African Regional Conference for the WSIS Pre-Conference Activities
Workshop on Information Society and Regulation:
Access and Infrastructure
By Peter K KenduiywoTelkom Kenya
EASSyEasterm Africa Submarine Cable System
Accra International Conference Centre30 January 2005
Overview1.Introduction2.Background3.Project Overview
3.1 Project Status3.2 Key Milestones3.3 Sources of Finance3.4 Way Forward
4. EADTP – Linking EASSy to the Hinterland
5.Contacts
1. Introduction
The Eastern Africa Submarine System (EASSy): optic undersea cable system connecting the
region with the rest of the world. commercially viable, robust and reliable
undersea cable will provide the owners with significant opportunity to benefit directly from international traffic.
International traffic is expected to grow substantially as a higher quality, more reliable, and lower cost undersea system offsets the limitations of traditional satellite communications.
2. Background
The 15 MOU Parties driving the project are from the
following countries:-
Kenya, Uganda, Tanzania, Malawi, Sudan, Ethiopia, Djibouti, Mozambique, Botswana, South Africa, Madagascar, Rwanda, Somalia.
Membership also expected from the following countries : -
Zambia, Zimbabwe, Lesotho, Eritrea, and Burundi
Eastern Africa Submarine System
Toliary
Durban
Background cont.
NEPAD has identified EASSy as a priority project for the enhancement of ICT infrastructure in the region.
The regional governments believe that a robust and reliable international telecommunications link will have significant benefits for the citizens of the region in the following ways:-
Stimulating investment and economic growth, Providing a more reliable international
communications,
Background cont.
EASSy will link to the global submarine cable network through other regional undersea systems including SAT3, SAFE, SEA-ME-WE 3 and SEA-ME-WE 4.
EASSy will provide the last link to completely encircle Africa by high capacity optic fibre telecommunications networks.
The project has broad based support from the telecommunications industry, business community, and regional governments.
SAT-3/WASC
SAFE
SEA ME WE 3
20
Global Connectivity
EASSy
Background cont. Will result in competitive prices for
international connectivity
The objectives support the ultimate goals of reducing poverty and increasing economic opportunity for the citizens of the Region and in the efforts to facilitate the attainment of the UN MDGs
EASSy promises a new era of better quality services at reduced operational costs and user charges.
3. Project Overview The Cable system will connect Mtunzini,
located just north of Durban, in South Africa to Port Sudan, in Sudan a distance of about 9,900Km.
Other eight landing stations are planned for Maputo - Mozambique, Toliary - Madagascar, Dar-Es-Salaam – Tanzania, Zanzibar – Tanzania, Mombasa – Kenya, Mogadishu – Somalia, Djibouti – Djibouti, and Massawa – Eritrea.
3.1 Project Status
Detailed Feasibility Study (DFS) by AXIOM of France began mid-November 2004 and currently in progress.
DFS to be completed mid-March 2005.
Interim DFS report from AXIOM is expected in February 2005.
Drafting Commercial Terms and Conditions, Technical Specification for the supply of the system, Tender documents and drafting of evaluation Procedures have been completed.
PMC is in the process of appointing a financial advisor/legal counsel.
3.2Project Milestones
Sign MOU Q4 2003 Agree on Configuration Q4 2004 Issue Invitation to Tender Q4 2004 Financial Closing Q1 2005 Sign Supply Contract & C&MA Q4
2005 Cable RFCS Q2 2007
3.3 Way Forward and Critical Elements to meet milestones
Development of Marketing strategy in progress
Appointment of Financial Adviser/ legal counsel for the parties by end February 2005: -
To define and implement project structure To carry out road show to financiers
through Information Memorandum Development of Capacity Pricing and
Incentives for investors. The 1st Data Gathering Meeting April 2005. Financial Closing by April 2005 Issuance of Tender May 2005.
3.4 Financing Options
Sources of Finance
Legible MOU Parties- Equity Strategic Investors- Global carriers Loans to meet financial gap
4. East Africa Digital Transmission System
(EADTS)
Linking EASSy to the hinterland
Mbarara
Tanga
new site
Kilulu
Morogoro
Malaba
Tororo
Nairobi
Mombasa
Dodoma
Mutukula
Eldoret
Masaka
Bukoba
Mbale
Arusha
Kyebe
Nakuru
KampalaJinja
Muhoroni
KerichoKisumu
Nyamanyama
Nyashana
Uganda Kenya
Tanzania
fibre optic cable
mw/radio link
existing mw network
border
Manyoni
Bungoma
S. HillLemeipot(new site)
Oldinka Losayale(new site)
Lengijawe
Lolkisale
Sangaiwe (new site)
Singo
Mengali
Marambao
Kimbogolo (new site)
Chenene
Kivumoni
Maragoli Forest
Samia
GeitaR.S.
Mwalolala
Ikoka
Kiziru
Rubya
Karambi
Mrangeizinew site
Matale
Voi
Sultan Hamud
Naivasha
Longonot E/S
Timboroa
Themi Hill
Kondoa
Babati
Geita P.O
Muleba Mwanza
Imagi Hill
Oleserewa
Dar-es-Salaam
Namanga
Ilemelevu (new site)
Nyakasiko(new site)
Nyabubele Hill(new site)
Sengerema
Fibre Cable and Radio Link Routes
East Africa Digital Transmission System (EADTS)
KENYA FIBER PORTION OF THE EAST AFRICA BACKHAUL TRANSMISSION LINK
Malaba
Nairobi
Mombasa
Eldoret
Nakuru
Muhoroni
Kericho
Kisumu
Bungoma
Voi
Mtito-Andei
Naivasha
Longonot E/S
Timboroa
Project Overview • Within Kenya
• Basic EADTS Configuration is a SDH transmission system:
• from Mombasa to Malaba (Kenya-Uganda border) through Nairobi with Spurs to major towns within the country.
Status of the project Phase 1 of the project consists of system from
Nairobi to Mombasa.
Contract for this phase has been awarded and work is expected to start February 2005.
Phase 2 of the project consists of system from Nairobi to Malaba (Kenya –Uganda border).
Telkom Kenya in partnership with Kenya Power & Lighting Co. Ltd are in the process of jointly developing phase 2.
Status of the project cont.
Project is planned to be completed ahead of of the EASSy System as it is one of the regional backhaul links upon which EASSy will heavily depend.
4. Contacts Project Secretariat Simon A. Olawo Telkom Kenya, Telposta Towers, 24th Floor,
Kenyatta Av. P.O Box 30301, GPO, Nairobi Kenya TEL: +254 20 316167, FAX: +254 20 310104, E-mail: [email protected]
Project Coordinator John Sihra TEL: +353 1 668 5205, FAX: +353 1 660 4840 Mob: : +353 87 259 3966 E-mail: [email protected]
• Website www.eassy.org
THANK YOU