Country/Borrower: Government of Sri Lanka
Project Name: Emergency Northern Recovery Project Credit/Grant #: 4676
Implementing Agency: ENREP PMU
GPN # and Date Published :
Original Plan Approved Date(at Appraisal/Negotiations): November 30, 2009
Update as of: January 4, 2010
Update as of: May 7, 2010
Update as of: September 24, 2010
Update as of: May 31, 2011
Update as of: September 30, 2011
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Planned 1/29/2010 3/5/2010 - 4/19/2010 10/16/2010
Actual 6/26/2010 7/16/2010 - 7/28/2010 8/11/2011 On Progress
Planned 1/29/2010 3/5/2010 - 4/19/2010 4/19/2011
Actual 6/26/2010 7/16/2010 - 7/23/2010 8/6/2011 On Progress
Planned 1/29/2010 3/5/2010 - 4/19/2010 1/14/2011
Actual 6/26/2010 7/16/2010 - 7/9/2010 7/18/2011 On Progress
Planned 7/19/2010 8/23/2010 - 9/23/2010 3/23/2011
Actual 2/8/2011 3/8/2011 - 4/7/2011 12/17/2011 On Progress
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 11/9/2010 3/16/2011 6/16/2011
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 11/9/2010 3/16/2011 16/6/2011
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 10/4/2010 3/15/2011 12/10/2010
Planned 7/19/2010 8/23/2010 - 9/23/2010 3/23/2011
Actual 2/8/2011 3/8/2011 - 4/11/2011 9/22/2011 On Progress
Planned - - - 9/23/2010 3/23/2011
Actual - - - 10/28/2010 3/3/2011 On Progress
Planned - - - 9/23/2010 3/23/2011 Completed
Actual - - - 9/20/2010 1/28/2011 6/6/2011
Planned 8/27/2010 10/1/2010 - 10/8/2010 1/6/2011
Actual 2/8/2011 3/8/2011 - 4/25/2011 10/6/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 10/5/2010 2/9/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 10/5/2010 2/9/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Update as of: December 31, 2011
Dis
tric
t
D.S
.Div
isio
n
FO,
Kalmadunagar 3.06
114.29
NCB 51.8 44.99 Shyaam
Builders
FO,
Vaddakachchi 3.46
Jathur
Enterprise 12.86
3.98
Rehabilitation of Kariyalainagapaduwan
Tank in Pooneriyn Kilinochchi.0.47
Kandavalai
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Kanthi
Construction
5 ENREP/W/3-h
Rehabilitaion of Sampukulam,
Villukulam, Kuruppikulam in
Ramanathapuram ASC
4 PostENREP/W/258
0.04DC 4.00
Post LKR
Rohan
Enterprises 12.09
13.33
LKR 21.56
Prior LKR 128.51
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
C1. Irrigation Schemes
1 ENREP/W/2Rehabilitation of Kanagambigai Tank,
Karachchi, KilinochchiNCB 25.4 0.23 Post
2 ENREP/W/4Restoration of Kalmadu tank,
Kandawalai, KilinochchiNCB 171.62 1.55
Post LKR 4.48
LKR 23.09
ENREP/W/3-i
Rehabilitaion of Ramanathankulam,
Eraddaipanikulam, Mamilkulam,
Kunchumeesankulam in
Ramanathapuram ASC
DC
Post LKR
Post
6.19
LKR
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
5.00 0.05
3 ENREP/W/6
6
Pri
or/
Post
Rev
iew
by B
an
k *
LKR 1.27 FO,
Kandawalai 1.25 7 ENREP/W/3-p
Rehabilitaion of Puthukulam in
Kilinochchi ASCDC 1.27
8 ENREP/W/5-a
Post
Karachchi
Rehabilitation of Rasanayakulam NCB 8.58 0.08
0.01Kilinochchi
Post LKR
0.02
Leading
Crusher Works 2.92
9 ENREP/W/5-b Rehabilitation of Thatchadampan kulam DC 2.67
Kandavalai
Rehabilation of Dri aru tank in
KilinochchiNCB 30.8 0.28
Kilinochchi
Kilinochchi
Kilinochchi
1.17
0.10 Post LKR
Post
11.53 Abdul Azeez
5.28
11 ENREP/W/5-fRehabilitation of Thadduvankoddikulam
and UriyankulamNCB 11.53
10 ENREP/W/5-c Rehabilitation of Periyakulam DC 5.28
0.39
Kandavalai
Kandavalai
Kandavalai
Fo,
Periyakulam 5.16 0.05
LKR 2.67
FO,
Nagenthirapura
m
0.73 0.01 Kandavalai
1.03
12 ENREP/W/5-gRehabilitaion of Pullukulam in
Puliyampokkanai ASCDC 0.77 0.01
Post LKR
LKR
0.00 Post LKR
DC
FO,
Tharmapuram
West
0.77
0.73 FO,
Karukkaikulam
Post
0.33
14 ENREP/W/5-iRehabilitaion of Kallattukulam in
Puliyampokkanai ASCDC 0.35 Kandavalai
13 ENREP/W/5-hRehabilitaion of Karukkaikulam in
Puliyampokkanai ASC
0.35 FO,
Piramanthanaru 0.35
PROCUREMENT PLAN FOR WORKS
Karachchi
Kandavalai
Pooneryn
Karachchi
Karachchi
Karachchi
Update as of : 30th April, 2012
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 10/5/2010 2/9/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 10/5/2010 2/9/2011 On Progress
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 10/4/2010 3/15/2011 12/10/2011
Planned - - - 2/9/2010 6/9/2010 Terminated
Actual - - - 10/7/2010 2/11/2011 5/30/2011
Planned - - - 2/9/2010 6/9/2010 Terminated
Actual - - - 10/7/2010 2/11/2011 5/30/2011
Planned - - - 2/9/2010 6/9/2010
Actual - - - 7/19/2010 12/29/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/10/2010 3/15/2011 On Progress
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 10/29/2010 1/3/2011 11/24/2010
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 10/29/2010 1/3/2011 11/24/2011
Planned - - - 7/17/2010 4/13/2011
Actual - - - 7/19/2010 12/29/2010 On Progress
Planned - - - 7/18/2010 4/14/2011 Completed
Actual - - - 7/21/2010 12/29/2010 4/25/2011
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/12/2010 1/13/2011 On Progress
Planned 1/10/2010 1/10/2010 - 2/9/2010 6/9/2010
Actual 10/30/2010 12/3/2010 - 12/28/2010 6/10/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 9/14/2010 1/19/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/13/2010 1/13/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/1/2010 1/5/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 9/17/2010 1/22/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/13/2010 1/13/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/17/2010 1/22/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/17/2010 1/22/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/10/2010 1/19/2011 On Progress
Kilinochchi
Mannar
Mannar
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
Kandavalai 1.04 FO,
Kandawalai
0.00 Post LKR
0.01 Post
14 ENREP/W/5-iRehabilitaion of Kallattukulam in
Puliyampokkanai ASCDC 0.35 Kandavalai
Kandavalai
0.35 FO,
Piramanthanaru 0.35
15 ENREP/W/5-jRehabilitaion of Kanthankulam in
Puliyampokkanai ASCDC 1.04 LKR 0.82
16 ENREP/W/5-kRehabilitaion of konankulam in
Puliyampokkanai ASCDC 1.47 0.01 1.47
FO,
Kandawalai 1.03
17 ENREP/W/7-a Rehabilitation of Thumpuruvil -
Mathamoodaikulam at Mulankavil ASCDC 2.17PoonerynKilinochchi 2.17
PoonerynKilinochchi
Kilinochchi
Post LKR
0.02 Post LKR
1.99
FO, Jeyapuram
North -
18 ENREP/W/7-bRehabilitation of Puthiyarmoodaikulam
in Poonagary AscDC 1.99 0.02 Post LKR
FO, Nallur,
Poonakari -
19 ENREP/W/7-d Rehabilation of Neradampan kulam. DC 4.18 Post LKR 3.76 RDS
Neradampan 3.62
PoonerynENREP/W/7-fRehabilation of Mudkompan kulam
Pooneryn,DC 4.10 0.04
0.04
LKR 3.68 FO,
Mudkompan 3.71
21 ENREP/W/7-jConstruction of 3 Bay Regulator at
Gnanimadam in KilinochchiDC 0.83
20
Poonakary
Poonakary
Pooneryn
Kilinochchi
Kilinochchi
Post
Kilinochchi 0.01 Post LKR 0.83 FO,
Gnanimadam 0.78
22 ENREP/W/7-kConstruction of 3 Bay Regulator at
Pavoodai in KilinochchiDC 0.65 0.01
29
Post LKR 0.65 FO,
Gnanimadam 0.59
23 ENREP/W/9Rehabilitaion of Uppulavan Kalappu
SWE Scheme - 4kmDC
26 ENREP/W/11-b Rehabilitation of Soolamandakulam NCB 8.21 0.07Manthai West
LKR 3.22
Rural
Development
society
2.41
FO,Vellankula
m
FO,
Vellankulam
Santhiyapillai
&Son's
LKRRehabilitation of Ramankalappu SWE
Scheme 4.5km, PoonakaryDC 3.93 0.04
0.03 post3.58
post 3.53
Rural
Development
society
2.71
0.05 FO,
Illupaikadavai
24 ENREP/W/10
27 ENREP/W/11-d Rehabilitation of Veddiyamurippu DC 2.22 0.02
28 ENREP/W/11-e Rehabilitation of Annaipappankulam DC 2.09 0.02
3.30
Mannar
ENREP/W/11-f Rehabilitation of Kovilkulam DC 3.18 0.03
0.03
Post LKR
0.03
30 ENREP/W/11-g Rehabilitation of Periyavillankulam DC 2.94 0.03
31 ENREP/W/11-h Rehabilitation of Ahathikulam DC 3.66
34 ENREP/W/11-m Rehabilitation of Villiyankulam DC
32 ENREP/W/11-i Rehabilitation of Uyilankulam DC
33 ENREP/W/11-jRehabilitation of Mullikulam-
VellankulamDC 2.27 0.02
3.06
4.43 Madhu 0.04
Manthai West
25 ENREP/W/11-aRehabilitation of
IllupaikadaviperiyakulamDC 5.22 Post LKR 4.71 1.96
Post LKR 5.79 -
Post LKR 2.00 0.86
Post LKR 1.88 0.94 FO, Chalampan
FO, St.
Anthony's
3.18 0.99
Post LKR 2.94 1.67
FO,
Kovilkulam
-
Post LKR 3.06 1.75
FO,
Uthaiyasooriyan
FO,
Arunothaya Post LKR
FO,Vellankula
m
Post LKR 2.27 1.19
Post LKR 4.43 0.64
Pooneryn
Pooneryn
Manthai West
Manthai West
Manthai West
Manthai West
Manthai West
Manthai West
Manthai West
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/14/2010 1/19/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/14/2010 1/19/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/10/2010 1/19/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/17/2010 1/22/2011 On Progress
Planned 1/29/2010 3/5/2010 - 4/19/2010 1/14/2011
Actual 2/1/2011 3/8/2011 - 4/7/2011 4/20/2012 On Progress
Planned 2/13/2011 3/20/2011 - 4/19/2011 4/18/2012
Actual 3/8/2011 4/8/2011 - 4/25/2011 5/8/2012 On Progress
Planned 4/30/2010 6/4/2010 - 7/19/2010 4/15/2011
Actual 9/27/2010 11/4/2010 - 12/30/2010 1/13/2012 On Progress
Planned 5/1/2010 6/5/2010 - 7/20/2010 4/16/2011
Actual 9/27/2010 11/4/2010 - 12/3/2010 12/17/2011 On Progress
Planned 7/12/2012 - 7/25/2012 11/14/2012
Actual 7/30/2012 - 8/15/2012 On Progress
Planned
Actual On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/19/2010 12/21/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/13/2010 12/21/2010 On Progress
Planned - - - 8/8/2010 12/6/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned 12/6/2009 1/10/2010 - 8/8/2010 12/6/2010
Actual 11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/4/2010 2/11/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned - - - 9/19/2010 1/17/2011
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned - - - 12/5/2010 4/4/2011
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/17/2010 3/17/2011
post
0.05
NS
14.08 NS LKR 13.34
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mannar
Mullaitivu
Mullaitivu
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
LKR
LKR
1.11 2.50 0.02 FO,
Uthaiyasooriyan Post LKR 2.50 35 ENREP/W/11-n Rehabilitation of Viravappuliyankulam DC
3.47 0.0336 ENREP/W/11-o Rehabilitation of Vinayakarkulam DC
DC 1.97 0.02
0.03Madhu37 ENREP/W/11-p Rehabilitation of Palampiddikulam DC 3.75 FO, Vinayagar LKR 3.75
1.06
SMA
Construction,
thalawatugoda
FO, Methanveli Post LKR 1.97
39 ENREP/W/12Rehabilitation of Periyapandivirichchan,
MadhuNCB 117.98
38 ENREP/W/11-t Musali
Madhu
Rehabilitation of Kallikulam
Rehabilitation of Adampankulam, NCB 50.32
40 ENREP/W/409 Rehabilitation of Mullikulam Tank NCB 64.20 Madu
Manthai west
0.58
FO, Vinayagar
0.74
post LKR 97.59 27.87
Post LKR 3.47 -
Post
0.58
42 ENREP/W/14 Rehabilitation of Periyamadu NCB 92.74 0.84
0.4541 ENREP/W/13
Post LKR 60.64 13.85
post LKR 41.80 13.25 Rajarata
Construction
SMA
Construction,
thalawatugoda
27.10
45 ENREP/W/17-c Rehabilitation of Kankanarkulam DC 5.04
43 ENREP/W/15 Rehabilitation of Sinnathimoddai Tank Nanaddan
post LKR 86.49 Padminie
Construction
Zanu
Construction
0.05 Post 5.04
0.84 post
FO,
Naddankandal LKR 1.57
47 ENREP/W/17-e Rehabilitation of Palaipanikulam DC 3.83
46 ENREP/W/17-d DC 5.29
3.83 FO, Palaipani 1.97
Post 5.29 FO,
Vinayagapuram 1.23
0.03
LKR
49 ENREP/W/17-g Rehabilitation of Kompuvaithakulam DC 4.60
48 ENREP/W/17-f
Rehabilitation of Thevikulam
5.26
0.04 Post 4.60
LKRPost
Post 4.46 puvithara Civil
Engineering 0.05
51 ENREP/W/17-i Rehabilitation of Siradikulam DC 3.53
Rehabilitation of Thanukankulam and
Periyathihilankulam
50 ENREP/W/17-h Rehabilitation of Moonrumuripukulam DC 4.42
PostManthai East
Manthai East
Post
Rehabilitation of Vandilkaddukulam
FO,
Moonrumurippu 0.04Manthai East
PostDC 5.22 0.05
0.03 3.53
FO,
Ampalpuram
53 ENReP/W/30-a Rehabilitation of Salampankulam DC 4.00
52 ENReP/W/17-k
Rehabilation of Mallavi, Thunukai NCB 36.9 0.33
0.04 PostManthai East
Thunukai
Mullaitivu
Mullaitivu Post 28.94 Shyaam
Builders 54 ENREP/W/18
-
LKR 1.66
LKR 2.60
LKR 1.01
FO,
Vavnnivilankul
am
FO,
Siraddikulam
4.42
2.92
LKR 1.54
LKR 19.02
4.07
FO,
Poovarasankula
m
5.22
Madhu
Madhu
Manthai west
Manthai East
Manthai East
Manthai East
Manthai East
Manthai East
NCB
Mannar 14.40 44 ENREP/W/16Improvements to Vilathikulam in
Mannar
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual 6/26/2010 7/16/2010 - 7/28/2010 8/11/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/17/2010 3/17/2011
Actual 6/26/2010 7/16/2010 - 7/28/2010 8/23/2011 On Progress
Planned 1/29/2010 3/5/2010 - 4/19/2010 4/19/2011
Actual 3/9/2011 7/9/2010 - 7/23/2010 8/6/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/17/2011 3/16/2012
Actual 03/09/2011 4/8/2011 - 4/18/2011 5/2/2012 On Progress
Planned 1/11/2010 2/15/2010 - 3/17/2010 3/17/2011
Actual 9/3/2011 7/16/2010 - 8/9/2010 8/23/2011 On Progress
Planned 1/29/2010 3/5/2010 - 4/19/2011 4/18/2012
Actual 3/9/2011 4/8/2011 - 4/25/2011 6/9/2012 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/19/2010 12/21/2010 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 6/9/2010 Terminated
Actual 11/29/2010 1/4/2011 - 1/25/2011 6/8/2011 7/11/2011
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned 7/16/2010 8/20/2010 - 9/19/2010 3/18/2011
Actual 11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 12/5/2010 4/4/2011
Actual - - - 2/28/2011 6/5/2011 On Progress
Planned 7/16/2010 8/20/2010 - 9/19/2010 3/18/2011
Actual 11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 9/19/2010 1/17/2011
Actual - - - 11/9/2010 3/15/2011 On Progress
Planned - - - 9/19/2010 1/17/2011
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned - - - 9/19/2010 1/17/2011
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned 7/16/2010 8/20/2010 - 9/19/2010 1/17/2011
Actual 11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 12/5/2010 4/4/2011
Actual - - - 11/9/2010 2/14/2011 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 6/14/2010 11/20/2010 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 5/12/2010 10/12/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 6/18/2010 10/12/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 6/18/2010 10/26/2010 On Progress
Mullaitivu
Mullaitivu
Vavuniya
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
LKR
LKR
LKR
LKR
LKR
Rehabilation of Mallavi, Thunukai NCB 36.9 0.33ThunukaiMullaitivu Post 28.94 Shyaam
Builders
55 ENREP/W/20Rehabilitation of Therankandal,
ThunukaiNCB 24.7
54 ENREP/W/18
0.22 Post 20.90 Edward &
Christe Thunukai
Thunukai
57 ENREP/W/23 Rehabilation of Koddaikaddiyakulam NCB 34.94
56 ENREP/W/21 Rehabilitation of Iyankulam, Thunukai NCB 74.78
Jathur
Enterprise Thunukai
ThunukaiMullaitivu
Mullaitivu
Post 65.80 Padmini
Construction 0.67Mullaitivu
41.00 0.37
0.31 PostMullaitivu
PostNCB 32.57 Shyaam
Builders
59 ENREP/W/25 Rehabilation of Ampalaperumal NCB 72.08
58 ENREP/W/24 Rehabilation of Palayamurukandi
0.65 PostThunukai
ThunukaiMullaitivu Post
61 ENREP/W/26-bRehabilitation of Paddankadikulam and
Asaipillai KulamNCB 8.71
60 ENREP/W/26-a Rehabilitation of Vattaiadappukulam DC 4.70 4.83
FO,
Yogapuram
West
6.57
0.04
0.04
0.08 Post SMS
Construction
Thunukai
63 ENREP/W/26-d Rehabilitation of Karampaikulam
4.77 FO, Thunukkai
DC 4.25
Mullaitivu
0.09Oddusuddan64 ENReP/W/29-a Rehabilitation of Ampakamamkulam
Thunukai
Thunukai
Post
NCB 10.17
Oddusuddan
62 ENREP/W/26-c Rehabilitation of Murukankulam DC 4.77
Mullaitivu
9.97Mullaitivu
Mullaitivu
Karunya Civil
Engineering
Contractors
65 ENReP/W/29-b Rehabilitation of Kodalikalukulam DC 4.95
67 ENReP/W/29-d Rehabilitation of Thavasikulam DC 2.95
66 ENReP/W/29-cRehabilitation of Olumadukulam and
Periyapuliyankulam
Oddusuddan,
MaritimepattuNCB
0.03OddusuddanMullaitivu
0.04
68 ENReP/W/29-e Rehabilitation of Periyakulam DC 4.45 0.04Oddusuddan
70 ENReP/W/29-jRehabilitation of Kuruvichchai Anicut
and KakkaipanikkankulamNCB 12.00
69 ENReP/W/29-f Rehabilitation of Palampasikulam DC 3.91
LKR -
4.95 Fo, Kodalikallu
7.80
Post 4.53
2.32
0.54
-
LKR
FO,
Therankandal
Post 3.00 F.O, Palampasi
-
LKR 2.13
LKR
LKR 19.02
LKR 5.52
FO,
Periyakulam
0.09 Post 9.85 SMA
Construction
0.04 Post 4.25
0.04 Post
39.11
0.11 Post 10.15 Abdul Azeez
Post 2.01 FO, Mankulam
Post
FO,
Periyakulam
0.02
17.93
LKR 1.23
LKR 5.12
LKR 10.54 68.49
WMB
Contractors &
Transporters
-
LKR 2.60
LKR 3.22
Post 3.91
FO, 7th Mile
post
Karadipallavu
LKR 2.07
71 ENReP/W/29-k Rehabilitation of Puthirirruppukulam DC
Vavuniya
2.00
72 ENREP/W/28-aRehabilitation of Periyakulam in
Kanagarayankulam ASCDC
Post0.02
FO,
Kanakarayankul
am South
LKR 2.18 1.29
2.45
LKR 0.80
73 ENREP/W/28-bRehabilitation of kurisuddakulam in
Kanagarayankulam ASCDC 2.41
0.03
Vavuniya North
Post LKR 2.95
3.78
0.98 0.03
Post LKR 3.41 1.74
74 ENREP/W/28-cRehabilitation of Kunriddamadukulam
in Kanagarayankulam ASCDC 3.27
75 ENREP/W/28-dRehabilitation of Aanaipooddiyakulam
in Kanagarayankulam ASCDC 2.23
Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.02
FO,
Puliyankulam
North
Post LKR 2.01
FO,
Puliyankulam
North
0.91
Vavuniya North
Oddusuddan
Oddusuddan
Oddusuddan
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 2/9/2010 6/9/2010
Actual - - - 6/4/2010 11/11/2010 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 6/14/2010 11/13/2010 On Progress
Planned - - - 2/9/2010 8/9/2010 Completed
Actual - - - 6/18/2010 12/2/2010 7/30/2011
Planned - - - 2/9/2010 6/9/2010
Actual - - - 6/18/2010 10/26/2010 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 6/18/2010 10/26/2010 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 7/19/2010 12/30/2010 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 9/24/2010 2/1/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 9/6/2010 1/19/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 8/9/2010
Actual 9/27/2010 11/4/2010 - 12/3/2010 6/15/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 9/9/2010 1/19/2011 On Progress
Planned - - - 2/9/2010 7/9/2010
Actual - - - 9/1/2010 2/10/2011 On Progress
Planned - - - 2/9/2010 6/9/2010
Actual - - - 8/9/2010 12/16/2010 On Progress
Planned - - - 9/19/2010 3/18/2011
Actual - - - 10/21/2010 3/3/2011 On Progress
Planned - - - 10/1/2010 3/30/2011
Actual - - - 10/19/2010 2/10/2011 On Progress
Planned - - - 10/1/2010 2/1/2011 Completed
Actual - - - 10/8/2010 2/15/2011 6/15/2011
Planned - - - 10/1/2010 2/1/2011 Completed
Actual - - - 10/19/2010 2/25/2011 7/10/2011
Planned - - - 10/1/2010 2/1/2011 Completed
Actual - - - 10/5/2010 2/9/2011 3/28/2011
Planned - - - 10/7/2010 2/5/2011
Actual - - - 10/16/2010 2/22/2011 On Progress
Planned 8/3/2010 9/7/2010 - 10/7/2010 4/5/2011
Actual 10/30/2010 12/3/2010 - 12/22/2010 6/4/2010 On Progress
Planned - - - 10/7/2010 3/5/2011
FO,
Sinnadampan Post LKR 4.49 1.66 76 ENREP/W/28-e
Rehabilitation of Karappukuththi kulam
in Kanagarayankulam ASCDC 4.99
77 ENREP/W/28-fRehabilitation of Nedunkerneykulam in
Nedunkerney ASCDC 5.32
0.04Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.05 FO, Olumadu Post LKR 4.79 1.00
FO,
Mamadukulam Post LKR 3.29 1.75 78 ENREP/W/28-g
Rehabilitation of Mamadukkulam in
Nedunkerney ASCDC 3.65
79 ENREP/W/28-hRehabilitation of Maruthankulam in
Nedunkerney ASCDC 2.35
0.03
Vavuniya North
Vavuniya NorthVavuniya
Vavuniya 0.02
FO,
Nedunkerny
South
Post LKR 2.12 0.49
FO,
Nedunkerny
South
Post LKR 2.15 0.72 80 ENREP/W/28-iRehabilitation of Rambaikulam in
Nedunkerney ASCDC 2.39
81 ENREP/W/28-jRehabilitation of Kulavisuddan
Periyakulam in Nedunkerney ASCDC 3.20
0.02Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.03 FO,
Kulavisuddan Post LKR 2.88 0.21
FO,
Mannakulam Post LKR 3.23 0.79 82 ENREP/W/28-l Rehabilitation of Puthuvilankulam DC 3.58
83 ENREP/W/28-n Rehabilitation of Sadavankulam DC 2.02
0.03Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.02 FO,
Sinnadampan Post LKR 1.82 0.44
Ajith
Construction Post LKR 5.42 1.15 84 ENREP/W/28-o Rehabilitation of Palaiyavadikulam NCB 6.70
85 ENREP/W/28-p Rehabilitation of Koththankulam DC 5.50
0.06
Vavuniya North
Vavuniya NorthVavuniya
Vavuniya 0.05 FO, Mara
Eluppai Post LKR 4.95 3.27
FO,Olumadhu Post LKR 1.98 0.54 86 ENREP/W/28-s Rehabilitation of Theevukadupankulam DC 2.20
87 ENREP/W/28-t Rehabilitation of Ariyamadukulam DC 4.60
0.02Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.04
F.O,Nochcikula
m
Post LKR 4.14 0.45
FO,
Anantharpuliya
nkulam
Post LKR 3.2 0.54 88ENREP/W/28-
adRehabilitation of Nochchikulam DC 3.55
89ENREP/W/28-
akRehabilitation of Thuvarankulam DC 2.15
0.03Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.02 FO,
Thuvarankulam Post LKR 2.15 1.15
FO,
Muththumari
Amman
Post LKR 1.53 1.23 90ENREP/W/28-
anRehabilitation of Puthukulam DC 1.53
91ENREP/W/28-
apRehabilitation of Sinnaparanthankulam DC 2.76
0.01Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.02 FO, Paranthan Post LKR 2.76 2.33
FO,
Mathiyamadu Post LKR 3.53 3.28 92
ENREP/W/28-
aqRehabilitation of Moonrumurippu DC 3.53
93 ENREP/W/28-ar Rehabilitation of Mathiyamadu DC 4.18
0.03Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.04 FO,
Mathiyamadu Post LKR 4.18 3.60
Ajani
Construction Post LKR 3.19 1.10 94 ENREP/W/28-at Rehabilitation of Anantharpuliyankulam NCB 3.97
95ENREP/W/28-
auRehabilitation of Karadijankulam DC 2.54
0.04Vavuniya North
Vavuniya North
Vavuniya
Vavuniya 0.02 FO,
Nainamadu Post LKR 2.54 1.18
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 10/21/2010 3/11/2011 On Progress
Planned - - - 10/7/2010 4/5/2011
Actual - - - 10/26/2010 3/1/2011 On Progress
Planned - - - 12/5/2010 6/3/2011 Completed
Actual - - - 10/19/2010 2/25/2011 7/10/2011
Planned - - - 9/19/2010 3/18/2011
Actual - - - 9/27/2010 2/3/2011 On Progress
Planned - - - 9/19/2010 3/18/2011
Actual - - - 8/19/2010 12/23/2010 On Progress
Planned - - - 9/19/2010 3/18/2011
Actual - - - 8/18/2010 12/21/2010 On Progress
Planned - - - 9/19/2010 3/18/2011
Actual - - - 10/21/2010 2/3/2011 On Progress
Planned - - - 10/7/2010 4/5/2011 Completed
Actual - - - 9/9/2010 1/14/2011 6/20/2011
Planned - - - 10/7/2010 4/5/2011 Completed
Actual - - - 9/14/2010 1/22/2011 6/25/2011
Planned - - - 10/7/2010 4/5/2011
Actual - - - 9/17/2010 1/25/2011 On Progress
Planned - - - 10/1/2010 3/30/2011 Completed
Actual - - - 11/9/2010 3/16/2011 7/14/2011
Planned - - - 12/5/2010 6/3/2011
Actual - - - 10/20/2010 3/2/2011 On Progress
Planned - - - 12/5/2010 6/3/2011 Completed
Actual - - - 10/1/2010 2/18/2011 7/18/2011
Planned - - - 10/7/2010 4/5/2011
Actual - - - 8/30/2010 2/3/2011 On Progress
Planned - - - 12/5/2010 6/3/2011 Completed
Actual - - - 9/27/2010 2/1/2011 5/31/2011
Planned - - - 9/19/2010 3/18/2011 Completed
Actual - - - 10/11/2010 2/15/2011 5/18/2011
Planned 1/29/2010 3/5/2010 - 4/19/2010 1/14/2011
Actual 6/26/2010 7/16/2010 - 7/23/2010 8/6/2011 On Progress
Planned 1/1/2011 2/5/2011 - 3/22/2011 12/17/2011
Actual 3/8/2011 3/8/2011 - 5/20/2011 6/2/2012 On Progress
Planned 1/1/2011 2/5/2011 - 3/22/2011 12/17/2011
Actual 6/30/2011 7/29/2011 - 5/8/2011 5/7/2012 On Progress
Planned 10/31/2010 12/5/2010 - 1/19/2011 10/16/2011 Terminated
Actual 11/29/2010 1/4/2011 - 2/10/2011 2/24/2012 11/11/2011
95ENREP/W/28-
auRehabilitation of Karadijankulam DC 2.54Vavuniya NorthVavuniya 0.02
FO,
Nainamadu Post LKR 2.54 1.18
FO,
Periyamadu Post LKR 1.12 0.75 96
ENREP/W/28-
avRehabilitation of Periyamadukulam DC 1.25
97ENREP/W/28-
bgRehabilitation of Sannasiparanthan DC 3.19
0.01
Vavuniya North
Vavuniya NorthVavuniya
Vavuniya 0.03 FO, Paranthan Post LKR 3.19 2.90
F.O,Asikulam Post LKR 5.14 0.21 98 ENREP/W/28-w Rehabilitation of Arasankulam DC 5.14
99 ENREP/W/28-y Rehabilitation of Sinnalankulam DC 4.56
0.05Vavuniya
Vavuniya
Vavuniya
Vavuniya 0.04 F.O,Mamadhu Post LKR 4.65 2.21
FO,
Veemankallu Post LKR 2.13 0.89 100 ENREP/W/28-z Rehabilitation of Vairavarsinnakulam DC 2.09
101ENREP/W/28-
abRehabilitation of Aththikulam DC 2.62
0.02Vavuniya
Vavuniya
Vavuniya
Vavuniya 0.02
FO,
Periyavilaththik
ulam
Post LKR 2.62 1.26
FO,
Suriyothayam Post LKR 4.67 2.69 102
ENREP/W/28-
ax
Rehabilitation of Kothandar
NochchikulamDC 4.59
103ENREP/W/28-
ayRehabilitation of Kallikulam DC 2.19
0.04
Vavuniya
VavuniyaVavuniya
Vavuniya 0.02 FO,
Echchankulam Post LKR 2.19 1.42
FO, Kalmadu Post LKR 3.87 3.70 104ENREP/W/28-
azRehabilitation of Ariyan Kurisudakulam DC 3.87
105 ENREP/W/28-aj Rehabilitation of Peyadikulankulam DC 2.89
0.03Vavuniya
Vavuniya
Vavuniya
Vavuniya 0.03 FO,
Nochchimoddai Post LKR 2.89 1.50
FO,
Poovarasankula
m
Post LKR 3.98 2.75 106ENREP/W/28-
beRehabilitation of Kovilmoddaikulam DC 3.98
107 ENREP/W/28-bf Rehabilitation of Nelvelikkulam DC 3.64
0.04Vavuniya
Vavuniya
Vavuniya
Vavuniya 0.03
FO,
Kompuvaithaku
lam
Post LKR 3.64 2.55
FO,Eropothana Post LKR 4.32 1.15 108ENREP/W/28-
baRehabilitation of Kelebogaswewa tank DC 4.22
109ENREP/W/28-
bcRehabilitation of Kalayanoorkulam DC 4.31
0.04Vavuniya South
Vavuniya South
Vavuniya
Vavuniya 0.04 Fo,
Rangethkama Post LKR 3.89 2.26
Fo,
Mahakachchiko
diya
Post LKR 4.23 1.86 110ENREP/W/28-
acRehabilitation of Puliyankulama DC 4.23
111 ENREP/W/37 Rehabilitation of Kanagarayankulam, NCB 34.74
0.04Vavuniya South
Vavuniya North
Vavuniya
Vavuniya 0.31 14.47
112 ENREP/W/410Rehabilitation of Kalmadu Tank in
vavuniyaNCB 64.15Vavuniya LKR 60.91 11.62 Vavuniya
Vavuniya
0.58
Mega
Construction Post LKR 32.11
WMB
Construction Post
- 113 ENREP/W/412 Rehabilitation of Rasenthirakulam NCB 46.3 SSK
Construction Post LKR 43.020.42
114 ENREP/W/411Rehabilitation of MahaKachchakodiya
Tank,NCB 34.35
Cheddikulam
Vavuniya SouthVavuniya 0.31 Ajani
Construction Post LKR 29.29 2.54
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 1/1/2011 2/5/2011 - 3/22/2011 12/17/2011
Actual 3/8/2011 4/8/2011 - 4/25/2011 5/8/2012 On Progress
Planned 5/10/2012 - 4/24/2012 10/16/2011 On Progress
Actual 6/1/2012 - 5/23/2012 10/15/2012
Planned 9/2/2012 -
Actual 9/5/2012 -
Planned 9/2/2012 -
Actual 9/5/2012 -
Planned -
Actual -
Planned - - -
Actual - -
Planned 12/6/2009 1/10/2010 - 2/9/2010 8/8/2010
Actual 5/10/2010 7/9/2010 - 7/23/2010 2/2/2011 On Progress
24.87
23.45
LKR
LKR
Post LKR 20.87
SMA
Construction
SMA
Construction
Jathur
Enterprises ENREP/W/400
Rehabilitation of Mahakachakodiya
Tank balance work at VavuniyaVavuniya Vavuniya South NS 21.5 0.19
C2 Rural Access Roads
Vavuniya Rajarata
Construction Post LKR 26.95 12.03 115 ENREP/W/413 Rehabilitation of Iraipothana tank NCB 32.67
0.24Maruthankerni
119 ENREP/W/403
Construction of Emergency need of
Water in the bed of tank at Vavuniya
South
Jaffna
0.29
Vavuniya South NS 16.0 0.14
Vavuniya Vavuniya South
Vavuniya South
122 ENREP/W/38Rehabilitation of Roads in
Maruthankerny Package-01NCB 26.50 Post LKR 22.63
Master
Builders 12.75
116
ENREP/W/401
ENREP/W/402
0.18 Post
Rehab.of Kalabogaswewa Tank Pack - I Post
Rehab.of Kalabogaswewa Tank Pack - II Vavuniya Vavuniya South NS 19.9
Vavuniya
117
118
DC 1.05 0.01 Post
120 ENREP/W/404Construction of Arugampuleliya Anicut
in Vavuniya SouthVavuniya Vavuniya South 10 0.09 Post -
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 12/6/2009 1/10/2010 - 2/9/2010 8/8/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 3/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 8/8/2010
Actual 9/27/2010 11/4/2010 - 12/3/2010 6/15/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 7/10/2010 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011 Terminated
Actual 2/8/2011 3/8/2011 - 4/7/2011 10/18/2011
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 2/8/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 2/8/2011 3/8/2011 - 4/11/2011 10/22/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 8/14/2011 On Progress
Planned - - - 2/3/2011 6/3/2011
Actual - - - 12/22/2011 3/3/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 10/30/2010 12/3/2010 - 12/22/2010 7/4/2010 On Progress
Planned 9/25/2010 10/30/2010 - 1/28/2011 7/27/2011
Actual 2/8/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 3/8/2011 3/8/2011 - 4/25/2011 11/5/2011 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 7/10/2010 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 7/10/2010 On Progress
Planned 10/1/2010 11/5/2010 - 12/5/2010 6/3/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 10/13/2011 On Progress
Planned - - 7/15/2012 - 7/30/2012 11/20/2012
Actual - - 8/6/2012 - 8/9/2012
Planned - - 7/10/2012 - 7/25/2012 11/20/2012
Actual - - 8/6/2012 - 8/9/2012
Planned - -
Actual - -
Planned - -
Actual - -
LKR
10.7 0.11 Post LKR 10.01
16.69Post0.18
- ENREP/W/419Rehabilitation of Thanippanai Veethy
Metling and TarringJaffna Maruthankerny NS
Sairam
Contractor
Sairam
Contractor - NS 17.7
130 ENREP/W/415Repair of Interior Roads within the
Jaffna Teaching HospitalJaffna Jaffna Town - 3.02
Hospital
Development
Society,
Teaching
Post LKR
Jaffna123 ENREP/W/39Rehabilitation of Roads in
Maruthankerny Package-02NCB 40.20 Post LKR 33.46
Jathur
Enterprises 19.42
0.35Maruthankerni
Maruthankerni
Jaffna
Jaffna
0.36Maruthankerni
125 ENREP/W/261Rehabilitation of Internal Roads in
Mathurankerny Package 4, JaffnaNCB 52.83
124 ENREP/W/40Reconstruction of Roads in
Maruthankerny Jaffna Package 3NCB 39.00
Post LKR 44.31 A Group
Construction 7.36
Post LKR 26.53 Master
Builders 4.51
0.46
Maruthankerni
MaruthankerniJaffna
Jaffna
0.48
127 ENREP/W/263Rehabilitation of Internal Roads in
Maruthankerney, Jaffna- Package 6NCB 43.41
126 ENREP/W/262Rehabilitation of Internal Roads in
Maruthankerney, Jaffna- Package 5NCB 50.87
Post LKR 33.98 Shakthi Civil
Construction 7.31
Post LKR 35.28 SMA
Construction 5.69
0.36Maruthankerni
Jaffna Town
Jaffna
Jaffna
0.39
ENREP/W/414Rehabilitation of Internal Roads in
Jaffna MC Area, JaffnaNCB 23.43
128 ENREP/W/264Rehabilitation of Internal Roads in
Maruthankerney, Jaffna- Package 7NCB 39.86
Post LKR 20.47
Eurivile
Engineers And
Contractors
9.40
Post LKR 33.09 SMA
Construction 18.92
0.34Vali North
Vali North
Jaffna
Jaffna
0.21
DC 3.02 0.03
ENREP/W/32Rehabilitation of Internal Roads in
Valikamam North, Jaffna- Package 2NCB 33.12
131 ENREP/W/415Rehabilitation of Internal Road in
Valikamam North, JaffnaNCB 37.69
24.75 Leading
Crusher Works 19.89
Post LKR 30.24 Master
Builders 9.23
Jaffna
Jaffna
0.30 Post
0.41
LKR
ENREP/W/267Rehabilitation of Internal Roads in
Valimamam East, JaffnaNCB 45.41
133 ENREP/W/265Rehabilitation of Internal Roads in
Valikamam North, Jaffna- Package 3NCB 27.93Vali North
Jaffna
Koneswaran
Engineering 27.88
Post LKR 21.03 Leading
Crusher Works 1.63
Post LKR
11.72
Post LKR 45.52 Benaal
Constryction 22.92
Post LKR 51.18 Benaal
construction NCB
NS
Kopay
Chavakachcheri
PostENREP/W/421 Jaffna Velanai NS 20.8
ENREP/W/417
ENREP/W/418Rehabilation of Metaling u Sampalodai
Veethy at KarainagarJaffna Maruthankerny
63.09Jaffna
Rehabilitation of Internal Roads in
Valikamam South, JaffnaNCB 56.98Uduvil
Maruthankerny
Rehabilitation of Internal Roads in
Chavakachcheri, Jaffna
-
Rehab.of Mudipillaiyar Road in Velanai
at Jaffna
0.57
37.84
0.25
0.51
Post
- 140
Rehabilitation of Arasady veethy
vathrajan in Maruthankerny in JaffnaJaffna
137
138
139
136
135 ENREP/W/416
134
132
129
ENREP/W/420
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - -
Actual - -
Planned - -
Actual - -
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 3/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Terminated
Actual 7/8/2010 8/10/2010 - 9/9/2010 2/26/2011 6/13/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 3/22/2011 On Progress
Planned - - - 5/15/2011 9/12/2011
Actual - - - 5/30/2011 10/1/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 3/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Terminated
Actual 7/8/2010 8/10/2010 - 9/9/2010 3/22/2011 6/13/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 7/8/2010 8/10/2010 - 9/24/2010 4/6/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 7/8/2010 8/10/2010 - 9/24/2010 4/6/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 6/26/2010 7/16/2010 - 7/28/2010 2/7/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Terminated
Actual 6/26/2010 7/16/2010 - 8/9/2010 2/19/2011 7/19/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Terminated
Actual 6/26/2010 7/16/2010 - 8/25/2010 3/7/2011 7/19/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 6/26/2010 7/16/2010 - 8/25/2010 3/7/2011 On Progress
Planned - - - 2/9/1900 9/7/2010
Actual - - - 12/26/2011 4/27/2012 On Progress
Planned 7/10/2012 12/21/2012
Actual 8/3/2012
Planned 7/12//2012 12/12/2012
Actual 8/3/2012
Planned 7/5/2012 5/3/2009 12/21/2012
Actual 8/3/2012 9/21/2009
Pooneryn
12.37
14.48
4.11
LKR
Rehabilitation of Road in Poonaryan
Package 04LKR
Kilinochchi
Rehabilitation of Road in Poonaryan
Package 02ENREP/W/49
155
LKR 8.49 0.10
LKR 9.57
Subramaniam
Civil
Engineering
Kilinochchi
Kilinochchi
LKR 10.49
LKR 10.48
1.96 15.30
Kilinochchi
Kilinochchi
Kilinochchi
Karachchi
Karachchi
Karachchi
Post
LKR
3.56
144 ENREP/W/42Rehabilitation of Roads in Karachchi,
Kilinochchi- Pacakge-02NCB 23.40 0.21 Post
LKR A Group (Pvt)
Ltd.
145 ENREP/W/43 NCB 19.30 0.17 PostRehabilitation of Roads in Karachchi,
Kilinochchi- Pacakge-03
C&C
Engineering 9.00
D.S
Construction &
Earth Movers
LKR 1.93
LKR 13.82 C&C Eng.
Karachchi
South MPCS 0.55
6.83
146 ENREP/W/578Rehabilitation of Elephant Pass -
Thadduvankoddi Road, KilinochchiDC 1.93 0.02KarachchiKilinochchi Post
148 ENREP/W/45 Kandavalai
0.17 Post
Kilinochchi
Kilinochchi Kandavalai147 ENREP/W/44
D.S
Construction &
Earth Movers
9.31 AMM Welding
Workshop LKR 9.74
0.78 LKR
Rehabilitation of Roads in Kandawalai,
Kilinochchi- Package-01NCB 18.40
Post
Rehabilitation of Roads in Kandawalai,
Kilinochchi- Pacakge-02NCB 19.60 Post
0.11Kandavalai
12.80
Rehabilitation of Roads in Kandawalai,
Kilinochchi – Package 03NCB 11.40 0.10
0.18
Kandavalai
Post150 ENREP/W/47Rehabilitation of Roads in Kandawalai,
Kilinochchi – Package 04
Kilinochchi
NCB 10.80
149 ENREP/W/46
Kilinochchi
Kilinochchi
152
9.31
151 ENREP/W/48Rehabilitation of Roads in Poonery,
Package 01NCB 15.00 0.14 Post
NCB 11.90
8.51
153 ENREP/W/50Rehabilitation of Road in Poonaryan
Package 03NCB 12.90 0.12PoonerynKilinochchi
Post Land Mark
Eng. 0.02
Post
9.39
LKR
0.03
154 ENREP/W/51 NCB 15.20 0.14
143 ENREP/W/41Rehabilitation of Roads in Karachchi,
Kilinochchi- Pacakge-01NCB 6.10 0.05
Post Ragal
Construction
Edward &
Christe
Vanaja
Construction
Post 40.91
NS
Pooneryn
K.P.K.Construc
tion
11.96 S.R.M.
Construction LKR
Improvement of Approach Road to Co-
operative Council in Kilinochchi. DC
Post LKR
NS156 ENREP/W/42
Kilinochchi
District Women
Development
Federation.
-
Pooneryn
Pooneryn
ENREP/W/52 2.98 0.03
Rehabilitation of Roads in Karachchi,
Kilinochchi- Pacakge-02 Balance workKilinochchi Karachchi 0.12 Post LKR 12.50
158 ENREP/W/50Rehabilitation of Road in Poonaryan
Package 03Kilinochchi Pooneryn CancelledNS -
-
9.30
157 ENREP/W/45Rehabilitation of Roads in Kandawalai,
Kilinochchi- Pacakge-02 balance workKilinochchi Kandavalai 11.58 0.11 Post
PostRehab.of Karainagar Package -I
ENREP/W/422 Post
ENREP/W/423 Jaffna Karainagar NS 20
Rehab.of Sudaaliveethy in Allaipiddy
JaffnaJaffna NS 10.3 -
-
141
142
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 7/12/2012 - 7/25/2012 11/15/2012 -
Actual 7/30/2012 - 8/8/2012 -
Planned 7/10/2012 - 7/25/2012 11/15/2012 -
Actual 7/30/2012 - 8/8/2012 -
Planned - -
Actual - -
Planned - -
Actual - -
Planned - -
Actual - -
Planned - -
Actual - -
Planned - -
Actual - -
Planned - -
Actual - -
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 1/15/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 12/3/2010
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 4/24/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 4/20/2011
Planned 12/6/2010 1/10/2011 - 2/9/2011 9/7/2011
Actual 1/20/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 12/20/2010
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 3/8/2011 4/8/2011 - 4/25/2011 11/5/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 4/20/2011
- - 2.07167 ENREP/W/417Rehabilitation of Approach road to dri
aru tank in kilinochchiKilinochchi Karachchi DC
160 ENREP/W/51
Metaling & Tarring of Malayankanthan
Road, Graveling ross Roads, Jungle
Clearing & Security Bund Clearing at
Muhamalai
Kilinochchi Pachilaipalli NS
168
169 ENREP/W/53Rehabilitation of Roads in Manthai
West- Package 2NCB 9.20
17.79 0.16 Post LKR 17.21 Jathur
Enterprises
0.17 Post LKR 18.03 Jathur
Enterprises 159 ENREP/W/51
Metaling & Tarring of Ponthor
Kudiyiruppu Road (Package-1)Kilinochchi Pachilaipalli NS 19.08
Mannar
Mannar
6.69
-
-
0.08 Post LKR 7.29
0.09
8.16
0.31
7.04 Sanjeeve
Construction.
R&S
Eng.Constructio
n.
3.38
0.13
171 ENREP/W/55Rehabilitation of Roads in Manthai
West- Package 4NCB 11.00
170 10.00
Manthai West
Mannar
Mannar
Post LKR 7.05 A Group (Pvt)
Ltd.
7.05
Post LKR 7.37 Mahadevan
Contractors. 7.17
Post LKR
Mannar
Mannar
ENREP/W/52Rehabilitation of Roads in Manthai
West- Package 1NCB
Rehabilitation of Internal Roads in
Manthai West, Mannar- Package 5NCB
ENREP/W/54Rehabilitation of Roads in Manthai
West- Package 3NCB
10.00 0.09
0.10
173 ENREP/W/56Rehabilitation of Roads in Madhu-
Package 1NCB 9.00
172 ENREP/W/421 34.64
Post LKR 6.44 Santhiyapillai
&Sons 5.90
Post LKR 21.21 Edward &
Christie
0.10
Madhu
Madhu
Mannar
Mannar
0.08Madhu
11.00
174 ENREP/W/57Rehabilitation of Roads in Madhu-
Package 2NCB 14.00
Jana Civil
Works. 7.30
Post LKR 7.61 Sri Arans Civil
Contractors -
LKR 7.70 Post175 ENREP/W/58Rehabilitation of Roads in Madhu-
Package 3NCB
Manthai West
Manthai West
Manthai West
Manthai West
-
LKR
Post LKR
Post -
LKR -
165 ENREP/W/56Metaling and Taring of Ponthor
Kudiyiruppu road, Package 1Kilinochchi NS
166 ENREP/W/57
Metaling and Taring of Malayankanthan
road, cross road, Bund clearing Package
2
Kilinochchi NS Post
162 ENREP/W/53Skanthapuram Maniyankulam link road
1.4KmKilinochchi NS
NS
Post - LKR161 ENREP/W/52
Construction of Box culvert at
Krishnapuram focal village in
Kilinonchchi
Kilinochchi NS
-
- 164 ENREP/W/55
Ananthapuram Thurkkaiamman road
Uthayanagar east and west cross road
1.8Km
Kilinochchi
163 ENREP/W/54Ramanathapuram Kalmadunagar road
0.8KmKilinochchi NS Post
Post LKR
LKR
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 4/20/2011
Planned 12/6/2010 1/10/2011 - 2/9/2011 9/7/2011
Actual 1/20/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 7/12/2012 - 7/28/2012 11/14/2012
Actual 7/30/2012 - 8/15/2012
Planned 7/5/2012 - 7/25/2012 11/14/2012
Actual 7/30/2012 - 8/15/2012
Planned -
Actual -
Planned
Actual
Planned 12/6/2010 1/10/2011 - 2/9/2011 9/7/2011
Actual 1/20/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned
Actual
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 2/1/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 3/18/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
ENREP/W/424b Rehabilitation of Variveli Tank Road Mannar Musali
Post LKR 15.25 Priyanka
Conionstruct 178 ENREP/W/423a
Rehabilitation of Periyapandiviruchchan
Agriculture Road including Mataling tar
and Gravel Road at Madu AGA
Division
Mannar
179 Pastini
Construction
0.21
Madhu NS
10.01 0.09 Post LKR 9.67
Mannar
0.05
177 ENREP/W/422Rehabilitation of Internal Roads in
Madhu, Mannar- Package 5NCB 22.46
176 ENREP/W/59Rehabilitation of Roads in Madhu-
Package 4NCB 6.00
Post
Madhu
Madhu
Mannar
Mannar LKR 15.95 Leading
Crusher Works 2.61
Post LKR 3.62 Jana Civil
Works. 3.50
Mannar
Mullaitivu
0.20
NS
0.1416.05
Nanaddan
184 ENREP/W/60Rehabilitation of Internal Roads in
Thunukkai, Mullaitivu- Package 1NCB 22.33
182 ENREP/W/423Rehabilitation of Internal Roads in
Musali, MannarNCB 23.73
Post LKR 19.04 Lanka Machine
Leasers 3.10
Post LKR 18.23 Edward &
Christie 2.95
0.16Thunukai
Thunukai
Mullaitivu
Mullaitivu
0.20Thunukai
186 ENREP/W/62Rehabilitation of Roads in Thunukkai-
Package 3NCB 11.20
185 ENREP/W/61Rehabilitation of Roads in Thunukkai-
Package 2NCB 18.00
Post LKR 9.53 SMS
Construction 2.39
Post LKR 15.07 Mega
Construction 5.80
0.14Thunukai
ThunukaiMullaitivu
Mullaitivu
0.10
188 ENREP/W/64Rehabilitation of Roads in Thunukkai-
Package 5NCB 11.20
187 ENREP/W/63Rehabilitation of Roads in Thunukkai-
Package 4NCB 15.00
Post LKR 9.79 Theepan
Engneering. 5.61
Post LKR 13.08
K.P.K.Construc
tion
7.31
0.11
Thunukai
ThunukaiMullaitivu
Mullaitivu
0.10
190 ENREP/W/66Rehabilitation of Roads in Thunukkai-
Package 7NCB 18.40
189 ENREP/W/65Rehabilitation of Roads in Thunukkai-
Package 6NCB 11.90
Post LKR 15.59 Jana Agency. 10.59
Post LKR 10.2
K.P.K.Construc
tion
7.79
0.12Manthai East
Manthai East
Mullaitivu
Mullaitivu
0.17
192 ENREP/W/68Rehabilitation of Roads in Manthai East-
Package 2NCB 16.00
191 ENREP/W/67Rehabilitation of Roads in Manthai East-
Package 1NCB 13.40
Post LKR 13.99 Leading
Crusher Works. 12.09
Post LKR 12.13 SMA
Construction 7.43
0.10Manthai East
Manthai East
Mullaitivu
Mullaitivu
0.14
194 ENREP/W/70Rehabilitation of Roads in Manthai East-
Package 4NCB 12.20
193 ENREP/W/69Rehabilitation of Roads in Mantha East-
Package 3NCB 11.00
Post LKR 10.3 D & D
Construction 9.19
Post LKR 9.37 Pupethira Civil
Engineering. 6.77
0.11
183 ENReP/W/510Rehabilitation of Narikkadu Housing
Scheme road in NanaddanNS
Musali
Post LKR180 ENREP/W/425cRehabilitation of Sinnathmoddai Tank
roadMannar Mannar NS
Priyanka
Conionstruct Post
181 ENREP/W/428
Rehabilitation of Agriculture road at
Thetaveli including metaling tar gravel
road
Mannar Mannar NS Post
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 3/20/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 3/30/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 6/15/2011 7/15/2011 - 6/1/2011 12/1/2011
Actual 6/30/2011 7/29/2011 - 8/4/2011 2/14/2012 On Progress
Planned - - - 10/10/2010 5/8/2011
Actual - - - 11/3/2010 1/19/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 1/22/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 1/10/2011 On Progress
Planned 7/11/2010 8/15/2010 - 9/14/2010 4/12/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 6/27/2011 On Progress
Planned 7/11/2010 8/15/2010 - 9/14/2010 4/12/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 6/27/2011 On Progress
Planned 7/11/2010 8/15/2010 - 9/14/2010 4/12/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 7/19/2011 On Progress
Planned 7/11/2010 8/15/2010 - 9/14/2010 4/12/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 7/31/2011 On Progress
Planned 7/11/2010 8/15/2010 - 2/1/2010 8/30/2010
Actual 2/1/2011 3/8/2011 - 4/7/2011 8/19/2011 On Progress
Planned 7/20/2012 - 8/5/2012 11/25/2012
Actual 8/9/2012 - 8/15/2012
Planned 7/15/2012 - 7/20/2012 11/25/2012
Actual 8/9/2012 - 8/15/2012
Post LKR 17.16 Babithan
Construction 212 ENREP/W/426b
Renovation of Rural Road at
Mulliyavalai East in Marritimepattu
Division,
Mullaitivu
Post LKR 11.10 Babithan
Construction 211 ENREP/W/426a
Renovation of Rural Road at
Kumulamunai in Marritimepattu
Division,
Mullaitivu Maritimepattu NS
Manthai EastMullaitivu194 ENREP/W/70Rehabilitation of Roads in Manthai East-
Package 4NCB 12.20 Post LKR 10.3
D & D
Construction 9.19
0.14Manthai East
Manthai East
Mullaitivu
Mullaitivu
0.11
196 ENREP/W/72Rehabilitation of Roads in Manthai East-
Package 6NCB 15.40
195 ENREP/W/71Rehabilitation of Roads in Manthai East-
Package 5NCB 15.10
Post LKR 13.58 SMA
Construction 8.23
Post LKR 13.15 SMA
Construction 8.68
0.19Manthai East
Manthai East
Mullaitivu
Mullaitivu
0.14
198 ENREP/W/74Rehabilitation of Roads in Manthai East-
Package 8NCB 30.32
197 ENREP/W/73Rehabilitation of Roads in Manthai East-
Package 7NCB 21.50
Post LKR 24.17 Koneswaran
Engineering -
Post LKR 19.09 Mega
Construction 5.60
0.01Manthai East
Oddusuddan
Mullaitivu
Mullaitivu
0.27
200 ENREP/W/74Rehabilitation of Roads in Oddusuddan-
Package 1NCB 16.00
199 ENREP/W/270Construction of Bridge across the left
bank main channel at VavunikkulamDC 1.50
Post LKR 12.49 K.R.Lanka
(pvt) Ltd 10.58
Post LKR 1.5 RDS,
Selvapuram 0.77
0.19
Oddusuddan
OddusuddanMullaitivu
Mullaitivu
0.14
202 ENREP/W/76Rehabilitation of Roads in Oddusuddan-
Package 3NCB 20.00
201 ENREP/W/75Rehabilitation of Roads in Oddusuddan-
Package 2NCB 20.60
Post LKR 15.95 A Group
Constructions 13.79
Post LKR 17.02 S.Subramaniam
Civil Eng. 9.89
0.14Oddusuddan
Oddusuddan
Mullaitivu
Mullaitivu
0.18
204 ENREP/W/78Rehabilitation of Roads in Oddusuddan-
Package 5NCB 16.00
203 ENREP/W/77Rehabilitation of Roads in Oddusuddan-
Package 4NCB 15.50
Post LKR 12.91 Thurai
Construction 10.91
Post LKR 11.26
J.K.Constructio
n
5.59
0.14Oddusuddan
Maritimepattu
Mullaitivu
Mullaitivu
0.14
206 ENREP/W/35Rehabilitation of internal roads in
Maratimepattu, Mullaitivu Package 1NCB 23.00
205 ENREP/W/79Rehabilitation of Roads in Oddusuddan-
Package 6NCB 16.00
Post LKR 15.65 K.R.Lanka
PVT(LTD) 0.09
Post LKR 12.97
S.
Subramaniam
Civil Engineers
8.96
0.20
Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
0.21
208 ENREP/W/197Renovation of internal roads in
Maratimepattu, Mullaitivu Package 3NCB 22.32
207 ENREP/W/36Rehabilitation of internal roads in
Maratimepattu, Mullaitivu Package 2NCB 22.23
Post LKR 17.56 Master
Construction 2.84
Post LKR 15.21 K.R.Lanka
PVT(LTD) 0.07
0.19Maritimepattu
Maritimepattu
Mullaitivu
Mullaitivu
0.20
210 ENREP/W/425Rehabilitation of Internal Roads in
Maritimepattu, Mullaitivu- Package 5NCB 8.18
209 ENREP/W/198Rehabilitation of internal roads in
Maratimepattu, Mullaitivu Package 4NCB 21.07
Yansika
Construction 0.09
Post LKR 14.45 Babithan
Construction 4.64
Post0.07
11.73 0.11
NS 18.25Maritimepattu 0.16
LKR 6.14
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned -
Actual -
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 3/26/2010 4/29/2010 - 5/21/2010 12/1/2010 On Progress
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/21/2010 12/1/2010 6/30/2011
Planned 12/6/2009 1/10/2010 - 2/9/2010 9/7/2010
Actual 3/26/2010 4/29/2010 - 5/21/2010 12/1/2010 On Progress
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/1/2010 2/8/2011 On Progress
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/1/2010 2/8/2011 On Progress
Planned - - - 11/12/2010 6/10/2011 Completed
Actual - - - 10/1/2010 2/8/2011 6/24/2011
Planned - - - 11/12/2010 6/10/2011 Completed
Actual - - - 10/20/2010 3/4/2011 6/22/2011
Planned 12/15/2010 2/15/2011 - 11/12/2010 6/10/2011
Actual 1/24/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/20/2010 2/25/2011 On Progress
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/4/2010 2/11/2011 On Progress
Planned - - - 11/12/2010 6/10/2011 Completed
Actual - - - 10/4/2010 2/11/2011 5/24/2011
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/18/2010 2/25/2011 On Progress
Planned - - - 11/12/2010 6/10/2011 Completed
Actual - - - 10/20/2010 2/25/2011 6/22/2011
Planned - - - 11/12/2010 6/10/2011 Completed
19.60214 ENREP/W/414Rehabilitation of Suthan suthana Play
ground front concrete road 1.1 KmMullaitivu Mamoolai
215 ENREP/W/415Rehabilitation of Thoondal North
Upumaveli joint road 1.5 KmMullaitivu Upumaveli 19.75
Vavuniya
Vavuniya
Vavuniya
Vavuniya
Vavuniya
0.15
217 ENREP/W/81Rehabilitation of Roads in Vavuniya
District – Package 2NCB 17.80
216 ENREP/W/80Rehabilitation of Roads in Vavuniya
District – Package 1NCB 16.80
V.V.
Ramanthan
&Company(pvt)
Ltd
7.14
Post LKR 12.58
V.V.
Ramanthan
&Company(pvt)
Ltd
9.87
Vavuniya
Vavuniya
LKR0.16
0.04
13.96
4.66
PostVav North
0.16
219 ENREP/W/271
Formation & Gravelling of Resettlement
area Roads at Karappukuththi
Periyamadu road in Vavuniya
DC 4.66
218 ENREP/W/82Rehabilitation of Roads in Vavuniya
District – Package 3NCB 17.60
Vavuniya
North MPCS -
Post LKR 13.44
V.V.
Ramanthan
&Company(pvt)
Ltd
3.30
Post LKR
221 ENREP/W/272
Formation & Gravelling of Resettlement
area Roads at Kurisuddakulam Ampal
nagar and Panaininran kulam roads in
Vavuniya North
DC 4.53
220 ENREP/W/273
Formation & Gravelling of Resettlement
area Roads at Keerisuddankiramam in
Vavuniya North
DC 2.56
4.53 Vavuniya
North MPCS 3.87
Post LKR 2.56 Vavuniya
North MPCS 0.01
LKR
223 ENREP/W/437Rehabilitation of Roads in Vavuniya
North package 4NCB 24.54
222 ENREP/W/284Cleaning & Reformation of VNPS area
Roads Vavuniya NorthDC 3.78
Edward &
christie 3.18
Post LKR 3.78 Vavuniya
North MPCS 2.78
0.03
Vavuniya
vavuniyaVavuniya
Vavuniya
18.79VavuniyaVavuniya 0.22 LKR
225 ENREP/W/275
Formation and Gravelling of
Resettlement area road at
Nochchimoddai & Veemankal in
Vavuniya
DC 5.63
224 ENREP/W/274Formation and gravelling of resettlement
area road at Salampaikulam RoadsDC 3.81
Vevakanantha
Community
Center
0.79
Post LKR 3.81 Vavuniya
MPCS 1.20
0.03Vavuniya
vavuniya
Vavuniya
Vavuniya
5.08
2.77
LKR0.05 Post
227 ENREP/W/277Formation and gravelling of resettlement
area at omanthai RoadsDC 2.77
226 ENREP/W/276Formation & gravelling of resettlement
area road at Paranaddakal RoadsDC 3.15
Vavuniya
Vavuniya 0.04
Vavuniya
MPCS 2.51
Post LKR 3.15
Vevakanantha
Community
Center
2.76
229 ENREP/W/278
Formation and Gravelling of
resettlement area roads at
Periyathampanai & Piramanalankulam
Roads
DC 4.56
228 ENREP/W/283
Urgent clearing and reformation of
VSTPS area in
vavuniya(illamaruthankulam internal
roads, Nochchikulam roads, Kothanda
Nochchikulam Approach & Internal
road)
DC 4.15
Vavuniya 4.28
Post LKR 4.15 Vavuniya
MPCS 1.62
Post LKR 4.56 Cheddikulam
MPCS
Vavuniya North
Vav North
Vavuniya North
Vavuniya North
0.02
Post
0.04
Vavuniya North
0.03
Vavuniya
Vav North
0.02 Post LKR
LKR213 ENREP/W/426cCommunity Infrastructure II Meddukudi
Road VisvamadhuMullaitivu Meddukudi NS Post
0.04 Post
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 10/4/2010 2/9/2011 5/31/2011
Planned - - - 11/12/2010 6/10/2011 Completed
Actual - - - 10/4/2010 2/8/2011 4/4/2011
Planned - - - 11/12/2010 6/10/2011
Actual - - - 10/25/2010 1/27/2011 On Progress
Planned - - - 11/12/2010 6/10/2011
Actual - - - 11/15/2010 2/20/2011 On Progress
Planned 9/20/2010 10/25/2010 - 2/1/2010 6/10/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 6/10/2010 On Progress
Planned - - - 5/25/2011 9/25/2011
Actual - - - 7/15/2011 11/17/2011 On Progress
Planned - - - 6/10/2012
Actual - - - 7/5/2012 On Progress
Planned - - - 5/10/2012 8/20/2012
Actual - - - 6/15/2012 9/20/2012 On Progress
Planned - - - 8/8/2012 8/20/2012
Actual - - - 8/14/2012 11/26/2012 On Progress
Planned - - - 8/8/2012 8/20/2012
Actual - - - 8/14/2012 11/26/2012 On Progress
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
-
-
236 ENREP/W/402
14.30 0.13 Post LKR 14.4 A.J.S
Contractors 237 ENREP/W/403
Construction of Achchipuram Main road
in Vavuniya districtVavuniya Vavuniya South NS
LKR 19.74 Pastini
Construction - Vavuniya South Post238 ENREP/W/404
Construction of Salmmalankulam
Achchipuram Main road in Vavuniya
district
SMA
Construction - Vavuniya Vavuniya South 12.87 0.12 LKRPost
Post LKR26.31 0.24
Rehabilitation of Kalabogeswewa Road
16 Km + 365 m to 17 Km + 165 m in
Vavuniya
235 ENREP/W/401
Rehabilitation and reconstruction of
Galabogeswewa Bridge Across Kiwoya
at Galabogeswewa
Vavuniya Vavuniya South NCB
Vavuniya
Vavuniya 0.04229 ENREP/W/278
Formation and Gravelling of
resettlement area roads at
Periyathampanai & Piramanalankulam
Roads
DC 4.56Vavuniya 4.28 Post LKR
0.04 Post
4.56 Cheddikulam
MPCS
4.57 RDS, Palaruwa 231 ENREP/W/280
Formation and Gravelling of
Resettlement area road at Palairuva &
Track 07 Roads
DC 4.57
230 ENREP/W/279
Formation and Gravelling of
Resettlement area road at
Kanthasamynagar in VCK
DC 3.87
ENREP/W/427
1.41
Post LKR 3.87 Cheddikulam
MPCS 3.61
LKR
Vavuniya
Vavuniya
PostRehabilitation of roads in
Galabogaswewa RoadNCB 27.45
232 ENREP/W/281
Formation and Gravelling of
Resettlement area road at
Awaranthulawa Roads
Vavuniya
Vavuniya233
Vavuniya
19.14 WMB
Contractors 4.32
Post LKR 2.38 WRDS,
Awaranthulawa 0.55
LKR
-
SMA
Construction
NS
Vavuniya South234 ENREP/W/428Renovation of Kallikulam Internal Road
in Vavuniya DC
NS
NS
Vavuniya South DC
0.03Cheddikulam
LKR
0.02
Vavuniya South
Vavuniya South
NS
Post
LKR
3.17 FO Kallikulam Post
LKR
NS 19.90 0.18
2.38
0.25
3.17 0.03
Post Yansika
Construction
LKR
239 ENREP/W/407Concreting and gravelling road at
Atabagasksda in vavuniyaVavuniya Vavuniya South NS
247 ENREP/W/415Metaling & Tarring Annanagar Internal
RoadVavuniya Vavuniya NS
Gnanam
Builders
LKR246 ENREP/W/414Const.of Metaling & tarring of Allakalla
Aluthgama Road - 2 kmVavuniya Vavuniya NS
Post LKR245 ENREP/W/413Rehabilitation & Reconst.of Peranamadu
main road 3 kmVavuniya Vavuniya
244 ENREP/W/412Rehabilitation of Reconstruction of
Mamaduwa Internal road 3KmVavuniya Mamaduwa
NS
Post
11.80 Post LKR
Post
Post LKR Panditharatne
Construction
243 ENREP/W/411
Rehabilitation and Reconstruction of Y
junction to Kiri- ibban wewa and y
junction to Monarawewa
Vavuniya Vavuniya
242 ENREP/W/410Const.of Rural roads at Kokweliya in
Vavuniya SouthVavuniya Vavuniya South NS
Post LKR
241 ENREP/W/409Const.of Rural roads (Pack II) at 40 acre
Division at VavuniyaVavuniya Vavuniya South 15.20 Post LKR
240 ENREP/W/408Const.of Rural roads (Pack I) at 40 acre
Division at VavuniyaVavuniya Vavuniya South NS 9.20
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - -
Planned - - -
Actual - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 6/1/2011
Actual - - - - -
Planned - - - 12/1/2010 12/1/2011
Actual - - - - -
Planned - - - 6/1/2011 6/1/2012
Actual - - - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 6/1/2011 -
Actual - - - 4/8/2011 4/20/2012 -
Planned - - - 12/1/2010 12/1/2011 -
Jaffna
Jaffna
C3 Drinking Water
NCB
NCB
10.00
10.00
5.00
-
-
-
249 ENREP/W/285 Maruthankerny Community WSS 25.00Maruthankerny NCB
Civil Works
Pipe Laying
M & E Works
250 ENREP/W/83 ValvettithuraiWSS, Point Pedro
ENREP/W/285-
a
ENREP/W/285-
b
ENREP/W/285-
c
- 0.23
Point pedro NCB 348.57 2.24
NCB
Post LKR
ENREP/W/83-a
ENREP/W/83-b
Civil Works
-
63.63
-Post
Post
LKR
0 -
LKR
1.23
2.23
3.23
Post
Post
LKR
-
Pipe Laying 200.00
3.24
4.24
Post
Post
75.00NCB
NCB
Squir Mech
Engineering(Pvt
) Ltd
68.65
LKR
LKR
247 ENREP/W/415Metaling & Tarring Annanagar Internal
RoadVavuniya Vavuniya NS
Vijeya Buildres
Gnanam
Builders
248 ENREP/W/416Metaling & Tarring Annanagar School
RoadVavuniya Vavuniya NS 9.20 Post LKR
11.80 Post LKR
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - - - -
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
- - - - -
- - - - - On Progress
Planned - - - 6/1/2010 6/1/2010 -
Actual - - - 2/23/2011 5/7/2012 -
Planned - - - 12/1/2010 12/1/20111 -
Actual - - - - - -
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 6/1/2011 -
Actual - - - 4/7/2011 4/19/2012 -
Planned - - - 12/1/2010 12/1/2011 -
Actual - - - 8/5/2011 4/14/2012 -
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
- - - -
- - - -
Planned - - - 6/1/2010 6/1/2011 -
Actual - - - 12/92010 12/21/2011 - On Progress
Planned - - - 12/1/2010 12/1/2011 -
Actual - - - 13/5/2011 2/21/2012 - On Progress
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 6/1/2011 -
Actual - - - 5/3/2011 5/15/2012 -
Planned - - - 12/1/2010 12/1/2011 -
Actual - - - - - -
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 6/1/2011 -
Actual - - - 4/22/2011 - -
Planned - - - 12/1/2010 12/1/2011 -
ENREP/W/90-a
ENREP/W/90-b
ENREP/W/90-c
Civil Works
Pipe Laying
M & E Works
ENREP/W/87-a
ENREP/W/87-b
ENREP/W/87-c
Civil Works
Pipe Laying
Mullaitivu
60.00
100.00
44.07
NCB 204.07Manthai West
ENREP/W/84-a
Civil Works
Pipe Laying
M & E Works
NCB
NCB
ENREP/W/85-c
Civil Works
251 ENREP/W/84 Vidathalthivu WSS, Manthai W
Pipe Laying
M & E Works
252 ENREP/W/85
ENREP/W/84-a
45.62
115.85
75.00
Post -
LKR
LKR
LKR
254 ENREP/W/87 Mallavi Town WSS, Thunikai NCB 294.26
253 ENREP/W/90 Adampan WSS, Manthai W NCB 296.00
50.00
- 20.00
Post
Post
Finite Lanka
(Pvt) Ltd
Isuru Builders
ENREP/W/88-a
ENREP/W/88-b
32.4NCB
NCB
Post
Post
255 ENREP/W/88 Pandiyankulam, Manthai E NCB 298.53 1.79Manthai EastMullaitivu Post LKR 0 - 37.12
4.51
NCB
3.51
4.51
5.51
125.00
Civil Works
ENREP/W/83-b
ENREP/W/83-c
Mannar
Mannar
Mannar
Thevanpiddy, Manthai W
2.84
3.84
4.84
1.51
NCB
ENREP/W/85-a
Manthai West NCB
2.51
ENREP/W/84-a
Post
LKR
-
LKR
LKR
LKR
LKR
Post
NCB
75.00
Pipe Laying
M & E Works
96.00
NCB
NCB
Manthai West
Pipe Laying
M & E Works
200.00
73.57
Post
Post
NCB
LKR
NCB
NCB
NCB 38.04
1.75
3.75
50.00 Post
Post
Post
Post
2.51
3.51
4.75
Post
Post
Post
4.24
5.24
Post
Post
NCB
150.00
ENREP/W/85-b
Thunukkai
168.04
NCB
NCB
80.00
69.26
2.75
75.00
150.00
2.79
3.79
-
LKR
LKR
LKR
51.25
-
56.50
Squir Mech
Engineering(Pvt
) Ltd
LKR
LKR
Squir Mech
Engineering(Pvt
) Ltd
- - -
48.03
101.22
20.00
LKR
LKR
90.38
Finite Lanka
(Pvt) Ltd
Richmo
Construction
Engineers
-
Lohitha
Construction
- -
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - - - -
Planned - - - 6/1/2011 6/1/2012 -
Actual - - - - - -
Planned - - - - -
Actual - - - - - On Progress
Planned - - - 6/1/2010 - -
Actual - - - 2/23/2011 - -
Planned - - - - 3/22/2011
Actual - - - - - On Progress
Planned - - - 6/1/2010 - - 6/1/2011
Actual - - - 2/23/2011 - - 11/3/2012
Planned - - - 12/1/2010 - - 12/1/2011 -
Actual - - - - - - - -
Planned - - - 6/1/2011 - - 6/1/2012 -
Actual - - - - - - - -
Planned 11/2/2010 12/7/2010 - 3/17/2010 11/12/2010
Actual 11/29/2010 1/4/2011 - 2/1/2011 10/13/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 8/4/2010
Actual 9/27/2010 11/4/2010 - 12/10/2010 5/23/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 9/3/2010
Actual 9/27/2010 11/4/2010 - 12/10/2010 5/23/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 8/4/2010 Completed
Actual 9/27/2010 11/4/2010 - 12/3/2010 5/16/2011 6/30/2011
Planned 1/11/2010 2/15/2010 - 3/7/2010 8/4/2010
Actual 11/29/2010 1/4/2011 - 2/10/2011 7/24/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 8/4/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 2/20/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 8/4/2010
Actual 11/29/2010 1/4/2011 - 2/1/2011 7/15/2011 On Progress
Jaffna
Jaffna
Jaffna
Civil Works
Civil Works
Jaffna
ENREP/W/86-a
ENREP/W/89-a
Pipe Laying
258 ENREP/W/91Reconstruction of DS Office at
Maruthankerny, Jaffna
ENREP/W/89-b
ENREP/W/89-c
Mullaitivu
Vavuniya
M & E Works
ENREP/W/88-b
ENREP/W/88-c
Oddusuddan 0.83 Post LKR 0
NCB
NCB Post
Post
256 ENREP/W/86 Oddusuddan Town WSS, Oddusuddan NCB 92.21
43.73
4.58
Post
Post
Post
LKR
LKR
-
257 ENREP/W/89 Nedunkerny WSS, Vav North NCB 175.62
C4 Public Buildings and Facilities
Vav North
Dharmadasa
Construction &
Enterprises
12.35
Post LKR 0 - 116.27
LKR
-
-
0.05Maruthankerny
Maruthankerny
0.44 Post LKR
LKR
Maruthankerny NCB 49.17
260 ENREP/W/93Reconstruction of Vadamarachchi East
MPCS Builidng, Maruthankerny, JaffnaNCB 4.50
259 ENREP/W/92Reconstruction of Kudaththanai
Pradeshiya Sabha Sub Officer, JaffnaNCB 5.50
4.24 Jathur
Enterprose 2.98
Post LKR 4.82 Krishna
Contractor -
0.07
Maruthankerny
Maruthankerny
Jaffna
0.04 Post
Post262 ENREP/W/95reconstruction of Vetinerary surgeon's
office at MaruthankernyNCB 7.70
261 ENREP/W/95Reconstruction of Agrarian Service
Centre, Ampan, JaffnaNCB 7.60
LKR 8.51
Ratna
Engineering and
Constractors
1.01
Post LKR 7.23 Chandra
Construction 6.02
0.05Maruthankerny
Maruthankerny
Jaffna
Jaffna
0.07
264 ENREP/W/97Reconstruction of Post Office at
Thalaiyadi, Jaffna NCB 6.43
263 ENREP/W/96Construction of Nagarkovil Market,
jaffna.NCB 5.58
Post LKR 5.78
Yaso
Construction &
Civil Contract
Works
0.76
Post LKR 5.65
Shanth
Engineering
Contractor
0.03
0.06
3.58
-
150.00
73.53
3.79
4.79
NCB
NCB
Pipe Laying
M & E Works
NCB
NCB
92.21 1.83
50.00 2.58
1.58
37.92
Squir Mech
Engineering(Pvt
) Ltd
-
LKR
LKR
LKR 65.33
Squir Mech
Engineering(Pvt
) Ltd
-
100.00
25.62
Post
80.00
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 10/8/2010 12/7/2010 Completed
Actual - - - 9/27/2010 12/5/2010 3/4/2011
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 9/27/2010 12/5/2010 12/5/2011
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 9/27/2010 12/5/2010 2/4/2011
Planned - - - 10/8/2010 1/6/2011 Completed
Actual - - - 9/27/2010 12/5/2010 4/4/2011
Planned - - - 10/8/2010 1/6/2011
Actual - - - 9/27/2010 12/5/2010 On Progress
Planned - - - 10/8/2010 2/5/2011
Actual - - - 3/17/2011 7/19/2011 On Progress
Planned - - - 1/1/2011 5/1/2011
Actual - - - 3/18/2011 7/19/2011 On Progress
Planned 12/11/2010 1/15/2011 - 2/5/2011 10/3/2011
Actual 2/8/2011 3/8/2011 - 4/25/2011 1/4/2012 On Progress
Planned - - - 2/6/2011 6/6/2011
Actual - - - 3/9/2011 7/9/2011 On Progress
Planned 8/31/2010 10/5/2010 - 10/12/2010 2/9/2011
Actual 2/8/2011 3/8/2011 - 5/12/2011 9/18/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 5/23/2011 9/22/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 5/23/2011 9/22/2011 On Progress
Planned - - - 6/15/2011 10/13/2011
Actual - - - 7/27/2011 11/29/2011 On Progress
Planned - - - 6/15/2011 10/13/2011
Actual - - - 7/25/2011 11/25/2011 On Progress
Planned - - - 6/20/2011 10/18/2011
Actual - - - 7/25/2011 11/25/2011 On Progress
Planned - - - 6/25/2011 10/23/2011
Actual - - - 7/25/2011 11/25/2011 On Progress
DC Planned - - - 6/26/2011 10/24/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 6/27/2011 10/25/2011
Jaffna
Jaffna
Jaffna
Jaffna
281
282 Post -
ENREP/W/547 Jaffna
LKR 5.460.05ENREP/W/548 Jaffna
Post
0.05Maruthankerny
Maruthankerny
Jaffna
Jaffna266 ENREP/W/293Renovation of Class room building at
J/Aliyawalai CCTMSDC 1.49
265 ENREP/W/292Renovation of Class room building at
J/Uduthurai MVDC 5.31
Post LKR 1.49 SDS 1.37
Post LKR 5.31 SDS 4.73
0.00
Maruthankerny
MaruthankernyJaffna
Jaffna
0.01
268 ENREP/W/296Renovation of Class room building at
J/Maruthankerny HTMS, JaffnaDC 5.00
267 ENREP/W/294Renovation of Class room building at
J/Chempijanpattu GTMSDC 0.43
Post LKR 5 SDS 4.14
Post LKR 0.43 SDS 0.38
0.02Maruthankerny
Maruthankerny
Jaffna
Jaffna
0.05
270 ENREP/W/295Rehabilitation of roof works of
J/Thalayadi RCTMSDC 2.52
269 ENREP/W/302Renovation of Class room building at
J/Chempijanpattu RCTMSDC 1.82
Post LKR 2.52
SDS,
J/Thalayadi
RCTMS
1.18
Post LKR 1.82 SDS 1.42
0.03Maruthankerny
Maruthankerny
Jaffna
Jaffna
0.02
272 ENREP/W/428Reconstruction of Ward Blocks in
Divisional Hospital, MaruthankernyNCB 33.87
271 ENREP/W/300Reconstruction of CR building in
J/Mamunai GTMSDC 3.65
LKR 27.64 Nimovil Civil
Engineering 1.37
Post LKR 3.56
SDS,
J/Mamunai
GTMS
1.99
0.04MaruthankernyJaffna
Jaffna
0.31 Post
Maruthankerny274 ENREP/W/305Reconstruction of 4 Nos. of MPCS
Outlet Branches at MaruthankernyNCB 12.34
273 ENREP/W/429
Reconstruction of Vadamarachchi East
Palm Development Co-op Society Ltd,
Maruthankerny, Jaffna
DC 4.91
3.50
Post LKR 4.91
Vadamarachchi
east Palm
Development
Co-op Society
1.55
Jaffna
0.11 Post LKR 10.12 Mathankan
Construction
Post LKR 3.66
Vadamarachchi
East MPCS
Maruthankerny
275 ENREP/W/541Reconstruction of GHC Uduthurai,
MaruthankernyDC 3.66 0.03Jaffna Maruthankerny -
276 ENREP/W/542Renovation of Fisherman Co-op Society
Building at MaruthankernyDC 4.15 0.04 Post LKR 4.15
Vadamarachchi
East Fisherman
Co-op Society
0.20
ENREP/W/543Reconstruction of Primary Medical Care
Unit at Mullian Stage-1, JaffnaDC 5.50 0.05 Post LKR 5.5
Maruthankerny
MPCS Ltd -
278 ENREP/W/544
Reconstruction of School Building
(120’x25’) J/Kaddaikadu
RCTMS,Jaffna.
DC 4.57 0.04 Post LKR 4.57
SDS
/Kaddaikadu
RCTMS,Jaffna
-
279 ENREP/W/98
Repairs to Class Room Building
J/Vettilaikerney Parameswara
Vidiyalayam.
NCB 2.67 0.02 Post LKR 2.67
SDS
Vettilaikerney
Parameswara
Vidiyalayam.
-
4.46 0.04
5.46
0.04Maruthankerny
Maruthankerny
Maruthankerny
Renovation Works of DMO’s Qrs at
Maruthankerney, Jaffna.
Reconstruction of Female Ward of 12
Beds & Canteen at R.H
Maruthankerney, Jaffna
280 ENREP/W/431Reconstruction of School Building
J/Kervil GTMS, Jaffna.NCB 3.95 Post LKR 3.95
SDS Kervil
GTMS, -
4.46
Hospital
Development
Society,
Pointpedro
- LKR
Hospital
Development
Society,
Pointpedro
277
Maruthankerny
Maruthankerny
Maruthankerny
Maruthankerny
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 6/28/2011 10/26/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 6/29/2011 10/27/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 6/30/2011 10/28/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 7/1/2011 10/29/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
DC Planned - - - 7/2/2011 10/30/2011
Actual - - - 12/30/2011 4/29/2012 On Progress
Planned 4/27/2010 6/1/2010 - 6/21/2010 12/18/2010
Actual 3/26/2010 4/29/2010 - 6/11/2010 12/22/2010 On Progress
Planned - - - 6/21/2010 12/18/2010
Actual - - - 8/16/2010 1/13/2011 On Progress
Planned 4/27/2010 6/1/2010 - 6/21/2010 12/18/2010
Actual 11/29/2010 1/4/2011 - 2/1/2011 7/15/2011 On Progress
11/2/2010 12/7/2010 - 12/31/2010 6/29/2011
11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 3/8/2011 7/7/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 6/24/2011 10/27/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 1/1/2011 5/1/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 10/12/2010 2/9/2011
Actual - - - 3/30/2011 8/2/2011 On Progress
Planned - - - 2/2/2011 6/2/2011
Actual - - - 7/4/2011 11/4/2011 On Progress
Planned - - - 2/3/2011 2/28/2011
Actual - - - 12/22/2011 3/30/2012 On Progress
Planned - - - 2/5/2011 6/5/2011
Actual - - - 1/10/2011 5/17/2011 On Progress
Planned - - - 10/8/2010 1/6/2011
Actual - - - 3/17/2010 7/19/2011 On Progress
Jaffna
Jaffna
Jaffna
- 298
300
282
283
284
285
286
287
Post
Post
Post
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
LKR 4.57
SDS, J/
Kaddaikadu
RCTMS
6.98 Sairam
Contractors
LKR 2.63
LKR
LKR
Nallur MPCS
-
-
-
-
-
-
7.51
Yaso
Construction &
Civil Contract
Works
0.03 Post LKR 3.47
SDS J/St. John
Bosco's
Vidylalayam
10.20
Post
LKR 5.45
Hospital
Development
Society,
Pointpedro
0.04
Post LKR
Post LKR
3.73
13.38
Hospital
Development
Society,
Pointpedro
5.34
Hospital
Development
Society,
Pointpedro
LKR 5.23
Hospital
Development
Society,
Pointpedro
LKR
Renovation Works of MID Wife Qrs at
Maruthankerney, Jaffna.
Renovation of OPD Block, Water Tank
& Generator Room at Maruthankerney,
Jaffna.
Post
Post
0.05
5.23 0.05ENREP/W/551
LKR 5.46
LKR 5.02
0.05
ENREP/W/551Reconstruction of Generator House of
Conference Hall at Public Library Jaffna.Jaffna Jaffna Town
Reconstruction of Male Ward of 12
Beds, Ambulance Garage & Kitchen at
Maruthankerney, Jaffna.
Reconstruction of Maternity Ward at
R.H Maruthankerney, Jaffna.
ENREP/W/547
Reconstruction of Lab for Chief
Engineer Office at Dept of Building ,
Jaffna
Jaffna TownJaffna
DC 0.16 0.00
ENREP/W/548 Jaffna
ENREP/W/549 Jaffna
LKR 0.16 Nallur MPCS.
ENREP/W/553 Jaffna Jaffna Town
5.46
Maruthankerny
ENREP/W/552 Jaffna Maruthankerny
Maruthankerny
5.45 0.05
Reconstruction of Female Ward of 12
Beds & Canteen at R.H
Maruthankerney, Jaffna
288 ENREP/W/98Reconstruction of Unit Office Cum
Quality Control Laboratory at Pannai
0.05
5.34
4.57
Reconstruction of Two Storey Class
Room Building With Stage(Ground
Floor) J/Kaddaikadu RCTMS,Jaffna.
5.02
NCB 15.60
Maruthankerny
ENREP/W/550 Jaffna
Hospital
Development
Society,
Pointpedro
Improvements of Chief Engineer's &
Executive Engineer's office, JaffnaDC 4.13 0.04
0.14 Nimovi Civil
Engineers
WRDS
Eachamopddai
Jaffna Maruthankerny
1.38
290 ENREP/W/431Reconstruction of Market at Moor street,
Jaffna.NCB 8.23
289 ENReP/W/197
0.07 Post
2.72
2.84
292 ENREP/W/539
Renovation and Improvements of
Building of Nurses Traning School
Jaffna Teaching hospital, Jaffna
DC 3.53 0.03
ENREP/W/432Repairs to Osmanya College Buildings
at Jaffna.NCB
LKR 3.53
Koddai
Meenadchi
Women Rural
Development
Society.
Jaffna Town Post8.42 0.08
DC 5.50 0.05
Jaffna Jaffna Town Post
Jaffna Jaffna Town Post
3.04
Post
294 ENREP/W/548Reconstruction of 63x25 class room
Building J/St. John Bosco's VidylalayamDC 3.47
0.02Nallur
0.01
LKR 5.5 Nallur MPCS 0.01
296 ENREP/W/433
Refurbishment of CE Office &
Ancillary Items at Depet of Building
Jaffna
DC 4.59
295 ENREP/W/549Reconstruction of MPCS outlet and Sub
post office at poompugar, Ariyalai EastDC 2.63 0.71
Post LKR 4.59 Nallur MPCS
Ltd
Jaffna Town 1.00
Jaffna Town 0.04 1.00
Post
0.03 Post
5.22
SDS
J/Koddaikaddu
GTMS, Jaffna.
LKR
LKR
299 ENREP/W/434Reconstruction of Primary Health Center
AriyalaiDC 3.27 0.03Nallur
ENREP/W/550 Post
ENREP/W/435 Reconstruction of J/Poompukar GTMS DC 3.47
Reconstruction of Two Storey Class
Room Building J/Koddaikaddu GTMS,
Jaffna.
DC 5.22 0.05
1.36
Post LKR 3.27
Ariyalai Center
South Samurthi
Task Force
2.67
3.47
Women Rural
Development
Society,
Navaladi
291
293
297
Nallur
Jaffna Town
Jaffna Town
Jaffna Town
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 2/5/2011 7/5/2011
Actual - - - 3/18/2011 7/19/2011 On Progress
Planned - - - 7/5/2011 1/1/2012
Actual - - - 11/3/2011 2/15/2011 -
Planned 11/5/2010 12/10/2010 - 2/11/2011 2/11/2012
Actual 11/29/2010 1/4/2011 - 1/18/2011 9/29/2011 On Progress
Planned 8/27/2010 10/1/2010 - 10/8/2010 1/6/2011
Actual 2/8/2011 3/8/2011 - 3/11/2011 9/21/2011 On Progress
Planned 8/27/2010 10/1/2010 - 10/8/2010 1/6/2011
Actual 3/8/2011 4/8/2011 - 4/11/2011 11/21/2011 On Progress
Planned 8/27/2010 10/1/2010 - 10/8/2010 1/6/2011
Actual 2/8/2011 3/8/2011 - 3/11/2011 8/22/2011 On Progress
Planned - - - 1/15/2011 5/15/2011 Completed
Actual - - - 2/7/2011 6/10/2011 7/9/2011
Planned 6/15/2011 7/15/2011 - 8/15/2011 2/11/2012
Actual 6/30/2011 7/29/2011 - 8/15/2011 2/25/2012 On Progress
Planned 6/15/2011 7/15/2011 - 2/5/2011 11/2/2011
Actual 6/30/2011 7/29/2011 - 8/5/2011 5/15/2012 On Progress
Planned - - - 12/5/2011 11/3/2011
Actual - - - 12/27/2011 6/29/2012 1/0/1900
Planned - - - 2/7/2011 11/4/2011
Actual - - - 12/30/2011 7/11/2012 1/0/1900
Planned 8/31/2010 10/5/2010 - 12/12/2010 5/11/2011
Actual 11/29/2010 1/4/2011 - 2/10/2011 7/24/2011 On Progress
Planned - - - 10/8/2010 12/7/2010 Completed
Actual - - - 10/5/2010 12/13/2010 12/3/2010
Planned - - - 2/8/2011 6/8/2011 Completed
Actual - - - 3/18/2011 7/19/2011 8/30/2011
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Jaffna
Jaffna
Jaffna
Sairam
Contractors 310
311
302
304
306
Lingam
Building
Construction
0.099.66
Nallur
Jaffna 0.09 Post LKR 8.72ENREP/W/437Reconstruction of Two Storey Class
Building at J/Ariyalai GTMS, JaffnaNCB 10.37
301 ENREP/W/436Reconstruction of Class room building
J/Muthuthamby MVDC 5.16
Nallur
0.59Jaffna
Jaffna
-
Post LKR 5.16
SDS,
Muthuthamby
MV
2.53 0.05
ENREP/W/438
Reconstruction & Improvements to
Assembly Hall & Library Building in
J/hartley College
NCB 20.88
303 ENREP/W/286Reconstruction of Public Market
Building at Point pedro Phase IINCB 65.36Point pedro
17.45 Mathankan
Construction 6.58
Post LKR 54.55
V.T.
Construction
(pvt) Ltd.
18.73
0.22Jaffna
Jaffna
0.19 Post LKRPoint pedro
ENREP/W/440Reconstruction of Libarary Building in
J/Point pedro Sithivinayagar VidylayamNCB 11.40
305 ENREP/W/439
Reconstruction of two storey Class room
Building at J/Methodist Girls High
School
NCB 23.90Point pedro
9.88 Sai Ram
Construction 1.86
Post LKR 19.75
Lingam
Buildeing
Construction
1.53
0.05Jaffna
Jaffna
0.10 Post LKRPoint pedro
Point pedro
Point pedro 0.24308 ENREP/W/578Reconstrution of Zonal Education Office
at Vadamarachi, Jaffna(22.2Mn)NCB 27.06
307 ENREP/W/441Reconstruction of Ward Block at base
Hospital Point pedroDC 5.46
4.00
Post LKR 5.46 RDS Puloiy
North West 4.74
Post LKR 24.54 Jana Civil
Works
0.47
-
- Jaffna Point pedro
NS
DC
PostJaffna Point pedro
312 ENREP/W/287
Rehabilitation of 2 MPCS Branches
and 2 no of Food Stores at Thellipalai,
Jaffna.
NCB 9.63
LKRENREP/W/443Completion of UC Building at
Valveddithurai, Jaffna
ENREP/W/444Reconstruction of Library Urban
Council, Pointpedro, Jaffna.
309 ENREP/W/442 Reconstruction of UC Point pedro NCB 52.47
Star
Engineering
Construction
Point pedro
Post
13.92 0.13
5.72
Post LKR 49.65
VV
Ramanathan &
Co
7.61
Lingam
Buildeing
Construction
LKR 9.66
11.77
0.05
Jaffna
0.09 Post LKR 7.14
1.35
Vali North
Vali North
Jaffna
314 ENREP/W/446Rehabilitation of a J/Pannalai Sri
Kanagasabai VidDC 1.50
313 ENREP/W/445 Repairs to J/ Vasavillan M.M.V DC 6.03
SDS,
J/Pannalai Sri
Kanagasabai
Vidiyalayam
1.29
Post LKR 5.44 SDS 5.14
0.04Jaffna
Jaffna
0.01 Post LKR
LKR
Vali North
Vali North
316 ENREP/W/552Reconstruction of J/Veemankamam
M.V, ThellipalaiDC 4.69
315 ENREP/W/551
Reconstruction of Two Storey Class
Room J/Veemankamam M.V,
Thellipalai.
DC 4.71
4.69
SDS
J/Veemankama
m M.V,
Thellipalai
0.23
Post LKR 4.71
SDS
J/Veemankama
m M.V,
Thellipalai
0.20
0.04
Vali North
Jaffna
Jaffna
0.04 Post
Post
Vali North
Vali North
318 ENREP/W/554
Repairs to Class Room Building at
J/Kolankaladdy Saiva Vidyalayam,
Thellipalai.
NCB 4.53
317 ENREP/W/553Reconstruction of J/Maaviddapuram
South AMTMS, Thellipalai.DC 4.30
LKR 4.53
SDS
J/Alaveddy
Arunachchalam
Vidyalayam
0.21
Post LKR 4.3
SDS
J/Thellipalai
Ssivapiragasa
Vid
0.01
0.04
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/14/2011 10/20/2011 On Progress
Planned - - - 5/5/2011 9/5/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Planned - - - 1/15/2011 6/14/2011
Actual - - - 5/20/2011 10/31/2011 On Progress
Planned - - - 1/16/2011 6/15/2011
Actual - - - 12/22/2011 4/29/2012 On Progress
Planned 11/20/2010 12/25/2010 - 1/15/2011 5/15/2011
Actual 3/8/2011 4/8/2011 - 5/20/2011 10/31/2011 On Progress
Planned - - - 2/5/2011 6/5/2011 Completed
Actual - - - 2/1/2011 7/7/2011 8/24/2011
Planned - - - 3/10/2011 7/10/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 5/25/2011 9/29/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 6/10/2011 10/12/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 6/10/2011 10/12/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 6/10/2011 10/12/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 8/12/2011 12/14/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 10/1/2010 4/13/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 1/31/2011 6/10/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 3/10/2011 7/10/2011
Actual - - - 6/24/2011 10/27/2011 On Progress
Planned 5/15/2011 6/25/2011 - 3/10/2011 11/12/2011
Actual 6/29/2011 7/29/2011 - 8/5/2011 12/14/2011 On Progress
Planned 5/15/2011 6/25/2011 - 6/22/2011 12/19/2010
- 322 Post5.48 0.05 LKR 5.48
SDS, J/
Keerimalai
Naguleswara
Maha
Vidyalayam.
ENREP/W/578
Reconstruction of Two Storey Class
Room Building with Stage (Ground
Floor) J/Keerimalai Naguleswara
Vidyalayam, Jaffna.
Jaffna Vali North DC
0.04Vali North
Vali North
Jaffna
Jaffna320 ENREP/W/556Reconstruction of J/Maaviddapuram
North AMTMS, Thellipalai.DC 4.30
319 ENREP/W/555Reconstruction of J/Valithundal
RCTMS, Jaffna.DC 4.19
Post LKR 4.3
SDS J/
Kadduvanpulam
Maha
Vidyalayam
0.21
Post LKR 4.19
SDS Illavalai
Meihandan
Maha Vid
0.01
0.09Vali North
Vali North
Jaffna
Jaffna
0.04
323 ENREP/W/448Reconstruction of Naguleswaram
VidiyalayamNCB 10.06
321 ENREP/W/447Repairs & Improvements to Thellipalai
DS officeDC 10.53
Post LKR 8.83 K.S Arumugam
& Sons 0.98
Post LKR 9.12
Java Civil
Engineering
Construction
1.49
0.05Vali North
Vali North
Jaffna
Jaffna
0.09
325 ENREP/W/557Renovation works at Palmara Production
Center at VithagapuramDC 4.13
324 ENREP/W/449Reconstruction of Primary Health Center
Vithagapuram in ThellipalaiDC 5.50
Post LKR 4.13
Piam De.Co-op
Society
Thellipalai
0.82
Post LKR 5.5 RDS, Ilavalai
North 3.74
0.04Vali North
Vali North
Jaffna
Jaffna
0.04
327 ENREP/W/559Renovation Works of OPD Block at
Base hospital ThellipalaiDC 5.50
326 ENREP/W/558Renovation works at Palmara Production
Center at VasanthapuramDC 4.13
Post LKR 5.5
Hospital
Development
Society
Thellipalai
1.93
Post LKR 4.13
Piam De.Co-op
Society
Thellipalai
0.65
0.05
Vali North
Vali North
Jaffna
Jaffna
0.05
329 ENREP/W/561Renovation of Ward no 1, ward no 2 and
Kitchen at base hospital ThellipalaiDC 5.50
328 ENREP/W/560Renovation and Balance works at Base
hospital ThellipalaiDC 5.50
Post LKR 5.5
Hospital
Development
Society
Thellipalai
1.62
Post LKR 5.5
Hospital
Development
Society
Thellipalai
0.01
0.02Vali North
Vali North
Jaffna
Jaffna
0.05
331 ENREP/W/563
Reconstruction of Village Secretariat
Pannalai(J/224),Thurkkapuram (J/229)
Jaffna.
DC 3.70
330 ENREP/W/562Reconstruction of Village Secretariat
Kurumbasiddy East (J/243) JaffnaDC 1.85
Post LKR 3.7 RDS Pannalai 0.94
Post LKR 1.85
RDS
Kurumbasiddy
East
0.03
0.03Vali North
Vali North
Jaffna
Jaffna
0.03
333 ENREP/W/565
Reconstruction of Village Secretariat
Maviddapuram (J/231), Maviddapuram
South(J/232), Jaffna
DC 3.70
332 ENREP/W/564
Reconstruction of Village
SecretariatNaguleswaram(J/226),
Thanthaiselvapuram (J/230)Jaffn
DC 3.70
Post LKR 3.7
RDS
Maviddapuram
South
0.03
Post LKR 3.7
RDS
Thanthaiselvapu
ram
0.03
0.03
Vali North
Vali NorthJaffna
Jaffna
0.03
335 ENREP/W/567
Reconstruction of PS Office, Bus Stand
& Market Building at Thellipalai,
Jaffna(18.9 Mn)
NCB 32.35
334 ENREP/W/566
Reconstruction of Village Secretariat
Illavalai North
(J/221)Viththagapuram(J/223), Jaffna.
DC 3.70
Post LKR 28.13
Java Civil
Engineering
Construction
0.02
Post LKR 3.7 RDS
Viththagapuram 2.89
0.10Vali NorthJaffna
0.29
336 ENREP/W/568Reconstruction of ASC Building at
Keerimalai, Jaffna(9.06Mn)NCB 10.90 Post LKR 9.39
MCT Cvil
Engineering
Contractor
1.53
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual 6/29/2011 7/29/2011 - 8/12/2011 12/14/2011 On Progress
Planned - - - 6/22/2011 12/19/2011
Actual - - - 9/2/2011 1/12/2012 On Progress
Planned 4/28/2010 6/2/2010 - 6/22/2010 12/19/2010
Actual 3/26/2010 4/29/2010 - 10/1/2010 4/13/2011 On Progress
Planned - - - 10/12/2010 12/11/2010 Terminated
Actual - - - 3/18/2011 7/19/2011 5/30/2011
Planned - - - 2/5/2011 6/5/2011
Actual - - - 1/31/2011 6/10/2011 On Progress
Planned - - - 2/6/2011 6/6/2011
Actual - - - 12/22/2011 4/28/2012 On Progress
Planned - - - 2/2/2011 6/3/2011
Actual - - - 3/18/2011 7/19/2011 On Progress
Planned - - - 2/2/2011 6/3/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 2/2/2011 6/3/2011
Actual - - - 7/29/2011 12/1/2011 On Progress
Planned - - - 2/2/2011 6/3/2011
Actual - - - 6/24/2011 10/27/2011 On Progress
Planned - - - 4/2/2011 6/3/2011
Actual - - - 6/9/2011 10/12/2011 On Progress
Planned - - - 3/8/2011 7/3/2011
Actual - - - 5/25/2011 9/22/2011 On Progress
Planned - - - 5/25/2011 8/24/2011
Actual - - - 6/7/2011 9/23/2011 On Progress
Planned - - - 5/26/2011 8/25/2011
Actual - - - 12/22/2011 4/29/2012 On Progress
Planned - - - 5/5/2011 9/6/2011
Actual - - - 6/7/2011 10/11/2011 On Progress
Planned 8/31/2010 10/5/2010 - 10/12/2010 4/10/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 8/14/2011 On Progress
Planned - - - 2/10/2011 6/10/2011
Actual - - - 3/18/2010 7/30/2010 On Progress
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
-
-
SDS,
Ramakrishnan
mahavidiyalaya
m, Kondavil
0.05 Post LKR 5.5
341
349 5.38
Mareesankudal
Kusumanthurai
Fisherman
Cooperative
Society Ltd.
ENREP/W/288Reconstruction of Fish Stall & Rest Hall
Mathagal East in Sandillipay, Jaffna.Jaffna Vali South West DC
0.10Vali North
Vali North
Jaffna
Jaffna 0.02337 ENREP/W/569Improvement of Divisional Secretariat,
Thellipalai, Jaffna.DC 2.41
336 ENREP/W/568Reconstruction of ASC Building at
Keerimalai, Jaffna(9.06Mn)NCB 10.90
2.41 RDS
Viththagapuram -
Post LKR 9.39
MCT Cvil
Engineering
Contractor
1.53
Post LKR
Post LKR
LKR
338 ENREP/W/99 Reconstruction of IE's Office at valalai NCB 15.50 0.14Kopai
339 ENREP/W/289Rehabilitation of Public Market at
ValalaiDC 4.96 0.04KopaiJaffna
Women RDS
Valalai 0.01
LKR 3.52
Vali- East
Sourthern
Division MPCS
Ltd.
15.72 Visvakarma
Pvt Ltd. 4.07
Kopai
Kopay
DC Post
0.04
4.96Post
Kopay
342 ENREP/W/291 Reconstruction of J/Kondavil R.M.V DC 5.17
340 ENREP/W/308
Reconstruction of Food packing Centers
7 Agriculture Product Storange Centre
Neervely
DC 4.69
0.03Kopay
ENREP/W/309
Renovation of Food Packing Center &
Agriculture Product Storage Centre
Stage II Neervely, Jaffna
3.52
Kopay
0.03
0.05
Jaffna
Jaffna 0.21
Post LKR 4.69
Vali-East
Sourthern
Division MPCS
Ltd.
3.88
Post LKR 5.17
344 ENREP/W/616Reconstruction of Store for MPCS
Iddaikkadu, JaffnaDC 5.50
343 ENREP/W/569Reconstruction of Main hall J/Aththiyar
Hindu College NeervelyDC 3.21
0.05Kopay
Kopay
Vali-East
Northern
Division MPCS
Ltd.
-
Post LKR 3.21
SDS
J/Aththiyar
Hindu College
Neervely
-
346 ENREP/W/571
Reconstruction of Two Storey Class
Room Building J/Achuvelly St Thiresha
Vidyalayam
DC 4.31
345 ENREP/W/570Reconstruction of Store for MPCS
(J/281) at PaththamenyDC 5.50
4.32
SDS
J/Achuvelly St
Thiresha
Vidyalayam
-
Post LKR 5.5
Vali-East
Northern
Division MPCS
Ltd.
-
0.02
Vali South West
Vali South West
0.04 Post LKR
348 ENREP/W/573Renovation of Main Store Pandaterippu
parish MPCS ltd. SandilipaiDC 2.42
347 ENREP/W/572Reconstruction of MPCS Branch-
Sitharamoli, SandilipaiDC 1.90
2.42
Pandaterippu
parish MPCS
ltd
0.21
Post LKR 1.9
Pandaterippu
parish MPCS
ltd
0.21
0.05Vali South West
Velanai
0.02 Post LKR
LKRPost5.38 0.05
351 ENREP/W/288 Reconstruction of ASC at Punkuduthivu NCB 11.73
350 ENREP/W/574
Reconstruction of Two Story Class
Room Building J/Uyarapulam M.M.T.M
School, Anaikoddai, Jaffna
DC 5.39
10.13 Ratna
Engineers 5.37
Post LKR 5.39
SDS
Uyarapulam
M.M.T.M
School
1.05
0.02Velanai
0.11 Post LKR
352 ENREP/W/454Reconstruction of Velanai Central
CollegeDC 2.06 Post LKR 2.06 SDS 1.05
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 2/10/2011 6/10/2011
Actual - - - 3/21/2011 7/21/2011 On Progress
Planned - - - 2/10/2011 6/10/2011
Actual - - - 3/21/2011 7/21/2011 On Progress
Planned - - - 2/10/2011 6/10/2011 Completed
Actual - - - 3/21/2011 7/21/2011 8/23/2011
Planned - - - 1/5/2011 5/5/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 4/18/2011 8/16/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 4/19/2011 8/17/2011
Actual - - - 30/12/2011 1/5/2012
Planned 10/25/2010 11/25/2010 - 1/6/2011 5/6/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 7/15/2011 On Progress
Planned - - - 11/11/2010 3/11/2011
Actual - - - 12/23/2010 4/26/2011 On Progress
Planned - - - 11/12/2010 3/12/2011
Actual - - - 12/22/2011 4/29/2012 On Progress
Planned 1/25/2011 3/1/2011 - 3/24/2011 7/22/2011
Actual 6/29/2011 7/29/2011 - 8/12/2011 2/22/2012 On Progress
Planned - - - 2/15/2011 6/15/2011
Actual - - - 3/30/2011 8/2/2011 On Progress
Planned - - - 2/16/2011 6/16/2011
Actual - - - 12/22/2011 4/27/2012 On Progress
Planned - - - 7/22/2011 11/19/2011
Actual - - - 7/22/2011 11/25/2011 On Progress
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned
Actual
Planned
Actual
PlannedPost370 ENREP/W/419
Improvement to Ministry of Economic
Development Building at JaffnaJaffna Jaffna DC
Post369 ENREP/W/418Reconstruction of PCMU, Mulliyan in
Jaffna DistrictJaffna Mulliyan DC
368 ENREP/W/413
Extension work of Govt Audit office,
Jaffna to provide the office for the Asst
Auditor General, Northern Province
Jaffna Jaffna 5.00 PostDC
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
Jaffna
LKR 4.79
Thenmarachchi
MPCS,
Kodikamam
5.40 -
-
364
ENReP/W/540Reconstruction of Market at
Eluthumadduval Stage I, Jaffna.Jaffna
358
361 Chavakachcheri DC Post
-
Consortium of
Organizations
for Rural
Empowerment,
Kayts.
4.79 0.04
ENREP/W/580Reconstruction of Self Study Center at
Kayts, Jaffna.Jaffna Velanai DC Post LKR 5.4
SDS, J/ Araly
Hindu College
0.05 Post LKR 5.49
DC Post5.20 0.05 LKR 5.2
0.05
ENREP/W/541
Reconstruction of Two Storey Class
Room Building with Stage J/Araly
Hindu College, Jaffna
Chankanai
Velanai353 ENREP/W/455Renovation of Roof for J/Mandaithivu
MVDC 1.71 1.71 SDS 0.20
0.01
Velanai
Velanai
0.02 Post LKR
355 ENREP/W/457Renovation of Roof for J/Punguduteevu
Sri thuraiswami Vid.DC 3.15
354 ENREP/W/456Renovation of Roof for J/Naranthanai
RC Vid.DC 1.59
3.15 SDS 1.06
Post LKR 1.59 SDS 1.46
0.04Velanai
Kayts
0.03 Post LKR
357 ENREP/W/576Renovation of Main Hall Enterance Roof
at J/Kayts St.Anthony's College jaffnaDC 0.85
356 ENREP/W/575Improvement of Self Study Center at
Delft in JaffnaDC 4.74
0.85
J/Kayts
St.Anthony's
College SDS
0.09
Post LKR 4.74 Delft MPCS -
Chavakachcheri
Jaffna
Jaffna
0.01 Post LKRJaffna
Post LKR
LKR
359 ENREP/W/290Rehabilitation of Maravanpulo Branches
at Thenmaracchi.NCB 2.33 0.02Chavakachcheri 2.11
K.S Arumugam
& Sons. 1.57
360 ENREP/W/458Reconstruction of Primary Health Center
MaravanpulloDC 2.18 0.02 Post 2.18
Maravanpulo
West
Community
Center
0.66
ENReP/W/540Rehabilitation of J/Meesalai
Veerasingam MVNCB 10.95 0.10ChavakachcheriJaffna LKR 10.27
Tharani
Building
Enterprises
-
363 ENReP/W/617Reconstruction ofPrimary Health Center
at ThondamanaruDC 5.49
362
4.03 Karaveddy
Vali-East
Northern
Division MPCS
Ltd
Jaffna
365 ENREP/W/542
Reconstruction of Two Storey Class
Room Building J/Araly Murugamoorthy
Vidyalayam.
DC 5.50 Post LKR 5.5
SDS /Araly
Murugamoorthy
Vidyalayam.
0.26 0.05
Post
Chankanai
DC Post LKR
Post LKR
366 ENREP/W/543Additional works of self study centre at
DelftJaffna Delft
367 ENREP/W/544Supplying & Fixing steel truss for
proposed Market EluthumadduvalJaffna Palai DC
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual
Planned 1/16/2010 2/20/2010 - 4/6/2010 10/3/2010
Actual 9/27/2010 11/4/2010 - 12/22/2010 9/2/2010 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 6/5/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/12/2010 11/22/2010 4/15/2011
Planned 1/16/2010 2/20/2010 - 4/6/2010 10/3/2010
Actual 6/26/2010 7/16/2010 - 7/23/2010 1/3/2011 On Progress
Planned 1/11/2010 2/15/2010 - 3/7/2010 6/5/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 1/20/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Terminated
Actual 5/10/2010 6/9/2010 - 7/12/2010 12/23/2010 12/17/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 3/26/2010 4/29/2010 - 5/21/2010 11/1/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 5/10/2010 6/9/2010 - 8/25/2010 2/5/2011 On Progress
Planned 12/16/2009 1/20/2010 - 2/9/2010 5/10/2010 Terminated
Actual 5/10/2010 6/9/2010 - 7/23/2010 12/4/2010 3/16/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 6/26/2010 7/16/2010 - 7/23/2010 12/4/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 7/8/2010 8/10/2010 - 9/24/2010 3/7/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010
Actual 3/26/2010 4/29/2010 - 5/21/2010 12/1/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 12/11/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 11/11/2010 1/7/2011
Planned - - - 9/5/2010 1/3/2011 Completed
Actual - - - 10/14/2010 2/9/2011 11/15/2010
Planned 5/1/2010 6/5/2010 - 6/25/2010 12/22/2010 Completed
Actual 3/26/2010 4/29/2010 - 6/11/2010 12/1/2010 8/30/2010
Planned 5/2/2010 6/6/2010 - 6/26/2010 12/23/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 12/11/2010 On Progress
Planned - - - 4/25/2010 10/22/2010 Completed
Actual - - - 5/11/2010 7/16/2010 8/10/2010
Planned 4/1/2010 5/6/2010 - 6/6/2010 10/6/2010 Completed
Actual 5/10/2010 6/9/2010 - 7/12/2010 11/23/2010 11/23/2010
Planned 4/1/2010 5/6/2010 - 6/6/2010 10/6/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 2/20/2011 On Progress
Post370 ENREP/W/419Improvement to Ministry of Economic
Development Building at JaffnaJaffna Jaffna DC
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
LKR 15.91
5.25
26.37
LKR
7.72
39.61
LKR
8.96
LKR 10.65
Eastern
Building
Construction
9.96 LKR371 ENREP/W/100Reconstruction of Mail Hub Office at
KarachchiNCB 46.00 0.41 Post
372 ENREP/W/101
Renovation of Laboratory building and
Additional infrastructure facilities to
Regional Agriculture Research Center at
Iranaimadhu
NCB 8.60 0.08
373 ENREP/W/103
Govt Seed Production Farm at
Vadakachchi - Phase 1 (District
agriculture training centre and
Vaddakachchi farm rehabilitation)
NCB 15.03 0.14
Post KPK
Construction 8.92
Post Visvakarma
(Pvt)Ltd 7.85
Post LKR 13.24
LKR374 ENREP/W/104Re-construction of Karachi Office &
Library Building in KilinochchiNCB 19.00 0.17
LKR 8.36
LKR 6.39 Land mark
13.34
16.44
Master
Building
3.02
375 ENREP/W/105Construction of MPCS Branch offices
& MPCS building at KarachchiNCB 10.00 0.09KarachiKilinochchi Post
Dharmadasa
Construction 4.92
376 ENREP/W/107Re-Construction of ACCD Office at
Kilinochchi (Stage 1)NCB 8.73 0.08 Post
377 ENREP/W/108 NCB 9.20 0.08 PostKarachiRe-construction of ACLG Office
Building at Kilinochchi 0.96
Karachi
0.09 Post
Premium
International.(p
vt) Ltd
LKRKarachi
8.15
LKR 4.99 ENREP/W/110Re-construction of Market Building
Complex at AmpalkulamNCB 5.50 0.05
GISO
Construction
PostKarachi
LKR
Kilinochchi
Karachi
Kawsi
Construction 1.29
379 ENREP/W/111
Renovation &Improvements to a
Building of Dept. of Buildings-
Kilinochchi
NCB 10.20 4.54
378
380 ENREP/W/113 Repairs to Kilinochchi ASC Building NCB 12.10 0.11Karachi Post Ahnanth
Builders 2.88
381 ENREP/W/114Re-construction of government seed farm
at ParanthanNCB 20.08 0.18 Post
V.V.Ramanatha
n & Co (Pvt)
Ltd
7.22
382 ENREP/W/115Re-construction of Office Building for
Asst. Director of Fisheres OfficeNCB 6.98 0.06 Post 5.91 Turbo Group 3.25
383 ENREP/W/117Re-construction of Chief Engineer's
office RDDNCB 10.04 0.09Karachi
384 ENREP/W/117Construction of PIC Building of
ENRePat KilinochchiDC 5.25
LKR
Karachi
KarachiKilinochchi
Kilinochchi
Karachchi
South MPCS 5.17
Post LKR 8.47 Hema
Engineering 8.13
0.02Karachi
Karachi
0.05 Post LKR
Post LKR386 ENREP/W/119Re-construction of Two Storey Senior
Staff Quarters at KilinochchiNCB 31.00
385 ENREP/W/118Urgent Repairs to Agriculture Ministry
BuildingNCB 2.09
Premium
International.(p
vt) Ltd
11.49
Post LKR 1.90 Mapil Civil
Eng. 1.62
0.02Karachi
Karachi
Kilinochchi
Kilinochchi
0.28Kilinochchi
388 ENREP/W/121Renovation and Repairs to vetinary
Office and Quarters at KarachiNCB 6.28
387 ENREP/W/120
Urgent repairs & Rehabilitation works to
Chief Engineers office Dept. of
Buildings, Kilinochchi
DC 2.10
6.61 JK
Construction 5.91
Post LKR 1.89 Karachchi
North MPCS 1.70
0.07KarachiKilinochchi
0.06 Post
389 ENReP/W/198Reconstruction of Food Store Building
in KarachiNCB 7.65 Post LKR 6.70
Ahnanth
Builders 3.22
Karachi
Karachi
Karachi
Karachi
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 6/6/2010 10/6/2010 Completed
Actual - - - 8/27/2010 1/29/2011 4/15/2011
Planned - - - 6/6/2010 10/6/2010 Completed
Actual - - - 8/12/2010 1/13/2011 2/28/2011
Planned - - - 6/6/2010 10/6/2010 Completed
Actual - - - 8/12/2010 1/13/2011 2/28/2011
Planned - - - 2/20/2011 6/22/2011 Completed
Actual - - - 3/21/2011 7/26/2011 6/23/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/9/2010 1/2/2011 4/5/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/23/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 8/20/2010 12/8/2010 2/21/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/25/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/12/2010 1/2/2011 3/20/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/13/2010 1/2/2011 2/18/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/15/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/23/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/15/2010 1/2/2011 2/26/2011
Planned - - - 2/10/2011 7/10/2011 Completed
Actual - - - 3/21/2011 7/26/2010 7/25/2011
Planned - - - 2/10/2011 7/10/2011
Actual - - - 3/21/2011 7/26/2010 On Progress
Planned - - - 2/10/2011 7/10/2011 Completed
Actual - - - 3/21/2011 7/26/2011 5/28/2011
Planned - - - 6/5/2011 10/3/2011
Actual - - - 7/4/2011 11/1/2011 On Progress
Planned - - - 5/15/2011 9/12/2011
Actual - - - 6/28/2011 11/1/2011 On Progress
Planned - - - 5/15/2011 9/12/2011
Actual - - - 6/28/2011 11/1/2011 On Progress
Kilinochchi390 ENReP/W/199Reconstruction of Paddy Store at
KilinochchiDC 5.61 5.04
Karachchi
North MPCS 4.26
0.03Kilinochchi
Kilinochchi
0.05 Post LKRKarachi
Karachi
392 ENReP/W/201Construction of the Fertilizer store at
Akkarayankulam ASCDC 3.60
391 ENReP/W/200Construction of the Fertilizer store at
Kilinochchi ASCDC 3.60
3.24 FO, Pillayar 2.90
Post LKR 3.24 FO, D5 Right
Bank 2.86
0.05Kilinochchi
Kilinochchi
0.03 Post LKRKarachi
394 ENReP/W/311Providing roof with necessary structural
perair to Kn/Uruthirapuram MVDC 0.61
393 ENReP/W/202Reconstruction of Kn/Kilinochchi Maha
VidyalayamDC 5.24
0.61 SDS 0.43
0 LKR 5.24 SDS 4.68
0.01Kilinochchi
Kilinochchi
0.01 Post LKR
Karachi
396 ENReP/W/313
Providing roof with necessary structural
perair to Kn/Kanagambigaikulam
GTMS
DC 1.65
395 ENReP/W/312Providing roof with necessary structural
perair to Kn/Thiruvairu MVDC 0.89
1.65 SDS 1.54
Post LKR 0.89 SDS 3.36
0.01Kilinochchi
Kilinochchi
0.01 Post LKR
398 ENReP/W/315Providing roof with necessary structural
perair to Kn/Skanthapuram No.2 GTMSDC 0.21
397 ENReP/W/314Providing roof with necessary structural
perair to Kn/Pannakandy GTMSDC 1.29
0.21 SDS 1.51
Post LKR 1.29 SDS 0.98
0.00Kilinochchi
Kilinochchi
0.00 Post LKR
400 ENReP/W/317Providing roof with necessary structural
perair to Kn/Sivapathakalaiagam GTMSDC 1.17
399 ENReP/W/316Providing roof with necessary structural
perair to Kn/Vaddakachchi South GTMSDC 0.32
1.17 SDS 0.97
Post LKR 0.32 SDS 0.30
0.01Kilinochchi
Kilinochchi
0.01 Post LKRKarachi
402 ENReP/W/319
Providing roof with necessary structural
perair to Kn/Kilinochchi Hindu Primary
Vid
DC 0.93
401 ENReP/W/318Providing roof with necessary structural
perair to Kn/Unionkulam GTMSDC 1.43
SDS 0.84
Post LKR 1.43 SDS 1.22
Kilinochchi
Kilinochchi
0.01 Post LKR 0.93
Post LKR 5.24
1.97
403 ENReP/W/461
Renovation and Reconstruction in
K/Vivekananda Vidylayam,
Ampalkulam
DC 5.24 0.05Kilinochchi Karachi SDS 2.76
404 ENReP/W/462Renovation of School building in
Kn/Sivanagar GTMSDC 1.97 0.02 Post LKR SDS 0.30
405 ENReP/W/463Renovation of School building in
Kn/Puthumurippu vigneswara vidylayamDC 3.36 0.03 Post LKR 3.36 SDS 4.52
ENReP/W/579Repairs of School Building at
Kilinochchi Central College.DC 4.71 0.04 SDS 3.58
ENReP/W/580
Construction of Class Room Building
with Principal office at Kn/Ampalkulam
Vivekanada Vidyalayam.
DC 5.45 0.05
Kilinochchi
Kilinochchi
KandavalaiKilinochchi
Post LKR 4.71
Post LKR 5.45 SDS 1.31
ENReP/W/618
Construction of Class Room Building
with Principal office at
Kn/Ramanathapuram East GTMS
DC 5.45 0.05 Post LKR 5.45 SDS 4.94
406
407
408
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
Karachi
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 5/15/2011 9/12/2011
Actual - - - 6/28/2011 11/1/2011 On Progress
Planned - - - 3/28/2011 11/23/2011
Actual - - - 4/7/2011 10/18/2011 On Progress
Planned - - - 1/15/2011 6/14/2011
Actual - - - 1/25/2011 7/8/2011 On Progress
Planned - - - 2/6/2011 6/6/2011
Actual - - - 2/8/2011 6/15/2011 On Progress
DC Planned - - - 2/7/2011 6/7/2011
Actual - - - 29/12/2011 4/28/2012 On Progress
DC Planned - - - 2/8/2011 6/8/2011
Actual - - - 12/15/2010 4/18/2012 On Progress
DC Planned - - - 2/9/2011 6/9/2011
Actual - - - 30/12/2011 29/4/202 On Progress
Planned 9/10/2010 10/15/2010 - 11/5/2010 3/5/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 7/15/2011 On Progress
Planned 8/31/2010 10/5/2010 - 10/26/2010 2/23/2011
Actual 11/30/2010 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned 8/31/2010 10/5/2010 - 10/26/2010 2/23/2011
Actual 11/29/2010 1/4/2011 - 1/25/2011 10/6/2011 On Progress
Planned 8/31/2010 10/5/2010 - 10/26/2010 2/23/2011
Actual 11/29/2010 1/4/2011 - 1/25/2011 7/8/2011 On Progress
Planned - - - 10/26/2010 2/23/2011
Actual - - - 2/8/2011 6/15/2011 On Progress
Planned - - - 10/26/2010 2/23/2011 Completed
Actual - - - 2/8/2011 6/15/2011 7/13/2011
Planned - - - 10/26/2010 2/23/2011
Actual - - - 2/21/2011 6/23/2011 On Progress
Planned - - - 10/26/2010 2/23/2011
Actual - - - 2/21/2011 6/23/2011 On Progress
Planned - - - 10/26/2010 2/23/2011
Actual - - - 12/15/2010 4/23/2011 On Progress
Planned - - - 10/26/2010 2/23/2011
Actual - - - 12/15/2010 4/23/2011 On Progress
Planned - - - 2/10/2010 7/10/2010
Actual - - - 3/25/2011 7/28/2011 On Progress
Planned - - - 2/10/2010 7/10/2010
Actual - - - 3/25/2011 7/28/2011 On Progress
Planned - - - 2/10/2010 7/10/2010
Actual - - - 3/25/2011 7/28/2011 On Progress
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
-
-
-
413
414
415
5.50 0.05
KilinochchiENReP/W/581
Construction of Class Room Building
with Principal office at Kn/Poonakay
Jeyapuram M.V
DC 5.45 0.05 LKR 5.45 SDS
ENReP/W/582Renovation of School building at Kn/ St.
Thiresa Girls College at Kilinochchi.DC 3.71 0.03
Pooneryn
0.05
Post
KarachiKilinochchi
Kilinochchi
4.93
Kilinochchi
Post LKR 3.71 SDS 2.19
LKR 5.45 SDS 1.46
ENReP/W/584
Construction of Class Room Building
with Principal office at
Kn/Uruthirapuram MV
DC 5.45 0.05
PalaiENReP/W/583
Construction of Class Room Building
with Principal office at Kn/Iyakkachchi
GTMS
DC 5.45
416 ENReP/W/320
Renovation & Improvements to Co-op
Society's Rice mill & Stores at
Kilinochchi.
NCB 12.03
Post
412 Karachi
Karachi
Kilinochchi
10.13
Premium
International
Pvt Ltd
2.25
Post LKR 5.45 SDS 2.98
LKR
LKR
0.09Karachi
Karachi
0.11 Post LKR
418 ENReP/W/322
Renovation & Improvements to
Karachchi East MPCS mills and Stores
at Kilinochchi.
NCB 6.08
417 ENReP/W/321Renovation & Improvements to Co-
operaty Building at Kilinochchi.NCB 9.51
4.97 Sadhu
Construction 3.44
Post LKR 8.40 Kawsi
Construction 5.04
0.06Karachi
Karachi
0.05 Post LKR
420 ENReP/W/324Karachi South MPCS Outlet at
SelvanagarDC 2.15
419 ENReP/W/323
Reconstruction of 03 Nos. MPCS
Branches of Karachi East MPCS at
Vaddakachchi, Kilinochchi.
NCB 7.20
2.15 Karachi South
MPCS 1.85
Post LKR 6.53
Premium
International
Pvt Ltd
1.45
0.02Karachi
Karachi
0.02 Post LKR
422 ENReP/W/465Reconstruction of Stores at
Skanthapuram for Akkarayan MPCSDC 2.24
421 ENReP/W/464Karachi South MPCS Outlet at
UruthirapuramDC 2.15
2.24 Akkarayan
MPCS Ltd 1.80
Post LKR 2.15 Karachi South
MPCS 1.81
0.02
Karachi
Karachi
0.02 Post LKR
424 ENReP/W/326Reconstruction of Outlets for Karachchi
South MPCSDC 3.17
423 ENReP/W/325Reconstruction of 01 MPCS Branch of
Thiruvaiyaru MPCS(thiruvaiyaru West)DC 2.15
3.17 Karachi South
MPCS Ltd. 3.17
Post LKR 2.15
Thiruvairu
Youth Project
Agriculture Co-
1.08
0.02Karachi
Karachi
0.03 Post LKR
426 ENReP/W/466Rehabilitation of Hostal building in
Mahadeva Siva Siruvar IllamDC 4.96
425 ENReP/W/327Reconstruction of 01 stores building for
Karachi South MPCSDC 2.26
4.96 Karachi South
MPCS Ltd. 1.84
Post LKR 2.26 Karachi South
MPCS Ltd. 1.61
0.01Karachi
Karachi
0.04 Post LKR
428 ENReP/W/468
Renovation and Improvement of Prayer
hall, Study Room & Store with external
Toilet building complex in Mahadeva
Siva Siruvar Illam
DC 5.50
427 ENReP/W/467Rehabilitation of External Supply in
Mahadeva Siva Siruvar IllamDC 1.47
0.97
Post LKR 1.47 Karachi South
MPCS Ltd. 0.61
LKR 5.50 Karachi South
MPCS 0.05 Post
LKR
411
409
410
SDS
SDS,
Kn/Vivekananth
a Vidyalayam
SDS
5.50
5.50
5.50
Karachi
Karachi
Karachi
Post
Post
Post
5.50 0.05
5.50 1.05
ENReP/W/585
ENReP/W/586
ENReP/W/587
Reconstruction of Class Room Building
with Principal Office at Kn/Kilinochchi
Central Primary Vidyalayam,
Kilinochchi.Repairs to Aesthetic College Building at
Jeyanthinagar, Kilinochchi.
Reconstruction of Hostal Building for
Kilnochchi Central College
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 2/14/2011 6/14/2011 Completed
Actual - - - 3/28/2011 7/28/2011 5/6/2011
Planned - - - 4/15/2011 8/15/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 4/20/2011 8/20/2011
Actual - - - 5/27/2011 9/30/2011 On Progress
Planned - - - 4/21/2011 8/21/2011
Actual - - - 12/29/2011 4/28/2012 On Progress
Planned - - - 6/15/2011 10/15/2011
Actual - - - 6/23/2011 10/27/2011 On Progress
Planned - - - 6/10/2011 10/10/2011
Actual - - - 6/23/2011 10/27/2011 On Progress
Planned - - - 6/10/2011 10/10/2011
Actual - - - 9/27/2011 1/26/2012 On Progress
Planned 4/5/2011 5/5/2011 - 6/2/2011 1/28/2012
Actual 7/7/2011 7/29/2011 - 8/12/2011 2/22/2012 On Progress
Planned - - - 6/2/2011 1/28/2012
Actual - - - 12/26/2011 4/27/2012 On Progress
Planned - - - 8/15/2011 4/11/2012
Actual - - - 8/17/2011 12/20/2011 On Progress
Planned - - - 8/15/2011 4/11/2012
Actual - - - 8/17/2011 12/31/2011 On Progress
Planned - - - 5/5/2011 10/2/2011
Actual - - - 5/27/2011 10/1/2011 On Progress
Planned - - - 10/6/2011 10/3/2011 Completed
Actual - - - 12/26/2011 26/11/2011 .
Planned - - - 4/15/2011 8/15/2011
Actual - - - 5/27/2011 10/1/2011 On Progress
Planned - - - 4/28/2011 8/30/2011
Actual - - - 5/30/2011 10/1/2011 On Progress
Planned - - - 5/5/2011 9/10/2011
Actual - - - 6/10/2011 10/15/2011 On Progress
Planned - - - 6/15/2011 10/12/2011
Actual - - - 6/23/2011 10/27/2011 On Progress
Planned - - - 5/25/2011 9/25/2011
Actual - - - 6/10/2011 10/15/2011 On Progress
NS Planned 7/15/2011 7/28/2011 - 8/1/2011 12/1/2011
Actual 7/19/2011 8/2/2011 - 8/12/2011 12/24/2011 On Progress
5.41 0.05 Planned - - - 8/2/2011 5.41 12/2/2011
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
432
437
441
Post LKR 5.20 Karachi South
MPCS 5.20 0.05Karachi
Karachi
4.76
430 ENReP/W/587
Reconstruction of Field Officer's Office
Building District Secretariat,
Kilinochchi.
DC 5.43
429 ENReP/W/585Repairs and Reconstruction of
Kanagapuram Training CenterDC
3.65 Karachchi
North MPCS 3.65
Kilinochchi 5.03Karachi
-
Post
0.05 Post LKR 5.43 Karachi South
MPCS -
0.03
0.05
4.51 0.04
ENReP/W/590Reconstruction of ACCD Office Balance
Work at Kilinochchi.Kilinochchi Karachi DC
ENReP/W/588Reconstruction of Laboratory Building
for Dept. of Building, Kilinochchi.DCKarachi
ENReP/W/539
Reconstruction of Office Building for
Confederation of Co-op Society,
Kilinochchi.
DC
Post
DC 4.35 0.04Kilinochchi Post
Akkarayan
MPCS Ltd -
Post LKR 5.03
Confederation
of Co-operative
Society,
Kilinochchi
2.30
LKR
Post LKR
Karachchi
North MPCS -
ENReP/W/619Reconstruction of Paddy Stor to
Akkarayan MPCS at KonavilDC 4.35 0.04
Kandavalai
LKR 4.35 Karachi
Karachi
ENReP/W/589
Reconstruction of MPCS Outlet
BuildingUmaiyalpuram Branch,
Kilinochchi.
4.35
PostDC 4.79 0.04Karachi
436 ENReP/W/469Reconstruction of Office for Department
of Survey at KilinochchiNCB 24.16
438 ENReP/W/470 Reconstruction of Market Vadakachchi
ENReP/W/470Reconstruction of Study Hall Building at
Shanthapuram, Kilinochchi
LKR 4.79
Kilinochchi
Palm
Development
Co-op Society
1.25
439 ENReP/W/471 Reconstruction of Market Skanthapuram DC 4.79 0.04 4.79
Northern
Region Lorry
Owners' co-op
Society Ltd
-
0.05
ENReP/W/474Construction of 03 Nos of Production
well and Clean a Dug well Kilinochchi Karachi DC
Karachi
ENReP/W/473 Reconstruction of GHC at Santhapuram DC 5.20 Post
LKRKilinochchi
Kilinochchi
Post
Karachi 5.20 Thiruvaiyaru
MPCS 1.81
ENReP/W/590 Renovation of GHC at Malaiyalpuram DC 5.28 0.05 - Karachi
Reconstruction of Karachchi South
MPCS Mill at Uruthirapuram,
Kilinochchi
DC 5.47 0.05Karachi
LKR
Post2.00 0.03
Post LKR 5.28 Karachchi
South MPCS
ENReP/W/592
Renovation of MPCS Outlet for
Karachchi South MPCS
Uruththirapuram, Kilinochchi.
DC 1.89 0.02
ENReP/W/591 Post
Kilinochchi
Kilinochchi
Karachi
ENReP/W/594Reconstruction of Store (7.2m x 9m)
Thiruvaiyaru MPCS at Kilinochchi.
ENReP/W/593
Reconstruction of MPCS Outlet
Building Ramanathapuram East,
Kilinochchi.
DC 2.05 0.02 Post
Karachi
Reconstruction of a Building for Audit
Sub Office in Kilinochchi7.28 0.07
Post LKRKarachi
LKRDC 2.24 0.02 Post
Post LKRKarachi 6.23
Chandra
Construction
Works
-
444
440
448
ENReP/W620
434
445
446
447
435
442
443
431
433
LKR 3.60 RDS
Santhapuram -
0.22 Post LKR 22.40 Premier
Enterprises 3.60
Kilinochchi Karachi DC Post3.60 0.03
LKRDC PostENReP/W/622
Reconstruction of Field Officer’s Office
& 1 No Vehicle Park (Stage-II),
Kilinochchi.
Kilinochchi Karachi
LKR 4.51 Karachchi
North MPCS 1.08
Karachchi
South MPCS
2.24
Thiruvaiyaru
Youth Project
Cooperative
Society.
1.58
LKR
LKR 5.47 Karachchi
South MPCS -
0.45 1.89 Karachchi
South MPCS
2.05 Karachchi East
MPCS -
LKR 1.74 Karachi South
MPCS -
-
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 10/31/2011 3/2/2012 On Progress
5.42 0.05 Planned - - - 8/3/2011 5.42 12/3/2011
Actual - - - 11/23/2011 3/27/2012 On Progress
1.65 0.01 Planned - - - 8/4/2011 1.65 12/4/2011
Actual - - - 12/26/2011 4/27/2012 On Progress
4.26 0.04 Planned - - - 8/5/2011 4.26 12/5/2011
Actual - - - 12/26/2011 4/27/2012 On Progress
5.50 0.05 Planned - - - 8/6/2011 5.50 12/6/2011
Actual - - - 12/26/2011 4/27/2012 On Progress
NS Planned 7/15/2011 7/28/2011 - 8/1/2011 12/1/2011
Actual 6/28/2011 7/29/2011 - 8/12/2011 3/10/2012 On Progress
Planned 4/1/2010 5/6/2010 - 5/27/2010 10/6/2010 Terminated
Actual 9/27/2010 11/14/2010 - 12/22/2010 6/4/2010 11/18/2011
Planned 5/7/2012 - 25/11/2012
Actual 3/8/2012 - 21/12/2012
Planned 4/1/2010 5/6/2010 - 5/27/2010 10/6/2010
Actual 7/8/2010 8/10/2010 - 9/24/2010 3/7/2011 On Progress
Planned - - - 5/27/2010 9/27/2011
Actual - - - 8/5/2011 12/9/2011 On Progress
Planned - - - 5/27/2010 9/27/2011
Actual - - - 6/23/2011 10/27/2011 On Progress
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/15/2010 1/3/2011 4/20/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 8/20/2010 12/8/2010 2/21/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/15/2010 12/8/2010 2/24/2011
Planned - - - 4/10/2011 8/10/2011
Actual - - - 5/11/2011 9/13/2011 On Progress
5.50 0.05 Planned - - - 4/11/2011 5.50 8/11/2011
Actual - - - 11/28/2011 3/30/2012 On Progress
4.82 0.04 Planned - - - 4/12/2011 4.82 8/12/2011
Actual - - - 12/26/2011 4/27/2012 On Progress
4.31 0.04 Planned - - - 4/13/2011 4.31 8/13/2011
Actual - - - 12/29/2011 4/28/2012 On Progress
4.31 0.04 Planned - - - 4/14/2011 4.31 8/14/2011
Actual - - - 12/29/2011 4/28/2012 On Progress
Planned - - - 3/11/2011 7/11/2011 Completed
Actual - - - 3/21/2011 7/26/2011 6/16/2011
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
Kilinochchi
466
467
451
452
463
464
465
454
459
461
458
449
450
ENReP/W/625
Rehabilitation & Resumption of
Elephantpass & Kurunjathivu Salterns,
Kilinochchi.
Kilinochchi
ENReP/W/624Repairs to Study Hall Building at
Uthayanagar East, Kilinochchi.Post
Post
Post
Pachilaipalai
20.78 Sarukaya
Construction
DC
Pachilaipalai
LKR
LKR
5.10
-
-
RDS
Uthayanagar -
RDS
Thadduvankodd
i
Karachchi
North MPCS
0.08 Post LKR
22.77 0.21 Post LKR
Post LKR
ENREP/W/123 Kilinochchi Pachilaipalai NS 8.70Reconstruction of Post office balance
work at Palai
ENREP/W/122 Reconstruction of Post office at Palai NCB 11.20 0.10PachilaipalaiKilinochchi 10.80 Lion Asian
Construction 2.55
456 ENReP/W/202Re-construction of pachchipalai MPCS
office at Palai.NCB 11.40 0.10 Post LKR 9.30
Ahnanth
Builders 2.15
1.17
ENReP/W/596Reconstruction of MPCS Store (7.2m x
9m) Palai Kilinochchi.DC 2.20 0.02
ENReP/W/595Reconstructionof Bus Stand at Palai for
Pachchilaipalai PS office Stage-IDC
Pachilaipalai
LKR 4.68 Palai MPCS 4.68 0.04 Post
Palai MPCS 0.50 LKR 2.26 Post
ENReP/W/339Providing roof with necessary structural
perair to Kn/Soranpattru CCTMSDC 1.12 0.01 PostKilinochchi LKR 1.14 SDS 1.08
460 ENReP/W/340Providing roof with necessary structural
perair to Kn/Soranpattru Ganesh VidDC 2.08 0.02Pachilaipalai Post LKR 2.08 SDS 2.01
LKR 1.44 SDS 1.37
ENReP/W/597Repairs to School Building at Kn/ Palai
RCTMS, KilinochchiDC 5.48 0.05
ENReP/W/341 0.01
ENReP/W/476Reconstruction of Vegetable Market at
Pithukaddu Junction PalaiDC 0.98
PostProviding roof with necessary structural
perair to Kn/Tharmakerny GTMSDC 1.44
Post LKR 0.98
Sooranpattu
sarasvathy
Community
Center
0.89
Post LKR 5.48 SDS 5.09
LKR
0.01Pachilaipalai
ENReP/W/626
462
448
453 ENReP/W622
457
455
Kilinochchi Karachi
LKR
LKR
LKR
DC
DC
DC
Post
Post
ENReP/W/622
Reconstruction of Field Officer’s Office
& 1 No Vehicle Park (Stage-II),
Kilinochchi.
Kilinochchi Karachi
ENReP/W/623Repairs of Building for Open University
Study Center, Kilinochchi. Kilinochchi Karachi
Karachchi
South MPCS
Karachchi
South MPCS
Ltd
DC
-
-
DC
DC
DC
DC
Post
Post
Post
Post
Balance Work in Co-operative Council
Buildings at Kilinochchi.Kilinochchi Pachilaipalai
Pachilaipalai
Pachilaipalai
Reconstruction of DS Office at Palai
Pachilaipalai
Pachilaipalai
Pachilaipalai
Kilinochchi
Reconstruction of Proposed MPCS
Outlet at Vannankerni &
Sinnathalayady, Kilinochchi
Kilinochchi Pachilaipalai
ENReP/W/601
Reconstruction of Proposed MPCS
Outlet at Soranpattu & Kilali,
Kilinochchi.
Kilinochchi Pachilaipalai
ENReP/W/598
Reconstruction of (120’x27’) Classroom
Building With (20’x20’) Principal
Office at Kn/Kilaly RCTMS,
Kilinochchi Pachilaipalai
ENReP/W/599
-
-
-
-
SDS
Tharmakkerney
GTMS
LKR
LKR
LKR
Palm
Development
Co-op Society,
Palai
Palai MPCS
Ltd.
Palai MPCS
Ltd.
Reconstruction of Palm Development Co-
op Society Ltd at Palai, Kilinochchi.Kilinochchi Pachilaipalai
ENReP/W/600
8.28
Chandra
Construction
works
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 4/15/2011 8/16/2011
Actual - - - 5/30/2011 10/1/2011 On Progress
Planned - - - 2/21/2010 6/1/2010
Actual - - - 1/10/2011 5/10/2011 On Progress
Planned - - - 10/8/2010 11/22/2010
Actual - - - 1/10/2011 5/10/2011 On Progress
Planned - - - 2/21/2010 5/7/2010 Completed
Actual - - - 5/5/2010 8/10/2010 3/12/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 5/10/2010 7/16/2010 - 7/23/2010 12/4/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 12/21/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010 Terminated
Actual 5/10/2010 5/25/2010 - 7/12/2010 12/23/2010 15/03/2012
Planned - - - 2/21/2010 5/7/2010
Actual - - - 8/15/2010 1/13/2011 On Progress
Planned - - - 2/22/2010 5/8/2010 Completed
Actual - - - 8/15/2010 1/13/2011 3/2/2011
Planned - - - 2/22/2010 5/8/2010 Completed
Actual - - - 8/26/2010 1/29/2011 3/15/2011
Planned - - - 2/22/2010 5/8/2010 Completed
Actual - - - 9/6/2010 1/7/2011 4/15/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/13/2010 1/2/2011 2/20/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/21/2011
Planned - - - 10/8/2010 11/22/2010
Actual - - - 10/12/2010 1/2/2011 On Progress
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/10/2010 1/2/2011 3/20/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/20/2010 12/8/2010 2/23/2011
Planned - - - 7/15/2011 11/15/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 7/15/2011 11/15/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 7/15/2011 11/15/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Kilinochchi
Kilinochchi
475
477
0.03Pachilaipalai
Kandavalai
Kilinochchi
KilinochchiENREP/W/124Re-Estabilishment of Herbal Harden at
KalmadunagarDC 4.47
468 ENReP/W/479 Reconstruction of GHC at Iyakachchi DC 3.04
469 Post LKR 4.47 Akkarayan
MPCS ltd. 1.46
Post LKR 3.04 Pachcilipalli
MPCS 1.76
0.05Kandavalai
Kandavalai
Kilinochchi
Kilinochchi
0.04
ENREP/W/125Construction of MPCS Building for
Karachi North MPCS LtdDC 5.25
470 ENReP/W/480
Re-Estabilishment of Herbal Harden
office & over head tank at
Kanmadunagar
DC 5.40
471 Post LKR 5.49
GM, Karachchi
North MPCS
Ltd
4.07
Post LKR 5.15 Karachchi East
MPCS 4.74
0.08Kandavalai
Kandavalai
Kilinochchi
Kilinochchi
0.05
ENREP/W/127Re-construction of Market Building
Complex at ParanthanNCB 5.50
472 ENREP/W/126Construction of Veterinary Surgeon's
Office at KandawalaiNCB 8.85
473 Post LKR 4.79
Turbo Group
Civil
Engineering
Consultant
2.76
Post LKR 7.82 SY
Construction 4.59
0.10
Kandavalai
KandavalaiKilinochchi
Kilinochchi
0.05
ENREP/W/203Repairs of the Fertilizer store at
Puliyampokanai ASCDC 1.20
474 ENREP/W/128Reconstruction of Post Office at
ParanthanNCB 11.60
Post LKR 1.20
FO,
Nagenthirapura
m
1.04
Post LKR 9.68 Dharmadasa
Construction 4.26
0.01Kandavalai
Kandavalai
Kilinochchi
Kilinochchi
0.01
ENREP/W/205
Construction of proposed Building for
Karachchi North MPCS Ltd. Paranthan
Branch
DC 2.24
476 ENREP/W/204Repairs of the Fertilizer store at
Ramanathapuram ASCDC 0.69
Post LKR 2.02 Karachchi
North MPCS 1.78
Post LKR 0.69 FO,
Vaddakachchi 0.55
0.05Kandavalai
Kandavalai
Kilinochchi
Kilinochchi
0.02
479 ENREP/W/343Providing roof with necessary structural
perair to Kn/Muruganantha MVDC 1.45
478 ENReP/W/481
Renovation & Improvements to
Karachchi North MPC Food Store at
Paranthan
DC 6.06
LKR 1.45 SDS 1.32
Post LKR 5.46 Karachchi
North MPCS 4.78
0.02KandavalaiKilinochchi
Kilinochchi
0.01 Post
0.00Kandavalai481 ENREP/W/345Providing roof with necessary structural
perair to Kn/Kandawalai MVDC 0.55
480 ENREP/W/344
Providing roof with necessary structural
perair to Kn/Paranthan Hindu MV (120
x 27)
DC 2.00
0.42
Post LKR 2.00 SDS 1.72
Post LKR 0.55 SDS
482 ENREP/W/346Providing roof with necessary structural
perair to Kn/Paranthan GTMSDC 0.10 0.00Kilinochchi Kandavalai Post LKR 0.10 SDS 0.91
483 ENREP/W/347Providing roof with necessary structural
perair to Kn/Kaddaikadu GTMSDC 0.89 0.01 Post LKR 0.89 SDS 0.85
ENREP/W/598
Reconstruction of (120'x27') Classroom
Building with Principal office
Kn/Mylvaganapuram GTMS,
Kilinochchi.
DC 5.48 0.05 PostKilinochchi
ENREP/W/599
Reconstruction of (120'x27') Classroom
Building with Principal office
Kn/Kovilvayal GTMS, Kilinochchi.
DC 5.48 0.05 PostKandavalai
4.82
LKR 5.48 SDS -
LKR 5.48 SDS
LKR 5.48
-
ENREP/W/600
Reconstruction of (120'x27') Classroom
Building with Principal office Kn/
Malaiyalapuram GTMS, Kilinochchi.
DC 5.48 0.05 Post
Kilinochchi
SDS 486
485
484
Kandavalai
Kandavalai
Kandavalai
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 7/15/2011 11/15/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 7/15/2011 11/15/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 5/15/2011 9/15/2011
Actual - - - 5/27/2011 9/30/2011 On Progress
Planned - - - 5/15/2011 9/15/2011
Actual - - - 7/22/2011 11/26/2011 On Progress
Planned - - - 5/15/2011 9/15/2011
Actual - - - 8/12/2011 1/23/2012 On Progress
Planned - - - 5/16/2011 9/16/2011
Actual - - - 12/26/2011 4/27/2012 On Progress
Planned - - - 5/15/2011 9/15/2011 7/5/2012
Actual - - - 12/22/2010 9/2/2011 Terminated
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 12/11/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 1/20/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 3/26/2010 4/29/2010 - 6/11/2010 11/22/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 12/21/2010 On Progress
Planned - - - 2/21/2010 5/7/2010
Actual - - - 917/2010 1/22/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 1/20/2011 On Progress
Planned - - - 10/8/2010 11/22/2010 Terminated
Actual - - - 10/15/2010 1/13/2011 5/30/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/15/2010 1/13/2011 3/25/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 8/20/2010 12/8/2010 2/23/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/15/2010 1/2/2011 2/24/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/13/2010 12/8/2010 2/21/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/21/2010 1/11/2011 2/25/2011
Kilinochchi
Kilinochchi
492
5.48 SDS
SDS -
ENREP/W/601
Reconstruction of (120'x27') Classroom
Building with Principal office
Kn/Mayavanoor GTMS, Kilinochchi.
DC 5.48 0.05 PostKandavalai LKR
3.49 0.03
-
ENREP/W/602Renovation of Classroom at Kn/ St
Fatima RCTMS, KilinochchiDC 0.29 0.00 0.29 488
490 ENReP/W/486 Reconstruction of GHC at Kalaru DC 1.58
489 ENReP/W/484Reconstruction of GHC at
PuliyampokkanaiDC
LKR
Kilinochchi
Kilinochchi
Kandavalai
Kandavalai
Kandavalai
Post
-
Post LKR 3.49 Karachchi
North MPCS 2.26
LKR
0.01 Post LKR 1.58 Karachchi
North MPCS
0.08
Post
Rural
Development
Society,
Kalmadhunagar.
5.50 -
Construction of DS office at poonakary DC 52.02
Kilinochchi
Kilinochchi
8.66
LKR
5.50 0.05ENReP/W/488Reconstruction of Primary Health Center
at Kalmadhunagar, Kilinochchi.Kilinochchi DC
491 ENReP/W/487Reconstruction of GHC at Umayal
PuramDC
Kandavalai
493 ENREP/W/129 45.38 Lanka Trading
& Construction 8.93
Post LKR 7.62 Jeka
Construction 1.82
0.05PoonakaryKilinochchi
Kilinochchi
0.47 Post
Post495 ENREP/W/131Reconstruction of Pradesheiya sabha
office building poonerynNCB 6.00
494 ENREP/W/130Construction of District Fisheries
Inspector Office at JayapuramNCB 5.09
LKR 5.11 Jeya Builders 1.55
Post LKR 4.26 Rohan
Enterprises 4.09
0.05Kilinochchi
Kilinochchi
Poonakary
Poonakary
0.05Poonakary
497 ENREP/W/133Construction of Veterinary Surgeon's
office at PoonakaryNCB 8.02
496 ENREP/W/132Re-construction of MPCS Office
Building at PoonakeryNCB 5.81
LKR 6.93 Jeya Building 3.63
Post LKR 4.40 Dharmadasa
Construction 5.76
0.05Kilinochchi
Kilinochchi
Poonakary
Poonakary
0.07
0.10499 ENREP/W/135Reconstruction of Post Office at
PoonakaryNCB 11.10
498 ENREP/W/134Construction of market Complex at
poonagaryDC 5.22
2.97
Post LKR 4.71 Poonery MPCS 1.78
Post LKR 9.99
Post LKR 3.24 500 ENREP/W/207Construction of the Fertilizer store at
Mulankavil ASCDC 3.60 0.03Kilinochchi Poonakary
501 ENREP/W/208Construction of the Fertilizer store at
Poonakery ASCDC 3.60 0.03Kilinochchi
LKR 0.88
Poonakary
0.45
FO,
Kariyalainagapa
duvan
-
Post LKR 3.24
503 ENREP/W/349Providing roof with necessary structural
perair to Kn/Valaipadu RCTMSDC 0.88
502 ENREP/W/348
Providing roof with necessary structural
perair to Kn/Kariyalainagapaduvan No.2
School
DC 0.60
Kilinochchi
Kilinochchi
0.01 Post
Kilinochchi
Kilinochchi
Post
0.01Poonakary
Poonakary
505 ENREP/W/351
Providing roof with necessary structural
perair to Kn/Poonakary Nallur
MV(100x20)
DC 1.39
504 ENREP/W/350Providing roof with necessary structural
perair to Kn/Gnanimadam GTMSDC 0.74
0.01 1.33
Post LKR 0.74 SDS 0.68 0.01
487
Poonakary
Poonakary
Kandavalai
Poonakary
1.39
Post LKR 0.60
Post
SDS
0.70
SDS
SDS
LKR
FO, Vadiyady 2.85
Eastern
Building
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/15/2010 1/9/2011 2/25/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/12/2010 1/2/2011 2/18/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/12/2010 1/3/2011 3/15/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/13/2010 1/3/2011 2/25/2011
Planned - - - 2/10/2011 7/10/2011 Completed
Actual - - - 3/21/2011 7/26/2011 6/15/2011
Planned - - - 4/10/2011 8/12/2011
Actual - - - 5/20/2011 9/22/2011 On Progress
Planned - - - 4/10/2011 8/12/2011 Cancelled
Actual - - - 5/30/2011 10/1/2011 5/12/2011
Planned - - - 4/10/2011 8/12/2011
Actual - - - 8/3/2011 12/6/2011 On Progress
5.18 0.05 Planned - - - 4/11/2011 SDS 8/13/2011
Actual - - - 5/11/2011 9/13/2011 On Progress
5.48 0.05 Planned - - - 4/12/2011 SDS 8/14/2011
Actual - - - 12/16/2011 4/18/2012 On Progress
5.48 0.05 Planned - - - 4/13/2011 SDS 8/15/2011
Actual - - - 12/16/2011 4/18/2012 On Progress
Planned - - - 4/10/2011 8/12/2011
Actual - - - 5/11/2011 9/13/2011 On Progress
Planned - - - 4/10/2011 8/12/2011
Actual - - - 6/23/2011 10/27/2011 On Progress
Planned - - - 4/10/2011 8/12/2011
Actual - - - 6/10/2011 10/15/2011 On Progress
Planned - - - 4/11/2011 8/13/2011
Actual - - - 16/12/2011 1/31/2012 On Progress
Planned - - - 4/10/2011 8/12/2011
Actual - - - 7/22/2011 11/26/2011 On Progress
Planned - - - 8/1/2011 11/31/2011
Actual - - - 8/5/2011 12/20/2011 On Progress
Planned - - - 8/1/2011 11/31/2011
Kilinochchi
514
515
516
520
Kilinochchi 0.01
506 ENReP/W/488
Providing roof with necessary structural
perair to Kn/Poonakary Nallur
MV(72x21)
DC 0.88 0.01PoonakaryKilinochchi
0.02Poonakary
Poonakary
Kilinochchi
Kilinochchi
507 ENReP/W/489
Providing roof with necessary structural
perair to 60'x20', 20'x20' Kn/Chelliyar
thivu GTMS
DC 1.02
Providing roof with necessary structural
perair to Kn/Karukkaithivu MVDC 3.26
Providing roof with necessary structural
perair to Kn/Chelliyar thivu GTMSDC 2.34
0.03 Post LKR 3.26 SDS 2.88
2.11 0.02Poonakary
Poonakary
Kilinochchi
Kilinochchi DC 1.17 0.01
Reconstruction of Class Room Building
with Principal Office at Kn/Oottupulam
GTMS, Kilinochchi.
ENReP/W/606Repairs to school Building at Kn/
Akkarayan M.V KilinochchiKilinochchi
Renovation of Kn/Kariyalai
Nagapaduwan No IIDC
ENReP/W/603Repaits to 100'x20' School Building at
Kn/Poonakary Nallur M.V Kilinochchi.
ENReP/W/608
ENReP/W/607
LKR 1.17
Post
DC
Post
Post
Post
5.48 0.05 LKRKarachi
PoonakaryKilinochchi
ENReP/W/605
Post
Reconstruction of Class Room Building
with Principal Office at Kn/Mudkomban
GTMS, Kilinochchi.
Kilinochchi Akkarayan
Improvement of Class Room Building
with Principal Office Kn/Thiruvaiaru
Maha Vidyalayam, Kilinochchi.
0.02
Repairs to school Building at Kn/
Akkarayan GTMS, KilinochchiDC 5.18 0.05
Akkarayan
ENReP/W/604
Reconstruction of Gramodaya Health
Centre at 4thMile Post Poonagari,
Kilinochchi.
DC 1.68
DC
SDS 2.85
ENReP/W/607Reconstruction of Store (7.2m x 9m) at
Poonagary MPCSDC 2.24 0.02
Akkarayan
Poonagary
MPCS
ENReP/W/606
Reconstruction of Akkaraayan MPCS
Head office, Kilinochchi.DC 5.47 0.05
2.24
Post LKR
Karachi
Kilinochchi
Kilinochchi
Kilinochchi
Poonakary
3.78 Karachchi
South MPCS -
ENReP/W/623
Reconstruction of Building for Dept.of
Animal Production & Health at
Pooneryn
DC 3.11 0.03
Poonakary
Poonakary
ENReP/W/624
Renovation & Improvements to Study
Hall & Office Buildings at Children
Home in Kilinochchi
DC 3.59
ENReP/W/491Reconstruction of GHC
Kanakambikaikulam at Thampirai
0.03
Post
Poonakary
Kilinochchi
Kilinochchi
Kilinochchi Post
DC 3.78 0.03
LKR 3.59 Karachi South
MPCS -
Post LKR 3.11
Livestock
Breeders
cooperative
Society Ltd
0.99
LKR
ENReP/W/608 Post LKR
ENREP/W/353
508 ENREP/W/352
509
510
511
512
513
517
ENReP/W/490
518
519
521
522
523
Poonakary
5.48 SDS -
Post Karachchi
South MPCS - LKR 1.68
1.03
SDS 2.34 2.10 Post
Post LKR 0.88 SDS 0.84
2.11
SDS,
Kn/Kariyalai
Nagapaduvan
No Ii GTMS
2.06
LKR 1.02 SDS 0.76
-
-
-
SDS
-
Kilinochchi Karachi
5.47 Akkarayan
MPCS 1.05
LKR
Post LKR 0.18
4.35 Akkarayan
MPCS
DC
DC LKR
5.18
5.48
5.48
LKR
5.18
DC Post LKR4.35 0.04
Post LKR
Post
LKR
ENReP/W/609
Reconstruction of Palm Development Co-
op Society Ltd at Poonakary,
Kilinochchi.
Kilinochchi Poonakary
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 9/27/2011 1/27/2012 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 11/11/2010 4/15/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/7/2010 Completed
Actual 3/26/2010 4/29/2010 - 6/1/2010 11/12/2010 12/7/2010
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 3/26/2010 4/29/2010 - 6/11/2010 11/22/2010 8/2/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 5/10/2010 7/17/2010 - 7/23/2010 12/4/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 4/20/2010 5/25/2010 - 6/30/2010 11/11/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 9/27/2010 11/4/2010 - 12/3/2010 5/16/2011 On Progress
Planned - - - 1/24/2011 5/24/2011 Completed
Actual - - - 8/26/2010 12/24/2010 3/29/2011
Planned - - - 1/24/2011 5/24/2011 Completed
Actual - - - 8/27/2010 12/30/2010 3/27/2011
Planned - - - 10/8/2010 11/22/2010
Actual - - - 8/25/2010 12/24/2010 On Progress
Planned 8/27/2010 10/1/2010 - 10/8/2010 11/22/2010 Completed
Actual 9/27/2010 11/4/2010 - 12/3/2010 3/25/2011 3/25/2011
Planned - - - 10/8/2010 11/22/2010
Actual - - - 8/24/2010 12/24/2010 On Progress
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/30/2010 12/6/2010 2/22/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/30/2010 12/6/2010 12/6/2010
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/30/2010 9/8/2010 12/10/2010
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/6/2010 12/12/2010 5/30/2011
Planned - - - 5/21/2010 8/19/2010
Actual - - - 8/26/2010 12/24/2010 On Progress
Planned - - - 5/21/2010 8/19/2010 Completed
Actual - - - 9/1/2010 1/11/2011 1/25/2011
Planned 9/27/2010 11/1/2010 - 11/21/2010 2/19/2011
Actual 11/29/2010 1/4/2011 - 2/1/2011 7/15/2011 On Progress
Planned 9/27/2010 11/1/2010 - 11/21/2010 2/19/2011 Terminated
ENReP/W/624
Renovation & Improvements to Study
Hall & Office Buildings at Children
Home in Kilinochchi
DC 3.59 0.03PoonakaryKilinochchi Post LKR 3.59 Karachi South
MPCS -
524 ENREP/W/137
Construction of Two Storey Building for
Manthai West Pradeshiya Shaba Sub
Office at Vidathalthivu
NCB 8.50 7.32 Zanu
Construction. 7.47
0.05Mannar
Mannar
0.08 Post LKRMannar Manthai West
Manthai West
526 ENREP/W/139Re-construction of Manthai AKN
Building at Manthai westNCB 9.55
525 ENREP/W/138
Re-Construction of 2 MPCS Branch
Office and Repairs one Building in
Manthai West
NCB 6.00
8.79
Nilantha
Traders&Contra
ctors.
7.48
Post LKR 6.89 Sumanasekara
Construction 4.96
0.07Mannar
Mannar
0.09 Post LKR
Post LKR
Manthai West
Manthai West
528 ENREP/W/141Construction of 120'-0" x 120'-0"
Market Building at AdampanNCB 5.02
527 ENREP/W/140Construction of Veterinary Surgeon's
Office at AdampanNCB 8.15
4.07 Pushpamal
Construction 1.92
Post LKR 8.05
Barberyn
Engineering
Construction
6.34
0.06Manthai West
Manthai West
Mannar
Mannar
0.05
ENREP/W/209Construction of Fertilizer store in
VelankulamDC 3.71
529 ENREP/W/143Reconstruction of post office at
AdampanNCB 6.76
530 Post LKR 3.34 FO,
Vellankulam 2.79
Post LKR 6.59
Nilantha
Traders&Contra
ctors.
1.84
0.03Manthai West
Manthai West
Mannar
Mannar
0.03
ENREP/W/211Repair works of Kathankulam Paddy
store 01 at manthai westDC 5.48
531 ENREP/W/210Construction of Fertilizer store at
ManthaiDC 3.34
532 Post LKR 5.48
Agriculture
Society,
Manthai West
3.83
Post LKR 3.34 FO, Chalampan 2.84
0.06Manthai West
Manthai WestMannar
Mannar
0.05
ENREP/W/213Repair works of Kathankulam Paddy
store 03 at manthai westDC 5.03
533 ENREP/W/212Repair works of Kathankulam Paddy
store 02 at manthai westNCB 6.80
534 Post LKR 5.03
Agriculture
Society,
Manthai West
4.05
Post LKR 6.07 Zanu
Construction 5.73
0.02
Manthai west
Manthai westMannar
Mannar
0.05
ENREP/W/358 Mn/Monrampiddy GTMS DC 1.55
535 ENREP/W/357 Mn/Thevanpitty RCTMS DC 2.18
Post LKR 1.55 SDS 1.31
Post LKR 2.18 SDS 1.93
0.01Manthai west
Manthai west
Mannar
Mannar
0.01
ENReP/W/498 Mn/Karakuli GMMS DC 1.81
537 ENREP/W/359 Mn/Kovilkulam GTMS DC 1.31
Post LKR 1.81 RDS 1.62
Post LKR 1.31 SDS 1.16
0.03Manthai west
Manthai west
Mannar
Mannar
0.02
ENReP/W/499Construction of Fertilizer Store at
AdampanDC 3.05
539 ENREP/W/219Construction of fertilizer store in
Uylankulam ASCDC 3.67
LKR 3.05 FO, Chalampan 2.87
Post LKR 3.31 St. Anthony's 1.82
0.05Manthai westMannar
Mannar
0.03 Post
ENReP/W/501Repairs to 2 no of Co-op Branches at
Kandal & Kovilkulam.NCB 3.58
541 ENReP/W/500Reconstruction of Primary Medical Care
Unit Periyamadu.NCB 5.54
Manthai west 0.58
Post LKR 4.72 Rucksika
Builders 1.19
0.03 Post LKR 3.14
K Vemake
Civil
Construction
Works
536
542
540
538
523
Manthai West
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual 11/29/2010 1/4/2011 - 2/10/2011 6/24/2011 11/17/2011
Planned - - - 11/22/2010 2/20/2011
Actual - - - 12/8/2011 4/10/2012 On Progress
Planned - - - 11/23/2010 2/21/2011
Actual - - - 12/8/2011 4/10/2012 On Progress
Planned - - - 11/24/2010 2/22/2011
Actual - - - 11/15/2011 3/20/2012 On Progress
Planned 9/27/2010 11/1/2010 - 11/21/2010 2/19/2011
Actual 11/29/2010 1/4/2011 - 2/10/2011 6/24/2011 On Progress
Planned 6/15/2011 7/15/2011 - 8/1/2011 1/28/2012
Actual 6/30/2011 7/29/2011 - 8/12/2011 2/22/2012 On Progress
Planned - - - 11/2/2011 4/30/2012
Actual - - - 11/15/2011 3/20/2012 1/0/1900
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 11/10/2010 5/20/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/11/2010
Actual 5/10/2010 6/9/2010 - 8/25/2010 2/5/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 5/10/2010 6/9/2010 - 9/8/2010 12/21/2010 5/3/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 4/20/2010 5/25/2010 - 7/12/2010 11/23/2010 4/22/2011
Planned 3/27/2010 5/1/2010 - 5/21/2010 8/19/2010 Completed
Actual 9/27/2010 11/4/2010 - 12/17/2010 5/30/2011 7/29/2011
Planned - - - 5/21/2010 8/19/2010
Actual - - - 8/13/2010 10/29/2010 On Progress
Planned - - - 5/21/2010 8/19/2010 Completed
Actual - - - 8/12/2010 1/13/2011 4/3/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/30/2010 12/6/2010 2/7/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 9/30/2010 12/6/2010 3/1/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/4/2010 12/10/2010 12/10/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/4/2010 12/10/2010 2/7/2011
Planned - - - 10/8/2010 11/22/2010 Completed
Actual - - - 10/5/2010 12/11/2010 1/9/2011
Planned - - - 10/8/2010 11/22/2010
Actual - - - 8/27/2010 12/30/2010 On Progress
3.81
Mannar
Mannar
Mannar
Mannar
Mannar
Mannar
549
543
555
Mannar
0.03 -
ENReP/W/503Reconstruction of Fertilizer Store at
Illupaikadvai, MannarMannar Manthai west
ENReP/W/504 p Mannar
LKR -
-
-
ENReP/W/618Reconstruction of Fertilizer Store at
Chalavathurai, MannarMannar Madhu DC
LKR
LKR
3.83
3.83
3.81
Post
Post
Post
3.83 0.03
3.09
3.81 0.03Reconstruction of Fertilizer Store at
Vidathalteevu, MannarMannar Manthai west
DC
DC
DC
MannarENReP/W/501Repairs to 2 no of Co-op Branches at
Kandal & Kovilkulam.NCB 3.58Manthai west 0.58
0.10
0.03 Post LKR 3.14
K Vemake
Civil
Construction
Works
0.03
FO
Illupaikadvai
Manthai West
Division Famers
Organization
FO Salampan
LKR 9.19 Rucksika
Builders 2.17
ENReP/W/617Reconstruction of PS Office at Musali,
MannarNCB 27.59 0.25
ENReP/W/502
ENREP/W/144
Construction of Two Storey Building for
Manthai West Pradeshiya Shaba Sub
Office at Madhu
NCB 8.50
Post546Reconstruction of Primary Medical Care
Unit and OPD Block at Martchchukaddi.NCB 11.09Musali
6.55
Post LKR 25.93
Mega
Constructions &
Suppliers
-
Post LKR 3.81 FO
Meththavelly
0.08
0.08 Post LKR 7.01 Prasanth
Builders.
ENREP/W/146Construction of Veterinary Surgeon's
Office at MadhuNCB 8.15
550 ENREP/W/145Reconstruction of 3 MPCS Branch
Offices at MadhuNCB 8.95
551 Arul Selvi
Construction 4.68
Post LKR 8.14 T.V.V.Building
Contractors 6.76
0.05Madhu
0.07 Post LKR 6.51
ENREP/W/214Reconstruction of Irranillpaikulam AKN
BuildingNCB 8.20
552 ENREP/W/147Construction of 120'-0" x 120'-0"
Market Building at MadhuNCB 5.02
553 7.17 Samadhi
Construction 6.77
Post LKR 4.19 SLP Transport
& Construction 3.43
0.03Mannar
Mannar
0.07 Post LKRMadhu
ENREP/W/216Construction of Palampiddy Fertilizer
Store at Irranillpaikulam ASCDC 3.19
554 ENREP/W/215Construction of Irranillpaikulam
Fertilizer Store at Irranillpaikulam ASCDC 2.88Madhu
2.88 FO, Vinayagar 2.72
Post LKR 2.88 FO,
Uthayasooriyan 1.90
0.02Mannar
Mannar
0.03 Post LKRMadhu
Madhu
557 ENREP/W/365 Mn/Keerisuddan GTMS DC 2.59
556 ENREP/W/364 Mn/Periyapandivirichan MV DC 2.19
2.59 SDS 1.83
Post LKR 2.19 SDS 1.77
0.01Mannar
Mannar
0.02 Post LKRMadhu
Madhu
559 ENReP/W/504 Mn/Thachchanamaruthamadu GTMS DC 1.44
558 ENReP/W/503 Mn/Palampiddi GTMS DC 1.61
1.44 SDS 1.24
Post LKR 1.61 SDS 1.41
0.01Mannar
Mannar
0.01 Post LKR
Post LKR
Madhu
Madhu
561 ENREP/W/217Repair works of Palampiddy AKN
BuildingDC 5.37
560 ENReP/W/505repairs to school building at
Mn/Ilanthaimoddai GMMSDC 0.73
5.37 FO, Vinayagar 4.23
Post LKR 0.73 SDS 0.84
0.05Madhu
ENReP/W/617545
548
547
544
542
Madhu
Madhu
Madhu
Manthai west
Musali
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 10/11/2010 11/15/2010 - 12/15/2010 5/14/2011
Actual 11/29/2010 1/4/2011 - 2/10/2011 7/24/2011 On Progress
Planned - - - 6/6/2010 9/4/2010 Completed
Actual - - - 5/28/2010 8/21/2010 10/31/2010
Planned - - - 6/6/2010 9/4/2010 Completed
Actual - - - 8/27/2010 12/30/2010 4/20/2011
Planned - - - 7/30/2010 12/27/2010
Actual - - - 11/24/2010 3/31/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 5/27/2011 9/30/2011 On Progress
Planned 6/15/2011 7/15/2011 - 7/30/2010 12/29/2010
Actual 6/30/2011 7/29/2011 - 8/11/2011 4/7/2012 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 8/26/2011 12/27/2011 On Progress
Planned - 9/25/2011 - 10/1/2011 2/28/2011
Actual - 10/3/2011 - 10/7/2011 3/5/2012 On Progress
Planned - - - 7/30/2011 11/30/2011
Actual - - - 7/18/2011 11/19/2011 On Progress
Planned - - - 7/30/2011 11/30/2011
Actual - - - 7/19/2011 11/19/2011 On Progress
Planned - - - 7/30/2011 11/30/2011
Actual - - - 12/26/2011 4/27/2012 1/0/1900
Planned - - - 6/6/2012 8/15/2012
Actual - - - 7/5/2012 9/21/2012
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - -
Actual - - -
Planned - - - - -
Actual - - - - - On Progress
Planned4.76 0.04 Post LKR581 ENReP/W/509
Relocation surveying at Narikkadu
Scheme at MannarMannar Narikkadu DC
NS 2.42 0.03 Post LKR 3.14
Mannar
Mannar
Mannar
Mannar SLP Transport
& Construction
572
Mannar
Mannar
Manthai West
0.10Mannar
Mannar
Madhu
Mannar563 ENREP/W/148Urgent repairs to CE office, Buildings,
MannarDC 2.19
562 ENReP/W/506
Reconstruction of Primary Medical Care
Unit and OPD Block at
Iranalluppaikulam
NCB 11.09
post LKR 1.97
RDS,
Pallimunai
West
1.82
0 LKR 9.20 Rucksika
Builders 1.02
0.04
Mannar
Mannar
Mannar
Mannar
0.02
0.04Construction of ENReP PIC Building
Mannar DC 4.92
564 ENREP/W/218Construction of Technical Unit 34x32
Ground floor stage 1 for district officeDC 4.83
5.02
post LKR 4.83 FO, St.
Anthiony's 4.37
post LKR 4.92
RDS,
Panankaddikodd
u
LKR 2.26 FO, St.
Anthiony's -
ENReP/W/508Reconstruction of EE's Office Building
of Dept of Buidings, MannarDC 28.38 0.26
ENReP/W/616 0.02
568 ENReP/W/617Construction of PIC Building, Mannar
Stage IIDC 5.37
post566Reconstruction of Technical Unit 1st
Floor (Stage II)DC 2.26
-
post LKR 26.90 Mahadevn
Contractor -
Mannar
0.05 post LKR 5.37
RDS,
Panankaddikodd
u
post LKR 8.54
post LKR 5.50
Arulselvi
construction 569 ENReP/W/618
Reconstruction of General Audit Office
Building, MannarNS 8.50 0.08
573 ENReP/W/501Repairs to 2 no of Co-op Branches at
Kandal & Kovilkulam.
ENReP/W/621
-
570 ENReP/W/625
Reconstruction of ACAD Office
Building (34'x48') Ground Floor Stage-I
in Mannar
DC
post5.47 0.05
St. Anthony's
FO -
5.47
RDS,
Panankaddikodd
u West
-
5.50 0.05
571 ENReP/W/626
Reconstruction of Fertilizer Store at
Alkaddiveli ASC Manthai West in
Mannar
DC
565
Reconstruction of Garage Building &
Drivers Rest Room Kachcheri, MannarMannar Manthai West DC
ENReP/W/507
3.60
Manthai West
Division
Agriculture
Society
3.60 0.03 -
Post LKR
post LKR
LKR
580
575 ENReP/W/503
567
Manthai West
Manthai west
Mannar
Mannar
Mannar
Mannar
Pastini
Construction
DC
Pastini
Construction
578 ENReP/W/506Const.of Fertilizer store at
Marichukaddy at MusaliMannar Musali NS Post LKR
579 ENReP/W/507Const.of Marichukaddy AKN Bldg. at
MusaliMannar Musali NS
Construction of (30*20) community
building at MannarMannar Mannar DC
Post LKR574 ENReP/W/502 Construction of PIC Building stage 3 Mannar Mannar DC
Post LKR
Post LKR
577 ENReP/W/505Const.of 30'*20' Community Bldg. at
Karunkandal Mannar Karunkandal
576 ENReP/W/504
Renovation of building (59*20) of paddy
store at Pallikuli & Construction of
(50*20) community building at Kannady
Mannar Pallikuli DC
Post LKR
LKR -
CheddiyarMaha
n
Kaddayadampa
50.00 Construction of 2 Nos Dug Well at
Narikkadu Village, MannarMannar Narikkadu DC PostENReP/W/508
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual
Planned
Actual
Planned 12/28/2009 2/1/2010 - 11/4/2010 2/22/2011 Terminated
Actual 10/30/2010 12/3/2010 - 12/22/2010 9/2/2010 8/10/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 7/8/2010 8/10/2010 - 9/24/2010 3/7/2011 On Progress
Planned - - - 2/21/2010 5/22/2010 Completed
Actual - - - 3/24/2010 7/30/2010 12/24/2010
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/11/2010
Actual - 3/8/2011 - 4/7/2011 9/18/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 5/10/2010 7/16/2010 - 8/9/2010 12/21/2010 12/24/2010
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010
Actual 6/26/2010 7/16/2010 - 8/9/2010 2/19/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/12/2010 11/22/2010 5/31/2011
Planned 7/28/2010 9/1/2010 - 9/22/2010 2/19/2011
Actual 9/27/2010 11/4/2010 - 12/10/2010 6/22/2011 On Progress
Planned - - - 9/22/2010 2/19/2011
Actual - - - 8/20/2010 12/21/2010 On Progress
Planned - - - 9/22/2010 2/19/2011
Actual - - - - 12/6/2011 On Progress
Planned 12/28/2009 2/1/2010 - 3/18/2010 7/16/2010 Terminated
Actual 10/30/2010 12/3/2010 - 1/25/2011 10/6/2011 11/17/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 6/26/2010 7/16/2010 - 7/23/2010 2/2/2011 On Progress
Planned - - - 2/21/2010 5/22/2010
Actual - - - 4/3/2010 8/3/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 5/10/2010 6/9/2010 - 8/9/2010 12/21/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010
Actual 6/26/2010 7/16/2010 - 7/23/2010 2/2/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010
Actual 4/20/2010 5/25/2010 - 7/12/2010 12/23/2010 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/19/2010 11/29/2010 3/25/2011
Planned - - - 9/22/2010 2/19/2011
Actual - - - 7/16/2010 12/30/2010 On Progress
4.76 0.04 Post LKR
ENReP/W/510Reconstruction of Staulter house
building at MannarMannar Mannar NS
6.53
581 ENReP/W/509Relocation surveying at Narikkadu
Scheme at MannarMannar Narikkadu DC
Post LKR
Thunukai NCB 35.73 0.32 Post LKR 31.17 Lion Asian
Construction 583 ENREP/W/149
Completion of Divisional Secretariat
Office Thunukkai DS (Phase 2)
582
Mullaitivu
Mullaitivu Thunukai584 ENREP/W/150 Re construction of Thunukkai PS office NCB 11.23 0.10 Post LKR 9.81 Supreme
Builders 1.98
585 ENREP/W/151
Construction of Office Building for
Multi- Purpose Co-op Society at
Thunukkai
DC 5.55 LKR 5 Thunukkai
MPCS Ltd. 4.87 Thunukai
Thunukai 8.9
Sewa Economic
Development
Company
(PVT) LTD
1.39 10.21 0.09
0.05
587 ENREP/W/154Construction of Veterinary Surgeon's
Office at ThunukkaiNCB 8.85
586 ENREP/W/153 District Herbal Garden at Mallavi NCB
ThunukaiMullaitivu
Mullaitivu
PostMullaitivu
Mullaitivu Post
Post
LKR
Mullaitivu 0.08 Post LKRThunukai
LKR
7.9 SY
Construction 3.06
588 ENREP/W/155Construction of Bus Stand & Market
Building at ThunukkaiNCB 16.18 0.15 15.75
Mary
Construction 12.34
589 ENREP/W/157Construction of Sub Post Office at
YogapuramNCB 6.72 LKR 5.8
Island
Engineers 4.69 Thunukai
ThunukaiReconstruction of ASC Thunukkai NCB 10.80 0.10
0.06
Asiri
Contractor 5.39
591 ENREP/W/221Construction of Fertilizer store at
ThunukkaiDC 3.60
590 ENREP/W/220 LKR
LKR
OddusuddanMullaitivu
Mullaitivu
PostMullaitivu
Post
Mullaitivu 0.03 Post
Post
3.24
9.52
Thunukai
Thunukkai
Cultivators
Society
2.31
Urgent Repairsto Office Building,
Qurters at Zonal Education Office
,Thunukkai
DC 4.89 0.04 Post LKR 4.89 SDS,
Mankulam M.V -
593 ENREP/W/160Construction of Divisional Sedretariat
office Building ofr Manthai East DSNCB 52.40 0.47 44.98
Lion Asian
Construction
(Pvt) Ltd.
8.39
594 ENReP/W/509Reconstruction of PS office Building at
Manthai EastNCB 5.50 0.05
Manthai East
595 ENReP/W/510
Construction of Office Building for
Multi- Purpose Co-op Society at
Palinagar
DC 5.55
LKR
Manthai EastMullaitivu
Mullaitivu 5
Panankamam
Pattu MPCS
Ltd.
4.44
Post LKR 4.78 Pupethira
Construction 2.89
0.08Mullaitivu
Mullaitivu
0.05 Post LKRManthai East
Manthai East
597 ENREP/W/164Construction of Market Building at
Manthai EastNCB 6.50
596 ENReP/W/511Construction of Vaterinary Surgeon's
Office at PandiyankulamNCB 8.83
5.7 Prashanth
Builders 4.74
Post LKR 8.09 AJ
Construction 3.15
0.17Mullaitivu
Mullaitivu
0.06 Post LKRManthai East
Manthai East
599 ENREP/W/166Construction of Sub Post Office at
NaddankandalNCB 6.72
598 ENREP/W/165
Reconstruction of Vavunikulam
Irrigation Engineers office at
Vavunikulam
NCB 19.40
5.55 Karunya Civil
Eng. 4.44
Post LKR 16.16
SY
Construction
&Contractors
3.90
0.03Mullaitivu
0.06 Post LKRManthai East
Manthai East600 ENREP/W/222Construction of Fertilizer store at
PandiyankulamDC 3.60 Post LKR 3.24
FO,
Pandiyankulam 2.59
ENREP/W/627592
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 10/7/2010 11/6/2010
Actual - - - 9/23/2010 12/14/2010 On Progress
Planned - - - 9/22/2010 2/19/2011
Actual - - - 1/6/2011 4/13/2011 On Progress
Planned 12/29/2009 2/2/2010 - 9/21/2010 1/19/2011 Completed
Actual 3/20/2010 4/20/2010 - 5/12/2010 11/22/2010 11/22/2010
Planned 12/28/2009 2/1/2010 - 2/22/2010 5/23/2010
Actual 7/8/2010 8/10/2010 - 9/9/2010 2/20/2011 On Progress
Planned - - - 2/21/2010 5/22/2010 Completed
Actual - - - 4/7/2010 8/13/2010 4/30/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010 7/5/2012
Actual 9/27/2010 11/4/2010 - 12/22/2010 9/2/2010 Terminated
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010
Actual 9/27/2010 11/4/2010 - 12/10/2010 6/22/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010
Actual 11/29/2010 1/4/2011 - 2/1/2011 8/14/2011 On Progress
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/21/2010 11/1/2010 10/21/2010
Planned - - - 9/22/2010 2/19/2011
Actual - - - 7/26/2010 12/30/2010 On Progress
Planned - - - 9/22/2010 2/19/2011
Actual - - - 8/16/2010 12/16/2010 On Progress
Planned - - - 9/22/2010 2/19/2011 Completed
Actual - - - 11/25/2010 3/2/2011 3/17/2011
Planned - - - 9/22/2010 2/19/2011 Completed
Actual - - - 11/1/2010 3/4/2011 3/1/2011
Planned - - - 7/30/2010 12/27/2010
Actual - - - 11/9/2010 2/14/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 9/3/2010 1/11/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 9/9/2010 1/14/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 9/9/2010 1/14/2011 On Progress
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 11/25/2010 3/2/2011 4/13/2011
Mullaitivu601 ENREP/W/231Providing roof with necessary structural
repair to Mu/Vavunikulam Central SlusuDC 0.94 0.94 SDS 0.84
0.05Mullaitivu
Mullaitivu
0.01 Post LKRManthai East
Manthai East
603 ENREP/W/167Construction of District Office Building
for Housing Department at MullaitivuNCB 12.20
602 ENReP/W/512
Repairs of DA Quarters, Staff Quarters
& Store Irrigation Engineer's office at
Vavunikulam
DC 5.40
10.79 Sewa Economic
Development 8.84
Post LKR 5.4
Pandiyankulam/
Thunukkai Palm
Development
4.16
0.06Mullaitivu
Mullaitivu
0.11 Post LKROddusuddan
Oddusuddan
605 ENREP/W/169
Construction of Office Building for
Multi- Purpose Co-op Society at
Muthuiyankaddu
DC 5.55
604 ENREP/W/168Re construction of Oddusuddan PS
office -Puthukudiyiruppu NCB 6.11
5 MPCS,
Muthayankaddu 4.58
Post LKR 5.55 Inthiran
Builder 1.82
0.53Mullaitivu
Mullaitivu
0.05 Post LKROddusuddan
Oddusuddan
607 ENREP/W/174Reconstruction of Post office at
OddusuddanNCB 11.70
606 ENREP/W/173 Construction of Mail hub at Mankulam NCB 58.79
9.86
Jeshani
Buildings
Contruction
4.06
Post LKR 50.44
Lanka
Trading&Constr
uction
10.92
0.19Mullaitivu
Mullaitivu
0.11 Post LKROddusuddan
Oddusuddan
609 ENREP/W/158Urgent Repairs to Agriculture Ministry
BuildingNCB 4.30
608 ENREP/W/175Reconstruction of District Agriculture
Training centreNCB 20.79
4.25 Gnanam
Builders 3.49
Post LKR 17.8 Premium
International 2.87
0.03Mullaitivu
Mullaitivu
0.04 Post LKR
LKR
Oddusuddan
Oddusuddan
611 ENREP/W/224Reconstruction of Fertilizer store at
OddusudanDC 3.60
610 ENREP/W/223Reconstruction of Fertilizer store at
OlumaduDC 3.60
3.24 FO,
Puliyakulam 1.48
Post LKR 3.24 FO, Mankulam 2.87
0.01Mullaitivu
Mullaitivu Oddusuddan
0.03 Post
Post
Oddusuddan
Oddusuddan
613 ENREP/W/226Reconstruction of Agriculture Ministry
building VithyapuramDC 2.25
612 ENREP/W/225Repairs of Fertilizer store at
MuthuiyankadduDC 0.94
LKR 2.25
Muthaiyankadd
u MPCS
2.07
Post LKR 0.96 FO, Track one
Right Bank 0.83
0.01Mullaitivu
Mullaitivu
Oddusuddan
Oddusuddan
0.02
615 ENREP/W/232Providing roof with necessary structural
repair to Mu/Periyaeththimadu GTMSDC 0.96
614 ENREP/W/229Repair work to fertilizer stores at
Thanduwan ASCDC 1.61
Post LKR 0.96 SDS 0.87
Post LKR 1.61 FO, Palampasi 0.75
0.02Mullaitivu
Mullaitivu
Oddusuddan
Oddusuddan
0.01
617 ENREP/W/234
Renovation of Outlets (MPCS branch)
at Vithiyapuram & Kaneshapuram in
Oddusuddan DS Division
DC 4.07
616 ENREP/W/233 Repairs of ASC at Olumadu DC 1.88
Post LKR 4.07
Muthaiyankadd
u MPCS
0.54
Post LKR 1.7 FO, Olumadu 0.94
0.02
Oddusuddan
Mullaitivu
Mullaitivu
Oddusuddan
0.04
619 ENREP/W/367Renovation & Repair of Building for
TCCS Union at Vithiyapuram.DC 1.03
618 ENREP/W/366
Renovation of Outlets (MPCS branch)
at Thirumurukandy in Oddusuddan DS
Division
DC 2.04
1.05
Thift Credit
Co_op Societies
Union
0.98
Post LKR 2.04
Muthaiyankadd
u MPCS
0.18
0.01 Post LKR
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010 Terminated
Actual 9/27/2010 11/4/2010 - 12/10/2010 6/22/2011 8/10/2011
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010
Actual 1/20/2011 3/8/2011 - 4/7/2011 10/18/2011 On Progress
Planned - - - 3/15/2011 7/13/2011
Actual - - - 4/26/2011 8/25/2011 On Progress
Planned - - - 3/16/2011 7/14/2011
Actual - - - 12/23/2011 4/24/2012 1/0/1900
Planned - - - 3/17/2011 7/15/2011
Actual - - - 12/23/2011 4/24/2012 1/0/1900
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010
Actual 9/27/2010 11/14/2010 - 12/22/2010 9/2/2010 On Progress
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010
Actual 10/30/2010 12/3/2010 - 12/22/2010 7/4/2010 On Progress
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 9/13/2010 1/18/2011 10/6/2010
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010
Actual 11/29/2010 1/4/2011 - 2/1/2011 6/15/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 7/26/2010 12/30/2010 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 11/9/2010 3/16/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 7/19/2010 12/30/2010 On Progress
Planned 6/10/2010 7/15/2010 - 7/30/2010 12/27/2010
Actual 10/30/2010 12/3/2010 - 12/22/2010 7/4/2010 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 8/4/2010 8/25/2010 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 8/20/2010 12/28/2010 On Progress
Planned - - - 11/17/2010 1/16/2011 Completed
Actual - - - 10/21/2010 1/10/2011 6/17/2011
Planned - - - 7/30/2010 12/27/2010
Actual - - - 8/23/2010 11/29/2010 On Progress
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 8/23/2010 11/29/2010 3/27/2011
Planned - - - 7/30/2010 12/27/2010
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
Mullaitivu
-
- 624
637
623
5.28 MPCS
Maritimepattu
4.07 MPCS
Maritimepattu
4.07 MPCS
Maritimepattu
Chemalai cente,
Community
center
4.07 MPCS
Maritimepattu
0.13 Post LKR 14.61
Post LKR 2.63
3.2
Post
0.89 F.O,
Puliyankulam
2.77
Oddusuddan
Palm
Development
Co-op Society
Tharani
Construction
3.24
FO,
Kumulamunai 3.24
2.7
SMA
Construction
Puthukudiyirup
pu MPCS
FO,
Kumulamunai
East
9.53
LKR
Post LKR
Post
LKR
LKR
LKR
Post
Post LKR
Post
LKR
Post LKR
DC
DC
0.89
2.77
Mullaitivu
Oddusuddan
Mullaitivu
Mullaitivu
Post LKR
LKR
620 ENREP/W/259Completion of Divisional Secretariat
Office Oddusuddan DS (Phase 2) NCB 22.52 0.20Oddusuddan 18.45
Lion Asian
Construction 3.10
621 ENReP/W/513Renovation & Reconstruction of RDD
Building ComplexNCB 23.36 0.21 Post 20.2
Hema
EngineeringCon
struction
-
PostOddusuddan
Maritimepattu
5
SDS,
Mankulam
Maha
Vidyalayam
4.58 LKR
ENReP/W/629Repairs of Oddusuddan ASC at
MullaitivuOddusuddan
ENReP/W/514Renovation of Palm Development Office
at OddusuddanMullaitivu Oddusuddan
Mullaitivu
ENREP/W/232Construction of Divisional Sedretariat
office Building ofr maritime pattu DSNCB 52.40 0.47
Maritimepattu
Mullaitivu
Mullaitivu
ENReP/W/628
626 ENREP/W/236Reconstruction of PS office building at
Maritime pattu -Phase 1NCB 14.30
Urgent Roof Repairs to Thunukkai
Zonal Education Office Buildings &
Quarters, Mullaitivu.
DC 5.00
625
0.05
7.08
Post LKR 44.58 Wahid
Construction 10.18
0.01
0.02
Post
2.63 0.02Maritimepattu
Post LKR 4.9
LKR 5.15Post
2.05
628 ENREP/W/238Repair works to Food & paddy store no
2 at mulliyawalaiNCB 5.94
627 ENREP/W/233Repair works to food store no 1 at
mullaiwalaiDC
3.04 Maritimepattu
Maritimepattu
FO,
Mulliyawalai
North
1.41 Repairs to ASC Mulliyawalai DC 4.90 0.04
0.05
Mullaitivu
FO,
Thanneerutu
West
2.69 Maritimepattu
Maritimepattu
630 ENREP/W/240Construction of Fertilizer store at
Mulliyawalai ASCDC 3.60Mullaitivu
3.20 0.03
0.03 Post LKR
-
632 ENREP/W/242Construction of Fertilizer store at
Kumulamunai ASCDC 3.24
631 ENREP/W/241 Reconstruction of ASC Kumulamunai DC
1.56 Maritimepattu
Maritimepattu Post LKR Subramaniam
Civil Eng. 10.31 0.09
0.03 Post
2.89
634 ENREP/W/244Renovation & Repairs to DRRS & DPS
at KachcheriDC 3.00
633 ENREP/W/243 Reconstruction of ASC Alampil NCB
Mullaitivu
WRDS,
Vattapallai
North
2.54 Maritimepattu
ENREP/W/245Repairing of proposed office space of
ENReP office & Kachcheri BuildingDC 5.28 0.05
0.03
Maritimepattu
Maritimepattu
4.73
636 ENREP/W/368
Improvements of maritimepattu
Praseshiya saba Chemalai sub office
building
DC 2.00
4.07
635
0.04
0.02 Post LKR 2
DCMullaitivu
Mullaitivu
Maritimepattu
3.21
1.86
638 ENREP/W/371
Renovation of outlets (MPCS branch) at
Silawathai & Mulliyawalai west in
Marritimepattu DS Division
DC 4.07
ENREP/W/370
Renovation of outlets (MPCS branch) at
Udappukulam & Chemmalai in
Marritimepattu DS Division
4.61 Maritimepattu
ENREP/W/372
Renovation of outlets (MPCS branch) at
Kallappadu & Karachcheikudiyiruppu in
Marritimepattu DS Division
DC 4.07 0.04
0.04
Maritimepattu
Mullaitivu
Mullaitivu
LKR
1.74 639
629 ENREP/W/239
622
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 8/23/2010 11/29/2010 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 10/14/2010 12/5/2010 On Progress
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 10/14/2010 12/5/2010 11/3/2011
Planned - - - 10/7/2010 11/6/2010 Completed
Actual - - - 10/4/2010 11/27/2010 12/8/2010
Planned - - - 10/7/2010 11/6/2010 Completed
Actual - - - 10/12/2010 12/5/2010 12/5/2011
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 10/11/2010 11/27/2010 10/26/2010
Planned - - - 10/7/2010 8/21/2010 Completed
Actual - - - 10/14/2010 12/5/2010 4/15/2011
Planned - - - 10/7/2010 11/6/2010 Completed
Actual - - - 10/18/2010 11/27/2010 11/3/2011
Planned - - - 10/7/2010 11/6/2010 Completed
Actual - - - 10/14/2010 12/5/2010 10/28/2010
Planned - - - 2/6/2011 3/8/2011 Completed
Actual - - - 10/6/2010 2/15/2011 10/28/2011
Planned - - - 7/30/2010 12/27/2010
Actual - - - 10/25/2010 3/8/2011 On Progress
Planned - - - 7/30/2010 12/27/2010
Actual - - - 9/8/2010 1/15/2011 On Progress
Planned - - - 10/7/2010 12/6/2010
Actual - - - 2/28/2011 5/6/2011 On Progress
Planned 8/26/2010 9/30/2010 - 10/7/2010 12/6/2010
Actual 1/20/2011 3/8/2011 - 4/7/2011 9/18/2011 On Progress
Planned - - - 2/6/2011 4/7/2011
Actual - 3/8/2011 - 4/25/2011 8/29/2011 On Progress
Planned 1/5/2011 2/28/2011 - 10/7/2010 12/6/2010
Actual 1/20/2011 3/8/2011 - 4/25/2011 21/11/2011 On Progress
Planned - - - 7/1/2011 10/29/2011
Actual - - - 7/7/2011 11/4/2011 On Progress
Planned - - - 6/14/2011 10/18/2011
Actual - - - 6/20/2011 10/18/2011 On Progress
Planned - - - 6/1/2011 9/29/2011
Actual - - - 6/21/2011 10/18/2011 On Progress
Planned - - - 6/14/2011 10/12/2011
Actual - - - 6/20/2011 10/18/2011 On Progress
Planned - - - 10/7/2010 12/6/2010 Completed
646
648
650
4.07 MPCS
Maritimepattu Post LKR
Post LKR
Post
Post
ENREP/W/372
Renovation of outlets (MPCS branch) at
Kallappadu & Karachcheikudiyiruppu in
Marritimepattu DS Division
DC 4.07 0.04
MPCS
Maritimepattu
Maritimepattu
Mullaitivu
Maritimepattu
Maritimepattu
0.01
Mullaitivu
Mullaitivu
SDS,
Mullaitivu
HBTMS
1.74
640 ENREP/W/373
Repair of outlets (MPCS branch) at
Neeravipity, Mulliyawalai center &
Alampil in Marritimepattu DS Division
DC 3.00
639
LKR 3.06
Repairs to Maritimepattu DE office at
Zonal Education office DC 1.03 0.01
0.03 1.48
Mullaitivu Post LKR 1.07
Maritimepattu
Maritimepattu
1.03
642 ENREP/W/374Providing roof with necessary structure
repair to Mu/Chellawattai TVDC 1.03
641 ENReP/W/515
LKR 1.06 SDS 1.01
644 ENReP/W/516Providing roof with necessary structure
repair to Mu/Mullaitivu RCTMSDC 0.37
643 ENREP/W/375Providing roof with necessary structure
repair to Mu/Thannirootu HBTMSDC 1.27
0.32
1.22
Post LKR 0.39 SDS
Mullaitivu
Maritimepattu
Maritimepattu
1.32 SDS 0.01Mullaitivu
0.02
0.00Mullaitivu
ENREP/W/380Providing roof with necessary structure
repair to Mu/Mullaitivu HBTMS DC 0.45
645 ENREP/W/379Providing roof with necessary structure
repair to Mu/Mulliyawalai TVDC 2.23Mullaitivu
0.44
Mullaitivu
Mullaitivu
Maritimepattu
Maritimepattu
Post LKR 2.32 SDS 2.07
0.02
0.00 Post LKR 0.46 SDS
ENREP/W/384Providing roof with necessary structure
repair to Mu/Vidyannanda CollegeDC 1.20
647 ENREP/W/382Providing roof with necessary structure
repair to Mu/Kumulamunai MVDC 2.26
1.18
Mullaitivu
Mullaitivu
Maritimepattu
Maritimepattu
Post LKR 2.36 SDS 1.86
0.05
0.01 Post LKR 1.25 SDS
ENREP/W/386Construction of fertilizer Stores at
Alampil ASC in Mullaitivu DC 3.60
649 ENREP/W/385Reconstruction of Paddy Stores CUM
Seles center at Mullaiwalai ASCDC 5.40
1.79
Mullaitivu
Mullaitivu
Maritimepattu
Maritimepattu
Post LKR 5.4
FO,
Mulliyawalai
East
4.56
0.02
0.03 Post LKR 3.24 FO, Alampil
South
652 ENReP/W/518improvements of a Block at Mu/
Mullaitivu RCTMSNCB 6.82
651 ENReP/W/517 Impeovements to DEO at Maritiempattu DC 2.48
1.24 Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
Post LKR 2.48
SDS,
Mullaitivu
HBTMS
0.69
0.05
0.06 Post LKR 5.25 Lanka Machile
Leasers
654 ENReP/W/519improvements of a Block at Mu/
Chilawaththai shoolNCB 6.80
653 ENReP/W/521
Improvements to Market Vatapallai,
Kumulamunai & Chemmalai Market
Maritimepatu PS,
DC 5.00
1.91 Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
Post LKR 5.12
MPCS,maritime
pattu
0.01
0.05
0.06 Post LKR 5.95 Prasanth
Builders
ENReP/W/610Reconstruction of Class Room Building
at Karunadukerney GTMSDC 5.47
655 ENReP/W/610
Renovation of 10 Rooms Summary
Quarters kachcheri staff at
Maritimepattu
DC 5.30
- Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
Post LKR 5.3
Muththiyankadd
u MPCS
0.38
0.05
0.05 Post LKR 5.47
SDS, Alampil
RC
Vidiyalayam
Reconstruction of Class Room Building
at Muslim Vidyalayam DC 5.47
657 ENReP/W/612Reconstruction of Class Room Building
at Kokulai GTMSDC 5.47
- Maritimepattu
MaritimepattuMullaitivu
Post LKR 5.22 SDS, Kokkulai
GTMS 4.14
0.02
0.05 Post LKR 5.47
SDS,
Vadduvakal
GTMS
659 ENREP/W/387
Repairs of Statistical branch, DRDO
branch, Audit branch, Vehicle Garage &
Ladies & gents toilets buildings in the
Kachcheri Premieses
DC 2.30 Post LKR 2.39 Maretimepattu
MPCS 2.15
658 ENReP/W/612
656
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 11/9/2010 1/25/2011 12/10/2010
Planned - - - 6/1/2011 11/28/2011
Actual - - - 8/12/2011 2/22/2012 On Progress
Planned - - - 6/1/2011 11/28/2011
Actual - - - 8/12/2011 2/22/2012 On Progress
Planned - - - 3/1/2011 8/28/2011
Actual - - - 8/11/2011 12/9/2011 On Progress
Planned - - - 12/1/2011 8/29/2011
Actual - - - 23/12/2011 4/24/2012 On Progress
Planned - - - 12/5/2011 8/30/2011
Actual - - - 23/12/2011 4/24/2012 On Progress
Planned - - - 12/1/2011 8/29/2011
Actual - - - 23/12/2011 4/24/2012 On Progress
Planned - - - 6/1/2011 11/28/2011
Actual - - - 8/5/2011 4/15/2012 On Progress
Planned - - - 6/1/2011 11/28/2011
Actual - - - 8/5/2011 2/15/2012 On Progress
Planned 7/10/2011 7/25/2011 - 2/6/2011 4/7/2011
Actual 7/19/2011 8/2/2011 - 8/12/2011 12/14/2011 On Progress
Planned 7/12/2012 12/21/2012
Actual 8/3/2012
Planned 7/10/2012 12/21/2012
Actual 8/3/2012
Planned 7/15/2012 12/21/2012
Actual 8/3/2012
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned - - - 2/21/2010 6/21/2010 Completed
674 ENREP/W/416 Renovation of Ms Quarters at Mullaitivu Mullaitivu DC 1.30 0.01 Post
LKR665
663
664
4.04LKR
LKR
DC
DC
Post
4.04 0.04
4.04 0.04
5.49 0.05
Reconstruction of 60 x 20 Quarters at
Kokulai GTMS at MullaitivuMullaitivu Maritimepattu
ENReP/W/632Completion of PIC Building Stage II at
Kachcheri MullaitivuMullaitivu Maritimepattu
ENReP/W/631
ENReP/W/630Reconstruction of 60 x 20 Quarters at
Karunaddaikerney GTMS at MullaitivuMullaitivu Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
0.02
Reconstruction of ACLG Office at
MullaitivuNCB 30.23
659 ENREP/W/387
Repairs of Statistical branch, DRDO
branch, Audit branch, Vehicle Garage &
Ladies & gents toilets buildings in the
Kachcheri Premieses
DC 2.30
660 ENReP/W/525 - Maritimepattu
MaritimepattuMullaitivu
Mullaitivu
Post LKR 2.39 Maretimepattu
MPCS 2.15
0.25
0.27 Post LKR 27.23 Latha
Construction
Reconstruction of PIC Building of
ENReP at MullaitivuDC 5.43 0.05 Post
661 ENReP/W/526Reconstruction of ACAD Office at
MullaitivuNCB 28.24
-
-
-
Mullaitivu
Mullaitivu
Post LKR 25.85 Premier
Enterprises -
Maritimepattu
Puthukkudiyirup
pu
4.04
5.49
SDS, Alapmil
RC Vid
SDS, Kokulai
GTMS
MPCS
Maritimepattu DC
Post
Post
LKR 5.43 MPCS,
Maritimepattu 1.31
666 ENReP/W/526Reconstruction of DS Office at
Puthukudiyiruppu, MullaitivuNCB 52.59 0.47 Post LKR 49.31
Anchaneya
Constructioin -
667 ENReP/W/527Reconstruction of PS Office at
Puthukudiyiruppu, MullaitivuNCB 24.17
ENReP/W/630
Maritimepattu
MaritimepattuMullaitivu
Vavuniya
671 ENREP/W/149
Completion of Divisional Secretariat
Office Thunukkai DS (Phase 2) Balance
work
Mullaitivu Thunukai
0.22 Post LKR 21.65 Sewa Economic
Development -
-
675 ENREP/W/177
Construction of Co-operative Retail
Shop Building at Nainamadu, Vavuniya
and Repair Works for Co-operative
Branch Shops at Nedunkerny, Vavuniya.
DC 5.00 0.05 Post
Reconstruction of Audit Sub Office in
MullaitivuNS
Vavuniya North
6.15 Prasanth
Builders 7.28 0.07 Post LKR
LKR 4.51
Vavuniya
North MPCS
Ltd.
2.62
ENReP/W/629662
668
Premier
Enterprises NS 24.40 0.24 Post LKR 25.3
22.91 0.22 Post LKR 20.45
670 ENREP/W/160
Construction of Divisional Sedretariat
office Building of Manthai East DS
Balance work
Mullaitivu Manthai East
669 ENREP/W/259
Completion of Divisional Secretariat
Office Oddusuddan DS Balance work
(Phase 2)
Mullaitivu Oddusuddan NS
NS 24.30 0.24 Post Mary
Construction
Mary
Construction
LKR 23.79
Post0.02
Post LKR672 ENREP/W/150Construction of Pre school building for
NaddankandalMullaitivu DC
Post LKR673 ENREP/W/151Improv.to the office of the M/Economic
Development in MullaitivuMullaitivu DC
Const.of Courts Registar's Quarters in
Mullaitivu675 ENREP/W/417 Mullaitivu DC 2.30
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual - - - 5/18/2010 6/20/2010 10/21/2011
Planned 12/26/2010 1/30/2011 - 2/6/2011 4/7/2011 Completed
Actual 4/20/2010 5/25/2010 - 6/30/2010 11/11/2010 2/24/2011
Planned 12/28/2009 2/1/2010 - 2/21/2010 6/21/2010 Completed
Actual 3/26/2010 4/29/2010 - 5/12/2010 10/23/2010 12/14/2010
Planned 12/28/2009 2/1/2010 - 3/18/2010 7/16/2010
Actual 6/26/2010 7/16/2010 - 7/30/2010 4/10/2011 On Progress
Planned 12/29/2009 2/2/2010 - 2/22/2010 5/23/2010 Completed
Actual 3/20/2010 4/20/2010 - 5/12/2010 11/22/2010 2/12/2010
Planned 12/28/2009 2/1/2010 - 3/18/2010 7/16/2010
Actual 3/8/2010 3/23/2010 - 4/24/2010 11/4/2010 On Progress
Planned 12/29/2009 2/2/2010 - 2/22/2010 5/23/2010 Completed
Actual 3/20/2010 4/20/2010 - 5/12/2010 11/22/2010 11/24/2010
Planned 12/28/2009 2/1/2010 - 2/21/2010 5/22/2010 Completed
Actual 4/20/2010 5/25/2010 - 7/12/2010 12/23/2010 2/3/2011
Planned - - - 6/24/2010 12/21/2010 Completed
Actual - - - 5/13/2010 10/12/2010 10/8/2010
Planned - - - 8/25/2010 1/22/2011
Actual - - - 8/27/2010 2/6/2011 On Progress
Planned 6/30/2010 8/4/2010 - 8/25/2010 1/22/2011 Terminated
Actual 10/30/2010 12/3/2010 - 12/22/2010 9/2/2010 10/2/2012
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 9/2/2010 12/8/2010 11/12/2010
Planned - - - 9/27/2010 11/11/2010 Completed
Actual - - - 9/22/2010 12/14/2010 12/27/2010
Planned - - - 9/27/2010 11/11/2010 Completed
Actual - - - 9/22/2010 12/14/2010 3/29/2011
Planned - - - 9/27/2010 12/26/2010 Completed
Actual - - - 10/4/2010 2/8/2011 4/29/2011
Planned - - - 9/27/2010 12/26/2010 Completed
Actual - - - 9/27/2010 2/1/2011 6/30/2011
Planned - - - 8/25/2010 1/22/2011 Completed
Actual - - - 9/3/2010 1/11/2011 6/30/2011
Planned - - - 2/20/2010 3/30/2010
Actual - - - 2/9/2010 4/17/2010 On Progress
Planned - - - 8/25/2010 1/22/2011 Completed
Actual - - - 12/1/2010 2/2/2011 3/28/2011
Vavuniya675 ENREP/W/177
Construction of Co-operative Retail
Shop Building at Nainamadu, Vavuniya
and Repair Works for Co-operative
Branch Shops at Nedunkerny, Vavuniya.
DC 5.00 0.05 PostVavuniya North
Vavuniya NorthVavuniya
Vavuniya
LKR 4.51
Vavuniya
North MPCS
Ltd.
2.62
676 ENREP/W/178Construction and Repairs of Rice mill
and Stores at NedunkernyNCB 9.98 0.09 Post LKR 8.78
A.J
Construction 7.63
677 ENREP/W/179
Re - Construction of DO's Quarters,
Seed Paddy Stores, Sales Center at
Nedunkerny.
NCB 9.00 7.76 Vijeya Builders 5.09 Vavuniya North
Vavuniya North 30.91 Sisira Builders 25.20 41.84 0.38
0.08 Post
Vavuniya
LKR
679 ENREP/W/181Construction of Veterinary Surgeons
Office at Kanagarayankulam.NCB 8.13
678 ENREP/W/180
Vavuniya North
Construction of Bus stand and market
Building at NedunkernyNCB
Vavuniya NorthVavuniya 0.30 Prior
Vavuniya
Post LKR
Vavuniya 0.07 Post LKR
LKR
LKR 2.11
6.81 Karuniya Civil
Contractors 6.19
680 ENREP/W/183Construction of Training center Building
in Kanagarayankulam NCB 33.00
0.02 Post
28.54 Wahid
Construction 27.12
681 ENREP/W/184Construction of Community Store at
Nedunkerny, VavuniyaNCB 2.50
ENREP/W/185
Vavuniya North
Inthiran
Contractors 1.82 Vavuniya North
Vavuniya NorthConstruction of Post Office at
NedunkernyNCB 10.17 0.09
Post LKR
Vinayaga Civil
Eng.
Construction
7.65
683 ENREP/W/186Repairs to A.I. Quarters Cum Office for
Agriculture DepartmentDC 2.28
682
FO,
Kanagarayankul
am
1.90
684 ENREP/W/243
Repairs to Farmers Traing centre and
construction of tractor Garage at
nedunkerny
DC 3.16 0.03Vavuniya North
Vavuniya 2.05
Vavuniya
Vavuniya Vavuniya North LKR
8.68PostVavuniya LKR
0.02
9.52 CSN
Engineering 1.20 0.09 Post685 ENReP/W/526
Reconstructionof Co-Op Retail Shops at
Vavuniya Package-2NCB 10.09
Post LKR
0.03 SDS 2.34
Post LKR 2.85 Vavuniya
North MPCS 2.83
686 ENREP/W/252
Vavuniya North
Renovation of V/Periyakulam GTMS DC 2.90Vavuniya
Vavuniya
Vavuniya North
Renovation of V/Marailluppai GTMS SDS 3.09
688 ENREP/W/392 Renovation of V/Mannakulam GTMS DC 1.91 0.02Vavuniya North
DC
ENREP/W/400Construction of Paddy store at
NedunkernyDC 4.86 0.04
2.61
3.55
Post LKR
0.03
Post
3.55
Vavuniya
Vavuniya
687 ENREP/W/391
Vavuniya North LKR 4.86689
FO,
Madiyamadu 2.29
Post LKR 1.91 SDS 1.71
MPCS,
Vavuniya North 2.67
Post
Repairs of the Nedunkerny ASC
BuildingDC 5.16
690 ENREP/W/407
Vavuniya North
Reconstruction of fertilizer store at
KanakarayankulamDC 2.85Vavuniya LKR
Vavuniya 0.05 Post LKR
0.03Vavuniya North 2.57
FO, Katkulam 1.99
692 ENREP/W/187Improvements to Existing Building of
for PMU of ENRePDC 5.79 0.05Vavuniya
693 ENREP/W/188
Construction of Conference Hall and
Improvements to PMU, ENReP at
Vavuniya
DC 5.43
4.66
Vavuniya
Vavuniya
691 ENREP/W/242
Vavuniya
Post LKR 5.2 MPCS,
Vavuniya 5.02
0.05 Post LKR 5.43 Vavuniya
MPCS 5.10
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned - - - 8/25/2010 1/22/2011 Completed
Actual - - - 10/20/2010 3/31/2011 3/23/2011
Planned - - - 7/22/2010 9/13/2010 Completed
Actual - - - 9/22/2010 12/14/2010 12/9/2010
Planned - - - 9/27/2010 9/5/2010 Completed
Actual - - - 9/22/2010 12/14/2010 12/14/2010
Planned - - - 9/27/2010 11/11/2010 Completed
Actual - - - 9/23/2010 12/14/2010 12/31/2010
Planned - - - 9/27/2010 11/11/2010 Completed
Actual - - - 9/22/2010 12/14/2010 12/10/2010
Planned - - - 9/27/2010 11/11/2010
Actual - - - 9/22/2010 12/14/2010 On Progress
Planned - - - 9/27/2010 11/11/2010
Actual - - - 9/23/2010 12/14/2010 On Progress
Planned 2/25/2011 8/4/2010 - 8/25/2010 1/22/2011
Actual 2/29/2011 3/8/2011 - 3/22/2011 9/18/2011 On Progress
Planned 2/25/2011 8/4/2010 - 8/25/2010 1/22/2011 Completed
Actual 2/29/2011 11/4/2010 - 4/17/2011 8/15/2011 6/232011
Planned 8/16/2010 9/20/2010 - 11/22/2010 4/21/2011 Completed
Actual 9/27/2010 11/4/2010 - 12/10/2010 5/23/2011 7/25/2011
Planned - - - 10/20/2010 3/19/2011 Completed
Actual - - - 10/1/2010 2/4/2011 6/30/2011
Planned - - - 9/27/2010 2/24/2011
Actual - - - 10/1/2010 2/4/2011 On Progress
Planned - - - 9/27/2010 12/26/2010 Completed
Actual - - - 10/1/2010 2/4/2011 5/30/2011
Planned - - - 8/25/2010 1/22/2011
Actual - - - 10/1/2010 2/4/2011 On Progress
Planned - - - 12/23/2010 5/22/2011
Actual - - - 3/21/2011 8/21/2011 On Progress
Planned - - - 1/27/2011 6/26/2010
Actual - - - 3/11/2011 8/13/2011 On Progress
Planned - - - 8/25/2010 1/22/2011 Completed
Actual - - - 8/27/2010 2/3/2011 1/12/2011
Planned - - - 7/30/2010 12/27/2010 Completed
Actual - - - 10/21/2010 1/20/2011 11/30/2010
Planned - - - 7/30/2010 12/27/2010
Actual - - - 5/2/2011 9/1/2011 On Progress
Vavuniya SDS 4.65 LKR
695 ENREP/W/253 Renovation of V/Kovilkunchukulam Vid DC 1.61
694 ENReP/W/527
Vavuniya
Repairs to College of Education Hostel
Blocks in Vavuniya DC
Vavuniya
Post
DC 0.54
Vavuniya
Vavuniya
Vavuniya 0.01
4.84 0.04
Post LKR 1.61
4.84
SDS 1.39
697 ENREP/W/389Renovation of V/Nochchimoddai No 1
JSVDC 0.91
696 ENREP/W/388Renovation of
V/Arumugathanputhukulam GTMSVavuniyaVavuniya
Vavuniya
Post LKR 0.54 SDS 0.42 0.00
0.01 Post LKR 0.91 SDS 0.86
699 ENREP/W/254Renovation of V/Semamadu Unit 2
GTMSDC 0.91
698 ENREP/W/390Renovation of V/Semamadu
Sanmuganantha vidDC 1.00
0.71
Vavuniya
Vavuniya
Post LKR 1 SDS 0.83 0.01Vavuniya
0.01
0.01 Post LKR 0.91 SDS
LKR 1.63 SDS 1.44
701 ENReP/W/528Reconstruction & Renovation of School
Buildings at VavuniyaNCB 15.19
700
0.14
ENReP/W/631
Vavuniya
VavuniyaVavuniya
Vavuniya
PostENREP/W/255Renovation of V/Matharpanikar
Makilankulam GTMSDC 1.63
Post LKR 13.49 Edward &
Christie 3.61
Urgent Repairs to School building at
Omanthai Centarl CollegeDC 5.28 0.05 Post LKR 5.28 SDS 4.76
703 ENREP/W/394Construction of rice Mill and Stores at
OmanthaiNCB 11.10 0.10 Post 10.51
Jathur
Enterprises 9.79
704 ENREP/W/396 Construction of Paddy store at omanthai DC 4.86 0.04Vavuniya
705 ENREP/W/397Construction of Paddy store at
PalamoddaiDC 3.89
LKR
Vavuniya 3.89 Vavuniya
MPCS 3.08
Post LKR 4.86 Vavuniya
MPCS 4.41
0.04Vavuniya
Vavuniya
0.04 Post LKRVavuniya
Vavuniya
707 ENREP/W/246Fertilizer store at Omanthai in
Palamoddai DC 2.78
706 ENREP/W/401Construction of Paddy store at
ArumugaththanputhukkulamDC 4.86
2.78 FO,
Palamoddai 1.96
Post LKR 4.86 MPCS,
Vavuniya 4.54
0.04Vavuniya
Vavuniya
0.03 Post LKRVavuniya
ENReP/W/530
Addition & Improvements to Quality
Control Laboratory at thandikulam &
Vehicle Park for EE office, vavuniya
DC 4.48
708 ENReP/W/529 Reconstruction of Self learning center DC 4.99Vavuniya
4.48 MPCS,
Vavuniya 4.15
Post LKR 5.08
Rural
Development
Society,
Ukkulankulam
2.42
0.03Vavuniya
Vavuniya
0.04 Post LKRVavuniya
Vavuniya
ENREP/W/256 Construction of PIC Building of ENReP DC 5.49
710 ENREP/W/251Additional &Improvement to CE's &
EE's office to Dept. of Building DC 3.58
4.93
RDS,
Vairavapuliyank
ulam
4.63
Post LKR 3.23 Vavuniya
MPCS 2.70
0.04Vavuniya
0.05 Post LKRVavuniya
Vavuniya 712 ENREP/W/632Improvement of wards No-03 &04 in
General HospitalDC 4.86 Post LKR 4.86
Hospital
welfare Society 2.37
702
711
709
Vavuniya
Vavuniya
Vavuniya
Vavuniya
Vavuniya
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Planned 8/16/2010 9/20/2010 - 9/27/2010 12/26/2010
Actual 6/29/2011 7/29/2011 - 8/15/2011 4/11/2012 On Progress
Planned - - - 7/15/2011 12/27/2010
Actual - - - 8/3/2011 12/6/2011 On Progress
Planned - - - 6/22/2011 12/27/2010
Actual - - - 7/11/2011 12/1/2011 On Progress
Planned - - - 6/22/2011 12/27/2010
Actual - - - 7/18/2011 11/19/2011 On Progress
Planned - - - 6/22/2011 12/27/2010
Actual - - - 7/11/2011 11/12/2011 On Progress
Planned - - - 6/22/2011 12/27/2010
Actual - - - 6/23/2011 10/24/2011 On Progress
Planned - - - 11/10/2011 12/28/2010
Actual - - - 26/12/2011 4/27/2012 On Progress
Planned - - - 12/5/2011 6/12/2012
Actual - - -
Planned - - - 12/25/2011
Actual - - - 6/22/2012
Planned 6/30/2010 8/4/2010 - 8/25/2010 1/22/2011
Actual 10/30/2010 12/3/2010 - 12/28/2010 9/8/2011 On Progress
Planned - - - 9/27/2010 12/26/2010
Actual - - - 10/4/2010 2/8/2011 On Progress
Planned - - - 9/27/2010 12/26/2010
Actual - - - 10/1/2010 2/18/2011 On Progress
Planned - - - 8/25/2010 1/22/2011 Completed
Actual - - - 8/10/2010 1/13/2011 6/20/2011
Planned - - - 9/27/2010 11/11/2010 Completed
Actual - - - 9/23/2010 12/29/2010 12/13/2010
Planned 6/30/2010 8/4/2010 - 8/25/2010 1/22/2011
Actual 9/27/2010 11/4/2010 - 12/10/2010 5/23/2011 On Progress
Planned - - - 9/27/2010 12/26/2010 Completed
Actual - - - 9/28/2010 2/2/2011 4/29/2011
Planned - - - 2/20/2012 6/21/2012
Actual - - - 2/27/2012
Planned 4/20/2012 30/12/2012
Actual 5/25/2012 10/1/2012
Planned 4/20/2012731 ENREP/W/404
Reconstruction of Co - Operative
Retailshop at Marilluppai, stage 2,
Vavuniya
LKR Vavuniya
North MPCS Vavuniya Vavuniya South DC Post
Post LKR MPCS
Vavuniya
729 ENREP/W/399
Improvement of Project Management
Unit, Emergency Northern Recovery
Project, Vavuniya
LKR
730 ENREP/W/403
Reconstruction of Co - Operative
Retailshop at
Arumukathanputhukkulam, stage 2,
Vavuniya
Vavuniya Vavuniya South DC 1.87 0.02
4.86 MPCS
Cheddykulam 4.58 728 ENREP/W/398
Construction of Paddy store at
Pavatkulam unit 6Vavuniya Cheddikulam DC 0.04 Post LKR
719
720
721
Procurement
Process & Under
Process
Procurement
Process & Under
Process
4.98
5.50
5.50
RDS
Ukkulankualam -
-
-
VavuniyaENReP/W/531Reconstruction of RDI's , IE's © of
Dept of Irrigation, VavuniyaNCB 42.17
V V
Ramanathan &
Company
5.79
Vavuniya
Vavuniya
0.38 Post LKR 36.19
LKR 4.57
Vavuniya
4.24
ENReP/W/611Repairs & Iprovements of Ward ,
Quarters General Hospital, VavuniayDC 4.57 0.04 PostVavuniya
Hospital
Welfare Society,
Vavuniay
-
ENReP/W/612Renovation & repairs to Technical ollege
Building VavuniyaDC 5.50 0.05 Post
Vavuniya
Vavuniya
Hospital
Welfare Society,
Vavuniay
ENReP/W/613
Repairs & Iprovements of Ward No-05,
No-07 &No-14 in General Hospital,
Vavuniay
DC 4.24 0.04 PostVavuniya
Palmyra &
Coconut
Development
Co-op Society
0.77
3.48 Vavuniya
North MPCS -
LKR 5.50 RDS,
Maravankulam 1.22
LKR
PostVavuniya
-
ENReP/W/614
Reconstruction of Palmyra & Coconut
Development Co-op Society Building at
Puliyankulam, Vavuniya
DC 4.51 0.04 Post 4.51LKRVavuniya
LKR
LKR
LKR
ENReP/W/615Reconstrution fo Co-op Retail shop
building at KanakarayankualmDC 3.48 0.03
5.50 0.05
Vavuniya
Vavuniya
Vavuniya
Vavuniya
VCK
Vavuniya
Post
Post
Post
DC
DC
DC
4.98 0.04
5.50 0.05
Reconstruction of DPD office Stage II
Preparation and Improvements of store
at Cheddikulam IE's office
Preparation and Improvements of store
at Vavuniya IE's office
ENReP/W/616
ENReP/W/617
ENReP/W/618
0.01
0.03 Post LKR
722 ENReP/W/536Reconstructionof Co-Op Retail Shops at
Vavuniya Package-1NCB 9.87 0.09Vavuniya
Vavuniya
Vavuniya
Vavuniya
2.85 0.03
0.02
DC
Vavuniya
South MPCS 1.55
Post LKR 9.68 Omega Steels 5.95
Post LKR 2.73723 ENREP/W/399Construction of Paddy store at
KachchakodyDC 2.73
DC725 ENREP/W/245Construction of Fertilizer store at
Periyathampanai
Reconstruction of fertilizer store at
Ulukulam724 ENREP/W/408
Cheddikulam
NCB 11.10
726 ENREP/W/393Renovation of V/Periyathampanai
GTMSDC
LKR 10.12 Asire
Contractor 6.13
Post LKR 1.53 SDS 1.33
0.10 Post727 ENREP/W/395Construction of rice Mill and Stores at
Pavatkulam
714
713
Vavuniya South
Vavuniya South
LKR
Cheddikulam DC 0.70 0.01 Post
Agreement Not
signed
0.68 MPCS
Vavuniya
Vavuniya South
3.34
Vavuniya
Vavuniya
Vavuniya
1.53Cheddikulam
4.86
Cheddikulam
715
716
717 Vavuniya
Vavuniya718
3 FO,
Ramaiyankal
Post LKR 2.57 FO, Acre 400
L.B
2.57
0.65
On Progress
On Progress
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Actual
Planned 4/20/2012
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
Planned
Actual
731 ENREP/W/404
Reconstruction of Co - Operative
Retailshop at Marilluppai, stage 2,
Vavuniya
Post LKR MPCS
Vavuniya
LKR Vavuniya
North MPCS
732 ENREP/W/405
Reconstruction of Co - Operative
Retailshop at Palamoddai, stage 2,
Vavuniya
Vavuniya Vavuniya South DC
Vavuniya Vavuniya South DC Post
Sacntion is on
Progress
Agreement Not
signed
Agreement Not
signed
Jammy
Enterprises
NS
Vavuniya Vavuniya NS Post LKR
ENREP/W/406 VavuniyaVavuniya
734 ENREP/W/407Retail of Assembly Hall at V/Vavuniya
Gamini Maha Vidyalayam
733Sacntion is on
ProgressLKR
Jammy
Enterprises Post
Retail of office building at V/Vavuniya
Gamini Maha Vidyalayam
Vavuniya Post LKR
Vavuniya South 2.30 0.02 Post LKR
Improv. Of DPD Office stage II A & Re-
awakening PPMU- VavuniyaVavuniya
738 ENREP/W/412 Renov.of Mamadhu Hospital VS Vavuniya
Post LKR735 ENREP/W/408
Air condition facility to conference hall
of Divineguma Training Center at
Kanagarajankulam
Vavuniya Vavuniya
4.50 0.04 Post LKR737 ENREP/W/411 Improv.to DPD Office Stage II Vavuniya Vavuniya
739 ENREP/W/413
736 ENREP/W/409
Construction of V/Arugampulaliya
School Vavuniya South DS DivisionVavuniya Vavuniya South 5.03 0.05 Post LKR
740 ENREP/W/414Construction of rural water supply
scheme stage 1 at MamaduwaVavuniya Mamaduwa 0.65 0.01 Post LKR
741 ENREP/W/415Public Drinking water wells close to
Sivisuma Vidyalaya in Pradesiya sabhaVavuniya Mamaduwa 1.65 0.01
743 ENREP/W/417 Public well in Mamaduwa Vavuniya Mamaduwa 1.00 0.01
742 ENREP/W/416Mamaduwa Kalikulam Co- Operative
shop's common well Vavuniya Mamaduwa 1.65 0.01
744 ENREP/W/417Repairs for the Computer Trainning
centre at Pradesiya sabha office Vavuniya Vavuniya South 2.00 0.02
LKR USD
Date
Cu
rren
cy
Am
ou
nt
Dis
tric
t
D.S
.Div
isio
n
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Bid
Clo
se/
Bid
op
enin
g
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of Contract
Con
tract
No./
Am
ou
nt/
Nam
e of
the
Con
tract
or
Su
bm
it S
ign
ed C
on
tract
cop
yto
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
New
s P
ap
er
Com
ple
tion
Ex
pen
dit
ure
in
cure
d t
o d
ate
Sta
tus/
Rem
ark
s**
Ser
ial
No
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimated Cost
(Million)
Pri
or/
Post
Rev
iew
by B
an
k *
Country/Borrower: Government of Sri Lanka
Project Name: Emergency Northern Recovery Project Credit/Grant #: 4676
Implementing Agency: ENREP PMU
GPN # and Date Published :
Original Plan Approved Date(at Appraisal/Negotiations): November 30, 2009
Update as of: January 4, 2010
Update as of: May 7, 2010
Update as of: September 24, 2010
Update as of: May 31, 2011
Update as of: September 30, 2011
Update as of: December 31, 2011
Update as of: January 31, 2012
Update as of: April 30, 2012
* For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
** Indicate extensions/modifications etc.
Seria
l N
o.
Pack
age N
o.
Desc
rip
tion
Meth
od
of
Procu
rem
en
t
Qu
an
tity
(Nu
mb
er)
Estimate
d Cost
(Million)
Prio
r/
Post
Revie
w
by B
an
k* Stage
Su
bm
it D
BD
wit
h
IFB
for B
an
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d
UN
DB
Dead
lin
e f
or
sub
mis
sion
of
bid
s
Su
bm
it B
ER
for
Ban
k's
N/O
Nam
e o
f
Con
tracto
r/
nati
on
ali
ty
Su
bm
it s
ign
ed
con
tract
cop
y t
o
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
new
spap
ers
Com
ple
tion
of
con
tract
Exp
en
dit
ure
incu
rred
to d
ate
Sta
tus/
Rem
ark
s**
LKR USD Date Currency Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
D1 Vehicles, Equipment & Office Facilities
1 NS 3 27.00 0.24 Prior Planned - - 31/12/2009 1/03/2010 1/03/2010
Actual 15/02/2010 - 27/04/2010
2 NS 4 30.00 0.27 Post Planned - - 31/01/2010 1/04/2010 1/04/2010
Actual 29/07/2010 - 12/10/2010
3 NCB 9 70.00 0.63 Post Planned - - 30/01/2010 31/03/2010 31/03/2010
Actual 9/07/2010 12/01/2010 2/5/2011
4 NS 8 0.90 0.01 Post Planned - - 20/01/2010 20/01/2010
Actual 28/01/2010 - 12/2/2010
5 NCB 25 5.00 0.05 Post Planned - - 31/01/2010 2/03/2010 - - 2/03/2010
Actual 28/01/2010 6/11/2010 6/7/2010
6 NCB 7 1.10 0.01 Post Planned - - 31/01/2010 2/03/2010 - - 2/03/2010
Actual 21/04/2010 6/11/2010 15/09/2010
7 NCB 6 0.10 0.00 Post Planned - - 31/01/2010 2/03/2010 - - 2/03/2010
Actual 21/04/2010 14/06/2010 8/7/2010
8 NCB 25 2.50 0.02 Post Planned - - 6/31/2010 31/08/2010 31/08/2010
Actual 9/07/2010 6/10/2010 29/10/10
9 NS 2 0.30 0.00 Post Planned - - 20/01/2010 20/01/2010
Actual 1/02/2010 - 12/2/2010
10 NCB 6 1.00 0.01 Post Planned - - 6/31/2010 1/09/2010 - - 1/09/2010
Actual 21/04/2010 6/11/2010 29/10/2010
11 NCB 6 1.00 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual7/09/2010 6/10/2010 29/10/2010
12NS
50.35 0.00
PostPlanned - -
4/20/20010 20/05/2010 - - 20/05/2010
Actual21/04/2010 8/02/2010
15/09/2010
13NS
50.09 0.00
PostPlanned - -
7/01/2010 7/01/2010
Actual2/01/2010 - 12/2/2010
14NS
150.35 0.00
PostPlanned - -
15/05/2010 20/05/2010 20/05/2010
Actual20/07/2010 - 24/07/2010
ENReP/G/7
ENReP/G/8
ENReP/G/9
ENReP/G/10
ENReP/G/11
ENReP/G/12
ENReP/G/13
ENReP/G/14
ENReP/G/1
ENReP/G/2
ENReP/G/3
ENReP/G/4
ENReP/G/5 Regional Head, Regional office,
MicroPC Systems
Purchases of 24 Nos. Of Computers and 1 no
Laptop
Global Net
PROCUREMENT PLAN FOR GOODS
Associated Motorways PLC
M/s Associted Motorways PLC
United Motors Lanka PLC
PC House (Pvt)Ltd
PC House (Pvt)Ltd
Signing of contract
Purchases of 6Nos. Of Computers & 2 No. of
Laptop for PMU
ENReP/G/6
44.25
Metropolitan office (Pvt) ltd
3.80
1.01
0.05
3.07
0.08
Strangers Group (Pvt)Ltd
1.56
29.98
17.98
41.01
1.04
0.57
0.64
3.80
Multi Vision Printers
PC House (Pvt) Ltd
Metropolitan office (Pvt) ltd
PC House (Pvt) Ltd
0.23
0.20
0.91
0.05
3.06
0.23
0.51
1.39
Completed
Completed
Completed
Completed
Completed
0.09
0.08
0.20
Global Net
0.10
24.99
19.98
LKR
LKR
LKR
LKR
LKR
LKR
Completed
LKR
LKR
LKR
LKR
LKR
LKR
Completed
Completed
Purchases of 3 nos. of Double cabs
Purchases of 4 nos. of Double cabs
Purchases of 9 nos. of Double cabs
Purchases of 25 Nos. Of Computers
Purchases of 7 No. of Laptop
Purchases of 6 Nos. Scanner for PMU & PIC
LKR
LKR
Completed
Completed
Completed
Completed
Completed
Completed
Purchases of 2 nos. of Photo copier
Purchases of 6 nos. of Photo copier
Purchases of 6 nos. of Photo copier
5 Nos. of Mobile Phone
15 Nos. of Mobile Phone
Purchases of 5 Nos. of Fax
Seria
l N
o.
Pack
age N
o.
Desc
rip
tion
Meth
od
of
Procu
rem
en
t
Qu
an
tity
(Nu
mb
er)
Estimate
d Cost
(Million)
Prio
r/
Post
Revie
w
by B
an
k* Stage
Su
bm
it D
BD
wit
h
IFB
for B
an
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d
UN
DB
Dead
lin
e f
or
sub
mis
sion
of
bid
s
Su
bm
it B
ER
for
Ban
k's
N/O
Nam
e o
f
Con
tracto
r/
nati
on
ali
ty
Su
bm
it s
ign
ed
con
tract
cop
y t
o
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
new
spap
ers
Com
ple
tion
of
con
tract
Exp
en
dit
ure
incu
rred
to d
ate
Sta
tus/
Rem
ark
s**
LKR USD Date Currency Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Signing of contract
15NCB
61.00 0.01
PostPlanned - -
31/01/2010 2/03/2010 2/03/2010
Actual9/07/2010 11/01/2010 10/11/2010
16 NS 2 0.06 0.00 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual1/02/2010 - 12/2/2010
17 NS 10 0.30 0.00 Post Planned - - 2/20/20010 20/03/2010 20/03/2010
Actual 3/05/2010 - 15/04/2010
18 NS 0.30 0.00 Post Planned - - 6/01/2010 20/01/2010 20/01/2010
Actual 18/01/2010 - 6/4/2010
19 NS 0.90 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual9/09/2010 - 27/09/2010
20 NS 0.30 0.00 Post Planned - - 10.06.2011 18/06/2011 18/07/2011
Actual11/07/2011 19/7/2011 -
21 NS 0.50 0.00 Post Planned - - 31/12/2009 20/01/2010 20/01/2010
Actual 18/01/2010 - -
22 NS 0.80 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual 21/04/2010 8/02/2010 30.08.2010
23 NS 0.80 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual 21/04/2010 8/02/2010 6/10/2010
24 NS 0.80 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual21/04/2010 8/02/2010 20/09/2010
25 NS 0.80 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual 21/04/2010 8/02/2010 7/10/2010
26 NS 0.80 0.01 Post Planned - - 31/01/2010 2/03/2010 2/03/2010
Actual21/04/2010 8/02/2010 7/10/2010
27 NS 40 5.00 0.05 Post Planned - - 31/12/2009 1/03/2010 1/03/2010
Actual 15/07/2010 - 23/08/2010
28 NS 75 1.00 0.01 Post Planned - - 31/12/2009 1/03/2010 1/03/2010
Actual 28/01/2010 - 11.02.2010
29 NS 0.08 0.00 Post Planned - - 1/05/2010 31/05/2010 31/05/2010
Actual 14/07/2010 - 29/07/2010
30 NS 2 0.21 0.00 Post Planned - - 25/03/2010 25/04/2010 25/04/2010
Actual - -
31 NS 1 0.16 0.00 Post Planned - - 2/04/2010 2/05/2010 2/05/2010
Actual 24/06/2010 - 13/07/2010
32 NS 1 5.00 0.05 Post Planned - - 30/08/2010 30/09/2010 30/09/2010
Actual 19/10/2010 - 10/11/2011
33 NS 2 0.10 0.00 Post Planned - - 30/07/2010 30/09/2010 30/09/2010
Actual 13/10/2010 29/10/2010 22/11/2010
ENReP/G/27
ENReP/G/31
ENReP/G/32
ENReP/G/33
ENReP/G/28
ENReP/G/30
ENReP/G/29
ENReP/G/23
ENReP/G/24
ENReP/G/25
ENReP/G/26
ENReP/G/16
ENReP/G/17
ENReP/G/18
ENReP/G/20
ENReP/G/21
ENReP/G/22
ENReP/G/19
ENReP/G/15
N.S.Rathnam&Bros
N.S.Rathnam&Bros
Superking Furniture
Superking Furniture
LKR Dynamic AV Technologies
David Pieris Motor Company
Limited
2 Nos Generator for PIC office in Kilinochchi &
Mullaitivu office
United Motors Lanka
(Pvt).Ltd
Set of Furniture for RaP PPMU Mullaitivu &
Kilinochchi office
Richco Associates
Richco Associates
Superking Furniture
Richco Associates
0.76
0.13
0.70
0.70 Richco Associates
0.06
0.12
4.15
0.13
0.66
0.74
0.55
0.09
4.96
0.99
4.43
Ayisha Multi Complex
Alpha Center
Swedish trading Audio Visual
(Pvt).Ltd
-
0.12
3.46
0.13
0.99
Completed
Completed
Completed
LKR
0.69
0.63
0.63
Richco Associates
0.74
0.66
0.77
Completed
Completed
0.22
0.64
0.55
0.76
0.64
0.55 DR Industries
Completed
Completed
Completed
Completed
Purchases of 10 Nos. of Digital Camara
Set of Furniture for PMU(Package 1)
Conference Table with Chair for PMU
Completed
Completed
Completed
LKR
Set of Furniture for PMU(Package 2)
Purchases of 6 Nos. of Multi media
Purchases of 2 Nos. of Digital Camara
Set of Furniture for PIC office in Kilinochchi
Set of Furniture for PIC office in Jaffna
Purchases of Motor Cycle (40 Nos)
LKR
LKR
LKR
LKR
LKR
Set of Furniture for PIC office in Vavuniya
Set of Furniture for PIC office in Mannar
Set of Furniture for PIC office in Mullaitivu
LKR
LKR
LKR
LKR
LKR
LKR
LKR
Completed
Completed
Completed
0.13
Completed
Completed
0.46
0.09
0.22
Completed
0.06
LKR
Purchases of Cycle(75 Nos)
Executive Iron safe
Purchase of 01 Nos Multimedia Projector PMU
Purchase of a Car
Purchase of 2 Nos Colour Printer
LKR
LKR
LKR
Metropolitan office (Pvt) ltd Completed
Seria
l N
o.
Pack
age N
o.
Desc
rip
tion
Meth
od
of
Procu
rem
en
t
Qu
an
tity
(Nu
mb
er)
Estimate
d Cost
(Million)
Prio
r/
Post
Revie
w
by B
an
k* Stage
Su
bm
it D
BD
wit
h
IFB
for B
an
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d
UN
DB
Dead
lin
e f
or
sub
mis
sion
of
bid
s
Su
bm
it B
ER
for
Ban
k's
N/O
Nam
e o
f
Con
tracto
r/
nati
on
ali
ty
Su
bm
it s
ign
ed
con
tract
cop
y t
o
Ban
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce i
n
UN
DB
& N
ati
on
al
new
spap
ers
Com
ple
tion
of
con
tract
Exp
en
dit
ure
incu
rred
to d
ate
Sta
tus/
Rem
ark
s**
LKR USD Date Currency Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Signing of contract
34 NS 10 0.80 0.01 Post Planned - - 7/07/2011 14/07/2011 28/07/2011
Actual 26/5/2011 27/5/2011 17/6/2011
35 NS 10 0.90 0.01 Post Planned - - 15/07/2011 22/07/2011 30/7/2011
Actual 19/8/2011 26/8/2011 9/05/2011
36 NS 15 1.80 0.02 Post Planned - - 1/08/2011 8/08/2011 7/10/2011
Actual 8/02/2011 12/08/2011
37 NS 1 0.05 0.00 Post Planned 9/09/2011 17/09/2011 18/10/2011
Actual 20/9/2011 28/09/2011 30/9/2011
38 NS 5.00 0.05 Post Planned 10/10/2011 18/10/2011 30/12/2011
Actual 9/08/2011 6/09/2011
39 NS 5 1.00 0.01 Post Planned 9/09/2011 17/09/2011 30/10/2011
Actual 21/7/2011 27/7/2011
9/09/2011 17/09/2011
14/9/2011 20/9/2011
9/09/2011 12/09/2011
9/09/2011 12/09/2011
12/10/2011 30/10/2011
7/10/2011 30/10/2012
18/01/2012 25/01/2012
18/01/2012 26/01/2012
18/04/2012 23/04/2012
21/04/2012 3/05/2012
NS 5 1.15 0.0104 Post Planned
ENReP/G/37
ENReP/G/34
ENReP/G/35
44 ENReP/G/41 Purchase 5 Nos of Mobile Phones to DPDs
Purchase 5 Nos Photocopiers
Purchase of 15 Numbers of Laptops
Quality Contral Equipment Set for Dept. of
Buildings.
43
ENReP/G/38
ENReP/G/36
ENReP/G/37
0.46
1.23
0.83
0.09
3.48
0.39
0.05
PC Technologies
Survey & Laboratory
Equipments(Pvt) Ltd
0.99
Metro Politan Office(Pvt) Ltd
30/11/2011
1.21
Spectro Scientific Enterprises0.46
LKR
LKR
LKR
LKR
0.05
6.02
1.23
0.83
LKR
Purchase of 15 Nos Computers with Printers
Purchase of 10 nos Testing hammer and anvil
Purchase of 10 Nos GPS
Purchase of 01 No Mobile Phone
Techinnovators (Pvt) Ltd
0.0135
LKR
LKR
Metropolitan Office ( Pvt ) Ltd &
Jahn Keels Office Automation (Pvt)
Ltd
T-Mobiles Tech
LKR 3.48
0.99
0.085
A.T.A International (Pvt) Ltd
Planned
Completed
Completed
Completed30/11/2011
LKR
Completed
Metro Politan Office(Pvt) Ltd
26/9/2011
Post Planned
NS
Completed
Completed
Completed
Completed
Completed
43 ENReP/G/40
Purchase and Supply of 01 No of Network
Switch 08 Port, 01 No of UPS and 02 Nos of
External Hard Drive
LKR 0.05
ENReP/G/40Purchase and supply of 2Nos of 42 inch LCD
Television with Home theatreLKR 2.2 Abans (PVT) Ltd0.018 Post Planned2
0.05 Completed
2.2 Completed3/2/2012
ENReP/G/38
4/5/2012KuinstonNS 4 0.7 0.0063 Post Planned
2
41 NS
40 NS 15 1.5
Purchase of a Dot Matrix Printer 1
Purchase of 6 Nos of Total Station Equipments
ENReP/G/39 0.1 0.0009 Post Planned
ENReP/G/3942 NS 6 2.1 0.0189 Post
Country/Borrower: Government of Sri Lanka
Project Name: Emergency Northern Recovery Project Credit/Grant #: 4676 W/285
Implementing Agency: ENREP PMU
GPN # and Date Published :
Original Plan Approved Date(at Appraisal/Negotiations): November 30, 2009
Update as of: January 4, 2010
Update as of: May 7, 2010
Update as of: September 24, 2010
Update as of: May 31, 2011
Update as of: September 30, 2011
Update as of: January 31, 2012
Update as of: April 30, 2012
* For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
** Indicate extensions/modifications etc.
LKR USD DateCurrenc
yValue
4.00 0.04 Post Appraisal 2/14/2010 3/7/2010 3/21/2010 9/21/2010Actual 2/10/2010 2/15/2010 5/3/2010 10/30/2010
12.00 0.11 Post Appraisal 2/7/2010 2/21/2010 3/14/2010 3/21/2010 12/31/2012Actual 1/29/2010 2/24/2010 3/15/2010 4/5/2010
1.50 0.01 Post Appraisal 3/21/2010 4/21/2010Actual 4/7/2010 5/17/2010
0.50 0.00 Post Appraisal 3/21/2010 4/21/2010Actual 3/26/2010
50.00 0.45 Post Appraisal 4/10/2010 4/24/2010 5/15/2010 5/29/2010 6/15/2010 12/31/2012Actual 5/3/2010 8/2/2010 8/25/2010 9/14/2010 10/25/2010
3.20 0.03 PostAppraisal 20/01/2012 6/2/2012
Actual
1.00 0.01 Post Appraisal
Actual
2.46 0.02 Post Appraisal
Actual
Licensed
Surveyor - K.
Shanmugalinga
m
All uneiversity
student
development
association
vavuniya
SSS
0.32
38.25
LS LKR
LKR
LKR
LKR
6 ENREP/W/197
LKR
LKR
LKR
0.32
15.68
LS
TB
SSS
SSS
QCBS
LS
RDC
1
2
3
4
5 Technical Audit
Base Line
Financial Audit
EIA Study to Kalmadu
tank
ENREP/W/191
ENREP/W/192
ENREP/W/194
NS
NS
ENREP/W/195
ENREP/W/196
Dam Safty study to
Kalmadu
Estimated Cost
(Million)
SLBDC
Enerest & Yong
ECL
Damsafty Pannel
Sta
ge
Pu
bli
sh N
oti
ce
for
EO
I
Signing of Contract
Nam
e/n
ati
on
ali
ty
of
the
con
sult
an
t
Con
tract
Com
ple
tion
Exp
end
itu
re
incu
rred
to d
ate
Ser
ial
no.
Pri
or/
post
rev
iew
by B
an
k*
Su
bm
it s
ign
ed
con
tract
cop
y t
o
Ban
k
Pu
bli
sh C
on
tra
ct
Aw
ard
in U
ND
B &
Na
tio
na
l
new
spa
pers
Su
bm
it s
hort
list
an
d d
raft
RF
P
for
Ban
k's
N/O
Issu
e R
FP
to
short
list
ed f
irm
s
Procurement Plan for Consulting Services
RF
P N
o.
Des
crip
tion
Met
hod
of
Sel
ecti
on
Lu
mp
sum
/Tim
e
Base
d
Dea
dli
ne
for
sub
mis
sion
of
pro
posa
ls
Su
bm
it T
ER
for
Ban
k's
N/O
Op
enin
g o
f
fin
an
cial
pro
posa
ls
Su
bm
it C
ER
&
init
iale
d d
raft
neg
oti
ate
d
con
tract
for
Sta
tus/
Rem
ark
s
**
1.34
3.07
0.66
3.22
7.86
1.13
LS
TB
LKR
ENREP/W/198
LS
Advanced GIS Training
with six packages of
ArcGIS software
PGIS, University
of Peredeniya
7Surveying land for ASB
housing schemeSSS LS
7 ENREP/W/198 Internal Task Team SSS
Country/Borrower: Government of Sri Lanka
Project Name: Emergency Northern Recovery Project Credit/Grant #: 4676
Implementing Agency: ENREP PMU
GPN # and Date Published :
Original Plan Approved Date(at Appraisal/Negotiations): November 30, 2009
Update as of: January 4, 2010
Update as of: May 7, 2010
Update as of: September 24, 2010
Update as of: May 31, 2011
Update as of: September 30, 2011
Update as of: December 31, 2011
Update as of: January 31, 2012
Update as of: April 30, 2012
* For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25
** Indicate extensions/modifications etc.
Ser
ial
No.
Pack
age
No.
Des
crip
tion
Met
hod
of
Pro
cure
men
t
Estimat
ed Cost
(Millio
n)P
rior/
post
rev
iew
by B
an
k*
Sta
ge
Su
bm
it D
BD
wit
h I
FB
for
Ban
k's
N/O
Pu
bli
sh I
FB
in
Nati
on
al
new
spap
ers
an
d U
ND
B
Dea
dli
ne
for
sub
mis
sion
of
bid
s
Su
bm
it B
ER
for
Ban
k's
N/O
Signing of
contract
Nam
e &
Nati
on
ali
ty o
f
con
tract
or
Su
bm
it s
ign
ed c
on
tract
cop
y
to B
an
k
Pu
bli
sh c
on
tract
aw
ard
noti
ce
in U
ND
B &
Nati
on
al
new
spap
ers
Com
ple
tion
of
con
tract
Exp
end
itu
re i
ncu
rred
to d
ate
Sta
tus/
Rem
ark
s
LKR USD Date Currenc
y
Value
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 ENREP/W/19 Providing security LCS 1.6 0.01 Planned 3/15/2010 LKR 46789.7 Asha Security 12/31/2012
Actual 3/29/2010 12/31/2012
PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES
0.8
Sub Total
Sub Total
Sub Total
Sub Total
Total
Vavuniya
Kilinochchi
Mullaitivu
Mannar4
Public
Buildings
&
Facilities
Jaffna
3
Drinking
Water
Schemes
Mullaitivu
Vavuniya
Jaffna
Mannar
Kilinochc
hi
Vavuniya
Mullaitivu
Mannar
Kilinochchi
2Rural
Roads
Jaffna
1 Irrigation
Mannar
Kilinochchi
S.No Sector District TEC in Mn
Mullaitivu
Vavuniya
6/21/20122/22/2012 120
Total
Irrigation Road Drinking Water
1 Jaffna - 463.33 373.57 1603.49
2 Kilinochchi277.74 164.49 - 1243.3
3 Mannar331.77 110.63 668.11 1378.22
4 Mullaitivu362.89 361.19 685 2110.06
5 Vavuniya319.7 130.95 175.62 958.23
Sub Total 1292.1 1230.59 1902.3 7293.3
11/18/2011 14 210 6/29/2012
12/30/2011 14 180 7/11/2012
12/22/2011 120 4/20/2012
4/19/2011 120 8/17/2011
12/5/2011 180 6/2/2012
12/25/2011 180 6/22/2012
2868.31
267.71
700.98
331.96
S. No District
Public Buildings
Sector
766.59
801.07
6/22/2012 90 9/20/2012
90 3/30/1900
6/23/2012 90 9/21/2012
7/5/2012 14 7/19/2012 180
1/15/2013
8/14/2012 104 11/26/2012
1/0/1900
1/0/1900
8/9/2012 104 11/21/2012