Page 1: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Darcy Bullock, P.E.ProfessorPurdue University

Page 2: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Requested TopicsWhat is Hardware-in-the-Loop (HITL)Why would you use itHistorical PerspectiveFuture Challenges

Page 3: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

What is HITLTesting and Evaluation of control equipment/algorithms with a simulated plant

Page 4: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

What is HITLGoal

Typical

HITL

SimulatedController

SimulatedPlant

Control Equipment

SimulatedPlant

Control Equipment

Real World Traffic

Page 5: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Why would you want to use HITL

So you can make mistakes (and learn from them) in the lab, not the field. Then when you deploy, there should be fewer surprises.So you have a controlled environment in which to experiment and quantify benefits.So you have a facility for students to try things and learn from their mistakes.Probe the “corners” of a control system without worrying about the consequences of failure

Page 6: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Functional Evaluation

Page 7: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Hmm.What if we could control a suitcase tester with a computer.

Monitor 24 volt phase outputsGround loop detector inputs as directed.

Page 8: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Performance Based Evaluation

Page 9: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Still Do Suite Case Testing

Page 10: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

SystemSetupw/Master

ClosedLoop

Netw ork

Closed Loop Managem ent Software

Clo

sed

Loop

Com

mun

icat

ion

Inte

rcon

nect

Cab

le

RS

-232

from

Clo

sed

Loo

p S

oftw

are

to S

yste

m M

aste

r

RS

-232

from

CO

RS

IM to

Sim

ulat

ion

Inte

rface

Net

wor

k

RS

-422

CID

Net

wor

k

CORSIM Network S im ula tion

Controller InterfaceDevice (CID)

Netw ork

RealW orldModel

Page 11: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Alternative to HITLSuitcase tester Ok feature individual tester Virtually impossible to evaluate

interaction of various features on a single controller much less a “system” of controllers

“Full Up Testing”…. Plug everything together and hope they work

Page 12: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Historical PerspectiveHITL has been used extensively by other industries for several decades.1985 at University of Vermont when Prof Bob Dawson explained his simulation system for testing/developing the control system on a PDP-11 controlling the gravel washing/production system.

Page 13: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Gate Control Logic1986 worked on a speed sieve design for gate control at the IBM Essex Junction Plant1987 senior design project worked with EE student and.. he built the control hardware.. I built a simulator in Modula II.

Page 14: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

1993Moved to LSU in Baton Rouge, LATom Urbanik invites me to participate with his team on the IVHS Research Center ProposalDeveloped HITL concept for Smart Diamond Testing

Page 15: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Dec 1993 Smart Diamond Testing Concept

Page 16: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

1994 Smart Diamond Test Plan

Page 17: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

1994 Smart Diamond Equipment Concept

Page 18: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Further DevelopmentsTexSIM developed for Smart Diamond Monty willl discuss nextCORSIM extended for hardware in the loop

Page 19: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Controller Interface Device(CID) ~1997

Page 20: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

1997-Present CID Uses Testing ACS Lite algorithmsAlgorithm developmentController feature testingLaboratory Based Instruction

Page 21: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

1997 – Present HardwareTTI PlatformIdaha PlatformUniv. of Minnesota PlatformNaztec/Eagle PlatformPortland PLC PlatformEmergence of a Software Platform (Univ of Arizona, Siemens, Univ of Utah)

Page 22: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Purdue HITL Laboratory

Page 23: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Project SetupChoose a real system to design and simulateObtain plans, volumes, etc. from DOTSystems that are being constructed, need to be upgraded, or were recently upgraded are ideal

Page 24: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Project Selections

Page 25: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

S B L T N B W B L T E B N B L T S B E B L T W B1 2 3 4 5 6 7 8

M a i n S t r e e t T h r o u g h 1 0 sS i d e S t r e e t T h r o u g h 7 sA l l L e f t T u r n s 5 s

Y e l l o w C l e a r a n c e

R e d C l e a r a n c e

P e d e s t r i a n C l e a r a n c e

P e d e s t r i a n W a l k 7 s e c o n d s

M a x 1 G r e e n M a x 1 = 1 . 3 * S y n c h r o S p l i t

V e h i c l e E x t e n s i o nF o r 3 s e c o n d V e h E x t : V e h E x t = 3 s e c - G a p A l l o w

T p = p e r c e p t i o n t i m e ( u s u a l l y 1 s e c . )V v = a v e r a g e v e h i c l e s p e e d o n a p p r o a c h ( m p h )

a = d e c e l e r a t i o n r a t e ( 1 0 f e e t / s 2 )W = a d j a c e n t a p p r o a c h w i d t h ( f e e t )L = a v e r a g e v e h i c l e l e n g t h ( u s u a l l y 2 0 f e e t )c = l a n e w i d t h ( f e e t )V w = a v e r a g e w a l k i n g s p e e d ( u s u a l l y 4 f e e t / s 2 )

M i n i m u m G r e e n

N o d e 1 6

P a r a m e t e r C a l c u l a t i o n

2aV * 1 .47 T Yellow v

p

vV * 1.47L W

Red

wV.5c - c) * Lanes of (#

Clr Ped

vAllow V * 1 .4 7

(f eet)Len g th D etecto r L G ap

Project: Design ProcessCalculate timing parameters

5 5 5 510 107 7

3.0 3.0 3.0 3.04.0 4.03.5 3.51.5 1.5 1.5 1.52.0 2.02.0 2.0

20 20 20 2050 5040 403.0 3.0 3.0 3.02.5 2.52.5 2.5

15 1515 157 77 7

Page 26: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Project: Design ProcessObtain cycles, offsets, and splits from Synchro or Highway Capacity Software

Page 27: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Project: Real-Time Simulation

Controllers are configured with the calculated timings and coordination timings

Page 28: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Project: Real-Time Simulation

Simulation model is built using proposed geometries and vehicle volumes and imported into CORSIM

ITRAF CORSIM

Page 29: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

I/O MappingVehicle sensors are mapped to the corresponding phases by the students

DetectorCards

Controller

ControllerMapping

Page 30: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

“Final Lab Exam”1 controller plugged into 1 CID for each intersectionAll CIDs plugged in to 1 PC running CORSIMAll controllers plugged in to 1 PC running remote software

Page 31: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

Closed Loop Monitoring Screens

PC set up to monitor the system remotely Change

controller parameters

View signal and detector status

Page 32: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation

For future HITL ChallengesCommercially viable CIDs that supports both TS2 Type 1 and Type 2 I/O AND aWell supported integration with an accepted simulation model (CORSIM)Blurring of software/hardware in the loopFormally addressing the timing latency issue between simulation clock and controller.