Adopted infrastructure resolution...
Transcript of Adopted infrastructure resolution...
Attachment 1 - Resolution template [All text in this template is able to be edited to suit specific requirements of each local government. Text in square brackets is for guidance only and must be deleted in the final document.]
This resolution is made under s. 630 of the Sustainable Planning Act 2009 (SPA).
1. Application to local government areaThis resolution declares that an adopted charge does not apply for: [delete following points not applicable or delete all points in this subsection if not applicable]
the entire [insert local government area name] Local Government Area
that part of [insert local government area name] Local Government Area shown on Map [insert map number/s reference and attach map/s to the resolution].
2. When resolution has effect This resolution has effect on and from [insert date].
3. Priority infrastructure areaThe priority infrastructure area for [insert local government area name] is identified in the State planning regulatory provision (adopted charges) or in the local government infrastructure plan in [insert name of local government planning scheme].
4. Comparison of planning scheme use categories and SPRP charge categoriesTo assist in applying the adopted infrastructure charges schedule in Schedule 1 of the State planning regulatory provision (adopted charges), Table 1 provides a guide to the uses under the planning scheme that come within the uses mentioned in column 2 of the adopted infrastructure charges schedule.
Table 1 - Planning scheme use categories and SPRP (adopted charges) charge categories
Current planning scheme use categories SPRP(adopted charges) charge categories
Residential
[Insert planning scheme use types that correspond to the classes of development to which adopted infrastructure charges apply][E.g. relatives accommodation]
Dwelling house
Dual occupancy
Caretaker’s accommodation
Multiple dwelling
Accommodation (short term)
Hotel
[E.g. accommodation unit] Short-term accommodation
Tourist park
Accommodation (long term)
Community residence
Hostel
Relocatable home park
[E.g. special needs housing] Retirement facility
Places of assembly
Club
Community use
Function facility
Funeral parlour
Place of worship
Commercial (bulk goods)
Agricultural supplies store
Bulk landscape supplies
Garden centre
Hardware and trade supplies
Outdoor sales
Showroom
Commercial (retail)
Adult store
Current planning scheme use categories SPRP(adopted charges) charge categories
[E.g. food service] Food and drink outlet
Service industry
Service station
Shop
Shopping centre
Commercial (office)
Office
Sales office
Education facility (excluding Flying Start facilities)
Child care centre
Community care centre
Educational establishment
Flying Start Education facility
Entertainment
Hotel (non-residential component)
Nightclub
Theatre
Indoor sport and recreational facility
Indoor sport and recreation
Industry
Low impact industry
Medium impact industry
Research and technology industry
Rural industry
Warehouse
Waterfront and marine industry
High impact industry
High impact industry
Noxious and hazardous industries
Low impact rural
Animal husbandry
Cropping
Permanent plantations
Current planning scheme use categories SPRP(adopted charges) charge categories
Wind farm
High impact rural
Aquaculture
Intensive animal industries
Intensive horticulture
Wholesale nursery
Winery
Essential services
[E.g. institutional residential] Correctional facility
Emergency services
Health care services
Hospital
Residential care facility
Veterinary services
Specialised uses
Air services
Animal keeping
Car park
Crematorium
Extractive industry
Major sport recreation and entertainment facility
Motor sport
[E.g. night court] Outdoor sport and recreation
Port services
Tourist attraction
Utility installation
Minor uses
Advertising device
Cemetery
Home based business
Landing
Market
Outdoor lighting
Park
Roadside stalls
Current planning scheme use categories SPRP(adopted charges) charge categories
Telecommunications facility
Temporary use
5. Adopted infrastructure charges
The [insert local government name] Council resolves to adopt the charges mentioned in Table 2, Column 3, for development for a use mentioned in Table 2, Column 2.
The local government declares that an adopted charge in Table 2, Column 3, applies to that part of the local government area mentioned for that charge in Table 2, Column 4.
[Insert following statement if applicable]The area in which the adopted infrastructure charge applies is identified in Map [insert map number/s reference and attach map/s to the resolution].
Table 2 – Adopted infrastructure chargeColumn 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Residential Dwelling houseCaretaker’s
accommodationMultiple dwellingDual occupancy
Adopted infrastructure charge Adopted infrastructure charges for stormwater network
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
[Insert adopted infrastructure charge]1 or 2 bedroom dwelling
or[Insert adopted infrastructure charge]
3 or more bedroom dwelling
N/A
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Accommodation (short term)
HotelShort-term
accommodationTourist park
For a tent or caravan site in a tourist park: [Insert adopted infrastructure charge]
per 1 or 2 tent/caravan sitesor
[Insert adopted infrastructure charge]per 3 tent or caravan sites
N/A [Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
For a cabin in a tourist park: [Insert adopted infrastructure charge]
per cabin with 1 or 2 bedrooms or
[Insert adopted infrastructure charge]per cabin with 3 or more bedrooms
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Accommodation (short term)
For a hotel or short-term accommodation: [Insert adopted infrastructure charge]
per suite (with 1 or 2 bedrooms) or
[Insert adopted infrastructure charge]per suite (with 3 or more bedrooms)
or[Insert adopted infrastructure charge]
per bedroom (for a bedroom that is not within a suite)
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Accommodation (long term)
Community residence
HostelRelocatable home
parkRetirement facility
For a relocatable home park: [Insert adopted infrastructure charge]
per 1 or 2 bedroom relocatable dwelling siteor
[Insert adopted infrastructure charge]per 3 or more bedroom relocatable dwelling
site
N/A [Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Accommodation (long term)
For a community residence, retirement facility or hostel:
[Insert adopted infrastructure charge]per suite (with 1 or 2 bedrooms)
or[Insert adopted infrastructure charge]per suite (with 3 or more bedrooms)
or[Insert adopted infrastructure charge]
bedroom (for a bedroom that is not within a suite)
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Places of assembly
ClubCommunity useFunction facilityFuneral parlourPlace of worship
[Insert adopted infrastructure charge]per m2 of gross floor area (GFA)
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Commercial (bulk goods)
Agricultural supplies store
Bulk landscape supplies
Garden centreHardware and trade
suppliesOutdoor salesShowroom
[Insert adopted infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Commercial (retail)
Adult storeFood and drink
outletService industryService stationShopShopping centre
[Insert adopted infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Commercial (office)
OfficeSales office
[Insert adopted infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Education facility (excluding Flying Start facilities)
Child care centreCommunity care
centreEducational
establishment
[Insert adopted infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Flying Start Education facility
Education establishment for the Flying Start for Queensland Children program
Nil Charge N/A
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Entertainment Hotel (non-residential component)
NightclubTheatre
[Insert adopted infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Indoor sport and recreational facility
Indoor sport and recreation
[Insert adopted infrastructure charge]per m2 of GFA, court areas at [Insert adopted
infrastructure charge]per m2 of GFA
[Insert adopted infrastructure charge for stormwater network] per
impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Industry Low impact industryMedium impact
industryResearch and
technology industryRural industryWarehouseWaterfront and
marine industry
[Insert adopted infrastructure charge] per m2
of GFA [Insert adopted infrastructure charge
for stormwater network] per impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
High impact industry
High impact industry
Noxious and hazardous industries
[Insert adopted infrastructure charge] per m2
of GFA[Insert adopted infrastructure charge
for stormwater network] per impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Low impact rural Animal husbandryCroppingPermanent
plantations
Nil charge
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
High impact rural Aquaculture Intensive animal
industries Intensive
horticultureWholesale nurseryWinery
[Insert adopted infrastructure charge] per m2 of GFA
N/A [Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Essential services Correctional facilityEmergency servicesHealth care
servicesHospitalResidential care
facilityVeterinary services
[Insert adopted infrastructure charge] per m2 of GFA
[Insert adopted infrastructure charge for stormwater network]
per impervious m2
[Insert applicable area (i.e. specific locality or across LGA) and cross reference to attached map number where required]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Specialised uses Air servicesAnimal keepingCar parkCrematoriumMajor sport,
recreation and entertainment facility
Motor sportNon-resident
workforce accommodation
Outdoor sport and recreation
Port servicesTourist attractionUtility installationExtractive industry
The adopted infrastructure charge is the charge (in Column 3) for the charge category (in Column 1) that the local government determines should apply for the use at the time of assessment.
[Note: the charge allocated to a development which is ‘specialised uses’ must not be more then the relevant maximum adopted charge in the SPRP (adopted charges)]
Column 1Adopted infrastructure charge category
Column 2Use
Column 3Adopted infrastructure charges
Column 4Part of local government area (LGA) to which charge applies
Minor uses Advertising deviceCemeteryHome-based
businessLandingMarketRoadside stallsTelecommunication
s facilityTemporary useParkOutdoor lighting
Nil charge
Other uses A use not otherwise listed in Column 2, including a use that is unknown because the development application does not specify a proposed use
The adopted charge is the charge (in Column 3) for the charge category (in Column 1) that the local government determines should apply for the use at the time of assessment.
[Note; the charge allocated to a development which is ‘any other use’ must not be more then the relevant maximum adopted charge in the SPRP (adopted charges)]
6. Additional DemandSection 636 of SPA provides that a levied charge may be only for additional demand placed upon trunk infrastructure. In working out additional demand the following must not be included: an existing use on the premises if the use is lawful and already taking place
on the premises; a previous use that is no longer taking place on the premises if the use was
lawful at the time it was carried out; other development on the premises if the development may be lawfully
carried out without the need for a further development permit.
7. Trunk infrastructure Until a local government infrastructure plan is made: [delete following points not applicable] the trunk infrastructure shown in Map [insert map number/s reference and
attach map/s to the resolution] is identified as the trunk infrastructure for the local government area
the trunk infrastructure network or trunk infrastructure networks to which the adopted charge applies are: [insert trunk infrastructure networks to which the adopted infrastructure charge applies]
the standard of service for each network or network mentioned above is stated to be the standard set out in attachment [x]
the establishment cost of trunk infrastructure items is the cost shown in attachment [x].
8. Indexing adopted charges
[Note: Indexation of adopted charges, between the levying and payment of the charge, cannot result in a charge which is greater than the maximum adopted charge in the SPRP (adopted charges); or result in a charge that is greater than the increase for the PPI index for the period starting on the day the charge was levied and ending on the day it is paid, adjusted by reference to the 3-yearly PPI index average (SPA section 631)]
The adopted charge for [insert development] may be increased after the charge is levied and before it is paid to the local government.
The increase must be calculated using the following method:
[insert methodology for calculating the increase]
9. Method for recalculating the establishment cost The method used to recalculate establishment cost when an application is made under section 657 of the SPA is outlined below:
[insert conversion method (refer to Statutory guideline 03/14 – Local Government infrastructure plans for guidance and parameters)]
10. Conversion criteria Conversion criteria used for making a decision on a conversion application made under section 659 of the SPA is outlined below
[insert conversion criteria (refer to Statutory guideline 03/14 – Local Government infrastructure plans for guidance and parameters)] ]
11. DictionaryWords and terms used in this resolution have the meaning given in SPA or the Queensland Planning Provisions version 2.0.
If a word or term used in this resolution is not defined in SPA or the Queensland Planning Provision version 2.0, it has the meaning given in this section.
[Insert critical terms used in this resolution].
12. Resolution attachments
[Include applicable maps and other supporting information mentioned above]