AFCEE Iraq Construction Standards

September 2006

Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

INTENT AND USE

The intent of this document is to aid all stakeholders, whether Contractor, Government, Title II Quality Assurance Representatives, or end-users associated with the construction project in determining the specificiations to be used and which standards and codes are applicable for each phase of construction.

Due to the unique nature of reconstruction in Iraq, which included at the outset varying levels of skilled tradesmen and widely-ranging qualities of construction materials, as well as the continuing lack of a uniformly enacted and enforced Iraqi National Building Code, AFCEE contracts have previously specified that the International Building Code (IBC) was to be utlized whererever feasible. With nearly three years experience providing construction in Iraq for AFCEE, AFCEE now recognizes there has been significant development in contractor capabilities and expects our WERC, HERC, and Iraqi subcontractors to build to the International Buidling Code standards as the norm. Recognizing that the Iraq reconstruction program continues amidst hostilities, shortages in skilled manpower and quality materials, logisitical challenges and tight deadlines, AFCEE realizes that the standards of the International Buidling Codes may not in all cases be achievable. AFCEE's intent is to deliver the end-users the highest quality facilities possible within the given schedule and budget. In keeping with this intent; where the contractorcannot comply with the requirements of the International Building Code, as a minimum, the contractror will comply with the requirements of the existing Iraqi specification for that particular phase of construction.

The document is based on the AFCEE Statement of Requirements (SOR) section provided with AFCEE Task Orders. The Statements of Requirements are at times silent as to the specific requirements regarding codes and standards, and for this reason, the document contains all applicable industry standards and references for the specific requirement, as well as the International Building Code and Iraqi specifications for the requirement. The information contained in this document is provided in a format consistent with each SOR Section. For ease of reference, this document is also organized with the SOR specifications arranged by Construction Specification Institute (CSI) Master Format numbering sequence.

Deviations from the International Buidling Code or other applicable referenced standard, specification or code must be submitted in writing to the Contracting Officer’sRepresentative (COR) at least 14 days in advance of planned implementation. The request for deviation must include a precise explanation for each requirement asto why the IBC or other specifications is not applicable, practical, or not achievable. This document and the specifications contained in it will be used by AFCEE Iraq Contracting Officer's Representatives and AFCEE Iraq Title II Quality Assurance to ensure contractual compliance and to evaluate construction methods, materials and workmanship for compliance with contractual requirments.

Page 2 of 40

AFCEE Air Force Center for Environmental Excellence

AIICS AFCEE Interim Iraqi Construction Standards

CSI Construction Specifications Insitute Master Format 2004

SOR AFCEE Iraq Statement of Requirements

Following is a list of documents referred to in this guide specifications. For convenience, these documents have been posted on the VIAP-Iraq website under the AFCEE Interim Iraqi Construction Standards. For information contact AFCEE Iraq Quality Assurance Program Manager, Bill Johnson at [email protected].

AFCEE Interim Iraqi Construction Standards - Civil Work Specifications. Developed in cooperation with the University of Technology - Baghdad.

AFCEE Interim Iraqi Construction Standards - Electrical Services Specifications. Developed in cooperation with the University of Technology - Baghdad.

General Technical Conditions and Specifications. Book -1 / 2; Specification of Materials; Workmanship of Civil Engineering Works; Second Edition. Al Fao General Engineering Company.

Iraqi Building Code Requirements for Reinforced Concrete. Code 1/ 1987 Building Research Centre; Scientific Research Council.

Iraqi Ministry of Housing and Construction - Technical Specification, Book 4: Mechanical Works_General. 1993.

Iraqi Ministry of Housing and Construction - General and Technical Specifications of the Sanitary Works.

Ministry of Higher Education and Scientific Research - Architectural, Structural, Electrical, Mechanical, and Sanitary Specifications; University of Technology, Consulting Engineering Office.

REFERENCE DOCUMENTS ABBREVIATIONS

Page 3 of 40

CSI DIVISION NUMBERS AND TITLES

Page 4 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.00.01 Completely remove all debris, rubble, and trash in each building.

02 42 00 Removal and Salvage of Construction Material

IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.02 Completely remove all damaged floor tiles, ceiling tiles, window casements, doorframes, mechanical ductwork, straps, hangers, inserts, electrical boxes, and devices.

02 41 16.13 Demolition, Building Demolition IBC Section 3303 Demolition AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.03 Repair all walls, ceilings, overheads, and floors. 02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.04 Eliminate ceiling tile except where absolutely necessary N/A Customer Requirement N/A N/A Customer Requirement2.00.05 Eliminate dropped ceilings except where absolutely

necessary for chase development of enveloping equipment (Exception: Those areas where mandated by HVAC loads such as a DFAC).

02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.06 Repair all damage to exterior and interior walls. Seal all open cracks on interior and exterior walls.

02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.07 Repair all concrete awnings. 02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.08 Remove all loose materials and patch to match existing building surface.

02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.09 Repair any supporting structure as required. 02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.10 Clean and repair all tarred joints in the roofing slabs. Reseal all joints and make watertight. Test water tightness of roofing and wall openings.

02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

Iraq Building Code Requirements for Reinforced Concrete

4.5, 4.4.5 and 4.4.6 Movement Joints, Laitance removal

2.00.11 Where possible, eliminate parapets from building vertices. Consider steel trussed roofs vs. poured roofs where procurement and cost of steel permits.

05 44 00 Cold Formed Metal Trusses IBC Section 2308 Conventional Light Frame Construction

AFCEE IICS - Civil Work Specifications

2.00.12 Enclose or fill in all existing openings in the walls, floors and ceilings with structurally stable material. All openings in the roof structure and exterior wall shall be made watertight.

02 01 80 Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.13 Remove and replace all damaged interior doors. 06 48 13 Interior Wood Door IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

2.00.13.01 Remove and replace all damaged exterior doors with insulated steel doors and frames. All necessary hardware, including locks, will be included for all doors.

08 13 00 Metal Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.02 Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations.

08 14 00 Wood Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.03 Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations.

06 48 16 Wood Door Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.04 Paint all interior doors and frames. 09 91 23 Interior Painting IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.05 Install wooden doors and door frames at all interior door locations.

08 14 00 Wood Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.06 Mechanical room doors shall not have glass but will have a grated vent.

08 91 26 Door Louvers IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.07 Main entrance door shall be steel and reinforced. 08 11 00 Metal Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.08 All steel doors shall have steel frames. 08 11 00 Metal Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

2.00.13.09 Paint all steel doors and frames with the same system as specified for metal above.

09 91 13 Exterior Painting IBC Section 805 Decorations and Trim AFCEE IICS - Civil Work Specifications

2.00.13.10 All doors, frames, and hardware shall be commercial / institutional grade capable of withstanding heavy use.

08 10 00 Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 5 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.1. Perimeter Wall: At each base the ECP shall meet Coalition Force Protection Standards for vehicle and personnel entrance. Provide new guard towers and security fencing as required. Contractor is to coordinate with the MITT team on site in order to meet the location requirements. Guard towers shall be spaced no more than 300 meters apart

32 31 00 Fences and Gates CFPS Customer requirement

Customer Requirement AFCEE IICS - Civil Work Specifications 3-4 General, Fencing the Site

2.2. Electrical Work: 26 00 00 Electrical NEC N/A N/A2.2.01 Renovate the existing and/or install a new and complete

building electrical power and lighting system to include all wiring.

26 05 19 Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

2.2.01 01 Panels 26 06 20.16 Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.4 Distribution Board

2.2.01 02 Breakers 26 28 16 Enclosed Switches and Circuit Breakers NEC Article 240 Over current Protection AFCEE IICS - Electrical Services Specifications

Section 2.5 Miniature and Molded Case Circuit Breakers

2.2.01 03 Switches 26 27 26 Wiring Devices NEC Article 404 Switches AFCEE IICS - Electrical Services Specifications

Section 4 Installation, Sockets and Switches

2.2.01.04 Outlets 26 27 26 Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

AFCEE IICS - Electrical Services Specifications

Section 4.11 Socket Outlets

2.2.01 05 Junction boxes 26 27 26 Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

2.2.01 06 Connectors 26 05 33 Raceway and Boxes for Electrical Systems

NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

2.2.01 07 Conduit 26 05 33 Raceway and Boxes for Electrical Systems

NEC Article 342, 344, 358, 353, 365

Intermediate Metal Conduit/Rigid Metal Conduit; Electrical Metallic Tubing; Rigid Nonmatallic Conduit; High Density Polyethylene Conduit; Electrical Nonmetalic Tubing

AFCEE IICS - Electrical Services Specifications

Section 3.1.5 Support and Fixing for Cable

2.2.01 08 Fixtures 26 51 13 Interior Lighting Fixtures NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.01 09 Fluorescent lights shall be mounted on walls (near full wall height) vs. ceiling mounted. Steel conduit shall be exposed instead of embedded placement

26 51 13 Interior Lighting Fixtures NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.01 10 Install lights in each room and at least four (4) electrical outlets. Minimum of one (1) outlet per wall that is 2m long or longer, space receptacles at 2m maximum spacing.

26 06 20.26 Wiring Device Schedule NEC Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps)

N/A

2.2.02 All outlets in bathrooms, kitchens, and other wet locations shall be waterproof type.

26 51 13 Interior Lighting Fixtures NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

2.2.03 Complete the interior and exterior electrical system with commercial/institutional grade wiring and fixtures using International Electric Code. This is to include tracing any existing electrical wires and/or providing new wiring.

26 05 19 Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

2.2.03 01 Installation of all switches. 26 27 26 Wiring Devices NEC Article 404 Switches AFCEE IICS - Electrical Services Specifications

Section 4 Installation, Sockets and Switches

2.2.03 02 Lights with cover 26 51 13 Interior Lighting Fixtures NEC Article 410 luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.03 03 Ceiling fans N/A N/A NEC Article 422 Appliance N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 6 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.2.03 04 Air-conditioning with electric heaters. 23 81 16 Room Air-Conditioners NEC Article 440 Air-Conditioning and Refrigerating Equipment

AFCEE IICS - Electrical Services Specifications

Section 4.16 Electrical Installation (for air conditioning)

2.2.03 05 Electrical outlets 26 06 20.26 Wiring Device Schedule NEC Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps)

AFCEE IICS - Electrical Services Specifications

Section 4.11 Socket Outlets

2.2.03 06 Breakers 26 28 16 Enclosed Switches and Circuit Breakers NEC Article 240 Over current Protection AFCEE IICS - Electrical Services Specifications

Section 2.5 Miniature and Molded Case Circuit Breakers

2.2.03 07 Main panels 26 06 20.16 Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.1.1 Main L.V. Switchboard

2.2.03 08 The contractor shall provide main distribution panel for the generator.

26 06 20.16 Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.1.1 Main L.V. Switchboard

2.2.04 The completed system will be connected into the generated electrical power distribution system.

26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

2.2.05 The Contractor shall be responsible for trenching and laying underground cable at least 1 meter deep from the buildings to the main distribution panel, with a minimum of 90 cm depth.

26 05 43 Underground Ducts and Raceway for Electrical Systems

NEC Article 300 section 300.50

Underground Installation AFCEE IICS - Electrical Services Specifications

Section 3.1.11 Cables Laid Direct in the Ground

2.2.06 The building electrical lines shall be in metal conduit for exposed installation.

26 05 33 Raceway and Boxes for Electrical System NEC Article 342/344

Intermediate Metal Conduit/Rigid Metal Conduit

AFCEE IICS - Electrical Services Specifications

Section 3.1.5 Support and Fixing for Cable

2.2.06 01 Cable trays 26 05 36 Cable Trays for Electrical Systems NEC Article 392 Cable Trays AFCEE IICS - Electrical Services Specifications

Section 3.12 & 3.13.1 Heavy Duty Cable Tray & Suspend Tray

2.2.06 02 Each wire shall be numbered at the terminal points with a permanent numbering system.

26 05 19 Low-Voltage Electrical Power Conductors and Cables

NEC Article 200 Use and Identification of Grounded Conductors

AFCEE IICS - Electrical Services Specifications

Section 3.1.10 & 3.7 Identification of Cables & Cable Core Identification

2.2.07 The contractor shall provide a communications site infrastructure for telephone as integral part of the infrastructure plan.

27 30 00 Voice Communications NEC Article 800 Communications Circuits AFCEE IICS - Electrical Services Specifications

Section 7.1.2 Telephone System

2.2.07 01 The contractor shall provide computer systems as an integral part of the infrastructure plan. For facilities traditionally earmarked for computer systems.

27 20 00 Data Communications NEC Article 800 Communications Circuits N/A

2.2.07 02 The contractor shall develop provisions for LAN network with consideration provided for Wireless Computer Networks.

27 20 00 Data Communications NEC Article 830 Communications Circuits N/A

2.2.07 03 The contractor shall include the electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings.

27 20 00 Data Communications NEC Article 800 Communications Circuits N/A

2.2.1 Perimeter & Exterior Lights 26 50 00 Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.1 01 The contractor shall provide appropriate security lighting to all building entries, exit ways, building perimeters (1 per corner), and courtyard areas.

26 55 53 Security Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.1 02 Exterior lighting system shall provide sufficient lighting in all areas commonly used at night in accordance with ground illumination requirements of the NEC

26 56 00 Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.1 03 Utilize area lights mounted on building exteriors vs. pole-mounted lighting wherever feasible.

26 56 00 Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.2.2 Power Distribution 26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

2.2.2.01 The Contractor shall provide the electrical power distribution system in accordance with the International Building Code Electrical Standards.

N/A N/A NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

2.2.2.02 The Contractor shall provide for the connection of electrical system into the existing Iraqi National local sub-station, if possible.

N/A N/A NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 1.1 Installation of Internal Electrical Services

2.2.2.03 The contractor shall plan and install a complete electrical distribution system for the area.

26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

2.2.2.04 The electrical system shall be connected to all buildings requiring electrical service.

26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 7 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.2.2.05 Install switching panels, transformer and ring gears for each location to facilitate proper electrical distribution to each of the buildings.

26 12 00 Medium-Voltage Transformer NEC Article 450 Transformer and Transformer Vaults (Including secondary ties)

AFCEE IICS - Electrical Services Specifications

Section 1.3 Power Transformer

2.2.2.06 Install electrical cable from the distribution panel to the main breakers in each building and tent.

26 05 19 Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

2.2.3 General 26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

2.2.3.01 The contractor shall provide connection of electrical system into the existing Iraqi National local sub-station, if possible. The power connection shall be installed in combination with and through an automatic transfer switch to the Electrical Power Generation Plant

26 36 23 Automatic Transfer Switch NEC Article 700 Emergency System N/A

2.2.3.01 01 The Electrical Power Generation Plant shall be designed as the primary power generation system. Therefore, provide redundant power generation with the largest generator out of service. It is the intent to utilize the national power grid as a redundant electrical supply in addition to the Electrical Power Generation Plant.

26 10 13 Primary Unit Substation NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 10 Standby Diesel Generator Set

2.2.4 Criteria N/A N/A N/A N/A N/A N/A2.2.4.01 The contractor's plan shall provide continuous power

through an underground or aerial electrical distribution system.

26 05 43 Underground Ducts and Raceway for Electrical Systems

NEC Article 300 Wiring Methods AFCEE IICS - Electrical Services Specifications

Section 3.1.11 Cables Laid Direct in the Ground

2.2.4.01 01 The electrical system shall complete with all required transformers. (400V to11KV step-up and local step-down transformer)

26 12 00 Meduim Voltage Transformers NEC Article 450 Transformer and Transformer Vaults (Including secondary ties)

AFCEE IICS - Electrical Services Specifications

Section 1.3 Power Transformer

2.2.4.01 02 High voltage and low voltage cable 26 05 13 Medium-Voltage Cables NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

2.2.4.01 03 Manholes 26 05 43 Underground Ducts and Raceway for Electrical Systems

NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

2.2.4.01 04 Junction boxes 26 27 26 Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

2.2.4.01 05 Connectors N/A N/A NEC Article 490 Equipment Over 600Volts, Nominal

N/A

2.2.4.01 06 Conductors 26 05 13.16 Medium-Voltage, Single- and Multi-Conductor

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3.13 High Tension Cable

2.2.4.01 07 Switches 26 18 00 Medium-Voltage Circuit Protection Devices

NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 2.3 Fused Switchgear and Isolators

2.2.4.01 08 Fuses 26 18 16 Medium-Voltage Fuses NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 2.3 Fused Switchgear and Isolators

2.2.4.01 09 Overloads 26 18 00 Medium-Voltage Circuit Protection Devices

NEC Article 430 Motors, Motor Circuits and Controllers

N/A

2.2.5 Street and Motor Pool Lighting System. 26 56 00 Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 8 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.2.5.01 The contractor shall conduct a complete site investigation and field check in order to fully research and document the existing electrical street and motor pool lighting system. The contractor shall map out all existing conditions. With this information, the contractor shall provide a complete plan illustrating all existing and proposed new work for the complete renovation of the installation’s street and motor pool lighting system. Construction shall not be started until the plan is approved. The contractor shall complete all work associated with the plan in order to provide a complete and comprehensive street and motor pool lighting system.

26 56 00 Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

2.3. Sanitary Work2.3.00.1 Renovate the existing and/or install a new and complete

building sanitary sewer system to include all piping, fittings, hangers, straps, flanges, traps, vents, drains and fixtures.

22 13 16 Sanitary Waste and Vent Piping IPC Section 701 General Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Chapter 9 Building Drainage and Sanitary Fittings

2.3.2 Piping 22 13 16 Sanitary Waste and Vent Piping IPC Section 702 Materials Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Chapter 9 Building Drainage and Sanitary Fittings

2.3.2.1 Waste lines from toilets will be a minimum of 100mm diameter and slope a minimum of 2%.

23 13 16 Sanitary Waste and Vent Piping IPC Section 704 Drainage Piping Installation AL-FAO General Engineering Company - General Technical Conditions and Specifications

Section 3.2.3.12 Drainage and Vent Pipes

2.3.2.2 Lateral lines from the building to the sewer mains will slope at a minimum of 2%.

24 13 16 Sanitary Waste and Vent Piping IPC Section 704 Drainage Piping Installation AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.3.12 Drainage and Vent Pipes

2.3.3 Fittings 22 05 16 Expansion Fittings and Loops for Plumbing

IPC Section 702.4 Fittings Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.3.4 Hangers 22 05 29 Hangers and Support for Plumbing Piping and Equipment

IPC Table 308.5 Hanger Spacing AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.3 Piping

2.3.5 Straps 23 05 29 Hangers and Support for Plumbing Piping and Equipment

IPC Section 308 Piping Support Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 6.2 Pipe Supports

2.3.6 Valves 22 13 19.33 Backwater Valves IPC Section 715 Backwater Valves Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 7.1 Valves and Strainers

2.3.7 Drains 22 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.7.1 Floor drains shall be provided in each room that contains a water source

23 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.7.2 Floor drains shall be provided in the mechanical equipment and toilet rooms as required.

24 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.7.3 Drains shall be located near urinals or toilet partitions in toilet rooms

25 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.7.4 In mechanical rooms, floor drains will be installed in such away to ensure positive slope to the drains, floor drains shall be provided to avoid running drain piping long distances above or over the floor.

26 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.7.5 Install p-traps at all applicable locations N/A N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.3.8 Faucets 22 42 39 Commercial Faucets Supplies, and Trim IPC Section 424 Faucets and other Fixture Fittings

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.4 Sanitary Fittings

2.3.9 Vent system 07 72 23 Relief Vents IPC Chapter 9 Vents Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 6 Pipe Work, Fittings and Installation

2.3.10 Plumbing Fixtures 22 40 00 Plumbing Fixtures IPC Chapter 4 Fixtures, Faucets and Fixture Fittings

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

2.3.11 Domestic and cold water shall be provided in the facilities to serve the water heater usage and plumbing fixtures provided for the facility.

22 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 9 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.3.12 Water service to each facility shall enter the building in a mechanical, storage, or similar type space. Isolation valves shall be installed at each facility and to separate latrine/shower area.

23 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

2.3.13 All water piping shall be routed parallel to the building lines.

24 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.2 Piping

2.3.14 Insulation shall be provided where required to control sweating of pipes.

22 07 19 22 07 19 Plumbing Piping Insulation IPC Section 607.2.1

Piping Insulation Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 8 Thermal Insulation

2.3.15 Domestic water shall be distributed by means of schedule 40 galvanized steel pipe or suitable high pressure PVC equivalent. Note: the contractor shall provide galvanized Schedule 40 plumbing for sinks, showers, and toilets.

22 11 13 Facility Water Distribution Piping IPC Section 605 Materials, Joints and Connections

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.3.2 Service and Distribution Pipes.

2.3.16 The hot water shall be generated by electric water heaters 22 33 00 Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.3.17 The storage unit shall be typically located inside the mechanical room, storage room, janitor room or similar type space.

23 33 00 Electric Domestic Water Heaters IPC Section 501.4 Location Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7 Electric Storage Water Heater

2.3.18 Floor drain shall be provided in each room that contains a water source. Floor drains shall be provided in the mechanical equipment and toilet room as required.

24 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.3.19 Install showers to include all piping, faucets, drains and concrete or tile work. Shower pan shall be lowered so all water on shower floor will run into the shower pan.

22 41 23 Residential Shower Receptors and Basin IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8 Showers

2.3.20 Install Eastern style toilets and sinks (provision of concrete trough in barracks for the feet/hand wash/laundry). Include all piping and hardware to make the units functional.

22 42 13 Commercial Water Closets, Urinals and Bidets

IPC Section 420 Water Closets AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.5 Eastern Water Closets

2.3.20.1 Provide foot wash stations in all places where there are showers

N/A N/A NA N/A N/A Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.3.21 Provide sanitary sprayer and hose assembly at each toilet. N/A N/A IPC Section 424.4 Hose Connected Outlets Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.3.22 Latrine and shower walls, from floor to ceiling, shall receive ceramic tile.

09 30 13 Ceramic Tiling IBC Section 1210.3

Showers AFCEE IICS - Civil Work Specifications Chapter 11 Finishing of Walls and Ceilings

2.3.22.1 Provide tile base on all walls. 09 30 00 Tiling IBC Section 1210.2

Walls AFCEE IICS - Civil Work Specifications Chapter 7 Construction Works

2.3.22.2 All the joints shall be grouted and sealed to prevent water migration into the walls.

32 01 19.61 Sealing of Joints in Rigid Paving IPC Section 705 Joints AFCEE IICS - Civil Work Specifications Chapter 11 Finishing of Walls and Ceilings

2.3.22.3 Shower units shall include a changing space and privacy enclosure.

10 21 16 Shower and Dressing Compartments IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8 Showers

2.3.23 Latrine stalls shall receive a swinging door with barrel bolt closure.

10 26 19.16 Shower Doors IBC Section 2606.9

Bathroom Accessories AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8 Showers

2.3.24 Hose connects with appropriate piping shall be provided in each latrine/shower facility.

22 45 36 Hand-held Emergency Drench Hoses IPC Section 424.4 Hose Connected Outlets Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.4. Water Supply & Distribution: 22 11 00 Facility Water Distribution IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11 Water Supply Main, Distribution, Service Pipes and Equipments

2.4.1 The CONTRACTOR shall repair and renovate the existing water supply and distribution system and provide a new water supply and distribution system where required.

22 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

2.4.1.2.1 The main headers leaving the primary water pumping plant shall be at least two (2) pipe sizes oversized and have blind flanges located at tees near both ends of future expansion zones.

N/A N/A IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

2.4.1.2.2 Fabricate and install covers or access hatches at all manholes, and electric hand holes.

33 39 13 Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 708.3.6

Manholes AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 10 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.4.1.2.3 Cisterns 33 39 13 Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 606.5.3

Covers Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.3 Cold Water Storage Tanks

2.4.1.2.4 Sanitary sewer and water system valve manhole covers shall be round cast iron.

33 39 13 Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 708.3.6

Manholes AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

2.4.1.2.5 Recess and grout all concrete manhole caps. 33 39 13 Sanitary Utility Sewerage Manholes, Frames and Covers

IBC Section 2105.2.2.1.2

Concrete Masonry AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

2.4.1.2.6 Add fill dirt to within 2 centimeters on the top of concrete manhole cap and grade to slope away from manhole. Add fill dirt to cover an area of 2 meters around all sides of manhole.

33 39 13 Sanitary Utility Sewerage Manholes, Frames and Covers

IBC Section J107.4

Fill Material AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

2.4.1.2.7 Service connections to individual building connections requiring water service shall be 1.5 meters outside each building, and shall have an isolation valve in a separate service box with accessible actuator.

33 12 16 Water Utility Distribution Valves IPC Section 606 Installation of Building Water Distribution System

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.28 Valves and Fittings

2.4.1.3 Pipe Bedding 31 23 23.13 Backfill IPC Section 306 Trenching, Excavation and Backfill

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.3 Bedding and Laying of Pipes

2.4.1.3.1 The CONTRACTOR will ensure that the following criteria are met when planning and installing the new, and renovating the existing underground water supply and distribution system: CONTRACTOR shall provide bedding material to level out any irregularities.

31 23 23.13 Backfill IPC Section 306 Trenching, Excavation and Backfill

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.3 Bedding and Laying of Pipes

2.4.1.3.10 Water supply mains sizes shall be calculated according to maximum daily future flows.

34 06 10 Schedules for Water Utilities IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

2.4.1.3.2 Compaction shall attain 95 percent maximum density for cohesionless soils, and 90 percent maximum density for cohesive soils. This is based on a Standard Proctor, ASTM D698.

32 23 23.23 Compaction IBC Section J107.5

Compaction AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.8 Backfilling of Trenches

2.4.1.3.3 Maximum size of aggregate should be not more than 8 millimeters per 100 millimeters (1 inch per foot) of pipe diameter, or 75 millimeters (3 inches) maximum. Selected aggregate shall consist of well-graded sand, gravel, crushed gravel, crushed stone.

31 05 16 Aggregate for earthwork IBC Section J107.4

Fill Material Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.5 Backfilling of Trenches

2.4.1.3.4 The Contractor shall ensure that the water supply and distribution system conform to International Plumbing Code.

01 41 00 Regulatory Requirements IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

2.4.1.3.5 The Contractor shall provide a new water supply and distribution system as needed.

22 11 00 Facility Water Distribution IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

2.4.1.3.6 The Contractor shall inspect all existing underground water piping for defects.

33 01 30.16 TV Inspection of Sewer Pipelines IPC Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

2.4.1.3.7 The Contractor shall repair all damaged and defective underground water piping as necessary.

33 01 30.71 Rehabilitation of Sewer Utilities IPC Section 703.4 Existing Building Sewers and drains

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

2.4.1.3.8 After completion of a section of water supply pipe the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling the trench covering the pipe.

01 43 26 Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

2.4.1.3.9 The Contractor will plan the overall water supply and distribution system for the base population which will vary with each facility.

33 06 10 Schedules for Water Utilities IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

2.4.2 The CONTRACTOR shall inspect all existing underground water piping and manholes for damage and defects. The CONTRACTOR shall repair all damaged and defective underground water piping as necessary.

23 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

2.4.3 After completion of a water section, the CONTRACTOR shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested.

01 43 26 Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 11 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.4.4 Piping Materials 22 11 13 Facility Water Distribution Piping IPC Table 605.3, Table 605.4 and 605.5

Piping Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.10 Pipe work

2.4.4.1 Domestic water shall be distributed by means of standard weight (schedule 40) galvanized steel pipe that is installed underground with a minimum of 80cm coverage of compacted soil.

23 11 13 Facility Water Distribution Piping IPC Table 605.3, Table 605.4 and 605.5

Piping Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.10 Pipe work

2.5. Waste Water Disposal: 2.5.1 The Contractor shall plan and construct a gravity waste

water collection and treatment system.44 41 13 Packaged Water Treatment Plant IPC Section 701.4 Sewage Treatment N/A N/A N/A

2.5.2 All sewerage lift stations are to be fenced and accessible only to Contractor tasked with maintenance of the WWCS

33 32 13 Packaged Sewage Lift Stations IPC Section 701.4 Sewage Treatment N/A N/A N/A

2.5.3 The Contractor shall ensure that the sanitary sewer system conforms to International Plumbing Code.

01 41 00 Regulatory Requirements IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.5.4 The Contractor shall plan for a gravity sanitary sewer system. Where gravity flow is not practical, the system shall consist of a series of holding tanks. The holding tanks will not be placed at or in front of any entrance.

44 41 13 Packaged Water Treatment Plant IPC Section 712 Sumps and Ejectors Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.2 Drainage Pump Stations

2.5.5 The Contractor shall plan for a non-mechanical waste water treatment plant where practical, if gravity sewer to the Municipal facilities is not available.

44 41 13 Packaged Water Treatment Plant IPC Section 701.4 Sewage Treatment N/A N/A N/A

2.5.6 After completion of a section of sewer the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling of the trench.

01 43 26 Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.21 Testing Gravity Sewers and Manholes

2.5.7 The Contractor will plan the overall sanitary sewer collection system for the base population with a requirement rate of 300 liters per person per day and the wastewater treatment plant at 200 liters per person per day.

33 06 30 Schedules for Sanitary Sewerage Utilities IPC Section 710 Drainage System Sizing AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.1 General Notes

2.5.8 The Contractor shall complete all work in order to provide a complete and comprehensive sanitary sewer collection system.

33 06 30 Schedules for Sanitary Sewerage Utilities IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.5.9 The Contractor is responsible for all planning and construction aspects for a complete sanitary sewer collection system. Pipe shall be installed from the holding tanks to the facility exterior to allow removal of product without entering the compound.

33 06 30 Schedules for Sanitary Sewerage Utilities IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.5.12 Cleanouts will be provided at each building. 22 05 75 Facility Drainage Piping Cleanouts IPC Section 708 Cleanouts AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.12 Pipe Cleanouts

2.6. Site Storm Water Management System2.6.1 The CONTRACTOR shall conduct a complete site

investigation and field check in order to fully research and document the existing site storm water management and drainage system.

22 14 00 Facility Storm Drainage IPC Chapter 11 Storm Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.6.2 The CONTRACTOR shall map out all existing conditions. With this information, CONTRACTOR shall plan an overall comprehensive site storm water management and drainage plan.

22 14 00 Facility Storm Drainage IBC Section 1803 Excavation, Grading and Fill Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.6.3 The CONTRACTOR shall incorporate the existing storm water management system, if applicable, into the new plan in order to ensure that the entire installation is provided with the most efficient drainage system available and that redundant work is not performed.

22 14 00 Facility Storm Drainage IPC Chapter 11 Storm Drainage AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

2.6.4 Grade all areas to provide a uniform sloping surface. 31 22 00 Grading IBC Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.3.3 Clearing and Grading of Site

2.6.5 Provide fill material as needed to raise grade elevations in built up areas. Fill low areas, unused ditches, and holes.

31 23 23 Fill IBC Section J107 Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.3.3 Clearing and Grading of Site

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 12 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.6.6 Areas around facilities shall be graded to slope away from buildings and facilities in order to provide storm water drainage.

31 22 00 Grading IBC Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1.4 Scope of Work

2.6.7 Provide storm water management basins or pond areas away from developed areas for storm water detention.

33 47 26 Storm Water Drainage Reservoir IPC Chapter 11 Storm Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.5 Backfilling of Trenches

2.6.8 Soil fill shall be compacted to 90% of the maximum density in unpaved areas and 95% maximum density in paved areas determined by the Standard Proctor Method, ASTM D 698. Minimum extent of grading shall be 300 meters from any facility.

32 23 23.23 Compaction IBC Section J107.5

Compaction AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.8 Backfilling of Trenches

2.7. Plumbing2.7.1 The CONTRACTOR shall plan and construct domestic cold

water systems and the succeeding plumbing work in accordance with International Plumbing Code.

01 41 00 Regulatory Requirements IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1 Scope of Work

2.7.1.1 Hot water systems 22 11 13 Facility Water Distribution Piping IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.7.1.1.1 Hot water shall be provided for the facility to supply 49°C (120°F) hot water to fixtures and outlets requiring hot water.

22 11 13 Facility Water Distribution Piping IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.7.1.1.2 Hot water of a higher temperature shall be provided only where required for special use or process.

22 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

N/A N/A N/A

2.7.1.1.3 Hot water piping shall be routed parallel to the building lines and concealed within finished rooms.

22 11 13 Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.2 Piping

2.7.1.1.4 All hot water piping shall be insulated. 22 07 19 Plumbing Piping Insulation IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 8 Thermal Insulation

2.7.1.2 Sanitary waste system. 22 13 00 Facility Sanitary Sewerage IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

2.7.1.3 Drains 22 13 13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.7.1.4 Vent system 22 13 16 Sanitary Waste and Vent Piping IPC Chapter 9 Vents Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 6 Pipe Work, Fittings and Installation

2.7.1.5 Waste oil collection and storage. 44 42 49 Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

2.7.1.6 Fuel oil storage and distribution 23 13 00 Facility Fuel Storage Tanks IMC Chapter 13 Fuel Oil Piping and Storage N/A N/A N/A

2.7.2 Sub-Contractors Qualifications2.7.2.1 The plumbing systems shall be executed by a plumbing

specialist sub-contractor experienced in the plan and construction of these types of systems.

01 43 23 Installer Qualifications IPC Section 106 Permits Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

2.7.3 All materials and equipment shall be standard product of a manufacturer regularly engaged in the manufacture of the product and shall duplicate items that have been in satisfactory use for at least two (2) years prior to bid opening.

01 43 13 Manufacturer Qualification IPC Section 303 Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1.8 Scope of Work

2.7.4 Plumbing Systems Requirements2.7.4.00.1 Compressed Air Systems: 22 61 00 Compressed-Air Systems for Laboratory

and Healthcare FacilitiesIMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.01 Compressed air shall be provided using a packaged air-cooled electric motor driven compressor

43 12 00 Gas Compressors IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.02 ASME rated receiver N/A N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.03 air cooler N/A N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.04 moisture separator to remove moisture and oil. N/A N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 13 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.7.4.01.05 Compressed air system shall be capable of operation up to 1380 KPa (200 psig) maximum for 862 KPa (125 psig) normal units.

22 61 00 Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.06 High-pressure system (above 1380 KPa) shall be provided to supply compressed air to equipment where required.

22 61 00 Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.07 Provide an engine driven air compressor where needed for operation during electrical power outages.

43 12 16 Piston Gas Compressors IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.01.08 The air distribution system shall be provided with necessary regulator valves to maintain desired pressure.

22 61 00 Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

2.7.4.1 Criteria N/A N/A IPC Section 604 Design of Building Water Distribution System

2.7.4.1.1 The CONTRACTOR will plan the overall water supply and distribution system for the base population.

22 11 13 Facility Water Distribution Piping IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.1.2 Provide water pressure of 1.5 bars to the highest point in each building.

22 11 13 Facility Water Distribution Piping IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.2 Plumbing Fixtures 22 40 00 Plumbing Fixtures IPC Section 402 Fixture Materials Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.2.1 Eastern Water Closet with flush tank assembly 22 41 13 Residential Water Closets, Urinals and Bidets

IPC Section 420 Water Closets AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

2.7.4.2.1.1 Enameled cast iron, recessed floor mounted. 22 41 13 Residential Water Closets, Urinals and Bidets

IPC Section 402 Fixture Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

2.7.4.2.1.2 Install p-traps at all water closet locations. N/A N/A IPC Section 1002 Trap Requirements AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

2.7.4.3 Lavatories 22 41 16 Residential Lavatories and Sinks IPC Section 416 Lavatories Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.3.1 Enameled cast iron, wall or counter mounted. Brass fittings provided for water supplies. In addition to lavatories, a combination foot and hand washing station will be provided. This should be a concrete trough assembly covered with ceramic tile.

22 41 16 Residential Lavatories and Sinks IPC Section 416 Lavatories Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.3.2 Install p-traps at all sink locations. N/A N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.4 Mop Sink 22 41 16 Residential Lavatories and Sinks IPC Section 427 Floor Sinks Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.4.1 Floor mounted enameled cast iron with copper alloy rim guard. Provide hot and cold-water valves with manual mixing. Faucet handles shall be copper alloy.

22 41 16 Residential Lavatories and Sinks IPC Section 427 Floor Sinks Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.4.2 Install p-traps at all sink locations N/A N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.5 Shower 22 41 23 Residential Showers Receptors and Basin

IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8 Showers

2.7.4.5.1 Showerhead and faucet handles shall be copper alloy. Provide for manual mixing with hot and cold-water valves.

22 41 23 Residential Showers Receptors and Basin

IPC Section 424 Faucets and other Fixture Fittings

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8 Showers

2.7.4.5.2 Shower head riser pipe shall be schedule 40 galvanized steel.

22 41 23 Residential Showers Receptors and Basin

IPC Section 605 Materials Joints and Connections

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.6 Emergency Shower 22 45 13 Emergency Showers IPC Section 411 Emergency Showers and Eyewash Stations

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.6.1 Eye Wash Assembly 22 45 16 Eyewash Equipment IPC Section 411 Emergency Showers and Eyewash Stations

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 14 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.7.4.6.2 Provide in Vehicle Maintenance Building and in other facilities where required.

22 45 33 Combination Emergency Fixtures IPC N/A N/A Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.7 Service Sink 22 41 16 Residential Lavatories and Sinks IPC Section 418 Sinks Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 3.2.9 Service Sinks

2.7.4.7.1 Standard trap type, enameled cast iron. Service sinks provided in maintenance areas shall be metallic, and in battery rooms acid resistant.

22 41 16 Residential Lavatories and Sinks IPC Section 418 Sinks Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 3.2.9 Service Sinks

2.7.4.7.2 Install p-traps at all sink locations N/A N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.8 Grease Interceptor 44 42 49 Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

2.7.4.8.1 Steel construction, manual cleaning type with removable checker-plate cover, complete with flow control valve.

44 42 49 Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators

2.7.4.8.2 Concrete shall have 21 MPa (3045 psi) as a specified minimum compressive strength in 28 days.

03 39 00 Concrete Curing IBC Tables 1904.2.2(2)

Minimum Specified Compressive Strength

Iraq Building Code Requirements for Reinforced Concrete

2.1.6 (Table 2.1) Grade of Concrete

2.7.4.9 Floor or Shower Drain 22 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.7.4.9.1 Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze or nickel brass strainer consisting of a grate and threaded collar.

22 13 19.13 Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.7.4.9.2 Install p-traps at all drain locations N/A N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

2.7.4.10 Provide vent line between last p-trap inside building and locate away from all entrances for the building

07 72 23 Relief Vents IPC Chapter 9 Vents AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.3.13 Building Drainage

2.7.4.11 Trench Drain 22 14 26.19 Facility Trench drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.7.4.11.1 Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze, or nickel brass strainer consisting of a grate and threaded collar.

22 14 26.19 Facility Trench drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15 Floor Drains

2.7.4.12 Hose Bibs N/A N/A IPC Section 608.15.4.2

Hose Connections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.12.1 Provide steel taps vs. hose bibs in latrines N/A N/A IPC Section 608.15.4.2

Hose Connections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.4.12.2 Room hose bibs shall be provided as required N/A N/A IPC Section 606.4 Valve Identification Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.5 Plumbing Equipments2.7.5.1 Water heaters 22 33 00 Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -

General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7 Electric water Storage Heaters

2.7.5.1.1 The hot water shall be generated by electric water heater. 22 33 00 Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.7.5.1.2 The unit shall be located inside a mechanical room, storage room, toilet/janitor room or similar type locked space.

22 33 00 Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.7.5.1.3 The unit shall be of the commercially available tank type having low or medium watt density electric heating elements.

22 33 00 Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

2.7.5.1.4 Gas (natural or liquid propane) powered hot water generators shall be provided to satisfy large hot water requirements when economically justifiable and practical.

22 34 30 Residential Gas Domestic Water Heaters IPC Section 502 Installation Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 15 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.7.5.1.5 All installed water heaters shall have a pressure relief valve installed.

01 35 26 Governmental Safety Requirements IPC Section 504.4 Relief valve Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7 Electric water Storage Heaters

2.7.5.2 Booster Pumps 22 11 23.13 Domestic Water Packaged Booster Pump IPC Section 606.5 Water Pressure Booster Systems

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.5 Cold Water Service Boosting Plant

2.7.5.2.1 In the event that the water distribution system is not sufficient to provide building pressure, then booster pumps with hydro-pneumatic tanks shall be installed.

22 11 23.13 Domestic Water Packaged Booster Pump IPC Section 606.5.1

Water Pressure Booster Systems Required

Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 11.5 Cold Water Service Boosting Plant

2.7.6 Special Plumbing System2.7.6.1 Contractor shall plan and construct compressor air storage

and distribution.22 15 00 General Service Packaged Air

Compressors and ReceiversIPC Chapter 12 Special Piping and Storage

SystemIraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.6.2 Waste-oil collection and storage 44 42 49 Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

2.7.6.3 Fuel-oil storage and distribution plumbing systems that are required for full performance of equipment and other operations in the Power Plant

23 10 00 Facility Fuel Systems IPC Chapter 13 Fuel Oil Piping and Storage N/A N/A N/A

2.7.6.4 Sewage Treatment Facility 44 42 00 Water Treatment Equipment IPC Section 701.4 Sewage Treatment Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

2.7.7 Special Waste IPC2.7.7 Testing and Commissioning

2.7.7.1 Waste or hazardous drainage from battery repair/charging areas shall be treated prior to entering the site’s general waste drainage system.

44 41 13 Packaged Water Treatment Plant IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

2.7.7.1 After completing the work, the Contractor shall demonstrate that all plumbing systems operate to fully satisfy the function for which these systems have been designed.

01 43 26 Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

2.7.7.2 All drainage piping shall be acid resistant 22 13 13 Facility Sanitary Sewers IPC Section 702 Materials Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.7.2 The Contractor shall include tests for interlocks, safety cutouts and other protective devices to demonstrate safe operation

01 45 23 Testing and Inspecting Services IPC Section 307 Structural Safety Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.3 Cold water Systems

2.7.7.3 Smaller battery rooms shall have waste treated using acid neutralizing tank.

23 13 13.13 Double wall Steel, Underground Storage tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.7.3 Fully flush and sanitize system prior to final acceptance. 01 43 29 Code Required Special Inspector Classifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.2 Water Mains Test

2.7.7.4 Waste oil storage tanks shall be provided for collection of waste oil in the power plant

23 13 13.13 Double wall Steel, Underground Storage tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.7.7.4 Pressures test all lines for leaks. 01 45 23 Testing and Inspecting Services IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

Section 2.3 Cold water Systems

2.7.7.5 Waste oil storage tank shall be underground double-wall fiberglass or double-wall steel.

23 13 13.23 Glass-Fiber Reinforced Plastic, Underground Fuel-Oil storage Tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction - General and Technical Specifications of the Sanitary Works

N/A N/A

2.8. MECHANICAL WORK: 23 00 00 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

IMC

2.8.00.1 Heating Ventilating Air Conditioning: 23 00 00 HVAC IMC Chapter 4, 5, 6, 11

Ventilation, Exhaust Systems, Duct Systems, Refrigeration

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

2.8.00.01.01 Ventilation fans, 23 34 00 HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

2.8.00.01.02 Air-conditioning systems utilizing packaged terminal Air Handling Units,

23 81 13 Package Terminal Air-Conditioners IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 16 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.8.01.03 Condensing Units, 23 63 00 Refrigerant Condensers IMC Chapter 11 Refrigeration Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.18 g Condensers

2.8.01.04 Air-handling units, 23 30 00 HVAC Air Distribution IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.13 g Evaporator and Condenser Fans

2.8.01.05 Coils, 23 82 16 Air Coils IMC Chapter 11 Refrigeration Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.13 f Evaporator and Condenser coils

2.8.01.06 Piping, 23 23 00 Refrigerant Piping IMC Chapter 11 Refrigeration Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.18 h Refrigerant pipe work

2.8.01.07 Exhaust fans, 23 34 00 HVAC Fans IMC Chapter 5 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.63 Centrifugal Roof Exhauster

2.8.01.08 Grills, 23 37 13 Diffusers, Registers, and Grilles IMC Section 603.17

Registers, grilles and diffusers

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.45 Supply Air Diffuser

2.8.01.09 Registers, 23 37 13 Diffusers, Registers, and Grilles IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.43 Supply Air Registers

2.8.01.10 Ductwork, 23 32 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

2.8.01.11 Hangers, 23 32 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

2.8.01.12 Straps, 23 32 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

2.8.01.13 Fasteners, 23 32 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

2.8.02.01 The Contractor shall plan, supply, fabricate and install new ventilation system.

23 82 23 Unit Ventilators IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

2.8.02.02 The Contractor shall plan, supply, fabricate and install new heating systems.

23 82 39 Unit Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

2.8.03 Ventilators and Heaters, 23 82 00 Convection Heating and Cooling Units IMC Section 920 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

2.8.03.01 Heating systems, 23 83 00 Radiant Heating Units IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

2.8.03.02 Baseboard heaters, 23 83 13 Radiant Heating Electric Cables IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

2.8.03.03 Resistance heaters in the A/C units may be substituted for electric baseboard heaters,

23 83 33 Electric Radiant Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

2.8.03.04 ceiling fans, 23 34 00 HVAC Fans IMC Section 503.2 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

2.8.03.05 Air conditioning, 23 81 16 Room Air-Conditioners IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

2.8.03.06 Toilet exhaust systems, 23 34 00 HVAC Fans IMC Chapter 5 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.63 Centrifugal Roof Exhauster

2.8.03.07 Electric heaters, 23 82 39 Unit Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 17 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.8.03.08 Air conditioners/heat pumps in all enlisted quarters, 23 82 00 Convection Heating and Cooling Units IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

2.8.04 Air Conditioners/heat pumps, 23 81 00 Decentralized Unitary HVAC Equipment IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

2.8.04.01 Air Conditioners shall be window mounted type, shall be manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas.

23 81 16 Room Air-Conditioners IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.14 Package Air Conditioner Unit

2.8.04.02 Heat pumps shall be of the window mounted type, manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas.

23 81 43 Air-Source Unitary Heat Pumps IMC Chapter 9 Specific appliances, fireplaces and solid fuel burning equipment

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

2.8.1 Exhaust and Ventilation: 23 30 00 HVAC Air Distribution IMC Chapter 4, 5 Ventilation and Exhaust Systems

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

2.8.1.1 General: N/A2.8.1.2 Criteria: N/A

2.8.1.2.01 FILTRATION: 23 40 00 HVAC Air Cleaning Devices IMC Section 605 Air Filters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.60 Air Filters

2.8.1.2.01.01 Outside Air Intakes, 23 41 00 Particulate Air Filtration IMC Section 605 Air Filters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.60 Air Filters

2.8.1.2.01.02 Weatherproof louvers with a bird screen, 32 35 13 Screens and Louvers IMC Section 401.6 Outdoor opening protection Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.62 e Bird Screen

2.8.1.2.01.03 Wall intakes, 23 37 00 Air Outlets and inlets IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.52 b Fresh air (Roof intakes)

2.8.1.2.01.04 Roof hoods, 23 38 00 Ventilation Hoods IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.54 Kitchen Exhaust Hoods

2.8.1.2.01.05 50mm thick permanent washable metal mesh type filters as first stage for filtration of dust. Medium efficiency (30 percent, as defined by ASHRAE 52 Dust Spot Efficiency Criteria) filters, the 50 mm (2 –inch) thick disposable panel type, shall be the second.

23 43 13 Washable Electronic Air Cleaners IMC Section 605 Air Filters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.60 Air Filters

2.8.1.2.02 VENTILATION AND EXHAUST FANS: 23 34 00 HVAC Fans IMC Section 503 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

2.8.1.2.02.01 All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan.

23 34 16 Centrifugal HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.64 Centrifugal Power Supply Fan

2.8.1.2.02.02 Gravity dampers, 23 33 13 Dampers IMC Section [B]513.10.4

Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61f Dampers

2.8.1.2.02.03 Vibration isolators, 23 37 23 HVAC Gravity Ventilators IMC Section 506.3.2.4

Vibration isolation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64f Vibration Isolation

2.8.1.2.02.04 External lubricators, 23 37 23 HVAC Gravity Ventilators IMC Section 506.3.3

Grease duct support N/A N/A N/A

2.8.1.2.02.05 accessories and controls necessary for specified sequence of operation.

23 37 23 HVAC Gravity Ventilators IMC Chapter 5 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.63h Controls

2.8.1.2.03 Administrative Areas: 34 CMH/person (20 CFM/person) with air conditioning; 37 CMH/m2 (2 CFM/Ft2) of floor area.

23 34 16 Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 18 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

2.8.1.2.04 Toilet and Wash Areas: Exhaust ventilation at 37 CMH/m2 (2 CFM/Ft2) of floor area. Or 85 CMH/Water Closet or Urinal.

23 34 16 Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

2.8.1.2.05 Kitchen Hood Exhaust and Make-up air: As required and as per Kitchen plan specialist and equipment supplier requirements. Minimum requirements include requirements. Minimum requirements include hoods with exhaust fans and fire extinguishers over each cooking area

23 38 13 Commercial Kitchen Hoods IMC Section 506 Commercial Kitchen Hood Ventilation system ducts and exhaust equipment

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.54 Kitchen Exhaust Hoods

2.8.1.2.06 Electrical/Mechanical rooms: Mechanical ventilation sufficient to limit space temperature and to remove heat given out by operating equipment, 37 CMH/M2.

23 34 16 Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

2.8.1.2.07 Maintenance Shops: Maintenance Shops and similar spaces that use solvents and oils shall be provided with mechanical exhaust air systems. The systems shall consist of centrifugal fan, ductwork, exhaust grille, and interlock controls. These type spaces shall not return exhaust air to any split system unit or ventilation system.

23 34 16 Centrifugal HVAC Fans IMC 503 Motors and Fans Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.63 Centrifugal Roof Exhauster

2.8.1.2.07.01 Centrifugal fan, 23 34 16 Centrifugal HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

2.8.1.2.07.02 Ductwork, 23 31 00 HVAC Ducts and Casings IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

2.8.1.2.07.03 Exhaust grille, 23 37 13 Diffusers, Registers, and Grilles IMC Section 603.17

Registers, grilles and diffusers

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.52 Fresh and Exhaust Air Louvers

2.8.1.2.07.04 Interlock controls, 23 33 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.41e Flexible Connections

2.8.1.2.08 Central Diesel Generator Facility: Per the calculations of the plan ENGINEER and approval of the COR. The facility shall be provided with mechanical exhaust air systems. The system shall consist of centrifugal fan,

23 35 00 Special Exhaust Systems IMC 502.1.1 Exhaust Location Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.63 Centrifugal Roof Exhauster

2.8.1.2.08.01 Ductwork, 23 33 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

2.8.1.2.08.02 Exhaust grille, 23 33 00 Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.52 Fresh and Exhaust Air Louvers

2.8.1.2.08.03 Interlock, 23 33 00 Air Duct Accessories IMC Section 603.6.2

Flexible Air Connectors Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.41e Flexible Connections

2.8.1.2.09 Barracks: Air conditioning for officers and Senior NCO's only. Ceiling fans and adequate room ventilation for Junior NCO (jundis).

23 34 23 HVAC Power Ventilators IMC [F]502.5.2 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

2.8.1.3 Specific Requirements:2.8.1.3.01 Install ceiling fans in all rooms, with vibration mounts or

hook-type suspension.23 34 23 HVAC Power Ventilators IMC [F]502.5.2 Ventilations rate in rooms Iraq Ministry of Housing & Construction

Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

2.8.1.3.02 To reduce sand and dirt migration, outside air intakes shall be located as high as possible within architectural constraints. The intakes shall be sized so that free air velocities are below 2.5 m/s (500 fpm).

23 41 00 Particulate Air Filtration IMC 605.3 Airflow over the filter Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.60 Air Filters

2.8.1.3.03 All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan.

23 34 16 Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.66 Utility Exhaust Fan

2.8.2 Power Generation: 26 10 00 Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 19 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

3.2. Fire Prevention: A minimum of one (1), 8 kg or greater, fire extinguisher per 100 square meters shall be provided.

21 20 00 Fire Extinguishing Systems IBC Section 906 Portable Fire Extinguishers Ministry of Higher Education and Scientific Research - Electrical Specifications

41.1 Halon 1301 Cylinders

3.2.01 All fire extinguishers shall be mounted to the wall or placed in existing cabinets. Fire extinguishers shall be of the ABC type.

21 21 00 Carbon-Dioxide Fire-Extinguishing Systems

IBC Section 902 [F]

Carbon Dioxide Extinguishing Systems

Ministry of Higher Education and Scientific Research - Electrical Specifications

41.1 Halon 1301 Cylinders

3.2.02 Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways.

28 31 46 Smoke Detection Sensors IBC [F]907.2.8.3 Smoke Alarms Ministry of Higher Education and Scientific Research - Electrical Specifications

41.6 Smoke Detectors

3.2.03 Install emergency exit signs, in Arabic with international symbols, over primary fire exit routes.

26 53 00 Exit Signs IBC Chapter 10 Means of Egress Ministry of Higher Education and Scientific Research - Electrical Specifications

N/A N/A

3.2.1 Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways.

28 31 00 Fire Detection and Alarm IBC Chapter 9 Fire Protection Systems Ministry of Higher Education and Scientific Research - Electrical Specifications

41 Fire Detection and Extinguishing System

3.3.02 Non-load bearing shall be reinforced with 15 cm x 15 cm 12 gauge wire mesh or larger.

03 22 00 Welded Wire Fabric Reinforcing ASTM A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete

Iraq Building Code Requirements for Reinforced Concrete

5.10.2,5.10.4 Shrinkage and Temperature Reinforcement

3.3.03 A broom type finish is expected unless otherwise requested.

03 25 36 Grooved Concrete Finish IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications N/A

3.3.04 Expansion or control joints shall be placed in the concrete for a maximum slab size of approximately 3 m x 3 m.

07 95 00 Expansion Control IBC Section 1906 Formwork, Embedded Pipes and Construction Joints

Iraq Building Code Requirements for Reinforced Concrete

4.5.1 Movement Joints

3.3.05 All block and brick walls, both solid and hollow core shall be placed with mortar on all surfaces in contact with adjacent block or brick. Placing the mortar after the block is positioned in place is unacceptable.

04 20 00 Unit Masonry IBC Section 2103,2104

Masonry Construction Material

AFCEE IICS - Civil Work Specifications Chapter 6 Mortar

3.4.00.01 Finished Flooring: All finished flooring shall be of terrazzo tile except for food preparation areas and bathroom floors.

09 66 13 Portland Cement Terrazzo Flooring IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications Chapter 12.12 Floors and surfaces

3.4.00.02 All food preparation and bathroom finished floors shall be of glazed ceramic tile finish.

04 21 16 Ceramic Glazed Clay Masonry IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications Chapter 12.13 Floors and surfaces

4.01. The project includes all structures, buildings and systems as required for the installation.

N/A N/A N/A N/A N/A

5.00.00 Submit all manufacturer’s documentation, training manuals and training procedures, quality control, safety, security, and environmental protection procedures to the Contracting Officer’s Representative (COR). At time of negotiations, the Contractor and COR will determine number and type of copies of each submittal required. The Contractor will submit these items at a time determined by the COR and the submission will be documented on the Contractors schedule. All submittals shall include a cover letter to the COR on or before the date indicated in the Contractor’s schedule. Submit reports as required by the COR on all project related issues to the COR. Submit the following to COR and Title II for review and approval:

01 33 00 Submittal Procedures IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-9 General, Performed designer and which was performed.

5.1. Preventive Maintenance Plan: The Contractor shall prepare a Preventive Maintenance Plan and submit it to the COR for review and approval. This plan shall identify manufacturer’s information and recommendations for preventive maintenance on all new equipment installed under this contract.

01 78 23.19 Preventive Maintenance Instruction IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

5.2. Training Manuals: The Contractor will be responsible for providing a minimum 3 hours of training on each (1) HVAC, (2) Electrical, (3) Generator, (4) Plumbing, and (5) Fire Alarm systems. The Contractor shall provide Training Manuals for the components of these systems in English and Arabic.

01 79 00 Demonstration and Training IBC Section 106 Construction Documents N/A N/A N/A

5.3. COR Submittals:

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 20 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

5.3.01 Submit the following to the COR for review and approval: 01 45 33 Code-Required Special Inspections and Procedures

IBC N/A Customer Requirement N/A N/A N/A

5.3.02 Construction Inspection Reports 01 45 33 Code-Required Special Inspections and Procedures

IBC Section 1704 Special Inspection AFCEE IICS - Civil Work Specifications 4-1 to 4-5 General, Planning the Site

5.3.03 Testing and Inspection Reports 01 45 33 Code-Required Special Inspections and Procedures

IBC Section 1715 Material and Testing Standards

AFCEE IICS - Civil Work Specifications 1-7 General, Planning the Site

5.3.04 Coordination Memoranda 01 45 33 Code-Required Special Inspections and Procedures

IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-7 General, Planning the Site

6.00.00 PLANNING STANDARDS: 6.01. The Contractor must adhere to the International Building

Code, International Electrical Code, International Mechanical Code, International Plumbing Code, International Fire Code and in any other standards specifically cited herein as applicable. The Contractor must provide copies of all specifications, calculations and manuals used. All calculations, standards and correspondence shall be in English

01 41 00 Regulatory Requirements IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-7 General, Standard Specifications

6.02. The Contractor shall provide all site assessments and work plans with calculations and CADD drawings (where applicable). Provide as-built drawings, training manuals, warranties, preventive maintenance plans and operations and maintenance manuals, in English and Arabic. Provide 2 copies of legible operation and maintenance manuals for all new equipments, finishes, fixtures and hardware bound and cataloged in CSI format on A4 sized paper.

01 33 23 Shop Drawings, Product Data and Samples

IBC SEC 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-9, 1-10 Planning, Sample of Materials and Work

6.03. Follow "single manufacturer" premise for generators, pumps, valves, compressors, electrical components, etc. where possible for utility plants and critical infrastructure elements (WTPs, WWTPs, Power Plants, etc.)

N/A Customer Requirement N/A N/A Customer Requirement N/A N/A N/A

6.04. The contractor shall develop provisions for Wireless Computer Networks; consider including electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings.

27 21 33 Data Communication s Wireless Access Point

NES N/A N/A N/A

6.06. Explore opportunities to make manhole covers inaccessible to vehicle traffic or protect with bollards.

N/A Customer Requirement N/A N/A Customer Requirement N/A N/A N/A

6.07. The Contractor shall provide catalog cuts, supplier data, test reports and other information required by the COR during construction. Submittals shall clearly show that the materials or equipments supplied meet or exceed the specifications and project requirements.

01 33 00 Submittal Procedures IBC AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

7.1. Concrete Requirements:7.00.01 CONSTRUCTION DRAWINGS: Provide shop drawings or a

detailed Scope of Work for approval before construction proceeds. As-built drawings must reflect full details of items built.

01 33 23 Shop Drawings, Product Data and Samples

IBC AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

7.00.02 All buildings will be planned, designed, renovated, or constructed according to requirements and specifications. Iraqi standards or any other acceptable standards shall be implemented. Eastern and Western-style fixtures will be required and installed where indicated on construction drawings.

N/A Customer Requirement N/A N/A Customer Requirement AFCEE IICS - Civil Work Specifications 1-7 Standard Specifications

7.1.01 All concrete shall have a minimum 28 day compressive strength of 21 MPa (3000 psi).

03 31 00 Structural Concrete IBC Section 1905 Concrete Quality, Mixing and Placing

Iraq Building Code Requirements for Reinforced Concrete

2.1.6 (Table 2.1) Grade of Concrete

7.1.02 Reinforce slabs with 15 cm x 15 cm 12 gauge steel wire mesh or larger.

03 22 00 Welded Wire Fabric Reinforcing ASTM A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete

Iraq Building Code Requirements for Reinforced Concrete

5.10.2,5.10.4 Shrinkage and Temperature Reinforcement

7.1.03 A broom type finish is expected unless otherwise requested.

03 25 36 Grooved Concrete Finish IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 21 of 40

VIAP IraqVersar International Assistance ProjectsVersar International Assistance Projects

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by SOR

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute (CSI) #

Construction Specifications Institute # Description

Code Code # Code Description Iraqi SpecificationIraqi Specification

NumberSpecification Description

7.1.04 The concrete shall be free from excessive voids or cracks when poured and be wetted sufficiently to avoid stress cracking due to excessive moisture loss.

03 39 00 Concrete Curing IBC Section 1905 Concrete Quality, Mixing and Placing

Iraq Building Code Requirements for Reinforced Concrete

2.3.3a, 3.2 to 3.4 Exposure Conditions

7.1.05 Provide test cylinders or cubes for every 20 cubic meter of concrete placed.

03 39 00 Concrete Curing IBC Section 1903, 1905.6.2.3

Specification for tests and Materials

Iraq Building Code Requirements for Reinforced Concrete

2.2.5, 2.4.1 Proportioning of Concrete

7.1.06 Compact soils on foundation to 95% maximum density determined by the Standard Proctor Method, ASTM D 698 before concrete is poured.

32 11 16 Sub base Course IBC J107.5 Compaction AFCEE IICS - Civil Work Specifications 6-2, 6-3 Chapter 2, Digging Lengthened trenches for general services. Compaction)

7.1.07 Place expansion or control joints in the concrete for a maximum slab size of 3 meters x 3 meters.

07 95 00 Expansion Control IBC 1905.10.7 Construction Joints Iraq Building Code Requirements for Reinforced Concrete

4.5.1 Movement Joints

IBC,IEC, IPC, IMC, NES,NEC andASTM are all registered and copyrighted material.Versar © 2006 VIAP © 2006 This is a proprietary VIAP document. Any unauthorized use, distribution or copying of this document is prohibited.

Page 22 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

01 33 00 5.00.00 Submit all manufacturer’s documentation, training manuals and training procedures, quality control, safety, security, and environmental protection procedures to the Contracting Officer’s Representative (COR). At time of negotiations, the Contractor and COR will determine number and type of copies of each submittal required. The Contractor will submit these items at a time determined by the COR and the submission will be documented on the Contractors schedule. All submittals shall include a cover letter to the COR on or before the date indicated in the Contractor’s schedule. Submit reports as required by the COR on all project related issues to the COR. Submit the following to COR and Title II for review and approval:

Submittal Procedures IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-9 General, Performed designer and which was performed.

01 33 00 6.07. The Contractor shall provide catalog cuts, supplier data, test reports and other information required by the COR during construction. Submittals shall clearly show that the materials or equipments supplied meet or exceed the specifications and project requirements.

Submittal Procedures IBC AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

01 33 23 6.02. The Contractor shall provide all site assessments and work plans with calculations and CADD drawings (where applicable). Provide as-built drawings, training manuals, warranties, preventive maintenance plans and operations and maintenance manuals, in English and Arabic. Provide 2 copies of legible operation and maintenance manuals for all new equipments, finishes, fixtures and hardware bound and cataloged in CSI format on A4 sized paper.

Shop Drawings, Product Data and Samples

IBC SEC 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-9, 1-10 Planning, Sample of Materials and Work

01 33 23 7.00.01 CONSTRUCTION DRAWINGS: Provide shop drawings or a detailed Scope of Work for approval before construction proceeds. As-built drawings must reflect full details of items built.

Shop Drawings, Product Data and Samples

IBC AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

01 35 26 2.7.5.1.5 All installed water heaters shall have a pressure relief valve installed.

Governmental Safety Requirements IPC Section 504.4

Relief valve Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7

Electric water Storage Heaters

01 41 00 2.4.1.3.4 The Contractor shall ensure that the water supply and distribution system conform to International Plumbing Code.

Regulatory Requirements IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

01 41 00 2.5.3 The Contractor shall ensure that the sanitary sewer system conforms to International Plumbing Code.

Regulatory Requirements IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

01 41 00 2.7.1 The CONTRACTOR shall plan and construct domestic cold water systems and the succeeding plumbing work in accordance with International Plumbing Code.

Regulatory Requirements IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1 Scope of Work

01 41 00 6.01. The Contractor must adhere to the International Building Code, International Electrical Code, International Mechanical Code, International Plumbing Code, International Fire Code and in any other standards specifically cited herein as applicable. The Contractor must provide copies of all specifications, calculations and manuals used. All calculations, standards and correspondence shall be in English

Regulatory Requirements IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-7 General, Standard Specifications

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 23 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

01 43 13 2.7.3 All materials and equipment shall be standard product of a manufacturer regularly engaged in the manufacture of the product and shall duplicate items that have been in satisfactory use for at least two (2) years prior to bid opening.

Manufacturer Qualification IPC Section 303 Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1.8 Scope of Work

01 43 23 2.7.2.1 The plumbing systems shall be executed by a plumbing specialist sub-contractor experienced in the plan and construction of these types of systems.

Installer Qualifications IPC Section 106 Permits Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

01 43 26 2.4.1.3.8 After completion of a section of water supply pipe the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling the trench covering the pipe.

Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

01 43 26 2.4.3 After completion of a water section, the CONTRACTOR shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested.

Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

01 43 26 2.5.6 After completion of a section of sewer the Contractor shall provide a static pressure test of the system. Any leaks shall be repaired and the section shall be retested prior to backfilling of the trench.

Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.21 Testing Gravity Sewers and Manholes

01 43 26 2.7.7.1 After completing the work, the Contractor shall demonstrate that all plumbing systems operate to fully satisfy the function for which these systems have been designed.

Testing and Inspecting Agency Qualifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.3 Cold Water Systems

01 43 29 2.7.7.3 Fully flush and sanitize system prior to final acceptance. Code Required Special Inspector Classifications

IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.2 Water Mains Test

01 45 23 2.7.7.2 The Contractor shall include tests for interlocks, safety cutouts and other protective devices to demonstrate safe operation

Testing and Inspecting Services IPC Section 307 Structural Safety Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.3 Cold water Systems

01 45 23 2.7.7.4 Pressures test all lines for leaks. Testing and Inspecting Services IPC Section 312 Tests and Inspections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.3 Cold water Systems

01 45 33 5.3.01 Submit the following to the COR for review and approval: Code-Required Special Inspections and Procedures

IBC N/A Customer Requirement N/A N/A N/A

01 45 33 5.3.02 Construction Inspection Reports Code-Required Special Inspections and Procedures

IBC Section 1704 Special Inspection AFCEE IICS - Civil Work Specifications 4-1 to 4-5 General, Planning the Site

01 45 33 5.3.03 Testing and Inspection Reports Code-Required Special Inspections and Procedures

IBC Section 1715 Material and Testing Standards

AFCEE IICS - Civil Work Specifications 1-7 General, Planning the Site

01 45 33 5.3.04 Coordination Memoranda Code-Required Special Inspections and Procedures

IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-7 General, Planning the Site

01 78 23.19 5.1. Preventive Maintenance Plan: The Contractor shall prepare a Preventive Maintenance Plan and submit it to the COR for review and approval. This plan shall identify manufacturer’s information and recommendations for preventive maintenance on all new equipment installed under this contract.

Preventive Maintenance Instruction IBC Section 106 Construction Documents AFCEE IICS - Civil Work Specifications 1-10 General, Sample of Material and Works

01 79 00 5.2. Training Manuals: The Contractor will be responsible for providing a minimum 3 hours of training on each (1) HVAC, (2) Electrical, (3) Generator, (4) Plumbing, and (5) Fire Alarm systems. The Contractor shall provide Training Manuals for the components of these systems in English and Arabic.

Demonstration and Training IBC Section 106 Construction Documents N/A N/A N/A

02 01 80 2.00.03 Repair all walls, ceilings, overheads, and floors. Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 24 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

02 01 80 2.00.05 Eliminate dropped ceilings except where absolutely necessary for chase development of enveloping equipment (Exception: Those areas where mandated by HVAC loads such as a DFAC).

Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 01 80 2.00.06 Repair all damage to exterior and interior walls. Seal all open cracks on interior and exterior walls.

Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 01 80 2.00.07 Repair all concrete awnings. Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 01 80 2.00.08 Remove all loose materials and patch to match existing building surface.

Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 01 80 2.00.09 Repair any supporting structure as required. Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 01 80 2.00.10 Clean and repair all tarred joints in the roofing slabs. Reseal all joints and make watertight. Test water tightness of roofing and wall openings.

Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

Iraq Building Code Requirements for Reinforced Concrete

4.5, 4.4.5 and 4.4.6

Movement Joints, Laitance removal

02 01 80 2.00.12 Enclose or fill in all existing openings in the walls, floors and ceilings with structurally stable material. All openings in the roof structure and exterior wall shall be made watertight.

Maintenance of Facility Remediation IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 41 16.13 2.00.02 Completely remove all damaged floor tiles, ceiling tiles, window casements, doorframes, mechanical ductwork, straps, hangers, inserts, electrical boxes, and devices.

Demolition, Building Demolition IBC Section 3303 Demolition AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

02 42 00 2.00.01 Completely remove all debris, rubble, and trash in each building.

Removal and Salvage of Construction Material

IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

03 22 00 3.3.02 Non-load bearing shall be reinforced with 15 cm x 15 cm 12 gauge wire mesh or larger.

Welded Wire Fabric Reinforcing ASTM A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete

Iraq Building Code Requirements for Reinforced Concrete

5.10.2,5.10.4 Shrinkage and Temperature Reinforcement

03 22 00 7.1.02 Reinforce slabs with 15 cm x 15 cm 12 gauge steel wire mesh or larger.

Welded Wire Fabric Reinforcing ASTM A 185-1 Specification for Steel Welded Reinforcement, Plain Concrete

Iraq Building Code Requirements for Reinforced Concrete

5.10.2,5.10.4 Shrinkage and Temperature Reinforcement

03 25 36 3.3.03 A broom type finish is expected unless otherwise requested.

Grooved Concrete Finish IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications N/A

03 25 36 7.1.03 A broom type finish is expected unless otherwise requested.

Grooved Concrete Finish IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications

03 31 00 7.1.01 All concrete shall have a minimum 28 day compressive strength of 21 MPa (3000 psi).

Structural Concrete IBC Section 1905 Concrete Quality, Mixing and Placing

Iraq Building Code Requirements for Reinforced Concrete

2.1.6 (Table 2.1)

Grade of Concrete

03 39 00 2.7.4.8.2 Concrete shall have 21 MPa (3045 psi) as a specified minimum compressive strength in 28 days.

Concrete Curing IBC Tables 1904.2.2(2)

Minimum Specified Compressive Strength

Iraq Building Code Requirements for Reinforced Concrete

2.1.6 (Table 2.1)

Grade of Concrete

03 39 00 7.1.04 The concrete shall be free from excessive voids or cracks when poured and be wetted sufficiently to avoid stress cracking due to excessive moisture loss.

Concrete Curing IBC Section 1905 Concrete Quality, Mixing and Placing

Iraq Building Code Requirements for Reinforced Concrete

2.3.3a, 3.2 to 3.4

Exposure Conditions

03 39 00 7.1.05 Provide test cylinders or cubes for every 20 cubic meter of concrete placed.

Concrete Curing IBC Section 1903,

1905.6.2.3

Specification for tests and Materials

Iraq Building Code Requirements for Reinforced Concrete

2.2.5, 2.4.1 Proportioning of Concrete

04 20 00 3.3.05 All block and brick walls, both solid and hollow core shall be placed with mortar on all surfaces in contact with adjacent block or brick. Placing the mortar after the block is positioned in place is unacceptable.

Unit Masonry IBC Section 2103,2104

Masonry Construction Material

AFCEE IICS - Civil Work Specifications Chapter 6 Mortar

04 21 16 3.4.00.02 All food preparation and bathroom finished floors shall be of glazed ceramic tile finish.

Ceramic Glazed Clay Masonry IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications Chapter 12.13 Floors and surfaces

05 44 00 2.00.11 Where possible, eliminate parapets from building vertices. Consider steel trussed roofs vs. poured roofs where procurement and cost of steel permits.

Cold Formed Metal Trusses IBC Section 2308 Conventional Light Frame Construction

AFCEE IICS - Civil Work Specifications

06 48 13 2.00.13 Remove and replace all damaged interior doors. Interior Wood Door IBC Section 3403 Additions, Alterations and Repairs

AFCEE IICS - Civil Work Specifications 2-1 General, Destruction of Establishments

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 25 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

06 48 16 2.00.13.03 Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations.

Wood Door Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

07 72 23 2.3.9 Vent system Relief Vents IPC Chapter 9 Vents Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 6 Pipe Work, Fittings and Installation

07 72 23 2.7.4.10 Provide vent line between last p-trap inside building and locate away from all entrances for the building

Relief Vents IPC Chapter 9 Vents AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.3.13

Building Drainage

07 95 00 3.3.04 Expansion or control joints shall be placed in the concrete for a maximum slab size of approximately 3 m x 3 m.

Expansion Control IBC Section 1906 Formwork, Embedded Pipes and Construction Joints

Iraq Building Code Requirements for Reinforced Concrete

4.5.1 Movement Joints

07 95 00 7.1.07 Place expansion or control joints in the concrete for a maximum slab size of 3 meters x 3 meters.

Expansion Control IBC 1905.10.7 Construction Joints Iraq Building Code Requirements for Reinforced Concrete

4.5.1 Movement Joints

08 10 00 2.00.13.10 All doors, frames, and hardware shall be commercial / institutional grade capable of withstanding heavy use.

Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 11 00 2.00.13.07 Main entrance door shall be steel and reinforced. Metal Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 11 00 2.00.13.08 All steel doors shall have steel frames. Metal Doors and Frames IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 13 00 2.00.13.01 Remove and replace all damaged exterior doors with insulated steel doors and frames. All necessary hardware, including locks, will be included for all doors.

Metal Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 14 00 2.00.13.02 Ensure all doorframes are flush with the wall and seams are sealed. Paint all interior doors and frames. Install wooden doors and door frames at all interior door locations.

Wood Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 14 00 2.00.13.05 Install wooden doors and door frames at all interior door locations.

Wood Doors IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

08 91 26 2.00.13.06 Mechanical room doors shall not have glass but will have a grated vent.

Door Louvers IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

09 30 00 2.3.22.1 Provide tile base on all walls. Tiling IBC Section 1210.2

Walls AFCEE IICS - Civil Work Specifications Chapter 7 Construction Works

09 30 13 2.3.22 Latrine and shower walls, from floor to ceiling, shall receive ceramic tile.

Ceramic Tiling IBC Section 1210.3

Showers AFCEE IICS - Civil Work Specifications Chapter 11 Finishing of Walls and Ceilings

09 66 13 3.4.00.01 Finished Flooring: All finished flooring shall be of terrazzo tile except for food preparation areas and bathroom floors.

Portland Cement Terrazzo Flooring IBC Section 804 Interior Floor Finish AFCEE IICS - Civil Work Specifications Chapter 12.12 Floors and surfaces

09 91 13 2.00.13.09 Paint all steel doors and frames with the same system as specified for metal above.

Exterior Painting IBC Section 805 Decorations and Trim AFCEE IICS - Civil Work Specifications

09 91 23 2.00.13.04 Paint all interior doors and frames. Interior Painting IBC Section 1008 Doors, Gates, Turnstiles AFCEE IICS - Civil Work Specifications Chapter 16.16 Doors and Windows

10 21 16 2.3.22.3 Shower units shall include a changing space and privacy enclosure.

Shower and Dressing Compartments IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8

Showers

10 26 19.16 2.3.23 Latrine stalls shall receive a swinging door with barrel bolt closure.

Shower Doors IBC Section 2606.9

Bathroom Accessories AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8

Showers

21 20 00 3.2. Fire Prevention: A minimum of one (1), 8 kg or greater, fire extinguisher per 100 square meters shall be provided.

Fire Extinguishing Systems IBC Section 906 Portable Fire Extinguishers Ministry of Higher Education and Scientific Research - Electrical Specifications

41.1 Halon 1301 Cylinders

21 21 00 3.2.01 All fire extinguishers shall be mounted to the wall or placed in existing cabinets. Fire extinguishers shall be of the ABC type.

Carbon-Dioxide Fire-Extinguishing Systems

IBC Section 902 [F]

Carbon Dioxide Extinguishing Systems

Ministry of Higher Education and Scientific Research - Electrical Specifications

41.1 Halon 1301 Cylinders

22 33 00 2.7.5.1 Water heaters Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7

Electric water Storage Heaters

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 26 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

22 33 00 2.7.5.1.1 The hot water shall be generated by electric water heater. Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 33 00 2.7.5.1.2 The unit shall be located inside a mechanical room, storage room, toilet/janitor room or similar type locked space.

Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 33 00 2.7.5.1.3 The unit shall be of the commercially available tank type having low or medium watt density electric heating elements.

Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 05 16 2.3.3 Fittings Expansion Fittings and Loops for Plumbing

IPC Section 702.4

Fittings Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 05 29 2.3.4 Hangers Hangers and Support for Plumbing Piping and Equipment

IPC Table 308.5 Hanger Spacing AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.3 Piping

22 05 75 2.5.12 Cleanouts will be provided at each building. Facility Drainage Piping Cleanouts IPC Section 708 Cleanouts AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.12

Pipe Cleanouts

22 07 19 2.3.14 Insulation shall be provided where required to control sweating of pipes.

22 07 19 Plumbing Piping Insulation IPC Section 607.2.1

Piping Insulation Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 8 Thermal Insulation

22 07 19 2.7.1.1.4 All hot water piping shall be insulated. Plumbing Piping Insulation IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 8 Thermal Insulation

22 11 00 2.4. Water Supply & Distribution: Facility Water Distribution IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11 Water Supply Main, Distribution, Service Pipes and Equipments

22 11 00 2.4.1.3.5 The Contractor shall provide a new water supply and distribution system as needed.

Facility Water Distribution IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

22 11 13 2.3.11 Domestic and cold water shall be provided in the facilities to serve the water heater usage and plumbing fixtures provided for the facility.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

22 11 13 2.3.15 Domestic water shall be distributed by means of schedule 40 galvanized steel pipe or suitable high pressure PVC equivalent. Note: the contractor shall provide galvanized Schedule 40 plumbing for sinks, showers, and toilets.

Facility Water Distribution Piping IPC Section 605 Materials, Joints and Connections

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.3.2 Service and Distribution Pipes.

22 11 13 2.4.1 The CONTRACTOR shall repair and renovate the existing water supply and distribution system and provide a new water supply and distribution system where required.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 1 General and Technical Specification of the Sanitary Work.

22 11 13 2.4.4 Piping Materials Facility Water Distribution Piping IPC Table 605.3, Table 605.4 and 605.5

Piping Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.10 Pipe work

22 11 13 2.7.1.1 Hot water systems Facility Water Distribution Piping IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 11 13 2.7.1.1.1 Hot water shall be provided for the facility to supply 49°C (120°F) hot water to fixtures and outlets requiring hot water.

Facility Water Distribution Piping IPC Section 607 Hot Water Supply System Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 11 13 2.7.1.1.2 Hot water of a higher temperature shall be provided only where required for special use or process.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

N/A N/A N/A

22 11 13 2.7.1.1.3 Hot water piping shall be routed parallel to the building lines and concealed within finished rooms.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.2 Piping

22 11 13 2.7.4.1.1 The CONTRACTOR will plan the overall water supply and distribution system for the base population.

Facility Water Distribution Piping IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 27 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

22 11 13 2.7.4.1.2 Provide water pressure of 1.5 bars to the highest point in each building.

Facility Water Distribution Piping IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 11 23.13 2.7.5.2 Booster Pumps Domestic Water Packaged Booster Pump

IPC Section 606.5

Water Pressure Booster Systems

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.5 Cold Water Service Boosting Plant

22 11 23.13 2.7.5.2.1 In the event that the water distribution system is not sufficient to provide building pressure, then booster pumps with hydro-pneumatic tanks shall be installed.

Domestic Water Packaged Booster Pump

IPC Section 606.5.1

Water Pressure Booster Systems Required

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.5 Cold Water Service Boosting Plant

22 13 00 2.7.1.2 Sanitary waste system. Facility Sanitary Sewerage IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

22 13 13 2.7.1.3 Drains Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

22 13 13 2.7.7.2 All drainage piping shall be acid resistant Facility Sanitary Sewers IPC Section 702 Materials Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 13 16 2.3.00.1 Renovate the existing and/or install a new and complete building sanitary sewer system to include all piping, fittings, hangers, straps, flanges, traps, vents, drains and fixtures.

Sanitary Waste and Vent Piping IPC Section 701 General Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Chapter 9 Building Drainage and Sanitary Fittings

22 13 16 2.3.2 Piping Sanitary Waste and Vent Piping IPC Section 702 Materials Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Chapter 9 Building Drainage and Sanitary Fittings

22 13 16 2.7.1.4 Vent system Sanitary Waste and Vent Piping IPC Chapter 9 Vents Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 6 Pipe Work, Fittings and Installation

22 13 19.13 2.3.7 Drains Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

22 13 19.13 2.7.4.9 Floor or Shower Drain Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

22 13 19.13 2.7.4.9.1 Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze or nickel brass strainer consisting of a grate and threaded collar.

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

22 13 19.33 2.3.6 Valves Backwater Valves IPC Section 715 Backwater Valves Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 7.1 Valves and Strainers

22 14 00 2.6.1 The CONTRACTOR shall conduct a complete site investigation and field check in order to fully research and document the existing site storm water management and drainage system.

Facility Storm Drainage IPC Chapter 11 Storm Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

22 14 00 2.6.2 The CONTRACTOR shall map out all existing conditions. With this information, CONTRACTOR shall plan an overall comprehensive site storm water management and drainage plan.

Facility Storm Drainage IBC Section 1803 Excavation, Grading and Fill Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

22 14 00 2.6.3 The CONTRACTOR shall incorporate the existing storm water management system, if applicable, into the new plan in order to ensure that the entire installation is provided with the most efficient drainage system available and that redundant work is not performed.

Facility Storm Drainage IPC Chapter 11 Storm Drainage AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

22 14 26.19 2.7.4.11 Trench Drain Facility Trench drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

22 14 26.19 2.7.4.11.1 Cast iron construction with galvanized body, integral seepage pan, and adjustable perforated or slotted chromium plated bronze, nickel-bronze, or nickel brass strainer consisting of a grate and threaded collar.

Facility Trench drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 28 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

22 15 00 2.7.6.1 Contractor shall plan and construct compressor air storage and distribution.

General Service Packaged Air Compressors and Receivers

IPC Chapter 12 Special Piping and Storage System

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 33 00 2.3.16 The hot water shall be generated by electric water heaters Electric Domestic Water Heaters IPC Chapter 5 Water Heaters Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.2 Cold and Hot Water Distribution

22 34 30 2.7.5.1.4 Gas (natural or liquid propane) powered hot water generators shall be provided to satisfy large hot water requirements when economically justifiable and practical.

Residential Gas Domestic Water Heaters IPC Section 502 Installation Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 40 00 2.3.10 Plumbing Fixtures Plumbing Fixtures IPC Chapter 4 Fixtures, Faucets and Fixture Fittings

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

22 40 00 2.7.4.2 Plumbing Fixtures Plumbing Fixtures IPC Section 402 Fixture Materials Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 41 13 2.7.4.2.1 Eastern Water Closet with flush tank assembly Residential Water Closets, Urinals and Bidets

IPC Section 420 Water Closets AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

22 41 13 2.7.4.2.1.1 Enameled cast iron, recessed floor mounted. Residential Water Closets, Urinals and Bidets

IPC Section 402 Fixture Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

22 41 16 2.7.4.3 Lavatories Residential Lavatories and Sinks IPC Section 416 Lavatories Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 41 16 2.7.4.3.1 Enameled cast iron, wall or counter mounted. Brass fittings provided for water supplies. In addition to lavatories, a combination foot and hand washing station will be provided. This should be a concrete trough assembly covered with ceramic tile.

Residential Lavatories and Sinks IPC Section 416 Lavatories Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 41 16 2.7.4.4 Mop Sink Residential Lavatories and Sinks IPC Section 427 Floor Sinks Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 41 16 2.7.4.4.1 Floor mounted enameled cast iron with copper alloy rim guard. Provide hot and cold-water valves with manual mixing. Faucet handles shall be copper alloy.

Residential Lavatories and Sinks IPC Section 427 Floor Sinks Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

22 41 16 2.7.4.7 Service Sink Residential Lavatories and Sinks IPC Section 418 Sinks Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 3.2.9 Service Sinks

22 41 16 2.7.4.7.1 Standard trap type, enameled cast iron. Service sinks provided in maintenance areas shall be metallic, and in battery rooms acid resistant.

Residential Lavatories and Sinks IPC Section 418 Sinks Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 3.2.9 Service Sinks

22 41 23 2.7.4.5 Shower Residential Showers Receptors and Basin

IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8

Showers

22 41 23 2.7.4.5.1 Showerhead and faucet handles shall be copper alloy. Provide for manual mixing with hot and cold-water valves.

Residential Showers Receptors and Basin

IPC Section 424 Faucets and other Fixture Fittings

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8

Showers

22 41 23 2.7.4.5.2 Shower head riser pipe shall be schedule 40 galvanized steel.

Residential Showers Receptors and Basin

IPC Section 605 Materials Joints and Connections

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 41 23 2.3.19 Install showers to include all piping, faucets, drains and concrete or tile work. Shower pan shall be lowered so all water on shower floor will run into the shower pan.

Residential Shower Receptors and Basin IPC Section 417 Showers AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.8

Showers

22 42 13 2.3.20 Install Eastern style toilets and sinks (provision of concrete trough in barracks for the feet/hand wash/laundry). Include all piping and hardware to make the units functional.

Commercial Water Closets, Urinals and Bidets

IPC Section 420 Water Closets AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.5

Eastern Water Closets

22 42 39 2.3.8 Faucets Commercial Faucets Supplies, and Trim IPC Section 424 Faucets and other Fixture Fittings

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.4 Sanitary Fittings

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 29 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

22 45 13 2.7.4.6 Emergency Shower Emergency Showers IPC Section 411 Emergency Showers and Eyewash Stations

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 45 16 2.7.4.6.1 Eye Wash Assembly Eyewash Equipment IPC Section 411 Emergency Showers and Eyewash Stations

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 45 33 2.7.4.6.2 Provide in Vehicle Maintenance Building and in other facilities where required.

Combination Emergency Fixtures IPC N/A N/A Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 45 36 2.3.24 Hose connects with appropriate piping shall be provided in each latrine/shower facility.

Hand-held Emergency Drench Hoses IPC Section 424.4

Hose Connected Outlets Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

22 61 00 2.7.4.00.1 Compressed Air Systems: Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

22 61 00 2.7.4.01.05 Compressed air system shall be capable of operation up to 1380 KPa (200 psig) maximum for 862 KPa (125 psig) normal units.

Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

22 61 00 2.7.4.01.06 High-pressure system (above 1380 KPa) shall be provided to supply compressed air to equipment where required.

Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

22 61 00 2.7.4.01.08 The air distribution system shall be provided with necessary regulator valves to maintain desired pressure.

Compressed-Air Systems for Laboratory and Healthcare Facilities

IMC Section 1003 Pressure Vessels N/A N/A N/A

23 00 00 2.8. MECHANICAL WORK: HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

IMC

23 00 00 2.8.00.1 Heating Ventilating Air Conditioning: HVAC IMC Chapter 4, 5, 6, 11

Ventilation, Exhaust Systems, Duct Systems, Refrigeration

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

23 05 29 2.3.5 Straps Hangers and Support for Plumbing Piping and Equipment

IPC Section 308 Piping Support Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 6.2 Pipe Supports

23 10 00 2.7.6.3 Fuel-oil storage and distribution plumbing systems that are required for full performance of equipment and other operations in the Power Plant

Facility Fuel Systems IPC Chapter 13 Fuel Oil Piping and Storage N/A N/A N/A

23 11 13 2.3.12 Water service to each facility shall enter the building in a mechanical, storage, or similar type space. Isolation valves shall be installed at each facility and to separate latrine/shower area.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

23 11 13 2.4.2 The CONTRACTOR shall inspect all existing underground water piping and manholes for damage and defects. The CONTRACTOR shall repair all damaged and defective underground water piping as necessary.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

23 11 13 2.4.4.1 Domestic water shall be distributed by means of standard weight (schedule 40) galvanized steel pipe that is installed underground with a minimum of 80cm coverage of compacted soil.

Facility Water Distribution Piping IPC Table 605.3, Table 605.4 and 605.5

Piping Materials AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.10 Pipe work

23 13 00 2.7.1.6 Fuel oil storage and distribution Facility Fuel Storage Tanks IMC Chapter 13 Fuel Oil Piping and Storage N/A N/A N/A

23 13 13.13 2.7.7.3 Smaller battery rooms shall have waste treated using acid neutralizing tank.

Double wall Steel, Underground Storage tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

23 13 13.13 2.7.7.4 Waste oil storage tanks shall be provided for collection of waste oil in the power plant

Double wall Steel, Underground Storage tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 30 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

23 13 13.23 2.7.7.5 Waste oil storage tank shall be underground double-wall fiberglass or double-wall steel.

Glass-Fiber Reinforced Plastic, Underground Fuel-Oil storage Tanks

IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

23 13 16 2.3.2.1 Waste lines from toilets will be a minimum of 100mm diameter and slope a minimum of 2%.

Sanitary Waste and Vent Piping IPC Section 704 Drainage Piping Installation AL-FAO General Engineering Company - General Technical Conditions and Specifications

Section 3.2.3.12

Drainage and Vent Pipes

23 13 19.13 2.3.7.1 Floor drains shall be provided in each room that contains a water source

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

23 23 00 2.8.01.06 Piping, Refrigerant Piping IMC Chapter 11 Refrigeration Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.18 h Refrigerant pipe work

23 30 00 2.8.01.04 Air-handling units, HVAC Air Distribution IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.13 g Evaporator and Condenser Fans

23 30 00 2.8.1 Exhaust and Ventilation: HVAC Air Distribution IMC Chapter 4, 5 Ventilation and Exhaust Systems

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

23 31 00 2.8.1.2.07.02 Ductwork, HVAC Ducts and Casings IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

23 32 00 2.8.01.10 Ductwork, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

23 32 00 2.8.01.11 Hangers, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

23 32 00 2.8.01.12 Straps, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

23 32 00 2.8.01.13 Fasteners, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.47 Connections to Ductwork

23 33 00 2.3.17 The storage unit shall be typically located inside the mechanical room, storage room, janitor room or similar type space.

Electric Domestic Water Heaters IPC Section 501.4

Location Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.6 and 11.7

Electric Storage Water Heater

23 33 00 2.8.1.2.07.04 Interlock controls, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.41e Flexible Connections

23 33 00 2.8.1.2.08.01 Ductwork, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.40 Low Velocity Ductwork

23 33 00 2.8.1.2.08.02 Exhaust grille, Air Duct Accessories IMC Chapter 6 Duct Systems Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.52 Fresh and Exhaust Air Louvers

23 33 00 2.8.1.2.08.03 Interlock, Air Duct Accessories IMC Section 603.6.2

Flexible Air Connectors Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.41e Flexible Connections

23 33 13 2.8.1.2.02.02 Gravity dampers, Dampers IMC Section [B]513.10.4

Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61f Dampers

23 34 00 2.8.00.01.01 Ventilation fans, HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

23 34 00 2.8.01.07 Exhaust fans, HVAC Fans IMC Chapter 5 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.63 Centrifugal Roof Exhauster

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 31 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

23 34 00 2.8.03.04 ceiling fans, HVAC Fans IMC Section 503.2

Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

23 34 00 2.8.03.06 Toilet exhaust systems, HVAC Fans IMC Chapter 5 Exhaust System Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.63 Centrifugal Roof Exhauster

23 34 00 2.8.1.2.02 VENTILATION AND EXHAUST FANS: HVAC Fans IMC Section 503 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

23 34 16 2.8.1.2.02.01 All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan.

Centrifugal HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.64 Centrifugal Power Supply Fan

23 34 16 2.8.1.2.03 Administrative Areas: 34 CMH/person (20 CFM/person) with air conditioning; 37 CMH/m2 (2 CFM/Ft2) of floor area.

Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

23 34 16 2.8.1.2.04 Toilet and Wash Areas: Exhaust ventilation at 37 CMH/m2 (2 CFM/Ft2) of floor area. Or 85 CMH/Water Closet or Urinal.

Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

23 34 16 2.8.1.2.06 Electrical/Mechanical rooms: Mechanical ventilation sufficient to limit space temperature and to remove heat given out by operating equipment, 37 CMH/M2.

Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 b Centrifugal Power Supply Fan/Capacity

23 34 16 2.8.1.2.07 Maintenance Shops: Maintenance Shops and similar spaces that use solvents and oils shall be provided with mechanical exhaust air systems. The systems shall consist of centrifugal fan, ductwork, exhaust grille, and interlock controls. These type spaces shall not return exhaust air to any split system unit or ventilation system.

Centrifugal HVAC Fans IMC 503 Motors and Fans Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.63 Centrifugal Roof Exhauster

23 34 16 2.8.1.2.07.01 Centrifugal fan, Centrifugal HVAC Fans IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.64 Centrifugal Power Supply Fan

23 34 16 2.8.1.3.03 All fans used for ventilation and pressurization shall be selected for required performance and for minimum noise level. Unit mounted supply and exhaust fans shall be centrifugal forward curved, backward inclined, or airfoil fans with non-overloading characteristics of high efficiency and quiet running plan.

Centrifugal HVAC Fans IMC [F]502.5.2 Ventilation rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.66 Utility Exhaust Fan

23 34 23 2.8.1.2.09 Barracks: Air conditioning for officers and Senior NCO's only. Ceiling fans and adequate room ventilation for Junior NCO (jundis).

HVAC Power Ventilators IMC [F]502.5.2 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

23 34 23 2.8.1.3.01 Install ceiling fans in all rooms, with vibration mounts or hook-type suspension.

HVAC Power Ventilators IMC [F]502.5.2 Ventilations rate in rooms Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

23 35 00 2.8.1.2.08 Central Diesel Generator Facility: Per the calculations of the plan ENGINEER and approval of the COR. The facility shall be provided with mechanical exhaust air systems. The system shall consist of centrifugal fan,

Special Exhaust Systems IMC 502.1.1 Exhaust Location Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works_General

4.2.63 Centrifugal Roof Exhauster

23 37 00 2.8.1.2.01.03 Wall intakes, Air Outlets and inlets IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.52 b Fresh air (Roof intakes)

23 37 13 2.8.01.08 Grills, Diffusers, Registers, and Grilles IMC Section 603.17

Registers, grilles and diffusers

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.45 Supply Air Diffuser

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 32 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

23 81 43 2.8.04.02 Heat pumps shall be of the window mounted type, manually operated and enclosed in a protective vandal proof steel cage and mounted out of high traffic areas.

Air-Source Unitary Heat Pumps IMC Chapter 9 Specific appliances, fireplaces and solid fuel burning equipment

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

23 82 00 2.8.03 Ventilators and Heaters, Convection Heating and Cooling Units IMC Section 920 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

23 82 00 2.8.03.08 Air conditioners/heat pumps in all enlisted quarters, Convection Heating and Cooling Units IMC Section 312 Heating and Cooling Load Calculations

Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 Package Air Conditioner Unit

23 82 16 2.8.01.05 Coils, Air Coils IMC Chapter 11 Refrigeration Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.13 f Evaporator and Condenser coils

23 82 23 2.8.02.01 The Contractor shall plan, supply, fabricate and install new ventilation system.

Unit Ventilators IMC Chapter 4 Ventilation Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.61 Fans-Propeller Type (Wall Mounted)

23 82 39 2.8.02.02 The Contractor shall plan, supply, fabricate and install new heating systems.

Unit Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

23 82 39 2.8.03.07 Electric heaters, Unit Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

23 83 00 2.8.03.01 Heating systems, Radiant Heating Units IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

23 83 13 2.8.03.02 Baseboard heaters, Radiant Heating Electric Cables IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

23 83 33 2.8.03.03 Resistance heaters in the A/C units may be substituted for electric baseboard heaters,

Electric Radiant Heaters IMC Section 920 Unit Heaters Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.14 i Heaters

24 11 13 2.3.13 All water piping shall be routed parallel to the building lines.

Facility Water Distribution Piping IPC Chapter 6 Water Supply and Distribution

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.4.2 Piping

24 13 16 2.3.2.2 Lateral lines from the building to the sewer mains will slope at a minimum of 2%.

Sanitary Waste and Vent Piping IPC Section 704 Drainage Piping Installation AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.3.12

Drainage and Vent Pipes

24 13 19.13 2.3.7.2 Floor drains shall be provided in the mechanical equipment and toilet rooms as required.

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

24 13 19.13 2.3.18 Floor drain shall be provided in each room that contains a water source. Floor drains shall be provided in the mechanical equipment and toilet room as required.

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

25 13 19.13 2.3.7.3 Drains shall be located near urinals or toilet partitions in toilet rooms

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

26 00 00 2.2. Electrical Work: Electrical NEC N/A N/A26 05 13 2.2.4.01 02 High voltage and low voltage cable Medium-Voltage Cables NEC Article 300 &

310Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

26 05 13.16 2.2.4.01 06 Conductors Medium-Voltage, Single- and Multi-Conductor

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3.13 High Tension Cable

26 05 19 2.2.01 Renovate the existing and/or install a new and complete building electrical power and lighting system to include all wiring.

Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

26 05 19 2.2.03 Complete the interior and exterior electrical system with commercial/institutional grade wiring and fixtures using International Electric Code. This is to include tracing any existing electrical wires and/or providing new wiring.

Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 33 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

26 05 19 2.2.06 02 Each wire shall be numbered at the terminal points with a permanent numbering system.

Low-Voltage Electrical Power Conductors and Cables

NEC Article 200 Use and Identification of Grounded Conductors

AFCEE IICS - Electrical Services Specifications

Section 3.1.10 & 3.7

Identification of Cables & Cable Core Identification

26 05 19 2.2.2.06 Install electrical cable from the distribution panel to the main breakers in each building and tent.

Low-Voltage Electrical Power Conductors and Cables

NEC Article 300 & 310

Conductors for General Wiring and Wiring Methods

AFCEE IICS - Electrical Services Specifications

Section 3 Cables and Wires

26 05 33 2.2.01 06 Connectors Raceway and Boxes for Electrical Systems

NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

26 05 33 2.2.01 07 Conduit Raceway and Boxes for Electrical Systems

NEC Article 342, 344, 358, 353, 365

Intermediate Metal Conduit/Rigid Metal Conduit; Electrical Metallic Tubing; Rigid Nonmatallic Conduit; High Density Polyethylene Conduit; Electrical Nonmetalic Tubing

AFCEE IICS - Electrical Services Specifications

Section 3.1.5 Support and Fixing for Cable

26 05 33 2.2.06 The building electrical lines shall be in metal conduit for exposed installation.

Raceway and Boxes for Electrical System

NEC Article 342/344

Intermediate Metal Conduit/Rigid Metal Conduit

AFCEE IICS - Electrical Services Specifications

Section 3.1.5 Support and Fixing for Cable

26 05 36 2.2.06 01 Cable trays Cable Trays for Electrical Systems NEC Article 392 Cable Trays AFCEE IICS - Electrical Services Specifications

Section 3.12 & 3.13.1

Heavy Duty Cable Tray & Suspend Tray

26 05 43 2.2.05 The Contractor shall be responsible for trenching and laying underground cable at least 1 meter deep from the buildings to the main distribution panel, with a minimum of 90 cm depth.

Underground Ducts and Raceway for Electrical Systems

NEC Article 300 section 300.50

Underground Installation AFCEE IICS - Electrical Services Specifications

Section 3.1.11 Cables Laid Direct in the Ground

26 05 43 2.2.4.01 The contractor's plan shall provide continuous power through an underground or aerial electrical distribution system.

Underground Ducts and Raceway for Electrical Systems

NEC Article 300 Wiring Methods AFCEE IICS - Electrical Services Specifications

Section 3.1.11 Cables Laid Direct in the Ground

26 05 43 2.2.4.01 03 Manholes Underground Ducts and Raceway for Electrical Systems

NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

26 06 20.16 2.2.01 01 Panels Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.4 Distribution Board

26 06 20.16 2.2.03 07 Main panels Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.1.1 Main L.V. Switchboard

26 06 20.16 2.2.03 08 The contractor shall provide main distribution panel for the generator.

Electrical Panel board Schedule NEC Article 408 Switchboards and Panel boards

AFCEE IICS - Electrical Services Specifications

Section 2.1.1 Main L.V. Switchboard

26 06 20.26 2.2.01 10 Install lights in each room and at least four (4) electrical outlets. Minimum of one (1) outlet per wall that is 2m long or longer, space receptacles at 2m maximum spacing.

Wiring Device Schedule NEC Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps)

N/A

26 06 20.26 2.2.03 05 Electrical outlets Wiring Device Schedule NEC Article 406 Receptacles, Cord Connectors, and Attachment Plugs (Caps)

AFCEE IICS - Electrical Services Specifications

Section 4.11 Socket Outlets

26 10 00 2.2.04 The completed system will be connected into the generated electrical power distribution system.

Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

26 10 00 2.2.2 Power Distribution Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

26 10 00 2.2.2.03 The contractor shall plan and install a complete electrical distribution system for the area.

Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

26 10 00 2.2.2.04 The electrical system shall be connected to all buildings requiring electrical service.

Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

26 10 00 2.2.3 General Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 34 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

26 10 00 2.8.2 Power Generation: Medium-Voltage Electrical Distribution NEC Article 110 Requirements for Electrical Installation

N/A

26 10 13 2.2.3.01 01 The Electrical Power Generation Plant shall be designed as the primary power generation system. Therefore, provide redundant power generation with the largest generator out of service. It is the intent to utilize the national power grid as a redundant electrical supply in addition to the Electrical Power Generation Plant.

Primary Unit Substation NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 10 Standby Diesel Generator Set

26 12 00 2.2.2.05 Install switching panels, transformer and ring gears for each location to facilitate proper electrical distribution to each of the buildings.

Medium-Voltage Transformer NEC Article 450 Transformer and Transformer Vaults (Including secondary ties)

AFCEE IICS - Electrical Services Specifications

Section 1.3 Power Transformer

26 12 00 2.2.4.01 01 The electrical system shall complete with all required transformers. (400V to11KV step-up and local step-down transformer)

Meduim Voltage Transformers NEC Article 450 Transformer and Transformer Vaults (Including secondary ties)

AFCEE IICS - Electrical Services Specifications

Section 1.3 Power Transformer

26 13 19.13 2.3.7.4 In mechanical rooms, floor drains will be installed in such away to ensure positive slope to the drains, floor drains shall be provided to avoid running drain piping long distances above or over the floor.

Sanitary Drains IPC Section 412 Floor and Trench Drains AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11.15

Floor Drains

26 18 00 2.2.4.01 07 Switches Medium-Voltage Circuit Protection Devices

NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 2.3 Fused Switchgear and Isolators

26 18 00 2.2.4.01 09 Overloads Medium-Voltage Circuit Protection Devices

NEC Article 430 Motors, Motor Circuits and Controllers

N/A

26 18 16 2.2.4.01 08 Fuses Medium-Voltage Fuses NEC Article 490 Equipment Over 600Volts, Nominal

AFCEE IICS - Electrical Services Specifications

Section 2.3 Fused Switchgear and Isolators

26 27 26 2.2.01 03 Switches Wiring Devices NEC Article 404 Switches AFCEE IICS - Electrical Services Specifications

Section 4 Installation, Sockets and Switches

26 27 26 2.2.01.04 Outlets Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

AFCEE IICS - Electrical Services Specifications

Section 4.11 Socket Outlets

26 27 26 2.2.01 05 Junction boxes Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

26 27 26 2.2.03 01 Installation of all switches. Wiring Devices NEC Article 404 Switches AFCEE IICS - Electrical Services Specifications

Section 4 Installation, Sockets and Switches

26 27 26 2.2.4.01 04 Junction boxes Wiring Devices NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

26 28 16 2.2.01 02 Breakers Enclosed Switches and Circuit Breakers NEC Article 240 Over current Protection AFCEE IICS - Electrical Services Specifications

Section 2.5 Miniature and Molded Case Circuit Breakers

26 28 16 2.2.03 06 Breakers Enclosed Switches and Circuit Breakers NEC Article 240 Over current Protection AFCEE IICS - Electrical Services Specifications

Section 2.5 Miniature and Molded Case Circuit Breakers

26 36 23 2.2.3.01 The contractor shall provide connection of electrical system into the existing Iraqi National local sub-station, if possible. The power connection shall be installed in combination with and through an automatic transfer switch to the Electrical Power Generation Plant

Automatic Transfer Switch NEC Article 700 Emergency System N/A

26 50 00 2.2.1 Perimeter & Exterior Lights Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 51 13 2.2.01 08 Fixtures Interior Lighting Fixtures NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 35 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

26 51 13 2.2.01 09 Fluorescent lights shall be mounted on walls (near full wall height) vs. ceiling mounted. Steel conduit shall be exposed instead of embedded placement

Interior Lighting Fixtures NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 51 13 2.2.02 All outlets in bathrooms, kitchens, and other wet locations shall be waterproof type.

Interior Lighting Fixtures NEC Article 314 Outlet, Device, Pull and Junction Boxes: Conduit Bodies: Fittings and Manholes

N/A

26 51 13 2.2.03 02 Lights with cover Interior Lighting Fixtures NEC Article 410 luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 53 00 3.2.03 Install emergency exit signs, in Arabic with international symbols, over primary fire exit routes.

Exit Signs IBC Chapter 10 Means of Egress Ministry of Higher Education and Scientific Research - Electrical Specifications

N/A N/A

26 55 53 2.2.1 01 The contractor shall provide appropriate security lighting to all building entries, exit ways, building perimeters (1 per corner), and courtyard areas.

Security Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 56 00 2.2.1 02 Exterior lighting system shall provide sufficient lighting in all areas commonly used at night in accordance with ground illumination requirements of the NEC

Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 56 00 2.2.1 03 Utilize area lights mounted on building exteriors vs. pole-mounted lighting wherever feasible.

Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 56 00 2.2.5 Street and Motor Pool Lighting System. Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

26 56 00 2.2.5.01 The contractor shall conduct a complete site investigation and field check in order to fully research and document the existing electrical street and motor pool lighting system. The contractor shall map out all existing conditions. With this information, the contractor shall provide a complete plan illustrating all existing and proposed new work for the complete renovation of the installation’s street and motor pool lighting system. Construction shall not be started until the plan is approved. The contractor shall complete all work associated with the plan in order to provide a complete and comprehensive street and motor pool lighting system.

Exterior Lighting NEC Article 410 Luminaries (lighting fixtures), Lamp holders and Lamps

AFCEE IICS - Electrical Services Specifications

Section 5.1 Lighting Fixtures

27 20 00 2.2.07 01 The contractor shall provide computer systems as an integral part of the infrastructure plan. For facilities traditionally earmarked for computer systems.

Data Communications NEC Article 800 Communications Circuits N/A

27 20 00 2.2.07 02 The contractor shall develop provisions for LAN network with consideration provided for Wireless Computer Networks.

Data Communications NEC Article 830 Communications Circuits N/A

27 20 00 2.2.07 03 The contractor shall include the electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings.

Data Communications NEC Article 800 Communications Circuits N/A

27 21 33 6.04. The contractor shall develop provisions for Wireless Computer Networks; consider including electrical outlets in hidden but accessible locations to power the duct-node computer networks like those found in hotels and office buildings.

Data Communication s Wireless Access Point

NES N/A N/A N/A

27 30 00 2.2.07 The contractor shall provide a communications site infrastructure for telephone as integral part of the infrastructure plan.

Voice Communications NEC Article 800 Communications Circuits AFCEE IICS - Electrical Services Specifications

Section 7.1.2 Telephone System

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 36 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

28 31 00 3.2.1 Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways.

Fire Detection and Alarm IBC Chapter 9 Fire Protection Systems Ministry of Higher Education and Scientific Research - Electrical Specifications

41 Fire Detection and Extinguishing System

28 31 46 3.2.02 Install commercial grade, hard wired electric and battery powered smoke alarms in all rooms and hallways.

Smoke Detection Sensors IBC [F]907.2.8.3 Smoke Alarms Ministry of Higher Education and Scientific Research - Electrical Specifications

41.6 Smoke Detectors

31 05 16 2.4.1.3.3 Maximum size of aggregate should be not more than 8 millimeters per 100 millimeters (1 inch per foot) of pipe diameter, or 75 millimeters (3 inches) maximum. Selected aggregate shall consist of well-graded sand, gravel, crushed gravel, crushed stone.

Aggregate for earthwork IBC Section J107.4

Fill Material Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.5 Backfilling of Trenches

31 22 00 2.6.4 Grade all areas to provide a uniform sloping surface. Grading IBC Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.3.3 Clearing and Grading of Site

31 22 00 2.6.6 Areas around facilities shall be graded to slope away from buildings and facilities in order to provide storm water drainage.

Grading IBC Section 1803 Excavation, Grading and Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.1.4 Scope of Work

31 23 23 2.6.5 Provide fill material as needed to raise grade elevations in built up areas. Fill low areas, unused ditches, and holes.

Fill IBC Section J107 Fill AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.3.3 Clearing and Grading of Site

31 23 23.13 2.4.1.3 Pipe Bedding Backfill IPC Section 306 Trenching, Excavation and Backfill

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.3 Bedding and Laying of Pipes

31 23 23.13 2.4.1.3.1 The CONTRACTOR will ensure that the following criteria are met when planning and installing the new, and renovating the existing underground water supply and distribution system: CONTRACTOR shall provide bedding material to level out any irregularities.

Backfill IPC Section 306 Trenching, Excavation and Backfill

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.3 Bedding and Laying of Pipes

32 01 19.61 2.3.22.2 All the joints shall be grouted and sealed to prevent water migration into the walls.

Sealing of Joints in Rigid Paving IPC Section 705 Joints AFCEE IICS - Civil Work Specifications Chapter 11 Finishing of Walls and Ceilings

32 11 16 7.1.06 Compact soils on foundation to 95% maximum density determined by the Standard Proctor Method, ASTM D 698 before concrete is poured.

Sub base Course IBC J107.5 Compaction AFCEE IICS - Civil Work Specifications 6-2, 6-3 Chapter 2, Digging Lengthened trenches for general services. Compaction)

32 23 23.23 2.4.1.3.2 Compaction shall attain 95 percent maximum density for cohesionless soils, and 90 percent maximum density for cohesive soils. This is based on a Standard Proctor, ASTM D698.

Compaction IBC Section J107.5

Compaction AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.8 Backfilling of Trenches

32 23 23.23 2.6.8 Soil fill shall be compacted to 90% of the maximum density in unpaved areas and 95% maximum density in paved areas determined by the Standard Proctor Method, ASTM D 698. Minimum extent of grading shall be 300 meters from any facility.

Compaction IBC Section J107.5

Compaction AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.8 Backfilling of Trenches

32 31 00 2.1. Perimeter Wall: At each base the ECP shall meet Coalition Force Protection Standards for vehicle and personnel entrance. Provide new guard towers and security fencing as required. Contractor is to coordinate with the MITT team on site in order to meet the location requirements. Guard towers shall be spaced no more than 300 meters apart

Fences and Gates CFPS Customer requirement

Customer Requirement AFCEE IICS - Civil Work Specifications 3-4 General, Fencing the Site

32 35 13 2.8.1.2.01.02 Weatherproof louvers with a bird screen, Screens and Louvers IMC Section 401.6

Outdoor opening protection Iraq Ministry of Housing & Construction Technical Specification Book 4: Mechanical Works General

4.2.62 e Bird Screen

33 01 30.16 2.4.1.3.6 The Contractor shall inspect all existing underground water piping for defects.

TV Inspection of Sewer Pipelines IPC Section 312 Tests and Inspections AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

33 01 30.71 2.4.1.3.7 The Contractor shall repair all damaged and defective underground water piping as necessary.

Rehabilitation of Sewer Utilities IPC Section 703.4

Existing Building Sewers and drains

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.5 Existing Service

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 37 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

33 06 10 2.4.1.3.9 The Contractor will plan the overall water supply and distribution system for the base population which will vary with each facility.

Schedules for Water Utilities IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 2.1 General Requirements

33 06 30 2.5.7 The Contractor will plan the overall sanitary sewer collection system for the base population with a requirement rate of 300 liters per person per day and the wastewater treatment plant at 200 liters per person per day.

Schedules for Sanitary Sewerage Utilities

IPC Section 710 Drainage System Sizing AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.1 General Notes

33 06 30 2.5.8 The Contractor shall complete all work in order to provide a complete and comprehensive sanitary sewer collection system.

Schedules for Sanitary Sewerage Utilities

IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

33 06 30 2.5.9 The Contractor is responsible for all planning and construction aspects for a complete sanitary sewer collection system. Pipe shall be installed from the holding tanks to the facility exterior to allow removal of product without entering the compound.

Schedules for Sanitary Sewerage Utilities

IPC Chapter 7 Sanitary Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.1 Building Soil, Waste, Vent and Rain Water Pipe work.

33 12 16 2.4.1.2.7 Service connections to individual building connections requiring water service shall be 1.5 meters outside each building, and shall have an isolation valve in a separate service box with accessible actuator.

Water Utility Distribution Valves IPC Section 606 Installation of Building Water Distribution System

AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.28 Valves and Fittings

33 32 13 2.5.2 All sewerage lift stations are to be fenced and accessible only to Contractor tasked with maintenance of the WWCS

Packaged Sewage Lift Stations IPC Section 701.4

Sewage Treatment N/A N/A N/A

33 39 13 2.4.1.2.2 Fabricate and install covers or access hatches at all manholes, and electric hand holes.

Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 708.3.6

Manholes AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

33 39 13 2.4.1.2.3 Cisterns Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 606.5.3

Covers Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.3 Cold Water Storage Tanks

33 39 13 2.4.1.2.4 Sanitary sewer and water system valve manhole covers shall be round cast iron.

Sanitary Utility Sewerage Manholes, Frames and Covers

IPC Section 708.3.6

Manholes AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

33 39 13 2.4.1.2.5 Recess and grout all concrete manhole caps. Sanitary Utility Sewerage Manholes, Frames and Covers

IBC Section 2105.2.2.1.2

Concrete Masonry AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

33 39 13 2.4.1.2.6 Add fill dirt to within 2 centimeters on the top of concrete manhole cap and grade to slope away from manhole. Add fill dirt to cover an area of 2 meters around all sides of manhole.

Sanitary Utility Sewerage Manholes, Frames and Covers

IBC Section J107.4

Fill Material AL-FAO GEC - General Technical Conditions and Specifications

Section 3.1.23 Manholes

33 47 26 2.6.7 Provide storm water management basins or pond areas away from developed areas for storm water detention.

Storm Water Drainage Reservoir IPC Chapter 11 Storm Drainage Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.5 Backfilling of Trenches

34 06 10 2.4.1.3.10 Water supply mains sizes shall be calculated according to maximum daily future flows.

Schedules for Water Utilities IPC Section 604 Design of Building Water Distribution System

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

43 12 00 2.7.4.01.01 Compressed air shall be provided using a packaged air-cooled electric motor driven compressor

Gas Compressors IMC Section 1003 Pressure Vessels N/A N/A N/A

43 12 16 2.7.4.01.07 Provide an engine driven air compressor where needed for operation during electrical power outages.

Piston Gas Compressors IMC Section 1003 Pressure Vessels N/A N/A N/A

44 41 13 2.7.7.1 Waste or hazardous drainage from battery repair/charging areas shall be treated prior to entering the site’s general waste drainage system.

Packaged Water Treatment Plant IPC Chapter 8 Indirect/Special Waste Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

44 41 13 2.5.1 The Contractor shall plan and construct a gravity waste water collection and treatment system.

Packaged Water Treatment Plant IPC Section 701.4

Sewage Treatment N/A N/A N/A

44 41 13 2.5.4 The Contractor shall plan for a gravity sanitary sewer system. Where gravity flow is not practical, the system shall consist of a series of holding tanks. The holding tanks will not be placed at or in front of any entrance.

Packaged Water Treatment Plant IPC Section 712 Sumps and Ejectors Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.2 Drainage Pump Stations

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 38 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

44 41 13 2.5.5 The Contractor shall plan for a non-mechanical waste water treatment plant where practical, if gravity sewer to the Municipal facilities is not available.

Packaged Water Treatment Plant IPC Section 701.4

Sewage Treatment N/A N/A N/A

44 42 49 2.7.1.5 Waste oil collection and storage. Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

44 42 49 2.7.4.8 Grease Interceptor Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

44 42 49 2.7.4.8.1 Steel construction, manual cleaning type with removable checker-plate cover, complete with flow control valve.

Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators

44 42 00 2.7.6.4 Sewage Treatment Facility Water Treatment Equipment IPC Section 701.4

Sewage Treatment Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

44 42 49 2.7.6.2 Waste-oil collection and storage Water Treatment Oil/Grease Interceptors

IPC Section 1003 Interceptors and Separators Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 10.6 Manholes, Inspection Chambers and Gullies

N/A 2.00.04 Eliminate ceiling tile except where absolutely necessary Customer Requirement N/A N/A Customer RequirementN/A 2.2.03 03 Ceiling fans N/A NEC Article 422 Appliance N/AN/A 2.2.2.01 The Contractor shall provide the electrical power

distribution system in accordance with the International Building Code Electrical Standards.

N/A NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 0 General Requirements

N/A 2.2.2.02 The Contractor shall provide for the connection of electrical system into the existing Iraqi National local sub-station, if possible.

N/A NEC Article 110 Requirements for Electrical Installation

AFCEE IICS - Electrical Services Specifications

Section 1.1 Installation of Internal Electrical Services

N/A 2.2.4 Criteria N/A N/A N/A N/A N/AN/A 2.2.4.01 05 Connectors N/A NEC Article 490 Equipment Over 600Volts,

NominalN/A

N/A 2.3.7.5 Install p-traps at all applicable locations N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

N/A 2.3.20.1 Provide foot wash stations in all places where there are showers

N/A NA N/A N/A Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

N/A 2.3.21 Provide sanitary sprayer and hose assembly at each toilet. N/A IPC Section 424.4

Hose Connected Outlets Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

N/A 2.4.1.2.1 The main headers leaving the primary water pumping plant shall be at least two (2) pipe sizes oversized and have blind flanges located at tees near both the ends of future expansion zones.

N/A IPC Chapter 6 Water Supply and Distribution

Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 11.1 Main Supply Distribution

N/A 2.7.4.01.02 ASME rated receiver N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

N/A 2.7.4.01.03 air cooler N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

N/A 2.7.4.01.04 moisture separator to remove moisture and oil. N/A IMC Section 1003 Pressure Vessels N/A N/A N/A

N/A 2.7.4.1 Criteria N/A IPC Section 604 Design of Building Water Distribution System

N/A 2.7.4.2.1.2 Install p-traps at all water closet locations. N/A IPC Section 1002 Trap Requirements AL-FAO GEC - General Technical Conditions and Specifications

Section 3.2.11 Plumbing Fixtures

N/A 2.7.4.3.2 Install p-traps at all sink locations. N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 39 of 40

AFCEE Iraq Construction Guide SpecificationsRequirements Sorted by CSI

Construction Specifications

Institute (CSI) #

Statement of Requirements (SOR) Section

Statement of Requirements DefinitionConstruction Specifications

Institute # DescriptionCode Code # Code Description Iraqi Specification

Iraqi Specification

Number

Specification Description

N/A 2.7.4.4.2 Install p-traps at all sink locations N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

N/A 2.7.4.7.2 Install p-traps at all sink locations N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

N/A 2.7.4.9.2 Install p-traps at all drain locations N/A IPC Section 1002 Trap Requirements Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

Section 9.3 Sanitary Fittings

N/A 2.7.4.12 Hose Bibs N/A IPC Section 608.15.4.2

Hose Connections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

N/A 2.7.4.12.1 Provide steel taps vs. hose bibs in latrines N/A IPC Section 608.15.4.2

Hose Connections Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

N/A 2.7.4.12.2 Room hose bibs shall be provided as required N/A IPC Section 606.4

Valve Identification Iraq Ministry of Housing & Construction -General and Technical Specifications of the Sanitary Works

N/A N/A

N/A 4.01. The project includes all structures, buildings and systems as required for the installation.

N/A N/A N/A N/A

N/A 6.03. Follow "single manufacturer" premise for generators, pumps, valves, compressors, electrical components, etc. where possible for utility plants and critical infrastructure elements (WTPs, WWTPs, Power Plants, etc.)

Customer Requirement N/A N/A Customer Requirement N/A N/A N/A

N/A 6.06. Explore opportunities to make manhole covers inaccessible to vehicle traffic or protect with bollards.

Customer Requirement N/A N/A Customer Requirement N/A N/A N/A

N/A 7.00.02 All buildings will be planned, designed, renovated, or constructed according to requirements and specifications. Iraqi standards or any other acceptable standards shall be implemented. Eastern and Western-style fixtures will be required and installed where indicated on construction drawings.

Customer Requirement N/A N/A Customer Requirement AFCEE IICS - Civil Work Specifications 1-7 Standard Specifications

IBC, IEC,IPC,IMC,NES, NEC and ASTM are all registered and copyrighted material. Versar 2006 and VIAP 2006 . This is a proprietary VIAP document. Any unauthorized use, distribution or copying is prohibited.Page 40 of 40