Aero hub o&m, installation & maintenance

31
A New Generation of Aerosol Fire Suppression System Manufactured and Designed by Manufactured and Designed by HUB TECHNOLOGIES (M) SDN BHD HUB TECHNOLOGIES (M) SDN BHD Manual Operation, Installation and Commissioning Distributor and Installer TECHNICQAL SDN. BHD.

description

 

Transcript of Aero hub o&m, installation & maintenance

Page 1: Aero hub o&m, installation & maintenance

A New Generation of Aerosol Fire

Suppression System

Manufactured and Designed byManufactured and Designed byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Manual Operation, Installation and Commissioning

Distributor and Installer

TECHNICQAL SDN. BHD.

Page 2: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Control Panel

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AEROHUB ® CONVENTIONAL CONTROL PANEL

In Normal Condition:- “AC ON”, “DC ON” and “CHARGER ON”

This Aerohub® Control Panel got 2 power source:-a) Supply from TNB -- 240VACb) Battery 24VDC ___AH – up to 3 days of standby if the AC supply fails.

Page 3: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Control Panel

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

If the AC Fails the buzzer will sound and indicator “CHARGER FAIL” & “MAINS FAIL” will light ON.

If the Battery is Faulty or connection is loose the buzzer also will sound and indicator “BATTERY FAIL” will light ON.

Open the Aerohub® Control Panel, Switch for the buzzer is located behind the Main Board and have 2 Toggle switch :- 1) BELL OFF

2) BUZZER OFF

Page 4: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Smoke Detector

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Smoke Detector S65 (Apollo)

4 meter

Height : 4 meter

4 meter

4 meter4 meter

Coverage for Smoke Detector

Page 5: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Smoke Detector

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

SMOKE DETECTOR

Zone 1 = Smoke Detector activate / trigger :- Sense Smoke Fine dust Cable short circuit

In this situation the indicator L.E.D at zone 1 will light ON.

When Smoke Detector is Trigger:-

1) The Bell will be intermittent ringing,2) RED Bulb at Twins Flashing Light will be blinking.

Page 6: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Heat Detector

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Heat Detector S60 (Apollo)

3.5 meter

Height : 4 meter

3.5 meter

3.5 meter3.5 meter

Coverage for Heat Detector

Page 7: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Heat Detector

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

HEAT DETECTOR

Zone 2 = Smoke Detector activate / trigger- Sense Heat (Temperature 58oC) Cable shorted

In this situation the indicator L.E.D at zone 2 will light ON.

When Smoke Detector is Trigger:-

1) The Bell intermittent ringing ,2) RED Bulb at Twins Flashing Light will blinking.

Page 8: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Control Panel

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AIR-COND TRIP.

AIR-COND TRIP WHEN:-

1) When zone 1 & 2 are triggered, Aerohub® Control Panel will send voltage 24VDC to the DB Air-Cond,

2) If only 1 zone is triggered i.e., zone 1 or zone 2 Aerohub® Control Panel will not send Voltage 24VDC to DB Air-Cond.

Page 9: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Alarm Bell

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

ALARM BELL

In Normal condition the Alarm Bell not ringing,

Alarm Bell ringing if:- Zone 1 Smoke Detector -- trigger /, Zone 2 Heat Detector -- trigger

Stop the Alarm Bell from Ringing :-

1) Open the Aerohub® Main Board Control Panel:- 1) BELL OFF

2) BUZZER OFF

2) Switch the BELL OFF and the bell stop ringingSwitch the BUZZER OFF and the sound will stop.

Page 10: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Twins Flashing Light

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

TWINS FLASHING LIGHT

In Normal condition only GREEN Bulb will be light ON,

Twins Flashing Light RED Bulb will blinking / function if:- Zone 1 Smoke Detector -- trigger

/ Zone 2 Heat Detector -- trigger.

Page 11: Aero hub o&m, installation & maintenance

MANUAL OPERATION – KeySwitch

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

KEYSWICTH / MANUAL DISCHARGE:-

1) Keyswitch / Manual Discharged* To manually discharged the Aerohub® Fire Suppression,

-- Not waiting time delay of 25-30 second after of zone 1 & 2 is trigger.

Page 12: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Auto/Manual Switch

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AUTO / MANUAL :-

1) AUTO * In Normal condition the position of the key must be in AUTO.

2) MANUAL* If maintenance is being done inside the room, please turn to MANUAL, this is to prevent from accidentally discharged, but the system is in normal operation.

Page 13: Aero hub o&m, installation & maintenance

MANUAL OPERATION – Aerohub® Generator

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

SS/MS 50

SS/MS 30

SS/MS 20

SS/MS 10

SS/MS 5

SS/MS 2.5

50m3 30m3 20m3 10m3 5m3 2.5m3

GENERATOR SPECIFICATIONS :

• Generator housing and all internal components are made of Stainless Steel or Mild Steel to suit the environment.

• Temperature : Operates with +50 to -50 °C

• Humidity : Operates up to 96% RH

• Warranty : 2 years for manufacturer’s defect.

• Voltage : 24V dc 1.5A

Page 14: Aero hub o&m, installation & maintenance

Colour of Wiring Cable

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Colour of Cable

Page 15: Aero hub o&m, installation & maintenance

Wiring Accerssories

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Termination of Accerssories Detector

Page 16: Aero hub o&m, installation & maintenance

Drawing of Installation

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Drawing

Page 17: Aero hub o&m, installation & maintenance

Conduit G.I (Installation)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AERO-HUB®

KeySwitch Auto/Manual Switch

Alarm Bell

Twins Flashing Light

Heat DetectorSmoke Detector

AEROHUB® control Panel

Sample Layout Installation of GI. Conduit

Page 18: Aero hub o&m, installation & maintenance

Wiring Cable

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

1.5mm single cable

1.5mm single cable

Layout Wiring Colour

Page 19: Aero hub o&m, installation & maintenance

Testing, Commissioning & Handover

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Testing, Commissioning & HandOver Form

Page 20: Aero hub o&m, installation & maintenance

T, C & H – (Step -1)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

Note:-1) Please disconnect all Cable from Aerohub Canister.

This is to prevent from accidentally discharge Aerohub® Fire Suppression System.

1) MAINS ON/OFF2) CHARGER ON

i) Check AC Supply with Test-pen or Analog Meter (240V AC)

ii) Switch ON and OFF to check the switch is in good condition

Page 21: Aero hub o&m, installation & maintenance

T, C & H – (Step -2)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

3) BATTERY FAIL

i) Open the fuse (Battery Fuse), When you do this the buzzer will be sound and LED “Battery Fail” will light ON,

ii) Use Analog meter to check the Battery is in good Condition per cell voltage Battery is 12V DC above,

iii) After finish check Battery voltage, Close back (Battery Fuse). The sound and L.E.D indicator “Battery Fail” will be in OFF within 10 – 15 second.

Page 22: Aero hub o&m, installation & maintenance

T, C & H – (Step -3)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

4) TEST L.E.D

i) ON L.E.D toggle switch and all LED light “ON”,

ii) Check all toggle switch at main frame weather it is in condition,

iii) If you press alarm button the RED LED will light, Alarm Bell rigging and Twins Flashing Light Bulb change from GREEN to RED, to make it NORMAL condition back “ISO” isolate the alarm and press ALARM RESET.

Page 23: Aero hub o&m, installation & maintenance

T, C & H – (Step -4)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

5) SMOKE DETECTOR

i) Test Smoke Detector is in condition or not, use Smoke Tester,

ii) Spray Smoke Tester, when u do this the L.E.D at Zone 1 light “ON”, Alarm Bell will rigging intermittent, Twins Flashing Light Bulb change from GREEN to RED,

iii) To make it in NORMAL back “ISO” isolate the alarm and press ALARM RESET.

Page 24: Aero hub o&m, installation & maintenance

T, C & H – (Step -5)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

6) HEAT DETECTOR

i) Test Heat Detector in condition or not use Hair Dryer,

ii) Heat-up -- when u do this the L.E.D at Zone 2 light “ON”, the Alarm Bell rigging intermittent and Twins Flashing Light Bulb change from GREEN to RED,

iii) To make it in NORMAL condition back “ISO” isolate the alarm and press ALARM RESET.

Page 25: Aero hub o&m, installation & maintenance

T, C & H – (Step -6)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

7) ALARM BELL

i) Test Alarm Bell is in good condition is press alarm button at zone 1 / zone 2,

ii) To make it in NORMAL condition back “ISO” isolate the alarm and press ALARM RESET.

Page 26: Aero hub o&m, installation & maintenance

T, C & H – (Step -7)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

8) TWINS FLASHING LIGHT

i) In NORMAL green Bulb light ON.

ii) Test Twins Flashing Light is in good condition is press alarm button at zone 1 / zone 2, -- RED Bulb light “ON” and GREEN Bulb will OFF,

i) To make it in NORMAL condition back ‘ISO” isolate the alarm and press ALARM RESET.

Page 27: Aero hub o&m, installation & maintenance

T, C & H – (Step -8)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

9) KEYSWITCH / MANUAL RELEASE

i) Test keyswitch is in good condition is to turn ON and L.E.D Aero Discharged will light “ON”,

ii) To make it in NORMAL condition back is turn OFF back KeySwitch.

Page 28: Aero hub o&m, installation & maintenance

T, C & H – (Step -9)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AUTO / MANUAL :-

1) AUTO * In Normal condition the position of the key must be in AUTO.

2) MANUAL* Under maintenance turn to MANUAL,

this is to prevent from accidentally discharged, but the system is in NORMAL

mood operation system.

Page 29: Aero hub o&m, installation & maintenance

T, C & H – (Step -11)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AIR-COND TRIP.

AIR-COND TRIP WHEN:-

1) Press alarm button zone 1 and zone 2, Aerohub® Control Panel will send voltage 24VDC to the DB Air-Cond ,

2) If only 1 zone is triggered i.e., zone 1 or zone 2 Aerohub® Control Panel will not send voltage 24VDC to DB Air-Cond,

3) To make it in NORMAL, “ISO” isolate the alarm and press ALARM RESET.

Page 30: Aero hub o&m, installation & maintenance

T, C & H – (Step -12)

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

AEROHUB ® DISCHARGED 25 -30 SECOND

1) Press alarm button zone 1 and zone 2, after 25 – 30 second Aerohub ® Discharged LED will light ON,

2) After Aerohub® Discharged LED light ON, take Analog / Digital meter and check all terminal of Aerohub® have voltage 24VDC,

Page 31: Aero hub o&m, installation & maintenance

Designed byDesigned byHUB TECHNOLOGIES (M) SDN BHDHUB TECHNOLOGIES (M) SDN BHD

ThanksThanksTogether We Together We SucceedSucceed