/day of water out of which 227.0 m3/day fresh

water will be supplied by Local Body & generating about 272.0 m3/day of sewage, which PP has provided STP of capacity 300.0 m3/day, Treated 113 m3/day waste water will be used for utilities, and partially of which 39 m3/day will be used for gardening.

6. Biogas plant installed by PP for bio-degradable waste which is found not in operation during visit. Non-biodegradable waste will send to authorized vender.

7. 3 no. of DG sets each having capacity, 60 KVA. 8. The cost of the project is increased from 40 Cr to Rs 86.37 Crore for which they have paid Rs.

2,00,000-as consent fees. 9. SRO Pune has visited the site and observed that, PP has submitted the plan of 13 buildings and

applicant has started construction of 2 additional buildings without obtaining consent to establish and EC for the same. (Out of 2, buildings one Building is completed upto 9

th floor and

2nd

upto ground floor). 10. PP has provided STP which is located at 20 to 30 meter approx. from river Mula. 11. RO, Pune has recommended for renewal of consent by imposing condition to shift the STP

100meter from HFL, verification of actual construction done by sanction plan and additional consent fees on increased capital investment.

The application for renewal of consent to establish was discussed in CC meeting held on 13/12/2013 during discussion it was decided to issue SCN for refusal of consent to operate as PP has carried out construction of two additional building without obtaining consent to establish from Board and amendment in EC. And not operating Bio-gas plant as per consent to operate condition. SCN issued on 17/01/2014.

Applicant has submitted reply through E-mail on dated 25/02/2014 in reply applicant stated that “For Expansion of two buildings we have already applied for amendment in Environment clearance on 05/10/2011, for same expansion we will be apply consent to establish for

Page 12: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 10

additional construction. Also PP assure that we will operate and maintain the Biogas plant on regular basis to achieve the consented norms

In view of above we may consider plain renewal with condition not to take any effective step prior to EC for expansion phase and BG for O & M of Biogas plant of

Recommendation of SRO/RO

Page 13: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 11

CC-Fresh Agenda

Agenda no. 1 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s.Mauli Sai Developers Pvt.Ltd. ,

“Ambewadi CHS” at S.No.407,407/1 to 3, 408, 409,

410, 411, 412, 413, 414/1,415, 415/1 to9 ,416,416/1 to3,

417 ,417/1, 418, 418/1 to 4, 419 ,419/ 1 to15, 420, 421,

422, 422/1 to9, 423, 423/1to5,424,426(pt), 427,428, 429(pt),

434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai

Consent For C to E

Capital Investment Rs.58 Cr.

Previous Consent Validity

--

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-

Water consumption - 455 CMD.

Sewage Generation - 360 CMD

Capacity of STP Praposed (3 Nos) -205,86,87CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Page 14: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 12

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Consent to Establish for construction of residential project under SRA Scheme for Total Plot area - 8,807.19 Sq. mtrs Total Construction BUA -33,836.54 Sq.mtrs

Applicant has not obtained EC dated 4/10/2011 for Dr. Babasaheb Ambedkar Nagar CHS for S.No.407,407/1 to 3,408,409,410,411,412,413,414/1,415, 415/1 to9 ,416,416/1 to3, 417 ,417/1, 418, 418/1 to15, 420, 421, 422, 422/1 to9, 423, 423/1to5,524,424,426(pt),427,428,429(pt),434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai for

Total Plot area - 8807.19 Sq. mtrs Total Construction BUA -33836.54 Sq.mtrs

Applicant has obtained revise EC dated 16/11/2011 for Ambewadi CHS for S.No.407,407/1 to 3, 408, 409, 410, 411, 412, 413, 414/1,415, 415/1 to9 ,416,416/1 to3, 417 ,417/1, 418, 418/1 to 4, 419 ,419/ 1 to15, 420, 421, 422, 422/1 to9, 423, 423/1to5, 524, 424, 426(pt), 427,428,429(pt),434,435,436,436(1to3),441of village Kurara, Ta-Borivali,Malad(E),Mumbai

Nonhazardous waste

Wet garbage: 899 Kg/Day(will be treated in organic waste Converter)

Dry garbage:599 Kg/Day(will be handed over to MCGM)

STP Sludge-28 Kg/Day (used as manure)

Total no. of residential buildings is 3 Nos ( 2 Nos. Rehab Bldg & 1 no. sale Bldg. having 22 floors.

SRO reported that, PP has started the demolition work.

(field visit report dated 20/1/2014 is enclosed)

Applicant has submitted,

1.Letter of Intent(LOI) from SRA dated 19/11/2010

Applicant has not submitted architect plan and affidavit for compliance EC/CRZ clearance and C to E.

Recommendation of SRO/RO

SRO Recommended grant of consent to establish.

Page 15: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 13

Agenda no. 2 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 11/10/2013

Ro (HQ) Date of receipt;- 03/01/2013

Name & Address M/s. Saurabh Vastu Nirman Pvt Ltd, Survey No. 37 (P), Wadachiwadi, Tal Haveli, Dist Pune

Consent For C to E

Capital Investment 72.0 Crore

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :- Water Consumption :- 246.0 CMD , Effluent Generated :- 182.0

Proposed STP Capacity :-200 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Other Relevant Information

Applied for C to E Residential

Plot Area 33,100 sq.mt Built up area 59,583.64 sq.mt

EC Status Applied Dated 11/10/2013

River Distance @ 8.0 Km Name of River Mula-Mutha

Water Consumption 246.0 CMD Effluent Generated 182.0 CMD

STP Capacity 200.0 CMD Recycle water 77.0 CMD

Bio-degradable 473.0 Kg/D Treatment OWC

Non-Boi degradable 473.0 Kg/D Treatment Local Body

Page 16: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 14

No of DG Sets 1 Capacity 400 KVA

Construction status Not started Date of Visit 23/10/2013

We may consider consent to Establish with following condition

1) BG of Rs 5 lakh for compliance of Consent condition

2) Affidavit & BG for Not to take any effective steps prior to EC.

Recommendation of SRO/RO

RO Pune has recommended that PP has not started construction activity in view of above case is recommended for grant of consent to establish.

Page 17: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 15

Agenda no. 3 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 18/11/2013

Ro (HQ) Date of receipt;- 17/01/2014

Name & Address M/s Kumar Company “Residential Project” S. No. 97 Borhatewadi, Village Moshi, Tal-

Haveli, Dist-Pune. 412105

Consent For C to E

Capital Investment 57.0 Crore

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :- Water Consumption :- 312.0 CMD , Effluent Generated :- 283.0

Proposed STP Capacity :-290 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Other Relevant Information

Applied for C to E Residential

Plot Area 21,900 sq.mt Built up area 53,938 sq.mt

EC Status Obtained Dated 26/06/2013

River Distance @ 1.5 Km Name of River Indrayani (A-IV)

Water Consumption 312 CMD Effluent Generated 283.0 CMD

STP Capacity 290.0 CMD Recycle water 103.0 CMD

Bio-degradable 474.0 Kg/D Treatment OWC

Non-Boi degradable 474.0 Kg/D Treatment Local Body

No of DG Sets 3 Capacity (Total) 482.0 KVA

Page 18: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 16

Construction status Started Date of Visit 11/12/2013

PP has started construction of A1, B1,B2,B3 Buildings

In view of above PP has obtained Environment clearance & started construction we

may consider consent to Establish with following condition

1) BG of Rs 5 lakh for compliance of Consent condition

2) BG of Rs 2 Lakh for submission of BR.

Recommendation of SRO/RO

RO Pune has recommended that PP has not started construction activity in view of above case is recommended for grant of consent to establish.

Page 19: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 17

Agenda no. 4 Region : Thane Section : RO(HQ)-Fresh Case Date : /03/2014

Name & Address M/s. Kashimira Ceramic Product LLP , CTS No 1142 to 1146, 1491 to 1511, 1586, 1589 to 1600, 1629, 1630, 1646 to 1652, 1792, 1829, 1882, 1723 to 1726, 1793, 1831 to 1836, 1878 to 1881, 1953 of Village Mire Tal and Dist Thane

Consent For CE

Capital Investment 12898 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Kashimira Ceramic product LLP, Village: Mire Tal and Dist: Thane has applied for consent to Establish for proposed Residential construction project to MPC Board having area details as under :

For Area Details of Project :-

Total Plot Area : 23,292.83 Sq. meters ( covering phase –I and Phase-2) Total Construction BUA Area : 89,016.83 sq meters ( covering phase –I and Phase-2) Capital investment of Project is Rs. – 128.98 Crs ( Undertaking

Page 20: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 18

The project proponent has applied for Environment Clearance from Govt of Maharashtra for construction of residential project on 02/06/2011, Environment department had issued Show Cause notice dated 22.4.2013. Personal hearing extended to project proponent before Hon. Principal Secretary, Environment Department, GOM dated 26.7.2013. Principal Secretary, Environment Department had issued Direction on 6.12.2013 U/s. 5 of the Environment ( Protection) Act, 1986 r.w. Environment Impact Assessment Notification dated 14.9.2006.

Details of water consumption as under :-

Water consumption – 486. 00CMD

Sewage Generation –391.00 CMD

Proposed STP of the capacity- 400 CMD for treatment of sewage.

Non-hazardous Waste:

Bio degradable Waste : 724 Kg/day

Non- Bio Degradable : 1086 Kg/day

Proposed MSW Treatment facility (mechanical waste convertor) for treatment and disposal of MSW.

Project proponent has obtained Commencement certificate / permission from Mira Bhyander Municipal Corporation for proposed residential project dated: - 23/02/2011 and 06/08/2012 and submitted approved lay out plan from Mira Bhyander Municipal Corporation.

Proposed to provide DG sets – 225 KVA x 2 Nos.

Project proponent has paid consent fees of Rs. 2,58,062.51/- towards fees for consent to establish.

Present Status of Construction work carried out :-

As reported by the SRO MPC Board Thane-II office,

During visit of the Board official to the site on 02.01.2014 , No construction activity was found in operation, however it is observed that already some construction work of Phase –I and 2 was completed. The present status of Phase No1 and 2 is as below;

A) Phase No.1:- There are 5 Nos of Towes namely A, B, C,D and E.

1) Tower A:- Construction work up to 3rd floor completed.

2) Tower B:- Construction work up to 4th floor completed.

3) Tower C:- Construction work up to 10th floor completed.

Page 21: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 19

4) Tower B:- Construction work up to 10th floor completed.

5) Tower B:- Construction work up to 1st floor completed.

B) Phase No.2:- There are 3 Nos of Towes namely A, B and C. :-

1) Tower A:- Construction work up Stilt floor completed.

2) Tower B:- Construction work up Stilt floor completed.

3) Tower C:- Construction work up Stilt floor completed

Project representative told that, the above mentioned construction work was completed in the month of January 2013 and they have stopped the construction activity voluntarily since then and informed that till they obtain E.C. from competent Authority, no further construction will be undertaken.

Environment department had issued Show Cause notice dated 22.4.2013 to Project proponent and Personal hearing extended to project proponent before Hon. Principal Secretary, Environment Department, GOM dated 26.7.2013.

Principal Secretary, Environment Department had issued Direction on 6.12.2013 U/s. 5 of the Environment (Protection) Act, 1986 r.w. Environment Impact Assessment Notification dated 14.9.2006, in which directions are given to project proponent to stop construction work till obtaining Environmental clearance from competent authority for violation of provisions of EIA notification 2006 by starting construction work at site prior obtaining Environmental clearance

Recommendation of SRO/RO

Environment Department has issued show cause notice and directions to the project proponent because of violation of EIA Notification 2006, and authorized Member Secretary of the Board to file Criminal Case against the project proponent in appropriate Court. RO MPC Board Thane office has filed Criminal Case against M/s. Kashimira Ceramic product LLP, Village: Mire Tal and Dist: Thane before JMFC court Thane and the Court Case no: 293 of 2014.

Since to obtain C to E and Environment Clearance are separate issues as per EIA Notification 2006, consent to establish may be granted and if necessary it may be mentioned in the consent to establish that, the consent is issued without prejudice to legal action.

Page 22: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 20

Agenda no. 5 Region : Kolhapur Section : RO(HQ) Date : /03/2014

Name & Address M/s. Kallappanna Awade Co-Operative Industrial Estate and Integrated Textile Park Ltd. Gat No. 153 to 155 to 176, Hatkanagale, Gta No. 1044 to 1055, Tardal and Gat No. 357,358 Majale, Tal. Hatkanagale, Dist. Kolhapur

Consent For CE

Capital Investment 107. 10 Crs

Previous Consent Validity

Industry Type O39 Infrastructure development project

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Kallappanna Awade Co-Operative Industrial Estate and Integrated Textile Park Ltd. has applied for consent to establish for their Co-Operative Industrial Estate and Integrated Textile Park, at Gat No. 153 to 155 to 176, Hatkanagale, Gta No. 1044 to 1055, Tardal and Gat No. 357,358 Majale, Tal. Hatkanagale, Dist. Kolhapur. Propsed Textile Park having Textile/Engineering and Fabrication/Casting Industries. For Area Details of Project :- Total Area: 200 Acre Total Area of Textile Park-56 Acres(90 Plots) Total Area of Engineering Industries-94 Acres (64 Plots) Total Area under Road-20 Acre

Page 23: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 21

Total Area Under Open Space-26 Acre Total Area Under Amenities-04 Acre Capital investment of part operate Project is Rs. – 107.10Crs Details of water consumption as under :- Water consumption Domestic – 1080.00 CMD Sewage Generation – 800.00 CMD Industrial - 620.00 CMD Proponent has proposed STP of 1000 CMD capacity. Non-hazardous Waste: Bio degradable Waste: 6000 kg/day – vermi-composting proposed. This project comes under Textile Park of Ministry of Commerce & Industry,Govt. of India.In this Park Weaving & Garments Stitching will be carried out without any process and some part for Engineering Industries.

Recommendation of SRO/RO

SRO Kolhapur has recommended that the case may be granted by incorporate condition for 100 % recycle/gardening .

Page 24: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 22

Agenda no. 6 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 16/09/2013

Ro (HQ) Date of receipt:- 02/02/2014

Name & Address M/s. K Raheja Corporation Services Pvt. Ltd,

Raheja Tower, C- 30, Block “G”, Bandra Kurla Complex, Bandra (E), Mumbai

Consent For C to E (Expansion)

Capital Investment 30.0 Crore

Previous Consent Validity

28/02/2011

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :- Water Consumption :- 94.0 CMD , Effluent Generated :- 65

Proposed STP Capacity :-85.0 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Other Relevant Information

1. PP applied for consent to Establish for expansion of building from G + 10 Floor to G + 14

floor for IT & Office building.

2. Total plot area 4556.17m2 and total BUA 24,955.29 m2 [Existing 19212.54 m2 + 5742.75

m2.]

3. For this expansion applicant has obtained environment clearance from SEIAA on

02/04/2014. For same area.

4. Capital investment of the existing project 104 Cr and 30 Cr for expansion.

5. Total water consumption 94 m3 effluent generated 65 m3, STP provided capacity 85 m3.

6. Bio-degradable waste generated 279.0 Kg/D,non biodegradable 186.0, for biodegradable

waste PP has provided composting pit.

7. SRO Mumbai-II reported that applicant has obtained consent to operate for existing

building on 20/05/2009 valid upto 28/02/2011 and applicant has submitted application for

renewal of consent dtd 15/02/2011 but presently under process of HQ.

8. Applicant has paid Rs 6, 96,103/- at the time of renewal.

Page 25: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 23

9. During visit observed no any construction activity observed.

10. In view of above we may consider consent to establish expansion.

For existing renewal application not traceable at this office, hence we may call Xerox

copy from RO Mumbai or grant with considering this application as all detail available

with this application.

Recommendation of SRO/RO

Page 26: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 24

Agenda no. 7 Region : SRO Satara Section : JD(APC) Date: 18.02.2014.

Name & Address M/s Pushpak Ifracon Pvt.Ltd. , Plot No.B-3, B-4, MIDC Lonand, Tal- Khandala, Dist- Satara.

Consent For Ist Consent operate with additional qty.

Capital Investment Rs. 49.00 Crs

Previous Consent Validity

Consent to Establish obtained.

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( √ )

Details :- Industrial Eff: Nil.

Domestic Eff :1.50 CMD septic tank with soak pit provided.

Water Cess Assessment Done :-------- Paid Upto : ----------

BG Details Amount : ------------- Validity :------------

BG Obtained against : ----------------

Details of BG forfeited/encashed , if any : -------------

Submission of Environmental Statement

Period Ist Consent operate

Other Relevant Information

- Industry has applied for grant of consent to Ist consent operate with additional 2500 MT production qty.[ i.e. Consented qty 6250 MT/M to applied for 8750 MT/M ]

- Industry has submitted letter dated 03.12.2013 stating that the increase in CI Rs. 34.20 Crs is because of automated process. And also due to atomization, corresponding production capacity has also increased from 6250 MT/M to 8750 MT/M.

Recommendation of SRO/RO

- RO Pune has recommended case for grant of consent to operate with additional qty up to 31.01.2016.

Page 27: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 25

Agenda no. 8 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s.R Mall Developer

(RunwalDeveloper)Pvt.Ltd ,

CTS No.166,166/1to23,

R City Mall, LB MArg,

Ghatkopar (W).Mumbai400071

Consent For 1st C to O(part)

Capital Investment Rs.91.32Cr

Applicant has submitted Undertaking in which land cost is not mentioned

Previous Consent Validity

COU

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :-

Water consumption - 950 CMD.

Sewage Generation - 793 CMD

Capacity of STP Provided (2 Nos) - 630CMD

400CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Page 28: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 26

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Consent to 1st Operate(part) for residential cum commercial mall for

Applicant has not submitted area statement of constriction completed building for part C to O for which applicant has applied alngwith consent processing form.

Applicant has obtained C to E dated 27/10/2005 for 80,873 Sq.Mtrs with condition of obtaining EC from Competent authority

Total Plot area and Total Construction BUA is not mentioned.

Applicant has obtained EC from GOI dated 24/2/2006

for total area 80,873 Sq.Mtrs

Total Plot area and Total Construction BUA is not mentioned in EC.

Nonhazardous waste

Wet garbage: 11550 Kg/Day

Dry garbage:16500 Kg/Day

SRO reported that ,PP is praposed to installation of invessel composting of organic waste at site only.

As mentioned in EC, Said project consist of

1. residential complex comprises of 10towers of 13 floors each having 500 flats.

2. Commercial complex has 240 rooms hotel, shopping mall with seven screens.

Construction Status

SRO reported that,During the visit, it was observed that the construction work of residential complex was found completed and more than 80% occupancy were observed.

The construction work of commercial building (phase –II) was found under construction. The construction work upto fifth floor completed. The construction work of upper floor is going on.

Page 29: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 27

SRO reported that,

1)complaint of nuisance of noise pollution of R city mall from resident of ‘Orchid

residency” located behind the Rcity mall, Ghatkopar(W), .SRO office has carried out the

noise monitoring on dated 14.03.2013, 13.06.2013 & 19.07.2013 and issued the Show cause notice to developer wrt exceeding noise level due to operation of cooling towers on the top of R-city mall.

2)Project proponent has fail to submit the reply alongwith the concrete proposal of installation of acoustic panels to cooling tower.

3)Noise barrier at top of the commercial mall are partially installed.(Chilling tower & AC cooling) and work of L-barrier is going on while inspection.

Applicant has submitted,

1)Part occupancy certificate dated 7/2/2013.

SRO has submitted explanation regarding delay in submission of consent processing(Copy attached)

Recommendation of SRO/RO

SRO Recommended grant of C to O at HQ

Page 30: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 28

Agenda no. 9 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 26/12/2013

Date RO(HQ):- 28/02/2014

Name & Address M/s. SIM Reality, “Swaraj”

Gat No. 212 New 1331 old Gat No. 209 New (P)1327 old, Moshi, Taluka- Haveli, Dist. Pune.

Consent For C to O (Part)

Capital Investment 54.72 Crore

Previous Consent Validity

COU

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

Compliance Of Water Pollution Related Conditions

YES ( ) NO ( )

Details :- Water Consumption :- 649.0 CMD , Effluent Generated :- 500.0

Proposed STP Capacity :-500.0 CMD

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/enchased, if any :

Other Relevant Information

Applied for C to O (Part) Residential 16 buildings

Plot Area 40,400.0 m2 Total Built up area 66490.47m2

C to E Obtained (Valid) Dated 24/08/2011

Plot area as per CE 40,400.0 m2 BUA as per CE 66491.0 m2

EC Status Obtained (valid) Dated 21/10/2011

Plot area as per EC 40,400.0 m2 BUA as per EC 66490.87 m2

Water Consumption 649.0 CMD Effluent Generated 500.0 CMD

STP Capacity 500.0 CMD Recycle water 298.25 CMD

Page 31: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 29

Bio-degradable 1270 Kg/D Treatment OWC

Non-Boi degradable 850.0 Kg/D Treatment Local Body

No of DG Sets 1 Capacity 400.0 KVA

Construction status 16 bldg

completed

Part operate BUA 51688.75 m2

Project proponent has provided Sewage Treatment Plant for treatment which is located about

60 mtr from HFL of River Indrayani. As per consent to establish condition STP location shall

be beyond 100 mtr from HFL.

In view of above we may issue SCN for refusal of consent to establish as PP has installed

STP at 60 meters from HFL and not complied c to E condition.

Recommendation of SRO/RO

Project proponent has submitted undertaking in which reported that, they will shift the STP beyond 100 mtr from HFL, however, time bound action plan in this regard not submitted. In view of above, decision of grant of consent may be taken at HQ level

Page 32: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 30

Agenda no. 10

CC Item –Fresh

Region : Mumbai │Section : ROHQ Date:

Name & Address

M/s.Hiranandani Construction Pvt. Ltd.,

Maitri Park,Chembur ,CTS No.1790 to 1811,1813 & 1815 of Village Chembur,

CTS No.131,133 to 140 of village Wadhwali:Mumbai.

Consent for C to1st Operate(part).

Capital Investment

68.05 Crs

Consent Valid upto

Commissioning

Industry Type Construction

Industry Category

ORANGE

Compliance of Water Pollution Related Conditions

YES

Water consumption- 105 CMD.

Sewage Generation-70 CMD.

As per Environmental Clearance dated 13/6/2008, STP proposed 500 CMD.

Provided STP having capacity 64 CMD for constructed tower A & B.

Compliance of Air Pollution Related Conditions

YES ( )

Details: - Air pollution control system will be provided to DG set.

Water Cess Assessment Done: NA Paid upto: NA

Page 33: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 31

BG Details Amount: NA Validity NA

BG obtained against: NA

Details of BG forfeited/ enchased, if any:

There is No BG Condition mentioned in earlier C to E Granted by Board.

Submission of Environmental Statement

Period NA

Other Relevant Information

Application for C to O(Part-for Phase-I) for Construction of Redevelopment of residentail Building Project located at

Village Chembur : CTS No.1790/A and

Village: Wadawali : CTS No.131/ A for,

Construction BUA(As Per FSI) -9887.84 Sq.mtrs.

Total Construction BUA-11,371.016 Sq.mtrs.

Said project obtained EC from GOI Dated 13/6/2008.

Village Chembur: CTS No.1790 to 1811,1813 & 1815.

village Wadhwali: CTS No.131,133 to 140.

Total Plot Area -37,456.00 Sq.mtrs.

Total Construction BUA(praposed)-63,066.00Sq.mtrs.

Board has issued C to E Dated 8/4/2009 for ,

Total Plot Area -37,456.00 Sq.mtrs.

Total Construction BUA -63,066.00Sq.mtrs.

The Case was discussed in CC Meeting dated 13/6/2013 and it was decided to issue refusal of 1st Consent to Operate(part) since PP has not provided STP as as per condition of C to E and EC.

Page 34: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 32

Accordingly final refusal issued on 27/6/2013.

Now applicant has submitted letter dated 12/2/2014 which is received in HQ dated17/2/2014 in which

1) applicant has submitted consent fee of Rs.1,00,000/- 2) Provided STP having capacity 64 CMD for constructed tower A & B. 3) Letter from Dy. Chief Engineer (civil), Environment(civil) regarding

part completion of STP Capacity 64 CMD.

Recommendation SRO/RO

RO recommended C to Operate (Part) for period upto 31/1/2015

Page 35: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 33

Agenda no. 11 CC Item –

Region : Thane │Section : JD(APC) Date

Name & Address

M/s. Tekson Limited,

Kolshet Road,Kapurbawadi,

P.O. No.-20, Thane.

Consent for renewal of consent

Capital Investment Rs. 25.3 crs

Consent Valid upto 30.09.2013

Industry Type Engineering

Industry Category RED

Compliance of

Water Pollution

Related Conditions

YES () NO (√)

1. Trade effluent generation is 20CMD for which effluent treatment

plant provided.

2. For domestic effluent 60 CMD septic tank soak pit provided

Compliance of Air

Pollution Related

Conditions

YES (√ ) NO ( )

APCS Provided to Lead Bath & Hot water Boiler

Water Cess

Assessment Done:

Submitted up to:

Paid upto:

BG Details Amount: Validity -

BG obtained against:

Page 36: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 34

Submission of

Environmental

Statement

Period Environmental statement report submitted

Other Relevant

Information

Recommendation

of SRO/RO

Consent may be granted upto 30/09/2014.

Page 37: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 35

Agenda no. 12 Region : Pune Section : JD(APC) Date : 02/2014

Name & Address M/s. Tata Motors Ltd. Sr. No. 59-62, PO Bedeohol, Tal. Maval, Dist: Pune – 410 506.

Consent For Renewal

Capital Investment 50.62 Crs

Previous Consent Validity

30/09/2013

Industry Type R21 Ferrous and Non Ferrous metal extraction

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :-Domestic Effluent 80 CMD

Industrial Effluent Nil

Water Cess Assessment Done : Sept 2013 Paid Upto : Feb 2013

Compliance Of air Pollution Related Conditions

Fume Extraction and bag filter system is provided.

BG Details Amount : - Validity : -

BG Obtained against : -

Details of BG forfeited/encashed , if any : -

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

1. M/s. Tata Motors Ltd. has applied for renewal of consent their Maval Foundry unit for SG iron casting activity located at Sr. No. 59-62, PO Bedeohol, Tal. Maval, Dist: Pune – 410 506.

2. Earlier Industry has obtained consent to Operate from MPC Board for SG iron casting activity vide no: BOJD(APC)/EIC No. PN-15699-

Page 38: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 36

12/O-CC-784 dated 27/12/2012 valid till 30/09/2013

3. Applied for SG Iron Casting - 14,400 MT/A

4. Water Consumption Domestic – 100.00 CMD

Sewage – 80.00 CMD

Industrial – 200.00 CMD

Effluent – NIL

5. Industry has submitted details of raw material consumption, flow diagram of manufacturing process.

6. Industry has submitted consent fee of Rs. 1,25,000/- towards renewal of consent to operate and increase in CI, which is as per Govt. of Maharashtra G.R. for revision of Consent fees dated: 25/08/2011.

Recommendation of SRO/RO

Regional Officer, Pune, MPCB Pune has commented that there is increase in CI by 6.75 Crs. Due to modernization of plant and machinery and the attraction of RRZ policy as the dist. of the unit is about 700 mtrs. From the river Pawana.

Page 39: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 37

Agenda no. 13 Region : SRO Nashik Section : JD(APC) Section Date :28.02.2014.

Name & Address Electronica Tough Carb Ltd. , E-1, MIDC Malegaon Sinnar, Dist. Nashik

Consent For Renewal of consent to operate

Capital Investment Rs.29.65 Lacs

Previous Consent Validity

31/12/2013

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( √ )

- Details :- Industrial effluent: Nil, Domestic Effluent: 8.20 CMD Soak pit

provided.

Water Cess Assessment Done : July -2013 Paid Upto : June-2012

Compliance Of Air Pollution Related Conditions

Dust collector system provided to shaping section.

BG Details Amount : ------- Validity : -------

BG Obtained against : -------

Details of BG forfeited/encashed , if any : -------

Submission of Environmental Statement

Period

2012-2013

Other Relevant Information

-------

Recommendation of SRO/RO

- SRO –Nashik has recommended case for grant of renewal of consent to operate up to 31.12.2014.

Page 40: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 38

Agenda no. 14 Region : SRO Nashik Section :JD(APC) Date: 5.03.2014.

Name & Address M/s Gabriel India Ltd. , B-2, MIDC Ambad, Nashik

Consent For Renewal of consent with amalgamation for consent to operate for expansion.

Capital Investment Rs. 42.77cr

Previous Consent Validity Existing unit consent was valid up to 31/10/2013.

Board has granted Consent to establish for Expansion unit on 8.7.2013 which is valid up to COU or 5 years whichever is earlier.

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

Compliance Of Water Pollution Related Conditions

NO

1. After expansion ind effluent & dom. eff. will be 14 & 38 CMD.

2. ETP having cap. 30 CMD comprises of pri.sec & tert. Treatment provided for ind.eff.

3. STP having cap-50 CMD provided for dom.eff.

4. Analysis results of effluent sample collected during last 8 months are exceeding the standards for the parameter BOD,COD,TDS,Chloride,sulphate & phosphate.

Compliance Of Air Pollution Related Conditions

Yes

Stack provided to Thermic fluid heated

Water Cess Assessment Done :Sept-2013 Paid Up to :Sept-2013

BG Details Amount : Rs.2.0/- Lakhs Validity :31.07.2013

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2012-2013

Industry has not submitted the BG of Rs.4.0 Lakhs towards O & M of

Page 41: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 39

Other Relevant Information pollution control system as per the condition stipulated in consent to Establish for expansion project.

Recommendation of SRO/RO

SRO recommended to issue show cause notice for refusal of consent as industry has not submitted the BG towards O & M & JVS results are exceeding.

Page 42: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 40

Agenda no. 15

CC Item –

Region : Navi Mumbai │Section : JD(APC) Date

Name & Address

M/s. Sulzer Pumps India Ltd.,Plot No.-9,TTC Indl. Area,MIDC,Airoli

Node,Thane Belapur Road,Digha,Navi Mumbai.

Consent for Renewal of Consent

Capital Investment Rs. – 72.35 Crs.(existing 54.34) increased by 18.01 Crs.

Consent Valid upto Valid upto 31/12/2013.

Industry Type R27 Heavy Engg.

Industry Category RED

Compliance of Water

Pollution Related

Conditions

YES () NO (√)

Indl. Eff – 4 CMD. ETP provided, but existing ETP is in idle condition &

As reported by SRO Up-gradation of ETP will complete in April 2014.

Compliance of Air

Pollution Related

Conditions

YES () NO (√)

Not reported

Water Cess Assessment Done: Sep-13. Paid upto:

BG Details Amount: Rs.10,00,000/-

Validity – 31/12/2014

For Operation & Maintenance of Pollution Control System.

Submission of

Environmental

Statement

Period 2013

Other Relevant

Page 43: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 41

Information

Recommendation of

SRO/RO

Renewal of consent may be granted with a condition that industry shall

carry spray painting activity after up gradation of ETP.

Page 44: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 42

Agenda no. 16

Region : SRO Aurangabad I Section :JD APC Date :

Name & Address Dhoot Transmission Pvt.Ltd.Farola ,

Consent For CR

Capital Investment 3174.0 Lacs

Previous Consent Validity

31/07/2011 & 31/8/2011

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES

Details :- Indl effluent is nil.

Domestic 9 CMD, septic tank & soak pit.

Compliance Of Air Pollution Related Conditions

Yes

Fume extraction system followed by chimney to wire enamel machine.

Water Cess Assessment Done :No details Paid Upto :No details

BG Details Amount : NIL Validity :NA

BG Obtained against :NA

Submission of Environmental Statement

Period

NO details

Other Relevant Information

Industry had obtained two consents, one under Green cat. for product Wiring Harness, valid upto 31/7/2011 and other in Red category for product Enameled copper Wire, valid upto 31/8/2011. The total CI of Rs. 31.74 cores is shown. Now have increased the product qty of wiring harness-2500000 Nos./A to 7500000 Nos./A. due to capacity utilisation. Indl. effluent is nil. Provided fume extraction system with chimney to wire enamelling machine. The said application was returned back by RO to SRO for resbmission. Industry have stated that they do not generate HW from process. SRO recommended grant of consent renewal upto 31/7/2014.

Recommendation of SRO/RO

Renewal of consent upto 31/7/2014

Page 45: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 43

Agenda no. 17 Region : SRO Nashik Section : JD(APC) Section Date : 22.02.2014.

Name & Address Bellota Agrisolutions and Tools Pvt Ltd. , 267/4,STICE Musalgaon, Sinnar, Nashik

Consent For Renewal of consent to operate

Capital Investment Rs.43.60 Crs

Previous Consent Validity

31/10/2013

Industry Type Engineering (Agro base )

Industry Category Red

Compliance Of Water Pollution Related Conditions

YES ( √ )

Details :- Ind. Effluent: Nil, Dom Eff: 8.0 CMD, septic tank soak pit provided.

Compliance Of Air Pollution Related Conditions

Industry has provided air pollution control system to paint booth, powder coating and shot blasting section.

Water Cess Assessment Done : July-2013 Paid Upto : June-2012.

BG Details Amount : 5.0 Lakhs. Validity : 27.11.2014.

BG Obtained against : Earlier consent condition towards O & M.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2012-2013.

Other Relevant Information

-

Recommendation of SRO/RO

Recommended case for grant of renewal of consent to operate up to 31.10.2016.

Page 46: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 44

Agenda no. 18 CC Item –

Region : Navi Mumbai │Section : JD(APC) Date

Name & Address M/s. Balmer Lawrie Van Leer Ltd., Plot No. D-195/2, MIDC TTC Indl.

Area, Turbhe, Navi Mumbai.

Consent for Renewal of consent

Capital Investment Rs. – 49.65 Crs.(existing 20.34) increased by 29.31 Crs.

Consent Valid upto Valid upto 31/12/2013.

Industry Type R27 Heavy Engg.

Industry Category RED

Compliance of Water

Pollution Related

Conditions

YES (√) NO ()

Indl. Eff – 55 CMD. ETP provided & disposal at CETP & Dom Eff – 20.0

CMD .Septic tank provided.

Compliance of Air

Pollution Related

Conditions

YES (√) NO ()

Scrubber to cleaning Section, pickling section, Zinc Section as a provided.

Water Cess Assessment Done: Sep-13. Paid upto: DEC-12

BG Details Amount: Nil

Validity –

Submission of

Environmental

Statement

Period 2012-2013

Other Relevant

Information

Recommendation of

SRO/RO

Renewal of consent may be granted upto 31.12.2018 subject to BG towards

O & M.

Page 47: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 45

Agenda no. 19 CC/ Item –

Region : Pune │Section : JD(APC) Date

Name & Address

M/s. SM Eberspaecher Exhaust Pvt. Ltd.

(Formerly as SM Eberspaecher Exhaust Systems Pvt. Ltd.)

310 B, Nanekarwadi, Tal: Khed, Dist. Pune

Consent for Applied for Renewal of consent (Same Industry CTE case for

modernization under consideration in CC)

Capital Investment 31.28 crs

Consent Valid upto 31.10.2013

Industry Type R27

Industry Category RED

Compliance of Water Pollution

Related Conditions

YES

(√) NO ( )

2. ETP & STP provided for trade & domestic effluent.

Compliance of Air Pollution

Related Conditions

YES

(√ ) NO ( )

Water curtain provided to paint shop & fume extractors at welding

section provided

Water Cess Assessment Done: June 2013 Paid upto: March 2012

BG Details Amount: NIL Validity -

BG obtained against: N.A.

Details of BG forfeited/ enchased, if any:

Submission of Environmental

Statement Period 2011-2012

Page 48: Agenda no. 3

Web agenda of 23rd CC meeting (Part-II) of 2013-14 dtd. 11.03.2014 46

Other Relevant Information

o Name of industry change from SM Eberspaecher Pvt.Ltd. to SM Eberspaecher Exhaust Pvt.Ltd.

o CTE application of same industry for modernization was discussed in CC meeting dtd. 13/12/2013 & it was decided to issue SCN for refusal of consent, as PP carried out expansion without C to E.

o In this regards industry has submitted reply vide letter dtd. 13/01/2014 received to this office on 26/02/2014 (Copy enclosed).

o RO reported as per CPCB Categorization industry comes in Orange Category

Recommendation of SRO/RO RO Pune has recommended for grant of renewal in Orange Category with