Admin KM Project - Final

download Admin KM Project - Final

of 25

Transcript of Admin KM Project - Final

  • 8/8/2019 Admin KM Project - Final

    1/25

  • 8/8/2019 Admin KM Project - Final

    2/25

    LANGKASUKA

    ROSLINAH ABU BAKARMENTOR

    NOOR AIZAM WIRYO

    SME

    YUSMAN MOHD JOHARGROUP LEADER

    MOHD SHUKRI HJ. JAISPC MEMBER

  • 8/8/2019 Admin KM Project - Final

    3/25

    KM Project detailsy Project focus scope:

    y The project area is focusing on reduction of operational cost for 70units of RWS vehicles which consists of 37 units of Perodua Rusa 1.6

    EX, 12 units of Perodua Kembara 1.3 GX, 1 unit Proton Waja 1.6 A,

    1 unit Perodua Kenari 14 units of Perodua Kancil 850 EX and 5Units of Ford Ranger XL. Analysis is based on Litre/KM. All vehicles used in this analysis are 3 years old.

    y To provide procedure on how to install the Magsaver.

    Magsaver is a method used to help in reducing the fuel consumption. This equipment cost RM200.00 per unit and can last forever as long as it is properly fixed.

  • 8/8/2019 Admin KM Project - Final

    4/25

    KM Project detailsProject background :y RWS is an operational company and each cost will give impact to company P&L. Currently, 2% or

    RM501,247.22 (as at 31.3.2009) of RWS operational cost is contributed by fuel consumption. As to comply to our department

    KPI, we strive to reduce 30% of administration

    cost by the end of 2009.

    Therefore, we are focusing on the monitoring of fuel consumption toachieve our target.

  • 8/8/2019 Admin KM Project - Final

    5/25

    KM Project detailsy Problem / issue statement :

    y N o previous evidence or data analysis on fuel consumption for all RWS vehicle for reference

  • 8/8/2019 Admin KM Project - Final

    6/25

    COST VS KM BEFORE & AFTER INSTALLATION

    FUEL DATA

    58,400.81 60,693.41 61,883.77 59,900.38 54,445.9739,850.62

    268,794.14

    191,987.84

    204,627.80

    147,904.71

    233,104.45

    209,250

    29,904.82

    186,649.26

    0.00

    50,000.00

    100,000.00

    150,000.00

    200,000.00

    250,000.00

    JUNE JULY AUG SEPT OCT NOV DEC

    MON TH

    VOLUME

    RM KM

    B EFORE

    C O M P L E T E D INSTALLATIO N

  • 8/8/2019 Admin KM Project - Final

    7/25

    KM Project Detailsy 3 Month Before Installation

    Total Money(RM)

    53,880.95

    53,476.84

    55,032.67

    52,500.00

    53,000.00

    53,500.00

    54,000.00

    54,500.00

    55,000.00

    55,500.00

    JUNE JULY AUGUS TMONTH

    RM

  • 8/8/2019 Admin KM Project - Final

    8/25

    KM Project Detailsy 3 Months After Installation

    Total Money(RM)

    32,149.15

    44,157.20

    31,314.42

    0.00

    5,000.00

    10,000.00

    15,000.00

    20,000.00

    25,000.00

    30,000.00

    35,000.00

    40,000.00

    45,000.00

    50,000.00

    OC TOBE R N OVE MBER D ECE MBER

    MONTH

    RM

  • 8/8/2019 Admin KM Project - Final

    9/25

    KM Project detailsy Project question :

    y H ow many % cost saving been detected after using this method?y What is the positive impact from this implementation?y Does the equipment give impact to maintenance cost?y H ow long this equipment can last?y Is there any difference on cost saving between short distance (townarea) and long distance vehicles?y What type of vehicles are used in this project/analysis and number of

    vehicles?y Recover period?y Year of vehicles?

    y Project title :y Cost Saving On Fuel Consumption For RWS Vehicles

  • 8/8/2019 Admin KM Project - Final

    10/25

    KM Project Detailsy P ositive Impact of this Implementation

    * 20% - 40% fuel reduce ( depends on how the vehiclesdrived and traffic condition)

    * 20% upgrading engine perfomance* Self installation and save on cost of installation

  • 8/8/2019 Admin KM Project - Final

    11/25

    KM Project Detailsy Impact on Vehicles Repair & Maintenance

    * We have been used this equipment for almost one year

    and no negative impact on repair and maintenance cost.This is shown in the graph below.

  • 8/8/2019 Admin KM Project - Final

    12/25

    TOWN AREA AND LONG DISTANCEDRIVING

    Name Mohd Haffiz GhaniDepartment Network Modelling JbModel/cc/GearBox Perodua Rusa 1.6 Manual

    Year 2006Reg. No JJU 1606Installation 4/8/2008Fuel Petrol

    Without MagSaver ( Petrol Increase ) With MagSaver

    Fuel Station Shell Shell

    Price Per liter RM 2.70 RM 2.70

    Total Milage(KM) 4659 1263

    Total Money(RM) 1193.77 388.76

    Total Petrol (Liter) 442.14 146.4

    Kilometer /Liter (km/l) 10.54 8.63

    Money/Kilometer (rm/km) 0.26 0.31

    Saving Percentage -0 .000515780047200040 -20.13%

    Driving Condition City and Long Distance Drive City DriveTrafik Medium Heavy

    Mersing four times,Kota Tinggi four times,Ulu Tiram twice,Endau once

    Kulai,Bandaraya Johor BahruDrive Area In August

  • 8/8/2019 Admin KM Project - Final

    13/25

    TOWN AREA AND LONG DISTANCEDRIVING (STATE ROAD)

    Name Hood endo t Z aka riaDepa rt men t o ta ingg i/ e r ing ecu ti eMode l/cc / ea r ox Pe r odua emba r a . Manua l

    ea r eg . No JJG

    Ins ta lla tion 4 / /ue l Pe tr o l

    it ou t MagSave r ( Pe tr o l Inc r ease ) it MagSave r

    ue l S ta tion She ll She ll

    Price Pe r lit e r M . M .

    o ta l Milage ( M)

    o ta l Money ( M) . .43To ta l Pe tr o l ( it e r) 48 . .3

    Kilome ter / it e r (km /l) . 3.40

    Money /Kilome te r (r m /km ) 0. 3 0 . 0

    Sav ing Pe r cen tage 0 .000337394 1 4.46 %

    Driving ond ition City and ong Dis tance Drive (Old r oad ) City and ong Dis tance Drive (Old r oad )

    Tr a fik Med ium Med ium

    Ko ta Tingg i,Mer s ing , JB to Ko ta ve r yday Ko ta Tingg i,Mer s ing , JB to Ko ta ve r ydayDrive r ea In ugus t

  • 8/8/2019 Admin KM Project - Final

    14/25

    TOWN AREA DRIVINGName Fadzil GaniDepartment Leakage JbModel/cc/GearBox Perodua Rusa 1.6 Manual

    Year 2005Reg. No JJF 1158Installation 4/8/2008Fuel Petrol

    Without MagSaver ( Petrol Increase ) With MagSaver

    Fuel Station Shell Shell

    Price Per liter RM 2.70 RM 2.70

    Total Milage(KM) 2442 1891

    Total Money(RM) 688.67 575.85

    Total Petrol (Liter) 255.06 213.28

    Kilometer /Liter (km/l) 9.57 8.87

    Money/Kilometer (rm/km) 0.28 0.30

    Saving Percentage 0 .00 -7.98%

    Driving Condition City Drive City DriveTrafik Heavy Heavy

    Sri Alam,Skudai,Bandaraya Johr Bahru Bandaraya Johor bahruDrive Area In August

  • 8/8/2019 Admin KM Project - Final

    15/25

    TOWN AREA AND HIGHWAY DRIVINGName Mohd Na zri

    Depa rt men t eakage JbMode l/cc /Gea r Box Pe r odua Kemba r a 1 .3 Manua l

    ea r 005Reg . No JJF 1179

    Ins ta lla tion 4 /8 / 008Fue l Pe tr o l

    ithou t MagSave r ( Pe tr o l Inc r ease ) ith MagSave r

    Fue l S ta tion She ll She ll

    Price Pe r lit e r RM .7 0 RM .7 0

    To ta l Milage (KM) 872 2 460

    To ta l Money (RM) 79 0 39 6.1To ta l Pe tr o l ( it e r) 292 .65 1 46 .7

    Kilome te r / it e r (km /l) 9 .81 1 6.77

    Money /Kilome te r (r m /km ) 0.2 8 0.1 6

    Sav ing Pe r cen tage 0 . 00114053377720407 41 .46 %

    Driving Cond ition City and Highway Drive C ity and Highway DriveTr a fik LIGHT L IGHT

    Mua r, Sek ita r Ba tu Paha t,Segama tMua r, Kluang ,Segama t, Joho r Bah r u andSek ita r Ba tu Paha t

    Drive r ea In ugus t

  • 8/8/2019 Admin KM Project - Final

    16/25

    KM Project Detailsy RecoveryP eriod

    Month 1 2 3 Total

    Cost S aving 21,730.85 9,319.64 23,718.25 54,768.74

    Installation Cost 4,600.00 4,000.00 5,400.00 14,000.00

    S aving 17,130.85 5,319.64 18,318.25 40,768.74

  • 8/8/2019 Admin KM Project - Final

    17/25

    KM Project detailsy Project planning :

    INITIATIVES TARGET

    PLAN /TARGET

    JUNE 08 JULY 08 AUGUST 08 SEPT 08 OCT 08 NOV 08 DEC 08

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    W 1

    W 2

    W 3

    W 4

    1 NATIONWIDE FUEL INCREASE

    2 ESTABLISHMENT OF PROJECT TEAM

    3 REFER TO EXPERT FOR BEST SOLUTION

    4 CHOOSE ONE OF THE BEST SOLUTION

    5 PROPOSE TO INSTALL ( PILOT)

    6 INSTAL L ON 6 VE HICL E

    7 MONI TO R T HE RES ULT

    8 PRESENT THE RESULT TO MANAGEMENT

    9MANAGEMENT APPROVED INSTALL ON ALLRWS VEHICLE

    10 PROGRESS OF INSTALLATION TO ALL VEHICLE

    11

    INSTALATION ON SOUTHERN JOHOR VEHICLE (34 UNIT)

    12 TRAINED BY IKP(SUPPLIER) TO INSTALL

    13

    SELF INSTALLATION ON NORTHERN JOHOR VEHICLE (36 UNIT)

    14

    SELF INSTALLATION ON MELAKA & KEDAH VEHICLE

    16 INSTALLATION COMPLETE

    15 MONITOR THE PROGRESS ON ALL VEHICLE

  • 8/8/2019 Admin KM Project - Final

    18/25

    MONTH POKM INITIATIVES PERSON (S)RESPONSIBLES

    June-08 KNOWLEDGE APPLICATION

    * IKP

    - REFER TO SUPPLIER ON FUEL SAVING EQUIPMENT TOGET THE BEST SOLUTION. VEHICLE TECHNICIAN

    * ROAD MAP

    - PLAN WHEN TO INSTALL THE FUEL SAVING EQUIPMENT

    KNOWLEDGE MEASUREMENT

    * STRUCTUAL DESIGN ADMIN EXECUTIVE

    DISCUSS WITH HEAD OF DEPT ON THE PROGRESS * TECHNOLOGY

    PUT THE FINDINGS AND SHARE IN THE PUBLIC

    KM Project detailsy Roadmap

  • 8/8/2019 Admin KM Project - Final

    19/25

    MONTH POKM INITIATIVES PERSON (S)RESPONSIBLES

    July-08 KNOWLEDGE APPLICATION

    * IKP

    - TO FIND OTHER OPTION ON FUEL SAVING EQUIPMENT, HYDO FUEL OR NGV GAS TO BE INSTALLED FOR RWS VEHICLES

    ADMIN EXECUTIVE

    * ROAD MAP

    - PROPOSE TO MANAGEMENT TO SELECT MAGSAVER TO BE INSTALLED TO6 NOS OF VEHICLES AS OUR PILOT PROJECT

    KNOWLEDGE MEASUREMENT

    * STRUCTUAL DESIGN

    GET OPINION AND SUGGESTION FROM PC MEMBERS ADMIN EXECUTIVE

    * TECHNOLOGY

    SHARE THE FINDINGS OR PROGRESS OF THE PILOT PROJECT BY EMAIL

    KM Project detailsy Roadmap

  • 8/8/2019 Admin KM Project - Final

    20/25

    KM Project detailsy Roadmap

    MONTH POKM INITIATIVES PERSON (S)RESPONSIBLES

    August-08 KNOWLEDGE APPLICATION

    * IKP

    - TRAINED BY IKP(SUPPLIER) TO INSTALL THE FUEL SAVING METHOD

    * ROAD MAP VEHICLE TECHNICIAN

    - INSTALL FOR 34 NOS MAGSAVER FOR RANHILL VEHICLE

    JOHOR SOUTERN PROJECT

    KNOLEDGE MEASUREMENT

    * STRUCTUAL DESIGN

    - TO MONITOR THE PROGRESS BY GRAPH VEHICLE TECHNICIAN

    TECHNOLOGY ADMIN EXECUTIVE

    - KEY IN DATA AND SHARE BY EMAIL

  • 8/8/2019 Admin KM Project - Final

    21/25

    KM Project detailsy Roadmap

    MONTH POKM INITIATIVES PERSON (S) RESPONSIBLES

    September-08 KNOWLEDGE APPLICATION

    * IKP

    - FOLLOW THE INSTRUCTION GIVEN BY IKP TO SELF INSTALL VEHICLE TECHNICIAN

    * ROAD MAP

    - SELF INSTALLATION FOR 36 NOS MAGSAVER FOR RANHILL VEHICLE

    JOHOR NORTERN PROJECT

    KNOLEDGE MEASUREMENT

    * STRUCTUAL DESIGN

    - TO MONITOR THE PROGRESS BY GRAPH VEHICLE TECHNICIAN

    * TECHNOLOGY ADMIN EXECUTIVE

    - KEY IN DATA IN PUBLIC

  • 8/8/2019 Admin KM Project - Final

    22/25

    KM Project detailsy Roadmap

    MONTH POKM INITIATIVES PERSON (S) RESPONSIBLES

    October-08 KNOWLEDGE APPLICATION

    * IKP

    - TO FOLLOW ITEMS GIVE BY IKP TO INSTALL VEHICLE TECHNICIAN

    * ROAD MAP

    - SELF INSTALLATION MAGSAVER FOR RANHILL VEHICLE MALACCA AND

    KEDAH

    KNOLEDGE MEASUREMENT VEHICLE TECHNICIAN

    * STRUCTUAL DESIGN ADMIN EXECUTIVE

    - TO MONITOR THE PROGRESS BY GRAPH

    *TECHNOLOGY

    KEY IN DATA AND SHARE BY EMAIL

  • 8/8/2019 Admin KM Project - Final

    23/25

    KM Project detailsy Roadmap

    MONTH POKM INITIATIVES PERSON (S) RESPONSIBLES

    November-08 KNOWLEDGE APPLICATION

    * IKP

    - TO MONITOR FINAL RESULT TO ALL RANHILL VEHICLE

    - PETROL ANALISIS GRAPH VEHICLE TECHNICIAN

    * ROAD MAP

    - COMPLETE INSTALLATION OF MAGSAVER TO ALL RANHILL

    VEHICLES

    KNOLEDGE MEASUREMENT

    * STRUCTUAL DESIGN

    - TO COLLECT ALL MONTHLY DATA AND MONITOR THE PROGRESS VEHICLE TECHNICIAN

    TECHNOLOGY ADMIN EXECUTIVE

    SHARE THE DATA IN PUBLIC AND EMAIL

    % PETROL SAVING FOR ALL VEHICLES

  • 8/8/2019 Admin KM Project - Final

    24/25

  • 8/8/2019 Admin KM Project - Final

    25/25

    KM TV : INSTALLATION METHOD