Admin and finance presentation 020812
Transcript of Admin and finance presentation 020812
February 24, 2012Board of Regents
Administration and Finance Committee
California Lutheran University
Capital Project Construction
Update
Swenson Center Ventura County AIA Award
http://www.aiavc.org/designAwards2011_CalLutheran.cfm
Rolland Stadium • Temporary Certificate
of Occupancy obtained for Dedication and Homecoming Game October 29
• Extended Temporary C of O to move Football program into space in December
• Final occupancy sign off received January 30, 2012
• Final minor work items are completing.
New Dining FacilityBudget – Project estimate is $13
million, $5 million from CEFA bonds and looking at options for other $8 million.
Current Status – • Project plans completed through
the Design Development stage • Project concurrently submitted to
CTO Planning for Minor Modification, processing in progress
• Contractor cost estimates obtained in October indicated project as designed over budget.
• Started value engineering process in December.
• Revised budget estimate coming from Contractor for consideration at the February Board meeting.
New Dining Facility Site Plan• Demolishing existing Student Union Building and patio structure• Maintain Theater Arts (old gym) and K Building• Ground level patios
• Strong physical connection to Pedestrian Spine and Memorial Parkway
New Dining Facility – Value Engineering• Going to flat roof structure
– Reduces structural system costs
– Reduces glass, volume of space for HVAC and lighting• Eliminating moment frames and going to brace frame system
– Reduces structural system costs
– Brace frames will be visible on south and east elevations• Reducing building square footage
– Conference Center reduced
– Eliminating west patio seating• Eliminating expensive curtain wall glass structure and going to storefront
system
• Deferring some site work to future
• Eliminating some retaining wall on south side• Reducing work on the Pedestrian Spine
• Reusing some kitchen equipment, deferring some purchases
• Reducing interior finishes
New Dining Facility – Second Floor
Student Dining Areas
CLU Existing Cafeteria or Student Union
NDC Original Design at DD
NDC Value Engineering Design (1)
Main Resident Dining
174 interior56 exterior
313 interior 90 exterior
299 interior32 exterior(3)
Market Part of SUB 20 interior32 exterior
10 interior24 exterior (2)
Coffee Bar/Student Lounge
53 interior + 4 computer seats16 exterior on east patio64 exterior seats in Pavilion
67 interior + 2 computer seats52 exterior
44 interior + 2 computer seats68 exterior
Dining Seating Total Count, excl. Centrum
227 interior + 4 computer seats136 exterior
400 interior + 2 computer seats174 exterior
353 interior + 2 computer seats124 exterior
New Dining FacilityConference Center
CLU Nelson Room, Overton Hall, Lundring Events Center
NDC Original Design at DD
NDC Value Engineering Design (1)
Room 100 56 banquet86 lecture
24 banquet76 lecture
Room 101 Nelson Room – 80 banquetOverton Hall – 88 banquet
80 banquet140 lecture
80 banquet140 lecture
Room 100/101 combined
Lundring Events Center -160 banquet
144 banquet240 lecture
104 banquet216 lecture
Room 103 48 banquet65 lecture
24 - 32 banquet 48 lecture
Private Dining/Meeting
8 to 10 8 to 10
Conference Center Seating Total, excl. Private Dining/Meeting
328 banquet 192 banquet 128 banquet
New Dining Facility
Semester Break Renewal and Replacement
Heating/Cooling Lines Conejo Hall
New Whiteboards, Various Locations
Semester Break Renewal and Replacement
Ahmanson Science Lab Improvements