DOE/MC/27205 -- 5213 AFBC Co-Firing of Coal and Hospital Waste Quarterly Report November 1995 - January 1996 James M. Stuart March 1996 Work Performed Under Contract No.: DE-FG21- For U.S. Department of Energy Office of Fossil Energy Morgantown Energy Technology Center Morgantown, West Virginia Dinlee Technologies, Incorporated York, Pennsylvania w ~~~~~ OF THIS .9 1 MC27205

Transcript of AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal...

Page 1: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

DOE/MC/27205 -- 5213

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Report November 1995 - January 1996

James M. Stuart

March 1996

Work Performed Under Contract No.: DE-FG21-

For U.S. Department of Energy Office of Fossil Energy Morgantown Energy Technology Center Morgantown, West Virginia

Dinlee Technologies, Incorporated York, Pennsylvania

w

~~~~~ OF THIS

.9 1 MC27205

Page 2: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

DISCLAIMER

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manu- facturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Road, Springfield, VA 22161; phone orders accepted at (703) 487-4650.

Page 3: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

DOE/MC/27205 -- 5213 Distribution Category UC-107

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Report November 1995 - January 1996

James M. Stuart

Work Performed Under Contract No. : DE-FG21-91 MC27205

For U.S. Department of Energy

Office of Fossil Energy Morgantown Energy Technology Center

P.O. Box 880 Morgantown, West Virginia 26507-0880

BY Donlee Technologies, Incorporated

693 North Hills Road York, Pennsylvania 17402

March 1996

Page 4: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

A FBC Co-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1. 1995 -January 31. 1996)

Page i

CONTRACT DE-FC21-91 MC27205

TABLE OF CONTENTS

1 . I NTRODU CTlO N ......................................................................................... 1 A. Project Objective .................................................................................. 1 B . Reporting Period .................................................................................. 1 C . Report Layout ...................................................................................... 1

II . TASK ONE . Design. Specify. Procure. Install and Start-up Facility ........................................................................................... 1 A. Subtask l-A De sign ............................................................................. 1 B . Subtask l-B Equipment Purchase and Fabrication ................................ 2 C . Subtask l-C Installation ....................................................................... 6 D . Subtask l-D Shredder System Verification and Testing ....................... 7 E . Subtask 1E Start-up ............................................................................ 8

111 . TASK TWO . Obtain Permits ..................................................................... 9

IV . TASK THREE . Procure Coal. Limestone and Ash Disposal Contracts ................................................. 9

V . TASK FOUR . Conduct One Year Test Program ..................................... 9

VI . TASK FIVE . Prepare Final Rep0 rt ............................................................ 10

VI1 . PROJECT COSTS ...................................................................................... 10

VIII . SUMMARY ................................................................................................. 14

Page 5: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page ii

CONTRACT DE-FC21-91 MC27205

LIST OF TABLES

Paae

Table 1. Lebanon VA Project EquiprnedService Status Report ......................... 2

Table 2. Lebanon VA Project Subsystem Completion Ratios .............................. 6

Table 3. 11

Table 4. 15

Table 5. Lebanon VA Project EquipmentIService Costs ..................................... 16

23

Changes to Lebanon VA Project Contract ..... ........... ............................

Lebanon VA Project Cost-to-Date Reported by Task ...........................

Lebanon VA Project Schedule ..............................................................

Page 6: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

..

..

.- -. -. . - . .. .-. .. : ...

AFBC Co-Firing of Coal and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 1

CONTRACT DE-FC2 1-9 1MC27205

1. INTRODUCTION

A. PROJECT OBJECTIVE The project objective is to design, construct, install, provide operator training and start-up a circulating fluidized bed combustion system at the Lebanon Pennsylvania Veteran's Af3ii.r~ Medical Center. This unit will co-fire coal and hospital waste providing lower cost steam for heating and possibly cooling (absorption chiller) and operation of a steam tuibme-generator for limited power generation while providing efficient destruction of both general and infectious hospital waste. The steam generated is as follows:

Steam = 20,000 I b h

Pressure = 125 psig Steam quality = -98.5%

Temperature = 353 F (saturated)

B. REPORTING PERIOD The reporting period is fiom November 1,1995 to January 3 1,1996.

C. REPORT LAYOUT The Progress Reports will show progress and direction for each task and subtask. The Final Technical Report will also provide a coherent chronology of tasks and subtasks throughout the project. Weekly status meetings were held. In part, this report sumflliirizes the primary issues discussed in those meetings relating to the completion of this project.

II. TASK ONE - Design, Specify, Procure, Install and Start-up Facility A. SUBTASKI-A - DESIGN

Progress: equipment fact sheets have been completed.

Work on the Operation and Maintenance Manual continues. About 85% of the

Currently, the stack, base and anchoring system have been designed and materials have been procured. The stack fabrication has been completed and the stack was on site for the start of construction. Installation began on December 18, 1995 and was completed during the week of January 22, 1996. Three other systems need to be designed by DONLEE and/or installed at the LVA site:

Steam silencer and support - to be located next to the Southeast comer of the baghouse (optional). Ash conditioner system - supports for the ash screw and the rotary valve and ash conditioner.

Page 7: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of CoaI and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 2

CONTRACT DE-FC2 1-9 1MC27205

Support to raise the skiphoist approximately two feet above the existing foundation floor. Note this will be done to match the two-foot raised platform to be installed by the building contractor.

The sterilization system has been designed. Procurement of the remaining equipment is complete.

The shredder system’s piping and hose connections have been designed. Hoses and fittings have been purchased. McClure, the ducting and piping contractor, will install this equipment.

Problems: None

Plans: Continue filling out fact sheets for the equipment. Continue design and dr&g work. The P&IDs are being reviewed to as-built status.

B. SUBTASK I-B - EQUIPMENT PURCHASE AND FABRICATION

Progress: The status of the major pieces of equipment in the procurement process is show on Table 1. The fabrication procedure developed for the combustor, boiler, economizer and bins allowed these items to be fibricated by DONLEE.

Problems: None

Plans: Continue with authorized expenditures.

Table I. Lebanon VA Project EquipmentlService Status

Page 8: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

. . . -

.....

AFBC Co-Firing of Coal and Hospital Wmte

Quarterly Progress Report (November 1, 1995 - January 31,1996)

Page 3

CONTRACT DE-FC2 1-9 1MC27205

Page 9: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

..

- , 79 AddedLighting DONLEE 911 m 1 1 m

80 Sump PumptControls - Explosion Proof DONLEE

AFBC Co-Firing of CoaI and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 4

CONTRACT DE-FC21-91MC27205

Page 10: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 5

CONTRACT DE-FC21-9 1MC27205

Page 11: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

C.

AFBC Co-Firing of CoaI and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 6

CONTRACT DE-FC2 1-9 1MC27205

SUBTASK I-C - INSTALLATION

Progress: The construction work has been broken into smaller contracts. This allows us to take advantage of d e r constructors who specialize m specific portions of the construction package. The progress in the various work being done on-site is discussed below.

The blacktop paving has been mstalled around the building.

The site trailer is scheduled for removal from the site on February 7, 1996.

Back charges, for the support and bracing changes to the baghouse, were requested twice fiom the baghouse vendor, Aeropulse. The end result is that the vendor refksed to pay anytbing since the changes were not necessary, ie., the vendor design was adequate by their calculations.

Table 2 shows the completion ratios for each subsystem for October 31, 1995 to January 31, 1996.

Table 2. Lebanon VA Project Subsystem Completion Ratios

Completion Completion Task System Ratio Ratio

1 0131 195 1131196 01 Building 92% 93%

Page 12: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

.

AFBC &Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 7

CONTRACT DE-FC2 1-91MC27205

During this time period a total of 3,705 man-hours of work were performed in the following areas:

Contractor Man-Ho~s Piping and Ducting 1,100 Electrical 1,340 Building 135 Equipment 550 Insulation 340 Shakedown 240

3,705

TASK 07 - INSULATION - Summary Progress Report. The piping insulation work was completed during January.

AC&S was selected as the vendor.

TASK 08 - PAINTING - Summary Progress Report. The painting of the structure and the equipment of the facility is in the scope of the Lebanon VA Medical Center.

Problems: None

Plans: The installation continued this quarter and is projected to be completed by late March or early April.

D. SUBTASK l-D - SHREDDER SYSTEM VERIFICATION AND TESTING

Part of Phase I Contract testing to be done at DONLEE Pilot facility.

Progress: Task completed in June 1992.

Problems: None.

Plans: Task completed in June 1992. Sterilization testing Win be completed prior to completion of the installation. This testing uses a fidl-scale mock-up of a portion of the shredder hopper. The testing nozzles used are those to be used in the actual shredder system to ensure proper design.

Page 13: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

._ .-- - - - ~.. .- . . . . . .

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 8

CONTRACT DE-FC21-91MC27205

E. SUBTASK l-E - START-UP

Progress: Shakedown, startup and operation will begin after the completion of the equipment and instrument installation. The various subsystems of the ficility will be started up one at a time during pre-startup check out. The 14 subsystems are:

1. Building 2. Compressed air 3. Water service lines 4. Gas lines and startup burner 5 . Ashsystem 6. Limestone system 7. Baghouse 8. Stack 9. Coal handling system 10. Combustor and hot cyclone 11. Hospital waste and sterilization system 12. Boiler and steam lines and feed and recirculation water lines 13. Analyzers 14. Main control system

Subsystems 2, 3 and 7 have been M y checked out. Subsystems 6 and 12 have been partially checked out.

Operator training sessions were held during this quarter to paaially meet PA DER requirements, in addition to training the operators:

Problems: replace or maintain the Honeywell control system of the CFJ3 ficility.

The Lebanon VA continues searching for a responsible individual who will repair,

Plans: continues on the Training Program and the Operation and Maintenance Manual.

The facility is anticipated to be completed during the spring of 1996. Work

Page 14: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal andHospital Waste

Quarterly Progress Report (November 1, 1995 - January 31, 1996)

Page 9

CONTRACT DE-FC21-91MC27205

111. TASK TWO - Obtain Permits

Progress: DEP in November 1995. The plan approval was then extended to November 30, 1996.

The application for the extension of the Air Quality Plan Approval was sent to PA

A meeting was held with PA DEP on January 29, 1996 to c w the requirements of the air quality plan approval.

Problems: the installation of the equipment has begun.

None. Preparation for the PA DEP site review after construction has started since

Plans: Since the construction is not yet complete, the Plan Approval was extended again m November so that construction and mstallation can be completed. An inspection of the facility by PA DEP is planned for February.

IV. TASK THREE - Procure Coal, Limestone and Ash Disposal Contracts

Progress: Early in the project the coal, limestone and ash disposal contracts could not be halized because the initial supply date was in question due to NEPA approval related delays. Lebanon VA had received a supply proposal fiom Naughton Enera for coal, limestone and for ash disposal. During May 1994 the Lebanon VA set up a contract for procuring coal and limestone and for disposing of the generated ash when the facility is operational. Direnzo Coal Coqany is the ultimate supplier (subcontractor) of the coal and limestone. A limestone shipment was received at site m mid-January.

Problems: Naughton has a three-year contract (through September 1997) to supply the coal and limestone, and to dispose of the ash generated. The contract started m October 1994. From then until the time that the facility is operational, the right to purchase the coal and limestone and to dispose of ash is lost.

Plans: limestone systems.

Limestone and coal shipments will be obtained to do check outs of the coal and

I V. TASK FOUR - Conduct One Year Test Program

, Progress: This task will be performed after the installation, pre-startup check outs and startup/shakedown of the fscility have been completed. Stack testing and biospore testing are required by the Pennsylvania Department of Environmental Protection to demonstrate

Page 15: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal and Hcrspital Waste

Quarterly Progress Report (November 1,1995 - January 31, 1996)

Page 10

CONTRACT DE-FC21-91MC27205

performance and for the proof of DRE (destruction removal efficiency), respectively. At least one test of each type are required by PA DEP, however, more tests can be required. Due to funding limitations, only one or two stack tests or biospore tests can be performed. A test matrix will also be performed to demonstrate the performance and operation limitations of the CFB ficility and its emission levels.

Problems: None.

Plans: Spott, Stevens & McCoy was selected as the stack sampling vendor. Their h a l costs of the tests have been determined. ,SSM is also in the process of developing the protocol for the test ficility.

VI. TASK FIVE - Prepare Final Report

Progress: None. The report is due 3 months after the test program is completed.

Problems: None. The task is to be completed after the test program is finished.

Plans: Currently information has been gathered concerning the equipment and ficility. Preparation is being made to perform a matrix of tests that will demonstrate the performance and operation limits of the CFB system, quanti@ emission levels, identify problem areas and aid in pefiorming scale-up analyses for future commercial designs.

v11. PROJECT COSTS Changes to the contract

The following items have undergone price increases during this project. on Table 5 LVA Project EquipmmtIService Costs.

Refer to item numbers

Page 16: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 11

CONTRACT DE-FC2 1-9 1MC27205

Table 3. Changes to LVA Project Contract

NO DESCRIPTION

- 1.

2.

- 3.

- 4.

- 5.

- 6.

An air compressor will need to be purchased for the new facility. It was originaliy believed that the present system would be able to provide sufficient air quantities but the new facilities requirements are larger than originally anticipated. The cost of a 300 cfm air compressor rated at 110 psi was $21,015 (revised). The air is supplied for the pneumatic transport of limestone and ash, pneumatic slidegates and instrumentation.

An ash conditioner needed to be added to the contract. The Solid Waste Division of Pennsylvania's Department of Environmental Resources requires that the ash be conditioned with water before transport. The ash conditioner was supplied at a cost of $59,804 (revised), including ducts and screw conveyors.

The cost of the ash handling storage and screw system has increased to $152,292 due to purchasing 22 NiHard 4 5 O elbows for pneumatic ash and limestone transport.

The bed cleaning system which processes the ash generated from the combustion of the coal, limestone and medical waste currently costs $26,114. The scope of the sand silo design has been reduced to a sand Yunnel," resulting in a cost reduction of $5,000 to $10,000. The cost of the sand funnel was $2925. The total cost of the bins: ash, limestone and coal has increased from $43,065 to an estimated $1 23,663.

7. The boiler required $8,111 .OO of additions to meet the VA specifications. This

8.

9.

number will be revised pending final boiler design.

The cost of the economizer sootblower was $8,784.

The redesign of the stack is complete. The total cost of the stack is now $60,572. This cost includes $23,200 for installation included in item 64. -

10.

11. The feedwater circulating pump was bought by LVAMC. DONLEEs cost is zero.

The coal feeders were originally proposed to be screws. The VA has requested weighing capability. Weigh belt feeders here selected in place of screw feeders. The cost was $45,690.00.

I

12. 13.

The annunciator panel requested by the VA will be approximately $8160.00. The cost of the controls computer package has increased from $83,442 to $97,001. This cost increase is due to a required increase in the I/O capacity of the control system and for two computer courses.

The baghouse and sorbent injection system currently cost $13651 1 (revised).

The cost of the vendor doing the ducting and piping has increased to $254,473 (revised).

14.

15.

TABLE 5 ITEM REF. 1

2.334

Limestone - 2; Coal - 7a thru 7d

8

12 13a-13c

14

15

17

17

19 20

Page 17: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

. . _ _ _ - -- .. . ._____.

- 16.

17. -

- 18.

19.

20.

21.

-

- -

- 22.

23. -

- 24.

25. -

- 26.

- 27.

28.

- 29.

30. -

- 31.

- 32.

33. -

AFBC Co-Firing of Coal and Hospital Wmte

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 12

CONTRACT DE-FC2 1-9 1MC27205

The electrical contractor cost for the facility installation is currently $259,348 21 (revised).

The emissions monitoring system required $56,500 above the proposal for the HCI 22 monitoring system and heated sample lines.

An oxygen analyzer to be used to measure oxygen at the boiler entrance and to be 23 used to help control oxygen levels in the system was needed at a cost of $6429.

Expansion joints were needed to allow for thermal growth throughout the system at a 24 cost of $25,862.

The cooling bed and lift channel blowers cost $13,060. 25

The cost to move the gas lines at the facility was originally $5,500. This cost was 29 deleted by the gas company, UGI, in eady February.

The hospital waste handling and subsystems (or skip hoist) currently cost $36,815. 30

33 specification, was $4,097. This cost increase is due to the number of transmitters that have been added.

The painting currently costs $12,240 (revised). 38

Geotechnical Engineering Services for the building and foundation have been added 39 to ensure that the facility is constructed properly and safely. The cost is partly offset by the October 1993 budget cost of the building and foundation. The cost of the services was $9.512.

The building and foundation cost is currently $627,561 due to change order increases.

Design Engineering Services have been added to provide independent supervision for the construction. The cost of these services is included in the October 1993 budget cost of the building and foundation. The cost has since been reduced to $8,911 from $10.91 i. The cost of the design and manufacture of the initial platforms, supports and ladders 45 VMS $27,000.

47

48

The cost of the added transmitters for pressure and flow indication added to the

40

43

The refractory engineering, materials and installation vendor's cost was $88,007.

A refrigerated room is required for the storage of medical waste in the event that the unit is not operating. The cost of the refrigerated room was $15,407 with freight included.

Resources requires that the medical waste be weighed before disposal. The cost of a scale to be mounted in the loading dock was $4382.

The price of the shredder blower has increased due to a freight charge. The final price was $3,140.

Slidegates were needed for the coal, limestone and ash handling systems at a cost of $52,665.

The Solid Waste Division of Pennsylvania's Department of Environmental 49

51

53

I I

Page 18: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

34.

- 35.

- 36.

- 37.

38. -

39.

- 40.

41.

42. -

43.

- 44.

45.

46.

-

-

- 47.

- 48.

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31,1996)

Page 13

CONTRACT DE-FC2 1-9 1MC27205

Soil borings were required to determine soil bearing capacity before the foundation design could be started. It was originally believed that the VA had this information. The cost of the soil borings was $5850.

fluidized bed cost is $1 0,792.

$72,290 to $143,639 (estimated).

54

The start-up burner system, including its panel and motors, for the circulating

The cost of the steelmrk or equipment support (stntcture) has increased from

55,56,57

59

The general valves for the circulating fluidized bed system currently cost $-.

The cost of the vendor equipment installation, including the platform installation and extras, is now $507,835 (revised).

individual contracts (vendor equipment installation and ducting and piping). This item as a result is $0.

The additional feedwater and steam valves were ordered at a cost of $2,313 (revised).

Spare shredder hydraulic filters were purchased for $764.

The air cannons were purchased for the coal silos at a cost of $5,527.

The noise control pads and bases for the blowers, fans, compressor and shedder hydraulic unit have been purchased and installed at a cost of $4,288.

A heatless air dryer was purchased to provide air dried to -40 F dewpoint, at a cost of $7,028 (revised).

The orifices and venturis for flow measurement have been designed and cost $1 2,932.

A cart for medical waste handling was purchased to check out the skip hoist and shredder equipment. The cart cost was $682. However, this cart was returned when it was discovered that the cart design had changed, and the cart dimensions were too large to be used. Another cart design was chosen by DONLEE and LVA and six or more have been purchased by LVA.

months at a cost of $2,624 for an expected 13 months.

63, 70, 91,

64

66

a%o\53 '11

The cost of additional paymentlperformance bonds has been maintained in the

70

71,110

72

73

74

75

76 *

The site trailer for an office and storage space was rented for a minimum of 4

The equipment for the chemical feedwater system has been costed at $? ,305.

77

78

Page 19: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC &-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1,1995 - January 31, 1996)

Page 14

CONTRACT DE-FC21-9 1MC27205

Contract Costs-to-Date: The Lebanon VA Project Costs-to-Date are shown on Table 4.

Equipment Costs The equipment costs are shown on Table 5 Lebanon VA Project EquiprnedService Cost Summary. Several of these costs are preliminary and purchase orders have not been released yet.

VIII. SUMMARY

Operating permits will be obtained after construction has been completed. The stack sampler has been selected. This vendor is currently developing the testing protocol.

Severe weather in December and January caused work delays to the project, especially to outside work

The fabrication and installation of the stack are complete. Only the insulation of the stack remains to be done.

Budget problems began to occur in late January. Correction of this situation should occur shortly in February or March.

A current schedule for the project is included with this report.

Page 20: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-Firing of Coal and Hospital Waste

Quarterly Progress Report (November 1 1995 - January 3 1 1996)

Page 15

CONTRACT DE-FC2 1-9 lMC27205

Q RTLY QRTLY ACTUAL ACTUAL

Table 4. Lebanon VA Project Costs-to-Date Reported by Task

TO-DATE

CONTRACT TASK

TASK I: DESlGNlBUlLDIlNSTALL I 77,225.00 (122,485.51 I I

Aug-95 Sep95 I

TASK II: PERMITTING I TASK 111: OBTAIN COAL, LIMESTONE

Oct-95

128,496.01

& ASH CONTRACTS I I

TOTAL NOW95

328,206.52 124,588.91

TASK I V TESTING I I

119,627.97

6,637.35

112,990.62

TASK V: FINAL REPORT I I

$0.00

$0.00

99,281.73 346,108.25 $6,599,559.95

5,642.77 18,874.09 $412,373.09

93,638.96 327,234.16 $6,187,186.06

COSTS De095 Jan-96 I TOTAL I I 117,319.29 99,281.73 341,189.93 $6,196,073.90

$38,(xM.59

$44,09829

Page 21: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-firing of Coal and Hospital Waste Contract DE-FC21-91MC27205

Quarterly Progress Report Page 16

Table 5. Lebanon VA Project EquipmentlService Costs ' - - J r c w,

3 UY 3 E? a c!

ti a s i5 z

0 0 -I a

z

I-

K K 3 0

0

0

$21,015

$34,815

$2.979 $(

f 3 z EQUIPMENT/SERVICE VENDOR m

Q) Q) c

5 t W

W 0 z 4 d -

1 $21,801 ($786)) $21 ,Ol! Ur Compressor C.H. Reed 6/1 E

h h Conditioner Detroit Stoker 7 / 2 m $34,81 I

$28,307 $152,29; g 2

3

4

- -

~

b h Conditioner: Chutes Detroit Stoker 5/28E

b h Handling: Storage and Screw Macawber 811 O E $1 23,981

$21,112 5

6 - ied Material CoolinglCleaning System CSI Systems Inc. 9/2/%

DONLEE Sin, Sand (Sand funnel)-Replaces bed mat'l bin istimated R $lO.oOO lins: Ash, Limestone & Coal

$2,925

I $( 7

7a $18,94 >oal Bins DONLEE

.imestone Bin - 30 Ton DONLEE 7b $14,408

$4,200 $1,616 -* 7c

7d - .imestone Bin - 2 Ton DONLEE

h h Bins (2) DONLEE

loiler & Economizer: Boiler DONLEE 511 5 M

$15,0K $34,2501

$41,47f $41,4781 $58,:

$51 13

8

9

10

11

- _.

- $5,10; $5,112

$8,781

loiler 8 Economizer: Boiler Sootblower Fuel Efficiency 6/18E

loiler & Economizer: Boiler Sootblower-Engr Only Fuel Efficiency 6/18E

loiler & Economizer: Economizer Casing DONLEE 511 5/%

3oiler & Economizer: Economizer Sootblower Copes-Vulcan 6l9M

$1 .a $6,352

12

1 3a

13b

- -

$7,922

$21,921 $1 9.428 Stack (Chimney) Tri Fab, Inc. 8M1%

Stack (Chimney) - 2nd Design DONLEE 217186

Stack (Chimney) - Anchoring system DONLEEIAycock 8/7/86 E l 3 $10,899 $10,8991 $9,77E 13C _.

projcost.ds rev.2/28/96

Page 22: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

15

16

Coal Storage, Handling & Feeding Beaumont Birch 7/21/9:

Combustor/Cyclone/Cooling Bed Unit -No Tubes DONLEE 9 1 5/9:

17

18

Controls Computer Package Honeywell 4 m m

Cooling Bed & Economizer Tubes* Alleahenv Boiler Tube 6J9m 19

20

Dry Injection Fabric Filter: Baghouse Aeropulse Inc. 5/2019;

Ducting & Piping McClure

21

22

Electrical Equipment & Installation DBGlCarpenter Engr 2t3m

Emissions Monitoring Equipment Enertec . 811 11%

23

24

Emissions Monitoring Equipment: Oxygen W. A. Gregory, Inc 913%

Expansion Joints Senior Flexonics 711 31%

25

26

Fans & Blowers: ACB & LCB** I 1 /I 3/91

Fans & Blowers: Primary & ID Robinson 711 3%

Spencer Turbine

27

28

Flyash Reinjection System DONLEOFox Valve 12/5/91

Flyash Reinjection System: Bed Mat’l Blowers R.M Associates 71271%

30

31

Hospital Waste, Handling & Sub-systems Essex Conveyor 711 5/92

Instruments: Pressure lndlcators/Transmitters Dwyerkloneywell 911 0/92

33 Instruments: Pressure Transmitters (Additional)*** Honeywell

A FBC Co-Jring of Coal and Hospital Kaste Contract DE-FC21-9 1 MC27205

Quarterly Progress Report Page 17

Table 5. Lebanon VA Project EquipmentlService Costs e

8 m d)

P d

Li 0 u

5 8

I- z W

3 u E

s ij e 0

I I b 14 I Circulating Pumps, Feedwater IChester PumD I 7/1519:

$291,152

$12333

$297,2a

$1 23,s $01 $ l a , = $97,00’ $13,5591 $97,001 $83,442

$29,ooc *

$6,1351 $136,511 $1 30,376

$65,291

$1 3631 ‘

$254,47:

$161,25C

$26,57C $92,921

$135,2oc

$87,05(3 $23,826 $1 11,474

$6,11E

$26 ,m

$6,54(

$25,862 ** $12,709

$54,608

$C

$C $28,900

$41,600 $C $14,290

$1 0,075

$9,031 $1 0,025

$C

$C

29 I Natural Gas line moved I UGI I $0 $0

$36,815 $72,800 $31,010

$2,500

$0

$0

32 I Instruments: Pressure Transmitters I Honeywell I 5/24/92 $1 2,56?3 $12,56E $16,490 $1 2,569 + $0

$0 $4,097 $0 ***

projcost,xls rev.2/28/06

Page 23: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co--ring of Coal and Hospital Waste Contract DE-FC2 1-91MC27205

Quarterly Progress Report Page 18

Table 5. Lebanon VA Project EquipmentlService Costs '

p 1 Instruments: ThermocouDles

EQUlPMENTlSERVlCE VENDOR Li 0 0 -I

f s 0

ICGS $4.347) $5.421 $5,4281 sol I 35 I Insulation Materials & Installation lAC&S $17.22( $16,000 $3,125

$60,881 $0

$926 $0

$0 $12,240

$9,512 $0

$597,041 $30,520

$0 $0

$29,1 28 $0

~~ ~ ~ ~~ ~~ ~

36 Limestone Storage, Handling & Feeding Macawber

37 Outside Review of Bldg-PreliminaryIFinal Entech

38 Painting DONLEE

39 Plant Encl./Siie PreplFoundation: Geotechnical Engr. Schnabel

$C $72,8M:

$C ($4,0741

$31,20( ($2,7601

$9,512 $C

IArthur Funk 9/8/92 **** $81,861 Plant EncUSiie PreplFoundation: Bldg & Foundation****

I 41 Plant EncUSie PreplFoundation: Building

42 Plant EncVSiie PreplFoundation: Design DBGlSteckbeck

43 Plant EncVSite PreplFoundation: Engineer DBGlSteckbeck

44 Plant EncUSie PreplFoundation: Foundation

45 Platforms, Supports and Stairs and Design BSM, Inc.

46 Refractory Materials & Installation: Installation DONLEE

47 Refractory Materials & Installation: Materials J. T. Thorpe

48 Refrigerated Room Perley-Halfday

$C

$3,402

$87,68(:

$C 911 rn $8.91 1

-TI-+ $8,911

$0

$27,000

7 i i G 4 - 4 $22,600

$35,884 $52,915 6l24193

$77,515 $1 1,032

$530

$88,007

$15,407 $0

6/24/93

711 9/93 ~ -~

49 Scale B&M Scale

50 Shredder SSI Shredding Systems ($21 5)

$0

6/7/93

$01 $C $0

$3,0191 $3,14C $1211

sol $3,140

$5,200

51 Shredder Blower . Robinson

52 Shredder: Move from York to Sie DONLEE

4/26/93

$5,200

projcost,ds rev.2/28#

Page 24: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-firing of Coal and Hospital Waste Contract DE-FC21-9lMC27205

Quarterly Progress Report

Table 6. Lebanon VA Project EquipmentlService Costs

Page 19

c I s

VENDOR

53 ISlide Gates I RovalvelTechnaflow * $0 $1,28r

5.4 I soil Borings I Schnabel ~

55 Start-up Burner EclipseNorkaire

56 Start-up Burner (Mod. Motor) Honeywell

8/6/96 $9,24: $9,242

$26(

$1,28~ I $( $1,28f 57 Startup Burner Panel DONLEE

58 Steam Silencer Vibration & Noise Engr. 7/12/93 $3,41!

,+

$3,06!

$1 43,63!

$1 ,fa

$3,W

$1 43,a 59 Steelwork or Equipment Support DONLEE

60 Sterilization System DONLEE $6,18i I $C

61 I Sterilization Testing IDONLEE 62 Transformer for Leb VA Equipment Blatt & Meyers

63 Valves & DamDers IPS $26,06( $26,020 $1 1,701

$31 2 , W $448,10: 64 Vendor Equipment Installation IAycock

65 Comwterized Portable Analyzers ECOM America

66 Additional paymenffperformance bonds

67 Onsite refractow cure Hotworks

68 Bonding and Grounding

69 Sump pumps and controls Grainger

70 SteamlFeedwater Valves IPS

$4,632 $4,631

$C

$(

$2cE

$2,31

$48s

$5,52i

$2,319

$5,527

$2,312

$48E

$5,527

~ ~

71 Shredder Hydraulic Filter SSI Shredding Systems

72 Aircannons Airmatics 11/16/941 $(

projcost,xls rev.'LRBlgB

Page 25: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-jiring of Cool and Hospital Waste Contract DE-FC21-91MC27205

Quarterly Progress Report Page 20

EQUIPMENT/SERVICE

Table 5. Lebanon VA Project EquipmentlService Costs

VENDOR

c

8 2

ln d

m - c;

v c ? E c; m

P E 5 V 3 4

I? G z z_ 9

pe 9 a a a 3 a

c1 N

t 0 0 3

pl cn

c1 . LT 5

J P - P 0 m

0

W V

4 !i fl 0

ti

t3 0 t-

V

3 I- 2 w

2 e 8 3

m 0

s 2 2 2 0 V 0

73 Noise Suppression: MotorIBlowers BRD NoiseNibration 1 0/28/94 $0 $4,288 $4,288 $4,288 $0

74 Heatless Air Dryer Air Flow Co., Inc. 12/8/94 $0 $7,028 $7,028 $7,028 $0 75 Orifices and venturis ClBl NES 1 OI20194 $0 $12,932 $0 $12,932 $12,932 $0 76 Cart for medical waste Consolidated Plastic Co. 12/15/94 $0 $0 $0 $0 $0

77 Site trailer rental - 13 months GE Capital Modular Space 12/15/94 $0 $2,624 $2,624 $2,436 $188 78 Heat Tracing DONLEE 7/31 195 $0 $5,200 $0 $5,200 $0 $5,200 79 Added Lighting DONLEE 7/31/95 $0 $14, $0 $14,500 $0 $14,500

80 Sump PurnplControls - Explosion Proof DONLEE 11/16/94 $0 $0 $0 $0 $0 $0 81 Cal Gases and Regulators SC& Specialty 12/15/94 $0 $5,289 $0 $5,289 $0 $5,289

82 SinWShower Decontamination Stations Lab Safety 7/3/95 $0 $1,750 $0 $1,750 $0 $1,750

83 Sand for Beds U.S. Silica Sand 9/23/94 $0 $2,367 $0 $2,367 $0 $2,367

84 Coal Pit Cover ***** DONLEE 7/3/95 $0 $0 $0 $0 $0 $0

85 Grizzly Cover DONLEE 7/3/96 $0 $lO,OOo $0 $1O,OOo $0 $1O,OOo

86 Chemical Feedwater System Nutmeg Technologies 10/11/95 $0 $1,305 $0 $1,305 $1,305 $0

87 Baghouse Ring Gaskets Aeropulse 8/31 /95 $0 $86 $0 $86 $86 $0

88 Compressor Relief Valve C. H. Reed 911 8/95 $0 $132 $0 $132 $132 $0

89 Compressor Sample Parts C. H. Reed 1 Ol4M $0 $42 $0 $42 $42 $0

90 Burner Parts Yorkaire 1 011 0195 $0 $122 $0 $122 $122 $0

91 Instrumentation Ball Valves IPS 1011 0/95 $0 $152 $0 $152 $152 $0

92 Solenoid lves Equipment 10/13/95 $0 $482 $0 $482 $482 $0

I

projcost,xls rev.2RSM

Page 26: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

AFBC Co-fit-ing of Coal and Hospital Il'cste Contract DE-FC21-91MC27205

Quarterly Progress Report Page 21

Table 6. Lebanon VA Project EquipmentlService Costs

t W 3 n m EQUIPMENT/SERVICE VENDOR m m 0)

r

6 m 0 I- V 0

% 4 a m

z 0 3 $1.52( $C 93 Shredder HydrauliclGear Oils Industrial Lubricants

94 Dew Point Monitor - Rental Solomat $C

$C $W

$33

95 Pressure Gauges IPS

96 Sterilization Liquid Mixer McMaster Carr

f Ol25M

10127M

$64(

$35 $C

$22: $C $227

$81

$22i

$81

97 Baghouse Level Probe Drexelbrook

98 Limestone 8 Flexible CSllKinergy

1 OM1 M

1 1 l8lsx $84 $C

$76 $C 99 Pressure Gauges IPS

100 Instrument Repair Ametek

$71

$1 ,la $71

$1 ,lo(

111101sx

10131 1% $1 ,lo( $C

$3,802

$1,551

$3,602

$1,561

101 Sterilization Equipment M. Glosser

102 Hydraulic HoseslFittings Chester County Hydraulics

11/18/9E

11121/9E

1 1 1 2 1 ~

$(

$1 ,56i

$3,6oi

$C

103 IPropane Heaters - Rental I Rentals Unlimited $1,844 $1,844 $ 1 , 3 4 4 ~~ ~~~

104 I Oil for Roots Blowers 1 2/4m $2: $25 $2 $C

105 IMagnehelic Gauges IDWer 12/7/9E $4 $4 $4 $C

106 (Probe Exchange to 36" IAmetek $241

$715

$675

$241

$71 f

$67:

$241

$71 5

I 2/1 419E

I2/27m $C 107 K Thermocouple Wire CGS

108 Solenoids lves Equipment

109 Sterilization Nozzle, 1/2" Spraying Systems

$C $675

$51

$275

I2/27m

12/27/95

I2/27/SE

I 15m

I 15M

$51 ~

$0

$0

$C $51

$275 $C $C $275 110 Pressure Filters SSI Shredding Systems

11 1 3" Steam Vent Value IPS $C $0 $488

$155

$488

$156

$488

$155 112 I R0tameterslN.G. Gauge IDwer $C $C $0

projcost,ds rev.2Ram

Page 27: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

!

!

199'OLS'Et

9Et

OL'8$

tlOaN3A

Page 28: AFBC Co-Firing of Coal and Hospital Waste/67531/metadc672026/m2/1/high... · AFBC Co-Firing of Coal and ... The fabrication procedure developed for the combustor, boiler, ... startup

I.EBANON VA MEDICAL CENTER PROJECT I I

ID 1 -

~ I- 2

3

6

7

8

- 9

- 10

I FIRIST FIRING (COAL ONLY)

PROJECT OPERATION (COAL ONLY)

- IIOSPITAI, WASTE SYSTEM START UP

I 11

- 12

- 13

................ ......... - ... -_

PROJECT OPERATION (COAL/ A. WASTE)

. __ .... .-. ..... . - ~ _ _ -

ENVIRONMENT TESTING

FINAL REPORT

__ .............. PROJECT T.0.A.C 14

Critical Progress Summary -4 Project: LVA MEDICAL CENTER Date: ' Noncritical 7 1 Milestone ~ RolledUp 0

DOE QUARTERLY REPORT- OCTOBER 1,1995 - JANUARY 31,1996