ADOM ImplementationProject

Te Pou and Matua Raki Collaboration

November 2011

Page 2: ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.

Alcohol and Drug Outcome Measure (ADOM) Implementation

Te Pou is leading work on further developing and implementing ADOM in collaboration with Matua Raki and the Ministry of Health

ADOM Project Charter and Work Plan are on the Te Pou & Matua Raki websites - ADOM Implementation Project

ADOM Advisory Group – AOD expertise is in place – see websites for participants and Terms of Reference – consultation process.

Page 3: ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.

:The project will result in the development of:

Information Collection Protocols (DRAFT) – that will guide consistent use of the ADOM measure - Jan 2011

A data collection system that allows easy feedback/ access for consumer and clinician and aggregated data – Jan 2011(DRAFT)

An ADOM implementation training pack that includes ADOM information protocols (ICP) and data collection tools - March 2011 (DRAFT)

Page 4: ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.

Results cont.

Refinement and improvement of ADOM Part B – Jan 2012

An AOD sector communication plan for promoting/marketing voluntary uptake of ADOM – March 2012

A plan to deliver a staged approach to implementing ADOM in AOD services for delivery over the 2012/13 year and beyond)

Page 5: ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.

Test Sites – March – May 2012

Criteria for participating in the test sites is developed and an invitiation will be posted on the AOD Netlink, and on Te Pou & Matua Raki websites in Jan 2012 inviting interested AOD services to make contact.

The DRAFT ADOM Information Collection Protocol, data collection systems and the training resources will be evaluated through the test sites and from this, final resources will be completed.

Page 6: ADOM Implementation Project Te Pou and Matua Raki Collaboration November 2011.

Updates

Te Pou and Matua Raki websites will provide regular updates on the project / progress

AOD Netlink updates will also occur regularly