STATE HIGH PROJECT Agenda Why? Process Design Financia l Question s CRABTREE, ROHRBAUGH & ASSOCIATES ARCHITECTS

description

Agenda. STATE HIGH PROJECT. Why? Process Design Financial Questions. Crabtree, Rohrbaugh & Associates architects. An aging, deficient facility. Challenges Site Parkway Security Flooding Physical plant Educational adequacy. The SCASD responds. - PowerPoint PPT Presentation

Transcript of Agenda

Page 1: Agenda

STATE HIGH PROJECT

Agenda● Why?● Process● Design● Financial● Questions

CRABTREE, ROHRBAUGH & ASSOCIATESARCHITECTS

Page 2: Agenda

An aging, deficient facilityChallenges

SiteParkwaySecurityFlooding

Physical plant

Educational adequacy

Page 3: Agenda

The SCASD responds2009 Master plan and educational

specification

Concept D1Westerly

(reno & new)

SixConcepts

CommunitySurvey

FirstDown-select

Two Concepts Detailed

Evaluation

Second Down-select

2013 Site and concept

2012 Educational and architectural design team

Page 4: Agenda

North side• more reno than new• adaptive reuse• adds Delta

South side• more new than reno• unifies core academics• learning communities

Page 5: Agenda

Welch Pool parking

New access point, secure bus loop, & south side event parking

Proposed signals

Circulator road

Improved storm water

Proposed turf fields

Delta Program

Site plan

Page 6: Agenda

Proposed State High learning communities

9th Gra

de

Expe

rienc

e

Busin

ess &

Commun

icatio

ns

Arts

&

Human

ities

STEM

Healt

h &

Human

Ser

vices

“No student left unknown”

Personal Smaller

FlexibleRelevant

CollaborativeMultidisciplinary

Page 7: Agenda

SECOND FLOOR

State HighLearning communities

Page 8: Agenda

State High

Massing studySouth track overhead view

Page 9: Agenda

State High

Massing studyWeis Plaza overhead view

Page 10: Agenda

State High

Massing study Westerly Parkway overhead view

Page 11: Agenda

State High

Massing studyStreet level view from north side

Page 12: Agenda

Debt financing$115 million Project cap

- $10 million Capital reserve- $XX million Reallocation of District debt service

______________ $YY million Referendum cap 30-year bonds @ 5.30% 2.75 mills

Ballot amount finalized in February 2014Referendum tax phased-in from 2014-15 through 2016-2017 (3 years)

Page 13: Agenda

Referendum • May 20, 2014 (primary)

Open to all registered voters • Local Governmental Unit Debt

Act (LGUDA, Section 8042)Example wording*“Shall debt in the sum of (insert Amount) for the purpose of financing the construction of additions and improvements to the State College Area High School be authorized to be incurred as debt approved by the electors?”

• Outcome affects authorization to proceed

* Subject to approval by Centre County Board of Elections

Page 14: Agenda

Next steps

Now Pre-schematic design

Dec-Jan Cost estimating

May 20, 2014 Referendum

July-Dec, 2014 Design development

Early 2015 Construction documents

Spring, 2015 Bid

2015-2018 Construction

Page 15: Agenda

Questions?

Our community. Our children. Our future.http://www.scasd.org/statehighfuture