AESSiS Teamcenter to Aras
-
Upload
aras -
Category
Technology
-
view
272 -
download
2
description
Transcript of AESSiS Teamcenter to Aras
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter To Aras
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Topics
Extending the PLM footprint with Aras
Why integrate Aras with Teamcenter?
When does it make sense?
What are some of the use cases?
How do we go about integrating?
Components
Technical Deep Dive (Richard)
Q&A
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
CAD
Change
QualityProcesses
Risks
Projects
Contracts
Orders
Manufacturing
OrdersBespokeProcesses
Visualisation
...the trouble with extending The PLM Footprint
FMEA
Companies can get stuck in the heel
Design Collaboration
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Why?
‘Fixed’ or ‘Rigid’ hard coded data models
Difficult to use or complex data modelling tools
(Skills issue)
Upgrade risks following customization
Granular licensing models that drive exponential
increases in cost of ownership as new
capabilities are added
Per user licensing models that drive increases in
cost of ownership as new users are added
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Low # of Processes
Low # of Users
Low Level of Alignment
High # of Processes
High # of Users
High Level of Alignment
TCO $
Traditional PLM
OOTB ‘PDM’ Highly Optimised ‘PLM’
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter
ProjectsAras
Projects
Who are AESSiS
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Flexible & adaptable
Quick to deploy
Ability to model complex &
bespoke business processes
easily
Without causing upgrade
issues
Aras
Why Aras?
Its a breath of fresh air... and people want to use it
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter
NX CAD Integration
Visualisation
Change can seem daunting...
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter
ProjectsAras
Projects
Who are AESSiS
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Cost of Extending The PLM Footprint
Extending Existing PDM/PLM
Aras
Inte
gra
tio
n
CAD
CAD
$
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Every company has different
Objectives & Priorities
Teamcenter Customizations
Use Cases
Standardized Teamcenter Aras Integration Components
We configure a set of Standard Components to
deliver an integration Project that meets a set of
unique requirements
The customer must have the requisite Teamcenter & Aras licences
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Questions
What is the exact version of Teamcenter in use (including patches)?
What CAD tools are used and what is the exact version in use (including patches)?
Which item types are in scope
Which item types are out of scope (development item types?)
Is CAD data in-scope
Is JT data in scope?
If NX, are NX WAVE links in scope?
If NX, are NX Part Families in scope?
How many Teamcenter item masters and/or item revisions are there?
Are folder structures used in Teamcenter. Do they need to be replicated in Aras?
Are Change Objects such as ECNs in-scope?
Are thumbnails required?
Are all attributes that are currently used in CAD files also mapped into Teamcenter?
How should synch be triggered? (e.g. Teamcenter event such as Release)
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Migration
Integration
Integration
Teamcenter Aras
Scope
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Example Use Cases
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
CAD Part 1
CAD Part 2
CAD Part 3
CAD Part 4
CAD Part 5
CAD Part 6
CAD Part 7
CAD Sub-Assy 1
CAD Sub-Assy 2
CAD Sub-Assy 3
CAD Assy 1
TC
Release
CAD Part 1 (Released)
CAD Part 2 (Released)
CAD Part 3 (Released)
CAD Part 4 (Released)
CAD Part 5 (Released)
CAD Part 6 (Released)
CAD Part 7 (Released)
CAD Sub-Assy 1 (Released)
CAD Sub-Assy 2 (Released)
CAD Sub-Assy 3 (Released)
CAD Assy 1 (Released)
Aras
Create
Part BOM
Publish CAD Structure To Aras
Options
CAD Files
Published To Aras
Link to CAD File
Published To Aras
JT/PDFs/Thumbnails
Published To Aras
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
TC
Sales
Order
Aras
(Part BOM)
Configure to Order
Create CAD
Placeholder
Structure
Aras
(Part BOM)
Release
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Item Revision (B)
123 A
Affected Items
678 A
Teamcenter
Aras
Item Master
Item Revision (A)
Item Master
Item Revision (A)
Enterprise / Engineering Change
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
123 A
Affected Items
123 B
Item Revision (B)
Item Master
Item Revision (A)
Enterprise / Engineering Change
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
CAD Part 1
CAD Part 2
CAD Part 3
CAD Part 4
CAD Part 5
CAD Part 6
CAD Part 7
CAD Sub-Assy 1
CAD Sub-Assy 2
CAD Sub-Assy 3
CAD Assy 1
TC
• Project Management Processes
• Supply Chain
• Manufacturing
• Quality Processes
• FMEA
• Search
• Etc, etc, etc
CAD Part 1 (Released)
CAD Part 2 (Released)
CAD Part 3 (Released)
CAD Part 4 (Released)
CAD Part 5 (Released)
CAD Part 6 (Released)
CAD Part 7 (Released)
CAD Sub-Assy 1 (Released)
CAD Sub-Assy 2 (Released)
CAD Sub-Assy 3 (Released)
CAD Assy 1 (Released)
Aras
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Components
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter ArasMapping Utility
Components
• Defines how the Teamcenter data model is mapped into Aras
• Automatically builds the target Aras data model based on the mapping
• Allows data model extensions in Teamcenter to be transferred automatically to Aras
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter Aras
Bulk Migration Utility
Mapping Utility
Components
• Enables the rapid bulk migration of all in-scope Teamcenter prior to using the synchronisation utility.
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter Aras
Bulk Migration Utility
Synchronization Utility
Mapping Utility
Components
• Transfers data from Teamcenter to Aras when triggered by a synchronization event.
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter Aras
Bulk Migration Utility
Synchronization Utility
Mapping Utility
Validation Utility
Components
• Provides an independent mechanism to validate that data is transferred accurately from Teamcenter to Aras.
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Teamcenter Aras
Bulk Migration Utility
Synchronization Utility
Mapping Utility
Validation Utility
Workflow Handlers
Components
• Attached to Teamcenter events to trigger synchronisation.
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
+44 (0)845 680 0501Committed to improving how organisations manage and deliver engineering projects and products by reducing the risk, cost and complexity of planning and implementing Product Lifecycle Management
2.4 Million Part Revisions
13.2 Million BOM Lines
56 custom Teamcenter Business Objects
Bulk Migration from Teamcenter to Aras
in 24 hours on a single server
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Implementation• Typically 2-6 months (depending on complexity)
• Discovery Workshop
– Capture Use Cases
– Document Requirements
• Integration component installation & configuration
• Testing
• Training
• Go-Live
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Architecture - Migration
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
Architecture - Synchronization
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com
+44 (0)845 680 0501Committed to improving how organisations manage and deliver engineering projects and products by reducing the risk, cost and complexity of planning and implementing Product Lifecycle Management
AESSiS • 1st Floor • Venture House • 6 Silver Court • Welwyn Garden City • UKAL7 1TS
www.aessis.com