AE OPERATIONS Supplier Information on Changed Quality Process
Transcript of AE OPERATIONS Supplier Information on Changed Quality Process
Supplier Information on Changed Quality ProcessAE OPERATIONS
Outline
� Introduction
� Changes for the suppliers
� More information & Johnson Controls contacts
Johnson Controls, Inc. - INTERNAL2
Introduction
In this information package we
� inform you about the changes you will experience in the quality process due to our transition to SAP for our logistics, manufacturing and operations functions.
� provide details on training material to support you in the interaction with Johnson Controls facilities.
� confirm Johnson Controls contacts that will help you with any question.
Johnson Controls, Inc. - INTERNAL3
Outline
� Introduction
� Changes for the suppliers
� More information & Johnson Controls contacts
Johnson Controls, Inc. - INTERNAL4
Overview of two most important changes
1. An interactive PDF (iPDF) to support the problem-solving (8D report) process between Johnson Controls and its suppliers.
2. The removal of the 100 euro admin fee in the supplier chargeback process (SCB) and the introduction of a more transparent Issue Managing Cost process based on the degree of impact of the Supplier issue to JCI plant.
3. The MQR process will be handled by SAP which means that in the future suppliers get an automatic generated email and we ask you to fill out a suppliers get an automatic generated email and we ask you to fill out a Quality Roadmap template (in excel) for the MQR meeting.
5 Johnson Controls, Inc. - INTERNAL
An interactive PDF to support the problem-solving process
� At the moment the problem-solving process (8D report) is started from IRIS system by sending an email with a PDF with the issue details and an empty excel form that the supplier has to fill out. This excel sheets is then send back manually and forth by e-mail between the issue originator at Johnson Controls
Today Tomorrow� In the future the supplier will get an
email notification with the iPDF attached. This iPDF contains the issue details and an integratedinteractive 4D / 8D part. All mandatory input fields are clearly marked. The iPDF can be send back to JCI by only clicking a button inside the document.
� The option to attach documents
Benefits & impact� iPDF template is following the VDA
standard.
� User friendly format (all mantatory fields are marked).
� Easy resending (Automated) of the iPDF document by clicking only a “send“ button inside the iPDF.
� Option to attach documents directly inside the iPDF.
� Clear documentation for RMA and originator at Johnson Controls and the supplier.
6
� The option to attach documents directly inside the iPDF.
� Possibility to add yhe Return Material Authorization Number.
� The possibility to flag in the iPDF if a material needs to be returned or can be scrapped by Johnson Controls.
� Clear documentation for RMA and defective parts follow up.
� Option to decline the issue directly inside the iPDF with a reason.
� In case you supply to multiple Johnson Controls facilities you might be confronted with the new iPDF and today‘s way of working (Excel template coming from IRIS). Eventually all JCI facilities will use the iPDF.
In the next slide you will find an example of the excel file currently used and the interactive PDF
Johnson Controls, Inc. - INTERNAL
An example of the current problem-solving excel and the new Interactive PDF
An Interactive PDF to fill out:
� A description of the issue in the Issue Header and Issue Details and the possibility to enter supplier feedback directly in the form, so only one document attached to the e-mail notification.
� Send the form by clicking
Empty excel sheet to fill out:
� Besides a PDF with the issue details, the supplier receives an excel form to provide input on the issue.
OLD
NEW
7
� Send the form by clicking the send button at the end of the document.
� Possibility to attach documents in the iPDF.
Johnson Controls, Inc. - INTERNAL
A more transparent Issue Managing Cost process
� An admin fee of 100 euro or dollars (depending on region) is added to every supplier chargeback.
Today Tomorrow Benefits & impact� More detailed cost calculation .
� The fee will automatically settled by a debit note on the supplier‘s invoice once a month.
� The admin fee item will be cancelled and replaced by a more detailed breakdown.
� We will calculate the administration costs based on the complexity of an issue and based on different labor hour rates per different regions.
8
� We will debit issue managing costs only on closed SMRR / DMR issues that have been acknowledged by supplier.
� Debit note will contain a breakdown on single administration workload activities.
In the next slide you will find an example of a Debit Note and its cost variables
Johnson Controls, Inc. - INTERNAL
An example of Debit Note and its cost variables
On the Debit Note you will find:
� Issue Id
� Issue Type
� Issue Status
� Total amount of the issue based on the cost variables below
9 Johnson Controls, Inc. - INTERNAL
Changes to the MQR process
� Today the MQR notification is send to the supplier by email (manually).
Today Tomorrow Benefits & impact� A more standardized process
for both Johnson Controls and the supplier.
� An automatic generated email which contains the MQR notification (in a PDF file) and an excel template, the Quality Roadmap, which we ask you to fill in before the MQR meeting.
10
In the next slide you will find an example of a MQR notification and the Quality Roadmap template in excel
Johnson Controls, Inc. - INTERNAL
An automatic generated email which contains the MQR notification
NEW
11 Johnson Controls, Inc. - INTERNAL
The Quality Roadmap that has to be filled out before the MQR meeting
FY 11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 YTD PPM FY12 Goal
PROBLEM STATEMENT: Enter the Problem Statement here. (What, Where, When and to what extent.)
DEFECT AND RPPM BY MONTH
0 00
100
200
300
400
500
FY 11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 FY12 YTD
FY12 Goal
PPM Reduction by MonthForecasted PPM Actual PPM
0% 0% 0% 0% 0% 0%0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PPM Contributer #1 PPM Contributer #2 PPM Contributer #3 PPM Contributer #4 PPM Contributer #5 PPM Contributer #6
Pareto PPM % Contribution
NEW
In the excel file that you will receive you will find a separate tab with instructions how to fill out the Quality
12
FY 11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 YTD PPM FY12 Goal
Forecasted Pcs. Rejected
Forecasted Pcs. Shipped
Monthly Forecasted RPPM #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
% Contribution % Contribution % Contribution
PPM Contributer #1 0% #DIV/0!
PPM Contributer #2 0% #DIV/0!
PPM Contributer #3 0% #DIV/0!
PPM Contributer #4 0% #DIV/0!
PPM Contributer #5 0% #DIV/0!
PPM Contributer #6 0% #DIV/0!
Actual Pieces Rejected
Actual Pieces Shipped
Monthly Actual RPPM #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
FY 11 Actual #DIV/0! PPM
FY12 YTD #DIV/0! PPM
FY12 Goal
PPM Monthly
ReductionOwner Open Date
Plan (original)
Comp. Date
Revised
Completion Date
Actual Completion
Date
Long Term:
Long Term:
PPM Contributer #2 Short Term:
Problem Statement (What, where, when, to
what extent)Root Cause Root Cause Verification
Short-term corrective action / Long-
term countermeasure (list as
deliverable)
Verification of Corrective Actions
PPM Contributer #1 Short Term:
out the Quality Roadmap shown on the left
Johnson Controls, Inc. - INTERNAL
Outline
� Introduction
� Changes for the suppliers
� More information & Johnson Controls contacts
Johnson Controls, Inc. - INTERNAL13
More Information on the Johnson Controls Supplier Portalhttp://www.johnsoncontrols.com/content/us/en/suppliers/automotive_experience/Global_Standardization.html
www.johnsoncontrols.com
14 Johnson Controls, Inc. - INTERNAL
2
31
More Information on the Johnson Controls Supplier Portalhttp://www.johnsoncontrols.com/content/us/en/suppliers/automotive_experience/Global_Standardization.html
On the Global Standardization page you will find:
Information on changed Quality process:� This presentation� Training material on the Interactive PDF
Please familiarize yourself with the provided information
15
Please familiarize yourself with the provided information and work against DMR & SMRR email notifications
and address corrective actions.
Johnson Controls, Inc. - INTERNAL
Johnson Controls Contacts
Area Name Email
Quality Management (QM) Jürgen Wandelt [email protected]
Purchasing (PUR) Thomas Roßmüller [email protected]
Supply Chain Mgmt. (SCM) Jon Karel [email protected]
16 Johnson Controls, Inc. - INTERNAL