Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident...
Transcript of Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident...
![Page 1: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/1.jpg)
Optimizing Health Worker Performance and Productivity to Achieve the 95-95-95 TargetsToolkit Lessons and Applications
Adrienne Hurst USAID/Washington
Rachel DeussomHRH2030 | Chemonics
Samson Kironde Jean NguessanHRH2030 | URC
Godfrey NyombiUSAID/Tanzania
![Page 2: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/2.jpg)
Adrienne HurstUSAID/WashingtonModerator
www.hrh2030program.org
HRH2030 strives to build the accessible, available, acceptable, and high-quality health workforce needed to improve
health outcomes.
![Page 3: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/3.jpg)
![Page 4: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/4.jpg)
Webinar Objective
▪ To orient participants to the toolkit, its uses, and how it was developed with examples from the field
▪ To support PEPFAR agencies and implementing partners to achieve the 95-95-95 targets
![Page 5: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/5.jpg)
Why Health Worker Optimization Matters Human resources for health (HRH) is one of the largest cost drivers
among PEPFAR’s investment.
The World Bank estimated as much as 40% of government health budgets go to wages in EE/CA and SSA.1
The size of stakeholder investment in HRH should not be surprising: 59% of PLHIV were accessing ART in 2017 (UNAIDS) and in 2016 WHO projected a gap in health workers of 18 million by 2030 globally. 2
Sources: 1 Working in Health: Financing and Managing the Public Sector Health Workforce https://openknowledge.worldbank.org/bitstream/handle/10986/2621/483400PUB0Work101OFFICIAL0USE0ONLY1.pdf?sequence=1&isAllowed=y2 Global Strategy on Human Resources for Health: Workforce 2030 http://apps.who.int/iris/bitstream/handle/10665/250368/9789241511131-eng.pdf?sequence=1
![Page 6: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/6.jpg)
Why Health Worker Optimization Matters, cont. Even with these large investments, current government and donor
spending cannot bridge the projected health worker gap. There is need to optimize the performance and productivity of current staff to continue to increase HIV treatment coverage.
Stakeholder investments in HRH should be interventions to reach epidemic control, requiring program design and monitoring — not only inputs.
HRH2030’s toolkit, supported by PEPFAR through USAID, is one way to help ensure investments achieve their intended impact.
![Page 7: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/7.jpg)
Rachel DeussomHRH2030 | Chemonics
Toolkit Overview
![Page 8: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/8.jpg)
Overview of Process for Optimizing Health Worker Performance and Productivity to Achieve 95-95-95 Targets
![Page 9: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/9.jpg)
Step 1: Identify HIV Service Delivery Gaps
Support facility staff to review service statistics for 95-95-95 target areas:
HIV testing services (First 95 target): Number of individuals who received HIV testing services (HTS) and received their test results (HTS_TST)
Antiretroviral therapy (ART) initiation and continuation (Second 95 target): Number of adults and children newly enrolled on antiretroviral therapy (ART) (TX_NEW)
Viral load suppression (Third 95): Percentage of ART patients with a viral load result with a suppressed viral load (<1000 copies/ml) (TX_PVLS)
Staff analyze facility data at Ngome Dispensary in Tanzania in July 2017.
![Page 10: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/10.jpg)
What do you observe?
Where is the service delivery gap?
Step 1: Identify HIV Service Delivery Gaps
For example, reviewing both newly identified HIV+ patients and ART initiation data.
Review both newly identified HIV+ patients and ART initiation data. What do you observe? Where is the service delivery
gap?
![Page 11: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/11.jpg)
PEPFAR Rapid Site-Level Health Workforce Assessment Tool
PEPFAR Site Improvement Monitoring System (SIMS) Facility-Based Tool
Step 2: Identify Possible Workforce Problems
Fishbone Diagram Five Whys
![Page 12: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/12.jpg)
Step 2: Identify Possible Workforce Problems Health worker competency gaps
Do the health workers have the right skills? Low staff engagement
Are the health workers motivated? Poor allocation of staff and tasks
Do we have enough of the right health workers performing the right tasks?
Inefficient work processes Are health workers’ tasks well organized?
How do workforce problems seem to be affecting HIV service delivery?
Which problem(s)?
![Page 13: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/13.jpg)
Step 2: Identify Possible Workforce Problems
![Page 14: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/14.jpg)
Health worker competency gaps
Low staff engagement Poor allocation of staff and tasks
Inefficient work processes
•Poor counseling skills•Misalignment between training opportunities and providers
•Unclear job descriptions•Lack of feedback•Lack of teamwork•Low motivation
•Long patient wait times•High number of unexplained absences•Poor scheduling
•Lack of triage desk•Lack of preparation for clients
Provider skills assessments
Job satisfaction/ engagement survey
Site manager interview
Client flow & time-use tools
Step 3: Understand Underlying Causes of Workforce Problems
![Page 15: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/15.jpg)
Health worker competency gaps Inefficient work processes/task allocation
• Clinical officer is overburdened to conduct all ART refill consultations for stable patients
• Nurses formally trained and authorized to manage stable ART patients, but confident performing
• Nurses too busy to conduct community follow up of ART patients
• Adherence support volunteers were not formally trained to conduct referrals
• Many HIV-positive clients not physically escorted to the treatment clinic for either facility- or community-based referrals
• Patient contacts not captured for community referrals
• Long wait time for ART initiation and dispensation• First patient contact with adherence support
volunteers only at ARV dispensation
Rapid task analysis Client flow mapping
Step 3: Understand Underlying Causes of Workforce Problems
![Page 16: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/16.jpg)
•Competency-based in-service training• Improve mentoring• Support more supportive supervision•Reinforce use of job aids• “Low dose, high frequency” approaches
Health worker competency gaps
•Nonfinancial incentives• Staff recognition•Constructive performance feedback / appraisals• Support more supportive supervision•Team building• Improved communication• Improved work environment
Low staff engagement
• Implement task shifting guidance•Develop/ clarify job descriptions•Develop task assignments•Worker scheduling
Poor allocation of staff and tasks
•Consider differentiated care• Streamline services; clarify work processes•Reorganize SOPs/ processes
Inefficient work processes
Step 4: Develop Workforce Interventions
![Page 17: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/17.jpg)
• Improving mentoring, supportive supervision & communication• Local champions/peers for nurse ARV refills• Lay counselors & nurses for adherence support
volunteers• Nurse-led WhatsApp group for adherence
volunteers for support and follow up•Reinforce use of job aids• To ensure confidential patient data between
community and facility
• Implement task shifting guidance (based on national guidelines)• Nurses tasked with stable patients (relieve clinical
officer workload)• Adherence support volunteers tasked with
community outreach (relieve nurse workload)• Improve work processes• Place HIV+ expert patient at registration to
physically escort new patients to ART• Confidential registration in waiting room
• Consider differentiated care (in future)
Health worker competency gaps Inefficient work processes / task allocation
Step 4: Develop Workforce Interventions
![Page 18: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/18.jpg)
Step 5: Identify Strategies for Monitoring Workforce Interventions
Develop a monitoring plan Appropriate process and outcome indicators or
measures
Keep measures simple so staff workload is not impacted
Consider posting results in the facility for transparency and staff/client engagement
“Quick wins” are motivating!
Review HIV service delivery gaps continually Are interventions responding to HIV service delivery gaps?
Adjust intervention and make decisions as needed
For each measurement indicator, identify:
1. Title of measure2. Type of measure (process,
outcome)3. Operational definition of the
measure4. Data collection and sampling
method5. Plans for data display6. Availability of baseline data7. Goal(s) or target(s)8. Data source
![Page 19: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/19.jpg)
Process Indicators Percentage of newly identified HIV-positive
clients who were physically escorted to the care and treatment clinic
Average wait time for clients at the care and treatment clinic
Percentage of stable ART patient cases managed by a nurse
Outcome Indicators Number of newly identified HIV positive
patients (HTS_TST_POS) Number of patients newly initiated on
ART (HTX_New)
Step 5: Identify Strategies for Monitoring Workforce Interventions
![Page 20: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/20.jpg)
Optimizing Health Worker Performance and Productivity to Achieve 95-95-95 Targets
www.hrh2030program.org/prodperftoolkit
![Page 21: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/21.jpg)
Samson Kironde and Jean NguessanHRH2030 | URC
Toolkit Development & Field Applications:Lessons from Nigeria and Tanzania
![Page 22: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/22.jpg)
Development of the Field-level Training
Contributed to toolkit content & approach
Gathered contextual information for each country to develop toolkit training, including: identifying knowledge gaps and needs structured questionnaires to implementing
partners most recent available PEPFAR target data
Resulted in facilitator guide & slide deck
www.hrh2030program.org/prodperftoolkit
Facilitator Guide & Slide Deck
![Page 23: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/23.jpg)
Training Approach & Methodologies HRH problems are not about bringing more staff or material
Reinforces the importance of facility HRH in contributing to effective service delivery and meeting targets
Day 1: Participatory discussions on tool use at each step Presentations and role plays Small groups to apply the tools to a facility case study
Days 2 & 3: Field practicum Problem identification and root cause analysis Identification of possible interventions to manage challenges
![Page 24: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/24.jpg)
Fishbone diagram identifying causes of
service delivery challenges
24
Example from Small
Group Work
![Page 25: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/25.jpg)
Data collection sheet to
document and assess waiting
time; flow chart at Randle Hospital in
Lagos
Example from Nigeria
![Page 26: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/26.jpg)
Igumbilo Dispensary: Highlights from the Five-step Process
No data used to inform HIV service delivery
Inadequate HW skills and knowledge for data analysis and use
Inadequate task allocation for HIV service delivery
Onsite mentorship and supportive supervision on data analysis and data quality assessment
Development of task assignments
Monthly data review and analyses
![Page 27: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/27.jpg)
Increased number of lost-to-follow-up (LTF) clients
Little follow-up done for clients who missed appointments at least three days ago
Low follow-up linkage from CBO volunteers for LTF
The facility manager to contact AllamanoCenter (the CBO) for additional volunteers in Iringa District
Goal: initiate follow-up of clients within 3 days after missing the appointment
Itamba Dispensary: Highlights from the Five-step Process
![Page 28: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/28.jpg)
Insufficient viral load suppression among ART
patients
Overworked or insufficient service providers
On-the-job orientation for peer educators on adherence counseling
Strengthening peer educator skills
Tosamaganga Hospital: Highlights from the Five-step Process
![Page 29: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/29.jpg)
Key Lessons Learned Trainings were well received.
Orientation on HRH as part of overall health systems strengthening was important.
Participants had familiarity with the tools but had not applied them specifically to solve HRH issues.
Participants felt that the Toolkit empowers facility staff to solve their own problems.
IPs typically view the patients as their clients. The training prompted them to begin recognizing service providers as clients, as well.
Workshop attendees engage in a group activity during a July 2017 workshop in Tanzania.
![Page 30: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/30.jpg)
Godfrey NyombiUSAID/Tanzania
Examples & Lessons Learned: Toolkit use and results from field testing in Nigeria and Tanzania
![Page 31: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/31.jpg)
Service delivery partners
Council management team
Hands-on workshop
Practical field experiences
Data use
Iringa Workshop
Staff analyze facility data at Ngome Dispensary in Tanzania in July 2017.
![Page 32: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/32.jpg)
Progress Update
The eight facilities have implemented the plans they developed. Documentation of client records Reporting Staff duty roster
Igumbilo Dispensary dedicated one data focal person.
The practice has scaled up to 15 facilities.
Knowledge sharing to program staff is occurring.
Activities have been integrated with QI initiatives.
![Page 33: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/33.jpg)
Adrienne HurstUSAID/WashingtonModerator
Questions?
![Page 34: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/34.jpg)
Adrienne HurstUSAID/WashingtonModerator
www.hrh2030program.org
Follow
Like
Sign up
This webinar is made possible by the generous support of the American people through the United States Agency for International Development (USAID) under the terms of cooperative agreement no. AID-OAA-A-15-00046 (2015-2020) in partnership with The U.S. President's Emergency Plan for AIDS Relief (PEPFAR). The contents are the responsibility of Chemonics International and do not necessarily reflect the views of PEPFAR, USAID, or the United States Government.
![Page 35: Adrienne Hurst Optimizing Health Worker Performance and … · stable ART patients, but confident performing • Nurses too busy to conduct community follow up of ART patients •](https://reader036.fdocuments.us/reader036/viewer/2022081615/5fd65e9131f3694c30497375/html5/thumbnails/35.jpg)
Thank You