agenda 1 0409 - ieee802.org

21
802.3 FESG - 9/30-10/1/2004 1 802.3 Frame Expansion Study Group Agenda Agenda Kevin Daines World Wide Packets Ottawa, Ontario

Transcript of agenda 1 0409 - ieee802.org

Page 1: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20041

802.3 Frame Expansion Study GroupAgendaAgenda

Kevin DainesWorld Wide Packets

Ottawa, Ontario

Page 2: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20042

Agendag Welcome and Introductionsg Appoint/Volunteer Recording Secretaryg Goals for this Meetingg Reflector and Webg Ground Rulesg IEEE

n Structuren Bylaws and Rulesn Call for Patentsn IEEE Standards Process

g Presentationsg Motionsg Future Meetings

Page 3: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20043

Plan for interim (from July)g Research following topics:

n Frame size limitations of: n Existing equipment – below MAC (elasticity buffers, block

coding, delimiters)n Existing equipment – above MAC (FIFO, fabric)n Links with FEC (EPON)n Rate compensation (WAN PHY, EFM Copper)

n Effect of increased overhead on performance, especially in aggregation

n Feasibility of reducing MTU of installed base of clientsn Tutorial on 802.1ABn Straw man frame format modifications

g Finalize PAR/5 criteriag Draft TF objectives

Page 4: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20044

Reflector and Webg To subscribe to the Frame Expansion SG

reflector send an email to: [email protected]

g with the following in the body of the message:

subscribe stds-802-3-fe <first name> <last name>

g Frame Expansion SG web page URL:http://www.ieee802.org/3/frame_study/

Page 5: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20045

Ground Rulesg 802.3 Rules apply

n Foundation based upon Robert’s Rules of Orderg Anyone in the room may speakg Anyone in the room may voteg RESPECT… give it, get itg NO product pitchesg NO corporate pitchesg NO prices!!!

n This includes costs, ASPs, etc. no matter what the currency

g NO restrictive notices

Page 6: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20046

IEEE StructureIEEEIEEE

IEEE-SAStandards Association

IEEE-SAStandards Association

Standards BoardStandards Board IEEE 802Sponsor Group

IEEE 802Sponsor Group

NesComNew Stds. Committee

NesComNew Stds. Committee

RevComReview Committee

RevComReview Committee

IEEE 802.3Working Group

IEEE 802.3Working Group

Frame ExpansionStudy Group

Frame ExpansionStudy Group

Page 7: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20047

Bylaws and Rulesg Bylaws of the IEEE Standards Association (IEEE-SA):

http://standards.ieee.org/sa/sa-bylaws.pdf

g Bylaws of the IEEE-SA Standards Board:http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf

g IEEE LAN/MAN Standards Committee (LMSC) Operating Rules:

http://www.ieee802.org/rules.pdf

g IEEE 802.3 Working Group Operating Rules:http://www.ieee802.org/3/rules/

Page 8: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20048

IEEE-SA Standards Board Bylaws on Patents in Standards6. Patents

IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either

a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or

b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination

This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period.

Approved by IEEE-SA Standards Board – December 2002

Page 9: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/20049

Inappropriate Topicsg Don’t discuss licensing terms or conditions

g Don’t discuss product pricing, territorial restrictions or market share

g Don’t discuss ongoing litigation or threatened litigation

g Don’t be silent if inappropriate topics are discussed… do formally object.

g If you have questions, contact the IEEE Patent Committee Administrator at [email protected]

Approved by IEEE-SA Standards Board – December 2002

Page 10: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200410

IEEE 802.3 Standards Process (1/4)

Idea

Call forInterest

802.3802.3FormsForms

SGSG

RIPRIP

802802EC FormsEC Forms

SGSG

Study GroupStudy GroupMeetingsMeetings

802.3802.3ApproveApprove

No

Yes

RIPRIP

RIPRIP 802 EC802 ECApproveApprove

NesComNesComApproveApprove

STBSTBApproveApprove

ApprovedPAR

RIPRIP

RIPRIP

RIPRIP

Yes

Yes

Yes

Yes

YesNo

No

No

No

No

PAR 5 Criteria

Objectives

Page 11: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200411

IEEE 802.3 Standards Process (2/4)

Task ForceTask ForceMeetingsMeetings

ProposalsProposalsSelectedSelected

ToTo802.3 WG802.3 WG

BallotBallotTask ForceTask Force

ReviewReview

TFTFReviewReviewDoneDone

Yes

Yes

Objectives

ApprovedPAR

NoNo

No

Yes

A

D1.0

D1.n+1 D2.0

Page 12: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200412

IEEE 802.3 Standards Process (3/4)

802.3 WG802.3 WGBallotBallot

> 75 %> 75 %

ECECForward toForward to

LMSCLMSC

802.3802.3Forward toForward to

LMSCLMSC

No

RIP

Yes

Yes

No

A

A

CommentsComments

Yes

No

Yes

B

A

No

D3.0

D2.n+1

Page 13: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200413

IEEE 802.3 Standards Process (4/4)

LMSCLMSCSponsorSponsor

BallotBallot

> 75 %

ECECForward toForward toRevComRevCom

802.3802.3Forward toForward toRevComRevCom

No

RIPYes

Yes

No

B

B

CommentsComments

Yes

No

Yes

B

No

RevComRevComReviewReview

STBSTBApprovalApproval

RevComRevComApprovalApproval

Yes

No

Yes

B

NoRIP

D3.n

D3.n+1 Std

Page 14: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200414

Study Groupg Function is to draft a PAR and 5 Criteriag Gain approval at WG 802.3, 802 EC, IEEE

NesCom and IEEE Standards Boardg SG only exists for 6 months

n Extensions can be requested… voted on by 802.3, ratified by EC

g Development of Objectives helps set the goals for the Task Force

g Developing consensusn Education helps build consensus n Consensus (> 75%) required to move forward

Page 15: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200415

Possible (aggressive) timeline

04 05

LegendIEEE 802 PlenaryIEEE 802.3 InterimIEEE-SA Standards Board

Study Group

J A S O N D J F M A M J J A S

WG Ballots LMSC BallotsLMSC Ballots

Std!

D2.1 D3.0 D3.1

We are

here

Task Force

PAR

SG drafts

D2.2D0.9 D2.0

CFIAd Hoc

Page 16: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200416

Presentations

802.3_FESG_draft_PAR_5_criteria.pdfReview/approve PAR/5 Criteria

1502:15daines_4_0409.pdfInformal frame size pollK. Dainesbreak

break

802.3_FESG_objectives_0409.pdf

blatherwick_1_0409.pdf

daines_3_0409.pdf

daines_2_0409.pdf

daines_1_0409.pdf

martin_1_0409.pdf

braga_1_0409.pdf

Filename

Lunch

1511:30Proposed changes to Clause 3K. Daines

1510:00Impact of expanding frame size to IFS Stretch / 10G WAND. Martin

01:30

11:15

11:00

09:00

Start

15Impact of expanding frame size to overhead, aggregationK. Daines

Review proposed objectives

45Overview of LLDPP. Blatherwick

15Impact of expanding frame size to PAUSE flow controlK. Daines

45Frame size support of existing Ethernet devicesA. Braga

LenTopicPresenter

Page 17: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200417

Motions

Page 18: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200418

Future Meetingsg November 14-19, 2004

n IEEE 802 Plenary, San Antonio g January, 2005

n IEEE 802.3 Interim, TBDg March 13-18, 2005

n IEEE 802 Plenary, Atlanta

Page 19: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200419

Backup

Page 20: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200420

Concerns raised in Julyg “Is this absolutely necessary?”

n Alternativesn Exclude .3 support from .1ad & .1AE standardsn Handle on bootleg basisn Require .1 SAR functionn Reduce client MTU to make room for added headers

n Orn Expand frame size

n Possibly use discovery to enable larger frames on some links

g Backward compatibilityn Location of QTag, CSMA/CD fairness,

g Additional space used only for headers, not datag QoS/efficiency impact

Page 21: agenda 1 0409 - ieee802.org

802.3 FESG - 9/30-10/1/200421

P802.3ac Timeline

97 98

Legend802 Plenary802.3 InterimIEEE-SA Standards Board

J A S O N D J F M A M J J A S

PAR

D1.0 D2.0 D2.1 D2.2 D3.0 D3.1

WG Ballot TF LMSC Ballot Std!